Opinion

GE Oil & Gas Pressure Control, L.P. v. Carrizo Oil & Gas, Inc.

Court
Texas Court of Appeals, 1st District (Houston)
Filed
May 18, 2023
Status
Published
Cited by
0 cases
Authority
More cited than 23.3%

“The doctrine of equitable subrogation allows a party who would otherwise lack standing to step into the shoes of and pursue the claims belonging to a party with standing.”

How later courts described this case

  • “The doctrine of equitable subrogation allows a party who would otherwise lack standing to step into the shoes of and pursue the claims belonging to a party with standing.”
  • “Lay testimony may be used as evidence of causation in certain circumstances, but ‘[w]hen expert testimony is required, lay evidence supporting liability is legally insufficient.’” (quoting City of Keller, 168 S.W.3d at 812)
  • noting that Supreme Court of Texas has adopted this standard
  • “Language may satisfy the conspicuousness requirement by appearing in larger type, contrasting colors, or otherwise calling attention to itself.”

Written by the judges who cited it.

The opinion

Opinion issued May 18, 2023

In The

Court of Appeals

For The

First District of Texas

————————————

NO. 01-21-00285-CV

———————————

GE OIL & GAS PRESSURE CONTROL, L.P., Appellant

V.

CARRIZO OIL & GAS, INC., Appellee

On Appeal from the 165th District Court

Harris County, Texas

Trial Court Case No. 2014-24754

MEMORANDUM OPINION

This is an insurance subrogation case brought by Gemini Insurance

Company in the name of its insured, Carrizo Oil & Gas, Inc. (“Carrizo”) against

GE Oil & Gas Pressure Control, L.P. (“GE”). GE appeals from a final judgment

awarding appellee Carrizo Oil & Gas, Inc. (“Carrizo”) more than $2.5 million in

damages on its negligence claim arising from a well blowout.

GE leased and installed equipment for Carrizo (Marcellus) LLC (“Carrizo

Marcellus”), a wholly-owned subsidiary of appellee Carrizo, to drill and complete

a natural gas well. During the final fracking stage, a blowout occurred, resulting in

the release of water, sand, and drilling fluids, and necessitating remediation.

Carrizo sued GE and others, alleging negligence, breach of contract, product

liability, and breach of warranty. GE counterclaimed, alleging that Carrizo was

negligent, and that GE was entitled to indemnification from Carrizo.

In the summer of 2016, the trial court (Judge Mayfield) held a jury trial on

liability, and the jury found that both GE and Carrizo were negligent.1 The jury

found against Carrizo on the other claims. The trial court denied Carrizo’s motion

to disregard the jury’s finding that it was negligent. In 2018, the trial court (Judge

Hall) conducted the bench trial on GE’s indemnity claim. Two years later, the trial

court signed findings of fact and conclusions of law. In 2021, the trial court

granted Carrizo’s renewed motion to disregard the jury’s finding that it was

negligent and denied GE’s request for additional findings of fact and conclusions

of law. The court then rendered final judgment denying GE’s indemnity claim and

awarding Carrizo damages exceeding $2.5 million.

1

The parties agreed to try the indemnification to the bench after the jury trial on

liability, if necessary.

2

On appeal, GE raises three issues challenging: (1) Carrizo’s standing to sue

for damages sustained by its wholly-owned subsidiary Carrizo Marcellus; (2) the

trial court’s grant of Carrizo’s motion to disregard the jury’s verdict; and (3) the

trial court’s determination that GE was not entitled to indemnity.

We affirm.

Background

Carrizo is an oil and gas exploration and production company. Its wholly-

owned subsidiary, Carrizo Marcellus, owns and operates wells in the Marcellus

Shale “play” in Pennsylvania, including the Yarasavage 1H well that experienced

the blowout from which this litigation arose.2

GE is an oilfield service provider that leases and installs equipment used in

drilling and production, including the “frac valve assembly,” which is the main

valve assembly at the top of a well and which is used during the process of

fracturing a well to prepare it for production.3

2

A “shale gas play” is a “set of discovered, undiscovered or possible natural gas

accumulations that exhibit similar geological characteristics.” See

https://www.energy.gov/sites/prod/files/2013/04/f0/shale_gas_glossary.pdf (last

visited May 2, 2023). The Yarasavage 1H well takes its name, Yarasavage, from

the name of the owner of the surface estate. Its designation, 1H, refers to the fact

that it is the first (1) of several horizontal (H) wells. The Marcellus Shale (and

other similar formations) “hold hundreds of trillions of cubic feet of natural gas”

that was considered prohibitively expensive to access until innovations in drilling

and extraction technology brought it within reach. See https://tinyurl.com/y7ah37rr

(last visited May 2, 2023).

3

The frac valve assembly is also called the frac tree assembly.

3

GE installed the frac valve assembly that was used at Yarasavage 1H. All

the equipment, except a gasket in the flange beneath the main valve, was leased;

the gasket was sold to Carrizo because it is designed to be used once and replaced

after use. After passing a static pressure test upon installation, the frac valve

assembly was put into service. After twenty successful fracking stages, the frac

valve assembly failed during the twenty-first and final fracking stage. Fracking

fluids, water, and sand were expelled from the flange installed beneath the master

valve, as shown in this photo admitted at trial:

4

Carrizo regained control of the well, conducted remediation in accordance

with relevant laws and regulations, reported the incident to governmental agencies,

and made claims with its insurer, Gemini Insurance Company. Gemini later filed

suit on behalf of its insureds, Carrizo and Carrizo Marcellus, and in the name of

Carrizo. Although Gemini is the real party in interest, we refer to Carrizo as it is

the named plaintiff and appellee.

In its live pleading, Carrizo asserted that the frac valve assembly was

improperly installed and that the ring gasket used in the flange beneath the master

valve was defective and not within American Petroleum Institute (API) or

manufacturer specifications. Carrizo alleged claims against GE for negligence,

breach of contract, products liability, and breach of implied and express warranty.

GE generally denied the allegations and asserted counterclaims, including

allegations that Carrizo was negligent and was contractually obligated to

indemnify GE for its negligence. GE also sought attorney’s fees for asserting the

indemnity claim.

Carrizo filed an amended pleading adding Carrizo Marcellus as a plaintiff,

but the trial court sustained GE’s special exceptions and ordered Carrizo Marcellus

to file a petition in intervention if it wished to be joined as a plaintiff. Carrizo

Marcellus did not file a petition in intervention. GE moved for summary judgment,

arguing that because the Yarasavage 1H well was owned and operated by Carrizo

5

Marcellus, Carrizo lacked standing to claim damages from the blowout.4 GE

asserted that Carrizo “ha[d] not been personally aggrieved and therefore lack[ed]

standing to sue GE for those damages.”

Carrizo responded that both it and Carrizo Marcellus suffered damages and

that “all costs and expenses were passed on to and ultimately borne by” Carrizo, as

the parent company. Carrizo also argued that Carrizo Marcellus had assigned all its

rights to Carrizo and that all damages had been paid by and subrogated to its

insurer, Gemini Insurance Company, who was the real party in interest. The trial

court denied GE’s motion for summary judgment.

Before trial, GE and Carrizo agreed to bifurcate the trial into a jury trial on

liability and a later bench trial, if necessary, on GE’s counterclaims for

indemnification. The jury trial took place over seven days in the summer of 2016.

Manufacturing defect, negligence, and breach of contract theories were submitted

to the jury. The jury found that a manufacturing defect was not a producing cause

of the blowout, and that GE did not fail to comply with its agreement to install the

frac valve assembly on the Yarasavage 1H well. The jury found that the negligence

of both GE and Carrizo was a proximate cause of the blowout.

4

GE also made other arguments in this motion for summary judgment. GE filed

another motion for summary judgment three weeks after it filed the first summary-

judgment motion. It was largely identical to the first motion. GE filed an amended

summary judgment another month later, and the standing arguments were the

same.

6

After trial, Carrizo asked the trial court to disregard the jury’s answers to

questions 2b and 3. Question 2b asked whether the negligence, if any, of Carrizo

proximately caused the blowout on the Yarasavage 1H well. As to Carrizo,

“negligence” was defined as

[the] failure to use ordinary care, that is, failing to do that which an oil

and gas operator of ordinary prudence would have done under the

same or similar circumstances or doing that which an oil and gas

operator of ordinary prudence would not have done under the same or

similar circumstances.

(Emphasis added.) The jury answered question 2b, “YES.” Question 3 asked the

jury to find the percentage of responsibility attributable to GE and Carrizo. The

jury found that GE was 35% responsible and Carrizo was 65% responsible.

In its motion, Carrizo argued that GE presented no expert testimony or

competent evidence on elements of duty, breach, and causation that are necessary

to establish that Carrizo was negligent. Carrizo noted that GE did not object to the

part of the charge that defined negligence as it applied to Carrizo as the failure to

act as an ordinary and prudent oil and gas operator, as contrasted with the

definition of negligence as it applied to GE as the failure to act as an ordinary and

prudent person. Carrizo further argued that because GE failed to offer any expert

testimony that Carrizo was negligent, the jury’s answer to question 3, regarding the

apportionment of fault, was moot. In response, GE argued that no expert testimony

was needed because the failure to maintain the frac valve assembly through twenty

7

fracking stages was within the normal experience and common knowledge of the

jurors. In August 2016, the trial court denied Carrizo’s motion.

In January 2017, Judge Hall succeeded Judge Mayfield, and the parties

continued to work toward a bench trial on the indemnity issues. Because there was

no master service agreement (“MSA”) between GE and Carrizo, GE maintained

that it was entitled to indemnity based on language that appeared in four types of

documents: (1) quotes for materials and services, (2) invoices, (3) order

verification reports (“OVR”), and (4) field service orders (“FSO”). The quotes,

invoices, and OVRs were accompanied by the same version of GE’s standard

terms and conditions, which provided that the buyer would indemnify GE against

all claims arising out of the performance or non-performance of the contract

without regard to whether the claims or damages resulted from GE’s negligence.

Each FSO, including the FSO for installation of the frac valve assembly for the

Yarasavage 1H well, noted on its face that it was subject to terms and conditions

that were attached. The terms and conditions attached to the FSOs were different

from the terms and conditions that accompanied the three other types of

documents. Like the other terms and conditions, the terms and conditions attached

to the FSOs included a broad indemnification provision. However, the terms and

conditions attached to the FSOs specifically stated that the indemnity provision

extended to all claims “whether asserted directly by Customer or by a third party.”

8

The bench trial was held in October 2018. Coleby Weinstock, Carrizo’s

operations engineer, and Douglas Gosda, an attorney for GE, testified live. The

parties also proffered eleven deposition excerpts from nine witnesses who had

knowledge of facts relevant to GE’s indemnity claims. Two years later, the trial

court signed findings of fact and conclusions of law. In relevant part, the trial court

made the following findings of fact:

• GE “provided equipment and services to Carrizo and presented

‘field services orders,’ ‘verification reports,’ ‘invoices,’ and

quotes” such as the January 2012 quote.

• “The field services orders and verification reports were stamped

and required a signature for the sole purpose of confirming receipt

of equipment and services.”

• “Carrizo’s [wellsite supervisors] signed the stamped field services

orders and verification reports solely to confirm receipt of GE’s

equipment and services.”5

• “Coleby Weinstock, a district engineer for Carrizo, approved

payment for equipment and services. Carrizo electronically

received invoices from GE. Weinstock electronically received a

scanned copy of the front pages of an invoice that did not include

any terms and conditions. Weinstock reviewed the uploaded

invoice and approved or rejected payment of the uploaded

invoice.”

5

Different terms are used throughout the record and the briefing to refer to the role

of wellsite supervisor. These terms include company man, wellsite supervisor,

independent contractor, wellsite consultant, completions consultant, field

supervisor, and contract supervisor. Tom Weller and Larry Gerard served as

wellsite supervisors for the Yarasavage 1H well, working opposite 12-hour shifts.

Neither Weller nor Gerard was a direct employee of Carrizo or Carrizo Marcellus;

both were independent contractors, who contracted with Carrizo to work on

drilling and completion of wells in Marcellus Shale play. We refer to them as

wellsite supervisors.

9

• “Carrizo did not authorize its [wellsite supervisors] or Coleby

Weinstock to negotiate contract terms with its vendors or to bind

Carrizo to an agreement requiring Carrizo to indemnify GE for

GE’s own negligence. Carrizo did not authorize its [wellsite

supervisors] or Coleby Weinstock to bind Carrizo to indemnify

contractors or to negotiate or agree to the terms of any indemnity

contracts. Neither negotiating nor agreeing to such indemnity

provisions was necessary for the [wellsite supervisors] and/or

Weinstock to perform their work for Carrizo or to interact with

GE.”

• “Carrizo did not knowingly permit its [wellsite supervisors] or

Coleby Weinstock to hold themselves out as having authority to

execute indemnity agreements on behalf of Carrizo. Carrizo did

not grant such authority to its [wellsite supervisors] or to Coleby

Weinstock.”

