Federal Register / Vol. 71, No. 54 / Tuesday, March 21, 2006 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

14200

Federal Register / Vol. 71, No. 54 / Tuesday, March 21, 2006 / Notices

Additional Information

Additional information about the

project is available from the

Commission’s Office of External Affairs,

at 1–866–208–FERC or on the FERC

Internet Web site (http://www.ferc.gov)

using the eLibrary link. Click on the

eLibrary link, click on ‘‘General Search’’

and enter the docket number excluding

the last three digits in the Docket

Number field. Be sure you have selected

an appropriate date range. For

assistance, please contact FERC Online

Support at FercOnlineSupport@ferc.gov

or toll free at 1–866–208–3676, or for

TTY, contact (202) 502–8659. The

eLibrary link also provides access to the

texts of formal documents issued by the

Commission, such as orders, notices,

and rulemakings.

In addition, the Commission now

offers a free service called eSubscription

which allows you to keep track of all

formal issuances and submittals in

specific dockets. This can reduce the

amount of time you spend researching

proceedings by automatically providing

you with notification of these filings,

document summaries and direct links to

the documents. Go to http://

www.ferc.gov/esubscribenow.htm.

Magalie R. Salas,

Secretary.

[FR Doc. E6–4036 Filed 3–20–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. PF06–11–000]

Quoddy Bay, LLC; Notice of Intent To

Prepare an Environmental Impact

Statement for the Proposed Quoddy

Bay LNG Project, Request for

Comments on Environmental Issues

and Notice of Public Scoping Meetings

sroberts on PROD1PC70 with NOTICES

March 14, 2006.

The Federal Energy Regulatory

Commission (FERC or Commission) and

the U.S. Department of Homeland

Security, U.S. Coast Guard (Coast

Guard) are in the process of evaluating

the Quoddy Bay L.L.C. (Quoddy Bay)

Liquefied Natural Gas (LNG) Import and

Regasification Terminal project (the

Project) which involves the construction

and operation of facilities by Quoddy

Bay on the western shore of

Passamaquoddy Bay in Washington

County, Maine. The Project would

consist of an onshore LNG import

terminal located in Pleasant Point, ME

with an approximate eight-mile-long

pipeline connecting to a storage facility

VerDate Aug<31>2005

19:01 Mar 20, 2006

Jkt 208001

located in Perry, Maine., and 35-milelong natural gas sendout pipeline

interconnecting with the Maritimes and

Northeast (M&NE) Pipeline system.

As part of this evaluation, FERC staff

will prepare an environmental impact

statement (EIS) that will address the

environmental impacts of the project

and the Coast Guard will assess the

maritime safety and security of the

Project. As explained further in the

Public Participation Section of this

notice, the FERC and Coast Guard will

hold joint public scoping meetings to

allow the public and interested agencies

the opportunity to provide input to

these assessments.

This notice explains the scoping

process that will help us 1 determine

which issues/impacts need to be

evaluated in the EIS. This EIS will be

used by the Commission in its decisionmaking process to determine whether

the Project is in the public convenience

and necessity. Please note that the

scoping period for the Project will close

on April 28, 2006.

The FERC will be the lead Federal

agency in the preparation of an EIS that

will satisfy the requirements of the

National Environmental Policy Act

(NEPA). The Coast Guard; the U.S.

Army Corps of Engineers; and

Department of Interior, Bureau of Indian

Affairs will serve as cooperating

agencies during preparation of the EIS.

In addition, we have invited the U.S.

Department of Commerce, National

Oceanic and Atmospheric

Administration, National Marine

Fisheries Service; the U.S.

Environmental Protection Agency; the

U.S. Department of the Interior, Fish

and Wildlife Service; the Advisory

Council on Historic Preservation, the

Natural Resources Conservation Service;

the Maine Department of Environmental

Protection; the Maine Department of

Marine Resources; and the Maine

Division of Inland Fisheries and

Wildlife.

Comments may be submitted in

written form or verbally. In lieu of or in

addition to sending written comments,

you are invited to attend the public

scoping meetings that have been

scheduled in the Project area. Further

instructions on how to submit written

comments and additional details of the

public scoping meetings are provided in

the public participation section of this

NOI.

The Coast Guard is responsible for

matters related to navigation safety,

vessel engineering and safety standards,

and all matters pertaining to the safety

1 ‘‘We,’’, ‘‘us’’, and ‘‘our’’ refer to the

environmental staff of the Office of Energy Projects.

