Federal Register / Vol. 72, No. 242 / Tuesday, December 18, 2007 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–14–000]
El Paso Natural Gas Pipeline
Company; Notice of Intent To Prepare
an Environmental Assessment for the
Proposed Hobbs Expansion Project
and Request for Comments on
Environmental Issues
December 11, 2007.
yshivers on PROD1PC62 with NOTICES
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Hobbs Expansion Project involving
construction and operation of natural
gas pipeline facilities by El Paso Natural
Gas Pipeline Company (El Paso) in Lea
County, New Mexico and Winkler
County, Texas. The EA will be used by
the Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help determine which
issues need to be evaluated in the EA.
Please note that the scoping period will
close on January 11, 2008. Details on
how to submit comments are provided
in the Public Participation section of
this notice.
This notice is being sent to affected
landowners; federal, state, and local
government agencies; elected officials;
Native American tribes; other interested
parties; and local libraries and
newspapers. State and local government
representatives are asked to notify their
constituents of this proposed project
and to encourage them to comment on
their areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is available for viewing
on the FERC Internet Web site (http://
www.ferc.gov).
Summary of the Proposed Project
El Paso proposes three components
(compression, new pipeline, and piping
modifications) to meet the natural gas
delivery requirements at the SPS Hobbs
Power Plant in Lea County, New
Mexico. El Paso proposes to construct,
own, and operate:
VerDate Aug<31>2005
15:19 Dec 17, 2007
Jkt 214001
• A natural gas-fired, reciprocating
jumper compressor unit totalling 3,550
horsepower (HP), with appurtenances,
at it Eunice ‘‘C’’ Compressor Station;
• 7.3 miles of 20-inch-diameter
pipeline and the new Hobbs Delivery
Meter Station;
• Pipeline system improvements to
include the Maximum Allowable
Operation Pressure (MAOP) up-rate of
5.7 miles of the existing 16-inchdiameter Line No. 30131; and
• Plant yard pipe modifications at El
Paso’s existing Keystone and Eunice
‘‘B’’ Compressor Stations.
All work would occur in Lea County,
New Mexico except for the work at the
Keystone Compressor Station in
Winkler County, Texas. El Paso also
proposes to abandon in place 1,700 feet
of existing Line No. 30131 pipeline in
Lea County, New Mexico.
The general location of the proposed
facilities is shown in Appendix 1.1
The EA Process
We 2 are preparing this EA to comply
with the National Environmental Policy
Act (NEPA) which requires the
Commission to take into account the
environmental impact that could result
if it authorizes El Paso’s proposal. By
this notice, we are also asking federal,
state, and local agencies with
jurisdiction and/or special expertise
with respect to environmental issues to
formally cooperate with us in the
preparation of the EA.
With this notice, we are asking
federal, state, and local agencies with
jurisdiction and/or special expertise
with respect to environmental issues to
formally cooperate with us in the
preparation of the EA. These agencies
may choose to participate once they
have evaluated the proposal relative to
their responsibilities. Additional
agencies that would like to request
cooperating agency status should follow
the instructions for filing comments
provided under the Public Participation
section of this notice.
NEPA also requires the FERC to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices are available on the Commission’s
website at the ‘‘eLibrary’’ link or from the
Commission’s Public Reference Room, 888 First
Street, NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary refer to the ‘‘Additional Information’’
section of this notice. Copies of the appendices
were sent to all those receiving this notice in the
mail. Requests for detailed maps of the proposed
facilities should be made directly to El Paso.
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the FERC’s Office of Energy
Projects.
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
71677
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
Notice of Intent, we are requesting
public comments on the scope of the
issues to address in the EA. All
comments received are considered
during the preparation of the EA.
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils.
• Land use.
• Water resources, fisheries, and
wetlands.
• Cultural resources.
• Vegetation and wildlife.
• Air quality and noise.
• Endangered and threatened species.
We will also evaluate possible
alternatives to the proposed project or
portions of the project, where necessary,
and make recommendations on how to
lessen or avoid impacts on the various
resource areas.
