IN THE COMMONWEALTH COURT OF PENNSYLVANIA

PSP NE, LLC, :

Petitioner :

:

v. : No. 576 C.D. 2022

: Submitted: February 7, 2023

Pennsylvania Prevailing Wage :

Appeals Board, :

Respondent :

BEFORE: HONORABLE PATRICIA A. McCULLOUGH, Judge

HONORABLE CHRISTINE FIZZANO CANNON, Judge

HONORABLE MARY HANNAH LEAVITT, Senior Judge

OPINION

BY SENIOR JUDGE LEAVITT FILED: March 30, 2023

PSP NE, LLC (Developer) petitions for review of an adjudication of

the Pennsylvania Prevailing Wage Appeals Board (Board) holding that Developer’s

construction of a facility to be leased to the Pennsylvania State Police (State Police)

was a public work subject to the requirements of the Pennsylvania Prevailing Wage

Act (Act).1 In doing so, the Board affirmed a determination of the Department of

Labor and Industry’s Bureau of Labor Law Compliance (Bureau of Compliance).

On appeal, Developer contends that the Board erred in holding that its

predevelopment lease with the Commonwealth of Pennsylvania constituted a

“public work” within the meaning of the Act because the project will not be financed,

in whole or in part, by public funds. For the reasons that follow, we reverse the

adjudication of the Board.

The relevant facts found by the Board, based on the stipulations of

Developer and the Bureau of Compliance, follow. Developer owns land in Hanover

1

Act of August 15, 1961, P.L. 987, as amended, 43 P.S. §§165-1-165-17.

Township, Luzerne County. On July 22, 2019, the Commonwealth, by the

Department of General Services, executed a 20-year lease of a facility to be

constructed by Developer and used by the State Police as a barracks and training

center. Board Adjudication, 5/17/2022, Finding of Fact (F.F.) ¶¶4, 7, 10. Developer

hired “at its own expense” engineers, architects, and others “to develop plans and

specifications incorporating the State Police requirements set forth in the Lease.”

Id., F.F. ¶6. Developer selected the contractors to prepare the site and build the

facility. Id., F.F. ¶13. To help finance the construction, Developer obtained a bank

loan in the amount of $15,400,000. Id., F.F. ¶15. The bank loan is secured by

Developer’s land, the facility to be built, Developer’s personal guarantee, and an

assignment of all leases. Id., F.F. ¶17. Developer is required “to provide its personal

funds to pay for the entire project” of $17,158,680. Id., F.F. ¶15. Upon completion

of construction, the State Police will “take occupancy of the building facilities, as

Tenant, and begin lease payments[.]” Id., F.F. ¶10.

The predevelopment lease provides that if the Commonwealth

terminates or cancels the lease before completion of the 20-year term, the

Commonwealth will reimburse Developer “for any unamortized costs of

renovations,” but this will leave Developer “with a loss of any difference between

the total project and unamortized costs.” Board Adjudication, 5/17/2022, F.F. ¶11.

The “amortized construction costs of the project” are $15,615,940. Id., F.F. ¶12.

In response to a request from Developer for confirmation that its

construction of the facility to be leased to the Commonwealth was not subject to the

Act, the Bureau of Compliance informed Developer that the Act “covers this

construction project.” Certified Record, Item 1, at 5. The Bureau explained that

although Developer “will provide the initial funds for this project, the lease

2

payments from the State Police will reimburse this initial outlay, and, as such, are

the ultimate source for this construction.” Id. at 6.

On February 14, 2020, Developer filed a grievance with the Board,

seeking review of the determination of the Bureau of Compliance. Neither party

requested an evidentiary hearing to augment the stipulated facts. Following

argument, the Board issued an adjudication denying Developer’s grievance and

affirming the Bureau’s determination.