• “Carrizo never told the [wellsite supervisors] or Coleby Weinstock

they possessed any authority to approve and bind Carrizo to

indemnity agreements. Carrizo did not grant such authority to its

[wellsite supervisors] or to Coleby Weinstock.”

• “Carrizo never told GE the [wellsite supervisors] or Coleby

Weinstock had authority to approve and bind Carrizo to indemnity

agreements. Carrizo did not grant such authority to its [wellsite

supervisors] or to Coleby Weinstock.”

• “Coleby Weinstock reviewed and approved several invoices

electronically submitted by GE for equipment and services. The

electronically submitted invoices did not include the back side of

the invoice, which included an indemnity provision.”

• “By its express terms,” the January 2012 quote “expired on

February 23, 2012. At the time GE provided equipment and

services to Carrizo,” the January 2012 quote “had expired. Further,

no evidence exists in this record that the [January 2012 quote]

provided by GE to Carrizo included the terms and conditions GE

seeks to enforce.”

10

• “The field services order is two-sided. The indemnity provision is

on the back side of the field services order. The document is thin,

and the entire indemnity provision is in very small font, regular

typeface, and not capitalized.”

• “Coleby Weinstock reviewed and approved several invoices

electronically submitted by GE for equipment and services. The

electronically submitted invoices did not include the back side of

the invoice, which included an indemnity provision.”

• “In exchange for the money paid by Carrizo, it received equipment

and GE’s installation services.”

• “Carrizo received no benefit in exchange for a promise to

indemnify GE for GE’s negligence, and GE incurred no loss or

detriment.”

• “Not all attorney’s fees and expenses GE seeks were reasonable

and necessary to defend against Carrizo’s lawsuit.”

• “Certain experts retained by GE were excluded or their testimony

was substantially limited, and expenses associated for those

particular experts are neither reasonable nor necessary.”

• “GE was found partially liable for the blowout and resulting

damages. The jury found GE to be 35% liable and at fault.”

The trial court also made the following conclusions of law:

• “A reasonably prudent person would not rely on any conduct by or

apparent authority of the [wellsite supervisors] or Coleby

Weinstock to bind Carrizo to indemnity agreements. . . . The

[wellsite supervisors] and Coleby Weinstock did not have actual or

apparent authority to bind Carrizo to the indemnity agreements.

Carrizo did not grant such authority to its [wellsite supervisors] or

to Coleby Weinstock.”

• “Neither Carrizo’s prior payments of GE’s invoices nor any other

course of conduct created an implied acceptance or agreement by

Carrizo of the terms and conditions on the back side of GE’s

11

electronically submitted field tickets and invoices, including the

indemnity provision.”

• “Weinstock’s approval of GE’s electronically submitted invoices

does not constitute ratification of, acceptance of, or agreement to

the indemnity provisions in GE’s field service orders and

verification reports.”

• “The indemnity provisions on the back side of the field services

order is not conspicuous, does not meet the express negligence test,

and is unenforceable.”

• “The indemnity provisions on the back side of the GE invoice is

not conspicuous, does not meet the express negligence test, and is

unenforceable.”

• “The indemnity provisions in the field services orders, verification

reports, invoices, and [the January 2012 quote] (even if they were

included as part of the invoices or Quotation, which the Court finds

they were not) are unenforceable against Carrizo as

unconscionable and grossly one-sided in favor of GE. . . . As

written, GE would be entitled to pursue indemnity from Carrizo for

all its costs arising from a claim even if Carrizo had completely

prevailed against GE in the first trial.”

• “[T]he indemnity agreement in the field services orders,

verification reports, invoices, and [the January 2012 quote] (even if

they were included as part of the invoices or Quotation, which the

Court finds they were not) are void for lack of valid

consideration.”

About three months after the trial court issued its findings of fact and

conclusions of law, Carrizo again filed a motion for judgment notwithstanding the

verdict asking the trial court to disregard the jury’s answers to question 2b and

question 3. Carrizo raised the same arguments that it made when it first urged this

motion after the jury trial. GE again argued that the motion should be denied,

12

noting that the trial court had previously considered and denied the same

arguments. Both Carrizo and GE submitted transcripts of relevant trial testimony

for the court’s consideration.

The trial court granted Carrizo’s motion, and it entered final judgment in

favor of Carrizo in the amount of $2,531,785.68 (total) plus pre- and post-

judgment interest. The court also rendered judgment that GE was not entitled to

indemnity, and it incorporated its findings of fact and conclusions of law into the

final judgment by reference. GE appealed.

Analysis

GE raises three issues on appeal. First, GE argues that Carrizo lacked

standing to sue because Carrizo Marcellus was the undisputed owner and operator

of the Yarasavage 1H well. Second, GE argues that the trial court erred by granting

Carrizo’s motion to disregard the jury’s verdict, especially when the judge who

granted the motion was not the judge who presided over the jury trial. Third, GE

argues that the trial court erred by refusing to enforce the indemnity provisions in

the contracts that formed the parties’ agreement.

I. Carrizo has standing to sue GE because it is personally aggrieved and

the 100% owner of Carrizo Marcellus.

In its first issue, GE argues that Carrizo lacked standing to sue because

Carrizo Marcellus was the undisputed owner and operator of the Yarasavage 1H

well. GE maintains that an assignment of claims from Carrizo Marcellus to Carrizo

13

after the suit was filed was ineffective because limitations had already run. GE also

contends that the nature of this case as a subrogation claim does not affect the

analysis because an insurer can only assert claims that the insured could itself

assert.

Carrizo argues that both Carrizo and Carrizo Marcellus had standing to sue,

and both were insured by Gemini Insurance Company. Carrizo maintains that this

case is a subrogation suit, and the real party in interest is Gemini. Carrizo further

reasons that because Gemini was fully subrogated to the rights of both Carrizo and

Carrizo Marcellus, it had standing to sue and could do so in its own name, or in the

name of its insureds.

A. Legal standards

1. Standing and subject-matter jurisdiction

“Subject matter jurisdiction is essential to a court’s authority to decide a

case.” Meyers v. JDC/Firethorne, Ltd., 548 S.W.3d 477, 484 (Tex. 2018) (citing

Tex. Ass’n of Bus. v. Tex. Air Control Bd., 852 S.W.2d 440, 443 (Tex. 1993)). A

party’s standing to sue is implicit in the concept of subject-matter jurisdiction.

Linegar v. DLA Piper LLP (US), 495 S.W.3d 276, 279 (Tex. 2016) (citing Tex.

Ass’n of Bus., 852 S.W.2d at 445–46). Standing is a question of law, which we

review de novo. In re H.S., 550 S.W.3d 151, 155 (Tex. 2018); Heckman v.

Williamson Cnty., 369 S.W.3d 137, 150 (Tex. 2012).

14

“In Texas, the standing doctrine requires a concrete injury to the plaintiff

and a real controversy between the parties that will be resolved by the court.”

Heckman, 369 S.W.3d at 154. “The standing requirement derives from the Texas

Constitution’s provision for separation of powers among the branches of

government, which denies the judiciary authority to decide issues in the abstract,

and from the open courts provision, which provides court access only to a ‘person

for an injury done him.’” Meyers, 548 S.W.3d at 484 (quoting TEX. CONST. art. I,

§ 13); see Tex. Ass’n of Bus., 852 S.W.2d at 443–44.

Texas’s standing test parallels the federal test for Article III standing, which

requires a plaintiff to allege “personal injury fairly traceable to the defendant’s

allegedly unlawful conduct and likely to be redressed by the requested relief.”

Heckman, 369 S.W.3d at 154; see also Pike v. Tex. EMC Mgmt., LLC, 610 S.W.3d

763, 778 (Tex. 2020) (looking to federal jurisprudence to resolve issue of standing

under Texas law). The Texas Supreme Court has adopted the three-element test for

standing articulated by the United States Supreme Court:

First, the plaintiff must have suffered an “injury in fact”—an invasion

of a legally protected interest which is (a) concrete and particularized,

and (b) “actual or imminent, not ‘conjectural’ or ‘hypothetical.’”

Second, there must be a causal connection between the injury and the

conduct complained of—the injury has to be “fairly . . . trace[able] to

the challenged action of the defendant, and not . . . th[e] result [of] the

independent action of some third party not before the court.” Third, it

must be “likely,” as opposed to merely “speculative,” that the injury

will be “redressed by a favorable decision.”

15

Heckman, 369 S.W.3d at 154–55 (quoting Lujan v. Defenders of Wildlife, 504 U.S.

555, 560–61 (1992)) (citations omitted); see In re Abbott, 601 S.W.3d 802, 807

(Tex. 2020) (noting that Supreme Court of Texas has adopted this standard).

The Supreme Court of Texas has held that “a partner or other stakeholder in

a business organization has constitutional standing to sue for an alleged loss in the

value of its interest in the organization.” Pike, 610 S.W.3d at 778. In Pike, the

Supreme Court noted that “statutory provisions . . . define and limit a stakeholder’s

ability to recover certain measures of damages, which protect the organization’s

status as a separate and independent entity.” Id. at 778. However, the Court also

opined that “[t]hose provisions, however, go to the merits of the claim,” but they

do not deprive a court of subject-matter jurisdiction. Id.

2. Capacity

“A plaintiff must have both standing and capacity to bring a lawsuit.” Austin

Nursing Ctr., Inc. v. Lovato, 171 S.W.3d 845, 848 (Tex. 2005). “The issue of

standing focuses on whether a party has a sufficient relationship with the lawsuit so

as to have a ‘justiciable interest’ in its outcome, whereas the issue of capacity ‘is

conceived of as a procedural issue dealing with the personal qualifications of a

party to litigate.’” Lovato, 171 S.W.3d at 848 (citing 6A CHARLES ALAN WRIGHT

ET AL., FEDERAL PRACTICE AND PROCEDURE § 1559, at 441 (2d ed. 1990)).

“Separate from the issue of a party’s standing, a party’s capacity implicates its

16

legal authority to file a lawsuit and pursue a particular cause of action.” Mariner

Health Care of Nashville, Inc. v. Robins, 321 S.W.3d 193, 200 (Tex. App.—

Houston [1st Dist.] 2010, no pet.) (citing Lovato, 171 S.W.3d at 848). “A plaintiff

has standing when it is personally aggrieved, regardless of whether it is acting with

legal authority; a party has capacity when it has the legal authority to act,

regardless of whether it has a justiciable interest in the controversy.” Nootsie, Ltd.

v. Williamson Cnty. Appraisal Dist., 925 S.W.2d 659, 661 (Tex. 1996) . Whether a

claim brought by a stakeholder in a business organization actually belongs to the

organization is a matter of capacity. Pike, 610 S.W.3d at 779.

The burden is on the defendant to challenge a plaintiff’s capacity to sue.

Lovato, 171 S.W.3d at 853 n.7. An alleged defect in capacity must be raised by a

verified denial in the trial court. Id. at 849. Once capacity is controverted by a

verified denial, the plaintiff must prove at trial that it is entitled to recover in the

capacity in which it has sued. Republic Petroleum LLC v. Dynamic Offshore Res.

NS LLC, 474 S.W.3d 424, 432 (Tex. App.—Houston [1st Dist.] 2015, pet. denied).

If the court submits a question to the jury assuming the capacity originally pleaded,

the defendant must object to that question or risk waiver of the issue of capacity.

See Osterberg v. Peca, 12 S.W.3d 31, 55 (Tex. 2000); Republic Petroleum, 474

S.W.3d at 432.

17

3. Subrogation

Subrogation means “[t]he substitution of one party for another whose debt

the party pays, entitling the paying party to rights, remedies, or securities that

would otherwise belong to the debtor.” Subrogation, BLACK’S LAW DICTIONARY

(11th ed. 2019). The doctrine of subrogation commonly arises in the context of

insurance. Fed. Home Loan Mortg. Corp. v. Zepeda, 601 S.W.3d 763, 765 n.3

(Tex. 2020). Whether the right to subrogation arises from contract (conventional

subrogation) or by virtue of the involuntary payment of a debt for which another

was primarily liable (equitable subrogation), when an insurer exercises its

subrogation rights, it “stands in the shoes of the insured, obtaining only those rights

held by the insured against a third party, subject to any defenses held by the third

party against the insured.” Mid-Continent Ins. Co. v. Liberty Mut. Ins. Co., 236

S.W.3d 765, 774–75 (Tex. 2007) (citing Interstate Fire Ins. Co. v. First Tape, Inc.,

817 S.W.2d 142, 145 (Tex. App.—Houston [1st Dist.] 1991, writ denied)); see

Frymire Eng’g Co., Inc. ex rel. Liberty Mut. Ins. Co. v. Jomar Int’l, Ltd., 259

S.W.3d 140, 142 (Tex. 2008) (“The doctrine of equitable subrogation allows a

party who would otherwise lack standing to step into the shoes of and pursue the

claims belonging to a party with standing.”); Uddin v. Cunningham, No. 01-18-

00002-CV, 2019 WL 4065273, at *5 (Tex. App.—Houston [1st Dist.] Aug. 29,

2019, pet. dism’d) (mem. op.) (same). The insurance company can bring suit in its

18

own name or in the name of its insured. See Finger v. S. Refrigeration Servs., Inc.,

881 S.W.2d 890, 894 (Tex. App.—Houston [1st Dist.] 1994, writ denied)

(“Because Finger [the insured] had the right to sue for damages to his property,

Travelers, as the insurance company that paid for the repairs, had the right to sue in

his name for its subrogation interest.”); see also Sullivan v. Smith, 570 S.W.2d 197,

197 (Tex. Civ. App.—Houston [1st Dist.] 1978, no writ) (noting that insurance

subrogation claim was brought in name of insured).