PO 00000

Frm 00037

Fmt 4703

Sfmt 4703

of facilities or equipment located in or

adjacent to navigable waters up to the

last valve immediately before the

receiving tanks. The Coast Guard also

has authority for LNG facility security

plan review, approval, and compliance

verification as provided in Title 33 CFR

105, and recommendation for siting as

it pertains to the management of vessel

traffic in and around the LNG facility.

Upon receipt of a letter of intent from

an owner or operator intending to build

a new LNG facility, the Coast Guard

Captain of the Port (COTP) conducts an

analysis that results in a letter of

recommendation issued to the owner or

operator and to the state and local

governments having jurisdiction,

addressing the suitability of the

waterway to accommodate LNG vessels.

Specifically the letter of

recommendation addresses the

suitability of the waterway based on:

• The physical location and layout of

the facility and its berthing and mooring

arrangements.

• The LNG vessels’ characteristics

and the frequency of LNG shipments to

the facility.

• Commercial, industrial,

environmentally sensitive, and

residential area in and adjacent to the

waterway used by the LNG vessels en

route to the facility.

• Density and character of the marine

traffic on the waterway.

• Bridges or other manmade

obstructions in the waterway.

• Depth of water.

• Tidal range.

• Natural hazards, including rocks

and sandbars.

• Underwater pipelines and cables.

• Distance of berthed LNG vessels

from the channel, and the width of the

channel.

In addition, the Coast Guard will

review and approve the facility’s

operations manual and emergency

response plan (33 CFR 127.019), as well

as the facility’s security plan (33 CFR

105.410). The Coast Guard will also

provide input to other Federal, state,

and local government agencies

reviewing the project.

In order to complete a thorough

analysis and fulfill the regulatory

mandates cited above, the COTP Sector

Northern New England will be

conducting a formal risk assessment

evaluating the various safety and

security aspects associated with the

Quoddy Bay’s LNG proposed project.

This risk assessment will be

accomplished through a series of

workshops focusing on the areas of

waterways safety, port security, and

consequence management, with

involvement from a broad cross-section

E:\FR\FM\21MRN1.SGM

21MRN1

Federal Register / Vol. 71, No. 54 / Tuesday, March 21, 2006 / Notices

of government and port stakeholders

with expertise in each of the respective

areas. The workshops will be by

invitation only. However, comments

received during the public comment

period will be considered as input in

the risk assessment process.

This notice is being sent to affected

landowners within 0.5 mile of the

proposed LNG Terminal; landowners

within 200 feet of the pipeline route

under consideration; Federal, state, and

local government agencies; elected

officials; environmental and public

interest groups; Native American tribes;

and local libraries and newspapers; and

other interested parties.

Some affected landowners may be

contacted by a project representative

about the acquisition of an easement to

construct, operate, and maintain the

proposed facilities. If so, Quoddy Bay

and the affected landowners should

seek to negotiate a mutually acceptable

agreement. In the event that the Project

is certificated by the Commission, that

approval conveys the right of eminent

domain for securing easements for the

facilities. Therefore, if easement

negotiations fail to produce an

agreement, Quoddy Bay could initiate

condemnation proceedings in

accordance with state law.

A fact sheet prepared by the FERC

entitled ‘‘An Interstate Natural Gas

Facility On My Land? What Do I Need

To Know?’’ addresses a number of

typically asked questions, including the

use of eminent domain and how to

participate in the Commission’s

proceedings. It is available for viewing

on the FERC Internet Web site (http://

www.ferc.gov).

sroberts on PROD1PC70 with NOTICES

Summary of the Proposed Project

Quoddy Bay proposes to site,

construct, and operate an LNG terminal

and storage facility, and associated

natural gas sendout pipeline with a

capacity of 2.0 billion cubic feet per

day. More specifically, Quoddy Bay’s

facilities would consist of:

• An LNG import and marine LNG

terminal, including a double, staggered

berth, 1,700-foot-long pier, capable of

handling about 90 LNG tankers per year,

ranging in size from 135,000 to 200,000

cubic meters (m3) per ship;

• An onshore storage and

regasification facility which includes

three full-containment insulated storage

tanks with a capacity of 160,000 m3

each.

