Opinion

Former Employees of Pittsburgh Logistics Systems, Inc. v. United States Secretary of Labor

  • 27 Ct. Int'l Trade 1301
  • 2003 CIT 111
Court
United States Court of International Trade
Filed
Aug 28, 2003
Status
Published
Author
Musgrave
On the bench
Musgrave
Cited by
0 cases
Authority
More cited than 25.5%

thus equating “appropriate subdivision” with the production line

How later courts described this case

  • thus equating “appropriate subdivision” with the production line
  • “Though a court may reject an agency interpretation that contravenes clearly discernible legislative intent, its role when that intent is not contravened is to determine whether the agency’s interpretation is ‘sufficiently reasonable.’ ”

Written by the judges who cited it.

The opinion

Slip Op. 03 - 111

UNITED STATES COURT OF INTERNATIONAL TRADE

:

FORMER EMPLOYEES OF :

PITTSBURGH LOGISTICS SYSTEMS, :

INC., :

:

Plaintiff, : Before: MUSGRAVE, JUDGE

:

v. : Court No. 02-00387

:

UNITED STATES SECRETARY OF :

LABOR :

:

Defendant. :

:

[Judgment on pleadings for plaintiffs; Secretary of Labor’s negative determination on trade

adjustment assistance petition reversed, DOL ordered to certify TAA benefits eligibility.]

Decided: August 28, 2003

King & Spalding, Washington, D.C. (Lisa L. Cochrane, J. Michael Taylor, Stephen A.

Jones), for the plaintiff.

Peter D. Keisler, Assistant Attorney General; David M. Cohen, Director, Lucius B. Lau,

Assistant Director, Commercial Litigation Branch, Civil Division, United States Department of

Justice (Paul D. Kovac); Louisa M. Reynolds, Office of the Solicitor, U.S. Department of Labor, for

the defendant.

OPINION

This opinion concerns the results of remand from the U.S. Department of Labor, Office of

Employment and Training Administration (“DOL” or “Labor”) on a trade adjustment assistance

petition previously denied certification. Familiarity with the circumstances of this matter is

presumed. See Slip Op. 03-21 (Feb. 28, 2003). The remand results were filed on May 5, 2003,

following two motions for extension of time by Labor, and again deny certification. Notice of

Court No. 02-00387 Page 2

Negative Determination on Reconsideration on Remand, SPDoc 11, SR at 124.1 The remand results

acknowledged the Opinion’s request for clarification of why the work of “manag[ing] warehousing

and distribution” and “managing traffic and processing freight invoices” makes a petitioner ineligible

for certification as a “production” worker and interpreted the Opinion as concluding that Labor had

not fully articulated the issue of “control” that is part of Labor’s service worker analysis. See Slip

Op. 03-21. Notwithstanding that, the remand results respond as follows:

DOL’s interpretation of the phrase “appropriate subdivision thereof”

is limited to related or affiliated firms; [it] cannot be expanded to encompass

two unaffiliated firms. This interpretation of the phrase “appropriate

subdivision” is consistent with Section 222(a)(1) which requires DOL to

consider whether a significant number of workers have been separated from

“the workers’ firm or appropriate subdivision of the firm.” Because the Act

clearly limits “appropriate subdivision” to just “the” workers’ firm in the first

requirement, DOL understands Congress to have intended to similarly limit

“appropriate subdivision” in the immediately following requirements.

This limitation is reflected in the regulations. The regulatory

definition of “firm” states, “[a] firm, together with any predecessor or

successor-in-interest, or together with any affiliated firm controlled or

substantially or beneficially owned by substantially the same persons, may be

considered a single firm.” 29 C.F.R. § 90.2. This language allows the phrase

“workers’ firm” to include more than one entity, but only to the extent that

those multiple entities are “controlled or substantially or beneficially owned

by substantially the same persons.” Section 90.2 of the regulations defines

“appropriate subdivision” as one of three types of subdivisions, none of

which permit the inclusion of a worker group employed by one firm to be

included as within the “appropriate subdivision” of another, unaffiliated firm.

The first two types of “appropriate subdivisions” are expressly limited to one

“firm”: either “an establishment in a multi-establishment firm” or “a distinct

part or section of an establishment (whether or not the firm has more than one

establishment) where the articles are produced.” “One definition of

establishment . . . is ‘a permanent organization,’ and would encompass any

1

Following the convention of Slip Op. 03-21, supplementations of the administrative record

are indicated by the addition of “S.”

Court No. 02-00387 Page 3

subdivision up to the size of the entire corporation.” (Emphasis added.)

International Union, UAW v. Marshall, 584 F.2d 390 (D.C. Cir. 1978).

The third type of “appropriate subdivision” encompasses “auxiliary

facilities operated in conjunction with (whether or not physically separate

from) production facilities.” This broadens the term “appropriate

subdivision” to include a facility that does not produce an article. However,

this definition “has connotations that a subdivision can never be larger than

a single ‘establishment.’ The definition’s limited use of ‘auxiliary facilities’

implies that any physically separate operation may be a part of a subdivision

only if it is merely auxiliary and used in conjunction with the main

production unit.” Lloyd v. U.S. Dep’t of Labor, 637 F.2d 1267, 1274 (9th

Cir. 1980). In Lloyd, the CIT [sic] stated that the word “auxiliary” implies

that a facility will only be deemed an appropriate subdivision if it is a

subsidiary part of a firm that is producing an article. In addition, the phrase

“‘operated in conjunction with’ implies that the auxiliary facility must be run

by the same firm as the production facility or facilities.” Id.

Production Worker Analysis

When a worker group applies for assistance, the fundamental test

DOL applies is whether the workers’ firm or an appropriate subdivision of

the workers’ firm produced an import-impacted article during the relevant

period. If the worker group produces such an article, then they are deemed

“production workers.”

Because an “appropriate subdivision” is limited to the “workers’

firm” and Section 90.2 of the regulations permits the inclusion of multiple

entities with the term “firm” only if they are affiliated entities, on remand

DOL conducted additional investigation of the relationship between PLS and

LTV. The investigation indicates that substantially the same persons do not

control PLS and LTV. Supplemental Administrative Record (SAR) 43. No

corporate official of one company is a board member or officer of the other

(or of Quadrivius). SAR 42. Substantially the same persons do not own PLS

and LTV. LTV was a publicly owned company. SAR 39. After LTV’s

bankruptcy, PLS continued business. AR 25. The contract between LTV and

PLS indicates that they are separate corporations. SAR 108. Therefore,

DOL finds that LTV and PLS are not “controlled or substantially beneficially

owned by substantially the same persons.” 29 C.F.R. § 90.2. They are

independent business entities and as the word “firm” is defined by Section

90.2, “workers’ firm” cannot mean both LTV and PLS.

