Federal Register / Vol. 70, No. 234 / Wednesday, December 7, 2005 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

72806

Federal Register / Vol. 70, No. 234 / Wednesday, December 7, 2005 / Notices

Comment Date: 5 p.m. eastern time on

December 6, 2005.

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Magalie R. Salas,

Secretary.

[FR Doc. E5–6921 Filed 12–6–05; 8:45 am]

Magalie R. Salas,

Secretary.

[FR Doc. E5–6935 Filed 12–6–05; 8:45 am]

BILLING CODE 6717–01–P

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Federal Energy Regulatory

Commission

[Docket No. CP06–26–000]

[Docket No. RP06–78–001]

Dominion Cove Point LNG, LP; Notice

of Application

Discovery Gas Transmission LLC;

Notice of Compliance Filing

November 28, 2005.

November 29, 2005.

Take notice that on November 22,

2005, Discovery Gas Transmission LLC

(Discovery) tendered for filing as part of

its FERC Gas Tariff, Original Volume

No. 1, First Revised Sheet No. 117, to be

effective November 14, 2005.

Discovery states that the filing is

being made in compliance with the

order issued by the Commission in the

above-captioned proceeding on

November 14, 2005, 113 FERC ¶ 61,149.

Any person desiring to protest this

filing must file in accordance with Rule

211 of the Commission’s Rules of

Practice and Procedure (18 CFR

385.211). Protests to this filing will be

considered by the Commission in

determining the appropriate action to be

taken, but will not serve to make

protestants parties to the proceeding.

Such protests must be filed in

accordance with the provisions of

Section 154.210 of the Commission’s

regulations (18 CFR 154.210). Anyone

filing a protest must serve a copy of that

document on all the parties to the

proceeding.

The Commission encourages

electronic submission of protests in lieu

of paper using the ‘‘eFiling’’ link at

http://www.ferc.gov. Persons unable to

file electronically should submit an

original and 14 copies of the protest to

the Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

VerDate Aug<31>2005

13:01 Dec 06, 2005

Jkt 208001

Take notice that on November 16,

2005, Dominion Cove Point LNG, LP

(Cove Point LNG) filed an application in

Docket No. CP06–26–000, pursuant to

section 3 of the Natural Gas Act, for

authority to construct, install, own,

operate and maintain certain facilities at

the Cove Point LNG import terminal at

Cove Point, Maryland (Air Separation

Unit Project). The details of this

proposal are more fully set forth in the

application that is on file with the

Commission and open to public

inspection. The filing may also be

viewed on the Web at http://

www.ferc.gov using the ‘‘eLibrary’’ link.

Enter the docket number excluding the

last three digits in the docket number

field to access the document. For

assistance, please contact FERC Online

Support at

FERCOnlineSupport@ferc.gov or toll

free at (866) 208–3676, or TTY, contact

(202) 502–8659.

Any questions regarding this

application should be directed to Anne

E. Bomar, Managing Director,

Transmission, Rates and Regulation,

Dominion Resources, Inc., 120 Tredegar

Street, Richmond, Virginia 23219, or by

phone at (804) 819–2134.

Cove Point LNG says that the Air

Separation Unit Project is designed to

add two air separation units, a liquid

nitrogen storage tank, an electric

generation unit, and appurtenant

facilities at the Cove Point LNG import

terminal. This project will increase Cove

Point LNG’s ability to inject nitrogen

into the vaporized liquefied natural gas

as necessary to meet the tariff

requirements for gas quality contained

in the Cove Point LNG’s tariff. Cove

Point LNG requests that the Commission

grant the requested authorization at the

earliest practicable date, in order to

ensure an in-service date of January

2008.

Cove Point LNG says that the facilities

proposed in the Cove Point Air

PO 00000

Frm 00029

Fmt 4703

Sfmt 4703

Separation Unit Project will also

enhance the reliability of service at the

terminal and provide the Rate Schedule

LTD–1 customers with more flexibility

to acquire and schedule cargoes of LNG

from a wider variety of supply sources.

Cove Point LNG says that the Air

Separation Unit Project also will not

result in any change to the gas quality

specifications contained in Cove Point’s

tariff, including the BTU level and

nitrogen content specified in those

provisions.

Cove Point LNG says that it intends to

make a subsequent, limited Natural Gas

Act Section 4 filing to adjust the

currently effective LTD–1 settlement

rates to reflect the costs of the Air

Separation Unit Project. Further, Cove

Point LNG does not seek Commission

approval of the Air Separation Unit

Project rates in the instant proceeding;

however, it requests that the

Commission find in this proceeding

that: (1) The proposed facilities are

prudently designed and appropriately

sized to provide the requested nitrogen

injection capacity; (2) the costs of the

proposed facilities, about $ 63 million,

are reasonable; and (3) the proposed rate

treatment for the costs of the Air

Separation Unit Project as shown on

Exhibit Z is reasonable. Cove Point LNG

is proposing an Air Separation Unit

Project surcharge in the LTD rate

schedules with a reservation charge of $

1.5990 per Dth in the LTD–1 Rate

Schedule and a maximum commodity

charge of $ 0.0526 per Dth in the LTD–

2 Rate Schedule.

On October 7, 2005, the Commission

issued new rules which generally

require that projects involving liquefied

natural gas terminals follow mandatory

procedures requiring prospective

applicants to begin the Commission’s

pre-filing review process at least six

months prior to filing an application for

any siting or construction

authorizations. (See Order No. 665, new

rules at 18 CFR 157.21) However, based

on an October 25, 2005 request by Cove

Point LNG under section 157.21(e)(2) of

the new rules, the Director of the

Commission’s Office of Energy Projects

made a finding and determination on

November 14, 2005, that the pre-filing

review process would not apply to Cove

Point LNG’s Air Separation Unit Project.