B. Carrizo has standing to sue

GE’s arguments broadly fall into two categories. First, GE argues that

Carrizo did not have standing because it did not suffer an injury. Thus, GE

contends, the doctrine of subrogation does not change the outcome because the

insurer was limited to asserting the claims of Carrizo, and Carrizo had none.

Second, GE argues that an assignment of claims from Carrizo Marcellus to Carrizo

was ineffective to confer standing because the assignment occurred after

limitations expired.

1. Carrizo suffered an injury

In the trial court, Carrizo relied on an affidavit from Larry Michael

Kennington, the associate general counsel of Carrizo and the general counsel of

Carrizo Marcellus, to prove it sustained damages from the blowout. Kennington

explained that Carrizo Marcellus, a wholly-owned subsidiary of Carrizo, operated

19

the Yarasavage 1H well on behalf of itself and its joint venture partner, who

together held a 71.63% interest in the well. Carrizo Marcellus obtained insurance

on behalf of itself, its joint venture partner, and “certain other non-operating

working interest owners, totaling 81.59% of the insurable interests in the Well.”

The remaining non-operating working interest owners insured their own interests

separately. Kennington also averred:

4. Eighty-one-point-five-nine percent (81.59%) of all of the well

control costs and remediation costs, including testing, monitoring,

evaluation, and cleanup operations, which are being sought as

damages in this litigation damages [sic] were incurred and paid either

by [Carrizo Marcellus] or [Carrizo]. To the extent that [Carrizo

Marcellus] paid any of the damages, [it] was reimbursed by or the

costs were passed on to [Carrizo]; therefore, ultimately, [Carrizo] has

paid and continues to pay all the damages.

5. [Carrizo Marcellus] has assigned to [Carrizo] all rights,

privileges, entitlements, or causes of action, whether in contract, tort,

or otherwise and whether existing now or in the future, which [Carrizo

Marcellus] has or may have against the defendants in this case, or

other responsible parties, pertaining to the damges. . . . .

6. [Carrizo] submitted an insurance claim for the damages, to its

insurer, Gemini Insurance Company. Gemini has reviewed, adjusted,

paid and indemnified, and is continuing to review, adjust, and pay and

indemnify [Carrizo] for the damages. Gemini is therefore subrogated

to all claims of both [Carrizo Marcellus] and [Carrizo] for the

damages and is the real party in interest in this litigation.

The affidavit was dated November 30, 2015, and the assignment, which was

not otherwise dated, stated: “Effective April 30, 2014.”

20

GE’s argument centers on the first element of standing: that the plaintiff

must have suffered an “injury in fact.” See Lujan, 504 U.S. at 560. GE asserts that

it was Carrizo Marcellus—not Carrizo—that suffered damages from the well

blowout. GE maintains that a corporation cannot sue to recover costs incurred by

its subsidiary. Kennington’s affidavit is evidence that Carrizo itself incurred costs

and suffered damages as a result of the well blowout. In addition, the evidence at

trial showed that there was some overlap between Carrizo and Carrizo Marcellus’s

operations. For example, Weinstock worked directly for Carrizo, and the

contracted wellsite supervisors—Tom Weller and Larry Gerard—had contracts

with Carrizo, not Carrizo Marcellus. In addition, GE sent its invoices related to the

Yarasavage 1H well to Carrizo, not Carrizo Marcellus, and Carrizo was listed as

the customer on field service orders. The evidence supports a conclusion that

Carrizo suffered an injury in fact sufficient to confer standing in the constitutional

sense. See id.; Meyers, 548 S.W.3d at 485.

2. Carrizo suffered an injury as the owner of Carrizo

Marcellus

In addition, the undisputed evidence was that Carrizo Marcellus was a

wholly-owned subsidiary of Carrizo. As a stakeholder, Carrizo has constitutional

standing to sue for an alleged loss in the value of its interest in Carrizo Marcellus.

See Pike, 610 S.W.3d at 778. Because Carrizo Marcellus was wholly owned by

Carrizo, to the extent that the damages were suffered only by Carrizo Marcellus,

21

Carrizo nevertheless had an interest in the economic impact of the multimillion-

dollar damages suffered by its subsidiary on the value of Carrizo Marcellus. This

interest was sufficient to confer jurisdiction in the constitutional sense of an injury

in fact.6 See Lujan, 504 U.S. at 560–61; Pike, 610 S.W.3d at 778.

***

Finally, GE argues that the assignment of claims from Carrizo Marcellus to

Carrizo was not effective because it occurred after limitations had expired.

Limitations is an affirmative defense, not a jurisdictional requirement. See Uddin,

2019 WL 4065273, at *6. “[A] plaintiff does not lack standing in its proper,

jurisdictional sense ‘simply because he cannot prevail on the merits of his claim;

he lacks standing [when] his claim of injury is too slight for a court to afford

redress.’” Pike, 610 S.W.3d at 774 (quoting Meyers, 548 S.W.3d at 484–85).

We have already concluded that Carrizo had standing in the constitutional

sense because it suffered an injury in fact and had a 100% ownership interest in

Carrizo Marcellus. We overrule GE’s first issue.

6

In this case, GE filed a verified pleading challenging Carrizo’s capacity. At trial,

the jury charge did not include any questions or instructions relevant to capacity.

The charge asked—and the jury found—that Carrizo suffered damages in an

amount exceeding $2.5 million. GE did not object to the damages question

(question no. 5), nor did it request an instruction narrowing the damages question

to the lost value of Carrizo’s interest in Carrizo Marcellus resulting from the

blowout. Thus, GE waived any issue of Carrizo’s capacity. See Republic

Petroleum LLC v. Dynamic Offshore Res. NS LLC, 474 S.W.3d 424, 432 (Tex.

App.—Houston [1st Dist.] 2015, pet. denied). On appeal, GE has not challenged

Carrizo’s capacity, the jury charge (including the damages question), or the jury’s

answer to the damages question.

22

II. The trial court did not err by granting Carrizo’s motion to disregard

the jury’s findings.

In its second issue, GE argues that the trial court erred by vacating that part

of the jury’s verdict that found Carrizo’s negligence contributed to the blowout and

that Carrizo was 65% responsible for damages. GE contends that this unfairly

made it responsible for 100% of the damages as opposed to 35% of the damages.

Carrizo asserts that expert testimony was required to prove all the elements of

GE’s contributory negligence allegation because the jury was asked whether

Carrizo failed to act as “an oil and gas operator of ordinary prudence,” and GE

presented no such expert testimony. GE responds that expert testimony was not

required, and even if it were required, testimony from Carrizo’s expert, Weinstock,

and GE’s salesman Robert Ripple was sufficient to prove the standard of care and

the breach of the standard of care.

A. Preliminary considerations

1. GE cannot challenge the jury charge’s differing definitions

of negligence on appeal.

In addition, GE argues that if expert testimony were required to prove

Carrizo’s negligence, it was also required to prove GE’s negligence. We disagree

with this contention. In Question No. 2, the jury was asked whether the negligence,

if any, of GE and Carrizo proximately caused the blowout. But negligence was

defined differently for GE and Carrizo. As to GE, the jury charge stated:

23

“Negligence” means failure to use ordinary care, that is, failing to do

that which a person of ordinary prudence would have done under the

same or similar circumstances or doing that which a person of

ordinary prudence would not have done under the same or similar

circumstances.

As to Carrizo, the jury charge stated:

“Negligence” means failure to use ordinary care, that is failing to do

that which an oil and gas operator of ordinary prudence would have

done under the same or similar circumstances or doing that which an

oil and gas operator of ordinary prudence would not have done under

the same or similar circumstances.

GE did not object to the part of the charge that defined negligence

differently as applied to Carrizo compared to how it defined negligence as it

applied to GE. GE also did not challenge the court’s charge on appeal. Any

complaint about the charge is waived. See Osterberg, 12 S.W.3d at 55. Under the

charge as given, the jury was only required to assess GE’s negligence under the

standard of an ordinarily prudent person, not a standard relating to specialized

skills or activities.

2. GE did not challenge the jury’s finding of damages on appeal.

In addition, although GE argues that the trial court’s action in disregarding

some of the jury’s answers transformed the verdict finding it 35% responsible into

a judgment making it 100% responsible, GE has not complained about the jury’s

assessment of damages on appeal.

24

Questions 2 and 5 asked about damages. Question 2 was subdivided into

parts “a” and “b”:

Did the negligence, if any, of those named below proximately cause

the blowout on the Yarasavage No. 1H well?

Answer “Yes” or “No” for each of the following:

a. GE: YES

b. Carrizo: YES

The jury answered “yes” to both GE and Carrizo. The jury further found that

GE was 35% responsible for the blowout and that Carrizo was 65% responsible for

it. Question 5 asked:

QUESTION 5

What sum of money, if any, if paid now in cash, would fairly and

reasonably compensate Carrizo for its damages, if any, that resulted

from the conduct you found in response to Questions 1, 2.a, or 4.

Consider the following elements of damages, if any, and none other.

Do not add any amount for interest on damages, if any.

Do not reduce the amounts, if any, in your answers because of the

negligence, if any, of the Plaintiff. Do not speculate about what any

party’s ultimate recovery may or may not be. Any recovery will be

determined by the court when it applies the law to your answers at the

time of judgment.

Answer separately in dollars and cents for damages, if any.

1. Costs to bring the well under control sustained in the past.

Answer: $ 300,068.81

25

2. Costs to remediate, test and monitor the land sustained in the past.

Answer: $ 2,003,264.87

3. Costs to remediate, test and monitor the land which will, reasonable

probability, will be sustained in the future. [sic]

Answer: $ 228,452.00

(Emphasis added.)

GE did not object to the submission of question 5, which asked for the

amount of damages that would compensate Carrizo for the damages arising from

the conduct in question 2a. Question 2a asked only about the negligence of GE.

Thus, as written, the charge asked the jury to determine the amount of damages

caused by GE’s negligence, not the total amount of damages sustained by Carrizo.

Because GE did not object to question 5, it cannot (and did not) complain about it

on appeal. See id.

B. Standards of review

“We review a trial court’s grant of a judgment notwithstanding the verdict

under a no-evidence standard, examining whether any evidence supports the jury’s

findings.” Gharda USA, Inc. v. Control Sols., Inc., 464 S.W.3d 338, 347 (Tex.

2015). We consider the evidence in the light most favorable to the jury’s verdict,

indulging every reasonable inference in favor of the verdict and disregarding

contrary evidence unless a reasonable factfinder could not. City of Keller v. Wilson,

168 S.W.3d 802, 827 (Tex. 2005). No evidence exists when there is:

26

(a) a complete absence of evidence of a vital fact; (b) the court is

barred by rules of law or of evidence from giving weight to the only

evidence offered to prove a vital fact; (c) the evidence offered to

prove a vital fact is no more than a mere scintilla; (d) the evidence

establishes conclusively the opposite of the vital fact.

Id. at 810 (citing Robert W. Calvert, “No Evidence” and “Insufficient Evidence”

Points of Error, 38 TEX. L. REV. 361, 362–63 (1960)).

Carrizo and GE each pleaded that the other’s negligence caused the blowout

and ensuing damages. Thus, each was required to establish the elements of

negligence as to the other party. See Bustamante v. Ponte, 529 S.W.3d 447, 456

(Tex. 2017). “The elements of a common-law negligence claim are (1) a legal

duty; (2) a breach of that duty; and (3) damages proximately resulting from the

breach.” Elephant Ins. Co., LLC v. Kenyon, 644 S.W.3d 137, 144 (Tex. 2022).

“The threshold inquiry in a negligence case is duty.” Id. (quoting Greater Houston

Transp. Co. v. Phillips, 801 S.W.2d 523, 525 (Tex. 1990)). The existence of a duty

is a question of law for the court to decide from the facts surrounding the

occurrence in question. Id.; Nabors Drilling, U.S.A., Inc. v. Escoto, 288 S.W.3d

401, 404–05 (Tex. 2009).

Whether expert testimony is necessary to establish negligence is a question

of law, which we review de novo. FFE Transp. Servs., Inc. v. Fulgham, 154

S.W.3d 84, 89 (Tex. 2004); Simmons v. Briggs Equip. Tr., 221 S.W.3d 109, 114

(Tex. App.—Houston [1st Dist.] 2006, no pet.). “Expert testimony is necessary

27

when the alleged negligence is of such a nature as not to be within the experience

of the layman.” Roark v. Allen, 633 S.W.2d 804, 809 (Tex. 1982). To determine

whether expert testimony is required, we consider “whether the conduct at issue

involves the use of specialized equipment and techniques unfamiliar to the

ordinary person.” FFE Transp. Servs., 154 S.W.3d at 91. “In such a case, the

expert testimony must establish both the standard of care and the violation of that

standard.” Simmons, 221 S.W.3d at 114.

