Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Notices
franchised service area. The electric
energy which Sierra Power proposes to
export to Canada would be surplus
energy purchased from electric utilities,
Federal power marketing agencies, and
other entities within the United States.
Sierra Power will arrange for the
delivery of exports to Canada over the
international transmission facilities
owned by Basin Electric Power
Cooperative, Bonneville Power
Administration, Eastern Maine Electric
Cooperative, International Transmission
Co., Joint Owners of the Highgate
Project, Long Sault, Inc., Maine Electric
Power Company, Maine Public Service
Company, Minnesota Power, Inc.,
Minnkota Power Cooperative, Inc., New
York Power Authority, Niagara Mohawk
Power Corp., Northern States Power
Company, Vermont Electric Power
Company, and Vermont Electric
Transmission Co.
The construction, operation,
maintenance, and connection of each of
the international transmission facilities
to be utilized by Sierra Power has
previously been authorized by a
Presidential permit issued pursuant to
Executive Order 10485, as amended.
Procedural Matters: Any person
desiring to become a party to these
proceedings or to be heard by filing
comments or protests to this application
should file a petition to intervene,
comment, or protest at the address
provided above in accordance with
385.211 or 385.214 of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedures (18 CFR
385.211, 385.214). Fifteen copies of each
petition and protest should be filed with
DOE on or before the date listed above.
Comments on the Sierra Power
application to export electric energy to
Canada should be clearly marked with
Docket No. EA–329. Additional copies
are to be filed directly with Doug White,
Brad Nesiba, Sierra Power Asset
Marketing, 3773 Cherry Creek North
Drive, Suite 655, Denver, CO 80209 and
Steven A. Weiler, Justin P. Moeller,
Leonard, Street and Deinard, PA, The
Army and Navy Club Building, 1627
Eye Street, NW., Suite 610, Washington,
DC 20006.
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to the National Environmental Policy
Act of 1969, and a determination is
made by DOE that the proposed action
will not adversely impact on the
reliability of the U.S. electric power
supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
VerDate Aug<31>2005
17:27 Aug 15, 2007
Jkt 211001
provided above and at http://
www.oe.energy.gov/304.htm.
Issued in Washington, DC, on August 10,
2007.
Anthony J. Como,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. E7–16130 Filed 8–15–07; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Issuance of Order
August 9, 2007.
BE Allegheny, LLC (Docket No. ER07–
1112–000); BE CA LLC (Docket No.
ER07–1113–000); BE Cleco LLC (Docket
No. ER07–1114–000); BE Colquitt LLC
(Docket No. ER07–1115–000); BE
Ironwood LLC (Docket No. ER07–1116–
000); BE KJ LLC (Docket No. ER07–
1117–000); BE Rayle LLC (Docket No.
ER07–1118–000); BE Red Oak LLC
(Docket No. ER07–1119–000); BE Satilla
LLC (Docket No. ER07–1120–000); BE
Tenaska LLC (Docket No. ER07–1121–
000); and BE Walton LLC (Docket No.
ER07–1122–000)
BE Allegheny LLC, BE CA LLC, BE
Cleco LLC, BE Colquitt LLC, BE
Ironwood LLC, BE KJ LLC, BE Rayle
LLC, BE Red Oak LLC, BE Satilla LLC,
BE Tenaska LLC and BE Walton LLC
(collectively, the BE Subsidiaries) filed
applications for market-based rate
authority, with accompanying rate
schedules. The proposed market-based
rate schedules provide for the sale of
energy, capacity and ancillary services
at market-based rates. The BE
Subsidiaries also requested waivers of
various Commission regulations. In
particular, the BE Subsidiaries
requested that the Commission grant
blanket approval under 18 CFR Part 34
of all future issuances of securities and
assumptions of liability by BE
Subsidiaries.
On August 9, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Rates-Central,
granted the request for blanket approval
under Part 34 (Director’s Order). The
Director’s Order also stated that the
Commission would publish a separate
notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard concerning
the blanket approvals of issuances of
securities or assumptions of liability by
the BE Subsidiaries, should file a protest
with the Federal Energy Regulatory
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
46051
Commission, 888 First Street, NE.,
Washington, DC 20426, in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is September
10, 2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, the BE Subsidiaries
are authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of the BE
Subsidiaries, compatible with the public
interest, and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of the BE subsidiaries
issuance of securities or assumptions of
liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
http://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–16034 Filed 8–15–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL07–31–001]
DTE Pontiac North LLC; Notice of
Filing
August 9, 2007.
Take notice that on June 19, 2007,
pursuant to section 1266 of the Public
Utility Holding Company Act of 2005
(2005), 366.1 of the Federal Energy
Regulatory Commission’s regulations,
18 CFR 366.1 (2006) and Order No. 667,
E:\FR\FM\16AUN1.SGM
16AUN1
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.