In reaching this conclusion, the Board was guided by the Pennsylvania

Supreme Court’s holding in Pennsylvania National Mutual Casualty Insurance

Company v. Department of Labor and Industry, 715 A.2d 1068, 1074 (Pa. 1998)

(Penn National I). Therein, the Supreme Court explained that under the Act, a

“public work” is one that involves (1) certain work, (2) performed under contract,

(3) paid for in whole or part with funds from a public body, and (4) at a cost in excess

of $25,000. Id. The Board concluded that Developer’s construction satisfied all four

elements. It emphasized that because Developer’s loan agreement required the

Commonwealth’s lease payments to be sufficient to cover Developer’s debt service,

this established funding by a public body. Board Adjudication, 5/17/2022, at 10.

Specifically, Developer would recover its amortized construction costs of

$15,615,940 either through rental payments or reimbursement of unamortized costs

should the lease terminate early. Id. The Board further observed that the lease

required the facility to satisfy State Police design needs; required construction to be

completed within a specific timeline; and included a provision, standard in all

Commonwealth leases, that “Lessor” had to comply with the Act. For these reasons,

the Board concluded that the agreement did not establish a landlord-tenant lease but,

rather, a “public work,” or construction contract, subject to the Act.

3

Developer appealed the denial of its grievance to this Court.

On appeal,2 Developer raises eight issues, which effectively turn on the

single legal question of whether construction of the facility is public work subject to

the Act.3 Developer argues that the project is not public work, and the Bureau rejoins

that it is.4

We begin our analysis with a review of the Act. The Act is a remedial

statute that ensures that workers employed on public works are paid “[n]ot less than

the prevailing minimum wages[.]” Section 5 of the Act, 43 P.S. §165-5. The Act

defines “public work” as follows:

[C]onstruction, reconstruction, demolition, alteration and/or

repair work other than maintenance work, done under contract

2

This Court’s review of an administrative agency’s order determines whether findings of fact are

supported by substantial evidence, whether constitutional rights have been violated, and whether

the determination is in accordance with law. Bologna v. Department of Labor and Industry, 816

A.2d 407, 410 n.3 (Pa. Cmwlth. 2003). Our review of questions of law is plenary. Tomaskevitch

v. Specialty Records Corporation, 717 A.2d 30, 32 (Pa. Cmwlth. 1998). The Court will not

overturn an exercise of administrative discretion unless the agency has abused its discretion or

acted in an arbitrary or capricious manner. International Brotherhood of Electrical Workers v.

Department of Labor and Industry, Prevailing Wage Appeals Board, 816 A.2d 1220, 1223 (Pa.

Cmwlth. 2003).

3

Developer states the issues as follows: (1) whether the Board erred, acted arbitrarily, and/or

abused its discretion in rendering its May 17, 2022, adjudication; (2) whether Developer made a

prima facie case, thereby shifting the evidentiary burden to the Bureau of Compliance; (3) whether

the Bureau of Compliance met its burden of proof of establishing the Act applies to the lease in

question; (4) whether the lease was actually a “public work” construction contract under the Act;

(5) whether the rent to be paid by the Commonwealth, per the lease, actually constitutes public

financing for construction; (6) whether the Commonwealth, as tenant under the lease, was

allocated or assumes any risk of loss for Developer’s construction loan obligation or costs for the

project; (7) whether the Act applies to Developer as a private developer and landlord using private

funds to construct a building it owns and will continue to own; and (8) whether the language of

the lease, which is statutorily required to be included in all agreements to which the

Commonwealth is a party, is determinative of the Act’s applicability. Developer Brief at 3-5.

4

The Bureau of Compliance filed a notice of intervention in this matter, and the Board notified

this Court that it was a disinterested party.

4

and paid for in whole or in part out of the funds of a public body

where the estimated cost of the total project is in excess of

twenty-five thousand dollars ($25,000), but shall not include

work performed under a rehabilitation or manpower training

program.

Section 2(5) of the Act, 43 P.S. §165-2(5) (emphasis added). It is not disputed that

the Commonwealth is a “public body.” As summarized by our Supreme Court, the

Act makes a “public work” one that meets four requirements:

(1) there must be certain work;

(2) such work must be under contract;

(3) such work must be paid for in whole or in part with public

funds; and

(4) the estimated cost of the total project must be in excess of

$25,000.

