In the Matter of HOUSING AUTHORITY OF THE CITY OF

Agency decision

Ask Donna

What actually matters in this document.

Text

August 16, 2023

CBCA 7717-FEMA

In the Matter of HOUSING AUTHORITY OF THE CITY OF

LUMBERTON, NORTH CAROLINA

Antonio R. Pavía-Vidal of Baker, Donelson, Bearman, Caldwell & Berkowitz, PC,

Washington, DC; and Danielle M. Aymond of Baker, Donelson, Bearman, Caldwell &

Berkowitz, PC, Baton Rouge, LA, counsel for Applicant.

Jonathan Ekblad and Will Polk, Office of the General Counsel, North Carolina

Department of Public Safety, Raleigh, NC, counsel for Grantee.

Charles Schexnaildre, Office of Chief Counsel, Federal Emergency Management

Agency, Department of Homeland Security, Baton Rouge, LA; and Anthony Homer, Office

of Chief Counsel, Federal Emergency Management Agency, Department of Homeland

Security, Washington, DC, counsel for Federal Emergency Management Agency.

Before the Arbitration Panel consisting of Board Judges BEARDSLEY (Chair),

GOODMAN, and ZISCHKAU.

GOODMAN, Board Judge, writing for the panel.

The applicant, the Housing Authority of the City of Lumberton, North Carolina,

sought arbitration of a dispute with the Federal Emergency Management Agency (FEMA)

in accordance with section 423 of the Robert T. Stafford Disaster Relief and Emergency

Assistance Act, as amended, 42 U.S.C. § 5189a (2018). The issue before us is whether the

applicant is entitled to the costs of replacing, rather than repairing, public housing units in

accordance with FEMA’s “fifty-percent rule.” We find that the applicant is only eligible for

the costs of repairing the housing units, not the costs for replacement.

CBCA 7717-FEMA

2

Background

The applicant seeks public assistance (PA) funding for thirty units in its Turner

Terrace housing facility, which is a public low-income housing facility located in Robeson

County, North Carolina. The panel conducted a hearing on June 14, 2023.

From October 4 to 24, 2016, Hurricane Matthew caused storms and flooding in

Robeson County and other parts of North Carolina. The units in Turner Terrace were

flooded as a result of the storm. On October 17, 2016, the applicant contracted with ServPro

and K&S Builders for cleanup and remediation of the units.1 ServPro completed its work on

November 18, 2016. K&S Builders completed its work on August 17, 2017. The costs for

cleanup and remediation were included in FEMA project worksheet (PW) 20 for ServPro and

PW 315 for K&S Builders. The scope of work in PW 20 was to restore the condition of the

Turner Terrace housing facility, which included general construction, demolition, water

extraction, and remediation of mold. Exhibit 21 at 9–10. The scope of PW 315 was cleanup

and remediation—to “remove contamination . . . to eliminate or reduce the immediate threat

of significant damage”—which was accomplished by removal of debris. Exhibit 22 at 8.

Neither PW 20 nor PW 315 included costs for asbestos removal. Ultimately, the costs for

PW 20 and PW 315 were paid as emergency work projects under category B funding to

eliminate or lessen threats to lives, public health, or safety, or threats of damage to public or

private property in a cost effective manner. Public Assistance Program and Policy Guide

(PAPPG) (Jan. 2016) at 57.

In February 2017, the applicant hired Matrix Health and Safety Consultants, L.L.C.

(Matrix) to inspect the units for asbestos and lead. Exhibits 15, 16. Matrix found asbestos

in both the ceiling texture and the tan floor tile and mastic. Exhibit 15 at 5. The applicant

also supplied an inspection report, seemingly completed during 2021,2 which found asbestos

to be “oozing” through the tile floor and recommended removal. In 2017, the applicant

claims it obtained a quote to remediate the asbestos present in the units at issue and at other

nearby housing units not the subject of this dispute. The applicant asserts that it divided that

quote by the total number of units, which resulted in an average cost of $22,751.76 per unit.

Applicant’s Reply at 21-22. The applicant then adjusted the unit cost for inflation, to

$23,234.88. See Exhibit 19 at 3, line 33.

1

ServPro was used for insured units while K&S Builders was used for uninsured

units.

2

The report is undated. FEMA notes that “metadata suggests the report was

completed sometime in 2021.” FEMA’s Sur-Reply at 5 n.4.

CBCA 7717-FEMA

3

FEMA denied the asbestos abatement costs, finding the work not eligible. FEMA

determined that asbestos abatement was not needed to repair the flooring because “the floor

tile in the housing units was covered with a second layer of vinyl tile to encapsulate

asbestos,” which FEMA found was a common method of asbestos protection. Exhibit 3 at 6

& n.14. The applicant’s director of operations of public housing at the time of Hurricane

Matthew testified during the arbitration hearing that moisture present in the units due to the

flooding caused the second layer of vinyl tile to start popping up and that, as a result, the tile

and black mastic were cracked, exposing the asbestos material.

