holding that a contractor which submitted false statements related to a note sale had a duty to discover potential errors before submitting to the government
How later courts described this case
- holding that a contractor which submitted false statements related to a note sale had a duty to discover potential errors before submitting to the government
- terming “inferences from inferences” to be “nothing more than conjectures”
- holding that a company that submitted Medicaid claims could be liable because its owner was either aware of the fraud or acted with “reckless disregard
Written by the judges who cited it.
The opinion
UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA
ANDREW SCOLLICK,
ex rel. UNITED STATES OF AMERICA,
Plaintiff-Relator,
Case No. 1:14-cv-01339-RCL
Vv. RE ~
aa
VIJAY NARULA, et al., u a los
Defendants. "faye C. Foatete,
a Se @, f-
MEMORANDUM OPINION
Plaintiff-relator Andrew Scollick brought this case under the False Claims Act (“FCA”),
alleging an elaborate plot by thirteen defendants to defraud the federal government by posing as
service-disabled veteran-owned small businesses (“SDVOSB”) to obtain set-aside contracts.’
Second Am. Compl., ECF No. 298. Before this Court are twelve motions for summary judgment.
Plaintiff-relator moves for partial summary judgment? against Centurion Solutions Group, LLC
(“CSG”) and Amar Gogia, ECF No. 329; against Optimal Solutions and Technologies, Inc.
(“OST”), Vijay Narula, and Ajay Madan, ECF No. 330; against Hanover Insurance Company
(“Hanover”), Hudson Insurance Company (“Hudson”), Centennial ‘Surety Associates, Inc.
(“Centennial”), and Michael Schendel, ECF No. 331; and against Neil Parekh, ECF No. 332. OST,
Narula, and Madan in response move for summary judgment against the plaintiff-relator. ECF No.
337. CSG and Gogia similarly move for summary judgment against the plaintiff-relator, ECF No.
1! While plaintiff-relator’s second amended complaint originally included fifteen defendants, all claims against
defendant Nitin Mehta have been dismissed, ECF No. 340, and defendant Melvin Goodweather has settled claims
against him, ECF No. 304.
2 Plaintiff-relator did not move for summary judgment on the conspiracy claim; the amount of civil penalties owed;
the statutory fees and costs awardable under FCA; the false claims count against Hudson, Hanover, Centennial, and
Schendel; and a few specific false claims allegations (those related to OST and KGCI, Inc. and the HUBZone
contracts). See ECF No. 329-1 at 3 n.2; ECF No. 330-1 at 3 n.2; ECF No. 331-1 at 40.2; ECF No. 332-1 at 4n.2.
I
338, as do Parekh, ECF No. 341, and Mehta, ECF No. 342. The three insurance companies also
move for summary judgment against the plaintiff-relator. See ECF Nos. 334 (Hanover’s motion
for summary judgment), 335 (Hudson’s motion for summary judgment), & 328 (Centennial and
Schendel’s motion for summary judgment). Finally, Hudson moves for partial summary judgment
on its crossclaims for indemnification against crossclaim defendants CSG, Citibuilders, LLC
(“Citibuilders”), CB Construction Group, Inc. (“CB”), Gogia, and Parekh. ECF No. 336.
For the reasons explained below, the Court will DENY plaintiff-relator’s motions for
summary judgment, ECF Nos. 329, 330, 331, & 332; DENY OST, Narula, and Madan’s motion
for summary judgment against plaintiff-relator, ECF No. 337; DENY CSG and Gogia’s motion
for summary judgment against plaintiff-relator, ECF No. 338; DENY Parekh’s motion for
summary judgment against plaintiff-relator, ECF No. 341; GRANT Centennial and Schendel’s
motion for summary judgment against plaintiff-relator, ECF No. 328; GRANT Hanover’s motion
for summary judgment against plaintiff-relator, ECF No. 334; GRANT Hudson’s motion for
summary judgment against plaintiff-relator, ECF No. 335; GRANT Mehta’s motion for summary
judgment against plaintiff-relator, ECF No. 342; DENY Hudson’s motion for partial summary
judgment on its crossclaim, ECF No. 336; and DISMISS as moot Madan, Narula, and OST’s
motions to strike, ECF Nos. 366 & 367.
I. BACKGROUND
The parties here have different understandings of the facts at hand—or, at least, how those
facts should be characterized. The Court will note the areas of disagreement.
This case features a large cast of characters. Defendant Vijay Narula is the 100% owner
and chief executive officer of OST, an information-technology firm. P1.’s Statement of Mat. Facts
(“P1.’s Facts”), ECF No. 330-2 J 11. OST also employs Ajay Madan as its chief operating officer.
Id. | 33. OST is a successful company and has experience with government contracts in the
information-technology sector. Id. ] 14. Narula is not a service-disabled veteran, and OST is not a
service-disabled veteran-owned small business (“SDVOSB”). Jd. | 12.
Defendant Neil Parekh was the owner of two construction companies: Citibuilders’ and
CB Construction Group, Inc. (“CB”). Jd. 4 15. Like Narula, Parekh is not a service-disabled
veteran. Id. 4 16. Parekh met Narula when Citibuilders renovated OST’s office space, and the two
companies ultimately developed a subcontracting relationship. Jd. ff] 17-18. In 2010, Parekh
moved his operations into OST’s Washington, D.C. office. Jd. {| 18. That same year, Parekh
transitioned operations from Citibuilders to CB. Id. { 15. Plaintiff-relator Andrew Scollick was
employed by Parekh’s companies—first Citibuilders and then CB. Jd. 19.
A. Origins of the Alleged Plan
In 2009, Parekh and Narula discussed the possibility of pursuing government construction
contracts together—combining OST’s contracting experience and Parekh’s construction
experience. Id. § 20. They even discussed forming a construction “subsidiary of OST,” run by
Parekh, to bid on certain government contracts. Jd. 26. Parekh and Narula’s plan moved beyond
nascent discussions, and they even reached out to bonding companies like Centennial to discuss
the potential subsidiary. Jd. {| 25—26.
Sometime in 2008, OST learned of a $125 million Federal Aviation Administration
(“FAA”) SDVOSB set-aside contract known as “System Operations Management and
Administrative Support Service” (“SOMASS”). Id. § 31. SDVOSB set-aside contracts are
government contracts specifically set aside for companies owned by service-disabled veterans.
3 Citibuilders, CB Construction’s predecessor, should not be confused with Citibuilders Solutions Group, LLC, a
defendant in this case. Citibuilders Solutions Group is not at issue in any of the motions dealt with here—it was a
SDVOSB entity that Parekh created with defendant Goodweather, who has settled. P1.’s Facts ] 226.
3
CSG Statement of Mat. Facts (“CSG Facts”), ECF No. 338-1 § 9. To be awarded a SDVOSB set-
aside contract, a company must be certified as a SDVOSB. Id. Because OST was not an SDVOSB,
Pl.’s Facts {] 12, it could not bid for the contract alone. However, Narula determined that OST
could bid on the SOMASS project if it formed a joint venture with a qualified SDVOSB. Id. J 32.
Of course, to do so, Narula needed to find an SDVOSB.
Enter Amar Gogia. Defendant Gogia is a service-disabled veteran and second cousin to
Madan, OST’s chief operating officer. Jd. 33. In late November 2009, Madan emailed Narula
and other OST staff Gogia’s army discharge papers. Id. “He is an SDVO, and is willing to talk,”
Madan said. ECF No. 330-6 at 2. At the end of 2009, Narula and Gogia met in OST’s offices to
discuss contracting opportunities. Pl.’s Facts { 35. But before Narula and Gogia could pursue any
joint contracting venture—like the SOMASS contract—they had to establish a SDVOSB. OST’s
Resp. to Pl.’s Statement of Mat. Facts (“OST Fact Response”), ECF No. 370-1 4 35.
B. The Creation of Centurion Solutions Group, a “SDVOSB”
By early 2010, Gogia was working to form the new qualifying SDVOSB, Centurion
Solutions Group, LLG (“CSG”). Pl.’s Facts § 37. Plaintiff-relator alleges that Madan and Narula
helped form the SDVOSB: on an email thread, Gogia appears to seek significant insight from
Narula, Madan, and two other members of OST’s staff on the new SDVOSB’s name and structure.