Our independent analysis of the
issues will be in the EA. Depending on
the comments received during the
scoping process, the EA may be
published and mailed to federal, state,
and local agencies, public interest
groups, interested individuals, affected
landowners, newspapers, libraries, and
the Commission’s official service list for
this proceeding. A comment period will
be allotted for review if the EA is
published. We will consider all
comments on the EA before we make
our recommendations to the
Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the Public Participation
section below.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
By becoming a commentor, your
concerns will be addressed in the EA
and considered by the Commission. You
should focus on the potential
environmental effects of the proposal,
alternatives to the proposal including
alternative compressor station sites, and
measures to avoid or lessen
environmental impact. The more
specific your comments, the more useful
they will be. Please carefully follow
these instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your letter to: Kimberley D. Bose,
Secretary, Federal Energy Regulatory
E:\FR\FM\18DEN1.SGM
18DEN1
71678
Federal Register / Vol. 72, No. 242 / Tuesday, December 18, 2007 / Notices
yshivers on PROD1PC62 with NOTICES
Commission, 888 First St., NE., Room
1A, Washington, DC 20426;
• Label one copy of the comments for
the attention of Gas Branch 2, PJ–11.2;
• Reference Docket No. CP08–14–
000; and
• Mail your comments so that they
will be received in Washington, DC on
or before January 11, 2008.
The Commission encourages
electronic filing of comments. See 18
Code of Federal Regulations
385.2001(a)(1)(iii) and the instructions
on the Commission’s Internet Web site
at http://www.ferc.gov under the
‘‘eFiling’’ link and the link to the User’s
Guide. Prepare your submission in the
same manner as you would if filing on
paper and save it to a file on your hard
drive. Before you can file comments you
will need to create an account by
clicking on ‘‘Login to File’’ and then
‘‘New User Account.’’ You will be asked
to select the type of filing you are
making. This filing is considered a
‘‘Comment on Filing.’’
We will mail the EA for public
comment. If you are interested in
receiving it, please return the
Information Request (Appendix 2). If
you do not return the Information
Request, you will be taken off the
mailing list.
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding, or ‘‘intervenor’’. To become
an intervenor you must file a motion to
intervene according to Rule 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214). Intervenors
have the right to seek rehearing of the
Commission’s decision. Motions to
Intervene should be electronically
submitted using the Commission’s
eFiling system at http://www.ferc.gov.
Persons without Internet access should
send an original and 14 copies of their
motion to the Secretary of the
Commission at the address indicated
previously. Persons filing Motions to
Intervene on or before the comment
deadline indicated above must send a
copy of the motion to the Applicant. All
filings, including late interventions,
submitted after the comment deadline
must be served on the Applicant and all
other intervenors identified on the
Commission’s service list for this
proceeding. Persons on the service list
with email addresses may be served
electronically; others must be served a
hard copy of the filing.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
VerDate Aug<31>2005
15:19 Dec 17, 2007
Jkt 214001
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
DEPARTMENT OF ENERGY
Environmental Mailing List
Leaf River Energy Center LLC; Notice
of Intent To Prepare an Environmental
Assessment for the Proposed Leaf
River Storage Project and Request for
Comments on Environmental Issues
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners who own homes within
distances defined in the Commission’s
regulations of certain aboveground
facilities.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (http://www.ferc.gov)
using the ‘‘eLibrary’’ link. Click on the
eLibrary link, then on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to http://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at http://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–24413 Filed 12–17–07; 8:45 am]
Frm 00064
Fmt 4703
[Docket No. CP08–8–000]
December 11, 2007.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Leaf River Storage Project involving
construction and operation of
underground natural gas storage and
pipeline header facilities by Leaf River
Energy Center LLC (Leaf River) in
Smith, Jasper, and Clarke Counties,
Mississippi. The EA will be used by the
Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help determine which
issues need to be evaluated in the EA.
Please note that the scoping period will
close on January 10, 2008. Details on
how to submit comments are provided
in the Public Participation section of
this notice.
This notice is being sent to affected
landowners; federal, state, and local
government agencies; elected officials;
Native American tribes; other interested
parties; and local libraries and
newspapers. State and local government
representatives are asked to notify their
constituents of this proposed project
and to encourage them to comment on
their areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is available for viewing
on the FERC Internet Web site (http://
www.ferc.gov).
Summary of the Proposed Project
Leaf River proposes to:
• Construct four storage wells and
caverns with a total working gas
capacity of 32 billion cubic feet (Bcf);
• Install seven 4,800 horsepower gas
driven reciprocating compressor units at
its proposed compressor station/gas
BILLING CODE 6717–01–P
PO 00000
Federal Energy Regulatory
Commission
Sfmt 4703
E:\FR\FM\18DEN1.SGM
18DEN1