stating the rule that “[i]ssue preclusion may not be asserted against one who was not a party in the first case”
How later courts described this case
- stating the rule that “[i]ssue preclusion may not be asserted against one who was not a party in the first case”
- finding that Duke Energy, an entity operating dams and reservoirs in both the plaintiff and defendant States, had “demonstrated powerful interests” likely to “shape the outcome of [the] 95 litigation” that were separate from the interests represented by the States
- concluding that by implementing BMPs to address water pollution, the agency complied with Wyoming’s state water quality “requirements” under section 1323(a) of the CWA
- holding federal 106 agencies to the same water pollution control requirements “as if they were private citizens”
Written by the judges who cited it.
The opinion
UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA
STATE OF ALABAMA, et al.,
Plaintiffs,
and
WATER WORKS AND SANITARY
SEWER BOARD OF THE CITY OF
MONTGOMERY, ALABAMA, et
al.,
Plaintiff-Intervenors,
v. Civil Action No. 15-696 (EGS)
UNITED STATES ARMY CORPS OF
ENGINEERS, et al.,
Defendants,
and
STATE OF GEORGIA, et al.,
Defendant-Intervenors.
ALABAMA POWER COMPANY,
Plaintiff,
v. Civil Action No. 15-699 (EGS)
(Consolidated with No. 15-696)
UNITED STATES ARMY CORPS OF
ENGINEERS, et al.,
Defendants.
MEMORANDUM OPINION
i
Table of Contents
I. Introduction ............................................... 1
II. Background ................................................. 4
A. Statutory and Regulatory Background....................... 4
1. Clean Water Act ......................................... 4
2. National Environmental Policy Act ...................... 11
B. Factual Background....................................... 17
1. Authorized Project Purposes of the Corps’ Reservoir
Projects in the ACT Basin and the Development of Governing
Water Control Manuals ..................................... 17
2. The Allatoona Reservoir Project, Its History, and Its
Authorized Project Purposes ............................... 20
3. Prior Versions of the Allatoona Project’s Water Control
Manual: 1951, 1962, 1968, and a 1993 Draft Version ........ 27
4. The Process for Revising and Adopting the Updated 2015
Master Manual, the Allatoona Project Water Control Manual,
and the FEIS .............................................. 34
5. Key Features of the Updated Master Manual and the
Allatoona Project Water Control Manual, and the Specific
Changes to Which the Alabama Plaintiffs and Intervenor-
Plaintiffs Object ......................................... 38
C. Procedural Background.................................... 43
III. Legal Standard........................................... 48
IV. Analysis................................................. 53
ii
A. Defendants Did Not Violate the CWA or the Corps’
Implementing Engineer Regulations, and the Alabama Plaintiffs’
Water Quality Claims Must Fail .............................. 54
1. Issue Preclusion Does Not Apply to Bar the Alabama
Plaintiffs’ Water Quality Claims .......................... 61
a. The Issue Preclusion Criteria Are Satisfied as Against
the State of Alabama for Its Water Quality Claims Involving
the CWA and ER 1110-2-8154............................... 71
b. Although the Issue Preclusion Criteria Are Satisfied as
Against the State of Alabama’s CWA and ER 1110-2-8154 Water
Quality Claims, the Doctrine Is Inapplicable Here........ 74
i. The “Unmixed Questions of Law” Exception to Issue
Preclusion Applies Here ................................ 75
ii. Policy Considerations and the Presence of Non-Mutual
Parties Also Weigh Against the Application of Issue
Preclusion Here ........................................ 83
2. The Alabama Plaintiffs’ Water Quality Claims Fail on the
Merits .................................................... 97
a. Section 313(a) of the CWA (33 U.S.C. § 1323(a)) ....... 97
b. ER 1110-2-8154 ....................................... 118
c. The Duty Under the APA to Engage in Reasoned Decision-
Making and Not Arbitrarily Depart from Precedent........ 129
B. Defendants Did Not Violate NEPA......................... 133
iii
1. The Corps Reasonably Defined the No-Action Alternative in
the FEIS Using the 1993 Draft Allatoona Manual ........... 136
a. Issue Preclusion Does Not Apply to Bar the Alabama
Plaintiffs’ NEPA No-Action Alternative Claim............ 137
b. The Alabama Plaintiffs’ NEPA No-Action Alternative Claim
Fails on the Merits..................................... 143
2. The Corps Took a “Hard Look” at Environmental Impacts of
the Master Manual and Adequately Analyzed and Disclosed Those
Impacts in the FEIS ...................................... 155
a. Parameters of NEPA’s “Hard Look” Doctrine ............ 156
b. The FEIS Adequately Analyzes and Discloses Impacts of the
Proposed Action Alternative on Hydropower Generation.... 163
c. The FEIS Adequately Analyzes and Discloses Impacts of the
Proposed Action Alternative Associated with the CC-MWA’s
Water Supply Withdrawals................................ 169
d. The FEIS Adequately Analyzes and Discloses Impacts of the
Master Manual on Water Quality at Montgomery, Alabama... 176
e. The FEIS Adequately Analyzes and Discloses Impacts of the
Master Manual on Salt Water Intrusion from Mobile Bay... 188
f. The FEIS Adequately Analyzes and Discloses Impacts of the
Master Manual on Recreation and Economic Development at
Lake Martin............................................. 200
3. The Corps Adequately Considered All Reasonable
Alternatives in the FEIS ................................. 222
iv
C. Defendants Did Not Violate the APA...................... 232
1. The Master Manual Complies with the Corps’ Statutory
Obligations and Properly Balances the Authorized Project
Purposes of the ACT Basin, Including at the Allatoona Project
......................................................... 232
a. The Master Manual Does Not “Deemphasize” Hydropower at
the Allatoona Project................................... 243
i. Hydropower Was Not Abandoned or Reordered for the Sake
of Recreation, Which Was Appropriately Considered Among
Allatoona’s Other Project Purposes .................... 250
ii. Reductions in Hydropower Are Not So “Substantial” or
“Significant” So as to Have the Effect of Materially
Altering the Size of Allatoona’s Hydropower Purpose ... 260
b. The Master Manual Does Not “Deemphasize” Navigation at
the Allatoona Project................................... 279
2. The Master Manual Is Not an “Unexplained and Arbitrary
Departure from Established Operations” ................... 287
V. Conclusion ............................................... 294
v
I. Introduction
Following decades of litigation spanning numerous courts,
on May 4, 2015, the United States Army Corps of Engineers (the
“Corps”) adopted its updated Master Water Control Manual (the
“Master Manual”) governing management of its various dams and
reservoir projects in the Alabama-Coosa-Tallapoosa (“ACT”) River
Basin. See Administrative Record (“A.R.”), ECF No. 61 at D-
00053477-80. 1 The Master Manual, supplemented with separate
manuals for individual basin projects, is the Corps’ first
revised version of the manual since 1951, and was promulgated
pursuant to the public notice and comment process of the
Administrative Procedure Act (“APA”), 5 U.S.C. § 551, et seq.,
and the requirements of the National Environmental Policy Act of
1969 (“NEPA”), 42 U.S.C. §§ 4321-4347. Id. at D-00043862.
Plaintiffs the State of Alabama and Alabama Power Company
(“APC”) (collectively, the “Alabama Plaintiffs”) have sued the
Corps and various U.S. Army and Corps officers in their official
capacities (collectively, “Defendants”) to challenge the Master
1 When citing electronic filings throughout this Opinion, the
Court cites to the ECF header page number, not the original page
number of the filed document, with the exception of the
Administrative Record (“A.R.”), which is to the Bates number
assigned to the relevant corresponding document in Defendants’
certified list of contents of the administrative record. See
generally Defs.’ Notice of Filing of Certified List of Contents
of, and Production of, Administrative R., ECF No. 61, Attachment
B, Parts 1-6 [hereinafter cited as A.R., ECF No. 61].
1
Manual, specifically its updates to operation of the Corps’
federal dam and reservoir project at Allatoona Lake in Georgia,
alleging that it violates the APA, NEPA, and the Clean Water Act
(“CWA”), 33 U.S.C. § 1251, et seq. See Pls.’ Joint Mot. for
Summ. J. (“Pls.’ Mot.”), ECF No. 83 at 11-12. The Alabama
Plaintiffs ask that the Court set aside the Master Manual as
unlawful and direct the Corps to develop a revised manual
consistent with its statutory authority and operational
precedents under the APA, pursuant to a proper environmental
analysis as required by NEPA, and in accordance with the CWA’s
requirements. Id.; Compl., ECF No. 1 at 27-28. The Water Works
and Sanitary Sewer Board of the City of Montgomery, Alabama
(“Montgomery Board”), the Board of Water and Sewer Commissioners
of the City of Mobile (“Mobile Water”), Lake Martin Resource
Association, Inc. (“LMRA”), and Russell Lands, Inc. (“Russell
Lands”) (collectively, “Intervenor-Plaintiffs”) filed complaints
as intervenors, see ECF Nos. 34-35, 75; and have also jointly
moved for summary judgment, see Joint Mot. for Summ J. of
Intervenor-Pls. (“Intervenor-Pls.’ Mot.”), ECF No. 85 at 1.
Defendants have filed a Cross-Motion for Summary Judgment
(“Defs.’ Cross-Mot.”), arguing that the Master Manual “is
neither arbitrary nor in excess of Congressional authorizations”
pursuant to the APA and complies with the Corps’ statutory
obligations under the CWA and NEPA. See Defs.’ Cross-Mot., ECF
2
No. 95 at 9-10. Intervening alongside the Corps as defendants
are the State of Georgia, the Atlanta Regional Commission
(“ARC”), and the Cobb County-Marietta Water Authority (“CC-MWA”)
(collectively, “Intervenor-Defendants” or the “Georgia
Parties”), and they have also jointly filed a cross-motion for
summary judgment. See Georgia Parties’ Joint Cross-Mot. for
Summ. J. & Opp’n to Pls.’ & Intervenor-Pls.’ Mots. for Summ J.
(“Intervenor-Defs.’ Cross-Mot.”), ECF No. 97 at 1.
Pending before the Court are the Alabama Plaintiffs’ Joint
Motion for Summary Judgment, ECF No. 83; Intervenor-Plaintiffs’
Joint Motion for Summary Judgment, ECF No. 85; Defendants’
Cross-Motion for Summary Judgment, ECF No. 96; 2 and Intervenor-
Defendants’ Joint Cross-Motion for Summary Judgment, ECF No. 98. 3
Also pending is Intervenor-Defendants’ supplemental motion for
summary judgment alleging issue preclusion based on an
intervening judgment entered against Alabama by the District
Court for the Northern District of Georgia (“Northern District
of Georgia”) in what they call “parallel litigation challenging
2 Although docketed at ECF No. 96, the complete briefing for
Defendants’ Cross-Motion for Summary Judgment is docketed at ECF
No. 95. Therefore, the Court cites to the ECF header page number
of ECF No. 95 when citing to Defendants’ brief.
3 Although docketed at ECF No. 98, the complete briefing for
Intervenor-Defendants’ Joint Cross-Motion for Summary Judgment
is docketed at ECF No. 97. Therefore, the Court cites to the ECF
header page number of ECF No. 97 when citing to Intervenor-
Defendants’ brief.
3
a similar action by the same defendants in an adjacent river
basin.” See Suppl. Mot. for Summ. J. by Intervenor-Defs.
(“Intervenor-Defs.’ Suppl. Mot.”), ECF No. 129 at 6.
Upon careful consideration of the Alabama Plaintiffs’ and
Intervenor-Plaintiffs’ motions, Defendants’ and Intervenor-
Defendants’ cross-motions, Intervenor-Defendants’ supplemental
motion, the oppositions and replies thereto, the arguments of
amicus curiae, the applicable law and regulations, the full
administrative record, and for the reasons set forth below, the
Court upholds the Master Manual as lawful. Accordingly, the
Court DENIES the Alabama Plaintiffs’ and Intervenor-Plaintiffs’
motions for summary judgment, GRANTS Defendants’ and Intervenor-
Defendants’ cross-motions for summary judgment, and DENIES
Intervenor-Defendants’ supplemental motion for summary judgment.
II. Background
A. Statutory and Regulatory Background
1. Clean Water Act
The Federal Water Pollution Control Act, commonly referred
to as the Clean Water Act, “is a comprehensive water quality
statute designed to ‘restore and maintain the chemical,
physical, and biological integrity of the Nation’s waters.’” PUD
No. 1 of Jefferson Cnty. v. Wash. Dep’t of Ecology, 511 U.S.
700, 704, 114 S. Ct. 1900, 128 L. Ed. 2d 716 (1994) (quoting 33
U.S.C. § 1251(a)). The CWA seeks to eliminate the discharge of
4
pollutants into navigable waters and to attain “water quality
which provides for the protection and propagation of fish,
shellfish, and wildlife.” 33 U.S.C. § 1251(a)(1)-(2). To achieve
these goals, the CWA establishes a two-step approach that
assigns some responsibilities to the U.S. Environmental
Protection Agency (“EPA”) and others to the States “in
furtherance of the Act’s stated purpose of promoting cooperation
between federal and state governments.” Anacostia Riverkeeper,
Inc. v. Jackson, 798 F. Supp. 2d 210, 214 (D.D.C. 2011).
The first step, pursuant to section 301 of the CWA,
requires the EPA to promulgate “effluent limitations,” which are
technology-based restrictions on the maximum allowable
discharges into the country’s navigable waters from individual
point sources. Id.; PUD No. 1, 511 U.S. at 704 (citing 33 U.S.C.
§§ 1311, 1314); see also Arkansas v. Oklahoma, 503 U.S. 91, 101,
112 S. Ct. 1046, 117 L. Ed. 2d 239 (1992) (defining effluent
limitations as caps on “quantities, rates, and concentrations of
specified substances which are discharged from point sources”).
Point sources are “any discernable, confined and discrete
conveyance[s] . . . from which pollutants are or may be
discharged[,]” 33 U.S.C. § 1362(14); such as factory pipes or
sewage drains, and thus “constitute ideal starting points for
the monitoring and regulation of water contamination[,]”
Jackson, 798 F. Supp. 2d at 214. Once developed, effluent
5
limitations are incorporated into the National Pollutant
Discharge Elimination System (“NPDES”), which “is a permit
program through which individual entities responsible for
covered point sources receive permits setting the maximum
discharges of particular contaminants via these sources.” Id. at
214 (citing 33 U.S.C. § 1311(b)(2)). In other words, “discharges
of pollutants into the waters of the United States from ‘point
source[s]’ . . . are normally permissible only if made pursuant
to the terms of a [NPDES] permit.” Am. Paper Inst., Inc. v. EPA,
996 F.2d 346, 348-49 (D.C. Cir. 1993).
NPDES permits must be obtained from the EPA, or, in the
nearly 50 states “the EPA has authorized to administer their own
NPDES program, from a designated state agency.” Id. at 349; see
also NPDES State Program Authority, U.S. ENV’T PROT. AGENCY,
https://www.epa.gov/npdes/npdes-state-program-authority (last
visited July 29, 2023) (listing states with NPDES permitting
authority); 33 U.S.C. § 1342(b) (authorizing each State “to
administer its own permit program for discharges into navigable
waters within its jurisdiction[,]” subject to EPA approval). Of
note, nonpoint sources, which are not defined in the CWA but are
viewed as “diffuse sources of pollution, like farms or roadways,
from which runoff drains into a watershed[,]” Am. Farm Bureau
Fed’n v. EPA, 792 F.3d 281, 289 (3d Cir. 2015); are not subject
to NPDES permits or effluent limitations, In re ACF Basin Water
6
Litig., 467 F. Supp. 3d 1323, 1337-38 (N.D. Ga. 2020); see also
Or. Nat. Res. Council v. U.S. Forest Serv., 834 F.2d 842, 849-50
(9th Cir. 1987) (explaining that “[n]onpoint sources, because of
their very nature, are not regulated under the NPDES[,]” and
effluent limitations, “by definition,” apply only to point
sources). Nonpoint sources are discussed in a separate portion
of the CWA, “which encourages states to develop areawide waste
treatment management plans.” Or. Nat. Res. Council, 834 F.2d at
849 (citing 33 U.S.C. § 1288).
Next, “the CWA’s second step in its approach to water
cleanup requires each State to develop water quality standards
for interstate waters within its borders.” Jackson, 798 F. Supp.
2d at 215. Water quality standards are “promulgated by the
States and establish the desired condition of a waterway.”
Arkansas, 503 U.S. at 101 (citing 33 U.S.C. § 1313); see also
Am. Paper Inst., 996 F.2d at 349 (“[W]ater quality standards
referred to in section 301 are primarily the states’
handiwork.”). These standards “supplement effluent limitations
so that numerous point sources, despite individual compliance
with effluent limitations, may be further regulated to prevent
water quality from falling below acceptable levels.” Arkansas,
503 U.S. at 101 (citation and internal quotation marks omitted);
see also Am. Paper Inst., 996 F.2d at 349 (explaining that
section 301 of the CWA requires every NPDES permit to contain
7
both “(1) effluent limitations that reflect the pollution
reduction achievable by using technologically practicable
controls, . . . and (2) any more stringent pollutant release
limitations necessary for the waterway receiving the pollutant
to meet ‘water quality standards’”).
The EPA provides the States “with substantial guidance in
the drafting of water quality standards[,]” Arkansas, 503 U.S.
at 101; but “[i]n keeping with the interactive process
envisioned in the CWA, a State must submit these standards to
the EPA for review and approval[,]” Jackson, 798 F. Supp. 2d at
215; see also 33 U.S.C. § 1313(c)(2). States must review their
water quality standards at least once every three years, see 33
U.S.C. § 1313(c)(1); and “secure the EPA’s approval of any
revisions[,]” Arkansas, 503 U.S. at 101. Whenever the States
adopt new or revised water quality standards, the CWA requires
them to consider such standards’ “use and value for public water
supplies, propagation of fish and wildlife, recreational
purposes, and agricultural, industrial, and other purposes,” as
well as “their use and value for navigation.” 33 U.S.C. §
1313(c)(2)(A). Although the States primarily promulgate water
quality standards, the EPA can “step in and promulgate water
quality standards itself . . . where (1) it determines that a
state’s proposed new or revised standard does not measure up to
CWA requirements and the state refuses to accept EPA-proposed
8
revisions to the standard[,] or (2) a state does not act to
promulgate or update a standard but, in the EPA’s view, a new or
revised standard is necessary to meet CWA muster.” Am. Paper
Inst., 996 F.2d at 349 (citing 33 U.S.C. § 1313(c)(3)-(4)).