Id, Madan even helped choose the name. Jd. OST also submitted filing paperwork on Gogia’s
behalf. OST Fact Response § 37; P1.’s Facts § 40. CSG was established as a SDVOSB in 2010.
Pl.’s Facts {| 42. Defendants dispute the allegation that they were significantly involved in CSG’s
creation by arguing that the evidence fails to show that Narula, Madan, or other members of OST
staff had any “decision making authority.” OST Fact Response 37.
Also while Gogia was establishing CSG in 2009 and early 2010, Madan loaned Gogia
$18,000. PI.’s Facts 36. In February 23, 2010, Madan sent Gogia another payment of $5,000,
4
which he referred to as “seed monies”—these funds, unlike the prior $18,000 loan, were deposited
in CSG’s new bank account. Jd. { 44.
The newly created CSG and OST formed a joint venture to bid on the SOMASS contract,
which they were ultimately awarded. Jd. 4 46. Narula and Parekh also began to discuss how they
could “use” an SDVOSB like CSG. Id. 9.47. Just a month after CSG’s formation, Parekh forwarded
Narula a list of Department of Veterans Affairs (“VA”) SDVOSB set-aside contracts that he had
“identified” and “would like to pursue.” Jd. 50. Narula put Parekh in touch with Gogia so that
“as a team [they] could go after these opportunities.” Id. Gogia forwarded CSG’s registration
materials to Narula. Jd. 753. In March 2010, a meeting was organized with Gogia, Parekh, Narula,
and plaintiff-relator Scollick. Jd. After the meeting, plaintiff-relator Scollick told Gogia he would
send him “a copy of the Ist solicitation we will be pursuing.” Jd. 4/55.
Gogia then moved to register in the CCR and VA’s VetBiz VIP databases, databases used
by SDVOSB contractors to bid on projects. Id. ff] 54, 56. As part of this registration process,
Madan electronically signed an application verifying that he owned 49% of CSG and that CSG
was majority-owned and controlled by a service-disabled veteran, as required by the VA’s
SDVOSB regulations. Id. 4 56. A contemporaneous operating agreement shows Madan as 49%
owner and Gogia as 51% owner of CSG. Id. 58. The VA certified CSG as SDVOSB compliant.
OST Statement of Mat. Facts (“OST Facts”), ECF No. 337-2 77.
C. The Parties’ Divergent Narratives on CSG’s Operational Leadership
In 2010, CSG started bidding for SDVOSB set-aside contracts in earnest. P1.’s Facts {| 60.
It is here where the narrative from the defendants this Court will term the “construction
defendants” (OST, CSG, Narula, Gogia, Madan, and Parekh) sharply diverges from the plaintiff-
relator’s narrative.*
According to the construction defendants, Gogia was at all times in control of CSG. OST
Facts 39. The initial Operating Agreement listed Amar Gogia as the 51% owner of CSG, and
that agreement was only amended once—when Gogia became the 100% owner of CSG. Jd. 11 6,
12. Any assistance that OST provided to CSG for bid proposals was solely in a mentorship
capacity. Id. 56.
Plaintiff-relator contests these assertions through several avenues.
First, he points to evidence that CSG operations were directed by CB and OST. For
example, email correspondence illustrates that CB and OST employees jointly tracked SDVOSB
solicitations and prepared (or, at minimum, provided templates for and then reviewed) many bid
proposals. Pl.’s Facts | 60. Other emails from CSG’s early operations indicate that Gogia was
frustrated because the “Citibuilders guys” were “using my and Centurion’s name” to submit bids
and that he was being “blindfolded” and “shut out” of the bidding process. Jd. 83. And neither
party disputes that Parekh and CB staff were doing significant work for CSG, though the
construction defendants allege that Gogia merely “delegated” certain responsibilities to Parekh.
OST Facts ¥ 42.
Plaintiff-relator also points to evidence that CSG, CB, and OST were often treated as the
same company with significant staff overlap. For example, CSG’s bid proposals listed past projects
performed by CB as evidence of CSG’s experience. PI.’s Facts 4] 248-88. In fact, one previous
project—for Mehta Medical Group, a fictitious entity apparently owned by Parekh’s aunt,
defendant Dr. Sobha Mehta—was repeatedly used in bid proposals, although the cost of the alleged
* A second group of defendants, titled the “insurance defendants,” become relevant later in the narrative.
6
past project would change in each bid proposal. Id. {J 285, 290. CSG also never had its own office
space—at all relevant times, CSG operated out of OST offices and did not pay any rent. OST Fact
Resp. J 124. All office support functions were carried out by CB employees who also represented
that they were CSG employees, though there is no evidence that CSG paid them. Pl.’s Facts {| 126.
Furthermore, shortly after CSG was established in 2010, Parekh, Narula, and Madan began
emailing about an “SDVOSB Operating Agreement.” Jd. 1 91. This potential operating agreement
is much debated, as the Court will explore below: plaintiff-relator argues it is undeniable proof
that Gogia was not the majority owner of CSG, while the construction defendants argue that this
agreement was instead for a new SDVOSB joint entity that they never created. OST Facts 91.
D. The Relationship Between Gogia, Parekh, and the Other Construction Defendants
Breaks Down
The relationship between Parekh, Narula, Gogia and Madan soon began breaking down.
Emails illustrate that Parekh was frustrated with Gogia and was “opposed” to having him “near
the accounting system,” Pl.’s Facts §] 185; Narula in response assured Parekh that “at the end of
the day you are running the company/work.” Jd. J 186. In the emails, Narula reminded Parekh that
if they were “using [Gogia’s] quall[ifications],” presumably his SDV status, he “needs to be
compensated.” Jd. 4 187. In early 2012, Gogia emailed Narula and Madan to inform them of issues
he found when reviewing CSG financial records, which were maintained by CB. Jd. {| 205. He
noted that the “books . . . do not correlate to CB invoices provided.” Jd. As 2011 became 2012,
CSG failed to pay some of its workers as Parekh refused to approve payments. Jd. J 216. In the
midst of these financial troubles, Parekh separated from CSG. Jd. 217. Gogia remained.
From 2010 to 2015, CSG was awarded nineteen SDVOSB set-aside contracts. Id. J 234.
CSG never defaulted on any contracts for the VA, nor did they receive negative performance
reviews regarding completed contracts. OST Facts § 81. Even after CSG was no longer working
with Parekh and CB, CSG continued operations. Jd. | 52. The VA was notified of the allegations
of fraud in this lawsuit but continued to recertify CSG as a SDVOSB at least once. Jd. 479.
E. The Role of the Insurance Defendants
There is another group of defendants relevant here, who the Court will refer to as the
“Insurance defendants” (Centennial, Schendel, Hanover, and Hudson). The Miller Act requires
government contracts over $100,000 to be bonded. Id. J 9; see 40 U.S.C. § 3131(b). This
requirement is for all government contracts, not just SDVOSB set-aside contracts. 40 U.S.C.
§ 3131(b). The bonds guarantee that the contractor will comply with the terms of the contract and
perform as required. Pl.’s Facts J 10. The insurance companies that issue the bonds do not interact
with the government—they issue the bonds to the contractor, who then “furnishes” the required
bonds to the federal government. 40 U.S.C. § 3131(b). Defendant Centennial, a company owned
and run by defendant Michael Schendel, worked as a “bonding agent.” PI.’s Facts 22. Centennial
would garner information from potential contractors, like CSG, seeking bonding, then assist
bonding companies’ during the underwriting process. Jd. § 24. Defendants Hanover and Hudson
were both bonding companies that provided bonds to contractors. Jd. J 23.
Schendel and Centennial brokered the relationships between CSG and bonding companies
Hudson and Hanover. Jd. J] 69, 149. It is undisputed that Narula and Parekh were involved with
the bonding process for CSG, though all bonds were requested and issued in CSG’s name. Jd.
{1 70, 73, 76 (Hanover); id. {J 158-159, 160 (Hudson). As a requirement to providing surety
bonds for CSG’s SDVOSB set-aside contracts based on OST’s financial support, Hanover required
an agreement to indemnify them against any loss—an indemnification agreement that OST,
Narula, Narula’s wife, Parekh, Gogia, CB, CSG, and Centurion-OST all signed. Jd. J] 106-07.