Court No. 02-00387 Page 4

DOL has considered which factors of employment exercised by a firm

establish that it is “the” workers’ firm. DOL has consistently determined that

the critical employment factor is which firm was obligated to pay the

employee during the relevant period. Because PLS was so obligated, DOL

has determined that PLS is “the” workers’ firm. SAR 40. Furthermore, the

contract establishes that “PLS shall hire and use its own employees to provide

the services described in this contract.” (SAR 108) and “PLS is supplying its

own employees, which is (sic) controls and directs for employment

purposes.” SAR 111. PLS “hired and fired” the relevant worker group. SAR

40. Therefore, DOL finds that the petitioners are employees of PLS and

cannot be certified as an appropriate subdivision (or as part of an appropriate

subdivision) of LTV.

The CIT Opinion ordered DOL “to explain to petitioners how their

work was unrelated to production, not merely state that it was.” This

suggests that the CIT wants DOL to change the test of whether one qualifies

as a production worker to whether the workers’ tasks are “related” to

production. Such a change would violate Section 222(a)(3) which, as stated

earlier, requires actual production by the workers firm or an appropriate

subdivision of the workers’ firm. In addition, this change conflicts with

previous CIT decisions that support DOL’s determination that the test for

production must involve the transformation of a thing into something “new

and different.” Nagy v. Donovan, 6 CIT 141, 145, 571 F. Supp. 1261, 1264

(1983).

DOL thoroughly investigated and could not find any evidence that any

employees of PLS or Quadrivius actually produced any articles. AR 4, AR

11, AR 13, SAR 39. The workers’ job descriptions indicate that from their

workstations in LTV’s Independence, Ohio facility, they managed

transportation of items to and from LTV’s production facility in Cleveland,

Ohio. Because there is no evidence that the petitioners transformed anything

into something “new and different,” they are not eligible for certification as

production workers.

Service Worker Analysis

On the issue of whether the petitioners should be certified as service

workers, the petitioners argued that they should be certified because: they

performed their job inside an LTV facility, they were supervised by LTV

employees, and they were employees of LTV prior to their employment with

PLS. (LTV’s employees at the Independence, Ohio facility did not produce

any articles. AR 16, SAR 37, SAR 48, SAR 50, SAR 68. They were

Court No. 02-00387 Page 5

certified as a third type of appropriate subdivision because they provided

services to LTV’s Cleveland, Ohio production facility. SAR 57.)

As stated earlier, when a worker group applies for assistance, the

fundamental test called for by Section 222 of the Trade Act is whether the

workers’ firm or appropriate subdivision of the workers’ firm produced an

import-impacted article during the relevant period. If there is no evidence

that the worker group applying for certification produced an import-impacted

article, it may only be certified if: (1) the workers[’] separations were caused

importantly by a reduced demand for their services from a parent firm, a firm

otherwise related to the subject firm by ownership, or a firm related by

control; (2) the reduction in the demand for their services originated at a

production facility whose workers independently met the statutory criteria for

certification; and (3) the reduction directly related to the product impacted by

the imoprts. Abbott v. Donovan, 6 CIT 92, 100-101, 570 F. Supp. 41, 49

(1983). This “elaborated” analysis is necessary to determine whether a

worker group has met the regulatory requirements of a type three appropriate

subdivision: that the worker groups’ facility is “auxiliary” and “operates in

conjunction with a production facility.” This analysis is customarily called

the “support service” analysis, but it is actually not much different than the

fundamental test that DOL applies to every certification.

The first requirement (“the workers’ separation were caused

importantly by a reduced demand for their services from a parent firm, a firm

otherwise related to the subject firm by ownership, or a firm related by

control”) focuses on the definition of “firm” as it is used in the fundamental

test. For multiple entities to be considered a single workers’ firm, such

entities must be “controlled or substantially beneficially owned by

substantially the same persons.” 29 CFR § 90.2. As discussed earlier, PLS

and LTV are not controlled or substantially beneficially owned by the same

persons. The regulations establish that DOL cannot certify the petitioners as

service workers because their firm is unaffiliated with a firm that produces

or produced an import-impacted article.

Conclusion

Whether the performance of services by the petitioners is related or

unrelated to production is not relevant to determining their eligibility for

certification. Under Section 222 of the Act, what is relevant is whether the

workers’ firm or appropriate subdivision of the workers’ firm produces an

article. The workers’ firm in this case is PLS. As acknowledged in the

Court’s Opinion, the relevant petitioners in this remand action “were

Court No. 02-00387 Page 6

employed by Pittsburgh Logistics Systems, Inc. (PLS) and worked on-site at

LTV’s facilities in Independence, Ohio.” Slip Op. [03-21 at] 2. PLS is a

subsidiary of Quadrivius. SAR 36. Neither PLS not [sic] Quadrivius are

affiliated with LTV. SAR 43. The evidence clearly establishes that PLS and

Quadrivius do not produce, directly or through an appropriate subdivision, an

import impacted article. “Once DOL concludes that the workers’ employer

was not a firm that produced an import-impacted article, it may conclude that

the workers are not eligible for assistance without further analysis.” Stanley

Smith v. U.S. Sec’y of Labor, 20 CIT 201, 204, 967 F. Supp. 512, 515 (1996).

SPDoc 11, SR 126-131.

The plaintiffs filed comments on the remand results on May 15, 2003. On May 29, 2003, the

government’s attorney moved sua sponte for a second remand and a month to complete it upon the

argument that in light of the plaintiff’s comments further remand is necessary in order to “fully

comply with the Court’s order to address the question ‘whether the petitioners were engaged in jobs

that were integrated into or integral to “production” of steel at LTV facilities and that were lost due

to import competition.’”2 The plaintiffs filed a response opposing a second remand and arguing that

Labor’s request is a “sixth bite at the apple”3 and inequitable because Labor never met with any of

the plaintiffs or their counsel prior to filing the remand results despite offers to do so. Counsel for

the plaintiffs interpret Labor’s motion as a delaying tactic which should not be condoned and they

argue that Labor should have responded to the plaintiffs comments in a pleading filed with the Court

rather than through this instant motion. Pl.s’ Resp. at 4. The plaintiffs therefore move for judgment

on the existing pleadings. Labor filed a reply to this response on or about June 24, 2003, which

2

Def.’s Mot. for Remand to Further Develop the Notice of Negative Determination of

Reconsideration on Remand at 1.

