Federal Register / Vol. 73, No. 5 / Tuesday, January 8, 2008 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

Federal Register / Vol. 73, No. 5 / Tuesday, January 8, 2008 / Notices

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: 5 p.m. Eastern Time

on January 3, 2008.

Kimberly D. Bose,

Secretary.

[FR Doc. E8–70 Filed 1–7–08; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. CP08–39–000]

Saltville Gas Storage Company L.L.C.;

Notice of Request Under Blanket

Authorization

pwalker on PROD1PC71 with NOTICES

January 2, 2008.

Take notice that on December 18,

2007, Saltville Gas Storage Company

L.L.C. (Saltville), P.O. Box 1642,

Houston, Texas 77251–1642, filed in

Docket No. CP08–39–000 a prior notice

request pursuant to sections 157.205

and 157.210 of the Commission’s

regulations under the Natural Gas Act

(NGA) and Saltville’s blanket certificate

issued in Docket Nos. CP04–13, et al.,

for authorization to acquire, operate and

maintain storage facilities owned by

Spectra Energy Early Grove Company

and Spectra Energy Virginia Pipeline

Company, all as more fully set forth in

the application, which is on file with

the Commission and open to public

inspection. The filing may also be

viewed on the Web at http://

www.ferc.gov using the ‘‘eLibrary’’ link.

Enter the docket number excluding the

last three digits in the docket number

field to access the document. For

assistance, contact FERC at

FERCOnlineSupport@ferc.gov or call

toll-free, (886) 208–3676 or TYY, (202)

502–8659.

Any questions regarding the

application should be directed to Garth

VerDate Aug<31>2005

17:32 Jan 07, 2008

Jkt 214001

Johnson, General Manager, Certificates

& Reporting, East Tennessee Natural

Gas, L.L.C., P.O. Box 1642, Houston,

Texas 77251–1642 at (713) 627–5415.

Any person or the Commission’s Staff

may, within 60 days after the issuance

of the instant notice by the Commission,

file pursuant to Rule 214 of the

Commission’s Procedural Rules (18 CFR

385.214) a motion to intervene or notice

of intervention and, pursuant to section

157.205 of the Commission’s

Regulations under the Natural Gas Act

(NGA) (18 CFR 157.205) a protest to the

request. If no protest is filed within the

time allowed therefor, the proposed

activity shall be deemed to be

authorized effective the day after the

time allowed for protest. If a protest is

filed and not withdrawn within 30 days

after the time allowed for filing a

protest, the instant request shall be

treated as an application for

authorization pursuant to section 7 of

the NGA.

The Commission strongly encourages

electronic filings of comments, protests

and interventions in lieu of paper using

the ‘‘eFiling’’ link at http://

www.ferc.gov. Persons unable to file

electronically should submit an original

and 14 copies of the protest or

intervention to the Federal Energy

Regulatory Commission, 888 First

Street, NE., Washington, DC 20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: January 23, 2008.

Kimberly D. Bose,

Secretary.

[FR Doc. E8–96 Filed 1–7–08; 8:45 am]

BILLING CODE 6717–01–P

PO 00000

Frm 00024

Fmt 4703

Sfmt 4703

1337

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket Nos. ER03–768–000; ER03–768–

001]

Susquehanna Energy Products LLC;

Notice of Issuance of Order

January 2, 2008.

Susquehanna Energy Products LLLP

(now Susquehanna Energy Products

LLC) (Susquehanna Energy) filed an

application for market-based rate

authority, with an accompanying tariff.

The proposed market-based rate tariff

provides for the sales of capacity and

energy at market-based rates.

Susquehanna Energy also requested

waivers of various Commission

regulations. In particular, Susquehanna

Energy requested that the Commission

grant blanket approval under 18 CFR

Part 34 of all future issuances of

securities and assumptions of liability

by Susquehanna Energy.

On June 16, 2003, pursuant to

delegated authority, the Director,

Division of Tariffs and Market

Development-South, granted the

requests for blanket approval under Part

34 (Director’s Order). The Director’s

Order also stated that the Commission

would publish a separate notice in the

Federal Register establishing a period of

time for the filing of protests.

Accordingly, any person desiring to be

heard concerning the blanket approvals

of issuances of securities or assumptions

of liability by Susquehanna Energy,

should file a protest with the Federal

Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426,

in accordance with Rules 211 and 214

of the Commission’s Rules of Practice

and Procedure. 18 CFR 385.211, 385.214

(2004).

Notice is hereby given that the

deadline for filing protests is January 9,

2008.

Absent a request to be heard in

opposition to such blanket approvals by

the deadline above, Susquehanna

Energy is authorized to issue securities

and assume obligations or liabilities as

a guarantor, indorser, surety, or

otherwise in respect of any security of

another person; provided that such

issuance or assumption is for some

lawful object within the corporate

purposes of Susquehanna Energy,

compatible with the public interest, and

is reasonably necessary or appropriate

for such purposes.

The Commission reserves the right to

require a further showing that neither

public nor private interests will be

adversely affected by continued

E:\FR\FM\08JAN1.SGM

08JAN1

1338

Federal Register / Vol. 73, No. 5 / Tuesday, January 8, 2008 / Notices

approvals of Susquehanna Energy’s

issuance of securities or assumptions of

liability.

Docket Nos. ER03–768–000 and ER03–

768–001

Copies of the full text of the Director’s

Order are available from the

Commission’s Public Reference Room,

888 First Street, NE., Washington, DC

20426. The Order may also be viewed

on the Commission’s Web site at

http://www.ferc.gov, using the eLibrary

link. Enter the docket number excluding

the last three digits in the docket

number filed to access the document.