The resulting state water quality standards must contain:
(1) designated uses for the water body; (2) information about
the methodology for choosing those uses; (3) water quality
criteria sufficient to protect the designated uses; (4) an
antidegradation policy to prevent clean waters from falling
below applicable standards; (5) a certification by state
authorities that the standards were properly adopted pursuant to
state law; and (6) general information to aid the EPA’s review.
See 40 C.F.R. § 131.6(a)-(f). Of these six elements, “[t]he
‘designated uses of the navigable waters involved and the water
quality criteria for such waters’ are the heart of water quality
standards.” Jackson, 798 F. Supp. 2d at 215 (quoting 33 U.S.C. §
1313(c)(2)(A)); see also 40 C.F.R. § 130.2(d) (defining water
quality standards as “[p]rovisions of State or Federal law which
consist of a designated use or uses for the waters of the United
States and water quality criteria for such waters based upon
such uses”). A designated use is the way the State classifies a
water body for use by “governments, persons, animals, and
plants” and may include “drinking or reservoir purposes, primary
(e.g., swimming) or secondary (e.g., boating) recreation, and
9
the preservation and support of plant and animal life.” Jackson,
798 F. Supp. 2d at 215 (citing 40 C.F.R. § 131.3(f)). And, water
quality criteria “specify[] the maximum concentration of
pollutants that may be present in the water without impairing
its suitability for designated uses.” Am. Paper Inst., 996 F.2d
at 349. These criteria “come in two varieties: specific numeric
limitations on the concentration of a specific pollutant in the
water . . . or more general narrative statements applicable to a
wide set of pollutants . . . .” Id. The EPA has promulgated
recommended numeric criteria for certain pollutants, which the
States often rely on in establishing water quality standards.
Id. “Whether numeric or narrative, the key aspect of water
quality criteria is that they are dependent upon designated uses
associated with them.” Jackson, 798 F. Supp. 2d at 215. Overall,
States must monitor their waters and, when necessary, identify
those “for which current pollution controls ‘are not stringent
enough to implement any water quality standard applicable to
such waters.’” Id. (citing 33 U.S.C. § 1313(d)(1)(A)).
Pursuant to the CWA, the State of Alabama has adopted water
quality standards intended “to conserve the waters of the State
and to protect, maintain and improve the quality thereof.” Ala.
Admin. Code r. 335-6-10.01 (1991). Alabama’s water quality
criteria “covering all legitimate water uses” for waters in the
State are set out in Alabama’s Administrative Code. See id. at
10
r. 335-6-10.01—.12. The following designated “water use
classifications” are listed in the Code: (1) outstanding Alabama
water; (2) public water supply; (3) swimming and other whole
body water-contact sports; (4) shellfish harvesting; (5) fish
and wildlife; (6) limited warmwater fishery; and
(7) agricultural and industrial water supply. Id. at r. 335-6-
10.03. The Code sets forth the “general conditions applicable to
all water quality criteria,” see id. at r. 335-6-10.05; the
“minimum conditions applicable to all state waters,” see id. at
r. 335-6-10.06; the specific numerical “toxic pollutant criteria
applicable to state waters,” which mirror that recommended by
the EPA, see id. at r. 335-6-10.07; and the “specific water
quality criteria” for each of the seven designated uses, see id.
at r. 335-6-10.09. Alabama also has an antidegradation policy
requiring that “[e]xisting instream water uses and the level of
water quality necessary to protect the existing uses [ ] be
maintained and protected.” See id. at r. 335-6-10.04, 335-6-
10.12. Ultimately, Alabama applies its water quality criteria
and water use classification system to every interstate and
intrastate water body in the various river basins that flows
through the State. See id. at r. 335-6-11.01 to 335-6-11.02.
2. National Environmental Policy Act
Congress enacted NEPA “to use all practicable means,
consistent with other essential considerations of national
11
policy, to improve and coordinate Federal plans, functions,
programs, and resources to the end that the Nation may . . .
fulfill the responsibilities of each generation as trustee of
the environment for succeeding generations[.]” 42 U.S.C. §
4331(b); see also Pub. L. No. 91-190, § 2, 83 Stat. 852, 852
(1970) (establishing NEPA “to promote efforts which will prevent
or eliminate damage to the environment”). NEPA “requires that
federal agencies consider fully the environmental effects of
their proposed actions.” Theodore Roosevelt Conservation P’ship
v. Salazar, 616 F.3d 497, 503 (D.C. Cir. 2010). The statute “is
an ‘essentially procedural’ statute, meant to ensure ‘a fully
informed and well-considered decision, not necessarily’ the best
decision.” Id. (quoting Vt. Yankee Nuclear Power Corp. v. Nat.
Res. Def. Council, Inc., 435 U.S. 519, 558, 98 S. Ct. 1197, 55
L. Ed. 2d 460 (1978)). NEPA “does not mandate particular results
in order to accomplish [its] ends[;]” instead, it only
procedurally requires agencies “to undertake analyses of the
environmental impact of their proposals and actions.” Del.
Riverkeeper Network v. FERC, 753 F.3d 1304, 1310 (D.C. Cir.
2014) (quoting Dep’t of Transp. v. Pub. Citizen, 541 U.S. 752,
756–57, 124 S. Ct. 2204, 159 L. Ed. 2d 60 (2004) (some internal
quotation marks omitted)). This analysis does not, however,
“require agencies to elevate environmental concerns over other
appropriate considerations . . . . [I]t require[s] only that the
12
agency take a ‘hard look’ at the environmental consequences
before taking a major action.” WildEarth Guardians v. Jewell,
738 F.3d 298, 303 (D.C. Cir. 2013) (quoting Balt. Gas & Elec.
Co. v. Nat. Res. Def. Council, Inc., 462 U.S. 87, 97, 103 S. Ct.
2246, 76 L. Ed. 2d 437 (1983) (some internal quotation marks
omitted)); see also Robertson v. Methow Valley Citizens Council,
490 U.S. 332, 350, 109 S. Ct. 1835, 104 L. Ed. 2d 351 (1989)
(noting that agencies are “not constrained by NEPA from deciding
that other values outweigh the environmental costs” of a
proposed action).
“To ensure a well-considered decision, NEPA requires that
when an agency proposes a ‘major Federal action[] significantly
affecting the quality of the human environment,’ the agency must
prepare and circulate for public review and comment an
environmental impact statement [(“EIS”)] that examines the
environmental impact of the proposed action and compares the
action to other alternatives.’” Theodore Roosevelt, 616 F.3d at
503 (quoting 42 U.S.C. § 4332(2)(C)). An EIS is a detailed
statement “prepared in consultation with other federal agencies
with special expertise relevant to the proposed action’s
environmental impact.” Id. “It must [ ] assess the impact the
proposed project will have in conjunction with other projects in
the same and surrounding areas—‘cumulative impact analysis’—and
must include past, present, and reasonably foreseeable future
13
actions of any agency or person.” Id. (citing 40 C.F.R. §§
1508.25, 1508.7). The EIS must also “explain in detail ‘any
adverse environmental effects which cannot be avoided should the
proposal be implemented[,]’” see id. (quoting 42 U.S.C. §
4332(2)(C)(ii)) (noting that implicit in this requirement “is an
understanding that the EIS will discuss the extent to which
adverse effects can be avoided” (citation omitted)); and “any
‘alternatives to the proposed action,’” WildEarth, 738 F.3d at
303 (quoting 42 U.S.C. § 4332(2)(C)(iii)). NEPA’s regulations
also require agencies “to discuss possible mitigation measures”
in the EIS. Theodore Roosevelt, 616 F.3d at 503 (citing 40
C.F.R. §§ 1508.25(b)(3), 1502.14(f), 1502.16(h), 1505.2(c)); see
also Robertson, 490 U.S. at 351 (“[O]ne important ingredient of
an EIS is the discussion of steps that can be taken to mitigate
adverse environmental consequences.”). In sum, the EIS “must
include ‘sufficient detail to ensure that the environmental
consequences have been fairly evaluated.’” Theodore Roosevelt,
616 F.3d at 503 (quoting Robertson, 490 U.S. at 352).
“The statutory requirement that a federal agency
contemplating a major action prepare such an [EIS] serves NEPA’s
‘action-forcing’ purpose in two important respects.” Robertson,
490 U.S. at 349. First, it “places upon an agency the obligation
to consider every significant aspect of the environmental impact
of a proposed action,” Vt. Yankee, 435 U.S. at 553; and second,
14
“it ensures that the agency will inform the public that it has
indeed considered environmental concerns in its decisionmaking
process[,]” Balt. Gas, 462 U.S. at 97; see also 40 C.F.R. §
1502.1 (requiring an EIS to (1) “provide full and fair
discussion of significant environmental impacts[,]” and
(2) “inform decision makers and the public of reasonable
alternatives that would avoid or minimize adverse impacts or
enhance the quality of the human environment”).
However, not all decisions require an EIS. Theodore
Roosevelt, 616 F.3d at 503. “If it is unclear whether an action
will ‘significantly affect[] the quality of the human
environment,’ 42 U.S.C. § 4332(2)(C), agencies may [first]
prepare an environmental assessment [(“EA”),]” id. (citing 40
C.F.R. § 1501.4(a)-(b)); which is “a more limited document,”
Pub. Citizen, 541 U.S. at 757. An EA “[b]riefly provide[s]
sufficient evidence and analysis for determining whether to
prepare an [EIS.]” 40 C.F.R. § 1508.9(a)(1). Even if the agency
determines that it need only perform an EA, it must still
briefly discuss the need for the proposed action, the
alternatives, and the environmental impacts of the proposed
action and alternatives. Id. § 1501.5(c). If the agency
determines that a full EIS is not required, it must issue a
finding of no significant impact, “which briefly presents the
reasons why the proposed agency action will not have a
15
significant impact on the human environment.” Pub. Citizen, 541
U.S. at 757-58; see also 40 C.F.R. § 1501.6.
“[I]nherent in NEPA and its implementing regulations is a
‘rule of reason,’ which ensures that agencies determine whether
and to what extent to prepare an EIS based on the usefulness of
any new potential information to the decisionmaking process.”
Pub. Citizen, 541 U.S. at 767. If the agency determines that the
“the preparation of an EIS would serve ‘no purpose’ in light of
NEPA’s regulatory scheme as a whole,” then the rule of reason
dictates that the agency does not need to prepare one. Id. Thus,
in preparing an EA or EIS, the “agency need not foresee the
unforeseeable, but by the same token neither can it avoid
drafting an impact statement simply because describing the
environmental effects of and alternatives to particular agency
action involves some degree of forecasting.” Scientists’ Inst.
for Pub. Info., Inc. v. Atomic Energy Comm’n, 481 F.2d 1079,
1092 (D.C. Cir. 1973). “Reasonable forecasting and speculation
[are] thus implicit in NEPA, and [courts] must reject any
attempt by agencies to shirk their responsibilities under NEPA
by labeling any and all discussion of future environmental
effects as ‘crystal ball inquiry.’” Id. While NEPA does not
demand forecasting that is “not meaningfully possible[,]” the
agency must, pursuant to the rule of reason, fulfill its
16
“statutory duty of compliance with impact statement procedures
to ‘the fullest extent possible.’” Id. (citation omitted).
B. Factual Background
This action arises from the Corps’ operation of several
dams and federal reservoirs in the ACT River Basin, which is
formed by the Alabama, Coosa, Tallapoosa Rivers, and their
tributaries and drainage areas. A.R., ECF No. 61 at D-00044720.
The ACT Basin comprises 22,739 square miles in Alabama and
Georgia, see id.; with the various rivers flowing from northern
Georgia towards southern Alabama and into the Gulf of Mexico,
see id. at D-00043909. There are seventeen large dams located on
the mainstem rivers of the ACT Basin. Id. at D-00044178. The
Corps owns and operates six of these dams, and the remaining
eleven are privately-owned and operated by APC. Id. Two of the
Corps’ dams, Carters Dam and Allatoona Dam, are located in
Georgia upstream from the other dams, which are located in
Alabama. See id. at D-00043909.
1. Authorized Project Purposes of the Corps’
Reservoir Projects in the ACT Basin and the
Development of Governing Water Control Manuals
All Corps’ projects in the ACT Basin operate pursuant to
federal legislation authorizing certain enumerated project
purposes. Id. at D-00043779. In the River and Harbor Act of
1945, Congress authorized the development of the Alabama-Coosa
River and tributaries for three expressly authorized project
17
purposes—(1) navigation, (2) flood risk management, 4 and
(3) power development—as well as for generalized “other
purposes.” Id.; Pub. L. No. 79-14, § 2, 59 Stat. 10, 17 (1945).
“Other operational objectives” that derive from authorities
generally applicable to all Corps reservoirs have been added
over time and include: (4) fish and wildlife conservation (Fish
and Wildlife Coordination Act of 1958, Pub. L. No. 85-624, and
Endangered Species Act of 1973, Pub. L. No. 93-205);
(5) recreation (Flood Control Act of 1944, Pub. L. No. 78-534);
(6) water quality (Water Pollution Control Act Amendments of
1972, Pub. L. No. 92-500); and (7) water supply (Water Supply
Act of 1958, Pub. L. No. 85-500). A.R., ECF No. 61 at D-
00043779. While Corps’ projects in the ACT Basin operate in “a
system-wide context” to serve these authorized purposes, “each
individual project might not operate for all seven purposes.” 5
Id.
4 In 2006, the Corps began using the term “flood risk management”
in lieu of the term “flood control” to “more appropriately
characterize[]” its mission. A.R., ECF No. 61 at D-00043862. The
Court does the same unless quoting the administrative record.
5 In 1954, Congress suspended parts of the River and Harbor Act
of 1945 to permit APC to develop its own projects on the Coosa
River under a license issued by the Federal Power Commission
(now the Federal Energy Regulatory Commission). A.R., ECF No. 61
at D-00043985. Today, four APC projects (Weiss Lake, H. Neely
Henry Lake, Logan Martin Lake, and R.L. Harris Lake) are
authorized to operate for navigation and flood risk management
in coordination with the Corps and in accordance with Corps
regulations. Id. at D-00043985-86, D-00044178.
18
In practice, authorized project purposes often conflict
with one another, requiring the Corps to develop the Master
Manual and separate water control manuals (“WCMs”) for
individual reservoir projects describing how the Corps will
operate the ACT system to balance conflicting purposes,
consistent with congressional direction. Id. at D-00043772; In
re ACF Basin, 467 F. Supp. 3d at 1328; see also 33 U.S.C. § 709
(“[I]t shall be the duty of the Secretary of the Army to
prescribe regulations for the use of storage allocated for flood
control or navigation at all reservoirs . . . , and the
operation of any such project shall be in accordance with such
regulations[.]”); 33 C.F.R. § 222.5(a) (prescribing the policies
and procedures to be followed by the Corps “in carrying out
water control management activities, including establishment of
water control plans for Corps and non-Corps projects”). These
WCMs provide technical information “that guides the proper
management of reservoirs during times of high water, low water,
and normal conditions” and “specify how the various reservoir
projects will be operated as a balanced system.” A.R., ECF No.
61 at D-00043780. Specifically, the Master Manual contains
“drought plans and storage zones to assist federal water
managers to know when to reduce or increase reservoir releases
and conserve storage in the [Corps’] reservoirs” and guidance on
how to provide for proper “water control regulation and
19
coordination for the safety of dams during extreme conditions
such as floods.” Id. The previous official Master Manual for the
ACT system was adopted in 1951, with individual reservoir
manuals being “completed as the projects came on line.” Id. at
D-00043862.
2. The Allatoona Reservoir Project, Its History,
and Its Authorized Project Purposes
The Allatoona Project, at the center of this litigation, is
located on the Etowah River in Georgia. Id. at D-00013496.0024.
The Etowah River flows from Georgia towards the Coosa River,
which joins with the Tallapoosa River downstream near
Montgomery, Alabama to form the Alabama River, which combines
with the Tombigbee River to become the Mobile River, which
ultimately drains through Mobile Bay to the Gulf of Mexico. Id.
The Allatoona Project consists of the reservoir at Allatoona
Lake formed by Allatoona Dam. Id. at D-00044896-98. The drainage
area for Allatoona Lake is 1,122 square miles, which equates to
less than five percent of the ACT Basin. See id. at D-00043778.
Allatoona is the site of one of the Corps’ storage projects,
“meaning that the Corps varies the reservoir level depending on
whether the season typically is ‘wet’ or ‘dry.’” Pls.’ Mot., ECF
No. 83 at 14. “[T]he need for water in the summer and fall often
is greater than the supply of water in the river basin[,]” so an
important function of many of the Corps’ ACT Basin reservoirs
20
“is to store water when there is an abundance of rain and to
release water when there is less rain, ensuring that all water
needs can be met throughout the year.” A.R., ECF No. 61 at D-
00043910. At the Allatoona Reservoir, the Corps generally stores
water during the spring wet period that is released in the late
summer and fall dry periods to generate hydropower, provide
downstream flows, and support water quality, and it keeps lake
levels low during the winter to provide for additional flood
storage. See id. at D-00043910-11, D-00044948-49. At “full
flood-control pool” level, the reservoir has a total storage
capacity of 670,047 acre-feet. Id. at D-00044898.
The idea for the Allatoona Project began circulating in the
early 1900s, see id. at D-00044902; and in 1934, the Corps
submitted a report to Congress, published in House Document No.
66, recommending construction of a dam and reservoir at the top
of the basin at Allatoona “for the purposes of navigation and
efficient development of water power, the control of floods, and
the needs of irrigation[,]” id. at D-00053515 (H.R. Doc. No. 66,
74th Cong. (1935)). At the time of the report, the economic
aspect of the Allatoona Project appeared unfavorable. Id. at D-
00044902. Several years later, however, Congress requested that
the Board of Engineers for Rivers and Harbors review the Corps’
1934 report “with a view to determining the advisability of
constructing” the Allatoona Project “for the development of
21
hydroelectric power and the improvement of the river below the
dams for navigation as well as for other beneficial effects.”
Id. at D-00013497.0002 (H.R. Doc. No. 674, 76th Cong. (1940)).
