Federal Register / Vol. 71, No. 18 / Friday, January 27, 2006 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

Federal Register / Vol. 71, No. 18 / Friday, January 27, 2006 / Notices

the docket number filed to access the

document. Comments, protests, and

interventions may be filed electronically

via the internet in lieu of paper. See, 18

CFR 385.2001(a)(1)(iii) and the

instructions on the Commission’s Web

site under the ‘‘e-Filing’’ link. The

Commission strongly encourages

electronic filings.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Magalie R. Salas,

Secretary.

[FR Doc. E6–1002 Filed 1–26–06; 8:45 am]

Magalie R. Salas,

Secretary.

[FR Doc. E6–998 Filed 1–26–06; 8:45 am]

BILLING CODE 6717–01–P

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Federal Energy Regulatory

Commission

[Docket No. RP06–94–001]

[Docket No. RP06–175–000]

Garden Banks Gas Pipeline, LLC;

Notice of Compliance Filing

Gas Transmission Northwest

Corporation; Notice of Petition for

Limited Waiver

January 20, 2006.

Take notice that on January 5, 2006,

Garden Banks Gas Pipeline, LLC

(Garden Banks) tendered for filing as

part of its FERC Gas Tariff, Original

Volume No. 1, the following tariff sheets

to become effective December 15, 2005:

rmajette on PROD1PC67 with NOTICES

Substitute Second Revised Sheet No. 15

Substitute Second Revised Sheet No. 25

Substitute Third Revised Sheet No. 34

Garden Banks states that the purpose

of the filing is to comply with the

Commission instruction to file redlined

copies of the proposed tariff sheets.

Any person desiring to protest this

filing must file in accordance with Rule

211 of the Commission’s Rules of

Practice and Procedure (18 CFR

385.211). Protests to this filing will be

considered by the Commission in

determining the appropriate action to be

taken, but will not serve to make

protestants parties to the proceeding.

Such protests must be filed in

accordance with the provisions of

Section 154.210 of the Commission’s

regulations (18 CFR 154.210). Anyone

filing a protest must serve a copy of that

document on all the parties to the

proceeding.

The Commission encourages

electronic submission of protests in lieu

of paper using the ‘‘eFiling’’ link at

http://www.ferc.gov. Persons unable to

file electronically should submit an

original and 14 copies of the protest to

the Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

VerDate Aug<31>2005

15:17 Jan 26, 2006

Jkt 208001

4575

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible online at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: 5 p.m. Eastern Time

on January 27, 2006.

Magalie R. Salas,

Secretary.

[FR Doc. E6–1001 Filed 1–26–06; 8:45 am]

BILLING CODE 6717–01–P

January 20, 2006.

Take notice that on January 17, 2006,

Gas Transmission Northwest

Corporation (GTN) petitions the

Commission for the grant of a limited

waiver, to the extent required, of the

Right-of-First-Refusal (ROFR) provisions

of GTN’s tariff in order to facilitate the

restructuring of Duke Energy Marketing

America’s (DEMA) FTS–1 contracts.

GTN states that the filing has been

served upon each person designated on

the official service list.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed in accordance

with the provisions of Section 154.210

of the Commission’s regulations (18 CFR

154.210). Anyone filing an intervention

or protest must serve a copy of that

document on the Applicant. Anyone

filing an intervention or protest on or

before the intervention or protest date

need not serve motions to intervene or

protests on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

PO 00000

Frm 00019

Fmt 4703

Sfmt 4703

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project No. 620]

NorQuest Seafood Inc.; Notice of

Authorization for Continued Project

Operation

January 20, 2006.

On October 3, 2003, NorQuest

Seafood, Inc., licensee for the Chignik

Hydroelectric Project No. 620, filed an

application for a new or subsequent

license pursuant to the Federal Power

Act (FPA) and the Commission’s

regulations there under. Project No. 620

is located on Indian Creek in Chignik,

Alaska.

The license for Project No. 620 was

issued for a period ending October 31,

2005. Section 15(a)(1) of the FPA, 16

U.S.C. 808(a)(1), requires the

Commission, at the expiration of a

license term, to issue from year to year

an annual license to the then licensee

under the terms and conditions of the

prior license until a new license is

issued, or the project is otherwise

disposed of as provided in section 15 or

any other applicable section of the FPA.

If the project’s prior license waived the

applicability of section 15 of the FPA,

then, based on section 9(b) of the

Administrative Procedure Act, 5 U.S.C.

558(c), and as set forth at 18 CFR

16.21(a), if the licensee of such project

has filed an application for a subsequent

license, the licensee may continue to

operate the project in accordance with

the terms and conditions of the license

E:\FR\FM\27JAN1.SGM

27JAN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.