Federal Register / Vol. 72, No. 104 / Thursday, May 31, 2007 / Notices
This filing is accessible on-line at
http://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on May 29, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–10452 Filed 5–30–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF07–7–000]
Iroquois Gas Transmission System,
L.P.; Notice of Intent To Prepare an
Environmental Assessment; For the
Proposed Iroquois 08/09 Expansion
Project, Request for Comments on
Environmental Issues, and Notice of
Public Scoping Meetings
sroberts on PROD1PC70 with NOTICES
May 22, 2007.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
address the environmental impacts of
the Iroquois 08/09 Expansion Project
proposed by Iroquois Gas Transmission
System, L.P. (Iroquois). The
Commission will use the EA in its
decision-making process to determine
whether or not to authorize the project.
This notice explains the scoping process
the FERC staff will use to gather input
from the public and interested agencies
on the project. Your input will help us
determine the issues that need to be
evaluated in the EA. Please note that the
scoping period will close on June 29,
2007.
Comments may be submitted in
written or verbal form. Further details
on how to submit written comments are
provided in the Public Participation
section of this notice. In lieu of sending
written comments, the FERC staff invite
you to attend the public scoping
meetings we have scheduled as follows:
VerDate Aug<31>2005
16:01 May 30, 2007
Jkt 211001
Date and time
Location
Monday, June 18,
2007, 7 p.m. to 9
p.m. (EST).
Milford City Hall Auditorium, 110 River
Street, Milford, CT
06460, Telephone:
(203) 783–3230.
Brookfield High
School, 45 Long
Meadow Hill Road,
Brookfield, CT
06804, Telephone:
(203) 775–7704.
Tuesday, June 19,
2007, 7 p.m. to 9
p.m. (EST).
This notice is being sent to affected
landowners; Federal, State, and local
government agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers. We 1 encourage
government representatives to notify
their constituents of this planned
project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, you may be contacted by an
Iroquois representative about the
acquisition of an easement to construct,
operate, and maintain the proposed
project facilities. The pipeline company
would seek to negotiate a mutually
acceptable agreement. However, if the
project is approved by the FERC, that
approval conveys with it the right of
eminent domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings in
accordance with state law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility on My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Internet Web site (http://
www.ferc.gov). This fact sheet addresses
a number of typically asked questions,
including the use of eminent domain
and how to participate in the FERC’s
proceedings.
Summary of the Proposed Project
Iroquois proposes to construct the
Iroquois 08/09 Expansion Project in
three phases which would consist of:
Looping its existing pipeline system at
three locations in New York and
Connecticut by November 1, 2008
(Phase 1); constructing a new
compressor station in Milford,
Connecticut with 20,620 horsepower of
compression by January 1, 2009 (Phase
2); and adding a 10,310 horsepower
compressor unit to Iroquois’ Brookfield
Compressor Station in Brookfield,
1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the FERC’s Office of Energy
Projects.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
30367
Connecticut by November 1, 2009
(Phase 3).2
The Phase 1 pipeline looping would
include construction of 5.8 miles of 36inch-diameter pipeline in Boonville,
New York; 1.0 miles of 36-inch-diameter
pipeline in Wright, New York; and 1.6
miles of 36-inch-diameter pipeline in
Newtown, Connecticut. The new
pipeline looping segments would be
located adjacent to Iroquois’ existing
pipeline and connected to it at both
ends.
The planned project would expand
Iroquois existing system to deliver up to
200,000 dekatherms per day of natural
gas transportation service to KeySpan
Gas East Corporation at South
Commack, Long Island. Iroquois plans
to file its certificate application in
September 2007 and anticipates
receiving a Commission certificate by
March 2008.
A general location of the proposed
project is provided in Appendix 1.3
Land Requirements for Construction
The Iroquois 08/09 Expansion Project
is in the preliminary planning stage.
The precise facility design, pipeline
route, rights-of-way, and other details
have not yet been finalized. The
proposed pipeline loops are being
planned for routes adjacent to existing
rights-of-way. Specific information on
the proposed project location and the
land used by it will be made available
to the public when it is finalized.
Construction of the proposed pipeline
loop segments would require about
176.1 acres of land for construction.
Following construction, about 90.4 acres
would be maintained for Iroquois’
ongoing pipeline operation. The
remaining 85.7 acres of land would be
restored and allowed to revert to its
former use. Construction of the
proposed Milford Compressor Station
would require use of about 4.8 acres of
land, and operation of the station would
require maintaining 4.6 acres of the
2 The 7,700 horsepower Brookfield Compressor
Station was approved by the Commission on
December 21, 2006, as part of Iroquois’
MarketAccess Project in Docket No. CP02–31–002.