“After full consideration of the [Corps’] reports,” in a 1940
report, published in House Document No. 674, the Board of
Engineers recommended construction of the Allatoona Reservoir on
the Etowah River “for the control of floods, regulation of
stream flow for navigation, and the development of hydroelectric
power[.]” Id.; see also id. at D-00013497.0004 (assessing the
Corps’ plan “for the construction of a storage reservoir at the
Allatoona site . . . to be operated in the combined interests of
flood control and power development” and noting that the power
storage provided in the reservoir would increase the minimum
stream flow, which would in turn increase capacity at downstream
hydropower developments). Congress then passed the Flood Control
Act of 1941 authorizing the Corps to build and operate the
Allatoona Project. See Pub. L. No. 77-228, 55 Stat. 638, 638-41
(1941). In that Act, Congress “approved” “the recommendation of
the Chief of Engineers in House Document Numbered 674” and
“authorized $3,000,000 for initiation and partial accomplishment
of the [Allatoona P]roject” in accordance with that document.
Id. at 641; see also A.R., ECF No. 61 at D-00053808.
Due to rapid economic expansion in the basin in the late
1930s, and “in response to outstanding Congressional directives
22
calling for review of earlier comprehensive reports to determine
whether any change in previous recommendations was desirable[,]”
A.R., ECF No. 61 at D-00044756-57; in October 1941, the
Secretary of War submitted to Congress an interim report of the
Corps, printed as House Document No. 414, that “developed a
comprehensive plan for navigation, power generation, and flood
control in th[e] basin” as a whole, see A.R., ECF No. 61 at D-
00053819, D-00053821 ¶ 5 (H.R. Doc. No. 414, 77th Cong. (1941));
to be accomplished step-by-step over a period of years in
accordance with plans prepared by the U.S. Army’s Chief of
Engineers, id. at D-00044757. A few months later, in December
1941, the Corps issued to the Chief of Engineers a “Definite
Project Report,” which presented a “project plan” for the
construction of the Allatoona Dam and Reservoir on the Etowah
River. Id. at SUPPAR027125, SUPPAR027127, D-00013496.0020. This
report made recommendations in substantial agreement with the
original plan, “with the exception that a larger amount of
storage [be] allotted to the production of hydroelectric
power[,] with a corresponding decrease in storage reserved for
flood control.” 6 Id. at SUPPAR027125. The plan called flood risk
6 After construction began on the Allatoona Reservoir, storage
allocations were again reconsidered in 1946. A.R., ECF No. 61 at
D-00013496.0020. Congress’ original authorization in 1941 called
for 422,500 acre-feet of flood control storage and 182,500 acre-
feet of power storage. Id. at D-00013497.0018. Then, in the 1941
Definite Project Report, flood control storage decreased to
23
management and power “the dual purpose[s]” of the reservoir and
anticipated that its hydropower plant “would be used primarily
as a peaking plant 7 or for intermittent operation.” Id. at
SUPPAR027127, SUPPAR027131, SUPPAR027186. The plan also
predicted that the “regulated flow from Allatoona Dam would
increase the minimum flow at the downstream plants . . . and
would increase their firm [electric generating] capacity[.]” Id.
at SUPPAR027187. Ultimately, Congress passed the River and
Harbor Act of 1945, incorporating the Allatoona Project into the
overall plan for the ACT Basin’s “[i]nitial and ultimate
development” for “navigation, flood control, power development,
and other purposes, as outlined in House Document Numbered 414,
. . . with such modifications thereof from time to time as . . .
may be advisable for the purpose of increasing the development
of hydroelectric power[.]” Pub. L. No. 79-14, § 2, 59 Stat. 10,
17 (1945). In 1949, the Corps completed construction at
Allatoona, and the reservoir was filled until normal operations
began in June 1950, with the project reaching full conservation
pool on April 3, 1951. A.R., ECF No. 61 at D-00044759.
212,000 acre-feet, and power storage increased to 456,000 acre-
feet. Id. at SUPPAR027127. The 1946 reconsideration resulted in
389,000 acre-feet allocated to flood control and 253,000 acre-
feet for power generation. Id. at D-00013496.0020.
7 A peaking plant releases water through the turbines of a dam
and generates power at times of most, or “peak” demand.
24
Today, the Allatoona Project operates pursuant to its seven
authorized project purposes: “hydropower, flood risk management,
navigation, recreation, water quality, fish and wildlife
conservation, and water supply.” Id. at D-00044902. To fulfill
the hydropower purpose, the Corps releases water through
turbines at Allatoona Dam to generate daily peak hydropower
during periods of high use, with the number of hours of peaking
operations per day varying based on other system needs. 8 Id. at
D-00043784, D-00043931, D-00013496.0016. These water releases
also “indirectly” benefit navigation, a project purpose for
which Allatoona was authorized but “is not regulated . . .
because it is located distant from the navigation channel[,] and
any releases for that purpose would be captured and reregulated
by the [APC] reservoirs located downstream.” Id. at D-
00013496.0022, D-00044802. Nonetheless, water releases from
Allatoona assist in the creation of downstream flows towards the
Alabama River, which provides an important navigation route for
commercial barge traffic from Montgomery to the Mobile area. Id.
at D-00044801. Additionally, water releases during dry seasons
8 There are eleven daily peaking hours during the winter period
from October 1 through March 31: 5:00 a.m. to 9:00 a.m. and 3:00
p.m. to 10 p.m., Monday through Friday, and six during the
summer period from April 1 through September 30: 1:00 p.m. to
7:00 p.m., Monday through Friday. A.R., ECF No. 61 at D-
00044449. “The maximum daily amount of peak generation for each
plant [is] then defined as the product of the number of daily
peaking hours times the installed capacity of the plant.” Id.
25
provide for an increased water supply and improved water quality
for municipal and industrial uses in downstream metropolitan
areas. Id. at D-00013496.0016. Meanwhile, the Corps also retains
some water in storage, approximately seven percent of
Allatoona’s storage capacity, for local municipal water supply
pursuant to decades-old contracts with the CC-MWA and the City
of Cartersville, Georgia. Id. at 5813, SUPPAR012820. To fulfill
Allatoona’s flood risk management purpose, the Corps maintains
empty space at the top of the reservoir, which is reserved to
store water during flood conditions. Id. at D-00043931. These
operations are intended to provide flood protection at Rome,
Georgia and at APC’s Weiss Dam on the Coosa River. Id. at D-
00013496.0016, D-00044796. Finally, to satisfy Allatoona’s
recreation purpose and allow for activities such as boating,
fishing, and water skiing, lake levels are kept at higher levels
during peak recreation season, generally Memorial Day through
Labor Day, during which time the Corps considers recreational
needs in making water management decisions. Id. at D-00044797.
In sum, as a “multiple purpose project,” the Corps must operate
the Allatoona Project with all seven of its authorized purposes
in mind. Id. at D-00013496.0016.
26
3. Prior Versions of the Allatoona Project’s Water
Control Manual: 1951, 1962, 1968, and a 1993
Draft Version
Following the Corps’ promulgation of the 1951 ACT Master
Manual, it also adopted finalized versions of a separate WCM for
the Allatoona Project in 1951, 1962, and 1968. Pls.’ Mot., ECF
No. 83 at 20. Of note, the 1951 Allatoona Manual stated that the
project was to be “operated as a peaking plant for the
production of hydroelectric power and during off-peak periods
[would] maintain a flow of about 200” cubic feet per second
(“cfs”) through the Allatoona Dam’s smaller “service unit.”
A.R., ECF No. 61 at D-00011308.0018. That manual also stated
that “[d]uring low-water periods such regulation [would] provide
increased flow downstream for navigation, water supply,
pollution abatement, and other purposes[,]” but that “the
primary purpose of the project [was] flood control[.]” Id. To
accomplish these aims, this manual (and subsequent ones) split
Allatoona’s reservoir storage capacity into two “operating
pools”: (1) the “conservation” or “power” pool that operates for
several purposes, including hydropower generation; and (2) above
that, the “flood pool” that extends the reservoir’s operating
capacity to accommodate high flow and prevent downstream floods.
Defs.’ Cross-Mot., ECF No. 95 at 21-22 (citing A.R., ECF No. 61
at D-00044948); A.R., ECF No. 61 at D-00011308.0010 (explaining
the varying elevations for the “power pool” and the “flood-
27
control pool” and the accompanying storage allocations for flood
control and power). The area that splits the top of the
conservation pool and flood pool is the “rule” or “guide” curve
for power operations, which the 1951 Allatoona Manual created
for the first time, see A.R., ECF No. 61 at D-00011308.0043
(graphically depicting the “rule curve”); thereby giving
engineers “targets for reservoir elevations throughout the
year[,]” including when to fill the reservoir, when to maintain
it at a particular level, and when to release, or “draw down,”
the water, Pls.’ Mot., ECF No. 83 at 22. The 1951 Allatoona rule
curve required filling the reservoir in the spring, maintaining
it at a steady elevation during the summer, and drawing it down
by about twenty feet in elevation from September to December to
facilitate the release of water. Id. (citing A.R., ECF No. 61 at
D-00011308.0019, D-00011308.0021, D-00011308.0043).
Studies conducted in 1952 indicated that the Allatoona
Project’s overall benefits could be increased “by varying the
storage allocations in the reservoir on a seasonal basis.” A.R.,
ECF No. 61 at D-00013501.0014. As result, the revised 1962
Allatoona Manual required raising the top of the power pool
during the summer with a compulsory drawdown prior to the flood
season so as to create “increase[s] in power revenue with no
reduction in flood-control benefits.” Id. Under this operating
plan, the top of the power pool was to be kept at elevation 840
28
feet from May through August, drawn down from 840 to 820 feet
from September through December, and elevated from 820 to 840
feet from January through April. Id. As the 1962 manual
explained, the “storage delineation curve,” developed from a
study of past stream-flow records and then-existing power
contract requirements, showed “the seasonal variation” in the
top of the power pool and represented “a firm division” between
the power and flood pools, normally requiring that the reservoir
level “be maintained at or below the curve except when storing
flood waters.” Id. at D-00013501.0028. The manual further stated
that the principal purpose of the guide curve was “to indicate
when excess energy [was] available and when power declarations
[were to] be limited to minimum contract commitments.” Id. Like
the 1951 version, the 1962 manual also stated that Allatoona was
to be operated as a “peaking power plant,” id. at D-
00013501.0016; and it upped the minimum monthly flow from 200 to
240 cfs, id. at D-00013501.0010.
The Corps again revised the Allatoona Manual in 1968,
modifying the top of the power pool to extend the time that the
maximum elevation level could be held at 840 feet for one month,
or through September, so long as adequate flows were available,
id. at D-00011371.0003; a change which was expected to benefit
recreation, power, low-flow control, and navigation, id. at D-
00013501.0015, D-00044904; and provide “more flexibility in the
29
operation of the plant in the system[,]” id. at D-00011371.003.
Under this plan, the revised top-of-power-pool curve had a top
level at elevation 840 feet during May through September
(assuming favorable flow conditions); varied uniformly from 840
to 823 feet during October through December 15 (i.e., commenced
the drawdown on October 1); remained at elevation 823 feet from
December 15 through January 15; and then varied uniformly from
823 feet on January 15 to 840 feet at the end of April. Id. at
D-00044904, D-00013501.0015, D-00011371.0003; see also id. at D-
00013501.0067 (depicting the 1968 “guide curve for power
operation,” which included the “top of power pool” curve and the
lower “power guide curve”), D-00013501.0064 (depicting the 1968
operating rules for the power and flood control pools and the
“seasonal curve”). The Corps later prepared a report, based on
then-available data, concluding that there would be “little, if
any, benefit to recreation and no adverse effects due to the
modification of the top of power pool[,]” instead finding that
the higher pool levels during such periods would “provide
additional head for power generation and also benefit downstream
low flow control and navigation by retaining additional water in
storage for release during the normally dry months of October
and November.” Id. at D-00011371.0004. While the Corps was
conducting its ACT operations under the 1951 Master Manual and
this 1968 Allatoona Manual, NEPA was enacted into law in 1969,
30
thereby requiring the Corps to issue an EIS about any “major
Federal actions significantly affecting the quality of the human
environment” as a result of its ACT operations. 42 U.S.C. §
4332(2)(C). In 1974, in accordance with that obligation, the
Corps issued a final environmental impact statement (“FEIS”)
related to its then-existing Allatoona operations. See generally
A.R., ECF No. 61 at D-00004143.
In 1993, the Corps drafted another revised version of the
Allatoona Manual (the “1993 Draft Manual”) but did not finalize
that version or subject it to NEPA’s environmental review. See
generally id. at D-00013496; see also id. at D-00010026.0005;
Pls.’ Opp’n, ECF No. 83 at 23. According to the Alabama
Plaintiffs, the Corps purported to operate the Allatoona Project
under the 1993 Draft Manual, rather than earlier finalized
versions, from 1993 until its adoption of the 2015 Master
Manual, even though the 1993 Draft Manual made five “significant
changes to Allatoona’s operations” that were never properly
reviewed under NEPA. Pls.’ Opp’n, ECF No. 83 at 23-24; Compl.,
ECF No. 1 at 7 ¶¶ 24-25. First, the 1993 Draft Manual divided
the conservation pool into two “action zones” to be “used as a
guide to the generation to be provided from the Allatoona
[P]roject towards meeting the system hydropower contract.” A.R.,
ECF No. 61 at D-00013496.0041; see also id. at D-00013496.0072
(graphically depicting the two 1993 action zones), D-00044761
31
(explaining that “a system of action zones” was initially
developed in 1989 before being “implemented to guide operations
at Allatoona Lake”); Defs.’ Cross-Mot., ECF No. 95 at 22 n.5
(defining action zones as “essentially lake levels at which the
Corps makes various operational changes”). When the pool was in
Zone 1—the highest lake level—project conditions were “normal to
wetter than normal,” allowing “full consideration” to be given
to meeting hydropower contract amounts, while balancing other
project purposes and Allatoona’s drawdown with other lakes in
the basin. A.R., ECF No. 61 at D-00013496.0041. When the lake
was in Zone 1, the Draft Manual required “between two and six
hours of full powerhouse generation.” Id. at D-00013496.0072. As
pool levels declined into Zone 2, indicating “dry or impending
drought conditions[,]” “[m]ore conservative operations” were
required, and “the minimum generation to support dependable
hydropower capacity would generally be run.” Id. at D-
00013496.0041-42. If drought conditions became severe, resulting
in reductions in reservoir releases, Zone 2 was to be “reserved
for emergency needs, either hydropower or downstream water
supply, water quality or other extreme needs.” Id. at D-
00013496.0042. When projected conditions indicated a strong
possibility of exhausting conservation storage, the manual
allowed for routine hydropower generation to be scaled back or
suspended, among other conservative measures, depending on the
32
drought severity. Id. Nonetheless, minimum continuous releases
of 240 cfs, via the small hydropower unit, “plus two hours peak
power generation each weekday” continued to be the operational
objectives when the pool was in Zone 2. Id. at D-00013496.0072.
In addition, the 1993 Draft Manual continued the “compulsory
drawdown to elevation 823 feet in advance of flood season[,]”
providing “467,280 acre-feet of flood control (elevation 823 to
860) as compared to 302,580 acre-feet of storage (elevation 840
to 860) during the summer season[,]” and it required the
conservation pool to be regulated at a minimum elevation of 800
feet. Id. at D-00013496.0041.
In addition to these changes associated with the two action
zones, the Alabama Plaintiffs argue that the 1993 Draft Manual:
(1) reduced the storage available for Allatoona’s authorized
hydropower purpose; (2) decreased navigation support by not
treating navigation as an “operating purpose” despite it being
an “authorized purpose” of Allatoona; (3) reduced the amount of
storage available for flood risk management to achieve higher
lake levels when it designated a portion of the flood control
storage pool where water could be stored “indefinitely” as a
precaution against possible impending drought; and (4) adopted
new “recreation impact levels” for the Corps to consider when
making water management decisions at Allatoona, to be applied
during peak recreation season. Pls.’ Mot., ECF No. 83 at 25
33
(citing A.R., ECF No. 61 at D-00013496.0050, D-00013496.0064, D-
00013496.0022, D-00013496.0073, D-00013496.0045-46). The 1993
Draft Manual was embroiled in years of litigation between the
Corps, the State of Alabama, and APC, among other parties, but
in 2012, the District Court for the Northern District of Alabama
(“Northern District of Alabama”) dismissed the action’s NEPA
claims for lack of subject matter jurisdiction because the draft
was never finalized and therefore did not represent “final
agency action,” as required by the APA. See Order, Alabama v.
U.S. Army Corps of Eng’rs, No. 90-1331 (N.D. Ala. July 3, 2012),
ECF No. 771 at 1-3.
4. The Process for Revising and Adopting the
Updated 2015 Master Manual, the Allatoona
Project Water Control Manual, and the FEIS
In 2007, after the 2004 expiration of a congressionally-
approved interstate compact for the ACT Basin and a period of
court-ordered mediation, and in the “midst of a severe and
extraordinary drought,” the Corps reinitiated the process of
updating the ACT Master Manual by publishing notice in the
Federal Register that it intended to prepare an EIS for the ACT
WCM update pursuant to NEPA’s requirements. A.R., ECF No. 61 at
D-00043781, D-00043862; Defs.’ Cross-Mot., ECF No. 95 at 11, 17.
Thereafter, the Corps began a public “scoping process” to
“identify all the relevant issues and alternatives that should
be addressed in the EIS[.]” A.R., ECF No. 61 at D-00043865.
34
After identifying key challenges, the Corps adopted “objectives”
for the Master Manual update, which included to: (1) define flow
requirements for APC projects to support navigation; (2) develop
a basin-wide drought management plan, as required by Corps
regulations; (3) improve downstream conditions for fish and
wildlife conservation; (4) “[i]mprove system performance to
achieve congressionally authorized project purposes,”
specifically by modifying hydropower operations at Allatoona
Lake, operations which historically had adverse effects on the
Corps’ ability to balance project purposes during drought; and
(5) incorporate changes in APC project operations due to APC’s
relicensing of its Coosa River project. Id. at D-00044194-96.
Overall, the FEIS notes that conditions in the ACT Basin “have
changed substantially since the federal reservoirs were
authorized and constructed,” and it identified as the “purpose
and need” of the update “determin[ing] how the federal projects
in the ACT Basin should be operated for their authorized
purposes, in light of current conditions and applicable law,”
and implementing those operations. Id. at D-00043862-63; see
also 33 C.F.R. § 222.5(f)(3) (allowing water control plans
developed for specific projects and reservoir systems to be
“revised as necessary to conform with changing requirements
resulting from developments in the project area and downstream,
improvements in technology, new legislation and other relevant
35
factors, provided such revisions comply with existing Federal
regulations and established Corps of Engineers policy”).