• LNG being unloaded from either of

two berths. Each berth has four identical

unloading arms, three in liquid service

and one in vapor service. Each arm is

provided with an emergency release

VerDate Aug<31>2005

19:01 Mar 20, 2006

Jkt 208001

system. Tankers can be unloaded at

4,000 to 12,000 cubic meters per hour;

• The platform on the unloading pier

will be equipped with submerged

combustion vaporizers which can

vaporize the LNG on site and send gas

directly to the sendout line bypassing

the shore side storage facility;

• The electrical power distribution,

including power substations,

transformers, switchgear, multiple

voltage distribution, emergency and

UPS power systems;

• Ancillary terminal facilities being

located on the pier, including enclosed

control rooms, and platform firefighting

capability;

• A computer-based distributed

control system, measurement controls

and natural gas metering facilities;

• LNG being pumped via a cryogenic

transfer line approximately 6,000 ft.,

crossing under a state highway, across a

small inlet bay to the storage facility.

• A comprehensive hazard

monitoring system incorporating

flammable gas detectors, high and low

temperature detectors, smoke detectors,

and local emergency shut-down

controls.

• The proposed sendout pipeline

would consist of a 35.1 miles of 36-inch

diameter pipeline that would extend

from the Import Facility through the

Storage Facility and interconnect with

the M&NE Pipeline in Princeton, Maine.

A map depicting the general location

of the Project facilities and pipeline is

shown in Appendix 1.2

Quoddy Bay is requesting approval

such that the pier facilities are

completed and placed into service in

2009 with the storage facilities being

placed into service in 2010.

Land Requirements for Construction

Construction of the project would

disturb about 993 acres of land.

Following construction, about 337 to

340 acres of the total would be retained

for the operation of the LNG Terminal

and Sendout Pipeline.

As proposed, the Import Facility

would be constructed on submerged

lands that extend from mean low water

at Split Rock eastward towards the

United States shore between Pleasant

Point, Maine and Deer Island in New

Brunswick Canada. Construction of this

facility would require approximately

431 acres of land, of this amount, 30

acres consists of submerged lands that

2 The appendices referenced in this notice are not

being printed in the Federal Register. Copies are

available from the Commission’s Public Reference

and Files Maintenance Branch, at (202) 502–8371.

For instructions on connecting to eLibrary refer to

the last page of this Notice.

PO 00000

Frm 00038

Fmt 4703

Sfmt 4703

14201

would be permanently impacted by the

operation of the facility.

The Support Facility would be

located on Split Rock within the

Passamaquoddy Indian Reservation in

Pleasant Point, Maine. About 4 acres of

land would be temporarily impacted by

the construction of the Support Facility,

of which about 2.5 acres of land would

be permanently impacted by the

operation of the proposed facility.

Construction of the LNG Transfer

System would temporarily impact about

8 acres of land and would including a

segment of submerged land in Half

Moon Cove. About 6 acres would be

required for operation of the LNG

Transfer System.

The Storage Facility would be located

in the town of Perry, Maine and affect

about 100 acres of land. About 88 acres

would be affected by operation.

The 35.1-mile-long, 36-inch-diameter

sendout pipeline in Washington County,

Maine would temporarily affect about

430 to 450 acres of land during

construction. About 210 to 213 acres

would be required for operations.

Quoddy Bay would use a maximum

100-wide right-of-way for construction,

of this amount 50 feet would consist of

permanent right-of-way and 50 feet

would consist of temporary workspace.

The construction right-of-way near

wetlands and water bodies would be

limited to 75 feet and in residential

areas to 50 feet.

The EIS Process

The Project is currently in the

preliminary stages of design, and at this

time a formal application has not been

filed with the Commission. For this

proposal, the Commission is initiating

the National Environmental Policy Act

(NEPA) review prior to receiving the

application. This allows interested

stakeholders to become involved early

in project planning and to identify and

resolve issues before an application is

filed with the FERC. A docket number

(PF06–11–000) has been established to

locate in the public record information

filed by Quoddy Bay and related

documents issued by the Commission.3

Once a formal application is filed with

the FERC, a new docket number will be

established.

NEPA requires the Commission to

take into account the environmental

impacts that could result from an action

whenever it considers the issuance of a

Certificate of Public Convenience and

Necessity under Section 7 of the Natural

Gas Act. NEPA also requires us to

3 To view information in the docket, follow the

instructions for using the eLibrary link at the end

of this notice.