Penn National I, 715 A.2d at 1074. Notably, “public work” does not require a

“public body” to be directly involved, “only that the project must be paid for in

whole or in part with public funds.” Lycoming County Nursing Home Association,

Inc. v. Department of Labor and Industry, Prevailing Wage Appeals Board, 627

A.2d 238, 242 (Pa. Cmwlth. 1993).

In any challenge to a determination of the Bureau of Compliance, the

grievant bears the burden of proof. See 34 Pa. Code §213.8(j) (“The General Rules

[of Administrative Practice and Procedure, 1 Pa. Code §§31.1-35.251,5] govern

evidentiary hearings. The burden of proof shall be on the grievant.”); see also Butler

Balancing Company, Inc. v. Department of Labor and Industry, Prevailing Wage

Appeals Board, 780 A.2d 840, 842 n.6 (Pa. Cmwlth. 2001). It is the burden of the

5

Section 213.1 of the Board’s regulations states that “[u]nder 1 Pa. Code §31.1 (relating to scope

of part), 1 Pa. Code Part II (relating to general rules of administrative practice and procedure) is

applicable to the activities of, and proceedings before, the Board, of the Department [of Labor &

Industry], except as otherwise provided in this chapter.” 34 Pa. Code §213.1.

5

grievant to adduce evidence that a “predevelopment lease” constitutes a bona fide

lease. Thereafter, the burden shifts to the Bureau of Compliance to “establish that

the economic reality of the transaction is different from its appearance.” 500 James

Hance Court v. Pennsylvania Prevailing Wage Appeals Board, 33 A.3d 555, 573-

74 (Pa. 2011). The allocation of financial risk is a key aspect of the Bureau of

Compliance’s burden to prove untoward “evasive drafting” of a lease agreement that

was done to avoid the Act. Id. at 572. The party with the burden of proof must

adduce “sufficient evidence such that, in the absence of something else from the

opposing party, he should prevail.” Id. at 575. Stated otherwise, it is “incumbent

upon the opposing party to undermine that case in some way.” Id. at 576.

With this background, we turn to Developer’s argument that the Act

does not apply to its construction project because the Commonwealth does not own

the land; did not hire Developer to construct the facility for the Commonwealth to

own; and did not provide any funding for the construction of the facility that will be

leased to the State Police. Developer used its own funds, including a bank loan, to

purchase the land and construct the facility to be leased. The only funds ever to be

generated from a “public body” will “be in the form of rent” and only after the

construction is complete and the State Police takes occupancy. Developer Brief at

11-12. The rent payments merely give the State Police the right to occupy the land

and the facility.

Specifically, Developer contends its predevelopment lease with the

Commonwealth does not satisfy all of the four elements of a public work. See Penn

National I, 715 A.2d at 1074. The contract is a landlord-tenant lease and not a

contract for construction of “certain work,” and no part of the construction will be

paid by public funds. Developer did not receive an advance from the

6

Commonwealth to help fund the construction of the facility. The risk of loss

associated with an “early termination of the Lease and breach of the Construction

Loan” is borne solely by Developer. Developer Brief at 12.

Developer argues that because the record established that the contract

constituted a bona fide lease, the burden shifted to the Bureau of Compliance “to

present evidence that the economic reality of the transaction is contrary to what it

appears to be.” Developer Brief at 12. However, the Bureau offered no evidence

relative to the economic reality of the lease agreement.

In response, the Bureau of Compliance contends that the

predevelopment lease has placed the financial risk of the construction upon the

Commonwealth because it must cover unamortized construction costs should the

lease terminate early. Further, the lease has a potential 30-year duration, should it

be extended, which constitutes a real estate transfer, at least for purposes of the tax

laws. This supports the Board’s conclusion that Developer has been engaged to

construct a “public work” within the meaning of the Act. Bureau Brief at 13-14.