In April 2017, the applicant provided a sworn statement as to proof of loss for the

thirteen insured units. Exhibit 20. FEMA’s initial PW 1385 was submitted on May 13,

2017, and mistakenly only captured the damage to the nine housing units that were

uninsured. This PW reported flooding from six to twenty-four inches, which caused mold

damage. It also stated that the kitchen countertops and cabinets, electrical receptacles, and

interior doors and hardware needed to be replaced, the walls needed to be remediated, and

the vinyl and ceramic tile flooring needed to be patched and repaired. The PW stated further

that there would be an attempt to salvage the heating, ventilation and air conditioning

(HVAC) system, hot water heaters, cast iron tubs, sinks, and toilets. Exhibit 7.

In September 2018, Hurricane Florence flooded the facility in Turner Terrace again.

In June and October 2019, over two years after Hurricane Matthew, the applicant hired the

Wooten Company to provide an estimate on the cost to repair thirty-two units3 due to the

damage from Hurricane Matthew. The repair cost was greater than fifty percent of the

replacement costs for each of the thirty units. Based on the Wooten Company’s estimates,

the applicant submitted a request to change the scope of work to include: increasing the

damaged facilities captured from nine to all thirty-two units; asbestos abatement for vinyl

floor tiles; replacing undamaged cast iron bathtubs; upgrading the electrical wire runs and

receptacles; interior wall trim and painting; exterior wall insulation replacement; and HVAC.

Exhibit 13. PW 1385 was updated with new cost estimates. Exhibits 2, 13. The work

included installing new doors, walls, kitchen cabinets and sinks, and vinyl floor tiling and

a new water heater. Thus, the applicant requested that the units be deemed eligible for

replacement rather than repair. See Exhibit 13.

3

The applicant appealed the fifty-percent calculation on thirty-two units, but

before the Board, the applicant amended its position and no longer requested the replacement

costs of two of the thirty-two units.

CBCA 7717-FEMA

4

Discussion

The applicant argues that FEMA’s fifty-percent calculation, which concluded that

each of the thirty units was only eligible for repair costs, did not include all eligible costs.

We review the fifty-percent rule de novo and are not bound by FEMA’s prior determinations.

City of Hattiesburg, Mississippi, CBCA 7017-FEMA, 22-1 BCA ¶ 37,986, at 184,457

(2021).

Pursuant to the PAPPG at 96, the fifty-percent rule is “[t]he comparison of the repair

cost to the replacement costs . . . with the repair cost as the numerator and the replacement

costs as the denominator.” Not included in the repair cost are upgrades of non-damaged

elements even if required by standards, demolition beyond that which is essential to repair

the damaged elements, site work, soft costs, contents, hazard mitigation measures, and

emergency work. PAPPG at 96–97. Not included in the replacement cost is demolition, site

work, soft costs, contents, hazard mitigation measures, and emergency work. Id. at 97.

The applicant does not accept FEMA’s determination that the repair cost does not

exceed fifty percent of the replacement costs. First, the applicant argues that FEMA should

have used the actual quantities in the insurance proof of loss statement rather than the

quantities FEMA used. Second, the applicant believes that FEMA should approve costs for

asbestos remediation and that those costs should be included in FEMA’s fifty-percent-rule

calculation. Third, FEMA’s fifty-percent-rule calculation did not include the costs for water

and mold remediation.

The applicant also argues that regardless of the fifty-percent-rule calculation, repair

is not feasible, and, therefore, the project should be deemed eligible for replacement.

Actual Proof of Loss

Costs are only eligible if, among other things, the costs are “[d]irectly tied to the

performance of eligible work” and “[a]dequately documented.” PAPPG at 21. For work to

be eligible, it must (1) be required as a result of the disaster; (2) be located within the disaster

area, with the exception of sheltering and evacuation activities; and (3) be the legal

responsibility of an eligible applicant. PAPPG at 19. “The [a]pplicant is responsible for

providing documentation to demonstrate its claimed costs are reasonable.” Id. at 22.

According to the applicant, FEMA’s estimated costs contain inaccurate quantities for

several damaged elements which decreased the repair value, as FEMA used quantities which

were inconsistent with the quantities listed in the proof of loss. For example, in the unit at

309 Myrtle Court, the proof of loss listed 692.5 square feet of insulation compared to the 484

square feet listed in FEMA’s cost estimate. Compare Exhibit 20 at 125 (proof of loss) with

CBCA 7717-FEMA

5

Exhibit 10 at 27–28 (FEMA cost estimate). These differences appear throughout the two

documents. FEMA provides no reason why the quantities differ and even indicates in its

reply that FEMA’s cost estimators will review the differences and make changes, if

warranted. FEMA’s Sur-Reply at 2 n.1. We find that the applicant has adequately

documented the costs in the proof of loss statement. However, in order to prevail and

achieve replacement status for any of the units, the applicant must prove additional eligible

repair costs to achieve the required values under the fifty-percent rule. See Applicant’s 50

Percent Rule Demonstrative; Exhibit 26.