Hanover issued performance bonds for eight VA SDVOSB-set aside contracts. Jd. J 128. In May
2011, Hudson started issuing bonds to CSG. Jd. f§ 149-154. Like Hanover, Hudson required
8
indemnity agreements to issue these bonds. OST, CSG, CB, Gogia, and Gogia’s wife all signed an
indemnity agreement with Hudson. Id. { 157. Hudson issued performance bonds for five VA
SDVOSB set-aside contracts. Jd. §] 160.
It is undisputed that certain Hanover, Hudson, and even Centennial employees (including
Schendel) seemed to think that CSG was the “construction arm of OST” and that Parekh or Narula
owned CSG. Id. §f] 70-74, 164-65. Additionally, OST was the primary contact between “the
bonding company” and CSG. Id. ¢ 78. Gogia met Schendel once, though Schendel could not recall
any conversation of substance. Jd. On the other hand, it is also undisputed that there is no evidence
on the record illustrating that Schendel, Centennial, Hanover, or Hudson were aware of the specific
requirements of VA SDVOSB set-aside contracts.
F. Procedural History
In 2014, plaintiff-relator Scollick filed this complaint against CB, OST, CSG, Gogia,
Madan, Mehta, Narula, Parekh, Hanover, Hudson, Schendel, and defendant Citibuilders Solutions
Group, LLC. Compl., ECF No. 1. Five other named defendants are no longer in the case. See,
e.g., ECF No. 125 (dismissing Guatam Chitnis, Anita Chitnis, and KCGI, Inc); ECF No. 122
(dismissing Dilip Parekh); ECF No. 307 (granting stipulation of dismissal as to Melvin
Goodweather). The second amended complaint—operative here—alleges four counts:
Count I, submitting or causing to be submitted false or fraudulent
claims to the United States in violation of 31 U.S.C. § 3729(a)(1)(A)
against all defendants (the presentment claim);
Count II, causing to be made or used false records to submit false or
fraudulent claims to the United States in violation of 31 U.S.C.
§ 3729(a)(1)(B) against all defendants (the false statement claim);
Count III, knowingly avoiding an obligation owed to the United
States in violation of 31 U.S.C. § 3729(a)(1)(G) against defendants
Hanover and Hudson (the reverse false claim); and
Count IV, conspiracy to violate the FCA in violation of 31 U.S.C.
§ 3729(a)(1)(C) against all defendants (the conspiracy claim).
See Second Am. Compl. { 215-60, ECF No. 298. Hudson also filed a crossclaim against OST,
CSG, Parekh, Gogia, CB, Citibuilders, and Centennial, invoking the above-referenced
indemnification agreements. Crossclaim Compl., ECF No. 187.
Now, plaintiff-relator moves for partial summary judgment against all defendants but
Citibuilders Solutions Group and Mehta, and all defendants but Citibuilders Solutions Group move
for summary judgment. Hudson also moves for partial summary judgment against OST, CSG,
Parekh, and Gogia on its crossclaim. ECF No. 336. Finally, Madan, Narula, and OST move to
strike certain testimony from plaintiff-relator’s motion for partial summary judgment. ECF Nos.
366 & 367. These fourteen motions are all ripe.
II. LEGAL STANDARDS
A. Summary Judgment
When a movant “shows that there is no genuine dispute as to any material fact and the
movant is entitled to judgment as a matter of law,” the court shall grant summary judgment. Fed. R.
Civ. P. 56(a). A dispute about a material fact is “genuine” if the nonmovant presents evidence
“such that a reasonable jury could return a verdict for the nonmoving party.” Anderson v. Liberty
Lobby, Inc., 477 U.S. 242, 248 (1986). “[MJerely colorable” evidence or evidence that is not
sufficiently probative does not create a genuine dispute of material fact. Id. at 249-250. On a
summary judgment motion, all inferences to be drawn from the underlying facts “must be viewed
in the light most favorable to the party opposing the motion.” Matsushita Elec. Indus. Co. v. Zenith
Radio Corp., 475 U.S. 574, 587 (1986). The Court’s role when deciding summary judgment
motions is only to determine if there is a genuine dispute of material fact, not to make credibility
determinations or weigh the evidence. Wheeler v. Georgetown Univ. Hosp., 812 F.3d 1109, 1113
10
(D.C. Cir. 2016). The movant is entitled to summary judgment when the nonmovant fails to make
a sufficient showing of an essential element of her case for which she bears the burden of proof.
Celotex Corp. v. Catrett, 477 U.S. 317, 323 (1986). When parties file cross-motions for summary
judgment, a court views each motion separately in the light most favorable to the non-movant.
Howard Town Ctr. Dev., LLC v. Howard Univ., 267 F. Supp. 3d 229, 236 (D.D.C. 2017).
II. DISCUSSION
With this sprawling cast of characters to consider, the Court will split up its major analysis
into two groups of defendants. First, the Court will discuss the FCA and conspiracy claims against
the construction defendants (OST, CSG, Parekh, Narula, Madan, and Gogia). Second, the Court
will dispose of the claims against the insurance defendants (Schendel, Centennial, Hanover, and
Hudson). After these larger discussions, the Court will decide Mehta’s separate motion for
summary judgment and Hudson’s partial motion for summary judgment on its indemnification
crossclaim.
A. Whether The Construction Defendants Violated The FCA Is Genuinely Disputed
Plaintiff-relator brings three claims against the the construction defendants: a presentment
claim, a false-statement claim, and a claim alleging conspiracy to violate the False Claims Act.
Second Am. Compl. §{/ 215-60. Both plaintiff-relator and the construction defendants move for
summary judgment on these counts.” Presentment claims and false statement claims contain nearly
identical elements, and so this Court will analyze both claims together for the purposes of this
summary judgment motion.
There are three elements to an FCA presentment claim: “(1) the defendant submitted a
claim to the government, (2) the claim was false, and (3) the defendant knew the claim to be false.”
5 Plaintiff-relator excludes certain allegations from his motion on these two counts. See, e.g., ECF No. 329 at 2 nl.
The specifics of those exclusions are unnecessary because the Court will deny summary judgment on these counts.
11
United States ex. rel. Scollick v. Narula (“Scollick I’), 215 F. Supp. 3d 26, 35 (D.D.C. 2016)
(quoting Pencheng Si v. Laogai Rsch. Found., 71 F. Supp. 3d 73, 91 (D.D.C. 2014)). Although the
text of the FCA explicitly prohibits: only false fraudulent claims, 18 U.S.C. § 3729(a)(1)(A), a
violation of the FCA occurs when a person “fraudulently induces the government to enter a
contract and later submits claims for payment under that contract.” United States ex rel. Cimino v.
Int'l Bus. Machines Corp., 3 F.4th 412, 417 (D.C. Cir. 2021). This “initial fraudulent action” taints
all future claims. Scollick ex rel. United States v. Narula (“Scollick IIT’), No. 14-cv-1339 (RCL),
2020 WL 6544734, at *7 (D.D.C. Nov. 6, 2020). The false statement claim has almost identical
elements to the presentment claim, except that a false statement requires evidence that the
defendant made a false statement “as opposed to the submission of a false claim for payment.”
Scollick I, 215 F. Supp. 3d at 35 (quoting Pencheng Si, 71 F. Supp. 3d at 87).
While the parties attempted to bury the issue under a mountain of paper, a simple
conclusion cuts this Gordian knot: there are many genuine disputes of material fact. Both sides
provide evidence about (1) whether CSG was SDVOSB eligible, (2) whether defendants had the
required scienter for fraud, and (3) whether the OST defendants or Neil Parekh “caused” the false
claims or statements to be made to the government. These factual disputes pit contemporaneous
email evidence (supporting the fraud claims) against the alleged conspirators’ deposition testimony
(swearing that their actions were above-board). Because this Court cannot evaluate credibility or
weigh evidence at this stage, both motions for summary judgment must be denied. Wheeler, 812
F.3d 1109 at 1113.
