Federal Register / Vol. 72, No. 83 / Tuesday, May 1, 2007 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

23810

Federal Register / Vol. 72, No. 83 / Tuesday, May 1, 2007 / Notices

The Commission encourages

electronic submission of protests in lieu

of paper using the ‘‘eFiling’’ link at

http://www.ferc.gov. Persons unable to

file electronically should submit an

original and 14 copies of the protest to

the Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–8217 Filed 4–30–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Kimberly D. Bose,

Secretary.

[FR Doc. E7–8209 Filed 4–30–07; 8:45 am]

Federal Energy Regulatory

Commission

BILLING CODE 6717–01–P

[Docket No. RP07–403–000]

DEPARTMENT OF ENERGY

Northern Natural Gas Company; Notice

of Proposed Changes in FERC Gas

Tariff

April 24, 2007.

rmajette on PROD1PC67 with NOTICES

protests on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Take notice that on April 19, 2007,

Northern Natural Gas Company

(Northern), tendered for filing in its

FERC Gas Tariff, Fifth Revised Volume

No. 1, Ninth Revised Sheet No. 146, to

become effective May 20, 2007.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed in accordance

with the provisions of Section 154.210

of the Commission’s regulations (18 CFR

154.210). Anyone filing an intervention

or protest must serve a copy of that

document on the Applicant. Anyone

filing an intervention or protest on or

before the intervention or protest date

need not serve motions to intervene or

VerDate Aug<31>2005

15:32 Apr 30, 2007

Jkt 211001

Federal Energy Regulatory

Commission

[Docket No. EL07–57–000]

PJM Interconnection, LLC; Notice of

Institution of Proceeding and Refund

Effective Date

April 24, 2007.

On April 19, 2007, the Commission

issued an order that instituted a

proceeding in the above-referenced

docket, pursuant to section 206 of the

Federal Power Act (FPA), 16 U.S.C.

824e, regarding PJM’s allocation of costs

for ‘‘economic’’ projects.

The refund effective date in the

above-docketed proceedings,

established pursuant to section 206(b) of

the FPA, will be the date of publication

of this notice in the Federal Register.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–8218 Filed 4–30–07; 8:45 am]

BILLING CODE 6717–01–P

PO 00000

Frm 00021

Fmt 4703

Sfmt 4703

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. ER07–609–000]

Project Orange Associates, LLC;

Notice of Issuance of Order

April 24, 2007.

Project Orange Associates, LLC

(Project Orange) filed an application for

market-based rate authority, with an

accompanying rate schedule. The

proposed market-based rate schedule

provides for the sale of energy, capacity

and ancillary services at market-based

rates. Project Orange also requested

waivers of various Commission

regulations. In particular, Project Orange

requested that the Commission grant

blanket approval under 18 CFR part 34

of all future issuances of securities and

assumptions of liability by Project

Orange.

On April 24, 2007, pursuant to

delegated authority, the Director,

Division of Tariffs and Market

Development—West, granted the

requests for blanket approval under part

34 (Director’s Order). The Director’s

Order also stated that the Commission

would publish a separate notice in the

Federal Register establishing a period of

time for the filing of protests.

Accordingly, any person desiring to be

heard concerning the blanket approvals

of issuances of securities or assumptions

of liability by Project Orange should file

a protest with the Federal Energy

Regulatory Commission, 888 First

Street, NE., Washington, DC 20426, in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure. 18 CFR 385.211, 385.214

(2004).

Notice is hereby given that the

deadline for filing protests is May 24,

2007.

Absent a request to be heard in

opposition to such blanket approvals by

the deadline above, Project Orange is

authorized to issue securities and

assume obligations or liabilities as a

guarantor, indorser, surety, or otherwise

in respect of any security of another

person; provided that such issuance or

assumption is for some lawful object

within the corporate purposes of Project

Orange, compatible with the public

interest, and is reasonably necessary or

appropriate for such purposes.

The Commission reserves the right to

require a further showing that neither

public nor private interests will be

adversely affected by continued

approvals of Project Orange’s issuance

of securities or assumptions of liability.

E:\FR\FM\01MYN1.SGM

01MYN1

Federal Register / Vol. 72, No. 83 / Tuesday, May 1, 2007 / Notices

Copies of the full text of the Director’s

Order are available from the

Commission’s Public Reference Room,

888 First Street, NE., Washington, DC

20426. The Order may also be viewed

on the Commission’s Web site at

http://www.ferc.gov, using the eLibrary

link. Enter the docket number excluding

the last three digits in the docket

number filed to access the document.