In FFE Transportation, a long-haul trucker was injured in an accident while

he was driving a refrigerated trailer. Id. at 86. The trucker had inspected the pre-

loaded refrigerated trailer and the tractor-trailer connection before he began

driving. Id. While exiting a highway, “the trailer’s upper coupler assembly broke

loose from the trailer, causing the trailer to separate from the tractor and overturn.”

Id. The trucker sued FFE Transportation, alleging that the trailer he was driving

was defective “because the bolts and plates anchoring the upper coupler assembly

to the trailer were missing or weak or both due to rust and inadequate torque.” Id.

at 87. The trial court granted a directed verdict because the trucker did not present

any expert testimony to establish the applicable standard of care. Id. The court of

appeals, however, reversed, holding that expert testimony was not required to show

the standard of care because “the inspection and detection of loose and rusty bolts

connecting parts of a trailer” was not beyond the experience of laymen. Id.

28

The Texas Supreme Court disagreed, holding that expert testimony was

necessary to establish the standard of care and its breach. Id. at 91. The Supreme

Court held:

The upper coupler assembly, kingpin, and base rail of a refrigerated

trailer are specialized equipment, and the proper inspection and

maintenance of those parts involve techniques unfamiliar to the

ordinary person.

Few people not involved in the trucking industry are familiar with

refrigerated trailers, the mechanisms for connecting them to tractors,

and the frequency and type of inspection and maintenance they

require. While the ordinary person may be able to detect whether a

visible bolt is loose or rusty, determining when that looseness or rust

is sufficient to create a danger requires specialized knowledge.

Therefore, the layman does not know what the standard of care is for

the inspection and maintenance of the upper coupler assembly,

kingpin, and base rail of a refrigerated trailer.

Id.

Other cases have engaged in a similar analysis to determine whether expert

testimony is required to establish the standard of care and its breach in negligence

cases. See, e.g., Knox v. Eagle Water Mgmt., Inc., No. 01-17-00627-CV, 2018 WL

891239, at *3 (Tex. App.—Houston [1st Dist.] Feb. 15, 2018, no pet.) (mem. op.);

Fairways Offshore Expl., Inc. v. Patterson Servs., Inc., No. 01-11-00079-CV, 2013

WL 371601, at *6 (Tex. App.—Houston [1st Dist.] Jan. 31, 2013, pet. denied)

(mem. op.), op. partially withdr. by agrmt., 2013 WL 3148263 (Tex. App.—

Houston [1st Dist.] Feb. 15, 2018, no pet.) ; Simmons, 221 S.W.3d at 109.

29

C. Expert testimony was required to establish the standard of care

and breach in this case.

In its brief, GE initially evaluates all the evidence under the JNOV standard

of review. However, Carrizo’s contention in the trial court and on appeal is that

expert testimony was necessary to establish both the standard of care and breach of

that standard in this case. Before we consider whether the evidence satisfies the

JNOV standard of review, we must first determine whether expert testimony is

required to establish the duty and the breach of that duty, because that

determination will inform our legal sufficiency review of the evidence. See Jelinek

v. Casas, 328 S.W.3d 526, 533 (Tex. 2010) (“Lay testimony may be used as

evidence of causation in certain circumstances, but ‘[w]hen expert testimony is

required, lay evidence supporting liability is legally insufficient.’” (quoting City of

Keller, 168 S.W.3d at 812)).

On appeal, GE argues that Carrizo was negligent in monitoring the frac

valve assembly and that failure to detect a leaking flange below the master valve

caused the damage from the blowout. GE argues that expert testimony was not

needed because it was within the experience of the layman that failing to visually

monitor and check the torque on nuts and bolts on the frac valve assembly caused

Carrizo’s damages.

Carrizo argues that the conduct of oil and gas operators during fracking

processes is “well outside the common knowledge of laypersons.” Carrizo relies on

30

precedent from the court to reason by analogy that expert testimony was required

in this case. See Knox, 2018 WL 891239, at *4; Fairways Offshore, 2013 WL

371601, at *6; Simmons, 221 S.W.3d at 109.

In Knox, homeowners sued a pumping facility operator after the wastewater

pumps in their neighborhood failed during a heavy rainfall and wastewater flooded

their homes. 2018 WL 891239, at *1. The trial court granted summary judgment in

favor of the pumping facility operator, and the homeowners appealed. Id. at *2. On

appeal, we assumed that “expert testimony was not required to show that [the

pumping facility operator] owed a legal duty to the homeowners.” Id. at *3. But we

held that expert testimony was required to show that a breach of that duty caused

the flooding. Id. We explained:

The answer to whether a breach occurred thus requires an

understanding of the specific cause of the pump stoppage and [the

pumping facility operator’s] role, if any, in contributing to that cause.

The pumps at the lift station are specialized equipment. To evaluate

the evidence about the proper operation and maintenance of the

pumps, a jury would require information concerning the equipment

and processes involved in operating a sanitary wastewater collection,

transportation, and treatment system, as well as the impact of the

weather event that preceded the pump stoppage. Testimony from a

witness with specialized knowledge of those operations is necessary

to identify whether the stoppage resulted in part from [the pumping

facility operator’s] failure to act as a reasonably prudent operator.

Id. at *4. Because there was no expert testimony attributing the pump stoppage and

flooding to the pumping facility operator’s failure to act as a reasonably prudent

31

operator, we concluded that the trial court properly granted summary judgment. Id.

at *5.

In Fairways Offshore, Fairways was the operator and leaseholder of a

natural gas well in Wyoming. 2013 WL 371601, at *1. Fairways hired a contractor

to complete the well, which contained a high concentration of hydrogen sulfide. Id.

During the completion process, the contractor lowered its equipment into the well

under a nitrogen blanket. Id. Overnight, to relieve pressure in the well, Fairways

decided to “flow the well,” which introduced gas that displaced the protective

nitrogen blanket. Id. The next day, the contractor’s equipment failed. Id. at *2. The

gas that Fairways released into the well contained hydrogen sulfide, which caused

a sulfide-stress fracture in the contractor’s equipment. Id. The contractor’s

equipment failure caused property damage but no personal injuries. Id. Fairways

sued the contractor for negligence, and the contractor countersued Fairways for

negligence. Id. We held that expert testimony was required to prove the standard of

care applicable to Fairways and whether Fairways breached the standard of care.

Id. at *8. We held:

[T]he proper operation of a sour gas well is not a matter within the

experience of laypersons. Specifically, whether or not the use of a

nitrogen blanket in a well, such as the one in this case, was necessary

to protect the well piping and equipment, would be unfamiliar to the

ordinary person.

Id. at *6.

32

In Simmons, an employee was injured when he was forced to jump from a

rail-car mover when a fire started in its engine compartment. 221 S.W.3d at 111.

His employer sued the company that had contracted to provide maintenance

services for the rail-car mover. Id. at 112. The trial court granted a no-evidence

summary judgment, and the employer appealed. Id. We held that expert testimony

was required to prove that the contractor was negligent:

Here, the record reveals that the maintenance and service of a [rail-car

mover] involves specialized equipment and techniques unfamiliar to a

lay person. Few people not involved in the rail-car industry are

familiar with rail-car movers, the functioning of their engines and

other internal parts, or the frequency and type of inspection and

maintenance they require. . . . A maintenance company’s practices and

procedures and industry standards with respect to the inspection and

maintenance of a . . . rail-car mover engine are not matters within a

lay person’s general knowledge. Accordingly, we hold that Simmons

needed expert testimony regarding the appropriate standard of care

and whether Briggs’s conduct met that standard.

Id. at 114–15 (citations omitted).

Other courts of appeals have used the same type of reasoning to reach

similar conclusions. See, e.g., Greater San Antonio Transp. Co. v. Polito, No. 04-

10-00330-CV, 2011 WL 2893080, at *4 (Tex. App.—San Antonio July 20, 2011,

pet. denied) (mem. op.) (requiring expert testimony because taxicab dispatch

equipment and manner in which it functions is unfamiliar to lay people); Schwartz

v. City of San Antonio, No. 04–05–00132–CV, 2006 WL 285989, at *4 (Tex.

App.—San Antonio Feb. 8, 2006, pet. denied) (mem. op.) (requiring expert

33

testimony because “[w]hat a power company’s practices and procedures should be,

or what industry standards are, when a circuit breaker within an electrical

distribution is tripped are not within a person’s general knowledge”).

GE contends that not all cases involving technical matters require expert

testimony. See AKIB Constr. Inc. v. Shipwash, 582 S.W.3d 791, 804 (Tex. App.—

Houston [1st Dist.] 2019, no pet.). In AKIB Construction, Shipwash, the owner of a

business that handles hazardous materials, contracted with AKIB Construction to

facilitate the purchase, dismantling, removal, storage, and reassembly of a steel

building. Id. at 795. Shipwash later sued AKIB Construction for breach of contract

for failing to properly deconstruct the building and deliver it to his storage facility.

Id. at 796. At trial, a site supervisor for one of Shipwash’s companies testified that

pieces of the steel building were significantly damaged, that he witnessed workers

improperly dismantling the building, and that the metal removed from the building

could not be reused and was scrap. Id. at 798–99. The trial court found that AKIB

Construction breached the contract and rendered judgment in favor of Shipwash.

Id. at 802.

On appeal, AKIB Construction argued that Shipwash was required to present

expert testimony to prove that its actions caused the metal removed from the

building to be unusable. Id. We disagreed, relying on the following statement from

a 1970 opinion from the Texas Supreme Court:

34

The trier of fact is usually allowed to decide the issue of causation in

cases of this nature: (1) when general experience and common sense

will enable a layman fairly to determine the causal relationship

between the event and the condition; (2) when scientific principles,

usually proved by expert testimony, establish a traceable chain of

causation from the condition back to the event; and (3) when probable

causal relationship is shown by expert testimony.

Id. at 803 (quoting Lenger v. Physician’s Gen. Hosp., Inc., 455 S.W.2d 703, 706

(Tex. 1970)).

In AKIB Construction, in addition to testimony adduced at trial, photographs

showing the building before it was dismantled and after parts of the building had

been removed were admitted into evidence. Id. at 804–05. The “after” photos

showed “pieces of sheet metal lying crumpled and bent in piles around the jobsite,”

and “retractable garage-type doors, lying bent and broken on the ground.” Id. at

804. We concluded that “a factfinder applying a ‘commonsense understanding’

could consider the before and after pictures of the steel building and, with

reasonable probability, reach a conclusion that the building was damaged during

the dismantling process.” Id. at 805.

Here, GE argues that this case is more like AKIB Construction. GE asserts

that “[t]he damage in this case was caused by a leak that was not detected and

became a blowout.” GE further asserts that the leaks were caused by loose bolts,

because the jury rejected the alternate theory that the leaks were caused by using a

“too-hard” gasket. Therefore, GE contends that “it was within the jury’s common

35

sense and experience to find that[,] had Carrizo been monitoring and checking for

leaks or loosened bolts, this blowout would not have occurred.”

We disagree with GE’s conclusion that no expert testimony was required as

well as its characterization of the evidence. In AKIB Construction, the question for

the factfinder was whether the components of the steel building were in a usable

condition after the building was dismantled. The photographs and testimony there

established that the components of the building were damaged and broken. Here,

the question is whether Carrizo’s negligence caused damages from the blowout.

A frac valve assembly, including the master valve, the spool, the high-

pressure rated flange, the nuts and bolts needed to connect the component parts,

and the torque wrenches used for installation are specialized equipment. The

proper inspection and maintenance of those parts, particularly during a fracking

operation, involve techniques unfamiliar to the ordinary person. Few people not

involved in the petrochemical industry–particularly oil and gas well drilling and

completion operations–are familiar with this specialized equipment and its proper

use and maintenance. While an ordinary person may be able to detect whether fluid

is leaking from equipment, an ordinary person would not be able to detect when a

frac valve assembly is properly constructed, whether the nuts and bolts are

adequately torqued, and whether or how the construction and torquing of a frac

valve assembly creates a danger of a well blowout. Therefore, the layman does not

36

know what the standard of care is for the inspection, operation, and maintenance of

a frac valve assembly during an active fracking operation of a gas well.

Accordingly, we conclude that GE was required to present expert testimony about

the standard of care and how Carrizo’s breach of the standard of care caused the

blowout. See FFE Transp. Servs., 154 S.W.3d at 91; Knox, 2018 WL 891239, at

*3–4; Fairways Offshore, 2013 WL 371601, at *6; Simmons, 221 S.W.3d at 114.

D. GE did not present expert testimony showing the standard of care

applicable to Carrizo and that Carrizo’s breach of the standard of

care caused the blowout and ensuing damages.