1, Whether There Was A False Claim Or False Statement Is Genuinely Disputed
Plaintiff-relator argues that CSG falsely held itself out as an eligible SDVOSB when
submitting claims and statements to the government when it was in truth controlled by civilians
with no military background. ECF No. 329-1 at 3. Key to both his presentment claim and his false
12
statement claim is whether CSG was an eligible SDVOSB. If so, most of plaintiff-relator’s claims
fall apart—the claims and statements the construction defendants made to the government would
not be false.
To qualify as SDVOSB eligible under VA guidelines, a small business “must be
unconditionally owned and controlled by one or more eligible veterans, service-disabled veterans,
or surviving spouses.” 38 C.F.R. § 74.2(a) (2015).° A service-disabled veteran “owns” a small
business when at least 51% of the concern (company) is “unconditionally and directly” owned by
him. 38 C.F.R. § 74.3(a) (2015). Similarly, a service-disabled veteran “controls” a small business
when he conducts both “the day-to-day management and long-term decision-making authority.”
38 C.F.R. § 74.4(a) (2015). To control a small business, a service-disabled veteran must “hold the
highest officer position” and must have “managerial experience of the extent and complexity”
needed to run the company. 38 C.F.R. § 74.4(c)(1), (2) (2015).
The construction defendants point to the initial Operating Agreement for CSG—which
listed that Gogia was 51% owner—as evidence that CSG was SDVOSB eligible. See, e.g., ECF
No. 331-1 at 11. While plaintiff-relator acknowledges this fact, he also points to emails between
the construction defendants discussing potential equity splits or profit sharing, all of which would
entitle Gogia to far less than 51% of the assets. ECF No. 330-1 at 10-11.
For example, an email thread between Parekh and Narula discussed a potential “SDVOSB
Operating Agreement” that would entitle Gogia to, at most, 25% of profits. Pl.’s Facts { 91.
Multiple defendants stated under oath that this email referred to a new, separate entity. See OST
Facts J 90—93. But additional emails sent around the time period betray this characterization and
6 The eligibility regulations which were in place between 2010 and 2015 are controlling in this case. The VA and
Small Business Association SDVOSB programs subsequently merged their two regulatory schemes. See National
Defense Authorization Act for Fiscal Year 2017, Pub. L. No. 114-328, 130 Stat. 2658 (2016).
13
indicate that this new operating agreement was for CSG itself. For example, a week later Parekh
sent an email stating that he and Narula “really need to come to an agreement on the CSG
operations agreement soon.” PI.’s Facts § 92 (emphasis added). That same week, Madan emailed
Gogia that he was “thinking about a comp plan” that would allow him to “get more of [Gogia’s]
time” and pay Gogia a salary. Jd. { 93. Madan mentioned going over various “models.” Jd. This
context supports plaintiff-relator’s contention that the potential “SDVOSB Operating Agreement,”
which included proposed compensation models, was for CSG itself.
Emails aside, plaintiff-relator provides more evidence that Gogia was not the majority-
owner of CSG. A document titled “Compiled Financial Statement for Period Ending December
31, 2010” lists two equity partners for CSG: one holding $18,668 and one holding $210,000. Jd.
1 144.’ As plaintiff-relator points out, Madan paid CSG $211,000 in August 2010 but has
repeatedly denied this was an investment and insisted it was an interest-free loan. Jd. The financial
statement, however, again belies this statement and indicates that the $211,000 was instead an
investment.
All told, there is a material dispute as to whether CSG was majority-owned by Gogia, the
only eligible service-disabled veteran. But there is another dispute as well: whether CSG was
controlled by Gogia, as required by VA regulations. See 38 C.F.R. § 74.2(a).
The back-and-forth between the construction defendants and plaintiff-relator over who
truly controls CSG demonstrates why summary judgment is inappropriate here. As plaintiff-relator
tells it, Gogia played almost no meaningful role in CSG. ECF No. 330-1 at 8. CSG was operated
7 The OST defendants argue that this document is inadmissible for lack of foundation. ECF No. 370-1 q 144. The
nonmovant is not required to produce evidence that would be admissible at trial—all that is necessary is for the
evidence to be “capable of being converted into admissible evidence.” Gleklen v. Democratic Cong. Campaign
Comm., Inc., 199 F.3d 1365, 1369 (D.C. Cir. 2000). The Court believes it likely that plaintiff-relator could establish
foundation at trial for this document, which was apparently provided to the bonding defendants on behalf of CSG.
14
out of OST’s offices. Pl.’s Facts J 124. Parekh and Narula primarily controlled CSG’s operations.
Id. § 89-93. And Gogia did not contribute to bidding on SDVOSB proposals for at least the first
few years. Id. In emails, Gogia complains about not being in kept in the loop:
I am only writing this to you. This has built up. A while back, I was
told to come meet and greet CitiBuilders—instead, at the meeting I
was told who my new partners were. Since then I’ve been
intentionally shut out, which may have been ok if somebody had told
me about it. That last meeting with [Narula] caught me off guard
and does not make me feel comfortable. Still, I could bear being
locked out because I was told Citibuilders had experience and knew
what they were doing. These are serious flaws in this bid. The only
two things I ever heard about it were a surprise call from the VA
contracting officer, and now this. Yet, the VA response is addressed
to me, with Centurion’s name—reflecting on the reputation we’re
trying to build. Please forgive the tone—tell the Citibuilders guys to
stop using my and Centurion’s name if these are the results we're
going to be receiving. I want to move forward and believe this will
work, and apologize if I am being over the top. Maybe \’m missing
the big picture, but it’s because I’ve been blindfolded. How do I
make sure I don’t get another email like this?
Pl.’s Facts J 83 (emphases added). Madan, in his response, noted that “[they] ha{d] submitted some
bids already” but that Gogia “ha[d] not been maliciously shut out.” Jd. 4 84. Instead, Gogia was
“shut out for convenience.” Jd. Still, he reminded Gogia that “everyone has the same goals.” Jd.
Other emails cited by plaintiff-relator further support Gogia’s lack of control. For example,
in one email from Parekh to Narula, Parekh appears to give orders regarding what Gogia “need[s]
his focus to be on” in 2010 and 2011. Jd. 9 92. Other emails show Narula and Parekh discussing
Gogia’s role in CSG, id. §J 185-86, with Narula telling Parekh “at the end of the day you [Parekh]
are running the company/work.” Jd. { 186. While the construction defendants attempt to play these
off as “vague” statements, ECF No. 370-1 9186, this Court finds that they support plaintiff-
relator’s contention that Gogia was not really in control of CSG.
Still, there is countervailing evidence indicating that Gogia did control CSG at all relevant
times, as defendants claim. ECF No. 337-1 at 14. To start, Gogia attests—under oath—that at all
15
times he controlled CSG. See OST Facts 39, 50. Madan similarly claims that OST was never
involved in preparing any CSG VA bids proposals, id. 55, despite email evidence to the contrary,
PI.’s Facts {| 83. The construction defendants also cite a narrative of CSG’s creation that Gogia
drafted in 2012 and emailed to Narula in 2013— before any allegations of fraud. ECF No. 337-10.
According to this narrative, all that Gogia did was delegate back-office management to Parekh.
ECF No. 337-1 at 23. The evidence on both sides is sufficient to raise a genuine dispute of material
fact as to whether Gogia controlled CSG and thus whether CSG was eligible for SDVOSB status.®
In a final argument, the OST defendants maintain that plaintiff-relator has failed to provide
evidence that the claims were false because there is no evidence that the alleged misrepresentations
were material to the VA’s decision to pay claims to CSG. ECF No. 337-1 at 40-43. But, as this
Court has previously explained, Scollick II, 2020 WL 6544734, at *9, this showing is not required.
Plaintiff-relator is proceeding on a theory of fraudulent inducement—that the claims CSG
submitted to the governinent for its work were false because CSG used fraud to enter the original
contract— so he need only to prove two things: (1) that the fraud caused the government to enter
8 The construction defendants also allege that any support OST gave to CSG was formally approved of by the
government under a mentor-protégé agreement. ECF No. 337-1 at 15. This argument fails. To start, the government-
approved mentor-protégé agreement between CSG and OST that the construction defendants tout was for FAA
contracts. See ECF 337-5. The FAA Mentor-Protégé Program exists to encourage firms to assist SDVOSBs in
performing F'AA contracts. See The FAA Mentor-Protégé Program, Federal Aviation Administration, available at
https://sbo.faa.gov/mentorprotege.cfm. But all the allegations in the current complaint relate to contracts with the VA,
so whether the amount of support OST gave CSG was appropriate for FAA contracts is irrelevant. The construction
defendants’ follow-up argument that the FAA “explicitly permitted CSG to use the mentorship assisted provided by
OST in support of other contracts with other government agencies” is disingenuous. ECF No. 337-1 at 16. The cited
FAA approval letter states:
This approval does not constitute authorization to proceed with work contained in
the Mentor-Protégé Agreement until the approved agreement is incorporated into
an FAA contract. However, this does not preclude [OST] from mentoring to
{CSG] on other government contracts.”