3

Pl.s’ Resp. Objecting to Def.’s Mot. for Remand to further Develop the Notice of Negative

Determination of Reconsideration on Remand (“Pl.s’ Resp.”) at 2.

Court No. 02-00387 Page 7

without leave to file was returned to Labor. On July 9, 2003, Labor filed a motion for leave to

submit the reply, which objects to the plaintiffs’ characterization of Labor’s motives and asserts that

the request for a second remand was

solely for purposes of complying with this Court’s decision and not for the

purpose of delaying the case, bolstering the negative determination in light

of plaintiffs’ comments, or wasting judicial resources. Due to the time

constraints resulting from inter-departmental deliberations, and the fact that

a remand motion does not require consultation with opposing counsel (see

Rule 7(b)), we did not consult with the plaintiffs prior to filing.

Plaintiffs’ opposition offers little but unconstructive sniping at our

genuine efforts to expedite this dispute by voluntarily seeking a second

remand to ensure that the administrative record and decision are complete

prior to judicial review.

First, contrary to plaintiffs’ accusations of purposeful delay, the

previous 30-day extension for filing the redetermination results was due to

the Department’s inability to obtain the service contract between plaintiffs

[sic4] and LTV Steel after requesting it informally. . . . As a result, the

Department required additional time to complete the administrative process

involved in obtaining and issuing a subpoena. Had the service contract

[between PLS and LTV] been readily accessible, a second extension would

not have been necessary. Nothing regarding this extension suggests that the

Department was inappropriately delaying this litigation.

Second, plaintiffs allege that “Labor refused to allow the Former

Employees to provide input prior to the filing of the remand determination.”

Plaintiffs’ Response at 7. Plaintiffs make this allegation but fail to give any

examples of the “input” or evidence that they proposed for submission and

that was allegedly refused by the Department. At no time did the Department

ever prevent, refuse, or obstruct their claims.

Finally, counsel for plaintiffs have continually asserted that they

offered to meet with Department officials to “address any outstanding factual

or legal questions” but were somehow rebuffed. Plaintiffs response at 4. The

Department declined these meetings because it already received a letter

4

The referenced agreement shows that it is between Pittsburgh Logistics Systems, Inc. and

LTV Steel Company, Inc. See SCDoc 10, SR 105.

Court No. 02-00387 Page 8

stating plaintiffs’ position and plaintiffs’ counsel represented that they would

not present additional evidence at the proposed meeting. See Supplemental

Administrative Record at 1-31 (plaintiffs’ letter). Moreover, meetings with

counsel are not mandated by law or regulation and are certainly not utilized

to reiterate evidence already presented. Therefore, nothing regarding the

decision declining to meet with plaintiffs’ counsel suggests bad faith on the

part of the Department.

Although plaintiffs may be dissatisfied with the pace of this litigation,

there is no evidence in the record to substantiate any contention that the

Department is somehow purposefully delaying and circumventing its duties.

Simply stated, the remand determination was somewhat deficient in certain

respects and we, in good faith, approached the Court asking for an

opportunity to correct it ourselves. For the foregoing reasons, we respectfully

request that the Court grant the [defendant’s motion] and permit the

Department [a month] to file its results. After filing the new determination,

we propose that the Court permit plaintiffs the opportunity to comment and

the defendant the opportunity to respond.

Def.’s Mot. for Leave to File Reply to Plaintiffs’ Resp. Dated June 13, 2003, Ex. “A”, at 2-4.

The plaintiffs response to the foregoing, filed on July 17, 2003, implies that Labor’s reply

does not address their fundamental point, which is that Labor’s

actions have unjustifiably delayed this proceeding, and Labor’s motion would

require the additional, unexpected, and unnecessary expenditure of resources.

The Former Employees have been wrongly denied benefits to which they are

entitled for over eighteen months, and Labor has not demonstrated a

willingness to fully investigate the facts underlying the Former Employees’

entitlement to trade adjustment assistance. See the Plaintiffs’ Response dated

June 13, 2003.

Even if Labor did not purposefully engage in dilatory tactics, its

actions have effectively caused unwarranted delay. For example, Labor

requested that it be allowed to file its new determination by June 30, 2003.

Tellingly, Labor has not indicated that a new determination yet has been

prepared. If the court were to grant Labor a sixth bite at the apple, it is likely

to be at least several weeks before the Former Employees could review any

redetermination for comment (a process already undertaken by the Former

Employees with regard to the initial remand determination in accordance with

the Court’s remand order).

Court No. 02-00387 Page 9

Labor has had more than enough time to determine whether the

Former Employees are eligible for trade adjustment assistance. The Court

should not give Labor yet another opportunity to delay this matter only to

“rewrite” (not reevaluate) its remand determination in order to address the

Former Employees comments regarding the same. The Former Employees

respectfully request that the Court rule on Labor’s May 5, 2003 remand

determination without further delay.

Pl.s’ Resp. Objecting to Def.’s Mot. for Leave to File Reply to Plaintiffs’ Resp. Dated June 13, 2003.

For the reasons following, the Court grants the defendant’s motion for leave to file a reply,

but denies the defendant’s motion for a second remand. The Court concludes that further remand

would be futile and orders Labor to certify the plaintiffs for trade adjustment assistance benefits on

the basis of the administrative record.

Discussion

Judicial review of this denial of TAA eligibility continues to be pursuant to the substantial

evidence standard of 19 U.S.C. § 2395(b).

I.

In SKF USA Inc. v. United States, 254 F.3d 1022 (Fed. Cir. 2001), the Court of Appeals for

the Federal Circuit (“CAFC”) observed that although “there may be remand situations that do not

fall neatly into this taxonomy” an agency generally has five available options, not all of them

meritorious, when one of its administrative determinations is being reviewed on appeal. The agency

may: (1) choose to defend the determination on grounds articulated in the determination, (2) seek

to defend the determination on grounds not previously articulated by it, (3) request remand of the

determination for reconsideration due to intervening events outside its control, (4) or in the absence

of intervening events request remand “without confessing error” in order to reconsider the position

Court No. 02-00387 Page 10

taken in the determination, or (5) request remand “because it believes that its original decision was

incorrect on the merits and it wishes to change the result.” 254 F.3d at 1028.