E:\FR\FM\21MRN1.SGM

21MRN1

sroberts on PROD1PC70 with NOTICES

14202

Federal Register / Vol. 71, No. 54 / Tuesday, March 21, 2006 / Notices

identify and address concerns the

public would have about proposals.

This process is referred to as ‘‘scoping.’’

The main goal of the scoping process is

to focus the analysis in the EIS on

important environmental issues and

reasonable alternatives. By this Notice

of Intent, the Commission staff requests

agency and public comments on the

scope of the issues to be addressed in

the EIS. All comments received are

considered during the preparation of the

EIS.

In the EIS we will discuss impacts

that could occur as a result of the

construction, operation, maintenance,

and abandonment of the proposed

project under these general headings:

• Geology and Soils,

• Water Resources,

• Fish, Wildlife, and Vegetation,

• Endangered and Threatened

Species,

• Cultural Resources,

• Land Use, Recreation and Special

Interest Areas, and Visual Resources,

• Socioeconomics,

• Marine Transportation,

• Air Quality and Noise,

• Reliability and Safety, and

• Alternatives.

Our independent analysis of the

issues will be included in the draft EIS.

The draft EIS will be published and

mailed to Federal, state, and local

agencies, Native American tribes, public

interest groups, interested individuals,

affected landowners, newspapers,

libraries, and the Commission’s official

service list for this proceeding. A

comment period will be allotted for

review of the draft EIS. We will consider

all timely comments on the draft EIS

and revise the document, as necessary,

before issuing a final EIS.

We have already started to meet with

Quoddy Bay, agencies, and other

interested stakeholders to discuss the

Project and identify issues/impacts and

concerns. Between February 13 and 17,

2006, representatives of FERC staff

participated in public open houses

sponsored by Quoddy Bay in the Project

area to explain the NEPA environmental

review process to interested

stakeholders and take comments about

the Project. In addition, the Coast

Guard, which would be responsible for

reviewing the safety and security

aspects of the planned project and

regulating safety and security if the

project is approved, has initiated its

review of the project as well.

With this notice, we are asking other

Federal, state, and local agencies with

jurisdiction and/or special expertise

with respect to environmental issues in

the project area to formally cooperate

with us in the preparation of the EIS.

VerDate Aug<31>2005

19:01 Mar 20, 2006

Jkt 208001

These agencies may choose to

participate once they have evaluated the

proposal relative to their

responsibilities. Agencies that would

like to request cooperating status should

follow the instructions for filing

comments described later in this notice.

We encourage government

representatives to notify their

constituents of this planned project and

encourage them to comment on their

areas of concern.

To ensure your comments are

considered, please carefully follow the

instructions in the public participation

section below.

Currently Identified Environmental

Issues

We have identified several issues that

we think deserve attention based on a

preliminary review of the proposed

facilities and the information provided

by Quoddy Bay. This preliminary list of

issues may be changed based on your

comments and our analysis.

• Impact of LNG ship traffic on other

water-body users, including recreational

boaters, tour-boats, and commercial

fishing vessels.

• Potential impacts on regional

aquaculture and commercial fishing

activities.

• Safety and security issues relating

to LNG ship traffic, including transits

through Head Harbor Passage.

• Potential impacts on the residents

of neighboring communities, including

safety issues at the import and storage

facility, noise, air quality, and visual

resources.

• Project impacts on threatened and

endangered species and nearby National

Wildlife Refuges.

• Project impacts on cultural

resources.

We will make recommendations on

how to lessen or avoid impacts on the

various resource areas and evaluate

possible alternatives to the proposed

Project or portions of the Project.

Public Participation

You are encouraged to become

involved in this process and provide

your specific comments or concerns

about Quoddy Bay’s proposal. Your

comments should focus on the potential

environmental effects, reasonable

alternatives, and measures to avoid or

lessen environmental impacts. The more

specific your comments, the more useful

they will be. Please carefully follow

these instructions to ensure that your

comments are received in time and

properly recorded:

• Send an original and two copies of

your letter to: Magalie R. Salas,

Secretary, Federal Energy Regulatory

PO 00000

Frm 00039

Fmt 4703

Sfmt 4703

Commission, 888 First St. NE.; Room

1A, Washington, DC 20426.

• Label one copy of the comments for

the attention of Gas Branch 1.

• Reference Docket No. PF06–11–000

on the original and both copies.