Carrizo correctly notes that GE did not adduce testimony at trial from a

designated expert witness regarding the standard of care of an oil and gas operator

regarding inspection, maintenance, and operation of a frac valve assembly during

fracking operations. However, GE also correctly notes that many of the witnesses

who testified had educational and experiential credentials in the specialized areas

of knowledge at issue in this case. Carrizo presented the following witnesses at

trial:

• Coleby Weinstock. Weinstock has a B.S. in Petroleum Engineering from

Texas A&M University. He had eleven years’ experience in oil and gas

production and well completion jobs prior to joining Carrizo as a district

engineer in 2011. He testified that he was not aware of any maintenance

needed for the flange connection beneath the master valve on the frac valve

assembly. He also testified that, if properly assembled, the flange

connections cannot come apart during fracking operations. He testified that

Baker Hughes, the fracking contractor, checked for leaks in the “hot area”

near the well during fracking. This would include the pressurized frac valve

assembly. Weinstock said that Carrizo employs a roustabout whose job is to

37

check for leaks on all equipment. He said that the GE report from the day of

the blowout indicated that the frac valve assembly was not leaking at all

before the blowout. Weinstock said that torque checking, as opposed to

visually inspecting for leaks, was not an industry standard practice before

the blowout and was not an industry standard practice after the blowout. He

also said that he had successfully fracked at least 40 wells without torque

checking between fracking stages. Despite the lack of an industry standard

for torque checking, since the blowout, Carrizo has adopted a practice of

torque checking every fourth fracking stage or fifth day.

• Brad Fisher. Fisher is the Chief Operating Officer and Vice President of

Carrizo since 2005. He has a B.S. in Petroleum Engineering from Texas

A&M University. He had 32 years’ experience in the oil and gas industry by

the time of trial. Fisher testified: “In my 32 years, I had never been provided

a piece of paper by any wellhead or frac tree company saying that [the

flange beneath the master valve] required maintenance.”

• Devon Feaster. Feaster was the GE service technician who installed the frac

valve assembly for Yarasavage 1H well. He testified that he had never heard

that a company like Carrizo should be aware of a need to retorque flanges

during a fracking job. He said that if the flanges are properly torqued at

installation, there should be no need to retorque during the fracking job. He

also testified that he was on site during the fracking of the Yarasavage 1H

well, and he said that he saw more vibration than he witnessed in other jobs.

However, the record suggests that he may have been referring to something

he saw after the blowout because he also testified that he could not recall

having been present during a fracking operation prior to January 2013.

• Dustin Duff. Duff was a GE service technician, who was involved in the

fabrication of the lower part of the frac valve assembly for the Yarasavage

1H well. He said that before the blowout, he was never involved in

retorquing nuts on frac valve assembly. he also said that before the blowout,

he was not aware of any GE customer who checked torque between fracking

stages.

• Ben Holgate. Holgate is a GE employee. He is a licensed professional

engineer in Texas, and he has a degree in mechanical engineering. He was

involved in GE’s root cause analysis of the blowout incident. He said that

GE could not conclude “that Carrizo did anything wrong,” because GE did

38

not have sufficient information to assess external loads or extent of

vibration.

• Tom Weller. Weller is a civil engineer, with a degree from Pennsylvania

State University. He began working on fracking jobs for Halliburton after

graduating in 1981. Since 1985, he had been the lead engineer for drilling

and fracking jobs. He was a contracted wellsite supervisor and consultant for

Carrizo on the Yarasavage 1H well. He testified that it was not standard

practice to do any preventive maintenance on the frac valve assembly during

fracking. He said that the only maintenance conducted was on an as-needed

basis. He said that he had never checked bolts during a frac job.

• Simon Bellemare. He is a licensed professional engineer in eight states,

including Texas. He has a PhD in materials science and engineering from

Massachusetts Institute of Technology. He lectures at MIT, works as a

welding inspector, and had a start-up company developing non-destructive

testing techniques for in situ testing of pipelines and equipment. He belongs

to numerous professional societies, has published many papers, and won

several awards. He testified as an expert for Carrizo. He testified that

improper installation of the ring gasket was a contributing cause of the

blowout and that there was some evidence that the ring gasket (in the flange)

was titled when it was removed.

• Mark Beny. He is an oil and gas fracturing consultant, who worked onsite at

the Yarasavage 1H well. He has a B.S. in chemical engineering from Ohio

State University, and he has worked as an oil and gas fracturing consultant

since 2009. Prior to that, he worked for Halliburton for 23 years, for

Weatherford for three years in a fracturing facility in Oklahoma, and for

nearly two years as a production engineer for Occidental Petroleum. He

testified that he has fracked thousands of wells in his career and never

witnessed the nuts on an API 6A flange (like the flange that failed on the

Yarasavage 1H well) come loose. He said he had never heard of anyone

maintaining the API 6A flange connections between the tubing head and the

spool and between the spool and the master valve. He said that nobody

checks torque during fracking operations, and he testified that not checking

the torque between fracking stages was “an industry standard.” He was

present onsite at the Yarasavage 1H well during fracking, and he said that

the frac valve assemblies were constantly monitored by a Baker Hughes

employee working in the role of “line boss.” Beny testified that the frac

valve assembly was not leaking before the blowout. He said it went from no

39

drip or leak to a total blowout. He said that in his 35 years of experience,

“very, very rarely do bolts come loose,” and that he had “never ever

witnessed a blowout because of the bolts coming loose” before the

Yarasavage 1H blowout. He also said that checking torque would not have

avoided the blowout in this case.

• Judd Hansen. Hansen has a B.S. in mechanical engineering from South

Dakota School of Mines and Technology and 34 years’ experience in

working for oil and gas operators. He consulted with Carrizo to review its

actions after the incident and determine if a documented standard of care

exists regarding the flange that failed on Yarasavage 1H well. He testified

that he had seen hundreds of thousands of API 6A flanges (like the one that

failed at the Yarasavage 1H well) in his experience. He said that they are

designed for long-term use, like up to 30 years in some installations, and he

said that he had never seen a properly installed flange fail in his oil and gas

experience. He testified that there is no documented, published guidance

from API (American Petroleum Institute), the Society of Petroleum

Engineers, the American Association of Drilling Engineers, or the American

Society of Mechanical Engineers stating that a properly made-up flange with

a proper ring gasket needs any maintenance. He opined that Carrizo had no

obligation to periodically check the API 6A flange connection. Hansen

testified that with proper assembly, proper equipment, and a pressure tested

flange, failure is not foreseeable: “The flange should never fail based on

industry expectations.” He did, however, say that visual monitoring of the

frac valve assembly for leaks is the industry standard, but it is not considered

maintenance.

• Dawn Washo. Washo is a licensed geologist who worked with Carrizo on

clean up after the blowout.

GE presented the following witnesses at trial:

• Christopher MacInnis. MacInnis was the lead field area manager for GE at

the time of trial. In 2011, he began working for GE as a field service

technician, a role he kept through 2013. When he began working for GE, he

received five weeks’ training on wellheads and an additional one week

“frac” training. Prior to working for GE, he worked for ten years in the crane

and rigging industry, as a crane operator, overhead hoist inspector, and

forklift operator. He testified that GE offered a service call “frac watch.” For

a fee, GE would provide two technicians per shift to watch the frac valve

40

assembly and be available to grease valves or retorque nuts and bolts during

fracking operations. MacInnis testified that Carrizo was the only company

he was aware of that did not use the frac watch service offered by GE, and

he said that using GE’s frac watch service was the usual and customary

choice of other operators in the area.

• Manuel Araujo and James Latham. Araujo and Latham worked for two

different gasket manufacturers. Each man testified that he was unaware of

his company’s product ever failing.

• Robert Ripple. Ripple was the senior manager of sales and business

development for GE at the time of trial. He has a bachelor’s degree in

business management. He provided a general quote to Carrizo for equipment

and services in the Marcellus Shale play. He testified: “We recommend that

our valves are greased and torquing is applied every three stages” during

fracking. He testified that he was “confident” that he told Weinstock or his

colleague about that recommendation. Ripple testified that some customers

request retorquing after every fracking stage. Ripple also said that greasing

valves and torquing is on-site maintenance and that customers typically pay

for the frac watch service, which includes greasing, onsite personnel, valve

operation, and troubleshooting.

• Christopher Frey. Frey testified as GE’s corporate representative. His

educational and professional background was not provided in the limited

offer of excerpts from his video deposition admitted at trial. Frey said that

torque checking is part of the frac watch service that GE offered to Carrizo,

but GE makes no recommendation and gives no written maintenance

procedure to customers who rent a frac valve assembly.

• Scott Hudson. Hudson is the vice president of drilling and completions for

Carrizo. He testified that he worked for Brad Fisher, who asked him to go to

Pennsylvania to help secure the Yarasavage 1H well. His educational and

professional background was not provided in the limited offer of excerpts

from his video deposition that was admitted at trial. He testified that the only

maintenance he had ever done on a frac valve assembly was “greasing.” He

also testified that before the Yarasavage 1H blowout, no lessor of frac valve

assemblies had ever told him to do preventive maintenance on the frac valve

assemblies during fracking.

41

• Larry Gerard. Gerard is an oilfield consultant and who worked for Carrizo

as a wellsite supervisor and consultant on the Yarasavage 1H well. He

testified that he witnessed the pressure test on the frac valve assembly for the

Yarasavage 1H well, and it did not reveal any problems. He also testified

that GE never recommended periodic torquing to him or anyone else at

Carrizo. He also testified that he had no theory about what caused the

blowout, but he did not believe that he or GE did anything wrong.

• Ben Holgate. Holgate has a master’s degree in mechanical engineering from

the University of Illinois and is a professional engineer in Texas. He testified

that the API 6A standard covers the manufacture of equipment like the

flange used beneath the master valve on the frac valve assembly. He testified

about flanges, gaskets, flange seals, torquing on flanges as installed (with

and without the use of lubricant), and provided other technical explanations

regarding the equipment used. He did not offer an opinion about a standard

of care for the inspection or maintenance of the frac valve assembly or

whether Carrizo’s actions breached the standard of care and caused damages

from the blowout. He did testify that he believed the blowout could have

been caused by external forces or by loosening of torque on the bolts of the

flange, although he explained that this “torque relaxation” typically occurs

over a long period of time. Holgate testified that GE had not been able to

determine the specific cause of the blowout. In addition, he said that GE first

began advising its customers in writing to check torque between fracking

stages after the Yarasavage 1H blowout.

• Dr. Stuart Brown. Dr. Brown has a PhD in mechanical engineering from

MIT. He is the managing principal of an engineering consulting firm that

also does simulation, testing, product design, and process improvement. He

has experience and training in materials analysis. He belongs to numerous

professional societies, holds several patents, and has published papers. He

investigated the blowout. Dr. Brown’s testimony focused on the flange and

the gasket, including the metallurgy and testing he conducted. He concluded

that the gasket was compliant with API standards and nothing about the

gasket or its installation caused the blowout. Nothing in his testimony

identified a standard of care applicable to or breached by Carrizo.

At trial, GE did not offer testimony from a designated expert witness

regarding the standard of care that applied to Carrizo and how Carrizo’s breach of

42

such standard of care caused the blowout. On appeal, to establish a standard of

care, GE relies on a variety of non-expert testimony, such as testimony from

Ripple, GE’s sales and business development manager, that GE recommended its

customers purchase an add-on service for onsite frac watching. “When expert

testimony is required, lay evidence supporting liability is legally insufficient.”

AKIB Constr., 582 S.W.3d at 803.

GE also argues that Carrizo had not assigned anyone the task of watching

the frac valve assembly because Beny could not identify by name the person who

did that job. But Beny and others testified that watching the frac valve assembly

was contracted to Baker Hughes, and Beny testified that no Baker Hughes

employees were deposed. GE also argued that Beny testified that periodic torque

checking was “a necessary activity.” To the contrary, what Beny said was that,

during the three weeks of fracking before the blowout, when a Baker Hughes

employee or Carrizo roustabout noticed a loose bolt or nut, he would tighten it with

a hammer wrench. He said that torque wrenches, which were necessary to check

the torque, were not used. Beny also said that nobody used a hammer wrench on

the nuts and bolts holding together the API 6A flange, which failed during the

blowout. GE’s reliance on out-of-context testimony from Beny is not legally

sufficient. See City of Keller, 168 S.W.3d at 812 (“More generally, evidence

43

cannot be taken out of context in a way that makes it seem to support a verdict

when in fact it never did.”).

Having considered the evidence, we conclude that GE failed to prove by

expert testimony that Carrizo breached a standard of care applicable to oil and gas

operators and that such breach caused the damages from the blowout. See Gharda,

464 S.W.3d at 347. We hold that the trial court did not err by granting Carrizo’s

motion to disregard the jury’s answers to the questions about Carrizo’s negligence.

We overrule the second issue.

III. The trial court properly refused GE’s claim for indemnity.

In its third issue, GE argues that it is entitled to enforce a contractual first-

party indemnity provision. First, GE argues that Carrizo authorized Weinstock and

the wellsite supervisors to accept the indemnity provisions because it authorized

Weinstock to negotiate and contract for the rental of frac valve assemblies and it

authorized the wellsite supervisors to sign FSOs. Second, GE argues that the trial

court erred by concluding that the indemnity provisions did not satisfy the fair

notice requirements that apply to first-party indemnity provisions. Third, GE

argues that the trial court’s findings of fact and conclusions of law regarding

unconscionability and failure of consideration are erroneous. Thus, GE asserts that

this Court should render judgment in its favor on its contractual indemnity claim,

including attorney’s fees and costs.