ECF No. 337-6. Just because parties are not precluded from taking certain actions does not mean they are expressly
permitted to. If OST wanted to support CSG performing VA contracts, there is a separate VA Mentor-Protégé program
with a separate approval process they could have applied to. See 48 C.F.R. § 819.7101. They did not do so. The FAA
Mentor-Protégé agreement is irrelevant.
16
into the contract; and (2) that the fraud was material. United States ex rel. Cimino v. Int'l Bus.
Machines Corp., 3 F.4th 412, 422 (D.C. Cir. 2021). Fraud is material if it “capable of influencing
the government's decision to enter into a contract.” Id. at 423 (emphasis added). Because VA
SDVOSB set-aside contracts can only be awarded to SDVOSB-eligible companies, the facts
indicating that construction defendants fraudulently represented CSG as SDVOSB-eligible to
receive these contracts sufficiently proves both causation and materiality. Despite defendants’
argument, plaintiff-relator need not also prove that the fraud was material to the VA’s later decision
to pay.
Reviewing all the evidence cited above, this Court finds a genuine dispute exists as to
whether CSG was SDVOSB eligible. Because CSG repeatedly certified itselfas SDVOSB eligible
when submitting VA bid proposals, a reasonable jury could find that they submitted false claims
or statements to the government. This genuine dispute of fact allows the construction defendants
to survive plaintiff-relator’s motions for partial summary judgment against them. But because the
construction defendants also move for summary judgment, which plaintiff-relator can only survive
by making a sufficient showing of all essential elements for which he bears the burden of proof,
Celotex Corp., 477 U.S. at 323, this Court will proceed to the second element of a presentment or
false statement claim—scienter.
2. Whether Construction Defendants Knowingly Submitted A False Claim or
Statement To The Government Is Genuinely Disputed
Next, the court turns to scienter. A false statement or claim is made or submitted knowingly
when a defendant (1) has actual knowledge of the claim’s falsity, (2) acts in deliberate ignorance,
or (3) acts in reckless disregard. Scollick I, 215 F. Supp. 3d at 35. Plaintiff-relator alleges that the
construction defendants had actual knowledge of the falsity of the claims and statements.
17
Evidence supports the notion that the construction defendants had actual knowledge that
CSG was not SDVOSB eligible and were fraudulently representing it as such. For example, in an
email between Narula and Madan, Narula stated, “[W]e have the formalities completed with CSG.
Also, who are the owners and officers on the papers?” P1.’s Facts 4 54 (emphasis added). In another
email, Gogia asked Madan and Narula to create documentation of ownership because he was
“bidding on a job which requires ‘evidence’ of [his] 51% ownership of CSG.” Id. 4] 57. Gogia
added these scare quotes himself. In response, the defendants immediately created a new Operating
Agreement that same day to provide this “evidence.” Jd. 4 58. In another email, Narula emailed
Parekh and asked him to “call me to discuss how we can use the SDVO-SB. The company name is
Centurion Group, LLC.” Jd. 51 (emphasis added). And when Gogia complained about being kept
out of the loop, Madan reminded him that “everyone ha[d] the same goals.” Id. J 84. Plaintiff-
relator also provided evidence that the construction defendants plainly treated CSG as part of a
“team” as opposed to its own country: Parekh and Narula identified SDVOSB projects to bid on
and then sent them to Gogia so that “as a team [they] c[ould] go after these opportunities.” Jd. q
50. Finally, there are repeated examples of the construction defendants referencing the fact that
Gogia was allowing them to “use his quals.” Jd. { 187; see id. J 91, 94-95.
These facts, alone, are enough to raise a triable issue of fact regarding whether the
construction defendants had actual knowledge of the fraud they were allegedly committing—
passing off CSG as a SDVOSB-eligible company to secure prime VA projects. Because this
evidence supports a theory of actual knowledge, construction defendants’ argument that they
merely thought OST was providing FAA-approved support to CSG is unpersuasive here.
The construction defendants also argue that because CSG was audited and recertified by
the VA, plaintiff-relator cannot establish actual knowledge. ECF No. 337-1 at 33, ECF No. 338-1
18
at 12. This is incorrect. The allegation here is that the construction defendants worked together to
lie to the government and falsely hold CSG out as a SDVOSB-eligible company. “|G]overnment
approval or certification cannot be used as a shield from liability, especially where that approval
or certification was gained through fraudulent means.” United States v. Honeywell Int’l Inc., 502
F. Supp. 3d 427, 459 (D.D.C. 2020), motion to certify appeal granted, No. 08-cv-0961 (PLF),
2021 WL 2493382 (D.D.C. June 18, 2021).
As the construction defendants point out, “scienter is often a fact-intensive matter to
resolve.” ECF No. 337-1 at 34. That is the case here, and summary judgment is unwarranted.
3. Whether The Construction Defendants Presented False Claims Or Statements To
The Government Is Genuinely Disputed
Finally, plaintiff-relator must provide evidence showing that the construction defendants
submitted a claim or false statement to the government. “Presentment and false statement claims
can rest on a theory of direct presentment/making of false statements or indirect
presentment/making of false statements.” Scollick I, 2017 WL 3268857, at *5. Direct presentment
or false statement claims are simple—all that is required is that the defendant in question actually
submitted the false claims. United States ex rel. Tran v. Comput. Scis. Corp., 53 F. Supp. 3d 104,
127 (D.D.C. 2014). But to succeed on a theory of indirect presentment or false statements, the
defendants must have caused the submission of false claim or statement. Scollick I, 215 F. Supp.
3d at 39.
The Court starts with the direct-presentment claims. Defendant Gogia applied to the VA to
qualify CSG as a SDVOSB, and the VA certified CSG as an SDVOSB after receiving this
application. See ECF No. 337-8 at 2. Both Madan and Gogia signed a verification form in which
they affirmed that CSG was at least 51% owned and controlled by Gogia. P1.’s Facts J 56. Because
plaintiff-relator has provided sufficient evidence that CSG was not SDVOSB-eligible, this
19
representation that CSG was SDVOSB-eligible would qualify as a false statement. And because
any subsequent SDVOSB contracts awarded to CSG would be “procured by fraud,” any claims
CSG submitted for payment would be “false or fraudulent.” United States ex rel. Bettis v.
Odebrecht Contractors of Cal., Inc., 393 F.3d 1321, 1326 (D.C. Cir. 2015). CSG was awarded
nineteen VA SDVOSB set-aside contracts, submitted claims for all of them, and was ultimately
paid $7,003,693.11 by the United States. PI.’s Facts 234-35. Parekh and Gogia both signed the
claim payment requests. Jd. { 235. So, under a direct-presentment theory, plaintiff-relator’s claim
survives summary judgment.
Moving to a theory of indirect presentment, a defendant causes a false statement or claim
to be made when his conduct was “at least a substantial factor in causing, if not the but-for cause
of, submission of false claims.” United States v. Toyobo Co., Ltd., 811 F. Supp. 2d 37, 48 (D.D.C.
2011). Courts have recognized indirect presentment or false statement claims where a non-
submitting party was the “driving force behind an allegedly fraudulent scheme” or agreed to take
“certain critical actions in furtherance of the fraud.” Tran, 53 F. Supp. 3d at 127. Ultimately, the
court must evaluate the “degree to which [a party] was involved in the scheme that results in the
actual submission.” Scollick I, 215 F. Supp. at 39 (quoting Tran, 53 F. Supp. 3d at 127).