Here, the relief sought pertains to further legal argument only, not intervening events or

development of additional factual material for the record. Labor’s reasons for its motion do not fall

“neatly into this taxonomy,” and while Labor’s actual motives for remand may, as the government

asserts, differ from their portrayal by the plaintiffs, the Court expects that its practitioners will

continue to uphold the highest standards of the bar, which includes extending dignity and

professional courtesies to one another as officers of the Court. Whether “a remand motion does not

require consultation with opposing counsel” is beside the point and overlooks the Order of February

28, 2003. The Order allowed “such further matter as the plaintiffs may submit to [Labor] for

consideration and in compliance with such deadlines as [Labor] may establish to effect the purposes

of the Opinion and Order.” That includes the ability to offer constructive comment, which the

agency was obligated by the spirit of the Order to consider, on all legal and factual issues prior to

issuing a redetermination.

The government’s motion states that remand is only for the limited purpose of rewriting the

negative remand determination. Therefore, assuming that grant of the motion would result in a

determination that “rewrote” (i.e., more fully addressed) why the petitioners were not engaged in

jobs that were integrated into or integral to ‘production’ of steel at LTV facilities and that were lost

due to import competition, the outcome of such a determination is no less a foregone conclusion.

Unstated is the point that Labor has conducted analysis of the facts to its satisfaction. And, as

always, it is the factual record which is controlling. In this instance, the administrative record is

Court No. 02-00387 Page 11

adequate for a determination, and additional remand to Labor for the purpose of further reasoning

on the precise question is unnecessary and would not promote the interest of efficient and speedy

justice. The motion for leave to file a reply to the plaintiff’s opposition to the government’s motion

for remand is helpful explanation and is therefore granted, but the motion for remand is denied.

Labor has not sought to submit a response to the plaintiffs comments, even out of time.

Judgment will therefore be rendered on the pleadings.

II.

19 U.S.C. § 2272(a) requires:

(1) that a significant number or proportion of the workers in such workers’

firm or an appropriate subdivision of the firm have become totally or partially

separated,

(2) that sales or production, or both, of such firm or subdivision have

decreased absolutely, and

(3) that increases of imports of articles like or directly competitive with

articles produced by such workers’ firm or an appropriate subdivision thereof

contributed importantly to such total or partial separation, or threat thereof,

and to such decline in sales or production.

Ordering certification of eligibility for trade adjustment assistance is a remedy of last resort.

It is appropriate when, after one or more remands, it is clear that Labor continues to adhere to a

discredited position that is at odds with the developed facts of record. See, e.g., Former Employees

of Barry Callebaut v. Herman, 26 CIT ___, 240 F.Supp.2d 1214 (2002). The Court finds Labor’s

consideration of the facts developed and its treatment of the issues on remand not in accordance with

the law of the case, not in accordance with the substantial evidence on the record, and results-

oriented.

Court No. 02-00387 Page 12

As prelude to its production worker analysis, Labor proceeds from the proposition that

“[b]ecause an ‘appropriate subdivision’ is limited to the ‘workers’ firm’ and Section 90.2 of the

regulations permits the inclusion of multiple entities with the term ‘firm’ only if they are affiliated

entities, on remand Labor conducted additional investigation of the relationship between PLS and

LTV.” As observed in Slip Op. 03-21, whether a defined unit is an “appropriate subdivision”

depends upon its relationship to production, and the line of production cannot always be pigeonholed

into a single “firm.” The product line of the import-impacted article controls the analysis. If a

division of company A is devoted exclusively to contributing subcomponent A for import-impacted

article X, and a division of company B is devoted exclusively to contributing subcomponent B for

article X, and the ultimate import-impacted article X is further-manufactured, assembled, and

branded as the product of company C, and if as a result of importations of article X companies A and

B are forced to close their A and B divisions and lay off the workers of those divisions, the fact that

such subdivisions are unrelated to each other or to company C is irrelevant to a decision on

entitlement to trade adjustment assistance benefits. Such a hypothetical is not unusual in the world

of business these days, and nowhere in the statute does it state that “production” of the import-

impacted article must be “contained” within a single “firm.”

Labor’s production worker analysis is inadequate and inconsistent with its own interpretation

of its regulations as applied in other determinations. The relevant statutory requirement is “that

increases of imports of articles like or directly competitive with articles produced by such workers’

firm or an appropriate subdivision thereof contributed importantly to such total or partial separation.”

19 U.S.C. § 2272(a)(3). Labor has interpreted this provision in such as way as to include

Court No. 02-00387 Page 13

“appropriate subdivisions” which contribute to the production of “articles like or directly competitive

with” import-impacting “articles,” and Slip Op. 03-21 specifically referred Labor to its affirmative

determinations in Stein Steel Mill Services (the employees of which were working at an LTV facility

in Cleveland) and Computer Sciences.5 As pointed out in Slip Op. 03-21, the import-impacted

article “produced” by Stein Steel Mill Services, under contract with LTV, was the processing of slag

and steel scrap for LTV. Award of benefits to the former Stein Steel Mill Services employees hinged

on the loss of production at LTV, because Labor made no determination that slag or steel scrap was

an import-impacted article. The Computer Sciences employees working were outsourced former

DuPont employees who continued to perform the same job functions at three DuPont facilities after

being outsourced. Of particular note, they were certified despite the fact that there was “no corporate

affiliation between Computer Sciences Corporation and DuPont.” SR 80 & 83. In fact, Labor’s

determination expressly hinged on the fact that “the Computer Science Corporation contract workers

were engaged in employment related to the production of polyester fiber at Dupont plants under an

existing TAA certification.” S.R. 80 (highlighting added). As stated in Pemberton v. Marshall, 639

F.2d 798 (D.C. Cir. 1981), “[t]he only relevant concern in determining whether a facility is part of

5

See TA-W-40,910 (Apr. 29, 2002), Notice of Determinations Regarding Eligibility To

Apply for Worker Adjustment Assistance and NAFTA Transitional Adjustment Assistance, 67 Fed.

