Federal Register / Vol. 70, No. 203 / Friday, October 21, 2005 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

61268

Federal Register / Vol. 70, No. 203 / Friday, October 21, 2005 / Notices

Comment Date: 5 p.m. eastern time on

November 10, 2005.

Magalie R. Salas,

Secretary.

[FR Doc. E5–5833 Filed 10–20–05; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket Nos. CP05–119–001 and CP05–121–

001]

Cameron Interstate Pipeline, LLC;

Notice of Application To Amend

October 14, 2005.

Take notice that on October 7, 2005,

Cameron Interstate Pipeline, LLC

(Cameron Interstate Pipeline), 101 Ash

Street, San Diego, CA 92101, filed in the

above referenced docket(s), an

abbreviated application to amend its

certificates of public convenience and

necessity issued pursuant to section 7(c)

of the Natural Gas Act, and the

Commission’s regulations, 18 CFR Parts

157 and 284. In Docket No. CP05–119–

001 Cameron Interstate Pipeline is

seeking to amend its certificate to

construct and operate its pipeline, and

in Docket No. CP05–121–001 it is

seeking to amend its blanket certificate

to transport natural gas. The application

is on file with the Commission and open

for public inspection.

This filing is also accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Any questions regarding Cameron

Interstate Pipeline’s application should

be directed to: Carlos F. Peña, Senior

Regulatory Counsel, HQ13 101 Ash

Street, San Diego, CA 92101, phone

(619) 696–4320.

Cameron Interstate Pipeline requests

authority: (i) Approving its requested

pipeline design change allowing for the

use of thicker walled pipe, (ii)

approving the replacement pro forma

Tariff attached at Exhibit P and

canceling the tariff originally submitted,

(iii) approving Cameron Interstate

Pipeline’s updated rates and rate

schedules; and

VerDate Aug<31>2005

15:13 Oct 20, 2005

Jkt 208001

(iv) clarifying that the pipeline

facilities are certificated to transport

natural gas at levels up to 1.5 Bcf per

day.

Cameron Interstate Pipeline requests

that the Commission approve its revised

estimated cost of its facilities from $73.4

million, as originally approved, to

$105.3 million; its previously approved

annual cost-of-service from $12,729,701

to $28,600,026; and, its previously

approved firm transportation

reservation charge from $.7087 per Dth

to $.5278 per Dth. Cameron Interstate

Pipeline also asks that the Commission

approve a revised capital structure and

rate of return for the project. Finally,

Cameron Interstate Pipeline has filed for

approval an updated and revised pro

forma FERC Gas Tariff which reflects

only natural gas transportation services

it will now be offering under its

certificates.

Any person wishing to obtain legal

status by becoming a party to the

proceedings for this project should, on

or before the below listed comment

date, file with the Federal Energy

Regulatory Commission, 888 First

Street, NE., Washington, DC 20426, a

motion to intervene in accordance with

the requirements of the Commission’s

Rules of Practice and Procedure (18 CFR

385.214 or 385.211) and the Regulations

under the NGA (18 CFR 157.10). A

person obtaining party status will be

placed on the service list maintained by

the Secretary of the Commission and

will receive copies of all documents

filed by the applicant and by all other

parties. A party must submit 14 copies

of filings made with the Commission

and must mail a copy to the applicant

and to every other party in the

proceeding. Only parties to the

proceeding can ask for court review of

Commission orders in the proceeding.

Motions to intervene, protests and

comments may be filed electronically

via the Internet in lieu of paper, see, 18

CFR 385.2001 (a)(1)(iii) and the

instructions on the Commission’s Web

site under the ‘‘e-Filing’’ link. The

Commission strongly encourages

electronic filings.

Comment Date: November 4, 2005.

Magalie R. Salas,

Secretary.

[FR Doc. E5–5806 Filed 10–20–05; 8:45 am]

BILLING CODE 6717–01–P

PO 00000

Frm 00025

Fmt 4703

Sfmt 4703

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. EL02–23–008]

Consolidated Edison Company of New

York, Inc. v. Public Service Electric &

Gas Company, PJM Interconnection,

LLC, and New York Independent

System Operator; Notice of

Compliance Filing

October 17, 2005.

Take notice that on September 30,

2005, Consolidated Edison Company of

New York, Inc., (ConEd), and separately,

Public Service Electric & Gas Company

(PSE&G), PJM Interconnection, LLC and

New York Independent System

Operator, in compliance with

Commission Order issued Mary 18,

2005 submit an informational report

regarding the effectiveness of two

contracts between ConEd and PSE&G.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211, 385.214).