In light of the update’s enumerated objectives and purpose,
the Corps identified various “management measures,” defined as
“a feature or activity that can be implemented at a specific
geographical site to address one or more of the objectives.” Id.
at D-00044196. The measures considered were: “variations for
revising reservoir guide curves and conservation storage action
zones; revising hydropower generation plans for water control
regulation; revising drought procedures and environmental flows;
and developing navigation-specific operations.” Id. The Corps
then developed nine screening criteria, see id. at D-00043868;
against which to consider each management measure, eliminating
those which failed and carrying forward the ones that passed and
combining them “to form basin-wide alternative plans[,]” id. at
D-00044197, D-00044227. On March 1, 2013, the Corps released a
draft EIS, id. at D-00043776; evaluating twelve management
alternatives, see id. at D-00044228 (summarizing, in chart form,
the “alternative management measures”); starting with the “No-
Action Alternative,” reflecting the “continuation of the current
water control operations at each of the federal projects in the
ACT Basin[,]” and adding one measure at a time, such that the
alternatives built upon each other, id. at D-00044227.
36
There was a public notice and comment period on the draft
EIS, see 33 U.S.C. § 2319 (requiring the Corps to “provide
significant opportunities for public participation” when
revising WCMs); and on November 7, 2014, the Corps released the
revised ACT Master Manual and a more than 900-page FEIS, which
“included all comments on the Draft EIS and the detailed [Corps]
responses to those comments[,]” A.R., ECF No. 61 at D-00053483.
The Corps also accepted and responded to public comments on the
FEIS. See, e.g., id. at D-00043396, D-00043408, D-00046601, D-
00049511, D-00066475, D-00053483-84. In the FEIS, the Corps used
data models to simulate the effects of the alternative plans
across the entire hydrologic period of record (1939-2011),
“which were then evaluated in terms of project and watershed
criteria (channel availability, generation and capacity,
reservoir recreation impact levels, and other authorized
purposes, intended benefits, and existing uses in the system).”
Id. at D-00053479. The data results led the Corps to briefly
discuss and eliminate eight alternatives, while carrying forward
four for further analysis—the No-Action Alternative and Plans D,
F, and G. See id. at D-00044226-58. The Corps selected Plan G as
its “Proposed Action Alternative” or “Preferred Alternative,”
id. at D-00044246; for consisting “of the combination of water
management measures that are expected to meet the objectives and
best balance system operations[,]” and concluded, based on its
37
analysis, that “[i]mpacts on the human and natural environment
associated with the recommended water management plan compared
to current operations (No-Action Alternative) were found to be
negligible to minor[,]” id. at D-00053479.
On May 4, 2015, the Corps issued its Record of Decision
(“ROD”), thereby formally adopting the revised ACT Master Manual
and individual WCMs and commencing operations under them. See
id. at D-00053477-87. The ROD, representing “final agency
action,” stated that the Corps “took a balanced approach” in
updating the Master Manual and recognized that “there may be
occasions where conflicts exist between the individualized
authorized purposes” for the basin and its various reservoir
projects. Id. at D-00053478-79. Defendants contend that given
“[c]ongressional intent to delegate complex reservoir system
management to the Corps, the agency is entitled to significant
deference” in its revisions to its WCMs. See Defs.’ Cross-Mot.,
ECF No. 95 at 15-16.
5. Key Features of the Updated Master Manual and
the Allatoona Project Water Control Manual, and
the Specific Changes to Which the Alabama
Plaintiffs and Intervenor-Plaintiffs Object
Defendants state that “[i]t is impossible to summarize the
many changes in the expansive Master Manual,” but they note
several “beneficial changes,” including the development of a
drought management plan in coordination with stakeholders
38
(including the Alabama Plaintiffs); seasonal navigation releases
to support commercial navigation; and “adjustments to hydropower
to better match seasonal demands and balance all project
purposes during drought.” Defs.’ Cross-Mot., ECF No. 95 at 17.
The ROD also lists features of the revised water management plan
specific to the Allatoona Project, including: (1) continued
operation of Allatoona Dam to provide for a 240 cfs minimum flow
immediately downstream of the dam; (2) a revised guide curve at
Allatoona Lake to implement a phased fall drawdown period from
early September through December; (3) revised action zones at
Allatoona Lake shaped to mimic the seasonal demands for
hydropower; (4) modifications to the hydropower schedule at
Allatoona Dam to provide greater operational flexibility to meet
power demands while conserving storage; and (5) continued
withdrawal of water from Allatoona Lake by the CC-MWA and the
City of Cartersville, Georgia under existing water supply
storage agreements. A.R., ECF No. 61 at D-00053478.
The FEIS fills in the details regarding Allatoona’s updated
features, stating that “[a] seasonal conservation pool
regulation guide curve and conservation storage action zones
have been developed to guide” the Corps in making balanced water
control management decisions. Id. at D-00044949. The FEIS
explains that Allatoona’s conservation pool is now regulated
between a minimum elevation of 800 feet and a seasonal variable
39
top-of-conservation pool ranging between elevations 823 and 840
feet. Id. at D-00044948. Specifically, the top of conservation
elevation is 840 feet from May 1 to September 5; drawn down to
835 feet by October 1; held steady at 835 feet through November
15; drawn down to 823 feet by December 31 for additional flood
storage; and held steady at 823 feet until the refill period—
back up to 840 feet—begins on January 16. Id. at D-00044949, D-
00044904. This revised guide curve is supplemented by four new
action zones within the conservation storage pool, which are to
be “used as a general guide to the hydropower peaking generation
available from the Allatoona Project to help meet system
hydropower commitments.” Id. at D-00044949. The FEIS describes
the operations for each zone and its accompanying peaking
generation schedule—up to four hours in Zone 1, up to 3 hours in
Zone 2, up to 2 hours in Zone 3, and 0 hours in Zone 4—and
explains that the zones are “used to manage the lake at the
highest level possible within the conservation storage pool
while balancing the needs of all authorized purposes” at
Allatoona. Id. at D-00044949-51. In addition, above the top of
the conservation pool is the flood control pool, divided into
Zones A through E. Id. at D-00045086. “During the fall step down
period the pool may be held at the top of Zone A indefinitely if
all project purposes are met[,]” as Zone A “has the least
urgency for being evacuated.” Id.
40
The Alabama Plaintiffs take issue with three changes at the
Allatoona Project: “(1) the revised action zones, (2) the fall
phased drawdown (or phased) guide curve, and (3) reduced fall
hydropower generation”—all of which they claim raises lake
levels to benefit recreation, while reducing power generation,
navigation support, and flood risk management. Pls.’ Mot., ECF
No. 83 at 27. They argue that: (1) the new action zones reduce
the storage the Corps can use to generate power; (2) the new
phased guide curve reduces downstream flows during a critical
period in the fall; (3) the operational changes give the Corps
unfounded discretion to eliminate hydropower generation at any
time in all of the action zones; (4) the new Master Manual
eliminates navigation support by disclaiming any obligation to
the “distant” navigation channel; and (5) the Master Manual
reduces flood storage by allowing the Corps to store water in
Zone A of the flood pool “indefinitely,” further reducing
downstream flows. Id. at 28-30. As a result of these changes,
the Alabama Plaintiffs argue that there will be “substantially
decrease[d] flows into Alabama during low-flow and drought
periods[,]” which will result in “reduced hydropower generation,
reduced lake levels at [APC]’s Coosa and Tallapoosa River
projects, [ ] impaired water quality, especially in the Coosa
River and at [APC]’s Weiss Lake[,]” and increased frequency in
drought conditions at the Alabama-Georgia state line. Id. at 33.
41
Intervenor-Plaintiffs—the Montgomery Board, Mobile Water,
Russell Lands, and LMRA—also argue that they are harmed by the
Master Manual. The Montgomery Board is a public water utility in
Montgomery, Alabama that provides water and wastewater services.
Intervenor-Pls.’ Mot., ECF No. 85 at 9. Its service area is
located within the watershed of the ACT Basin, as it obtains
over sixty percent of its water supply from the Tallapoosa River
and has wastewater facilities on the Alabama and Tallapoosa
Rivers. Id. The Montgomery Board argues that the Master Manual
reduces water flows, thereby causing “the overall degradation of
water quality, impairment of [its] ability to treat wastewater
adequately, [ ] impairment of [its] ability to conduct and rely
upon long range planning and analysis[,]” and forced
modifications to its facilities so as to maintain compliance
with NPDES permits. Id. at 9-10. Mobile Water provides fresh
water unencumbered with salt or brine from tidal influences of
the Mobile Bay for use in industrial processes and as a source
of drinking water for residential and commercial customers. Id.
at 10. Mobile Water argues that reduced flows will result in
salt water intrusions up the Mobile River that will render the
water unacceptable for some industrial uses. Id. at 10-11. Lake
Martin is an APC reservoir on the Tallapoosa River located near
major population centers in Alabama and Georgia. Id. at 12. Lake
Martin offers “outstanding water quality” to Alabama and various
42
economic benefits resulting from major recreational seasons on
the lake in late spring, summer, and fall. Id. Lake Martin is
also important to the members of LMRA, the business of Russell
Lands, and Alabama’s economy generally, for example in terms of
jobs supported by recreation and real estate activity. Id. Both
Russell Lands and LMRA argue that lower flows from Allatoona, as
required by the updated Master Manual, will cause lower water
levels in Lake Martin in the summer and fall that will hurt APC
projects on the Coosa and Tallapoosa Rivers and damage
recreation at the lake. Id. at 12-13.
C. Procedural Background
The State of Alabama filed suit against Defendants on May
7, 2015, alleging that the Corps: (1) unlawfully abandoned and
reordered the Allatoona Project’s authorized project purposes
(Count One); (2) violated the CWA and Corps’ implementing
regulations requiring it to implement a water-quality management
program that complies with federal and state water quality
standards (Count Two); (3) violated NEPA by conducting a flawed
environmental impacts analysis, along with other modeling and
data errors (Count Three); and (4) violated the APA because the
updated Master Manual is contrary to the requirements of the
Flood Control Act of 1941, the CWA, NEPA, Corps’ regulations,
and prior operational precedents, is in excess of the limits
Congress placed on the Corps’ statutory authority without a
43
reasoned basis, does not meaningfully respond to objections
raised by commenters, and is therefore “arbitrary, capricious,
an abuse of discretion, or otherwise not in accordance with law”
(Count Four). See Compl., ECF No. 1 at 22-27 ¶¶ 95-114. On that
same day, APC filed suit against the same defendants, alleging
similar claims under the APA, CWA, and NEPA. See Compl., Ala.
Power Co. v. U.S. Army Corps of Eng’rs, No. 15-699 (EGS) (D.D.C.
May 7, 2015), ECF No. 1 at 36-42 ¶¶ 103-132. On July 25, 2016,
the Court found that these two cases “involve[d] common issues
of fact and gr[e]w out of the same event or transaction,” and
therefore consolidated the cases pursuant to Federal Rule of
Civil Procedure 42(a). See Min. Order, Ala. Power Co. v. U.S.
Army Corps of Eng’rs, No. 15-699 (EGS) (D.D.C. July 25, 2016).
The Alabama Plaintiffs seek relief pursuant to the APA and
the Declaratory Judgment Act. Compl., ECF No. 1 at 27. First,
they ask the Court to set aside as unlawful: (1) the Master
Manual, “including but not limited to the individual [WCM] for
the Allatoona Project[,]” and (2) the FEIS. Id. at 27 ¶¶ 1-2.
Second, they ask the Court to direct Defendants to either revise
the Master Manual or prepare new manuals “consistent with the
congressionally authorized purposes of the ACT River Basin,
including but not limited to the Allatoona Project, and to
ensure that downstream flow conditions in Alabama are consistent
with historic flows[.]” Id. ¶ 3. Third, they ask the Court to
44
direct Defendants to modify, as necessary, the Master Manual to
protect and maintain Alabama state water quality standards. Id.
at 27-28 ¶ 4. Fourth, they ask the Court to direct Defendants to
either revise the FEIS or prepare a new FEIS for any revised or
new manuals for the ACT Basin consistent with federal law. Id.
at 28 ¶ 5. Finally, they seek attorneys’ fees and costs and any
other relief the Court deems just and proper. Id. ¶¶ 6-7.
The Court granted Intervenor-Plaintiffs’ motions to
intervene in this case on April 4, 2016, see Min. Orders (Apr.
4, 2016) (granting the Montgomery Board and Mobile Water leave
to intervene); and on March 31, 2017 (granting LMRA and Russell
Lands leave to intervene), see Min. Order (Mar. 31, 2017). The
Court also granted Intervenor-Defendants’ motions to intervene
on March 31, 2017. See Min. Orders (Mar. 31, 2017) (granting the
State of Georgia, ARC, and the CC-MWA leave to intervene). On
July 22, 2016, the Court denied Defendants’ motion to change
venue, although it recognized that “this case could have been
brought in the Northern District of Georgia.” See Min. Order
(July 22, 2016). Thereafter, on November 18, 2016, Defendants
served a copy of the administrative record and its accompanying
index on all parties. See Defs.’ Notice of Filing of Certified
List of Contents of, and Production of, Administrative R., ECF
No. 61 at 1, 3 (noting that Attachment B, Parts 1-6, is the
45
indices, or, “the certified list of contents of the
Administrative Record”).
The Alabama Plaintiffs filed their joint motion for summary
judgment on May 30, 2017, see Pls.’ Mot., ECF No. 83; and
Intervenor-Plaintiffs filed their joint motion for summary
judgment on June 13, 2017, see Intervenor-Pls.’ Mot., ECF No.
85. Defendants filed their cross-motion for summary judgment on
August 14, 2017, see Defs.’ Cross-Mot., ECF 96; and Intervenor-
Defendants filed their joint cross-motion for summary judgment
on August, 28, 2017, see Intervenor-Defs.’ Cross-Mot., ECF No.
98. The Alabama Plaintiffs and Intervenor-Plaintiffs filed their
replies in support of their motions and in opposition to
Defendants’ and Intervenor-Defendants’ cross-motions on October
12, 2017 and October 26, 2017, respectively. See Pls.’ Reply,
ECF No. 99; Intervenor-Pls.’ Reply, ECF No. 101. Defendants
filed their reply on November 27, 2017, see Defs.’ Reply, ECF
No. 102; and Intervenor-Defendants filed their reply on December
11, 2017, see Intervenor-Defs.’ Reply, ECF No. 103. The Alabama
Municipal Electric Authority (“AMEA”) filed an amicus curiae
brief in support of the Alabama Plaintiffs’ joint motion for
summary judgment on August 2, 2017. 9 See Amicus Br., ECF No. 94.
9 The Court appreciates the analysis provided by amicus curiae.
46
On August 4, 2020, Intervenor-Defendants filed a notice
informing the Court of a decision by the Northern District of
Georgia that they called “relevant to matters pending before
this Court.” See Intervenor-Defs.’ Notice, ECF No. 119 at 1.
They attached as an exhibit a copy of that court’s 2020 opinion
and order (In re ACF Basin Water Litig., 467 F. Supp. 3d 1323
(N.D. Ga. 2020)), noting that the case presented “a similar
challenge to the Master Manual for a neighboring river basin,
the Apalachicola-Chattahoochee-Flint (“ACF”) River Basin[.]” Id.
at 2. The Alabama Plaintiffs responded to this notice on August
13, 2020, arguing that “[t]he Georgia Court’s reasoning is
erroneous and does not control this challenge to the [WCM] for
the [ACT] River Basin.” See Pls.’ Resp. to Suppl. Authority
Notice, ECF No. 120 at 1. Following another decision in the ACF
case on August 11, 2021, see In re ACF Basin Water Litig., 554
F. Supp. 3d 1282 (N.D. Ga. 2021); Intervenor-Defendants filed a
supplemental motion for summary judgment arguing that these
combined decisions, specifically involving “two legal issues
resolved in the ACF case” relating to the CWA and NEPA, should
be given “preclusive effect” in the instant case. See
Intervenor-Defs.’ Suppl. Mot., ECF No. 129 at 6-8. On April 11,
2022, the State of Alabama, Intervenor-Plaintiffs, and APC filed
their separate oppositions to the supplemental motion. See
Ala.’s Opp’n to Suppl. Mot., ECF No. 134; Intervenor-Pls.’ Opp’n
47
to Suppl. Mot., ECF No. 135; APC’s Opp’n to Suppl. Mot., ECF No.
137. Intervenor-Defendants replied to these oppositions on April
25, 2022. See Intervenor-Defs.’ Suppl. Mot. Reply, ECF No. 139. 10
On November 18, 2022, the Court granted the State of
Alabama leave to file a supplemental complaint arising out of
subsequent revisions Defendants made to the ACT Master Manual in
2021. See Min. Order (Nov. 18, 2022). The Court stated that
while the 2015 and 2021 revisions “relate to each other,” the
“legal claims in the original and proposed supplemental
complaint are distinct[,]” and that granting Alabama “leave to
supplement [would] merely result in a second round of cross
motions for summary judgment.” Id. The Court stated its intent
to address the pending motions before addressing any forthcoming
motions arising out of the 2021 revisions. Id. Therefore, the
parties’ motions and cross-motions for summary judgment, and
Intervenor-Defendants’ supplemental motion for summary judgment,
are now ripe and ready for the Court’s adjudication.
III. Legal Standard
Federal Rule of Civil Procedure 56 governs motions for
summary judgment, which are granted “if the movant shows that
there is no genuine dispute as to any material fact and the
10The Court addresses the arguments from Intervenor-Defendants’
supplemental motion for summary judgment, ECF No. 129; where
relevant to the parties’ pending cross-motions for summary
judgment, see ECF Nos. 83, 85, 95 & 96, and 97 & 98.
48
movant is entitled to judgment as a matter of law.” Fed. R. Civ.
P. 56(a). However, where litigants seek review of final agency
action under the APA, see 5 U.S.C. § 706; Rule 56’s standard
becomes inapplicable “because of the limited role of a court in
reviewing the administrative record[,]” Wilhelmus v. Geren, 796
F. Supp. 2d 157, 160 (D.D.C. 2011). “Under the APA, it is the
role of the agency to resolve factual issues to arrive at a
decision that is supported by the administrative record, whereas
the function of the district court is to determine whether or
not as a matter of law the evidence in the administrative record
permitted the agency to make the decision it did.” Sierra Club
v. Mainella, 459 F. Supp. 2d 76, 90 (D.D.C. 2006) (citation and
internal quotation marks omitted). “Summary judgment thus serves
as the mechanism for deciding, as a matter of law, whether the
agency action is supported by the administrative record and
otherwise consistent with the APA standard of review.” Id.