Reg. 35142 (May 17, 2002) (Stein Steel Mill Services, Inc Employed at LTV Steel, Inc. Cleveland

Ohio), and TA-W-39,535, A & B (Feb. 19, 2002); Computer Sciences Corp., at Dupont Corp.,

Cooper River Plant, Charleston SC; Computer Sciences Corp., at Dupont Corp., Cape Fear Plant,

Wilmington NC; Computer Sciences Corp., at Dupont Corp., Kinston Plant, Kinston NC.; Notice

of Revised Determination on Reconsideration, 67 Fed. Reg. 10767 (Mar. 8, 2002). See also TA-W-

39743, A, B, C & D (Jan. 3, 2002) (DuPont plant certifications). Stein Steel Mill Services and

Computer Sciences have been made part of the administrative record of this matter. SCDoc 6, SR

69; SCDoc 7, SR 78.

Court No. 02-00387 Page 14

the appropriate subdivision is whether it also produces the articles in question.” 639 F.2d at 801

(thus equating “appropriate subdivision” with the production line).

In this instance, as the government’s motion for a second remand essentially admits, Labor’s

production worker analysis again places undue emphasis on the fact that LTV was, and PLS is,

independent of the other. Labor has failed to consider and address the relationship of the PLS

subdivision at LTV’s Independence, Ohio facilities to production of the import-impacted articles,

in disregard of the Order of February 28, 2003. Labor’s assertion on remand that “[w]hether the

performance of services by the petitioners is related or unrelated to production is not relevant to

determining their eligibility for certification” is not only disingenuous in light of its own prior

affirmative determinations, it also defies common sense.

Furthermore, Labor overemphasizes the fact that PLS hires and uses its own employees to

provide services under the service agreement between PLS and LTV that Labor obtained from PLS

on remand. Labor recites only these portions of the agreement as the relevant facts supporting a

negative determination: “PLS shall hire and use its own employees to provide the services described

in this contract” and “PLS is supplying its own employees, which is [sic] controls and directs for

employment purposes[.]” The Court finds Labor’s analysis of the LTV-PLS agreement

unreasonable. The referenced portions of the agreement and the fact that PLS is (was) the payor of

the plaintiffs’ checks must be interpreted in light of the fact that the contract is part of an outsourcing

arrangement whereby the payroll and benefits of the plaintiffs were to be processed by PLS. They

are mere statements of the obvious implications of such an arrangement. Labor has ignored or

overlooked the first recital of the agreement that “PLS shall utilize sufficient personnel to operate

Court No. 02-00387 Page 15

the Traffic Support System of LTV and its affiliates[.]” More egregiously, Labor takes the statement

that “PLS is supplying its own employees, which is [sic] controls and directs for employment

purposes” out of context. The full portion of the relevant text reads as follows:

It is specifically understood and acknowledged, that although PLS is

supplying its own employees, which is [sic] controls and directs for

employment purposes, PLS shall act at all times as the Agent of LTV in

providing all services under this contract . . . .

SCDoc 10, SR 108 (emphasis added).

It is elementary that the principal’s right of control over its agent is what defines a principal-

agent relationship, and as already determined by the Court, it is the relationship between LTV and

the PLS subdivision that matters for purposes of determining this TAA petition.6 Previously, in the

context of the “service worker” test, Labor had argued that it interpreted “control” only to mean

ownership and corporate voting control. The Court found such argument at odds with other

6

It is also worth noting that while PLS “controls and directs” its workers for employment

purposes, the TAA statute uses no such term, nor such terms as “employer” or “employee.” Workers

are the backbone of any firm, and Congress specifically chose the words workers’ firm, thereby

elevating the worker to a more deserving level and intentionally focusing the inquiry where it

belongs: upon the affected workers. Such terms were deliberately chosen to provide flexibility in

interpretation, as circumstances require. In that regard, it is perhaps further worth noting that

Woodrum v. Donovan, 5 CIT 191, 564 F. Supp. 826 (1993) stated that the “predicate” for certifying

a petition “is a finding that petitioning workers were employed by a ‘firm’ which produced, or had

an ‘appropriate subdivision’ which produced, the import-impacted article.” 5 CIT at 199, 564

F.Supp. at 833 (highlighting added). As used in Woodrum, the term “employment” was intended

to connote the workers’ services to their firm, not their “legal” relationship to it. See 19 U.S.C. §

2272(a). Likewise, in the portion of Stanley Smith quoted by Labor supra, it might have been more

accurate to use the statutory term “workers’ firm” rather than “workers’ employer” in the opinion,

since the connotations are different, but whatever Labor’s intent behind the quoted portion of Stanley

Smith in the remand results, this Court already made it clear that it restricts that case to its specific

facts. As pointed out in Slip Op. 03-21, the Stanley Smith court expressly stated that it did not have

before it an allegation of control , unlike the matter at bar. See Stanley Smith, supra, 20 CIT at 205,

967 F.Supp. at 515, n.10.

Court No. 02-00387 Page 16

affirmative TAA benefits decisions and unduly restrictive in light of the remedial purpose of the

statute. The Court made clear that Labor was to determine who “exercised actual control” over and

who “managed and directed” the plaintiffs for purposes of determining “control,” which is a separate

consideration from “ownership.” Once again, Labor’s analysis, contrary to Slip Op. 03-21, has

entirely ignored consideration of the implications of the principal-agent relationship between LTV

and PLS and also the appropriate unit of consideration, the PLS subdivision. Such reasoning has a

tendency to make Labor’s negative determination appear predetermined. In the final analysis of

whether the PLS subdivision employees qualified for TAA benefits as production workers, Labor

asserts that it

thoroughly investigated and could not find any evidence that any employees

of PLS or Quadrivius actually produced any articles. AR 4, AR 11, AR 13,

SAR 39. The workers’ job descriptions indicate that from their workstations

in LTV’s Independence, Ohio facility, they managed transportation of items

to and from LTV’s production facility in Cleveland, Ohio. Because there is

no evidence that the petitioners transformed anything into something “new

and different,” they are not eligible for certification as production workers.

SPDoc 11, SR 129. The Court finds that Labor has not “thoroughly” investigated. Labor never

answers the question posed to it of “whether the petitioners were engaged in jobs that were integrated

into or integral to ‘production’ of steel at LTV facilities and that were lost due to import

competition.” Slip Op. 03-21 at 25; see id. at 12 & 21. In contravention of the Opinion, Labor

continues to focus upon the corporate separateness between PLS and LTV. In doing so, it ignores

or overlooks Stein Steel Mill Services, Computer Sciences, and the implications of the fact that when

Court No. 02-00387 Page 17

it certified LTV’s Technology Center in Independence,7 it also determined that those workers were

part of an “integrated production process of producing steel at LTV.” SCDoc 51.