Construction of the Brookfield Compressor Station
is scheduled to commence in the fall of 2007 and
operation of the station is scheduled to commence
in the fall of 2008.
3 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices, other than Appendix 1 (maps), are
available on the Commission’s Web site at the
‘‘eLibrary’’ link or from the Commission’s Public
Reference Room, 888 First Street, NE., Washington,
DC 20426, or call (202) 502–8371. For instructions
on connecting to eLibrary refer to the Public
Participation section of this notice. Copies of the
appendices were sent to all those receiving this
notice in the mail. Requests for detailed maps of the
proposed facilities should be made directly to
Iroquois.
E:\FR\FM\31MYN1.SGM
31MYN1
30368
Federal Register / Vol. 72, No. 104 / Thursday, May 31, 2007 / Notices
sroberts on PROD1PC70 with NOTICES
affected land. The proposed
modifications to the Brookfield
Compressor Station would increase the
compressor station yard area from 1.4
acres to 1.8 acres. All of the land
required for the proposed Milford
Compressor Station and the Brookfield
Compressor Station modifications is
currently owned by Iroquois.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
when it considers whether or not an
interstate natural gas pipeline should be
approved. The FERC will use the EA to
consider the environmental impact that
could result if the Iroquois 08/09
Expansion Project is authorized under
Section 7 of the Natural Gas Act. NEPA
also requires us to discover and address
concerns the public may have about
proposals to be considered by the
Commission. This process is referred to
as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the EA on the important
environmental issues. With this Notice
of Intent, the Commission staff is
requesting public comments on the
scope of the issues to be addressed in
the EA. All comments received will be
considered during preparation of the
EA.
Our independent analysis of the
issues will be included in the EA. We
will also evaluate possible alternatives
to the proposed project or portions of
the project, and make recommendations
on how to lessen or avoid impacts on
affected resources.
The EA will be mailed to Federal,
State, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; affected landowners;
commentors; other interested parties;
local libraries and newspapers; and the
FERC’s official service list for this
proceeding. A 30-day comment period
will be allotted for review of the EA. We
will consider all comments on the EA
before we make our recommendations to
the Commission. To ensure that your
comments are considered, please follow
the instructions in the Public
Participation section of this notice.
Although no formal application has
been filed, the FERC staff has already
initiated its NEPA review under its Prefiling Process. The purpose of the Prefiling Process is to encourage the early
involvement of interested stakeholders
and to identify and resolve issues before
an application is filed with the FERC.
With this notice, we are asking
Federal, State, and local governmental
VerDate Aug<31>2005
16:01 May 30, 2007
Jkt 211001
agencies with jurisdiction and/or
special expertise with respect to
environmental issues, to express their
interest in becoming cooperating
agencies for the preparation of the EA.
These agencies may choose to
participate once they have evaluated the
proposal relative to their
responsibilities. Agencies that would
like to request cooperating status should
follow the instructions for filing
comments provided below (see Public
Participation).
Currently Identified Environmental
Issues
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project. We have already
identified several issues that we think
deserve attention based on a
preliminary review of the project site
and the facility information provided by
Iroquois. This preliminary list of issues
may be changed based on your
comments and our analysis.
• Potential impacts on perennial and
intermittent streams and waterbodies.
• Evaluation of temporary and
permanent impacts on wetlands and
development of appropriate mitigation.
• Potential effect on federally and
state-listed species.
• Potential impacts on existing land
uses, including managed forested lands.
• Potential visual effects of the
aboveground facilities on surrounding
areas.
• Potential impacts to local air and
noise quality associated with
construction and operation.
• Public safety and potential hazards
associated with the transport of natural
gas and the proposed compressor
facilities.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the
proposed project. By becoming a
commentor, your concerns will be
addressed in the EA and considered by
the Commission. Your comments
should focus on the potential
environmental effects, reasonable
alternatives (including alternative
facility sites and pipeline routes), and
measures to avoid or lessen
environmental impact. The more
specific your comments, the more useful
they will be. To ensure that your
comments are timely and properly
recorded, please carefully follow these
instructions:
• Send an original and two copies of
your letter to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
Commission, 888 First St., NE., Room
1A, Washington, DC 20426.
• Label one copy of your comments
for the attention of Gas Branch 1, DG2E.
• Reference Docket No. PF07–7–000
on the original and both copies.
• Mail your comments so that they
will be received in Washington, DC on
or before June 29, 2007.
The Commission strongly encourages
electronic filing of any comments in
response to this Notice of Intent. For
information on electronically filing
comments, please see the instructions
on the Commission’s Web site at
http://www.ferc.gov under the
‘‘e-Filing’’ link and the link to the User’s
Guide, as well as information in 18 CFR
385.2001(a)(1)(iii). Before you can
submit comments, you will need to
create a free account, which can be
created on-line.