The APA provides that “[a] person suffering legal wrong
because of agency action, or adversely affected or aggrieved by
agency action within the meaning of a relevant statute, is
entitled to judicial review thereof.” 5 U.S.C. § 702. The Act
requires courts to “hold unlawful and set aside agency action,
findings, and conclusions found to be . . . arbitrary,
capricious, an abuse of discretion, or otherwise not in
accordance with law[,]” or “in excess of [the agency’s]
49
statutory jurisdiction, authority, or limitations, or short of
statutory right[.]” Id. § 706(2)(A), (C). Under the APA’s
“narrow” standard of review, “a court is not to substitute its
judgment for that of the agency[,]” Motor Vehicle Mfrs. Ass’n of
the U.S., Inc. v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29,
43, 103 S. Ct. 2856, 77 L. Ed. 2d 443 (1983); and “will defer to
the [agency’s] interpretation of what [a statute] requires so
long as it is rational and supported by the record,” Oceana,
Inc. v. Locke, 670 F.3d 1238, 1240 (D.C. Cir. 2011) (citation
and internal quotation marks omitted). Thus, review of agency
action is generally deferential, Blanton v. Off. of the
Comptroller of the Currency, 909 F.3d 1162, 1170 (D.C. Cir.
2018); so long as the agency examines the relevant data and
articulates a satisfactory explanation for its decision,
including a “rational connection between the facts found and the
choice made[,]” State Farm, 463 U.S. at 43 (citation omitted).
However, an agency’s decision is considered arbitrary and
capricious if the agency: (1) “has relied on factors which
Congress has not intended it to consider,” (2) “entirely failed
to consider an important aspect of the problem,” (3) “offered an
explanation for its decision that runs counter to the evidence
before the agency,” or (4) “is so implausible that it could not
be ascribed to [a] difference in view or the product of agency
expertise.” Advocs. for Highway & Auto Safety v. Fed. Motor
50
Carrier Safety Admin., 429 F.3d 1136, 1144-45 (D.C. Cir.
2005) (quoting State Farm, 463 U.S. at 43). The plaintiff bears
the burden of showing that the agency violated the APA. Banner
Health v. Sebelius, 715 F. Supp. 2d 142, 153 (D.D.C. 2010).
The APA’s deferential standard cannot, however, “permit
courts merely to rubber stamp agency actions, nor be used to
shield the agency’s decision from undergoing a thorough,
probing, in-depth review.” Flaherty v. Bryson, 850 F. Supp. 2d
38, 47 (D.D.C. 2012) (internal citations and quotation marks
omitted). Instead, courts must evaluate “whether the decision
was based on a consideration of the relevant factors and whether
there has been a clear error of judgment[,]” State Farm, 463
U.S. at 43 (citations omitted); and may “not defer to the
agency’s conclusory or unsupported suppositions[,]” Flaherty,
850 F. Supp. 2d at 47 (citation omitted). Reviewing courts also
“may not supply a reasoned basis for the agency’s action that
the agency itself has not given[,]” but may “uphold a decision
of less than ideal clarity if the agency’s path may reasonably
be discerned.” State Farm, 463 U.S. at 43 (quoting Bowman
Transp., Inc. v. Ark.-Best Freight Sys., 419 U.S. 281, 286, 95
S. Ct. 438, 42 L. Ed. 2d 447 (1974)). However, judicial review
is confined to “the administrative record already in existence,
not some new record made initially in the reviewing court.” Camp
v. Pitts, 411 U.S. 138, 142, 93 S. Ct. 1241, 36 L. Ed. 2d 106
51
(1973); see also Jackson, 798 F. Supp. 2d at 222 (highlighting
“the APA’s command” that courts “review the whole record or
those parts of it cited by a party,” and “evaluate that record
as it was when [the agency] published its Decision Rationale”).
Courts review agency decisions under NEPA and the CWA
pursuant to section 706(2) of the APA, i.e., the APA’s judicial
review provisions. See, e.g., Flaherty, 850 F. Supp. 2d at 47;
Loper Bright Enters., Inc. v. Raimondo, 544 F. Supp. 3d 82, 98
(D.D.C. 2021); see also Karst Env’t Educ. & Prot., Inc. v. EPA,
475 F.3d 1291, 1295 (D.C. Cir. 2007) (noting that when statutes,
like NEPA, “create[] no private right of action, challenges to
agency compliance with the statute must be brought pursuant to
the [APA]”); WildEarth, 738 F.3d at 308 (“We apply the arbitrary
and capricious standard of the [APA] . . . to the merits of the
Appellants’ NEPA . . . challenge[.]”); Sackett v. EPA, 556 U.S.
120, 131, 132 S. Ct. 1367, 182 L. Ed. 2d 367 (2012) (finding
that the CWA does not preclude APA judicial review). Agency
decisions under both statutes involve “complex judgments about
sampling methodology and data analysis that are within the
agency’s technical expertise,” and are therefore accorded “an
extreme degree of deference.” Alaska Airlines, Inc. v. TSA, 588
F.3d 1116, 1120 (D.C. Cir. 2009). In other words, deference to
the agency’s judgment is particularly appropriate where, as
here, the decision at issue “requires a high level of technical
52
expertise[.]” Marsh v. Or. Nat. Res. Council, 490 U.S. 360, 377,
109 S. Ct. 1851, 104 L. Ed. 2d 377 (1989) (citation omitted).
IV. Analysis
The Alabama Plaintiffs assert three independent legal
grounds for why the Master Manual should be deemed unlawful.
First, they argue that the Corps violates the CWA in the Master
Manual by cutting back on releases that will impair downstream
water quality while disclaiming any duty to comply with
Alabama’s state water quality standards, instead improperly
passing mitigation responsibility to state permitting
authorities and other downstream entities. Pls.’ Mot., ECF No.
83 at 11-12. Second, they argue, in conjunction with Intervenor-
Plaintiffs, that the Corps conducted an inadequate environmental
review under NEPA that used an improper baseline for comparison
and did not disclose all significant environmental impacts of
the Master Manual. Id. at 12. Third, they argue that the Master
Manual violates the APA by: (1) exceeding the Corps’ statutory
authority by deemphasizing and reordering the congressionally
authorized project purposes of the Allatoona Project—hydropower,
navigation, and flood risk management—for the sake of lake
recreation; and (2) departing, arbitrarily and capriciously,
from Allatoona’s prior operational precedents that served those
53
three originally identified purposes. Id. at 11, 36, 60. The
Court addresses each of these arguments in turn below. 11
A. Defendants Did Not Violate the CWA or the Corps’
Implementing Engineer Regulations, and the Alabama
Plaintiffs’ Water Quality Claims Must Fail
The Alabama Plaintiffs first argue that the Master Manual
is unlawful because it “violates the Corps’ obligations to
maintain water quality and to avoid environmental degradation
throughout the ACT Basin.” Id. at 48. Specifically, they argue
that the Corps is in violation of section 313(a) of the CWA,
codified at 33 U.S.C. § 1323(a), and the Corps’ implementing
Engineer Regulation (“ER”) 1110-2-8154, see ER 1110-2-8154,
Water Quality and Environmental Management (May 31, 1995)
[hereinafter “ER 1110-2-8154”]; because the decision to reduce
flows from the Allatoona Project will cause violations of
Alabama’s state water quality standards, Pls.’ Mot., ECF No. 83
at 50. They contend that, despite acknowledging “‘that its
operational decisions will have [downstream] water quality
impacts’ during low-flow conditions[,]” the Corps has failed to
select the action alternative “‘that complies with water quality
standards to the maximum extent feasible[,]’” instead shifting
responsibility to the States and other downstream entities to
“‘address the consequences of [its] operational decisions[,]’”
11It is uncontested that the Alabama Plaintiffs have standing to
pursue their claims. See Pls.’ Mot., ECF No. 83 at 35-36.
54
id. at 48 (quoting A.R., ECF No. 61 at D-00049709, D-00049711);
by expecting state permitting authorities to reevaluate their
NPDES permits and set more stringent standards on the effluent
concentrations that downstream permit holders can discharge, id.
at 50-51. According to the Alabama Plaintiffs, and the EPA in
its comments on the FEIS, see A.R., ECF No. 61 at D-00049703-14;
this expectation is an unlawful shift in mitigation
responsibility to the States and a violation of the Corps’
duties under the CWA and ER 1110-2-8154, see Pls.’ Mot., ECF No.
83 at 50-51. 12
Defendants argue in response that the Alabama Plaintiffs
have “overstated the Corps’ obligation with respect to the
consideration of state water quality standards under the [CWA].”
Defs.’ Cross-Mot., ECF No. 95 at 10, 53. They argue that the
Corps is only required to give “appropriate consideration” to
these standards, in conjunction with the “many other factors”
from other statutes that apply in updating the Master Manual.
Id. Defendants claim that “[t]he FEIS shows that the Corps did
give consideration to the water quality standards in analyzing
12Intervenor-Plaintiffs also argue that the Corps did not
adequately address water quality issues in the Master Manual.
See Intervenor-Pls.’ Mot., ECF No. 85 at 15-19. Unlike the
Alabama Plaintiffs, they do not advance this argument under the
CWA and ER 1110-2-8154 but under NEPA. See id. at 15-19. The
Court therefore addresses their water quality arguments in the
NEPA section of this Memorandum Opinion. See infra section IV.B.
55
the alternatives[,]” and that “[t]he alternative chosen
represents the Corps[’] decision regarding the balancing of the
factors at issue[,]” which suffices to meet its CWA obligations.
Id. at 53 (citing A.R., ECF No. 61 at D-00044030, D-00058007).
The Georgia Parties also argue that the Alabama Plaintiffs do
not have a valid claim under section 313(a) of the CWA because
Alabama’s “water quality standards are not ‘requirements’ within
the meaning of this provision[,]” Intervenor-Defs.’ Cross-Mot.,
ECF No. 97 at 22; and neither are the non-binding ERs, including
ER 1110-2-8154, Intervenor-Defs.’ Reply, ECF No. 103 at 15-16.
Because they contend Alabama has not pointed to any “enforceable
requirements” that the Corps has violated, Intervenor-Defendants
ask the Court to deny the Alabama Plaintiffs’ CWA and water
quality claims. Id. at 24-25.
The Alabama Plaintiffs seek to rebut the Georgia Parties’
argument, arguing that “[n]othing in [section] 1323(a)’s text
excludes water-quality standards from the ‘requirements’ to
which the Corps must adhere . . . in the same manner, and to the
same extent as any nongovernmental entity.” Pls.’ Reply, ECF No.
99 at 22-23 (quoting 33 U.S.C. § 1323(a)). Further, they contend
that the Corps is “doubl[ing] down,” without any legal support,
“on the position . . . that the ‘risk of non-attainment of
downstream water quality standards’ is not its problem[,]” and
has failed to point to any evidence in the record that it
56
engaged in a “‘balancing’ process that [determined that] water
quality needed to be sacrificed for the sake of other legitimate
project purposes.” Id. at 25-26.
On May 22, 2020, the Northern District of Georgia issued a
decision in which it ruled against Alabama as to its water
quality (and other) claims in an action against the same federal
defendants involving the ACT’s neighboring ACF River Basin,
specifically, dismissing the portions of Alabama’s complaint
relating to the CWA and ER 1110-2-8154 pursuant to a motion for
judgment on the pleadings under Federal Rule of Civil Procedure
12(c). See In re ACF Basin, 467 F. Supp. 3d at 1336-41. The ACT
Basin covers portions of Alabama and Georgia, while the ACF
Basin covers portions of Alabama, Georgia, and Florida.
Intervenor-Defs.’ Suppl. Mot., ECF No. 129 at 6. Both the ACT
and ACF cases are challenges by Alabama (among other parties) to
the Corps’ updated Master Manuals governing operations in the
respective river basins. Id. While the Corps first issued the
ACT Master Manual and the Allatoona Project WCM in 1951, it
issued the ACF Master Manual in 1958 and a separate WCM for the
Buford Project, located in that basin, in 1959. Ala.’s Opp’n to
Suppl. Mot., ECF No. 134 at 9.
By way of background, the Corps initially proposed draft
updates to the ACT and ACF Master Manuals in 1989 and began
operating pursuant to them without finalizing them or conducting
57
a formal EIS, thereby leading Alabama to challenge both drafts
in a single case before the Northern District of Alabama in
1990, alleging, among other claims, that the Corps did not
comply with NEPA. See Compl., Alabama v. U.S. Army Corps of
Eng’rs, No. 90-1331 (N.D. Ala. June 28, 1990), ECF No. 1 at 1,
14-21. Specific to the ACF Basin, Alabama argued it was unlawful
for the Corps to permit the Georgia Parties to make water
withdrawals from the Buford Project pursuant to interim water
supply contracts because, per the Water Supply Act of 1958,
Congress had to preapprove such withdrawals. Id. at 9-10 ¶ 17.
APC later intervened as a plaintiff, see Alabama v. U.S. Army
Corps of Eng’rs, 229 F.R.D. 669, 676 (N.D. Ala. 2005) (granting
APC intervention as of right); and in 2007, this case was
bifurcated along basin lines, with the ACF claims consolidated
as multidistrict litigation in the District Court for the Middle
District of Florida, while the ACT claims remained with the
Northern District of Alabama, see In re Tri-State Water Rts.
Litig., 481 F. Supp. 2d 1351, 1353 (J.P.M.L. 2007) (concluding
that the ACT and ACF cases did “not share sufficient questions
of fact”).
In 2011, the Court of Appeals for the Eleventh Circuit
dismissed the Alabama Parties’ challenges to the ACF Master
Manual, holding that most of their claims were not final agency
action under the APA and not subject to judicial review. See In
58
re MDL-1824 Tri-State Water Rts. Litig., 644 F.3d 1160, 1185
(11th Cir. 2011). In 2012, the Northern District of Alabama also
dismissed the majority of the Alabama Parties’ ACT claims,
concluding, as well, that the 1993 Draft Manual could not be
construed as “final agency action” under the APA. See Order,
Alabama v. U.S. Army Corps of Eng’rs, No. 90-1331 (N.D. Ala.
July 3, 2012), ECF No. 771 at 2-3; see also Final Order of
Dismissal, Alabama v. U.S. Army Corps of Eng’rs, No. 90-1331
(N.D. Ala. Oct. 23, 2012), ECF No. 786 at 1-2 (dismissing with
prejudice “all remaining claims,” thereby drawing “the saga of
the Water Wars that began [on] June 28, 1990 to a close”).
Following these dismissals, “the way was clear for the
Corps to update both Master Manuals[,]” which it completed,
pursuant to NEPA’s requirements, for the ACT Basin in 2015 and
the ACF Basin in 2017. Intervenor-Defs.’ Suppl. Mot., ECF No.
129 at 9. Alabama challenged both updates, first filing the
instant ACT case in May 2015, see Compl., ECF No. 1; and filing
a second case in this district challenging the ACF Master Manual
in April 2017, see Compl., Alabama v. U.S. Army Corps of Eng’rs,
No. 17-607 (JDB) (D.D.C. Apr. 5, 2017), ECF No. 1; which was
later transferred to the Northern District of Georgia pursuant
to a joint motion by the Corps and the Georgia Parties, see
Alabama v. U.S. Army Corps of Eng’rs, 304 F. Supp. 3d 56, 62, 70
(D.D.C. 2018). Following its earlier 2020 decision denying
59
Alabama’s CWA and ER 1110-2-8154 water-quality claims, on August
11, 2021, that court entered summary judgment in favor of the
Corps, and as relevant here, denied Alabama’s remaining water
quality claim under the APA and all plaintiffs’ NEPA claims. 13 In
re ACF Basin, 554 F. Supp. 3d at 1302-08. Of note, neither APC
nor any of Intervenor-Plaintiffs are parties to the ACF case,
while Intervenor-Defendants all intervened in the ACF case,
along with several Atlanta-based municipalities. Id. at 1287-88;
Ala.’s Opp’n to Suppl. Mot., ECF No. 134 at 15.
In their supplemental motion for summary judgment, the
Georgia Parties use the Northern District of Georgia’s 2020 and
2021 decisions to argue that their resolution of legal issues as
to the ACF Basin “is correct, preclusive, and dispositive of
claims currently pending before this Court.” Intervenor-Defs.’
Suppl. Mot., ECF No. 129 at 7. They contend that “the Court can
either hold that the ACF Court decided the issues common to
these two cases correctly, or it can apply the doctrine of issue
preclusion to conclude that issues dispositive to the Alabama
Parties’ claims are res judicata.” Id. at 7-8. The Court
addresses these supplemental issue preclusion arguments, first
13An appeal of this decision is currently pending in the Court
of Appeals for the Eleventh Circuit (“Eleventh Circuit”). See
Pl. State of Ala.’s Notice of Appeal, In re ACF Basin Water
Litig., No. 1:18-MI-43 (N.D. Ga. Sept. 10, 2021), ECF No. 236 at
1; Notice of Appeal, In re ACF Basin Water Litig., No. 1:18-MI-
43 (N.D. Ga. Oct. 6, 2021), ECF No. 243 at 1.
60
as to the parties’ water quality claims in this section of the
Memorandum Opinion, and later turns to the remaining preclusion
arguments under the NEPA section of the Memorandum Opinion. 14 See
infra section IV.B.1.a. For the reasons discussed below, the
Court declines to apply issue preclusion to both sets of claims
and will proceed to analyzing their merits.
1. Issue Preclusion Does Not Apply to Bar the
Alabama Plaintiffs’ Water Quality Claims
Issue preclusion, also known as collateral estoppel,
“refers to the effect of a prior judgment in foreclosing
successive litigation of an issue of fact or law actually
litigated and resolved in a valid court determination essential
to the prior judgment, whether or not the issue arises on the
same or a different claim.” New Hampshire v. Maine, 532 U.S.
742, 748-49, 121 S. Ct. 1808, 149 L. Ed. 2d 968 (2001). The
doctrine serves “to conserve judicial resources, avoid
inconsistent results, engender respect for judgments of
predictable and certain effect, and to prevent serial forum-
shopping and piecemeal litigation.” Hardison v. Alexander, 655
F.2d 1281, 1288 (D.C. Cir. 1981). Pursuant to the doctrine’s
rules, “the parties to a suit and their privies 15 are bound by a
14 The pendency of the above-referenced Eleventh Circuit appeal
does not affect the Court’s preclusion analysis. See El-Amin v.
Virgilio, 251 F. Supp. 3d 208, 211 (D.D.C. 2017).