If Labor’s analytical argument implies that its practice is to analyze discrete worker groups

along the affected production line for eligibility, the certification of workers at affected facilities as

a whole, such as those at the LTV Independence Technology Center, belies that assumption.

Furthermore, Labor’s assertion that LTV’s Independence, Ohio facilities were actually certified as

a type three “auxiliary facility” under its service worker analysis is also contradicted by the record,

which states that LTV’s Independence, Ohio facilities were engaged in work related to the

production of steel and that production at the facility decreased during the time of the investigation.

See SCDoc 5, SR 48 (“The [LTV workers in Independence] were engaged in development work

related to the production of hot and cold rolled sheet steel.”). Labor certified the LTV facility in

Independence as a whole as an appropriate subdivision, and thereby all of the LTV employees at the

facility became eligible for TAA benefits, including administrative, clerical, and maintenance

workers. Labor fails to explain the distinction of why these LTV employees were “engaged” in work

“related to the production of hot and cold-rolled flat steel,” cf. CDoc 51 (the workers at the

Independence Technology Center “were part of an integrated process of producing steel at LTV”),

yet the plaintiffs, who were more directly related to the production of steel because they controlled

the transportation of key raw materials and finished products, are to be separately situated. The only

distinction is that they were “employed” by a different entity, which distinction is meaningless

because the record demonstrates that the work of the facility, to which the plaintiffs were staffed and

7

See TA-W-40,724 (Mar. 21, 2002), SCDoc 5, SR 49

Court No. 02-00387 Page 18

tasked, qualified as “production,” and, as discussed more fully below, the work of the plaintiffs was

controlled by the owner of the facility.

Labor does not dispute the plaintiffs’ assertion that if LTV was (or rather had continued to

be) the direct payor of the plaintiffs’ paychecks, the plaintiffs would have been certified along with

the rest of the LTV Independence workers. Likewise, Labor does not address the assertion that LTV

in fact advised PLS on salary matters regarding the employees of the PLS subdivision in Ohio. It is

undisputed that the plaintiffs’ jobs were permanent. It was appropriate for Labor to consider such

matters, including its analysis of the workers of the PLS subdivision at the Independence Technology

Center, and explain the reasons for the different outcome on the plaintiffs’ petition. See, e.g., Sec’y

of Agriculture of U.S. v. United States, 347 U.S. 645, 653 (1954). The Court therefore concludes

that Labor has conducted an inadequate investigation and analysis of the plaintiffs as “production”

workers.

Similarly, the Court finds Labor’s service worker inadequate. The service worker analysis

examines whether (1) the workers’ separations were caused importantly by a reduced demand for

their services from a parent firm, a firm otherwise related to the subject firm by ownership, or a firm

related by control; (2) the reduction in the demand for their services originated at a production

facility whose workers independently met the statutory criteria for certification; and (3) the reduction

directly related to the product impacted by the imports. See Abbott v. Donovan, 6 CIT 92, 100-101,

570 F. Supp. 41, 49 (1983). Labor denied certification under this analysis because “PLS and LTV

are not controlled or substantially beneficially owned by substantially the same persons.” SPDoc

111, SR 130. This analysis was in contravention of Slip Op. 03-21.

Court No. 02-00387 Page 19

Ironically, Labor calls attention to the observation in Lloyd that “‘operated in conjunction

with’ implies that the auxiliary facility must be run by the same firm as the production facility or

facilities[,]”8 but it completely misses the obvious: that the evidence of record shows that the PLS

subdivision was operationally “run by the same firm as the production facility” (LTV) in this case,

as discussed more fully below. As mentioned in Slip Op. 03-21, whether considered as a

“production” or a “service” worker, all workers perform services on behalf of their “firm,” and the

fact that a firm’s output (or contribution to production) is subject to another’s control over the final

or further-finished product is a relevant consideration in the determination of eligibility, as Labor

recognizes. Cf. Communications Workers of America, AFL-CIO v. U.S. Sec’y of Labor, 19 C.I.T.

687 (1995) (negative determination relying upon finding that workers produced intermediate

pharmaceuticals, a different product from that for which they had been previously certified, which

intermediate products were integrated into upstream production of steroids at facility not under

8

Labor quotes from Lloyd to bolster its implied position that production must be “embodied”

within a single firm by elsewhere asserting that “the CIT [sic] stated that the word ‘auxiliary’ implies

that a facility will only be deemed an appropriate subdivision if it is a subsidiary part of a firm that

is producing an article.” SPDoc 11, SR 127 (quoting Lloyd, supra, 637 F.2d at 1275). The context

of the court’s observation was in connection with the position taken by the Secretary of Labor with

respect to delineation of the appropriate subdivision. Labor neglects to point out to the Court that

the Ninth Circuit as well as the D.C. Circuit in International Union, United Auto Workers etc. v.

Marshall, 584 F.2d 390, 394 & n. 15 & 395 (D.C. Cir. 1978) rejected the Secretary’s interpretation

“that an appropriate subdivision can never be larger than a plant” as too restrictive. See 637 F.2d

at 1275 (“[t]he mechanical adoption of the plant as the appropriate subdivision without reasoned

analysis is improper. The circumstances of each case must be examined to determine the

appropriate subdivision [to] that case”) (emphasis added). While cases such as Lloyd and

Pemberton preceded the Supreme Court’s guidance on deference to agency interpretations of law,

see United States v. Mead, 533 U.S. 218 (2001); Chevron U.S.A. Inc. v. Natural Resources Defense

Council, Inc., 467 U.S. 837, 844, (1984); Skidmore v. Swift & Co., 323 U.S. 134, 140 (1944), they

are no less the law of the land, and the Supreme Court’s decisions did not free up administrative

agencies to revisit established judicial decisions on regulatory interpretation that an affected agency

happens to continue to disagree with.

Court No. 02-00387 Page 20

certification). Labor has only considered the issue of control in the context of the service worker

analysis, the authority for which, as mentioned, is the TAA statute, which requires that jobs lost must

have been dependant upon production. However, under either a “production” or “service” worker

analysis, an interpretation that restricts “control” only to corporate control or ownership conflicts

with the statutory purpose of relieving affected firms, whether related or not, along the line of

production of an import-impacted article. See, e.g., TA-W-40,910 (Apr. 29, 2002), supra; TA-W-

39743, A, B, C & D (Jan. 3, 2002), supra.