Asbestos Abatement

The applicant asserts FEMA should have approved the costs for asbestos abatement

and included them in the fifty-percent calculation, while FEMA maintains that costs for

asbestos abatement are not eligible work. According to FEMA, asbestos abatement was not

required as a result of the disaster because photographs of the units’ floors and the insurance

proof of loss do not indicate damage to the underlying asbestos. In addition, vinyl tiling

containing the asbestos was encapsulated under a second layer of vinyl tiling.

We find the applicant has shown the need for asbestos abatement as a result of the

disaster. If the inspection report recommending the asbestos abatement, which was

conducted after another hurricane and subsequent flooding, was the only evidence before us,

we would not find the applicant had shown the asbestos abatement was eligible work.

However, the inspection report is supported by the 2017 asbestos and lead test which

discovered asbestos in the floor tile and mastic and the statements of a witness who told the

panel that immediately following the storm she found asbestos material to be “oozing” out

of the tile and mastic.

Even though we find the need for asbestos abatement was the result of the disaster,

FEMA is correct that asbestos abatement is not an eligible cost because the applicant has not

adequately documented or supported the costs. The applicant’s claimed asbestos abatement

costs are based on a 2017 quote adjusted for inflation4 that includes costs for remediation of

asbestos present in the units at issue and in other units. The applicant, however, failed to

provide the quote or any other documentation to support the costs claimed but, instead, only

mentioned the cost in two lines in its adjusted cost estimating formula, comments in its reply

brief, and at the hearing. See Applicant’s Reply Brief at 21–22; see also Exhibit 19 at 3,

lines 33–34. There is no information provided on the quantities, hours, or materials that

support the costs. See id. There is also no evidence in the record as to whether the per-unit

4

The applicant has not sufficiently explained why the 2017 quote should be

adjusted for inflation instead of obtaining a more recent quote.

CBCA 7717-FEMA

6

cost is a reasonable reflection of the asbestos abatement costs for the units in Turner Terrace.

Because the applicant has failed to adequately document its costs, we find the costs for

asbestos abatement are ineligible costs.

Water and Mold Remediation

The applicant asserts that remediation for water and mold was improperly excluded

from both the numerator and the denominator in the fifty-percent calculation. FEMA

excluded the water and mold remediation because FEMA classified it as emergency work,

which is not included in the fifty-percent calculation. While not clear, the applicant’s

argument appears to be that because the flood waters remained standing in the housing units

for over two weeks, instead of immediately receding, the remediation of these units cannot

be classified as emergency work.

Under FEMA regulations, emergency work is defined as “work which must be done

immediately to save lives and to protect improved property and public health and safety, or

to avert or lessen the threat of a major disaster.” 44 CFR 206.201 (2022). Emergency work

is performed to “[e]liminate or lessen an immediate threat of additional damage.” PAPPG

at 42. An “immediate threat” is defined as “the threat of additional damage or destruction

from an event which can reasonably be expected to occur within five years.” 44 CFR

206.221(c). FEMA emergency work is funded through category A (debris removal) or

category B (emergency protective measures) grants. PAPPG at 43, 57. Here, the water and

mold remediation work began about three weeks after the flooding receded. This work was

done to protect the property until additional repairs could be completed. Both the applicant

and FEMA agree the water and mold remediation was funded through PW 20 and PW 315,

which were paid as emergency work projects under category B. This work is clearly within

the definition of emergency work and is therefore excluded from the fifty-percent

calculation.

Feasibility

It must also be feasible to repair the facility. A facility is feasible to repair when “it

can perform the function for which it was being used as well as it did immediately prior to

the disaster.” 44 CFR 206.226(f)(1).5 If a facility is “not repairable . . . approved restorative

work may include replacement of the facility”—even if the repair cost does not get over the

replacement threshold under the fifty-percent rule. 44 CFR 206.226(f)(2).

5

Similarly, a facility is feasible to repair if “it can perform the pre-disaster

function as well as it did prior to the incident.” PAPPG at 96.

CBCA 7717-FEMA

7

The applicant argues that the facility is not repairable because of the high cost of flood

proofing the homes through elevation or another means and that, therefore, it must be

replaced. Little evidence was provided to show either that the homes need to be elevated to

be able to house people again or what the total repair costs would be. As such, we do not

find that the units are infeasible to repair.

Decision

We conclude that the units at issue are ineligible for replacement costs, as the cost to

repair does not exceed fifty percent of the cost to replace the units.

Allan H. Goodman

ALLAN H. GOODMAN

Board Judge

Erica S. Beardsley

ERICA S. BEARDSLEY

Board Judge

Jonathan D. Zischkau

JONATHAN D. ZISCHKAU

Board Judge

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.