15 “The term ‘privity’ signifies that the relationship between
two or more persons is such that a judgment involving one of
61
final judgment and may not relitigate any ground for relief
which they already have had an opportunity to litigate even if
they chose not to exploit that opportunity[, regardless of]
whether the initial judgment was erroneous or not.” Id. This is
because the objective of issue preclusion is “judicial finality”
and “the conclusive resolution of disputes . . . .” Yamaha Corp.
of Am. v. United States, 961 F.2d 245, 254 (D.C. Cir. 1992)
(citation omitted). Issue preclusion is properly raised on a
motion for summary judgment. See, e.g., Canonsburg Gen. Hosp. v.
Burwell, 807 F.3d 295, 307 (D.C. Cir. 2015).
Three elements must be present for a judgment to preclude
litigation of an issue in a subsequent case: “‘[1], the same
issue now being raised must have been contested by the parties
and submitted for judicial determination in the prior case[; 2],
the issue must have been actually and necessarily determined by
a court of competent jurisdiction in that prior case[; and] [3],
preclusion in the second case must not work a basic unfairness
to the party bound by the first determination.’” Martin v.
DOJ, 488 F.3d 446, 454 (D.C. Cir. 2007) (quoting Yamaha, 961
F.2d at 254). The party invoking issue preclusion “bears the
burden of establishing that the conditions for its application
them may justly be conclusive upon the others, although those
others were not party to the lawsuit.” Gill & Duffus Servs.,
Inc. v. A. M. Nural Islam, 675 F.2d 404, 405 (D.C. Cir. 1982).
62
have been satisfied[,]” Lardner v. DOJ, 638 F. Supp. 2d 14, 22
(D.D.C. 2009) (citation and internal quotation marks omitted);
and once an issue is determined to have preclusive effect, the
court “does not review the merits of the determinations in the
earlier litigation[,]” Consol. Edison Co. of N.Y. v. Bodman, 449
F.3d 1254, 1257 (D.C. Cir. 2006). Indeed, “even a ‘patently
erroneous’ first judgment is insufficient to bar issue
preclusion.” Canonsburg, 807 F.3d at 306 (quoting Otherson v.
DOJ, 711 F.2d 267, 277 (D.C. Cir. 1983)); see also Montana v.
United States, 440 U.S. 147, 162, 99 S. Ct. 970, 59 L. Ed. 2d
210 (1979) (“[A] fact, question or right distinctly adjudged in
the original action cannot be disputed in a subsequent action,
even though the determination was reached upon an erroneous view
or by an erroneous application of the law.” (emphasis in
original)). Furthermore, “it is the prior judgment that matters,
not the court’s opinion explicating the judgment[,]” such that
“once an issue is raised and determined, it is the entire issue
that is precluded, not just the particular arguments raised in
support of it in the first case.” Yamaha, 961 F.2d at 254
(emphasis in original).
Even when collateral estoppel would otherwise apply, courts
have recognized exceptions to the doctrine’s applicability.
Pharm. Care Mgmt. Ass’n v. Dist. of Columbia, 522 F.3d 443, 446
(D.C. Cir. 2008). “Of particular importance in this case[,]”
63
discussed below, “is the exception for cases presenting ‘unmixed
questions of law.’” Id. Under this exception, “[c]ollateral
estoppel does not apply with the same force to unmixed questions
of law as it does to mixed questions of law and fact or to pure
questions of fact.” Id. (citing United States v. Stauffer Chem.
Co., 464 U.S. 165, 170–71, 104 S. Ct. 575, 78 L. Ed. 2d 388
(1984)). “Although the Supreme Court has acknowledged that the
purpose and application of this exception are not entirely
clear, the exception continues to have force.” Id. (citing
Stauffer, 464 U.S. at 171-72).
In addition, while “[t]here is no general public policy
exception to the operation of res judicata[,]” courts have
recognized equitable exceptions to issue preclusion in “limited
circumstances[.]” Apotex, Inc. v. FDA, 393 F.3d 210, 219 (D.C.
Cir. 2004). First, “issue preclusion is inappropriate if there
has been an intervening ‘change in controlling legal
principles.’” Canonsburg, 807 F.3d at 306 (quoting Apotex, 393
F.3d at 219). Second, courts “have recognized that issue
preclusion would be unfair ‘if the party to be bound lacked an
incentive to litigate in the first trial, especially in
comparison to the stakes of the second trial.’” Id. (quoting
Otherson, 711 F.2d at 273). Third, issue preclusion is
inappropriate if the “prior proceedings were seriously
defective.” Martin, 488 F.3d at 455 (quoting Blonder-Tongue
64
Lab’ys, Inc. v. Univ. of Ill. Found., 402 U.S. 313, 333, 91 S.
Ct. 1434, 28 L. Ed. 2d 788 (1971)). The Court of Appeals for the
District of Columbia Circuit (“D.C. Circuit”) is “reluctant to
expand these equitable exceptions.” Canonsburg, 807 F.3d at 306.
This case involves the defensive use of issue preclusion,
meaning that a defendant is seeking to “preclude[] a plaintiff
from contesting an issue it has previously litigated and lost in
another case[.]” Pharm. Care, 522 F.3d at 446. Here, the Georgia
Parties, intervening as defendants in both the ACF and ACT
cases, argue that Alabama, a plaintiff in both cases, should be
precluded from relitigating issues in the instant case that the
Northern District of Georgia already decided against it. See
Intervenor-Defs.’ Suppl. Mot., ECF No. 129 at 6-7. This amounts
to defensive, mutual issue preclusion, meaning the defendant
seeking to invoke preclusion and the plaintiff against whom
preclusion is being invoked have both appeared in the first and
second suits. Cf. Menkes v. DHS, 637 F.3d 319, 334 (D.C. Cir.
2011). While the Supreme Court has “emphasize[d] the fundamental
nature of the general rule that a litigant is not bound by a
judgment to which [it] was not [previously] a party[,]” it has
also “endeavored to delineate discrete exceptions that apply in
‘limited circumstances[,]’” Taylor v. Sturgell, 553 U.S. 880,
898, 128 S. Ct. 2161, 171 L. Ed. 2d 155 (2008); i.e., where
“issue preclusion does not require mutuality of parties[,]”
65
Gov’t of Rwanda v. Johnson, 409 F.3d 368, 374 (D.C. Cir. 2005);
see also Blonder-Tongue, 402 U.S. at 328-29 (abandoning the
mutuality requirement in certain situations).
One exception of when “a nonparty may be bound by a
judgment” is when it “was adequately represented by someone with
the same interests who [wa]s a party to the [first] suit.”
Sturgell, 553 U.S. at 894 (citation and internal quotation marks
omitted). Using this exception to “the rule against nonparty
preclusion,” id. at 893; Intervenor-Defendants argue that “[t]he
preclusive effect of the ACF Court’s prior judgments is clear
[not only] as to Alabama,” but “extends to” APC and Intervenor-
Plaintiffs, who, although not parties to the ACF case, are
Alabama municipalities (the Cities of Mobile and Montgomery) or
Alabama-incorporated corporations (APC, Russell Lands, and
LMRA), and are thus “Alabama citizen[s] whose interests were
adequately represented by the State of Alabama in the ACF
Case[,]” Intervenor-Defs.’ Suppl. Mot., ECF No. 129 at 29-30.
To determine whether issue preclusion applies to bar the
Alabama Plaintiffs’ water quality claims in this case, the Court
first summarizes Alabama’s three ACF water quality claims and
the Northern District of Georgia’s rulings on those claims. For
its first two claims, Alabama argued that the ACF Master Manual
should be set aside because it would cause violations of
Georgia’s water quality standards contrary to: (1) section
66
313(a) of the CWA; and (2) the Corps’ internal ER 1110-2-8154.
See Compl., Alabama v. U.S. Army Corps of Engr’s, No. 17-607
(JDB) (D.D.C. Apr. 5, 2017), ECF No. 1 at 16-18 ¶¶ 60-67, 23 ¶¶
95-99; In re ACF Basin, 467 F. Supp. 3d at 1336. Third, Alabama
advanced “an independent water-quality claim under the APA[,]”
Ala.’s Opp’n to Suppl. Mot., ECF No. 134 at 16; based on the
Corps’ “failure to acknowledge and offer a reasoned explanation
for its departure from its own water-quality policy[,]” In re
ACF Basin, 554 F. Supp. 3d at 1303; even if ER 1110-2-8154
“cannot be directly enforced[,]” Intervenor-Defs.’ Suppl. Mot.,
ECF No. 129 at 7; 16 see also Compl., Alabama v. U.S. Army Corps
of Engr’s, No. 17-607 (JDB) (D.D.C. Apr. 5, 2017), ECF No. 1 at
18 ¶¶ 67-68, 24-25 ¶¶ 104-05. In its 2020 decision granting
partial judgment on the pleadings, the Northern District of
Georgia ruled against Alabama on its first two water quality
claims. See In re ACF Basin, 467 F. Supp. 3d at 1336-41. First,
that court concluded that under section 313(a) of the CWA, state
water quality standards are not “requirements” with which
federal agencies must comply, but are instead “limited to
objective state standards of control, such as effluent
limitations in permits,” or State-created programs imposing
16The Georgia Parties call this Alabama’s “fallback” CWA
argument, which they contend Alabama has asserted in the ACT and
ACF cases. Intervenor-Defs.’ Suppl. Mot., ECF No. 129 at 7.
67
enforceable conditions. Id. at 1336-38. Second, the Northern
District of Georgia determined that ER 1110-2-8154 is a non-
binding internal guidance document that is unenforceable by
third parties like the State of Alabama. Id. at 1340-41. Lastly,
in its 2021 decision granting summary judgment to the
defendants, that court concluded that “even if the Corps did not
follow its [ER] guidance as Alabama allege[d],” it acknowledged
that guidance and adequately explained its choice “to select the
preferred alternative despite potential impacts to water
quality.” In re ACF Basin, 554 F. Supp. 3d at 1303.
Intervenor-Defendants now argue that the Northern District
of Georgia’s rulings against Alabama are “preclusive” as to
whether: (1) state water quality standards are “requirements”
within the meaning of section 313(a) of the CWA; and (2) ER
1110-2-8154 is legally binding in Corps reservoir operations,
and therefore “dispositive” in answering both questions in the
negative for the purposes of Alabama’s instant ACT water quality
claims. See Intervenor-Defs.’ Suppl. Mot., ECF No. 129 at 6-7,
15-16. The Georgia Parties argue that pursuant to the rules of
issue preclusion, these two “issue[] of law” conclusions from
the ACF case lead to the “law application” that “[a] Corps’
Master Manual is not contrary to law” under the CWA or ER 1110-
2-8154 “because it does not ensure that Water Quality Standards
will be achieved[,]” and therefore Alabama has failed to state a
68
claim for relief under those legal theories. Id. at 15-16. Next,
they argue that the Northern District of Georgia’s ruling on
whether the Corps engaged in an “unexplained departure” from ER
1110-2-8154 in violation of the APA when adopting a Master
Manual with acknowledged downstream water quality impacts is
“persuasive,” even if not “preclusive,” “[b]ecause the Corps
provided essentially the same explanations for the ACT [Master
M]anual” as the ACF Master Manual. Id. at 7, 20-23.
In its opposition, Alabama argues that “[t]he differences
between the ACT and ACF cases are more than just ‘place names’
and ‘specific operational details[,]’” as Intervenor-Defendants
argue, but instead involve entirely separate river basins,
different operations manuals, and “vastly different procedural
issues[,]” Ala.’s Opp’n to Suppl. Mot., ECF No. 134 at 19—
quoting language from the Georgia Parties’ 2017 reply brief in
support of their motion to transfer venue of the ACF case from
this district to the Northern District of Georgia, see Def.-
Intervenor the State of Georgia’s Reply in Support of its Mot.
to Transfer Venue, Alabama v. U.S. Army Corps of Eng’rs, No. 17-
607 (JDB) (D.D.C. Aug. 11, 2017), ECF No. 35 at 18-19 (arguing
that there is “no overlap between the ACT-manual litigation and
[the ACF] case that would make it convenient or efficient to
litigate them in th[e] same jurisdiction” because the cases are
“so dissimilar”). Alabama further argues that “the specific
69
‘issues’ that the Georgia Parties seek to preclude Alabama from
litigating in this case constitute either pure questions of law,
or mixed questions of law and fact involving dissimilar facts to
which the issue preclusion doctrine does not apply.” Ala.’s
Opp’n to Suppl. Mot., ECF No. 134 at 19.
Next, Alabama argues that policy considerations weigh
against applying issue preclusion because of the broad public
interests at stake in such a case “involving the federal and two
State governments” and because applying the doctrine will not
conserve judicial resources, discourage forum shopping, or
prevent inconsistent results. See id. at 8, 32-36. Instead,
Alabama argues that the Northern District of Georgia’s ACF
rulings are “neither binding nor persuasive” in this ACT case
and that “the Court should bring its own judgment to bear” on
the merits of the issues. Id. at 8-9. Alabama also argues that
APC and Intervenor-Plaintiffs are not barred from litigating the
allegedly precluded issues because they were not parties to the
ACF case, nor were they adequately represented by Alabama in
that suit. See id. at 36-38. Intervenor-Plaintiffs and APC have
adopted Alabama’s opposition to the Georgia Parties’
supplemental motion for summary judgment, each adding a few
arguments of their own, discussed below. See Intervenor-Pls.’
Opp’n to Suppl. Mot., ECF No. 135 at 1-2; APC’s Opp’n to Suppl.
Mot., ECF No. 137 at 1-3.
70
a. The Issue Preclusion Criteria Are Satisfied
as Against the State of Alabama for Its
Water Quality Claims Involving the CWA and
ER 1110-2-8154
As an initial matter, the Court agrees with the State of
Alabama that issue preclusion need only be analyzed regarding
the first two issues raised in the Georgia Parties’ supplemental
motion for summary judgment. See Ala.’s Opp’n to Suppl. Mot.,
ECF No. 134 at 27-28. On the third issue, whether the Corps
engaged in an “unexplained departure” from ER 1110-2-8154 in
violation of the APA by adopting the ACF and ACT Master Manuals,
see Intervenor-Defs.’ Suppl. Mot., ECF No. 129 at 7, 20-23;
Intervenor-Defendants have acknowledged that the Northern
District of Georgia’s ruling that the Corps adequately explained
the reasons for its substantive actions in the ACF Basin
impacting water quality “is not necessarily preclusive here,”
id. at 20-21. Given this admission, the Court declines to engage
in the preclusion analysis as to this issue.
For the remaining two water quality issues involving the
CWA and ER 1110-2-8154, the Court first determines that the
preclusion criteria appear to be satisfied as against the State
of Alabama, a party to both the ACF and ACT cases. In reaching
this conclusion, the Court “does not review the merits of” the
Northern District of Georgia’s earlier rulings. Consol. Edison,
449 F.3d at 1257. Instead, it assesses whether: (1) the same
71
issues now being raised in the ACT case were “contested by the
parties and submitted for judicial determination” in the ACF
case; (2) those issues were “actually and necessarily determined
by a court of competent jurisdiction[;]” and (3) preclusion
would “work a basic unfairness to” Alabama, “the party bound by
the first determination.” See Yamaha, 961 F.2d at 254.
In both the ACF and ACT cases, the parties have contested
and submitted for judicial determination the identical issue of
whether state water quality standards are directly enforceable
“requirements” under section 313(a) of the CWA. Compare In re
ACF Basin, 467 F. Supp. 3d at 1336-39, with Intervenor-Defs.’
Cross-Mot., ECF No. 97 at 21-25, and Pls.’ Reply, ECF No. 99 at
22-25; see also Intervenor-Defs.’ Suppl. Mot., ECF No. 129 at 17
(comparing Alabama’s ACT and ACF pleadings, both contending that
the CWA “require[s]” the Corps “to implement a water-quality
management program that” complies with state water quality
standards, and that the Master Manuals are “contrary to” this
statutory requirement). The Northern District of Georgia, “a
court of competent jurisdiction,” “actually and necessarily”
decided this issue against Alabama, Yamaha, 961 F.2d at 254;
concluding, after surveying caselaw from the Supreme Court and
other federal district courts, that water quality standards are
not self-enforcing, substantive legal “requirements” with which
72
federal agencies must comply under section 313(a) of the CWA, 17
see In re ACF Basin, 467 F. Supp. 3d at 1336-39. This conclusion
led the Northern District of Georgia to determine that Alabama
failed to state a claim under 33 U.S.C. § 1323(a), which was
essential to its judgment dismissing that count of Alabama’s ACF
complaint. Id. at 1339, 1341. Finally, because Alabama’s
incentives to litigate this issue “were no less present in the
prior case, nor are the stakes of the present case of ‘vastly
greater magnitude[,]’” Martin, 488 F.3d at 455 (quoting Yamaha,
961 F.2d at 254); and “there is no change in the controlling
law” or “concern about procedural defects in the [ACF]
litigation, the application of issue preclusion is unlikely to
result in a ‘compelling’ showing of unfairness to” the State of
Alabama, Canonsburg, 807 F.3d at 306.
The Court reaches the same conclusion as to the State of
Alabama regarding the identical issue of whether ER 1110-2-8154
creates legally binding duties on the Corps in its reservoir
operations. Compare In re ACF Basin, 467 F. Supp. 3d at 1339-41,
with Pls.’ Mot., ECF No. 83 at 49-50; see also Intervenor-Defs.’
Suppl. Mot., ECF No. 129 at 17 (comparing Alabama’s ACT and ACF
pleadings, both contending that “the Corps’ implementing
17This conclusion did not turn on any specifics about the State
of Georgia’s water quality standards and was therefore intended
to apply to water quality standards across states, including
Alabama’s water quality standards at issue in the ACT case.
73
regulations and guidance require it to implement a water-quality
management program” in line with that guidance and that the
Master Manuals are “contrary to th[o]se regulations and
guidance”). The Northern District of Georgia “actually and
necessarily” decided this issue against Alabama, concluding,
after reviewing the history and purpose of the ERs and caselaw
from “[n]umerous courts,” that those regulations are “not
binding on the agency” and “not enforceable” by third parties.