The leading precedent is 500 James Hance Court, 33 A.3d 555, where

our Supreme Court considered whether the construction of a building for a charter

school was a public work subject to the Act.6 The charter school’s non-profit

6

The project in 500 James Hance Court was divided into two parts: one was for the construction

of the building and the other was for the interior or “fit out” of the building to be used as a charter

school. The “fit out” was to be financed by a foundation and, thus, subject to the Act. The

construction of the “shell” was privately funded. The Bureau of Compliance took the position that

if the project had proceeded under one contract, the entire project would have been subject to the

Act. Notably, our Supreme Court determined that “there does not appear to be any reason why

parties to a contract or lease cannot modify their relationship to account for legal requirements

(such as prevailing wages) which may attach to one, but not another, manner of transacting.” 500

James Hance Court, 33 A.3d at 570. The Supreme Court found a “strong and logical” demarcation

between the construction of the building shell and the customizing of the interior. Id. at 570-71.

Accordingly, it held part of the construction project was subject to the Act and part was not.

7

foundation provided financing for the construction of the building through bonds

issued by a public authority. The predevelopment lease between the developer and

the charter school had a duration of 24 years, with an option to purchase after the

first 5 years, and the lease payments were expected to cover the cost of construction

within 6 years.7 The building was to be used exclusively as a charter school, and

approximately a quarter of the total construction cost was attributed to customizing

the building for the particular needs of the charter school.

The Supreme Court explained that the “labels appended to transactional

documents do not exclusively determine the applicability of regulation under the []

Act, as the potential for evasion and artifice is too great. Rather, as in other settings,

the economic reality of the transaction should control.” 500 James Hance Court,

33 A.3d at 572 (emphasis added). To that end, the Supreme Court considered

whether the charter school’s rental payments under the lease, expected to cover

construction costs in six years, were tantamount to public financing. In concluding

that the rental payments did not constitute public funding, the court explained as

follows:

[T]here is little indication that the lease payments by the

Foundation were designed to be anything other than

compensation for use of the building . . . . [T]he Bureau of

Compliance highlights that, at oral argument, Appellees

indicated that the lease payments would allow construction costs

to be recouped in six years . . . . However, it is evident that few

office buildings would be built if the construction costs, including

the cost of servicing the construction loan, could not ultimately

be recouped by anticipated lease payments within a reasonable

time frame. Even to the degree this factor focuses on the prospect

that the Foundation’s lease payments will, alone, allow for such

7

Notably, unlike the lease in 500 James Hance Court, 33 A.3d 555, the Commonwealth does not

have an option to purchase the facility after five years.

8

recoupment, such a circumstance remains of little probative

value relative to the question of whether the lease is a disguised

construction contract, absent proofs regarding whether a six-year

recoupment period is substantially shorter than the industry norm

for building shells of the type involved here.

Id. at 574 (emphasis added). The Supreme Court further explained that the Bureau

of Compliance had given no weight to the fact that the premises reverted to the

developer at the end of the lease:

Absent a finding – or even an allegation – that the building’s

useful life is likely to be no greater than the 24-year lease term,

we find this reasoning counter-intuitive because such reversion

facially supports Appellees’ position that the lease is a bona fide

one and not a construction contract.

Id. at 575. In short, under 500 James Hance Court, a developer’s recoupment of its

costs of construction through rental payments does not transform a lease into a

“disguised construction contract.” Id.

In Ursinus College v. Prevailing Wage Appeals Board, 280 A.3d 1113,

1123 (Pa. Cmwlth. 2022), petition for allowance of appeal granted, (Pa., No. 18

MAP 2023, filed February 22, 2023), this Court considered whether a $23,000,000

construction project undertaken by a private college, but financed by bonds issued

by a public authority, constituted a public work subject to the Act. The Board

determined that because the construction was funded by loans from a public

authority, it was paid for by a public body. Accordingly, the prevailing wage

requirements of the Act applied to the construction.