44

We disagree. GE had the burden of proof to demonstrate that the parties had

an enforceable contract for first-party indemnity. In its brief, GE repeatedly refers

generally to contractual indemnity provisions. In this case, there was no master

service agreement between GE and Carrizo. Consequently, the relevant contractual

provisions appear in four types of documents: (1) a January 2012 quote for

materials and services, (2) invoices, (3) order verification reports (“OVR”), and

(4) field service orders (“FSO”). While all four documents include indemnity

provisions, only the FSOs included an express first-party indemnity provision. The

quote, the invoices, and the OVRs cannot support enforcement of first-party

indemnity under the express negligence test of the fair notice rule.

In addition, whether the wellsite supervisors who signed the FSOs had actual

or apparent authority hinges on the determination of certain factual matters. In its

findings of fact, the trial court found that the FSOs were signed by Carrizo’s

wellsite supervisors solely to confirm receipt of goods and services. The court also

found that Carrizo did not authorize the wellsite supervisors to negotiate or

approve a first-party indemnity agreement with GE, and Carrizo did not tell GE or

the wellsite supervisors that they had that authority. Our standard of review

requires us to respect and defer to these fact findings because they are supported by

sufficient evidence. Therefore, the first-party indemnity provision in the FSOs is

45

unenforceable because the wellsite supervisors who signed them had no authority

to bind Carrizo to provide first-party indemnity to GE.

A. Standards of review

“We construe indemnity agreements under normal rules of contract

construction.” Gulf Ins. Co. v. Burns Motors, Inc., 22 S.W.3d 417, 423 (Tex.

2000). “The primary goal is to ascertain and give effect to the parties’ intent as

expressed in the contract.” Id. “Whether a contract is ambiguous is a question of

law for the court to decide.” Id. (citing Coker v. Coker, 650 S.W.2d 391, 394 (Tex.

1983)). “When the contract is worded so that it can be given a certain or definite

legal meaning[,] it is not ambiguous, and the court will construe the contract as a

matter of law.” Id. (citing Coker, 650 S.W.2d at 393).

In an appeal of a judgment rendered after a bench trial, the trial court’s

findings of fact have the same weight as a jury’s verdict, and we review the

sufficiency of the evidence supporting those findings by using the same standards

to review jury verdicts. MBM Fin. Corp. v. Woodlands Operating Co., 292 S.W.3d

660, 663 n.3 (Tex. 2009) (citing City of Keller and stating that “[t]he same standard

of review applies to a trial court’s findings following a bench trial”); AKIB Constr.,

582 S.W.3d at 805. We review a trial court’s conclusions of law de novo. BMC

Software, 83 S.W.3d at 794.

46

B. Indemnity

An indemnity agreement is a promise to safeguard or hold the indemnitee

harmless against either existing [or] future loss or liability, or both. Dresser Indus.,

Inc. v. Page Petroleum, Inc., 853 S.W.2d 505, 508 (Tex. 1993). “Ordinarily, an

indemnity provision does not apply to claims between the parties to the agreement;

instead, it obligates the indemnitor to protect the indemnitee against claims brought

by third parties.” MG Bldg. Materials, Ltd. v. Moses Lopez Custom Homes, Inc.,

179 S.W.3d 51, 63 (Tex. App.—San Antonio 2005, pet. denied); accord Claybar v.

Samson Expl., LLC, No. 09-16-00435-CV, 2018 WL 651258, at *2 (Tex. App.—

Beaumont Feb. 1, 2018, pet. denied) (mem. op.); Nat’l City Mortg. Co. v. Adams,

310 S.W.3d 139, 143–44 (Tex. App.–Fort Worth 2010, no pet.) (op. on reh’g);

Ganske v. Spence, 129 S.W.3d 701, 708 (Tex. App.—Waco 2004, no pet.); Coastal

Transp. Co. v. Crown Cent. Petroleum Corp., 20 S.W.3d 119, 129–30 (Tex.

App.—Houston [14th Dist.] 2000, pet. denied). In Ganske, the court of appeals

noted, however, the possibility that an indemnity provision could be written so that

the parties indemnify each other against claims they later assert against each other.

Ganske, 129 S.W.3d at 708.

Because indemnity provisions seek to shift the risk of one party’s future

negligence to the other party, Texas imposes a fair notice requirement before

enforcing such agreements. Dresser Indus., 853 S.W.2d at 508; Cabo Constr., Inc.

47

v. R S Clark Const., Inc., 227 S.W.3d 314, 317 (Tex. App.—Houston [1st Dist.]

2007, no pet.). Fair notice is comprised of the express negligence doctrine and the

conspicuousness requirement. Dresser Indus., 853 S.W.2d at 508. The express

negligence doctrine requires that “the intent of the parties must be specifically

stated within the four corners of the contract.” Ethyl Corp. v. Daniel Constr. Co.,

725 S.W.2d 705, 708 (Tex. 1987); see Storage & Processors, Inc. v. Reyes, 134

S.W.3d 190, 192 (Tex. 2004). The conspicuousness requirement requires that

“something must appear on the face of the [contract] to attract the attention of a

reasonable person when he looks at it.” Dresser Indus., 853 S.W.2d at 508

(quoting Ling & Co. v. Trinity Sav. & Loan Ass’n, 482 S.W.2d 841, 843 (Tex.

1972)). “Language may satisfy the conspicuousness requirement by appearing in

larger type, contrasting colors, or otherwise calling attention to itself.” Storage &

Processors, 134 S.W.3d at 192. Although conspicuousness is based on the

existence of facts, the Supreme Court of Texas has held that a determination of

whether an agreement meets the conspicuousness requirement is a question of law

for the court. Dresser Indus., 853 S.W.2d at 509; Cabo Constr., 227 S.W.3d at

317.

C. Indemnity provisions in the four types of documents.

In their briefs, both GE and Carrizo appear to conflate the indemnity

provisions found in the four relevant types of documents. At oral argument, both

48

GE and Carrizo mentioned that they are not identical, and we have noted that the

FSO has a differently-worded indemnity provision. We begin by examining the

text of the indemnity provisions in the four types of documents.

1. January 2012 quote

The first relevant document is the January 2012 GE quote for rental of frac

valve assemblies for the Marcellus Shale project. This quote was an itemized list of

materials and services. Beneath the itemized list, on page 5 of 5, and in smaller

font, is a caveat about equipment specification and a statement incorporating by

reference GE’s “Terms and Conditions of Sale”:

The equipment offered by GE Oil & Gas Pressure Control fully meets

all requirements of the specifications stated in the Equipment

Descriptions, including API 6A PSL Levels, with any exceptions

noted. GE Oil & Gas Pressure Control offers equipment to meet

1. Customer specification or 2. Market practice, which may not follow

the recommended Product Specification Level (PSL) selection, as

suggested in API 6A 19th Edition, Annex A. This quotation, and any

sale resulting therefrom, is subject to Buyers Acceptance of GE

Oil & Gas Pressure Control’s Terms and Conditions of Sale, a

copy of which is attached or can be made available to Buyer upon

request. Any terms and conditions included with Buyer’s order which

are in any way in conflict or inconsistent with GE Oil & Gas Pressure

Control’s Terms and Conditions of Sale shall not be binding on GE

Oil & Gas Pressure Control unless expressly agreed to in writing.

Terms subject to credit approval.

(Emphasis added.)

GE’s standard terms and conditions were printed on the next page, and

included:

49

LIMITATIONS OF LIABILITY. THE TOTAL LIABILITY OF

SELLER ON ANY CLAIM WHETHER IN CONTRACT, TORT

(INCLUDING NEGLIGENCE WHETHER SOLE OR

CONCURRENT) OR OTHERWISE ARISING OUT OF,

CONNECTED WITH, OR RESULTING FROM THE

PERFORMANCE OR NON-PERFORMANCE OF THE

CONTRACT, THE PRODUCTS AND/OR THE SERVICES SHALL

NOT EXCEED THE PRICE RECEIVED BY THE SELLER AND

ALLOCABLE TO THE PRODUCT OR PART THEREOF, OR THE

COST OF FURNISHING OF ANY SERVICE WORK, WHICH

GIVES RISE TO THE CLAIM.

NOTWITHSTANDING ANY PROVISION TO THE CONTRARY

ELSEWHERE, IN NO CASE WILL SELLER BE LIABLE FOR

CONSEQUENTIAL LOSS AND BUYER SHALL SAVE,

INDEMNIFY, DEFEND AND HOLD HARMLESS SELLER FROM

AND AGAINST ANY AND ALL CONSEQUENTIAL LOSS EVEN

IF CAUSED BY SELLER’S SOLE, JOINT, COMPARATIVE,

CONTRIBUTORY OR CONCURRENT NEGLIGENCE, FAULT,

STRICT LIABILITY OR PRODUCT LIABILITY, AND

REGARDLESS OF THE FORM OF ACTION, WHETHER

CONTRACT, TORT (INCLUDING NEGLIGENCE), BREACH OF

WARRANTY, INDEMNITY, STATUTE, STRICT LIABILITY OR

OTHERWISE.

“Consequential Loss” shall mean (whether or not foreseeable at the

date of the contract): any and all consequential, indirect, special,

incidental, exemplary or punitive loss or damage; including, but not

limited to loss of production, product, goodwill, use, revenue, profit

(or anticipated profit), and cost of capital, in each case whether direct

or indirect, and claims for service interruption, costs and expenses

incurred in connection with substitute facilities or supply sources and

in connection with the removal and replacement of products or

reperformance of the services. The Buyer acknowledges that the

provisions of this Clause are reasonable and reflected in the Contract

price, which would be higher without those provisions and the Buyer

accepts such risks and will insure accordingly.

8 INDEMNITIES. 8.1 Subject to 8.2, the Buyer and Seller shall

each be responsible for and shall save, indemnify, defend and hold

50

harmless the other’s Group from and against all claims, losses,

damages, costs (including legal costs), expenses, and liabilities in

respect of, personal injury including death or disease or loss of or

damage to the property of any third party to the extent that any

such injury, loss or damage is caused by the negligence or breach of

duty (whether statutory or otherwise) of the respective Buyer or Seller

or their Groups.

8.2 Notwithstanding Section 8.1, Buyer shall be liable for, and shall

defend, indemnify and hold Seller Group harmless from and against,

any and all claims which arise out of the performance or non-

performance of the Contract in relation to the following, and whether

or not resulting from, or contributed to by, the negligence of Seller

Group; (i) loss of or damage to any well or hole or any third party oil

and gas production facilities; (ii) reservoir seepage or pollution

originating underground or from the property of the Buyer or third

party howsoever arising; (iii) blow-out, fire, explosion, cratering of

any well or reservoir or any other uncontrolled well condition

(including the costs to control a wild well and the removal of debris);

(iv) damage to or escape of product, or substance from any facility

including any pipeline or other subsurface facility.

(Emphasis added.)

2. Invoices

Unlike the January 2012 quote, the front of the invoices does not include any

reference to any terms or conditions. There is no indication that anything was

printed on the back of the invoices. Instead, a copy of GE’s “Standard Terms and

Conditions of Sale” was attached to the invoices as a second page. The indemnity

language was identical to the indemnity language in the Standard Terms and

Conditions attached to the January 2012 quote.

51

3. OVRs

The OVRs were like the invoices. Nothing on the front of the OVRs

referenced any terms or conditions. Like the invoices, GE’s “Standard Terms and

Conditions of Sale” was attached as the last page. The indemnity language was

identical to the indemnity language in the Standard Terms and Conditions attached

to the January 2012 quote and the invoices.

4. FSOs

The FSOs were different from the quote, the invoices, and the OVRs. The

top of the form stated:

GE Oil & Gas Pressure Control, LP

FIELD SERVICE ORDER

TERMS & CONDITIONS OF SALE

Below the words “Terms & Conditions of Sale” and in a smaller font than

used elsewhere on the document, was the statement: “Sale of any products or

services is conditioned on Customer’s agreement to the Terms & Conditions on the

reverse side hereof.”

The body of the document was a fill-in-the-blank form detailing equipment,

materials, and services provided. At the bottom of the form, above signature lines

for the “GE Technician” and “Company or Contractor,” was the following

statement, which was in bold typeface:

THIS AGREEMENT CONTAINS PROVISIONS RELATIVE TO

INDEMNITY, RELEASE OF LIABILITY AND ALLOCATION OF

52

RISK. Authorizing the work and acknowledging that, absent a master

or other controlling agreement between parties, the Terms &

Conditions on the reverse hereof shall apply to the work described

herein. BY SIGNING THIS DOCUMENT CUSTOMER AGREES

THESE TERMS & CONDITIONS ARE THE EXCLUSIVE TERMS

& CONDITIONS APPLICABLE TO THIS TRANSACTION.

“Terms and Conditions of Service” were printed on the back of the FSO.

These were different from GE’s “Standard Terms and Conditions of Sale.”