Comments, protests, and interventions

may be filed electronically via the

internet in lieu of paper. See, 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

Nathaniel J. Davis, Jr.,

Deputy Secretary.

[FR Doc. E8–41 Filed 1–7–08; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. CP08–40–000]

Transcontinental Gas Pipe Line

Corporation; Notice of Request Under

Blanket Authorization

pwalker on PROD1PC71 with NOTICES

December 21, 2007.

Take notice that on December 18,

2007, Transcontinental Gas Pipe Line

Corporation (Transco), Post Office Box

1396, Houston, Texas 77251, filed in

Docket No. CP08–40–000, an

application pursuant to sections

157.205, 157.208, and 157.212 of the

Commission’s Regulations under the

Natural Gas Act (NGA) as amended, to

construct and operate a new receipt

point to receive revaporized liquefied

natural gas in Beauregard Parish,

Louisiana, under Transco’s blanket

certificate issued in Docket No. CP82–

426–000,1 all as more fully set forth in

the application which is on file with the

Commission and open to the public for

inspection.

Transco states that it proposes to

construct and operate a new receipt

point on Transco’s mainline to receive

revaporized liquefied natural gas from

the Cheniere Trail LNG, L.P., import

terminal via the Cheniere Creole Trail

Pipeline. The taps into Transco’s

mainline would be located in

Beauregard Parish, Louisiana. This new

receipt point would provide Transco

with the ability to receive up to 1 Bcf/

day of revaporized LNG from the

Cheniere Creole Trail Pipeline into

Transco’s mainline. Transco further

states that it estimates the total cost to

construct and operate the proposed

receipt point at $1,700,000, for which

Cheniere Trail Pipeline, L.P., would

reimburse Transco for all costs

associated with such facilities.

Any questions concerning this

application may be directed to Bill

Hammons, Staff Regulatory Analyst,

Transcontinental Gas Pipe Line

Corporation, P.O. Box 1396, Houston,

Texas 77251, or via telephone at (713)

215–2130.

This filing is available for review at

the Commission or may be viewed on

the Commission’s Web site at http://

www.ferc.gov, using the ‘‘eLibrary’’ link.

Enter the docket number excluding the

last three digits in the docket number

filed to access the document. For

assistance, please contact FERC Online

Support at

FERCOnlineSupport@ferc.gov or call

toll-free at (866) 206–3676, or, for TTY,

contact (202) 502–8659. Comments,

protests and interventions may be filed

electronically via the Internet in lieu of

paper. See 18 CFR 385.2001(a)(1)(iii)

and the instructions on the

Commission’s Web site under the ‘‘eFiling’’ link. The Commission strongly

encourages intervenors to file

electronically.

Any person or the Commission’s staff

may, within 60 days after issuance of

the instant notice by the Commission,

file pursuant to Rule 214 of the

Commission’s Procedural Rules (18 CFR

385.214) a motion to intervene or notice

of intervention and pursuant to section

157.205 of the regulations under the

NGA (18 CFR 157.205), a protest to the

request. If no protest is filed within the

time allowed therefore, the proposed

activity shall be deemed to be

authorized effective the day after the

time allowed for filing a protest. If a

protest is filed and not withdrawn

within 30 days after the allowed time

for filing a protest, the instant request

shall be treated as an application for

authorization pursuant to section 7 of

the NGA.

Kimberly D. Bose,

Secretary.

[FR Doc. E8–45 Filed 1–7–08; 8:45 am]

BILLING CODE 6717–01–P

1 20 FERC ¶ 62,420 (1982).

VerDate Aug<31>2005

17:32 Jan 07, 2008

Jkt 214001

PO 00000

Frm 00025

Fmt 4703

Sfmt 4703

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project No. 2506–144]

Upper Peninsula Power Company;

Notice of Application and Soliciting

Comments, Motions To Intervene, and

Protests

December 28, 2007.

Take notice that the following

application has been filed with the

Commission and is available for public

inspection:

a. Application Type: Shoreline

Management Plan (SMP).

b. Project No.: 2506–144.

c. Date Filed: November 29, 2007.

d. Applicant: Upper Peninsula Power

Company (UPPCO).

e. Name of Project: Escanaba

Hydroelectric Project.

f. Location: The project is located on

the Escanaba River in Delta and

Marquette Counties, Michigan.

g. Filed Pursuant to: Federal Power

Act, 16 U.S.C. 791(a)–825(r).

h. Applicant Contact: Shawn C.

Puzen, Environmental Consultant,

Integrys Business Support, LLC, 700

North Adams Street, P.O. Box 19001,

Green Bay, WI 54307–9001, (920) 433–

1094.

i. FERC Contact: Any questions on

this notice should be addressed to

Lesley Kordella at (202) 502–6406, or by

e-mail: lesley.kordella@ferc.gov.

j. Deadline for filing comments and/

or motions: January 29, 2008.

All documents (original and eight

copies) should be filed with: Kimberly

D. Bose, Secretary, Federal Energy

Regulatory Commission, DHAC, PJ–

12.1, 888 First Street, NE., Washington,

DC 20426. Please reference the project

number (P–2506–144) on any comments

or motions filed. Comments and

motions filed need to carefully specify

the appropriate project number in order

to avoid confusion with the SMP’s

concurrently filed by UPPCO for four

other projects (see item k below).

Comments, protests and interventions

may be filed electronically via the

Internet in lieu of paper. See, 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

k. Description of Proposal: UPPCO

filed a proposed SMP for the Escanaba

Project to address the land use pressures

and potential impacts anticipated from

the sale of adjacent non-project lands to

residential real estate developers. The

project includes the Dam No. 1, the Dam

No. 3, and the Boney Falls (Dam No. 4)

E:\FR\FM\08JAN1.SGM

08JAN1