An agency's permissible interpretation of its own regulations may be deserving of substantial

deference so long as it is reasonable and does not conflict with law and legislative purpose. See, e.g.,

Mullins Coal Co. v. Director, OWCP, 484 U.S. 135, 159, 108 S.Ct. 427, 440 (1987); Former

Employees of Bass Enterprises Production Co. v. United States, 12 CIT 470, 473, 688 F.Supp. 625,

628 (1988). Labor asserts that “[t]he third type of ‘appropriate subdivision’ encompasses ‘auxiliary

facilities operated in conjunction with (whether or not physically separate from) production

facilities.’ This broadens the term “appropriate subdivision” to include a facility that does not

produce an article.” SPDoc 11, SR 127. Since the argument concedes that the analysis “broadens

the term ‘appropriate subdivision’ to include a facility that does not produce an article[,]” it cannot

be said that “service” workers are “engaged in production or transformation of a thing into something

new and different.” If Labor considers an “appropriate subdivision” certifiable under its “service

worker” analysis despite the fact that such subdivision is not engaged in the production of something

“new and different,” then (as mentioned in Slip Op. 03-21) Labor’s service worker analysis is an

Court No. 02-00387 Page 21

ultra vires interpretation of its mandate. Hence, certification of the workers at such a subdivision

would be lawful only by virtue of their relationship to production.

While Labor’s “expansive” interpretation of the TAA statute to incorporate the so-called

service-worker analysis is laudable, the Court holds that Labor’s interpretation of the word “control”

in that analysis is not “sufficiently reasonable” since it conflicts with the remedial purpose of the

statute and economic reality. Cf. American Lamb, 785 F.2d 994, 1001 (1986) (“Though a court may

reject an agency interpretation that contravenes clearly discernible legislative intent, its role when

that intent is not contravened is to determine whether the agency's interpretation is ‘sufficiently

reasonable.’”). Interpreting “control” in the manner suggested would tend to include a “class” of

workers the TAA statute was not intended to cover, and exclude a “class” of workers that it was

intended to cover. The Court determines that it need not remand to Labor for further elaboration of

why the plaintiffs are not entitled to benefits on the basis of a “production” analysis, because it is

clear that substantial evidence does not support denial of certification under either a production or

service worker analysis.

III

Substantial evidence supports a determination that the plaintiffs either produced an article

within the meaning of Section 222 of the Trade Act or they are eligible for trade adjustment

assistance benefits under application of Labor’s “service worker” analysis. Only the third prong of

19 U.S.C. § 2272(a) is at issue, which requires certification when “increases of imports of articles

like or directly competitive with articles produced by such workers’ firm or an appropriate

subdivision thereof contributed importantly to such total or partial separation, or threat thereof, and

Court No. 02-00387 Page 22

to such decline in sales or production.” The plaintiffs argued, and previously the Court accepted,

that the key to TAA eligibility was the relationship of their subdivision to production at LTV, not

the relationship of LTV to PLS. Remand was appropriate for adequate reconsideration of the issue.

A.

In support of the redetermination that the plaintiffs did not produce an article within the

meaning of the TAA statute, the page from the supplemental record that Labor cites to support its

“thorough investigation” actually9 reads:

Specifically, the PLS subdivision on location in Ohio at LTV worked closely

with LTV production personnel to produce raw materials needed for the

different types and grades of steel produced by LTV. LTV would not have

been able to produce steel without the tasks performed by the PLS

employees. Thus, the work performed by the employees in the PLS

subdivision on location at LTV was integral to the production of steel.

Letter of March 25, 2003, SCDoc 3, SR 39. This letter, from a PLS representative, essentially

reiterates in further detail what had previously been represented to Labor early on in record

developed from the petition10 (see Slip Op. 03-21). Other statements in the supplemental

administrative record buttress the plaintiffs’ position that they “produced” an article since they were

an integral part of the LTV steel production line:

* The former employees who worked in the PLS subdivision on location in

Ohio were laid off when LTV ceased steel production. Their jobs were

9

Labor’s out-of-context quotations in this matter concern the Court, and fall far short of the

standards the Court expects of those charged with fact finding, coming so soon, as they do, after

Precision Specialty Metals, Inc. v. United States, aff’d 315 F.3d 1346 (2003). The Court reserves

jurisdiction for consideration of any further proceedings that may be appropriate.

10

The initial administrative record, which Labor also cites, reads: “Our employees were

engaged in employment related to the production of a product. The product was steel, specifically

carbon flat-rolled steel.” CDoc 13.

Court No. 02-00387 Page 23

dedicated to performing the operational tasks directed by LTV, and as such

their employment was wholly dependent on steel production by LTV.

* Thus, employment at this subdivision was dependent on LTV’s production

of steel.

* [T]he work performed by the PLS subdivision on location at Independence,

Ohio was integral to the production of steel.

Letter of March 20, 2003, SPDoc 3, SR 36-37, 39-40.

These statements are unrebutted by other evidence. Also unrebutted are the assertions that

LTV controlled and directed the operations of the PLS subdivision and its employees on location in

Ohio, see Weinzetl Decl., ¶¶ 7, 9, SPDoc 1, SR 13; Dunn Decl. ¶¶ 4-8, SPDoc 1, SR 17; Letter of

March 20, 2003, SPDoc 3, SR 35, that the PLS subdivision was integrated into the LTV corporate

structure with PLS employees reporting “directly to LTV on all operational matters,” Dunn Decl. ¶

6, SPDoc 1, SR 17, and that LTV directed which employees could work at specific locations,

evaluated the job performance of the PLS employees, and advised PLS which PLS employees should

receive merit salary increases, see id. ¶ 5, and that the PLS subdivision reported to LTV with respect

to all assigned logistical tasks, see id. ¶ 6. Labor’s analyses does not address the plaintiffs’

assertions, and therefore Labor’s investigation cannot be said to have been conducted with the

utmost regard for affected workers. Since there appear no contrary indicia in the record, the Court

finds these statements to constitute substantial evidence in support of an affirmative determination.