In re ACF Basin, 467 F. Supp. 3d at 1340. This conclusion was
essential to that court’s judgment dismissing the related counts
of Alabama’s ACF complaint. Id. at 1341. Lastly, as noted, the
State of Alabama “had every incentive to forcefully litigate”
this issue, such that requiring it to adhere to this conclusion
“does not create any basic unfairness.” Robinson v. U.S. Dep’t
of Educ., 502 F. Supp. 3d 127, 135 (D.D.C. 2020).
b. Although the Issue Preclusion Criteria Are
Satisfied as Against the State of Alabama’s
CWA and ER 1110-2-8154 Water Quality Claims,
the Doctrine Is Inapplicable Here
However, even if the three elements of issue preclusion are
met, Alabama argues that the Northern District of Georgia’s 2020
water quality rulings do not bar Alabama’s ACT water quality
clams for two reasons. First, Alabama argues that “an exception”
to the doctrine applies, namely the “unmixed questions of law”
exception, Ala.’s Opp’n to Suppl. Mot., ECF No. 134 at 20-21;
74
which dictates that “[c]ollateral estoppel does not apply with
the same force to unmixed questions of law as it does to mixed
questions of law and fact or to pure questions of fact[,]”
Pharm. Care, 522 F.3d at 446. This exception thus requires “a
determination as to whether an ‘issue of fact’ or an ‘issue of
law’ is sought to be relitigated and then a determination as to
whether the ‘issue of law’ arises in a successive case that is
so unrelated to the prior case that relitigation of the issue is
warranted.” Stauffer, 464 U.S. at 171. Second, Alabama argues
that policy considerations, along with the presence of APC and
Intervenor-Plaintiffs as non-mutual parties, weigh against
preclusion. See Ala.’s Opp’n to Suppl. Mot., ECF No. 134 at 8-9,
32-38. For the reasons discussed below, the Court agrees with
Alabama on both arguments and declines to apply issue preclusion
to bar the Alabama Plaintiffs’ water quality claims.
i. The “Unmixed Questions of Law”
Exception to Issue Preclusion
Applies Here
“In cases involving mutual collateral estoppel,” as this is
for the State of Alabama, the “unmixed questions of law”
exception “applies only if the issue is one of law and the facts
of the cases are substantially unrelated.” Pharm. Care, 522 F.3d
at 446 (citing RESTATEMENT (SECOND) OF JUDGMENTS § 28(2) (Am. L. Inst.
1982) [hereinafter “RESTATEMENT (SECOND) OF JUDGMENTS”]); see also
Montana, 440 U.S. at 162 (“[W]hen issues of law arise in
75
successive actions involving unrelated subject matter,
preclusion may be inappropriate.”); 18 Charles Alan Wright &
Arthur R. Miller, FEDERAL PRACTICE AND PROCEDURE § 4425 (3d ed. 2023)
[hereinafter “FEDERAL PRACTICE AND PROCEDURE § 4425”] (“[I]ssue
preclusion does not attach to abstract rulings of law, unmixed
with any particular set of facts[.]”). This contrasts with
situations in which “‘the claims in two separate actions between
the same parties are the same or are closely related [such that]
it is not ordinarily necessary to characterize an issue as one
of fact or of law for purposes of issue preclusion . . . . ’”
Stauffer, 464 U.S. at 171 (quoting RESTATEMENT (SECOND) OF JUDGMENTS §
28(2), cmt. b). In such a case, it would be unfair to the
winning party and burdensome on the courts “‘to allow repeated
litigation of the same issue in what is essentially the same
controversy, even if the issue is regarded as one of law.’” See
id. at 171-72 (declining to apply the exception and “allow the
government to litigate twice with the same party an issue
arising in both cases from virtually identical facts” (quoting
RESTATEMENT (SECOND) OF JUDGMENTS § 28(2), cmt. b)). Thus, “where the
legal issue[s are] identical and the factual settings so closely
related, the exception simply does not apply.” Beverly Health &
Rehab. Servs., Inc. v. NLRB, 317 F.3d 316, 323 n.2 (D.C. Cir.
2003).
76
Since the parameters of the “unmixed questions of law”
exception are “far from clear[,]” Stauffer, 464 U.S. at 172; and
“the journey from a pure question of fact to a pure question of
law is one of subtle gradations[,]” RESTATEMENT (SECOND) OF JUDGMENTS
§ 28(2), cmt. b; the Supreme Court “regularly turns to the
Restatement (Second) of Judgments” when deciding whether to
apply this “challenging” exception to issue preclusion, see B &
B Hardware, Inc. v. Hardis Indus., Inc., 575 U.S. 138, 148, 135
S. Ct. 1293, 191 L. Ed. 2d 222 (2015). The Restatement states
that when: (1) “the issue is one of the formulation or scope of
[an] applicable legal rule[;]” and (2) “if the claims in the two
actions are substantially unrelated,” then the rule of law
declared in the first action between the two parties “should not
be binding on them for all time” because “the more flexible
principle of stare decisis is sufficient to protect [them] and
the court from unnecessary burdens.” RESTATEMENT (SECOND) OF JUDGMENTS
§ 28(2), cmt. b; accord Gruver v. La. Bd. of Supervisors for La.
State Univ. Agric. & Mech. Coll., 959 F.3d 178, 182 n.3 (5th
Cir. 2020).
The first element of this test applies here, as the
Northern District of Georgia addressed two pure questions of
law, i.e., not based on any underlying ACF case facts, to
enunciate legal rules regarding the statutory meaning of the
word “requirements” under section 313(a) of the CWA and the
77
enforceability of the agency’s ERs under the APA. The “unmixed
questions of law” exception applies in such situations “with
particular force[,]” since the issues to be re-litigated involve
“‘the formulation or scope’ of a statute [and an] applicable
legal rule[.]” Nat’l Org. of Veterans’ Advocs., Inc. v. Sec’y of
Veterans Affs., 260 F.3d 1365, 1373 (Fed. Cir. 2001) (quoting
RESTATEMENT (SECOND) OF JUDGMENTS § 28(2), cmt. b); see also U.S. ex
rel. Stinson, Lyons, Gerlin & Bustamante, P.A. v. Blue Cross
Blue Shield of Ga., Inc., 755 F. Supp. 1040, 1046 (S.D. Ga.
1990) (“Issue preclusion is least favored where the pure
question of law is one of statutory construction.”); Holland v.
Nat’l Mining Ass’n, 309 F.3d 808, 815 (D.C. Cir. 2002)
(“Allowing one circuit’s statutory interpretation to foreclose
APA review of the question in another circuit would squelch the
circuit disagreements that can lead to Supreme Court review.”);
FEDERAL PRACTICE AND PROCEDURE § 4425 (“It is reasonably clear that
preclusion does not extend to principles of law formulated in
abstract terms that could apply to completely separate fact
settings.”). As Alabama argues, the Northern District of
Georgia’s rulings “did not involve any fact findings” but
instead “turned strictly on [its] interpretation of the CWA’s
statutory scheme and the case law[,]” its understanding of the
history and purpose of the Corps’ ERs, and APA caselaw on
determining whether agency statements have the force of law.
78
Ala.’s Opp’n to Suppl. Mot., ECF No. 134 at 22, 26. In fact, it
appears that “[b]oth parties agree that the issues presented
here are legal[,]” Pharm. Care, 522 F.3d at 447; since the
Georgia Parties’ own brief draws a line between “issues of law”
and “law application,” seemingly relegating the Northern
District of Georgia’s two 2020 water quality rulings to the
former camp, while labeling it “law application” to conclude
that Alabama’s complaints in the ACT and ACF cases “fail to
state a claim for relief under [those] legal theories[,]”
Intervenor-Defs.’ Suppl. Mot., ECF No. 129 at 15-16. Overall,
“[t]o foreclose [the Court’s] reconsideration of [such pure]
legal issues would not aid judicial economy[,]” and would
instead “freeze” the Court’s ability to develop the law “in an
area of substantial public interest.” Pharm. Care, 522 F.3d at
447 (citing RESTATEMENT (SECOND) OF JUDGMENTS § 29, cmt. i).
For the second part of the Restatement’s test, the Court
concludes that the facts of the ACF and ACT cases are
“substantially unrelated,” such that the Northern District of
Georgia’s conclusions should not be binding on the parties “for
all time.” RESTATEMENT (SECOND) OF JUDGMENTS § 28(2), cmt. b. Although
the Supreme Court and the D.C. Circuit have not articulated a
standard for determining when two cases are “substantially
unrelated,” the Court is persuaded by the history of the Water
Wars litigation and by Intervenor-Defendants’ own statements
79
that the two cases not only involve different river basins and
geographical locations but “different contexts.” 18 Intervenor-
Defs.’ Suppl. Mot., ECF No. 129 at 21. In 2007, when the
original ACT and ACF cases were bifurcated, the Judicial Panel
on Multidistrict Litigation (“JPML”) concluded that “claims in
the Northern District of Alabama relating to the conduct of the
Corps vis-à-vis the flow of water in the [ACT] River basin do
not share sufficient questions of fact with claims relating to
the flow of water in the ACF River basin.” In re Tri-State Water
Rts. Litig., 481 F. Supp. 2d at 1353. And in 2017, when the
State of Georgia argued for transferring the ACF case from this
district to the Northern District of Georgia, it cited this
portion of the JPML’s decision when arguing that there is “no
overlap between” the ACT and ACF cases “that would make it
convenient or efficient to litigate them in th[e] same
jurisdiction.” See Def.-Intervenor the State of Georgia’s Reply
in Support of its Mot. to Transfer Venue, Alabama v. U.S. Army
Corps of Eng’rs, No. 17-607 (JDB) (D.D.C. Aug. 11, 2017), ECF
No. 35 at 18-19.
18The Georgia Parties argue that the Court should follow the
Court of Appeals for the Third Circuit’s standard for assessing
when two cases are “substantially unrelated” under the “unmixed
questions of law” exception, as articulated in Burlington
Northern Railroad Co. v. Hyundai Merchant Marine Co., 63 F.3d
1227, 1236 (3d Cir. 1995). See Intervenor-Defs.’ Suppl. Mot.
Reply, ECF No. 139 at 9-10. Given its above analysis, the Court
declines this invitation.
80
Intervenor-Defendants now argue that Georgia’s earlier
statements in support of its motion to transfer venue are not
inconsistent with its arguments in favor of applying issue
preclusion here because there is still “some overlap [between
the ACF and ACT cases], even if the overlap is not enough to
warrant keeping the cases together.” Intervenor-Defs.’ Suppl.
Mot. Reply, ECF No. 139 at 17. Although they claim that “the law
and facts relating to the[ water quality] issues are exactly the
same,” id. at 18; the Court agrees with Alabama that “[a]s it
relates to the CWA issues in both cases, the affected lakes and
rivers are different, the State water-quality standards that
will be violated are different, and the Corps’ stated
justifications for adopting operations that will violate these
standards are different[,]” see Ala.’s Opp’n to Suppl. Mot., ECF
No. 134 at 23, 24-25, 27-28 (enumerating other factual
differences between the ACF and ACF cases 19); see also Def.-
Intervenor the State of Georgia’s Reply in Support of its Mot.
19Alabama claims that “[o]ne specific and critical factual
difference is that in this case, the Corps’ operations under the
ACT Manual will contribute to violations of water-quality
standards that were incorporated in a ‘Total Maximum Daily
Load,’ or ‘TMDL,’ at Weiss Lake in Alabama.” Ala.’s Opp’n to
Suppl. Mot., ECF No. 134 at 24. The Court agrees that this is a
factual difference between the ACT and ACF cases, as the
Northern District of Georgia did not analyze TMDLs in-depth in
its 2020 decision. See In re ACF Basin Water Litig., 467 F.
Supp. 3d 1323, 1338 (N.D. Ga. 2020). The Court therefore
addresses ACT water quality arguments regarding TMDLs on the
merits. See infra section IV.A.2.a.
81
to Transfer Venue, Alabama v. U.S. Army Corps of Eng’rs, No. 17-
607 (JDB) (D.D.C. Aug. 11, 2017), ECF No. 35 at 18 (arguing that
the ACT case “involves an entirely separate river basin,
challenges a different operations manual, and has vastly
different procedural issues”). Such differences establish that
these actions do not involve “essentially the same controversy”
or “virtually identical facts” and instead involve “factual
differences . . . of . . . legal significance,” Stauffer, 464
U.S. at 172; making them sufficiently unrelated so as to warrant
applying “the unmixed question of law exception to the
collateral estoppel doctrine[,]” Ctr. for Biological Diversity
v. Hamilton, 385 F. Supp. 2d 1330, 1338 (N.D. Ga. 2005).
Furthermore, “[l]ess is required for the exception to apply
in a case of non-mutual estoppel—such as this case.” Pharm.
Care, 522 F.3d at 446. In such a non-mutual case, i.e., where
APC and Intervenor-Plaintiffs were not also parties to the ACF
case, “an issue is not precluded if it is one of law and
treating it as conclusively determined would inappropriately
foreclose opportunities for obtaining reconsideration of the
legal rule upon which it was based.” Id. at 446-47 (citation and
internal quotation marks omitted). As the D.C. Circuit has
concluded, “[t]o apply collateral estoppel under these
circumstances would prevent the [C]ourt from performing its
function of developing the law.” Id. at 447. Thus, contrary to
82
Intervenor-Defendants’ claim that the instant case “stands in
sharp contrast to” the D.C. Circuit’s decision in Pharmaceutical
Care Management Ass’n v. District of Columbia, 522 F.3d 443
(D.C. Cir. 2008), see Intervenor-Defs.’ Suppl. Mot. Reply, ECF
No. 139 at 19; that case supports applying the “unmixed
questions of law” exception when other players, like APC or
Intervenor-Plaintiffs, “could readily avoid the estoppel
consequence of a loss by” instead bringing the lawsuit, Pharm.
Care, 522 F.3d at 447.
ii. Policy Considerations and the
Presence of Non-Mutual Parties
Also Weigh Against the Application
of Issue Preclusion Here
Even if the Court had declined to apply the “unmixed
questions of law” exception, practical and equitable policy
considerations, including the presence of several non-mutual
parties, “counsel against application of collateral estoppel in
this case.” Id.
Issue preclusion “must be evaluated in light of the policy
concerns underlying the doctrine[,]” Stauffer, 464 U.S. at 176
(White, J., concurring); see also PJ United, Inc. v. Camron, No.
7:15-cv-00955, 2016 WL 10100762, at *4 (N.D. Ala. Mar. 23, 2016)
(“Defensive collateral estoppel is largely grounded in several
different policy concerns.”); which include conserving judicial
resources, avoiding inconsistent results across jurisdictions,
83
preventing forum shopping and piecemeal litigation, and
encouraging reliance on adjudication, see Hardison, 655 F.2d at
1288; Allen v. McCurry, 449 U.S. 90, 94, 101 S. Ct. 411, 66 L.
Ed. 2d 308 (1980). “[T]here is no justification for applying
collateral estoppel, which is a flexible, judge-made doctrine,
in situations where the policy concerns underlying it are
absent.” Stauffer, 464 U.S. at 176 (White, J., concurring).
Here, the Court concludes that none of these policy
concerns are implicated so as to warrant applying issue
preclusion to bar the Alabama Plaintiffs’ ACT water quality
claims. First, as Alabama argues, applying the doctrine against
it “will not conserve the parties’ or the Court’s resources”
because the Court is presently ruling on the merits of the
parties’ cross-motions for summary judgment. Ala.’s Opp’n to
Suppl. Mot., ECF No. 134 at 33. Additionally, as discussed
below, APC is a non-mutual party to which preclusion does not
apply, such that the Court “would not save any resources because
it still has to adjudicate [APC’s] same claims.” Id.; see also
PJ United, 2016 WL 10100762, at *4 (“Defendants [still] have to
litigate against the Operating Companies here, meaning they are
already allocating resources to litigating these issues.”); In
re Light Cigarettes Mktg. Sales Prac. Litig., 691 F. Supp. 2d
239, 251 (D. Me. 2010) (“[E]ven if issue preclusion were
appropriate against PM, there is a significant question as to
84
whether it may be used against Altria. Applying issue preclusion
to PM and not to Altria would yield few efficiency
benefits[.]”).
Second, the doctrine’s goals of discouraging forum shopping
and preventing piecemeal litigation are not implicated here, as
Alabama filed the ACT case two years prior to filing the ACF
case, and therefore could not possibly have “adopt[ed] a ‘wait
and see’ attitude, in the hope that the [ACF] action . . .
[would] result in a favorable judgment.” Parklane Hosiery Co. v.
Shore, 439 U.S. 322, 330, 99 S. Ct. 645, 58 L. Ed. 2d 552
(1979). Moreover, forum shopping entails filing suit in
different jurisdictions, but Alabama filed both the ACT and ACF
cases in this district, and the ACF case was only later
transferred to the Northern District of Georgia upon motion by
the State of Georgia, thereby diminishing any concern
Intervenor-Defendants might now have over piecemeal litigation.
See Ala.’s Opp’n to Suppl. Mot., ECF No. 134 at 35-36.
Third, because the Court has already determined that the
facts underlying the ACT and ACF cases are sufficiently
unrelated, the Court agrees with Alabama’s contention that
“[a]ny ruling on the fact issues will not result in inconsistent
results because the facts are different[.]” Id. at 33. And
because the Court has also determined that the Northern District
of Georgia’s water quality holdings involved pure questions of
85
law, any collateral estoppel policies are not advanced by
precluding reconsideration of “a legal issue involving different
facts.” Hamilton, 385 F. Supp. 2d at 1335.
In addition, to the extent there is a risk of inconsistent
rulings on pure legal issues affecting the Corps’ management of
its two multi-state river basins, see Intervenor-Defs.’ Suppl.
Mot. Reply, ECF No. 139 at 20 (expressing this concern); other
substantive policy considerations, such as the development of
the law on important questions of national public interest, can
outweigh the “interests of finality and judicial economy.”
United States v. Alcan Aluminum Corp., 990 F.2d 711, 719 (2d
Cir. 1993) (citation omitted); see also Am. Med. Int’l, Inc. v.
Sec’y of Health, Educ. & Welfare, 677 F.2d 118, 122 (D.C. Cir.
1981) (“It can hardly be gainsaid that complex questions of
national import can wholesomely and profitably be explored by
more than a single court.”). “Were this a case involving only
private litigants or only simple issues of fact,” the Court
might hesitate less in the application of issue preclusion. Am.
Med. Int’l, 677 F.2d at 121. However, this is a lawsuit by a
State government (and the State’s largest utility company)
against a federal agency, in which another State government and
numerous municipalities have intervened, about the legality of
operations “in a multi-state river basin that affects tens of
millions of people.” Ala.’s Opp’n to Suppl. Mot., ECF No. 134 at
86
34. In this context of “agency relitigation of legal issues with
substantial public policy implications, inquiry by other
[courts] should not be foreclosed; indeed a conflict among the
[courts in different] circuits could be a healthy matter.” Am.