Evidence—in addition to that discussed above, see Parts IJ.A.1 and III.A.2, supra—
indicates that Madan, Parekh, Narula, and OST were intimately involved with the bid proposal and
submittal process. Gogia, Parekh, Narula, and Madan were all on email threads regarding the
“construction pipeline,” identified certain SDVOSB-set-aside contracts, and asked Narula to
decide on what projects to pursue. See ECF No. 330-7 at 15-16. Sujana Pathak, an OST employee,
created a bid-proposal template for CSG to use, id. at 27, and met with plaintiff-relator and Gogia
to assist in bid proposals, id. at 38-39. Other OST employees assisted with additional edits to bid
20
proposals, including designing cover pages. P1.’s Facts {| 65. Parekh himself emailed Gogia to tell
him what types of SDVOSB-set-aside projects to look for. ECF No. 330-7 at 49. Finally, OST was
the “primary contact between” the insurance defendants, who assisted with necessary bonding, and
CSG. Pl.’s Facts J 78. Based on this evidence, a reasonable jury could find that Parekh, Narula,
Madan, and OST took “critical actions in furtherance of the fraud.” Tran, 53 F. Supp. 3d at 127.
So, in short, Plaintiff-relator has sufficiently raised a direct- and indirect- presentment
claim and a false-statement claim against these defendants. These claims must proceed to trial.
B. The Construction Defendants’ Conspiracy Claim Contains Genuine Disputes
Plaintiff-relator also alleged that the construction defendants conspired to violate the FCA.
AFCA conspiracy claim requires (1) an agreement to make false or fraudulent claims that (2) each
member of the alleged conspiracy joined where (3) at least one conspirator knowingly committed
an overt act in furtherance of the conspiracy. Scollick I, 215 F. Supp. 3d at 36. There must also be
an underlying violation of the FCA (which the court found was genuinely disputed in Part TILA,
supra).
The critical issue for this conspiracy claim is whether there is evidence demonstrating that
construction defendants agreed to violate the FCA. The answer is plainly yes. Gogia emailed
Madan and Narula for “evidence” (scare quotes his own) of his ownership of CSG to bid on jobs.
Pl.’s Facts 57. Narula and Parekh discussed “chow we can use the SDVO-SB.” Id. 9 51. Narula
and Madan discussed the “formalities” they completed and who would be the “owners and officers
[of CSG] on the papers” Jd. | 54. Gogia complained to Madan about being shut out and stated to
“tell the Citibuilders guys to stop using my and Centurion’s name” if they were going to receive
bad results (not to stop altogether), at which point Madan assured him that while “we have
9 Only the construction defendants move for summary judgment on the conspiracy claim, so the Court will construe
all facts in favor of plaintiff-relator in its analysis.
21
submitted some bids already,” presumably without Gogia’s awareness, “everyone has the same
goals.” Id. 84.
There is more evidence of the construction defendants’ plan, too. In November 2009,
Madan emailed Gogia’s army discharge papers to Narula and other OST staff, letting them know
that Gogia was “SDVO” and “willing to talk.” ECF No. 330-6 at 2. In late 2009, Narula and Gogia
held a meeting in OST’s offices to discussing SDVOSB contracting opportunities. P1.’s Facts q
35. At the same time, 2009 and early 2010, Madan suddenly loaned Gogia $18,000, id. 36, though
Madan testified that money was for “personal expenses” and that this money was not to set up a
fraudulent SDVOSB, ECF No. 370-1 436. Whatever the reason for the payment, by J anuary 2010
Narula, Madan, and Gogia were on an email thread with a CPA, establishing CSG and choosing a
name. ECF No. 330-6 at 112-17. This evidence is sufficient to raise a triable question of whether
there was an agreement to defraud the FCA that Narula, Madan, Parekh, Gogia, CSG, and OST
agreed to defraud the government by submitting false claims and statements. Accordingly, this
Court will not grant summary judgment to the construction defendants on the conspiracy claim.
C. The Insurance Defendants Are Entitled To Summary Judgment On All Claims
The claims brought against the insurance defendants—Hudson, Hanover, Centennial, and
Schendel—are a different story. The construction defendants could not have filed the allegedly
fraudulent bid proposals without surety bonds and performance bonds, which Centennial provided
as “agent and attorney-in-fact for [Hudson] and [Hanover].” Scollick I, 215 F. Supp. 3d at 33. This
Court previously allowed plaintiff-relator to proceed with presentment and false statement claims
against the insurance defendants based on a theory of indirect presentment: that while they did not
directly present false claims or make false statements to the government, their actions led to the
submission of false claims. United States ex rel. Scollick v. Narula (“Scollick IP’), No. 14-cv-1339
(RCL), 2017 WL 3268857, at *14 (D.D.C. July 31, 2017). The Court also allowed plaintiff-relator
22
to proceed with a reverse false-claim and conspiracy claim against the insurance defendants. Id. at
#15. Now, with the benefit of a summary judgment record, the Court concludes that no reasonable
jury could find for the plaintiff-relator on these claims.
Plaintiff-relator brings presentment and false statement claims against Centennial,
Schendel (Centennial’s president), Hudson, and Hanover relating to government contracts
awarded to defendant CSG. Second Am. Compl. 4 215-242. Plaintiff-relator brings two further
claims: a conspiracy claim against all defendants, id. {J 245-260, and a reverse false claim
violation, pursuant to 31 U.S.C. § 3729(a)(1)(C), against defendants Hudson and Hanover, Second
Am. Compl. 79 241-244. A reverse false claim is “any fraudulent conduct that results in no
payment to the government when a payment is obligated.” Pencheng Si, 71 F. Supp. 3d at 88
(quoting Hoyte v. Am. Nat'l Red Cross, 518 F.3d 61, 63 n.1 (D.C. Cir. 2008) (internal quotation
marks omitted). It occurs whenever a person “knowingly makes, uses, or causes to be made or
used, a false record or statement material to an obligation to pay or transmit money or property to
the Government, or knowingly conceals or knowingly and improperly avoids or decreases an
obligation to pay or transmit money or property to the Government.” 31 U.S.C. § 3729(a)(1)(G).
As plaintiff-relator points out, the “most important issue running through all [these claims]
is the knowledge possessed by the [i]nsurance [d]efendants.” ECF No. 331-1 at 24. But plaintiff-
relator has produced no evidence permitting a reasonable jury to find that the insurance defendants
had knowledge of the construction defendants’ fraud—“that they were fraudulently asserting status
as SDVOSBs.” Scollick II, 2017 WL 3268857, at *14. Because such knowledge is an essential
element of ail of the claims brought against the insurance defendants, the Court must grant
summary judgment in their favor. See Celotex Corp., 477 U.S. at 323.
23
In the context of the FCA, “knowledge” requires either “actual knowledge,” “acting in
deliberate ignorance,” or “act[ing] in reckless disregard.” United States ex rel. K & R Ltd. P’ship
v. Mass. Hous. Fin. Agency, 530 F.3d 980, 983 (D.C. Cir. 2008) (citing 31 U.S.C. § 3729(b)).
Actual knowledge is “subjective knowledge,” while deliberate ignorance is “the kind of willful
blindness from which subjective intent can be inferred” and reckless disregard is “an extension of
gross negligence, or gross-negligence-plus.” United States v. Speqtrum, Inc., 113 F. Supp. 3d 238,
249 (D.D.C. 2015) (quoting United States ex rel. Hockett v. Columbia/HCA Healthcare Corp., 498
F. Supp. 2d 25, 57 (D.D.C. 2007)). Again, while scienter is “often a fact-bound inquiry,” summary
judgment is appropriate when plaintiff provides no evidence to support a finding of knowledge on
an FCA claim, since knowledge is an essential element of the claim. Hockett, 113 F. Supp. 3d at
57-8.
In his complaint, plaintiff-relator alleged that the insurance defendants “obtained facts that
[they] knew or should have known violated the government’s contracting requirements” and
“concealed those facts” from the government. Second Am. Compl. 4 204. He alleges that the
insurance defendants, after touring OST’s offices, knew that CSG was a “shell company.” Jd.
fj 182-83. Plaintiff-relator argued that if the insurance defendants had done their due diligence,
must have known that Citibuilders and CSG were fraudulently asserting statuses as SDVOSBs. Jd.
q 194.