Similarly, Labor fails to address the record evidence that transportation management and

logistic functions are a “key business process” in the production of steel, even when performed by

outsourced employees who work with “commercial and operations groups.” See Pl.s’ Letter of

March 17, 2003, SPDoc 1, SR 7-8 (offering for Labor’s consideration S. Robertson, Wheeling-Pitt

Court No. 02-00387 Page 24

Outsourcing Cuts Logistics Costs, 110 Am. Metal Mkt. 4 (Oct. 4, 2002)). Cf. Slip Op. 03-21 at 21

& Order of February 28, 2003 (permitting supplementation of administrative record with such

matter). The Court accepts that industry participants recognize that transportation management and

logistics are an essential or “key” aspect of the steel production process. Since all LTV employees

at the facilities in Cleveland and Independence already received TAA eligibility certification, see 66

Fed. Reg. 18117 (Apr. 5, 2001); 67 Fed. Reg. 15224 (Mar. 29, 2003); see also Investigative Report,

CR 16, and since the record demonstrates that the same facility in which the plaintiffs worked

“embodied” work qualifying as production, there appears to be no reason why the plaintiffs should

not have been similarly certified, particularly since their work may be said to have been more

“directly related” to production than that of administrative, clerical, security, and other such

“tangential” jobs at the LTV Technology Center.

B.

After restating the three-prong legal standard for the service worker test, Labor summarily

concludes that the first prong (“the workers’ separation were [sic] caused importantly by a reduced

demand for their services from a parent firm, a firm otherwise related to the subject firm by

ownership, or a firm related by control”) was not satisfied in this instance because PLS and LTV

were “not controlled or substantially or beneficially owned by the same persons.” SPDoc 11, SR 130:

The investigation indicates that substantially the same persons do not control

PLS and LTV. Supplemental Administrative Record (SAR) 43. No

corporate official of one company is a board member or officer of the other

(or of Quadrivius). SAR 42. Substantially the same persons do not own PLS

and LTV. LTV was a publicly owned company. SAR 39. After LTV’s

bankruptcy, PLS continued business. AR 25. The contract between LTV and

PLS indicates that they are separate corporations. SAR 108.

Id., SR 128.

Court No. 02-00387 Page 25

Although Labor addresses the issue of control only in the context of the service worker

analysis, it should be apparent from the foregoing that the issue of “control” also has important

ramifications for the proper delineation of impacted-article production line. In the Court’s earlier

decision, after review of the evidence of record, it was clear that “[t]he only evidence of record

indicates that [the plaintiffs] were engaged in work for LTV.” Slip Op. 03-21 at 19. After

supplementation of the administrative record with the declarations of Messrs. Dunn and Weinzetl

and information obtained from PLS headquarters in Rochester, there was only greater evidence that

the plaintiffs worked for (i.e., were controlled by) LTV. And as discussed above, none of this

evidence is addressed or disputed by Labor.

LTV clearly exercised the requisite control over the PLS subdivision on site in Ohio to satisfy

the service worker test. The agreement between LTV and PLS clearly indicates a principle-agent

relationship between PLS and LTV (and, obviously by extension, between LTV and the affected PLS

subdivision), including liability for the actions of PLS employees The agreement further obligated

PLS to “expand its resources and hire personnel as may be necessary to give full attention to the

services required by this Agreement.” Except for the fact that the plaintiffs worked at the

Independence Technology Center, there appears to be little distinction from the long term contract

involved between Stein Steel Mill Services, Inc and LTV Steel (at its Cleveland facility) in TA-W-

40,910 (Apr. 29, 2002).

It is further undisputed that LTV actually managed all job tasks, directed which employees

could work at specific locations, relocated the PLS subdivision between LTV facilities in Cleveland

and Independence, evaluated the plaintiffs’ job performances, and advised which PLS employees

Court No. 02-00387 Page 26

were to receive merit salary increases. See Dunn Decl. at ¶¶ 5-6, SPDoc 1, SR 17; Letter of March

20, 2003, SPDoc 3, SR 36-37; Letter of March 25, 2003, SPDoc 4, SR 39-40. The “operational

responsibilities of the employees in the PLS subdivision that worked on location in Ohio at LTV

were established and controlled by LTV.” Letter of March 20, 2003, SPDoc 1, SR 35-36. As a PLS

subdivision, the plaintiffs were integrated into the LTV corporate structure. See Weinzetl Decl. at

¶¶ 7, 9, SPDoc 1, SR 13; Dunn Decl. at ¶¶ 4-8, SPDoc 1, SR 16-17. Moreover, the employees

within the PLS subdivision were responsible to LTV for all assigned logistical tasks. See Dunn Decl.

at ¶ 7, SPDoc 1, SR 17. Mr. Dunn, the CFO of PLS and the executive responsible for the LTV

account, asserted to Labor that “the PLS employees working in [the PLS subdivision at the LTV

facilities in Ohio] reported directly to LTV employees on all operational matters.” See Dunn Decl.

at ¶ 6, SPDoc 1, SR 17 (citing flow chart demonstrating the reporting structure of the PLS

subdivision, attached as Exhibit 1 to the Dunn Declaration; see SR 19).

The plaintiffs argue that reversal is appropriate because Labor has once again failed to point

to substantial evidence on the record showing that the plaintiffs did not produce an article and that

they were not controlled by LTV. The Court agrees. Labor has now had five bites at the apple: (1)

initial denial of eligibility, (2) denial of reconsideration for eligibility, (3) contest of the plaintiffs’

claim when filed with this Court, (4) refusal to seek voluntary remand after consultations with pro

bono counsel prior to briefing, and (5) reconsideration of the matter on remand. Labor now seeks

a sixth bite, and it is apparent that there is little apple left. The Court therefore relieves Labor of the

core, reverses Labor’s negative eligibility determination and awards judgment to the plaintiffs

ordering Labor to certify the plaintiffs as eligible for trade adjustment assistance benefits. See 19

Court No. 02-00387 Page 27

U.S.C. § 2395(c) (“[The] Court of International Trade shall have jurisdiction to affirm the action of

the Secretary of Labor . . . or to set such action aside, in whole or in part.”); United Elec. Radio and

Mach. Workers fo America v. Martin, 15 CIT 299, 309 (1991) (Labor ordered to certify plaintiffs).

Cf. Former Employees of Hawkins Oil And Gas, Inc. v. United States Sec’y of Labor, 17 CIT 126,

130, 814 F. Supp. 1111, 1115 (1993) (court-ordered certification of plaintiffs).

Conclusion

For the foregoing reasons, Labor’s negative eligibility determination is reversed, and

judgment is awarded to the plaintiffs. Labor shall certify the plaintiffs as eligible for trade

adjustment assistance benefits forthwith.

________________________________________

R. KENTON MUSGRAVE, JUDGE

Dated: August 28, 2003

New York, New York

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.