TERMS AND CONDITIONS OF SERVICE

As used herein, “Contractor” refers to GE Oil & Gas, and “Customer”

refers to the party requesting services from Contractor.

NOTICE: Sale or Lease of any products or services is expressly

conditioned on Customer’s assent to these Terms and Conditions.

THIS DOCUMENT CONTAINS REGARDLESS OF FAULT

RELEASE AND INDEMNITY PROVISIONS.

....

LIABILITY AND INDEMNITY

Customer agrees to release, defend, indemnify and hold

harmless Contractor, its divisions, subsidiaries, parent and affiliated

companies and the officers, directors, employees, agents and servants

of all of them from and against any claims, liability, expenses,

attorney fees and costs of defense, to the extent permitted by law,

whether asserted directly by Customer or by a third party; for:

(1) damage to property owned by, in the possession of, or leased by

Customer and/or the well owner (if different from Customer),

including surface and subsurface damage (the term “well owner” shall

include working and royalty interest owners); (2) reservoir, formation

and well loss or damage, subsurface trespass or any action in the

nature thereof; (3) personal injury, death or property damage or any

claims or damages whatsoever growing out of or in any way

connected with or resulting from pollution, fire, explosion, subsurface

pressure, losing control of a well, and /or a well blowout or the use of

radioactive material or clean-up or remediation. The defense

indemnity, release and hold harmless obligations of Customer

provided for above apply to claims or liability even if contributed

53

to or caused by the sole, joint or concurrent negligence, fault,

strict liability or product liability of Contractor . . . or any defect

in the data, product, supplies, materials or equipment of

Contractor whether in the preparation, design, manufacture,

maintenance, distribution or marketing thereof, or from failure to

warn any person of such defect. Such defense, indemnity, release

and hold harmless obligations of Customer shall not apply to the

extent the claims or liability, are caused by the gross negligence or

willful misconduct of Contractor.

The indemnification provided above shall only be effective to

the maximum extent permitted by law. The parties agree that in the

event any law is enacted in any state, the laws of which govern this

contract, that limit in any way extent to which indemnification may be

provided to an indemnitee, that this contract shall automatically be

amended to provide that the indemnification provided hereunder shall

extend only to the maximum extent permitted by applicable law.

(Emphasis in original.)

D. Only the FSO indemnity provision satisfies the fair notice

requirement.

The indemnity provision associated with the quote, the invoice, and the

OVRs was broad, but it did not expressly state that it applied to first-party claims.

Under our normal rules of contract construction, we cannot conclude that the

parties expressed an intent that Carrizo would provide GE with first-party

indemnity based on GE’s Standard Terms and Conditions of Sale. See Gulf Ins.

Co., 22 S.W.3d at 423. In addition, because of the heightened consequences of

liability shifting through a first-party indemnity clause, we must also consider

whether the indemnity provision at issue satisfies the fair notice requirement. See

Dresser Indus., 853 S.W.2d at 508; Cabo Constr., 227 S.W.3d at 317. The first

54

component of the fair notice requirement—the express negligence test—is not

satisfied by the indemnity provision in GE’s Standard Terms and Conditions of

Sale. See Ethyl Corp., 725 S.W.2d at 708. Unlike the “Terms and Conditions of

Service” that was attached to the FSOs, GE’s Standard Terms and Conditions of

Sale did not expressly state an intention to provide first-party indemnification

within the four corners of the document. See id. Accordingly, the indemnity

provision associated with the January 2012 quote, the invoices, and the OVRs fails

to satisfy the express negligence doctrine and the fair notice requirement. See

Dresser Indus., 853 S.W.2d at 508; Ethyl Corp., 725 S.W.2d at 708. GE is not

entitled to first-party indemnity from Carrizo based on the indemnity provision in

these documents.

As we have said, however, the FSOs are different. The FSOs, including the

FSO for installation of the frac valve assembly for the Yarasavage 1H well,

expressly stated that the indemnity provision extended to all claims “whether

asserted directly by Customer or by a third party.” The trial court concluded, as a

matter of law, that the indemnity provision on the back of the FSO does not meet

the express negligence test. We disagree with this conclusion. The statement—

whether asserted directly by Customer or by a third party—expresses an intent for

Carrizo to provide GE with first-party indemnification. See Ethyl Corp., 725

S.W.2d at 707. This language satisfies the express negligence test. See id.

55

The second part of the fair notice test is conspicuousness. See Dresser

Indus., 853 S.W.2d at 508. In this case, the trial court issued findings of fact and

conclusions of law relevant to the conspicuousness requirement:

• “The field services order is two-sided. The indemnity provision

is on the back side of the field services order. The document is

thin, and the entire indemnity provision is in very small font,

regular typeface, and not capitalized.”

• “The indemnity provisions on the back side of the field services

order is not conspicuous, does not meet the express negligence

test, and is unenforceable.”

We again disagree with the trial court. Although the FSO is thin, as

evidenced by the bleed-through of a company ink-stamp used by field personnel,

this document includes two references to the indemnity provision on its face. First,

a statement at the top of the page states: “Sale of any products or services is

conditioned on Customer’s agreement to the Terms & Conditions on the reverse

side hereof.” The font is small, and the typeface is normal. Second, a notice

appears on the bottom of the front side of the FSO, immediately above the

signature line. This notice is in bold typeface, and some of the words are

capitalized.7

7

56

The “Terms and Conditions of Service” on the back of the FSO is printed in

a single column that is the width of the page, and the font is the same size or larger

than that used on the front of the FSO. At the top of the back side, there is a notice,

which states in all capitals that the document contains “regardless of fault release

and indemnity provisions.”8 The “liability and indemnity” provisions constitute

two paragraphs. A heading stating “LIABILITY AND INDEMNITY” appears

immediately above the paragraphs in bold typeface, underlined, and in a slightly

larger font. Some of the words in the paragraphs are highlighted with bold

typeface, underlining, and italics.

We conclude that the indemnity provision on the FSOs is conspicuous. See

Dresser Indus., 853 S.W.2d at 508–11. The FSO included a statement on the top of

the front of the page that specifically referred to the terms and conditions printed

on the back of the document. See id. at 511. A second statement appeared at the

bottom just above the signature line and referred to the terms and conditions,

including the indemnity provisions printed on the reverse side. See id. The

indemnity provision on the back appears in a paragraph clearly labeled “liability

and indemnity,” in bold underlined text, and the specific provision is not

8

57

surrounded by completely unrelated terms. See id. The specific provision for first-

party indemnity is further highlighted by italicized print. Accordingly, we conclude

that the provision was conspicuous. See Storage & Processors, 134 S.W.3d at 192

(“Language may satisfy the conspicuousness requirement by appearing in larger

type, contrasting colors, or otherwise calling attention to itself.”); see also TEX.

BUS. & COM. CODE § 1.201(b)(10) (defining conspicuous as “so written, displayed,

or presented that a reasonable person against which it is to operate ought to have

noticed it”). We hold that the first-party indemnity provision in the FSOs satisfies

the fair notice test.

E. The FSOs were not signed by people who had authority to bind

Carrizo to a first-party indemnity provision.

We have concluded that the first-party indemnity provision satisfied the fair

notice test, but this conclusion does not end our inquiry into whether GE was

entitled to enforce that provision. The remaining question is whether GE proved

that Carrizo agreed to the first-party indemnity provision. See Baylor Univ. v.

Sonnichsen, 221 S.W.3d 632, 635 (Tex. 2007) (“Contracts require mutual assent to

be enforceable. . . . Evidence of mutual assent in written contracts generally

consists of signatures of the parties and delivery with the intent to bind.”). GE and

Carrizo do not dispute the existence of a general, third-party indemnity agreement

arising from the quote and the invoices. The question is whether Carrizo is

obligated to provide first-party indemnity because their independent contractors in

58

the field signed FSOs that included the first-party indemnity provision on the back.

The answer to this question depends on the determination of certain factual

matters. The trial court made findings of fact about the nature and purpose of the

FSOs and about the authority of Weinstock and the wellsite supervisors to accept a

first-party indemnity requirement on behalf of Carrizo.

On appeal, GE argues that the trial court erred by finding that no person with

authority assented to “the agreement” on Carrizo’s behalf. In making this

argument, GE refers generally to the “contract” or “agreement” without

differentiating among the four types of documents at issue in this case. GE does

not expressly challenge the sufficiency of the evidence to support the trial court’s

findings of fact, although it does argue that the court’s finding that Carrizo did not

authorize Weinstock or its wellsite supervisors “to negotiate contract terms with its

vendor or to bind Carrizo to an indemnity agreement” is “contrary to the

undisputed evidence.” Appellant’s Br. 44.

1. Findings of fact

Our standards of review require us to defer to the trial court’s fact findings

when they are supported by sufficient evidence. Italian Cowboy Partners, Ltd. v.

Prudential Ins. Co. of Am., 341 S.W.3d 323, 337 (Tex. 2011). Here, the trial

court’s relevant fact findings are supported by the record.

59

The nature and purpose of the FSOs

The trial court made the following fact findings relevant to the nature and

purpose of the FSOs:

• “[GE] provided equipment and services to Carrizo and presented

“field services orders [FSOs],” and other documents that were

admitted into evidence at the bench trial.

• “The field services orders [FSOs] . . . were stamped and

required a signature for the sole purpose of confirming receipt

of equipment and services.”

• “Carrizo’s [wellsite supervisors] signed the stamped field

services orders . . . solely to confirm receipt of GE’s equipment

and services.”

• “Coleby Weinstock, a district engineer for Carrizo, approved

payment for equipment and services. Carrizo electronically

received invoices from GE. Weinstock electronically received a

scanned copy of the front pages of an invoice that did not

include any terms and conditions. Weinstock reviewed the

uploaded invoice and approved or rejected payment of the

uploaded invoice.”

The evidence showed that Weinstock selected GE to supply material and

services based, in part, on the January 2012 quote. Having selected GE, Carrizo

placed orders that GE fulfilled. Carrizo established a procedure to verify what

materials and services were provided and to enable Carrizo to approve payment.

When materials or services were supplied by any vendor, the procedure was for the

vendor to present a document to the wellsite supervisor onsite after the material

was delivered or the services completed. These documents were the OVRs and the

60

FSOs. When the wellsite supervisor received an FSO or OVR, he would mark it

using a stamp provided by Carrizo that imprinted a small form for the wellsite

supervisor to fill in.9 Using the form created by the stamp, the wellsite supervisor

recorded the date, a description of the services performed, the cost, whether there

was a dispute about the costs, labor, or materials, and other codes relevant to

Carrizo’s internal administration and payment of invoices. The wellsite supervisor

also signed in the stamped box. Most of the OVRs and FSOs admitted at trial had

the stamp and a wellsite supervisor signature in the stamped area. A few OVRs and

FSOs were signed at the bottom on the preprinted line just below the text about

terms and conditions.

At the bench trial on indemnity, the court heard live testimony from

Weinstock and admitted excerpts of depositions of Weinstock, GE field service

technicians Devon Feaster and Christopher MacInnis, GE field manager Chris

Frey, Carrizo’s vice president and chief operating officer Brad Fisher, Carrizo’s

9

61

general counsel Larry Kennington, wellsite supervisor Larry Gerard, and GE

contracts manager April Jones. Jones testified that she worked in the office and did

not go to the field. She said that GE only works with customers after the customers

agree to a master service agreement or the terms and conditions in the OVRs and

FSOs. But she was surprised to learn that OVRs and FSOs are presented to the

customer only after the materials have been supplied and work has been

completed. In contrast to Jones’s testimony, Weinstock, Feaster, MacInnis, Frey,

Gerard, Fisher, and Kennington all testified that the FSOs were used to verify that

the work had been completed onsite. They all testified that this was used for the

purpose of invoices and billing. Weinstock testified that he received electronically

a copy of the front pages of the OVRs and FSOs with the invoices from GE. But he

testified that he did not approve the OVRs or FSOs. He used the information on the

OVRs and FSOs to determine whether to approve the charges in the invoices sent

by GE or to refer a charge for resolution of a dispute about labor, materials, or

pricing.

The trial court’s findings of fact regarding the FSOs are supported by legally

sufficient evidence because the evidence adduced at trial would enable reasonable

and fair-minded people to reach the findings of fact under review. See City of

Keller, 168 S.W.3d at 827. These findings of fact are also factually sufficient

because, having considered the appellate record in a neutral light, we conclude that

62

these fact findings are not so contrary to the overwhelming weight of the evidence

as to be clearly wrong and unjust. See Cain v. Bain, 709 S.W.2d 175, 176 (Tex.

1986). We therefore defer to these fact findings. See Italian Cowboy Partners, 341

S.W.3d at 337.

The authority of Weinstock and the wellsite supervisors

The trial court made the following fact findings relevant to the authority that

Weinstock and the wellsite supervisors had to act on behalf of Carrizo:

• “Carrizo did not authorize its [wellsite supervisors] or Coleby

Weinstock to negotiate contract terms with its vendors or to

bind Carrizo to an agreement requiring Carrizo to indemnify

GE for GE’s own negligence. Carrizo did not authorize its

[wellsite supervisors] or Coleby Weinstock to bind Carrizo to

indemnify contractors or to negotiate or agree to the terms of

any indemnity contracts. Neither negotiating nor agreeing to

such indemnity provisions was necessary for the [wellsite

supervisors] and/or Weinstock to perform their work for

Carrizo or interact with GE.”