The public scoping meetings (dates,
times, and locations are listed above) are
designed to provide another opportunity
to offer comments on the proposed
project. Interested groups and
individuals are encouraged to attend the
meetings and to present comments on
the environmental issues they believe
should be addressed in the EA. A
transcript of each meeting will be
generated so that your comments will be
accurately recorded.
Once Iroquois formally files its
application with the Commission, you
may want to become an official party to
the proceeding known as an
‘‘intervenor.’’ Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in a
Commission proceeding by filing a
request to intervene. Instructions for
becoming an intervenor are included in
the User’s Guide under the ‘‘e-filing’’
link on the Commission’s web site.
Please note that you may not request
intervenor status at this time. You must
wait until a formal application is filed
with the Commission.
Environmental Mailing List
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners who are potential right-ofway grantors, whose property may be
used temporarily for project purposes,
or who own homes within distances
defined in the Commission’s regulations
of certain aboveground facilities. If you
received this notice, you are currently
on the environmental mailing list for
this project. If you want to remain on
E:\FR\FM\31MYN1.SGM
31MYN1
Federal Register / Vol. 72, No. 104 / Thursday, May 31, 2007 / Notices
our mailing list, please return the
attached Information Request
(Appendix 2). All individuals who
provide written comments, attend the
scoping meetings, or return the
Information Request will remain on our
environmental mailing list for this
project.
sroberts on PROD1PC70 with NOTICES
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC (3372) or on the
FERC Internet Web site (http://
www.ferc.gov) using the ‘‘eLibrary link.’’
Click on the eLibrary link, select
‘‘General Search’’ and enter the project
docket number excluding the last three
digits (i.e., PF07–7) in the ‘‘Docket
Number’’ field. Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or TTY, contact
(202) 502–8659. The eLibrary link on
the FERC Internet website also provides
access to the texts of formal documents
issued by the Commission, such as
orders, notices, and rule makings.
In addition, the FERC now offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. To register for this service,
go to
http://www.ferc.gov/esubscribenow.htm.
Public meetings or site visits will be
posted on the Commission’s calendar
located at http://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Finally, Iroquois has established an
Internet website for this project at
http://08–09.iroquois.com. The Web site
includes a description of the project,
maps of the proposed pipeline facilities,
and answers to frequently asked
questions. You can also request
additional information or provide
comments directly to Iroquois by phone
at 1–800–253–5152, or by mail at the
following address: Ruth Parkins, Public
Affairs Manager, Iroquois Pipeline
Operating Company, One Corporate
Drive, Suite 600, Shelton, CT 06484. Email: ruth_parkins@iroquois.com.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–10449 Filed 5–30–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
16:01 May 30, 2007
Jkt 211001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 618–139]
Alabama Power Company; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
May 23, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Request for
Temporary Variance of Minimum Flow
Requirement.
b. Project No.: 618–139.
c. Date Filed: May 21, 2007.
d. Applicant: Alabama Power
Company.
e. Name of Project: Jordan Dam.
f. Location: On the Coosa River, in
Elmore, Chilton, and Coosa Counties,
Alabama.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Alan L. Peeples,
Alabama Power Company, 600 N. 18th
Street, P.O. Box 2641, Birmingham, AL
35291, (205) 257–1401.
i. FERC Contact: Peter Yarrington,
peter.yarrington@ferc.gov, (202) 502–
6129.
j. Deadline for filing comments,
motions to intervene and protests: June
6, 2007.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: The
Alabama Power Company (APC) is
requesting a temporary variance of the
minimum flow requirement of the
Jordan Dam Project license. Because of
persistent and worsening drought
conditions in the project area and the
need to conserve water, APC requests
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
30369
that it be allowed to begin downramping
from 3,000 cubic feet per second (cfs) to
2,000 cfs beginning on or about May 22,
2007, rather than beginning this
downramping June 16 as required in the
license. Once flows are downramped to
2000 cfs this flow release would be
maintained until the following April 1
as required in the license. Included in
APC’s request were concurrences
received from the state and federal
resource agencies. The Commission’s
order issued March 30, 2007, authorized
among other things the APC to increase
minimum flows from 2,000 cfs to 3,000
cfs rather than to 4,000 cfs beginning
April 1, 2007.
l. Location of the Application: The
filing is available for inspection and
reproduction at the Commission’s
Public Reference Room, located at 888
First Street, NE., Room 2A, Washington,
DC 20426 or by calling (202) 502–8371,
or by calling (202) 502–8371. This filing
may also be viewed on the
Commission’s Web site at http://ferc.gov
using the ‘‘eLibrary’’ link. Enter the
docket number excluding the last three
digits in the docket number field to
access the document. You may also
register online at http://www.ferc.gov/
docsfiling/esubscription.asp to be
notified vial e-mail or new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.