At the summary judgment stage, however, plaintiff-relator’s evidence of knowledge
falters. No evidence suggests that the insurance Anew the bids were fraudulent. Accord Scollick I,
215 F. Supp. 3d at 33-34. There is only evidence that the insurance defendants knew the details
of the bid proposals and some details of the ownership of CSG. See, e.g., Pl.’s Facts §] 70, 102,
105, 259. This is insufficient to proceed on a theory of actual knowledge.
24
Actual knowledge is not required to maintain an FCA claim, however—deliberate
indifference or reckless disregard also suffice. United States ex rel. K & R Ltd. P’ship, 530 F.3d at
983. Plaintiff-relator argues that the insurance defendants recklessly disregarded the truth about
the construction defendants’ fraud, averring that “[a]ll that was required to have full knowledge of
the fraud was for the [i]Jnsurance [d]efendants to take the actual knowledge they possessed and
apply it to the ownership and control regulations applicable to all VA SDVOSB set-aside
contracts.” ECF No. 331-1 at 29. But this no “simple step,” id., for the insurance defendants. This
would impose a significant duty on third party insurers to familiarize themselves with VA
regulations before bonding companies. It is a significant leap in terms of liability. Without facts
indicating that the insurance defendants knew of the specific SDVOSB requirements, this Court
will not impose an affirmative duty on insurance and bonding companies to double-check the
government’s verification.
Plaintiff-relator argues that the insurance defendants did have a duty to familiarize
themselves with the VA SDVOSB requirements. ECF No. 331-1 at 29. But the cases he cites are
inapplicable. In the first, Heckler v. Community Health Services, the Supreme Court broadly stated
that participants in Medicare have a duty to “familiarize [themselves] with the legal requirements
for cost reimbursements” because of the general rule that those who “deal with the Government
are expected to know the law.” 467 U.S. 51, 63 (1984). But Heckler did not involve questions of
fraud—the government in that case was allowed to recover funds improperly paid because of
defendant’s misunderstanding of federal regulations, but the Supreme Court did not impute
fraudulent intent on the defendants based on their error. Id. at 63-64.
And while there is no doubt that participants in federal programs must familiarize
themselves with the requirements, the insurance defendants are not “participants” in the federal
25
VA SDVOSB program—te construction defendants are. It is the construction defendants who
are obligated to familiarize themselves with the SDVOSB regulations, because they are dealing
with and seeking payment from the federal government. For when a defendant is “responsible for
day-to-day operations, long-term planning, lease and build-out negotiations, personnel, and legal
and accounting oversight” of a company, he has a duty to “be familiar with the legal requirements
for obtaining reimbursement . . . [from the government], and to ensure that the [company] was run
in accordance with all laws.” United States v. Mackby, 261 F.3d 821, 828 (9th Cir. 2001). This
duty has always been on the company dealing with the federal government.
Plaintiff-relator has cited no cases—and the Court can find none—that place this obligation
on a third-party insurer or bond underwriter. Cf United States v. Speqtrum, Inc., 113 F. Supp. 3d
238, 240 (D.D.C. 2015) (holding that a company that submitted Medicaid claims could be liable
because its owner was either aware of the fraud or acted with “reckless disregard); United States
ex rel. Ervin & Assocs., Inc. v. Hamilton Sec. Grp., Inc., 370 F. Supp. 2d 18, 41 (D.D.C. 2005)
(holding that a contractor which submitted false statements related to a note sale had a duty to
discover potential errors before submitting to the government).
Plaintiff-relator repeatedly references insurance defendants’ “FCA-imposed duty” to make
additional inquiries when they encounter “red flags of . . . possible fraud.” See, e.g., ECF No. 359
at 15-16; ECF No. 360 at 4, 13. But plaintiff-relator fails to acknowledge that without affirmative
knowledge of SDVOSB regulations or requirements, the facts in question would not raise red flags.
And while plaintiff-relator argues that the SDVOSB regulations are “simplistic,” ECF No. 359 at
15, the purported simplicity of the regulations are irrelevant. Plaintiff-relator has tried to construct
a duty out of thin air: that it “should be incumbent on [the insurance defendants] . . . to have a basic
familiarity with the concepts behind the SDVOSB regulations.” ECF No. 359 at 16. But plaintiff-
26
relator cannot point to any court recognizing this third-party burden for bonding companies, which
ensure all federal contracts—not just SDVOSB-eligible ones.
When this Court allowed the claims against the insurance defendants to proceed in Scollick
II, plaintiff-relator had alleged that the insurance defendants “concealed ne facts from the
government” that would have revealed the fraud and conducted a tour of OST’s offices which
should have revealed that CSG “was a shell company.” Scollick IT, 2017 WL 3268857, at *14. But
plaintiff-relator’s facts now include no mention of this tour or an awareness that CSG or Centennial
were “shell” companies. Instead, the facts are closer to what this Court originally dismissed in
Scollick I. The fact that the insurance defendants “knew the content of the bid proposals” does not
mean the insurance defendants “knew the content” was fraudulent. Scollick I, 2017 WL 3268857,
at *14 (quoting Scollick I, 215 F. Supp. 3d at 41).
In sum, plaintiff-relator has failed to proffer evidence that the insurance defendants knew
of the SDVOSB requirements nor any support for the notion that they had a duty to familiarize
themselves with those requirements. Because knowledge is a required element of every claim
against the insurance defendants, this Court will GRANT summary judgment for the insurance
defendants on all claims.!°
D. Shobha Mehta Is Entitled To Summary Judgment
Defendant Dr. Shobha Mehta represents a small part of the purported conspiracy. Plaintiff-
relator alleges that she assisted CSG when it falsified parts of CB’s past performance as its own.
Dr. Mehta allegedly asserted in “satisfaction surveys and phone calls that [the] work had been done
10 Because the Court is granting summary judgment for the insurance defendants, it will only briefly address the
argument that the public disclosure bar prohibits plaintiff-relator’s claims against the insurance defendants. ECF No.
335-1 at *23. A court shall dismiss an action if the same allegations or transactions in the claim were publicly
disclosed, “unless opposed by the [g]overnment.” 31 U.S.C. § 3730(e)(4)(A). The government here opposed. any
dismissal based on the public disclosure bar. See ECF No. 350. Accordingly, the public disclosure bar does not warrant
dismissal here. See United States ex rel. Scutellaro v. Capitol Supply, Inc., No. 10-cv-1094 (BAH), 2017 WL 1422364,
at *12 (D.D.C. Apr. 19, 2017)
27
[by CSG] and was ‘exceptional’ or ‘outstanding.’” Scollick I, 2017 WL 3268857, at *9. Because
CSG had not done work at Dr. Mehta’s office (instead, CB had performed work), this statement
was allegedly false. Beyond the false statement claim, plaintiff-relator also maintained a
conspiracy claim against Dr. Mehta, alleging that one of the CSG conspirators approached her and
convinced her to submit materially false performance questionnaires. Id.
Now, Dr. Mehta moves for summary judgment. ECF No. 342. Though she moves pro se,
the crux of her argument is clear: there were never any phone calls with government contractors
verifying CSG’s work. Jd. at 5; ECF No. 392 at 2. She never received a VA performance survey
questionnaire from any government officer. ECF No. 392 at 2. She never verified any false
information provided in any CSG bid proposals. Jd.
Plaintiff-relator points to two pieces of evidence as proof that Dr. Mehta either made false
statements or caused false statements to be submitted. Both are far too scrawny to shoulder the
heavy weight he places on them. First, plaintiff-relator argues that because Dr. Mehta’s phone
number was listed as a reference on one bid proposal, the Court could infer that government
contracting officers did, in fact, contact Dr. Mehta. ECF No. 361 at 9. But this argument piles
inference on inference—the Court would need to infer that the government contractor chose to call
references, that the contractor called Dr. Mehta, that Dr. Mehta picked up the phone, and that Dr.
Mehta gave false statements to the government contractor. This kind of conjecture is
impermissible. See United States v. Ross, 92 U.S. 281, 283 (1875) (terming “inferences from
inferences” to be “nothing more than conjectures”).
Second, plaintiff-relator points to the fact that Dr. Mehta admitted she “authorized Parekh
to fill out a performance questionnaire, which she then signed and returned to Parekh.” ECF No.