Med. Int’l, 677 F.2d at 122 (citation and internal quotation
marks omitted); see also United States v. Mendoza, 464 U.S. 154,
160, 104 S. Ct. 568, 78 L. Ed. 2d 379 (1984) (stating that a
rule allowing nonmutual collateral estoppel in cases involving
the government “would substantially thwart the development of
important questions of law by freezing the first final decision
rendered on a particular legal issue”); PJ United, 2016 WL
10100762, at *4 (noting that any potential inconsistencies on
legal issues can be resolved via appeals). Therefore, “with the
aim of producing a sound and well-reasoned decision[,]” the
Court declines, based on these underlying policy considerations,
to preclude consideration of the Alabama Plaintiffs’ water
quality claims. Am. Med. Int’l, 677 F.2d at 123.
A final equitable consideration that also weighs against
the application of issue preclusion in this instance is the
presence of several non-mutual plaintiffs—APC and Intervenor-
Plaintiffs—who were not parties to the ACF case. See Nat’l R.R.
Passenger Corp. v. Pa. Pub. Util. Comm’n, 288 F.3d 519, 525 (3d
Cir. 2002) (recognizing the lack of “mutuality of estoppel” as
an “equitable exception” to issue preclusion (citing Blonder-
87
Tongue, 402 U.S. at 328-29)). Intervenor-Defendants nonetheless
argue that like the State of Alabama, “[t]he remaining Alabama
Parties should also be barred from relitigating the issues
decided in the ACF case” because as Alabama citizens, they
cannot “complain that Alabama’s representation of their
interests in the ACF Case was ‘inadequate.’” Intervenor-Defs.’
Suppl. Mot., ECF No. 129 at 29-30. The Georgia Parties claim
that since APC co-signed Alabama’s brief and Intervenor-
Plaintiffs “adopt[ed] and incorporate[d] by reference in toto”
Alabama’s arguments, Intervenor-Pls.’ Mot., ECF No. 85 at 7; the
Alabama Parties have “endorsed” Alabama as an adequate
representative of their interests, Intervenor-Defs.’ Suppl.
Mot., ECF No. 129 at 30.
In response, Alabama argues that APC and Intervenor-
Plaintiffs are not barred from litigating the disputed water
quality issues because there are no indications that Alabama
served as their “legal representative in the ACF case [or] . . .
understood itself to be representing any of them, or that any of
them understood itself to be represented by Alabama.” Ala.’s
Opp’n to Suppl. Mot., ECF No. 134 at 37-38. Intervenor-
Plaintiffs “adopt and incorporate” Alabama’s opposing arguments
to the Georgia Parties’ supplemental motion and add that they
have each “raised distinct issues in this case that were not
present in the ACF litigation.” Intervenor-Pls.’ Opp’n to Suppl.
88
Mot., ECF No. 135 at 1-2. Likewise, APC adopts Alabama’s
arguments but limits its own response “to the non-party
preclusion issue[,]” arguing that: (1) due process bars the
application of collateral estoppel to APC because it was not a
party to the ACF case and had no opportunity to be heard on the
issues; and (2) APC “seeks to vindicate rights in this case that
are separate and apart from those represented by the State of
Alabama, and as such, the State of Alabama does not ‘adequately
represent’ [APC].” APC’s Opp’n to Suppl. Mot., ECF No. 137 at 2,
5. The Court is persuaded by the Alabama Parties’ opposition
arguments and concludes that these circumstances do not warrant
carving out an exception to issue preclusion’s general rule
requiring mutuality of parties. See Proctor v. Dist. of
Columbia, 74 F. Supp. 3d 436, 452 (D.D.C. 2014) (stating the
rule that “[i]ssue preclusion may not be asserted against one
who was not a party in the first case”).
Generally, pursuant to due process principles, a nonparty
to a suit is not deemed to have had “a full and fair opportunity
to litigate the claims and issues settled in that suit” because
of “the deep rooted historic tradition that everyone should have
[their] own day in court.” Sturgell, 553 U.S. at 892-93
(citation and internal quotation marks omitted); see also
Parklane, 439 U.S. at 327 n.7 (“It is a violation of due process
for a judgment to be binding on a litigant who was not a party
89
or a privy and therefore has never had an opportunity to be
heard.”). However, the Supreme Court has noted that “in certain
limited circumstances,” nonparties may be precluded from
litigating issues previously decided where they were “adequately
represented” by a party to the first suit “with the same
interests.” Sturgell, 553 U.S. at 894 (citation and internal
quotation marks omitted). For a party’s representation of a
nonparty to be considered “adequate,” “at a minimum:” (1) the
interests of the nonparty and its representative must be
aligned; and (2) either the party must have understood itself to
be acting in a representative capacity “or the original court
took care to protect the interests of the nonparty.” Id. at 900.
Examples of such “[r]epresentative suits with preclusive effect
on nonparties” include “properly conducted class actions, and
suits brought by trustees, guardians, and other fiduciaries[.]”
Id. at 894 (internal citations omitted).
Here, none of these “limited circumstances” are present,
nor can it be said that the State of Alabama “adequately
represented” APC and Intervenor-Plaintiffs’ water quality claims
in the ACF case. First, legal representatives for preclusion
purposes are “restricted to five specific categories: trustees,
persons authorized by the nonparty, executors, authorized public
officials, and class representatives designated by a court[,]”
In re Salas, No. 18-00260, 2018 WL 4621930, at *12 (Bankr.
90
D.D.C. Sept. 24, 2018); and nothing in the record indicates that
the State of Alabama embodied any of these categories to APC or
Intervenor-Plaintiffs, even though they are Alabama corporations
and municipalities, see Ala.’s Opp’n to Suppl. Mot., ECF No. 134
at 37.
Second, while Intervenor-Defendants claim that the Alabama
Parties’ interests, in relation to both water quality and NEPA
claims, are “perfectly aligned” with the State of Alabama, and
that “the Alabama Intervenors do not identify a single point
where their interests actually diverge from those of their
State[,]” see Intervenor-Defs.’ Suppl. Mot. Reply, 139 at 7, 23-
24; each of the four Intervenor-Plaintiffs has identified
“distinct issues” of particular interest to them that “were not
present in the ACF litigation[,]” see Intervenor-Pls.’ Opp’n to
Suppl. Mot., ECF No. 135 at 2 (noting the Montgomery Board’s
concern that reduced flows caused by the ACT Master Manual
“could adversely affect wastewater discharge assimilation and
its ability to comply with its NPDES permits,” Mobile Water’s
concern that the reduced flows will impact salinity levels in
the Alabama River, and Russell Lands’ and LMRA’s concerns that
the reduced flows will hurt reservoir levels at Lake Martin in
late summer and early fall and hinder economic and recreational
development); as has APC, see APC’s Opp’n to Suppl. Mot., ECF
No. 137 at 14 (noting its “‘unique and substantial’ interests in
91
the broader ACF and ACT litigation as a result of its federal
[Federal Energy Regulatory Commission (“FERC”)] licenses in the
ACT and [its] Nuclear Regulatory Commission license in the ACF—
an interest that especially does not concern the State of
Alabama”). These unique concerns negate the “perfect” alignment
of interests between Alabama, APC, and Intervenor-Plaintiffs on
both water quality and NEPA issues. 20
Third, the Georgia Parties fail to point to anything other
than Alabama’s status as a State to argue that it understood
itself to be “acting in a representative capacity” for APC and
Intervenor-Plaintiffs. Sturgell, 553 U.S. at 900. Although they
argue that courts have found nonparty citizens and “creatures of
the State” to be adequately represented by their States in prior
judgments, see Intervenor-Defs.’ Suppl. Mot. Reply, ECF No. 139
at 24-25; especially “in cases involving sovereign resources
such as water[,]” see Intervenor-Defs.’ Suppl. Mot., ECF No. 129
at 30-31; they cite no recent, apposite cases from this circuit
to support this argument, see APC’s Opp’n to Suppl. Mot., ECF
No. 137 at 12-13 (demonstrating why each of the cases cited by
the Georgia Parties are “inapplicable here”). 21 Furthermore,
20 As noted above, Intervenor-Plaintiffs do not even make the
same water quality claims as APC and Alabama, instead advancing
those claims solely under NEPA and not the CWA or the Corps’
ERs, as the Alabama Plaintiffs do. See supra note 12.
21 As APC notes in its opposition, “[t]hough they never use the
phrase, the Georgia Parties appear to claim that [APC] was
92
although Alabama stated in its ACF complaint that injury would
befall “its citizens,” Compl., Alabama v. U.S. Army Corps of
Eng’rs, No. 17-607 (JDB) (D.D.C. Apr. 5, 2017), ECF No. 1 at 8 ¶
32; the Court is unpersuaded that this statement alone indicates
that Alabama understood itself to be specifically representing
the interests of the Montgomery Board, Mobile Water, LMRA, and
Russell Lands. See Sturgell, 553 U.S. at 901 (rejecting the
“expansive” idea of “virtual representation” that “would
authorize preclusion based on identity of interests and some
kind of relationship between parties and nonparties”). Finally,
neither did the Northern District of Georgia take “care to
‘adequately represented’ because the State of Alabama was
supposedly appearing as parens patriae.” APC’s Opp’n to Suppl.
Mot., ECF No. 137 at 9. “[U]nder the doctrine of parens patria,
a state is deemed to represent all of its citizens, when the
state is a party in a suit involving a matter of sovereign
interest.” Menzel v. Cnty. Utils. Corp., 501 F. Supp. 354, 357
(E.D. Va. 1979). However, the ACT and ACF cases do not involve
matters of one sovereign’s interest but rather multi-state river
basins controlled not by any one State but by a federal agency.
Further, “a state cannot proceed as parens patriae when the
United States, the superior ‘parent of the country,’ is the
defendant.” Gov’t of Province of Manitoba v. Zinke, 273 F. Supp.
3d 145, 165 (D.D.C. 2017). The D.C. Circuit has “decided that
the extent to which a state may sue as a representative of its
residents ‘must be qualified by [a] statement of the type and
extent of the interests to be represented, and of the defendants
against whom the action is brought.’” Id. at 166 (quoting
Pennsylvania v. Kleppe, 533 F.2d 668, 673 (D.C. Cir. 1976)
(emphasis in original)). Thus, even if the Georgia Parties had
argued for the application of parens patriae, the federal nature
of the Corps and their officers as defendants implicates “policy
concerns, apart from the injury itself,” and prevents the
doctrine from being used here to claim Alabama was fit to
represent the Alabama Parties’ claims in the ACF case. Id.
93
protect the interests of” APC or Intervenor-Plaintiffs in the
ACF case such that it would now be fair to bind them, as non-
parties, to its 2020 and 2021 decisions. See id. at 898, 900
(requiring “special procedures to safeguard the interests of
absentees”).
In its opposition briefing, APC also argues that the
Northern District of Alabama’s decision in 2005 to allow APC to
intervene as a plaintiff in the original Water Wars litigation
based on a finding that APC’s interests were not “adequately
represented” by the State of Alabama, see Alabama, 229 F.R.D. at
672; supports concluding that APC “seeks to vindicate rights” in
this case that “differ” from those represented by Alabama, see
APC’s Opp’n to Suppl. Mot., ECF No. 137 at 7. The Northern
District of Alabama made this finding in the context of various
motions to intervene, where it noted that because Alabama had
explicitly filed suit as parens patriae, see supra note 21
(defining this doctrine); APC, as a citizen of the State of
Alabama, could only intervene as a matter of right if it showed
that Alabama would not adequately protect an interest APC shared
with other citizens of the State, or that APC sought to pursue
an interest apart from a shared interest with the class of all
other Alabama citizens, see Alabama, 229 F.R.D. at 673. The
Northern District of Alabama concluded that APC had demonstrated
that its interest “differ[ed] from that of Alabama[,]” as
94
Alabama was concerned with “the management of all water
resources in the ACF and ACT river basins” and “all its
citizens,” while APC “specifically desire[d] to protect the
supply of water needed for its power generation operations” and
“its interest in obtaining the Corps’ approval for its
development plan.” Id. at 674 (emphasis in original). In
addition to finding that APC’s specific interests “diverge[d]
from Alabama’s general interest[,]” that court also found that
the State would “not adequately represent” APC’s specific
interests, thereby concluding that APC overcame the parens
patriae presumption that Alabama would represent its interests
in the case. Id. at 674-75. APC now argues that “[t]he same is
true here[,]” especially since Intervenor-Defendants were
parties to the Northern District of Alabama’s 2005 ruling. APC’s
Opp’n to Suppl. Mot., ECF No. 137 at 11.
The Court agrees with APC that this 2005 decision provides
persuasive evidence in favor of concluding that the State of
Alabama does not now adequately represent the interests of APC
and Intervenor-Plaintiffs so as to permit defensive non-mutual
issue preclusion. See South Carolina v. North Carolina, 558 U.S.
256, 271-73, 130 S. Ct. 854, 175 L. Ed. 2d 713 (2010) (finding
that Duke Energy, an entity operating dams and reservoirs in
both the plaintiff and defendant States, had “demonstrated
powerful interests” likely to “shape the outcome of [the]
95
litigation” that were separate from the interests represented by
the States). Although the Georgia Parties argue that the
standard for “adequate representation” under a Rule 24(a) motion
to intervene differs from the standard used in the issue
preclusion analysis, see Intervenor-Defs.’ Suppl. Mot. Reply,
ECF No. 139 at 26-27; two of the key authorities relied on in
their briefings, see id. at 24; Intervenor-Defs.’ Suppl. Mot.,
ECF No. 129 at 31; in fact note that “the underlying principle”
of “adequate representation” involved in a motion to intervene
in regard to the doctrine of parens patriae is “applicable” to
preclusion cases, see Menzel v. Cnty. Utils. Corp., 501 F. Supp.
354, 357 (E.D. Va. 1979); United States v. Olin Corp., 606 F.
Supp. 1301, 1304, 1307 (N.D. Ala. 1985) (noting that “the rule
regarding intervention in a parens patriae action [ ] is equally
appropriate” in a res judicata preclusion case). Therefore, the
Court concludes that Intervenor-Defendants have failed to
establish the two requisite criteria for the “carefully
circumscribed ‘adequate representation’ exception to the bar
against nonparty preclusion[.]” Nationwide Mut. Fire Ins. Co. v.
George V. Hamilton, Inc., 571 F.3d 299, 313 (3d Cir. 2009);
Sturgell, 553 U.S. at 893-94, 900.
Accordingly, because the water quality issues raised by
Intervenor-Defendants’ supplemental motion for summary judgment
are “unmixed questions of law” excluded from the application of
96
the issue preclusion doctrine, and because policy and equity
considerations, including the presence of non-mutual parties,
further weigh against its application, the Court declines to
preclude the Alabama Plaintiffs’ water quality claims in the
instant action based on the Northern District of Georgia’s ACF
water quality rulings regarding the CWA and ER 1110-2-8154.
2. The Alabama Plaintiffs’ Water Quality Claims
Fail on the Merits
Because the Court has declined to apply issue preclusion to
the Alabama Plaintiffs’ water quality claims, it will proceed to
analyze the merits. As discussed, the Alabama Plaintiffs argue
that the ACT Master Manual should be set aside because it
violates: (1) section 313(a) of the CWA, 33 U.S.C. § 1323(a);
and (2) ER 1110-2-8154 of the Corps’ water quality guidance. See
supra section IV.A. They also advance a third argument—that by
adopting the Master Manual despite acknowledging its adverse
water quality impacts, the Corps engaged in an “unexplained
departure” from precedent in violation of the APA’s duty to make
reasoned decision-making. See Ala.’s Opp’n to Suppl. Mot., ECF
No. 134 at 13, 28-30; Compl., ECF No. 1 at 25-26 ¶ 114. The
Court addresses each argument in turn.
a. Section 313(a) of the CWA (33 U.S.C. §
1323(a))
The Alabama Plaintiffs argue that operations under the
Master Manual, resulting in reduced flows from the Allatoona
97
Project, will degrade downstream waters and lead to violations
of Alabama’s state water quality standards, see Ala. Admin. Code
r. 335-6-10.01 (1991); including the standards for nutrient
concentrations in Weiss Lake, an APC reservoir located in
Alabama, see Pls.’ Mot., ECF No. 83 at 48-50; Intervenor-Defs.’
Cross-Mot., ECF No. 97 at 21-22. As Defendants note, this
“argument boils down to the assertion that the Corps has an
obligation under 33 U.S.C. §§ 1313 and 1323 [of the CWA] to
avoid operational decisions that could contribute to non-
attainment of the state water quality standards applicable
downstream from the dams[.]” Defs.’ Cross-Mot., ECF No. 95 at
51. Defendants respond that they have fulfilled their duties
under the CWA because they gave the requisite consideration to
water quality standards, in addition to their obligations under
other relevant governing statutes. Id. at 53. The Georgia
Parties add that the Corps could not have violated Alabama’s
water quality standards because these standards are not, within
the meaning of section 313(a), “requirements” with which the
Corps must comply, and thus, the Alabama Plaintiffs’ CWA claim
must fail. Intervenor-Defs.’ Cross-Mot., ECF No. 97 at 22. For
the reasons discussed below, the Court agrees that Alabama’s
water quality standards are not enforceable “requirements” under
the statute and that the Alabama Plaintiffs have failed to state
a claim pursuant to the CWA.
98
The Alabama Plaintiffs’ argument that the Corps must comply
with state water quality standards is premised on the following
language in the CWA:
Each . . . agency . . . of the Federal
Government (1) having jurisdiction over any
property or facility, or (2) engaged in any
activity resulting, or which may result, in
the discharge or runoff of pollutants, . . .
shall be subject to, and comply with, all
Federal, State, interstate, and local
requirements, administrative authority, and
process and sanctions respecting the control
and abatement of water pollution in the same
manner, and to the same extent as any
nongovernmental entity . . . .
33 U.S.C. § 1323(a) (emphasis added). Using this language, they
argue that because the Corps, a federal agency, has jurisdiction
over the Allatoona Project, it is subject to and required to
comply with State requirements, specifically state water quality
standards. See Pls.’ Mot., ECF No. 83 at 48-50. Section 301 of
the CWA requires the States to establish these standards for all
of their waters. See 33 U.S.C. § 1313.
The Court first concludes that section 313(a) “does not
qualify as a requirement in and of itself.” In re ACF Basin, 467
F. Supp. 3d at 1336; see also New York v. United States, 620 F.
Supp. 374, 381-82 (E.D.N.Y. 1985) (explaining that section
313(a) does “not expand the category of applicable substantive
requirements with which federal facilities must comply”
(citation and internal quotation marks omitted)); Intervenor-
This text is long and has been trimmed here. Open the source document for the complete record.