• Mail your comments so that they

will be received in Washington, DC on

or before April 28, 2006 (Applicable

copies will be provided to the Coast

Guard).

Please note that the Commission

encourages electronic filing of

comments. See 18 Code of Federal

Regulations 385.2001(a)(1)(iii) and the

instructions on the Commission’s

Internet Web site at http://www.ferc.gov

under the ‘‘eFiling’’ link and the link to

the User’s Guide. Prepare your

submission in the same manner as you

would if filing on paper and save it to

a file on your hard drive. Before you can

file comments you will need to create an

account by clicking on ‘‘Login to File’’

and then ‘‘New User Account.’’ You will

be asked to select the type of filing you

are making. This filing is considered a

‘‘Comment on Filing.’’

In addition to or in lieu of sending

written comments, we invite you to

attend the public scoping meetings we

will conduct in the Project area.4 The

locations for these meetings are listed

below. All meetings are scheduled to

begin at 7 p.m.:

Wednesday, April 5, 2006, 7 p.m.

Pleasant Point Recreational Dept./

Sipayik Boy’s and Girl’s Club,

Passamaquoddy Drive, Perry, ME

04667, 207–853–6161.

Thursday, April 6, 2006, 7 p.m.

Perry School, 1587 U.S. Route 1,

Perry, ME 04667, 207–853–2522.

The scoping meetings listed above

will be combined with the Coast

Guard’s public meeting regarding the

safety and security of the project. At the

meetings, the Coast Guard will discuss

(1) the waterway safety assessment that

it will conduct to determine whether or

not the waterway can safely

accommodate the LNG carrier traffic

and operation of the planned LNG

marine terminal, and (2) the security

assessment it will conduct in

accordance with the requirements of the

Maritime Transportation Security Act.

The Coast Guard will not be issuing a

separate meeting notice for the maritime

safety and security aspects of the

project.

The joint public scoping meetings are

designed to provide state and local

agencies, interested groups, affected

4 The Quoddy Bay scoping meetings were

originally scheduled for March 28 and 29, 2006.

However, due to scheduling conflicts for the FERC

staff, the meetings were moved as noted above.

E:\FR\FM\21MRN1.SGM

21MRN1

Federal Register / Vol. 71, No. 54 / Tuesday, March 21, 2006 / Notices

landowners, and the general public with

another opportunity to offer your

comments on the Project. Interested

groups and individuals are encouraged

to attend the meetings and to present

comments on the environmental issues

they believe should be addressed in the

EIS and LNG vessel transit safety

concerns for consideration by the Coast

Guard. A transcript of each meeting will

be made so that your comments will be

accurately recorded.

All public meetings will be posted on

the Commission’s calendar located at

http://www.ferc.gov/EventCalendar/

EventsList.aspx along with other related

information.

When Quoddy Bay submits its

application for authorization to

construct and operate the project, the

Commission will publish a Notice of

Application in the Federal Register and

will establish a deadline for interested

persons to intervene in the proceeding.

Because the Commission’s Pre-Filing

Process occurs before an application to

begin a proceeding is officially filed,

petitions to intervene during this

process are premature and will not be

accepted by the Commission.

sroberts on PROD1PC70 with NOTICES

Environmental Mailing List

If you received this notice, you are on

the environmental mailing list for this

Project and will continue to receive

Project updates including the draft and

final EISs. If you want your contact

information corrected or you do not

want to remain on our mailing list,

please return the Correct or Remove

From Mailing List Form included as

Appendix 3.

To reduce printing and mailing costs,

the draft and final EISs will be issued

in both CD–ROM and hard copy

formats. The FERC strongly encourages

the use of the CD–ROM format in its

publication of large documents. If you

wish to receive a paper copy of the draft

EIS instead of a CD–ROM, you must

indicate that choice on the return

postcard (Appendix 3).

Additional Information

Additional information about the

Project is available from the

Commission’s Office of External Affairs,

at 1–866–208–FERC or on the FERC

Internet Web site (http://www.ferc.gov)

using the eLibrary link. Click on the

eLibrary link, click on ‘‘General Search’’

and enter the docket number excluding

the last three digits in the Docket

Number field. Be sure you have selected

an appropriate date range. For

assistance, please contact FERC Online

Support at FercOnlineSupport@ferc.gov

or toll free at 1–866–208–3676, or for

TTY, contact (202) 502–8659. The

VerDate Aug<31>2005

19:01 Mar 20, 2006

Jkt 208001

eLibrary link also provides access to the

texts of formal documents issued by the

Commission, such as orders, notices,

and rulemakings.