• “Carrizo did not knowingly permit its [wellsite supervisors] or

Coleby Weinstock to hold themselves out as having authority to

execute indemnity agreements on behalf of Carrizo. Carrizo did

not grant such authority to its [wellsite supervisors] or to

Coleby Weinstock.”

• “Carrizo never told the [wellsite supervisors] or Coleby

Weinstock they possessed any authority to approve and bind

Carrizo to indemnity agreements. Carrizo did not grant such

authority to its [wellsite supervisors] or to Coleby Weinstock.”

• “Carrizo never told GE the [wellsite supervisors] or Coleby

Weinstock had authority to approve and bind Carrizo to

indemnity agreements. Carrizo did not grant such authority to

its [wellsite supervisors] or to Coleby Weinstock. A reasonably

63

prudent person would not rely on any conduct by or apparent

authority of the [wellsite supervisors] men or Coleby

Weinstock to bind Carrizo to indemnity agreements.”

The record shows that the FSOs were signed by Gerard and Weller, the

wellsite supervisors. Kennington testified that both Gerard and Weller were

independent contractors, whose contracts prohibited them from being deemed an

employee, agent, or representative of Carrizo. Accordingly, neither Gerard nor

Weller had authority to enter a contract with GE on behalf of Carrizo.

Weinstock testified that he had authority to bid out the job and to make

purchases up to $150,000. He said that he was authorized by Carrizo to enter into

the contract, which he considered to be the January 2012 quote along with the

invoices. But he said that negotiating legal terms was not his “authority,” so he

paid no attention to the terms and conditions on the FSO or invoice. He also said

that he never saw the terms and conditions on the back of the FSO. Consequently,

he never brought the change in indemnity language that appeared in the FSO’s

terms and conditions to the attention of Carrizo’s legal department.

GE’s field service technicians and field manager testified that they did not

have authority to negotiate legal terms and conditions and they never discussed

them with the wellsite supervisors. Regarding the terms and conditions on the

FSOs, Frey said: “We’re all oil field hands. We–we don’t know that.” While Frey

testified that Gerard never told him that he did not have authority to sign an FSO,

64

Frey said he was not sure whether a wellsite supervisor had authority to enter into

contracts for the company for which he works. Gerard testified that the legal

meaning of the FSO’s terms and conditions was “outside my area.”

We conclude that the evidence is legally and factually sufficient to support

the trial court’s findings of fact that Carrizo did not authorize the wellsite

supervisors to enter contracts on behalf of Carrizo. Nor did Carrizo communicate

to the wellsite supervisors or to GE that they had that authority. See City of Keller,

168 S.W.3d at 827; Cain, 709 S.W.2d at 176. We therefore defer to these fact

findings. See Italian Cowboy Partners, 341 S.W.3d at 337.

2. Agency, authority, and ratification

With deference to these fact findings, we apply the law to the facts of this

case. “An agent is one authorized by another to transact some business for the

principal; the relationship is a consensual one between two parties, by which one

party acts on behalf of the other, subject to the other’s control.” Reliant Energy

Servs., Inc. v. Cotton Valley Compression, L.L.C., 336 S.W.3d 764, 782–83 (Tex.

App.—Houston [1st Dist.] 2011, no pet.) (quoting Jamison v. Nat’l Loan Invs., 4

S.W.3d 465, 468 (Tex. App.—Houston [1st Dist.] 1999, pet. denied)). Texas courts

do not presume that an agency relationship exists, and the party who alleges it has

the burden of proving it. Cmty. Health Sys. Prof’l Servs. Corp. v. Hansen, 525

S.W.3d 671, 697–98 (Tex. 2017) (citing IRA Res., Inc. v. Griego, 221 S.W.3d 592,

65

597 (Tex. 2007)). A principal is liable for the acts of its agent only when the agent

has actual or apparent authority to do those acts. See Gaines v. Kelly, 235 S.W.3d

179, 182 (Tex. 2007). “An agent’s authority to act on behalf of a principal depends

on some communication by the principal either to the agent (actual or express

authority) or to the third party (apparent or implied authority).” Id. “Because an

agent’s authority is presumed to be co-extensive with the business entrusted to his

care, it includes only those contracts and acts incidental to the management of the

particular business with which he is entrusted.” Id. at 185.

“Actual authority is authority that the principal intentionally conferred on

the agent or allowed the agent to believe was conferred.” Kettrick v. Coles, No. 01-

10-00855-CV, 2011 WL 3820941, at *9 (Tex. App.—Houston [1st Dist.] Aug. 25,

2011, pet. denied) (mem. op.). “Actual authority includes both express and implied

authority and ‘usually denotes that authority a principal (1) intentionally confers

upon an agent, (2) intentionally allows the agent to believe that he possesses, or

(3) allows the agent to believe that he possesses by want of due care.’” Id. (quoting

Spring Garden 79U, Inc. v. Stewart Title Co., 874 S.W.2d 945, 948 (Tex. App.—

Houston [1st Dist.] 1994, no writ). Implied actual authority is an “adjunct” to

express actual authority, “because implied authority is that which is proper, usual,

and necessary to the exercise of the authority that the principal expressly

delegates.” Id. (quoting Spring Garden 79U, 874 S.W.2d at 948).

66

Apparent authority arises “either from a principal knowingly permitting an

agent to hold [himself] out as having authority or by a principal’s actions that lack

such ordinary care as to clothe an agent with the indicia of authority, thus leading a

reasonably prudent person to believe that the agent has the authority [he] purports

to exercise.” Id. (quoting Baptist Mem. Hosp. Sys. v. Sampson, 969 S.W.2d 945,

948 (Tex. 1998)). “[A]pparent authority must be based on the acts of the principal”

and “is limited to the scope of responsibility that is apparently authorized.” Gaines,

235 S.W.3d at 184 (quoting First Valley Bank of Los Fresnos v. Martin, 144

S.W.3d 466, 471 (Tex. 2004)). Mere declarations of an alleged agent, standing

alone, are “incompetent to establish either the existence of the alleged agency or

the scope of the alleged agent’s authority.” Gaines, 235 S.W.3d at 183–84.

“Because apparent authority is an estoppel principle, a party seeking to recover

under such legal theory must show justifiable reliance on the principal’s words or

conduct resulting in harm to the party.” See Reliant Energy Servs., 336 S.W.3d at

784. The standard courts employ when evaluating the reasonableness of a third

party’s assumptions about apparent authority “is that of a reasonably prudent

person, using diligence and discretion to ascertain the agent’s authority.” See

Gaines, 235 S.W.3d at 182–83 (citing Chastain v. Cooper & Reed, 257 S.W.2d

422, 427 (Tex. 1953)); see also Reliant Energy Servs., Inc., 336 S.W.3d at 787

(“‘[R]easonable diligence to ascertain [an] agent’s authority’ is part of the standard

67

under Texas law for determining whether a person is ‘reasonably prudent’ in the

context of apparent authority . . . .”) (quoting Gaines, 235 S.W.3d at 182–83).

In this case, GE is asserting the existence of a contract based on acceptance

of the FSO terms and conditions by the wellsite supervisors. Therefore, GE had the

burden to prove at trial (as well as on appeal) that the wellsite supervisors had

actual or apparent authority by which they could act and bind Carrizo.

The findings of fact (and evidence at trial) establish that neither wellsite

supervisor had express actual authority to bind Carrizo to contractual terms or

negotiate any legal provisions. The FSOs were signed not as a contract to perform

in the future but as a business record memorializing work that had already been

done. Evidence from witnesses for both GE and Carrizo established that this was

understood by both parties. The fact findings and evidence also demonstrate that

the power to negotiate, renegotiate, or accept a more burdensome liability-shifting,

first-party indemnity provision was not necessary to the exercise of the authority

expressly delegated to the wellsite supervisors to manage the operations in the

field. None of the GE service technicians or the field manager believed that the

wellsite supervisors had such authority, nor did Gerard believe that he did. To the

contrary, the evidence supporting the trial court’s fact findings establishes that

neither the GE employees or wellsite supervisors believed that negotiation of or

68

understanding the legal terms was in any way part of the wellsite supervisors’

responsibility.

The evidence supporting the trial court’s fact findings likewise does not

support a conclusion that the wellsite supervisors had apparent authority. There

was no evidence that Carrizo communicated to GE that the wellsite supervisors

had the authority to assent to a contract on behalf of Carrizo. Instead, the evidence

showed that the wellsite supervisors had the authority to work within the

parameters of the contract negotiated by Weinstein by virtue of the quote and as

evidenced by the invoices that Carrizo paid. There was also no evidence that GE

made any inquiry–let alone acted with reasonable diligence and discretion—to

determine whether the wellsite supervisors had authority to agree to a first-party

indemnity provision when all the other documents comprising the contract between

GE and Carrizo included only a third-party indemnity provision.

We conclude that the trial court correctly held that the wellsite supervisors

did not have actual (express or implied) or apparent authority to bind Carrizo to the

terms and conditions on the back of the FSO. See Kettrick, 2011 WL 3820941, at

*9.

Finally, GE challenges the trial court’s conclusion that Carrizo did not ratify

the first-party indemnity provision on the back of the FSO by paying the invoices

GE submitted. We agree with the trial court.

69

“Ratification is the adoption or confirmation by a person with knowledge of

all material facts of a prior act which did not then legally bind him and which he

had the right to repudiate.” BPX Operating Co. v. Strickhausen, 629 S.W.3d 189,

196 (Tex. 2021). Ratification “is but an agreement, express or implied, by one to

be bound by the act of another performed for him.” Id. (quoting Dillingham v.

Anthony, 11 S.W. 139, 142 (Tex. 1889)); see Rhodes, Inc. v. Duncan, 623 S.W.2d

741, 744 (Tex. App.—Houston [1st Dist.] 1981, no writ) (“There can be no

ratification of an act which is not done in behalf of, and does not purport to bind,

the person against whom the doctrine of ratification is invoked.”).

Ratification can be express or implied. BPX Operating Co., 629 S.W.3d at

197. “Express ratification—in writing, for example—typically makes the parties’

intentions clear.” Id. A party claiming implied ratification must offer objective

evidence of intent, such as a party’s conduct. Id.; see Mo. Pac. R.R. v. Lely Dev.

Corp., 86 S.W.3d 787, 792 (Tex. App.—Austin 2002, pet. dism’d) (“Ratification

may be inferred by a party’s course of conduct and need not be shown by express

word or deed.”). “As with most objective inquiries, determining a party’s objective

intent requires an examination of ‘the totality of the circumstances.’” BPX

Operating Co., 629 S.W.3d at 197 (quoting State v. One (1) 2004 Lincoln

Navigator, 494 S.W.3d 690, 706 (Tex. 2016) (Devine, J., concurring)). “[I]mplied

ratification should be found only if the party’s actions ‘clearly evidenc[ed] an

70

intention to ratify.’” BPX Operating Co., 629 S.W.3d at 197 (quoting Chrisman v.

Electrastart of Hous., Inc., No. 14-02-00516-CV, 2003 WL 22996909, at *5 (Tex.

App.—Houston [14th Dist.] Dec. 23, 2003, no pet.) (mem. op.)).

GE has not identified any evidence that Carrizo expressly ratified the first-

party indemnity provision on the back of the FSOs. Thus, it was GE’s burden to

prove implied ratification by providing clear evidence that Carrizo intended to

ratify this provision. GE has not done that. Weinstock testified that he reviewed the

FSOs and the information included with the company stamp for the purpose of

determining whether the charges should be paid. He testified that he did not

approve the FSOs, which were used to memorialize facts about what happened in

the field. Weinstock’s recommendations to pay and Carrizo’s payment of the

invoices is fully consistent with the other documents that comprise the parties’

contract—the quote, the invoices, and the OVRs. These three types of documents

used GE’s Standard Terms and Conditions that included only the third-party

indemnity provisions. GE has failed to prove that Carrizo had any intent to ratify

the first-party indemnity provision. Accordingly, we conclude that Carrizo did not

impliedly ratify the first-party indemnity provision printed on the back of the

FSOs. See BPX Operating Co., 629 S.W.3d at 197.

***

71

Only the terms and conditions that accompanied the FSOs included the first-

party indemnity provision. Though the FSO satisfies the fair notice test, GE’s

indemnity argument fails for a much more fundamental reason: there was never a

meeting of the minds. See Baylor Univ., 221 S.W.3d at 635 (holding that contracts

require mutual assent to be enforceable); see also David J. Sacks, P.C. v. Haden,

266 S.W.3d 447, 450 (Tex. 2008) (“A meeting of the minds is necessary to form a

binding contract.”).

We overrule GE’s third issue.

Conclusion

Having overruled GE’s issues, we affirm the judgment of the trial court.

Peter Kelly

Justice

Panel consists of Chief Justice Adams, and Justices Kelly and Goodman.

72

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.