This Court reversed the Board’s adjudication. The bond documents

required the public authority to transfer the funds to a trustee, which transfer

occurred before the college received any funds. Accordingly, the college used funds

disbursed by the trustee, and not by the public authority, to pay for the project. The

9

economic reality of this transaction was that the project was not funded “out of the

funds” of a public body. We rejected the Board’s reasoning that the project was

subject to the Act because the college “would not have had this funding stream

available but for the existence of the [a]uthority and its coordination of the funding

through its statutory powers as a public body.” Ursinus College, 280 A.3d at 1123

(emphasis added). We explained that Section 2(5) of the Act is not triggered by a

“but for” test but, rather, requires the work be paid for “out of the funds” of the

public body. The college, not the public authority, bore the risk for repayment of

the bonds. As such, the economic reality of the transaction revealed that the project

was not a public work subject to the Act.

Here, as in 500 James Hance Court, the predevelopment lease states

that the State Police shall pay rent “for the use and occupancy of the [p]remises” and

not for construction. Reproduced Record at 37 (R.R. __).8 As in Ursinus College,

Developer has funded the cost of construction and solely bears responsibility for the

repayment of the construction loan. Developer and the Bureau of Compliance

stipulated:

[T]he Project has been purchased and funded totally through the

use of [Developer’s] private funds, and that no funds will be

provided directly by the Commonwealth for the purchase,

development and construction of the facilities.

Stipulated Facts, ¶20; R.R. 30 (emphasis added). The parties agreed that Developer

bears the “risk of losing substantial funds” notwithstanding the Commonwealth’s

agreement to reimburse Developer for unamortized costs should the lease be

8

Rule 2173 of the Pennsylvania Rules of Appellate Procedure specifies: “[T]he pages of . . . the

reproduced record . . . shall be numbered separately in Arabic figures . . . thus 1, 2, 3, etc., followed

in the reproduced record by a small a, thus 1a, 2a, 3a, etc.” PA. R.A.P. 2173. Because Developer’s

Reproduced Record page numbers are not followed by a small “a,” for ease of reference, this

opinion refers to the reproduced record pages as numbered by Developer.

10

terminated early. Stipulated Facts, ¶11; R.R. 30. In short, the economic reality is

that Developer provided the funds for the construction of the facility to be leased to

the Commonwealth.

Although the predevelopment lease requires the Commonwealth to

reimburse Developer for any unamortized costs after “the expiration of at least fifty

percent (50%) of the initial term of this Lease,” i.e., 10 years, this did not transform

the lease into a disguised construction contract. Lease, III, ¶8; R.R. 38. An early

termination of the lease at the end of year 10, for example, would leave unamortized

costs substantially below $15,615,940, possibly as little as half that amount. See

Developer Brief at 19-20. Should the Commonwealth become responsible for the

unamortized portion of the costs, Developer will nevertheless be liable for as much

as $10 million on the bank loan. Id. As in Ursinus College, construction of the

facility does not come out of funds of a public body, and the risk for repayment of

the loan is not borne by a public body.

The Board erred in holding that the lease was not a bona fide lease.

Improperly, the Board gave no weight to the fact that the Developer holds a

reversionary interest in the building under construction. In 500 James Hance Court,

33 A.3d at 575, our Supreme Court observed that such a reversionary interest in a

predevelopment lease to the developer “facially” supports the conclusion that “the

lease is a bona fide one and not a construction contract.”

Because Developer established a bona fide lease, the burden shifted to

the Bureau of Compliance. It did not present any evidence that the contractual

arrangement was not as it seemed. The Bureau presented no evidence, for example,

that the reversionary interest was fictional because the building would cease to be

useful by the end of the lease term. Likewise, it presented no evidence that

11

Developer’s recoupment of construction costs by rental payments was “substantially

shorter than the industry norm.” 500 James Hance Court, 33 A.3d at 574.