Protests will be considered by the

Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed on or before the

comment date. Anyone filing a motion

to intervene or protest must serve a copy

of that document on the Applicant and

all the parties in this proceeding.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible online at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

E:\FR\FM\21OCN1.SGM

21OCN1

Federal Register / Vol. 70, No. 203 / Friday, October 21, 2005 / Notices

Comment Date: 5 p.m. eastern time on

October 27, 2005.

Magalie R. Salas,

Secretary.

[FR Doc. E5–5831 Filed 10–20–05; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. ER05–1467–000]

DC Energy Midwest, LLC; Notice of

Issuance of Order

October 14, 2005.

DC Energy Midwest, LLC (DC Energy)

filed an application for market-based

rate authority, with an accompanying

rate tariff. The proposed rate tariff

provides for the sales of capacity, energy

and ancillary services at market-based

rates. DC Energy also requested waiver

of various Commission regulations. In

particular, DC Energy requested that the

Commission grant blanket approval

under 18 CFR part 34 of all future

issuances of securities and assumptions

of liability by DC Energy.

On October 12, 2005, pursuant to

delegated authority, the Director,

Division of Tariffs and Market

Development—South, granted the

request for blanket approval under Part

34. The Director’s order also stated that

the Commission would publish a

separate notice in the Federal Register

establishing a period of time for the

filing of protests. Accordingly, any

person desiring to be heard or to protest

the blanket approval of issuances of

securities or assumptions of liability by

DC Energy should file a motion to

intervene or protest with the Federal

Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426,

in accordance with Rules 211 and 214

of the Commission’s Rules of Practice

and Procedure. 18 CFR 385.211, 385.214

(2004).

Notice is hereby given that the

deadline for filing motions to intervene

or protests is November 14, 2005.

Absent a request to be heard in

opposition by the deadline above, DC

Energy is authorized to issue securities

and assume obligations or liabilities as

a guarantor, indorser, surety, or

otherwise in respect of any security of

another person; provided that such

issuance or assumption is for some

lawful object within the corporate

purposes of DC Energy, compatible with

the public interest, and is reasonably

necessary or appropriate for such

purposes.

VerDate Aug<31>2005

15:13 Oct 20, 2005

Jkt 208001

The Commission reserves the right to

require a further showing that neither

public nor private interests will be

adversely affected by continued

approval of DC Energy’s issuances of

securities or assumptions of liability.

Copies of the full text of the Director’s

Order are available from the

Commission’s Public Reference Room,

888 First Street, NE., Washington, DC

20426. The Order may also be viewed

on the Commission’s Web site at

http://www.ferc.gov, using the eLibrary

link. Enter the docket number excluding

the last three digits in the docket

number filed to access the document.

Comments, protests, and interventions

may be filed electronically via the

internet in lieu of paper. See 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

Magalie R. Salas,

Secretary.

[FR Doc. E5–5814 Filed 10–20–05; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. RP06–21–000]

Distrigas of Massachusetts LLC;

Notice of Proposed Changes in FERC

Gas Tariff

October 14, 2005.

Take notice that on October 11, 2005,

Distrigas of Massachusetts LLC

(DOMAC) tendered for filing as part of

its FERC Gas Tariff, Original Volume

No. 1, the following revised Tariff

sheets, proposed to be effective

November 1, 2005:

Fifth Revised Sheet No. 29

Fourth Revised Sheet No. 38

Fourth Revised Sheet No. 39

Fourth Revised Sheet No. 40

Fourth Revised Sheet No. 41

Original Sheet No. 48A

Original Sheet No. 48B

Original Sheet No. 48C

Original Sheet No. 48D

Original Sheet No. 48E

Original Sheet No. 48F

Original Sheet No. 48G

Frm 00026

Fmt 4703

Sfmt 4703

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed in accordance

with the provisions of section 154.210

of the Commission’s regulations (18 CFR

154.210). Anyone filing an intervention

or protest must serve a copy of that

document on the Applicant. Anyone

filing an intervention or protest on or

before the intervention or protest date

need not serve motions to intervene or

protests on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible online at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Magalie R. Salas,

Secretary.

[FR Doc. E5–5825 Filed 10–20–05; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. RP03–623–003]

Dominion Transmission, Inc.; Notice of

Compliance Filing

October 14, 2005.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

PO 00000

61269

Take notice that on October 11, 2005,

Dominion Transmission, Inc. (DTI)

tendered for filing supplemental

information concerning its annual

Transportation Cost Rate Adjustment

filing made in 2003 (2003 TCRA).

DTI states the filing is being made in

compliance with the Order on

Rehearing issued in the captioned

proceeding on September 20, 2005.

DTI states that copies of the filing

were served on parties on the official

service list.

E:\FR\FM\21OCN1.SGM

21OCN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.