Federal Register / Vol. 72, No. 83 / Tuesday, May 1, 2007 / Notices
Agency decision
Ask Donna
What actually matters in this document.
Text
23810
Federal Register / Vol. 72, No. 83 / Tuesday, May 1, 2007 / Notices
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
http://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
http://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8217 Filed 4–30–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8209 Filed 4–30–07; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket No. RP07–403–000]
DEPARTMENT OF ENERGY
Northern Natural Gas Company; Notice
of Proposed Changes in FERC Gas
Tariff
April 24, 2007.
rmajette on PROD1PC67 with NOTICES
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at http://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
http://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Take notice that on April 19, 2007,
Northern Natural Gas Company
(Northern), tendered for filing in its
FERC Gas Tariff, Fifth Revised Volume
No. 1, Ninth Revised Sheet No. 146, to
become effective May 20, 2007.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
VerDate Aug<31>2005
15:32 Apr 30, 2007
Jkt 211001
Federal Energy Regulatory
Commission
[Docket No. EL07–57–000]
PJM Interconnection, LLC; Notice of
Institution of Proceeding and Refund
Effective Date
April 24, 2007.
On April 19, 2007, the Commission
issued an order that instituted a
proceeding in the above-referenced
docket, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e, regarding PJM’s allocation of costs
for ‘‘economic’’ projects.
The refund effective date in the
above-docketed proceedings,
established pursuant to section 206(b) of
the FPA, will be the date of publication
of this notice in the Federal Register.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8218 Filed 4–30–07; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER07–609–000]
Project Orange Associates, LLC;
Notice of Issuance of Order
April 24, 2007.
Project Orange Associates, LLC
(Project Orange) filed an application for
market-based rate authority, with an
accompanying rate schedule. The
proposed market-based rate schedule
provides for the sale of energy, capacity
and ancillary services at market-based
rates. Project Orange also requested
waivers of various Commission
regulations. In particular, Project Orange
requested that the Commission grant
blanket approval under 18 CFR part 34
of all future issuances of securities and
assumptions of liability by Project
Orange.
On April 24, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under part
34 (Director’s Order). The Director’s
Order also stated that the Commission
would publish a separate notice in the
Federal Register establishing a period of
time for the filing of protests.
Accordingly, any person desiring to be
heard concerning the blanket approvals
of issuances of securities or assumptions
of liability by Project Orange should file
a protest with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is May 24,
2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Project Orange is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of Project
Orange, compatible with the public
interest, and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Project Orange’s issuance
of securities or assumptions of liability.
E:\FR\FM\01MYN1.SGM
01MYN1
Federal Register / Vol. 72, No. 83 / Tuesday, May 1, 2007 / Notices
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
http://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8213 Filed 4–30–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER04–1027–000]
Rocky Mountain Power, Inc.; Notice of
Issuance of Order
rmajette on PROD1PC67 with NOTICES
April 24, 2007.
Rocky Mountain Power, Inc. (Rocky
Mountain) filed an application for
market-based rate authority, with an
accompanying tariff. The proposed
market-based rate tariff provides for the
sale of capacity and energy at marketbased rates. Rocky Mountain also
requested waivers of various
Commission regulations. In particular,
Rocky Mountain requested that the
Commission grant blanket approval
under 18 CFR part 34 of all future
issuances of securities and assumptions
of liability by Rocky Mountain.
On September 3, 2004, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under part
34 (Director’s Order). The Director’s
Order also stated that the Commission
would publish a separate notice in the
Federal Register establishing a period of
time for the filing of protests.
Accordingly, any person desiring to be
heard concerning the blanket approvals
of issuances of securities or assumptions
of liability by Rocky Mountain should
file a protest with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
VerDate Aug<31>2005
15:32 Apr 30, 2007
Jkt 211001
Notice is hereby given that the
deadline for filing protests is May 23,
2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Rocky Mountain is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of Rocky
Mountain, compatible with the public
interest, and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Rocky Mountain’s issuance
of securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
http://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8212 Filed 4–30–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL07–58–000]
Organization of PJM States, Inc.;
District of Columbia Public Service
Commission; Indiana Utility Regulatory
Commission; Kentucky Public Service
Commission; Maryland Public Service
Commission, New Jersey Board of
Public Utilities; North Carolina Utilities
Commission; Pennsylvania Public
Utility Commission; and the Virginia
State Corporation Commission,
Petitioners, v. PJM Interconnection,
L.L.C., Respondent; Notice of
Complaint
April 24, 2007.
Take notice that on April 23, 2007,
the Organization of PJM States, Inc., the
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
23811
District of Columbia Public Service
Commission; the Indiana Utility
Regulatory Commission; the Kentucky
Public Service Commission; the
Maryland Public Service Commission;
the New Jersey Board of Public Utilities;
the North Carolina Utilities
Commission; the Pennsylvania Public
Utility Commission; and the Virginia
State Corporation Commission
(collectively, Complainants) hereby
submit a complaint against PJM
Interconnection, L.L.C. (PJM), alleging
apparent violations of Attachment M of
the PJM Open Access Transmission
Tariff with regard to the independence
and operation of the PJM Market
Monitor and Market Monitoring Unit.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at http://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
http://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on May 3, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8210 Filed 4–30–07; 8:45 am]
BILLING CODE 6717–01–P