We reject the Board’s suggestion that the standard lease appended to

the agreement is relevant to the determination of whether the predevelopment lease

involves a public work. Paragraph 32 of “Attachment A,” “Lease Standard Terms

and Conditions,” relates to “Payment of Prevailing Minimum Wages.” It states, in

relevant part, as follows:

Lessor and Lessor’s contractor(s) must comply with the

following conditions, provisions, and requirement in the

construction of the building, substantial rehabilitation of the

building and/or substantial alterations to the Premises:

(a) Lessor and Lessor’s contractors shall pay at

least the wage rates as determined by the

Secretary of the Pennsylvania Department of

Labor and Industry and shall comply with the

conditions of the [Act] and the regulations

issued thereto, to assure the full and proper

payment of the rates.

R.R. 52 (emphasis added). Additionally, Developer and the Bureau of Compliance

stipulated:

Section 9.101(a) of [the Board’s regulation, 34 Pa. Code

§9.101(a),] requires that any and all agreements in which the

Commonwealth is a party contain language requiring compliance

with the Act. Accordingly, as the Commonwealth is a party to

the Lease, it satisfied this statutory requirement by including

language that work performed comply with the Act.

Stipulated Facts, ¶8; R.R. 29.

The question of whether Developer has a contractual obligation to pay

prevailing wages was not before the Board, and it is not before the Court in this

appeal. The Board determines questions arising under the Act; its jurisdiction does

12

not extend to matters of contract interpretation and dispute. Likewise, this Court

does not determine what, if any, contractual obligation was undertaken by Developer

in Paragraph 32 of Attachment A.

Finally, the Bureau of Compliance argues that the predevelopment

lease effected a real estate transfer under Section 1102-C of the Tax Reform Code

of 1971,9 which treats a build-to-suit lease with a term of 30 years as a transfer that

triggers a realty transfer tax. Here, the lease agreement provides for one, 20-year

term followed by two, 5-year renewal terms. The Bureau of Compliance asserts that

a 30-year lease is not typical in a landlord-tenant relationship, which supports the

conclusion that the nature of the contract is not a lease between a landlord and tenant.

We reject this argument. First, the Board did not base its adjudication

on this argument. Second, renewal of the lease agreement beyond the initial 20-year

term is speculative, not certain. However, even assuming the lease effected a real

estate transfer for purposes of the tax laws, this is not a factor to be used to determine

whether the lease is a construction contract for a public work. Penn National I, 715

A.2d at 1074.

Developer made a prima facie case that its lease was a bona fide lease

by showing that funding for construction of the facility to be rented did not come

from a public body. Rather, Developer bears the financial risk, and it retains a

reversionary interest in the land and the buildings. It was the Bureau of

Compliance’s burden to present evidence to “establish that the economic reality of

the transaction is different from its appearance,” 500 James Hance Court, 33 A.3d

at 573-74, and it did not do so. That Developer expects, in time, to recover costs of

9

Act of March 4, 1971, P.L. 6, as amended, added by the Act of May 5, 1981, P.L. 36, 72 P.S.

§8102-C.

13

construction did not convert the bona fide lease into a construction contract. As our

Supreme Court has explained, if developers did not expect to cover their

construction costs with rental payments, few commercial buildings would ever be

built. Id. at 574. The Bureau of Compliance presented no evidence that the timeline

for Developer’s expected recoupment of construction costs was “substantially

shorter than the norm.” Id.

For these reasons, we reverse the Board’s determination that the Act

applies to Developer’s construction of a building that will be leased to the

Commonwealth.

____________________________________________

MARY HANNAH LEAVITT, President Judge Emerita

14

IN THE COMMONWEALTH COURT OF PENNSYLVANIA

PSP NE, LLC, :

Petitioner :

:

v. : No. 576 C.D. 2022

:

Pennsylvania Prevailing Wage :

Appeals Board, :

Respondent :

ORDER

AND NOW, this 30th day of March, 2023, the May 17, 2022,

adjudication of the Pennsylvania Prevailing Wage Appeals Board is REVERSED.

____________________________________________

MARY HANNAH LEAVITT, President Judge Emerita