There are two ways to become

involved in the Commission’s review of

this project. First, any person wishing to

obtain legal status by becoming a party

to the proceedings for this project

should, on or before the comment date,

file with the Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426, a motion to

intervene in accordance with the

E:\FR\FM\07DEN1.SGM

07DEN1

Federal Register / Vol. 70, No. 234 / Wednesday, December 7, 2005 / Notices

requirements of the Commission’s Rules

of Practice and Procedure (18 CFR

385.214 or 385.211) and the Regulations

under the Natural Gas Act (18 CFR

157.10). A person obtaining party status

will be placed on the service list

maintained by the Secretary of the

Commission and will receive copies of

all documents filed by the applicant and

by all other parties. A party must submit

14 copies of filings made with the

Commission and must mail a copy to

the applicant and to every other party in

the proceeding. Only parties to the

proceeding can ask for court review of

Commission orders in the proceeding.

Persons who wish to comment only

on the environmental review of this

project, or in support of or in opposition

to this project, should submit an

original and two copies of their

comments to the Secretary of the

Commission. Environmental

commenters will be placed on the

Commission’s environmental mailing

list, will receive copies of the

environmental documents, and will be

notified of meetings associated with the

Commission’s environmental review

process. Environmental commenters

will not be required to serve copies of

filed documents on all other parties.

The Commission’s rules require that

persons filing comments in opposition

to the project provide copies of their

protests only to the applicant. However,

the non-party commenters will not

receive copies of all documents filed by

other parties or issued by the

Commission (except for the mailing of

environmental documents issued by the

Commission) and will not have the right

to seek court review of the

Commission’s final order.

The Commission strongly encourages

electronic filings of comments, protests,

and interventions via the internet in lieu

of paper. See 18 CFR 385.2001(a)(1)(iii)

and the instructions on the

Commission’s Web site (http://

www.ferc.gov) under the ‘‘e-Filing’’ link.

Comment Date: December 16, 2005.

Magalie R. Salas,

Secretary.

[FR Doc. E5–6927 Filed 12–6–05; 8:45 am]

BILLING CODE 6717–01–P

VerDate Aug<31>2005

13:01 Dec 06, 2005

Jkt 208001

72807

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. RP06–105–000]

Eastern Shore Natural Gas Company;

Notice of Proposed Changes in FERC

Gas Tariff

Magalie R. Salas,

Secretary.

[FR Doc. E5–6947 Filed 12–6–05; 8:45 am]

BILLING CODE 6717–01–P

November 29, 2005.

Take notice that on November 22,

2005, Eastern Shore Natural Gas

Company (ESNG) tendered for filing as

part of its FERC Gas Tariff, Second

Revised Volume No. 1, the following

tariff sheets, with a proposed effective

date of November 1, 2005:

Fifty-Ninth Revised Sheet No. 7.

Fifty-Ninth Revised Sheet No. 8.

ESNG states that copies of the filing

have been served upon its jurisdictional

customers and interested state

commissions.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed in accordance

with the provisions of section 154.210

of the Commission’s regulations (18 CFR

154.210). Anyone filing an intervention

or protest must serve a copy of that

document on the Applicant. Anyone

filing an intervention or protest on or

before the intervention or protest date

need not serve motions to intervene or

protests on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

PO 00000

Frm 00030

Fmt 4703

Sfmt 4703

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. RP04–248–008; Docket No.

RP04–251–009]

El Paso Natural Gas Company; Notice

of Compliance Filing

November 29, 2005.

Take notice that on November 22,

2005, El Paso Natural Gas Company

(EPNG) tendered for filing as part of its

FERC Gas Tariff, Second Revised

Volume No. 1A, the tariff sheets listed

in Appendix A to become effective

January 1, 2006.

EPNG states that copies of the filing

were served on parties on the official

service list in the above-captioned

proceedings.

Any person desiring to protest this

filing must file in accordance with Rule

211 of the Commission’s Rules of

Practice and Procedure (18 CFR

385.211). Protests to this filing will be

considered by the Commission in

determining the appropriate action to be

taken, but will not serve to make

protestants parties to the proceeding.

Such protests must be filed in

accordance with the provisions of

section 154.210 of the Commission’s

regulations (18 CFR 154.210). Anyone

filing a protest must serve a copy of that

document on all the parties to the

proceeding.

The Commission encourages

electronic submission of protests in lieu

of paper using the ‘‘eFiling’’ link at

http://www.ferc.gov. Persons unable to

file electronically should submit an

original and 14 copies of the protest to

the Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

E:\FR\FM\07DEN1.SGM

07DEN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.