In addition, the Commission now

offers a free service called eSubscription

which allows you to keep track of all

formal issuances and submittals in

specific dockets. This can reduce the

amount of time you spend researching

proceedings by automatically providing

you with notification of these filings,

document summaries and direct links to

the documents. Go to http://

www.ferc.gov/esubscribenow.htm.

Finally, Quoddy Bay L.L.C. LNG has

established an Internet Web site for this

project at http://www.quoddylng.com.

The website includes a project

overview, status, and answers to

frequently asked questions. You can

also request additional information by

calling Quoddy Bay LNG at 207–853–

6631, or by e-mail at

ABarstow@quoddylng.com.

Magalie R. Salas,

Secretary.

[FR Doc. E6–4041 Filed 3–20–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Notice of Application for Non-Project

Use of Project Lands and Waters and

Soliciting Comments, Motions To

Intervene, and Protests

March 13, 2006.

Take notice that the following

hydroelectric application has been filed

with the Commission and is available

for public inspection.

a. Type of Application: Non-Project

Use of Project Lands and Waters.

b. Project No.: 516–418.

c. Date filed: February 21, 2006.

d. Applicant: South Carolina Electric

and Gas Company.

e. Name of Project: Saluda

Hydroelectric Project.

f. Location: On the Saluda River, near

the Town of Delmar, Saluda County,

South Carolina.

g. Filed Pursuant to: Federal Power

Act, 16 U.S.C. 791 (a) 825(r) and

sections 799 and 801.

h. Applicant Contact: Beth Trump,

South Carolina Gas and Electric Co.,

Land Management (MZ6), Columbia, SC

29218, telephone (803) 217–7912, fax

(803) 933–7520, e-mail

btrump@scana.com.

i. FERC Contact: Brandi Sangunett;

telephone (202) 502–8393, e-mail

brandi.sangunett@ferc.gov.

PO 00000

Frm 00040

Fmt 4703

Sfmt 4703

14203

j. Deadline for filing comments and or

motions: April 14, 2006.

k. Description of Proposal: South

Carolina Electric and Gas Company is

requesting Commission approval to

authorize the use by Saluda County

Water and Sewer Authority (SCWSA) of

project lands for the withdrawal of up

to 15 million gallons per day of water

from the project reservoir for public

drinking water, and to convey 0.23 acres

of project property along with a 40-foot

wide ingress and egress easement for the

purpose of constructing a raw water

pumping station and associated

facilities. The water withdrawal would

involve an inter-basin transfer from the

Saluda River basin for use and discharge

into the Lower Savannah River basin

and the Edisto River basin. No lands

presently reserved for public recreation

will affected.

l. Locations of the Application: A

copy of the application is available for

inspection and reproduction at the

Commission’s Public Reference Room,

located at 888 First Street, NE, Room

2A, Washington, DC 20426, or by calling

(202) 502–8371. This filing may also be

viewed on the Commission’s Web site at

http://www.ferc.gov using the

‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field (p–516) to

access the document. You may also

register online at http://www.ferc.gov/

docs-filing/esubscription.asp to be

notified via e-mail of new filings and

issuances related to this or other

pending projects. For assistance, call 1–

866–208–3676 or e-mail

FERCOnlineSupport@ferc.gov, for TTY,

call (202) 502–8659. A copy is also

available for inspection and

reproduction at the address in item (h)

above.

m. Individuals desiring to be included

on the Commission’s mailing list should

so indicate by writing to the Secretary

of the Commission.

n. Comments, Protests, or Motions to

Intervene—Anyone may submit

comments, a protest, or a motion to

intervene in accordance with the

requirements of Rules of Practice and

Procedure, 18 CFR 385.210, .211, .214.

In determining the appropriate action to

take, the Commission will consider all

protests or other comments filed, but

only those who file a motion to

intervene in accordance with the

Commission’s Rules may become a

party to the proceeding. Any comments,

protests, or motions to intervene must

be received on or before the specified

comment date for the particular

application.

o. Filing and Service of Responsive

Documents—Any filings must bear in

E:\FR\FM\21MRN1.SGM

21MRN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.