Comments, protests, and interventions

may be filed electronically via the

Internet in lieu of paper. See, 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–8213 Filed 4–30–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. ER04–1027–000]

Rocky Mountain Power, Inc.; Notice of

Issuance of Order

rmajette on PROD1PC67 with NOTICES

April 24, 2007.

Rocky Mountain Power, Inc. (Rocky

Mountain) filed an application for

market-based rate authority, with an

accompanying tariff. The proposed

market-based rate tariff provides for the

sale of capacity and energy at marketbased rates. Rocky Mountain also

requested waivers of various

Commission regulations. In particular,

Rocky Mountain requested that the

Commission grant blanket approval

under 18 CFR part 34 of all future

issuances of securities and assumptions

of liability by Rocky Mountain.

On September 3, 2004, pursuant to

delegated authority, the Director,

Division of Tariffs and Market

Development—West, granted the

requests for blanket approval under part

34 (Director’s Order). The Director’s

Order also stated that the Commission

would publish a separate notice in the

Federal Register establishing a period of

time for the filing of protests.

Accordingly, any person desiring to be

heard concerning the blanket approvals

of issuances of securities or assumptions

of liability by Rocky Mountain should

file a protest with the Federal Energy

Regulatory Commission, 888 First

Street, NE., Washington, DC 20426, in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure. 18 CFR 385.211, 385.214

(2004).

VerDate Aug<31>2005

15:32 Apr 30, 2007

Jkt 211001

Notice is hereby given that the

deadline for filing protests is May 23,

2007.

Absent a request to be heard in

opposition to such blanket approvals by

the deadline above, Rocky Mountain is

authorized to issue securities and

assume obligations or liabilities as a

guarantor, indorser, surety, or otherwise

in respect of any security of another

person; provided that such issuance or

assumption is for some lawful object

within the corporate purposes of Rocky

Mountain, compatible with the public

interest, and is reasonably necessary or

appropriate for such purposes.

The Commission reserves the right to

require a further showing that neither

public nor private interests will be

adversely affected by continued

approvals of Rocky Mountain’s issuance

of securities or assumptions of liability.

Copies of the full text of the Director’s

Order are available from the

Commission’s Public Reference Room,

888 First Street, NE., Washington, DC

20426. The Order may also be viewed

on the Commission’s Web site at

http://www.ferc.gov, using the eLibrary

link. Enter the docket number excluding

the last three digits in the docket

number filed to access the document.

Comments, protests, and interventions

may be filed electronically via the

Internet in lieu of paper. See, 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–8212 Filed 4–30–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. EL07–58–000]

Organization of PJM States, Inc.;

District of Columbia Public Service

Commission; Indiana Utility Regulatory

Commission; Kentucky Public Service

Commission; Maryland Public Service

Commission, New Jersey Board of

Public Utilities; North Carolina Utilities

Commission; Pennsylvania Public

Utility Commission; and the Virginia

State Corporation Commission,

Petitioners, v. PJM Interconnection,

L.L.C., Respondent; Notice of

Complaint

April 24, 2007.

Take notice that on April 23, 2007,

the Organization of PJM States, Inc., the

PO 00000

Frm 00022

Fmt 4703

Sfmt 4703

23811

District of Columbia Public Service

Commission; the Indiana Utility

Regulatory Commission; the Kentucky

Public Service Commission; the

Maryland Public Service Commission;

the New Jersey Board of Public Utilities;

the North Carolina Utilities

Commission; the Pennsylvania Public

Utility Commission; and the Virginia

State Corporation Commission

(collectively, Complainants) hereby

submit a complaint against PJM

Interconnection, L.L.C. (PJM), alleging

apparent violations of Attachment M of

the PJM Open Access Transmission

Tariff with regard to the independence

and operation of the PJM Market

Monitor and Market Monitoring Unit.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211, 385.214).

Protests will be considered by the

Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. The Respondent’s answer

and all interventions, or protests must

be filed on or before the comment date.

The Respondent’s answer, motions to

intervene, and protests must be served

on the Complainants.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: 5 p.m. Eastern Time

on May 3, 2007.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–8210 Filed 4–30–07; 8:45 am]

BILLING CODE 6717–01–P

E:\FR\FM\01MYN1.SGM

01MYN1