361 at 8. That much is true—as Dr. Mehta explained, and plaintiff-relator does not dispute, Parekh
28
asked Dr. Mehta certain questions about her satisfaction with him and his workers over the phone,
then filled out a questionnaire and sent it to her to sign. ECF No. 361 {| 10. The questionnaire was
in fact a VA performance questionnaire that referenced CSG, not CB. /d. To plaintiff-relator, this
is enough to prove not only that Dr. Mehta caused false statements to be submitted to the
government, but that she was involved in a conspiracy to violate the FCA. But the facts on the
record illustrate that Dr. Mehta was unaware that this performance questionnaire was for the VA.
ECE No. 361-1 at 30-31. She believed that “Neil and his workers” were “survey[ing] how happy
[she] was with the work.” Jd. One signature on a form that all parties agree Dr. Mehta did not fill
out personally is not sufficient to establish liability.
In sum, despite plaintiff-relator’s protests to the contrary, ECF No. 361 at 7, Dr. Mehta is
right: there is no evidence that Mehta knowingly submitted false statements. Because plaintiff-
relator has failed to make a sufficient showing of an essential element of his case—namely,
whether Dr. Mehta knowingly submitted a false performance questionnaire or gave false
verification of CSG’s work to a government officer when called—Dr. Mehta’s motion for
summary judgment will be GRANTED. Celotex Corp., 477 U.S. at 323.
E. Hudson’s Partial Motion For Summary Judgment Will Be Denied
At last, the Court will turn to Hudson’s crossclaim for indemnification. As a condition of
issuing surety bonds on CSG’s behalf, Hudson required CSG, Citibuilders, CB, OST, Gogia, and
Parekh to indemnify Hudson against losses, costs, and expenses incurred by Hudson as a result of
issuing any bonds. ECF No. 336-1 at 2. Now, Hudson moves for partial summary judgment against
OST, CSG, Gogia, and Parekh to enforce that agreement with respect to the losses and costs
incurred here. Id. at 9. CSG and Gogia opposed, ECF No. 369, as did OST, ECF No. 365, and
Hudson replied, ECF No. 376. Parekh did not respond.
29
In the General Indemnity Agreement (“GIA”) at issue, crossclaim defendants CSG, OST,
Gogia, and Parekh agreed to pay Hudson for costs “incurred by [Hudson] by reason of having
executed any Bond.” ECF No. 336-5 at 2. In Hudson’s view, its claim tums purely on interpretation
of this phrase. ECF No. 336-1 at 9. Because CSG, OST, Gogia, and Parekh executed the GIA, and
because Hudson’s argues its liability here “arises from its issuance of the Hudson Bonds,” Hudson
demands indemnification. Jd. at 10. This Court disagrees.
Parties in the District of Columbia!! are free to enter indemnification contracts like the
GIA. Parker v. John Moriarty & Assocs., 189 F. Supp. 3d 38, 43 (D.D.C. 2016). But that is not
the end of the inquiry: the D.C. Court of Appeals has explained that an indemnity provision should
“not be construed to permit an indemnitee to recover for his [or her] own negligence unless the
court is firmly convinced that such an interpretation reflects the intention of the parties.” W.M.
Schlosser Co. v. Md. Drywall Co., 673 A.2d 647, 653 (D.C. 1996) (quoting United States v.
Seckinger, 397 U.S. 203, 211 (1970) (alteration in original)). If a party expects to “shift
responsibility for its negligence” then the “mutual intention of the parties to this effect should
appear with clarity from the face of the contract.” Jd. The question a court must ask is whether the
contract provision in question “clearly reflects such a purpose.” Jd. If there is ambiguity as to
whether the contract intended to provide the type of protection in question, the standard is not
satisfied. Parker, 189 F. Supp. 3d at 43.
The alleged scienter in this case is greater—Hudson is accused not of negligence but of
willfully contributing to a fraudulent conspiracy. Accordingly, to grant Hudson’s summary
judgment motion here, the Court must determine that the GIA unambiguously and clearly reflects
the parties’ intent to shift liability for Hudson’s own knowing and willful acts. If the contract is “at
'! While the GIA lacks a choice of law provision, parties agree that District of Columbia law applies. See ECF No.
365 at4n.1.
30
all ambiguous” on this point, “this standard is not satisfied.” Rivers & Bryan, Inc. v. HBE Corp.,
628 A.2d 631, 635 (D.C. 1993). And if the standard is not satisfied, summary judgment must be
denied.
The GIA here indemnifies Hudson for all costs “incurred by [Hudson] by reason of having
executed any Bond.” ECF No. 336-5 at 2 (emphasis added). The Court finds that this language
does not clearly represent an intent to indemnify Hudson for any and all actions, even the knowing
illegal acts alleged in plaintiff-relator’s complaint. Costs incurred for allegedly committing illegal
acts are arguably not costs incurred by “reason” of having executed a bond. To put it another way,
it is Hudson’s allegedly fraudulent acts beyond the bond, not the execution of the bond itself, that
incurred costs in that scenario. Though this Court is ultimately dismissing the claims against
Hudson, plaintiff-relator alleged that Hudson was an active participant in the fraud and knowingly
continued to issue bonds despite being aware that CSG was not SDVOSB-eligible. Given this
ambiguity regarding whether these acts are covered by the GIA, the Court cannot say there is no
genuine dispute that the contract provision “clearly reflects such a purpose.” W.M. Schlosser Co.,
673 A.2d at 653.
In deciding this, the Court rejects the argument Hudson raises in its reply—that OST, CSG,
and Gogia’s express denial of the existence of fraud in their motions for summary judgment cannot
be reconciled with their argument that Hudson cannot seek indemnity here. ECF No. 376 at 4. This
misstates the crossclaim defendants’ arguments. Crossclaim defendants do not argue that Hudson
actually committed any illegal acts. Instead, they argue that the costs incurred in this litigation
came “by reason of” plaintiff-relator’s accusations of Hudson’s own willful fraud, not the act of
executing the CSG bond, and the GIA is ambiguous as to whether such costs are covered. ECF
31
No. 365 at 3. This Court agrees. Accordingly, Hudson’s motion for partial summary judgment will
be DENIED.
F. Madan, Narula, And OST’s Motions To Strike Portions Of Plaintiff-Relator’s
Motion For Partial Summary Judgment Will Be Dismissed As Moot
Madan, Narula, and OST finally move to strike portions of plaintiff-relator’s motion for
partial summary judgment, ECF Nos. 366 & 367. Specifically, they move to strike the declaration
of Benjamin Ward. ECF No. 366 at 1. Plaintiff-relator opposes this motion. ECF No. 385. Because
this Court’s analysis that there is a genuine dispute of material fact regarding the construction
defendants is not altered by the inclusion or exclusion of Ward’s testimony, the Court will
DISMISS this motion to strike AS MOOT.
IV. CONCLUSION
Plaintiff-relator and the construction defendants present a tangled web of facts and
conflicting characterizations that can only be resolved by a jury. Accordingly, this Court will:
¢ GRANT Centennial and Schendel’s motion, ECF No. 328, for
summary judgment against plaintiff-relator and DISMISS all claims
against Centennial and Schendel;
¢ DENY plaintiff-relator’s motion, ECF No. 329, for partial summary
judgment against CSG and Gogia;
¢ DENY plaintiff-relator’s motion, ECF No. 330, for partial summary
judgment against OST, Narula, and Madan;
¢ DENY plaintiff-relator’s motion, ECF No. 331, for partial summary
judgment against Centennial, Schendel, Hanover, and Hudson;
e DENY plaintiff-relator’s motion, ECF No. 332, for partial summary
judgment against Parekh;
¢ GRANT Hanover’s motion, ECF No. 334, for summary judgment
against plaintiff-relator and DISMISS all claims against Hanover;
¢ GRANT Hudson’s motion, ECF No. 335, for summary judgment
against plaintiff-relator and DISMISS all claims against Hudson;
32
e DENY Hudson’s motion, ECF No. 336, for partial summary
judgment on its crossclaims for indemnification;
e DENY OST, Narula, and Madan’s motion, ECF No. 337, for
summary judgment against plaintiff-relator;
e DENY CSG and Gogia’s motion, ECF No. 338, for summary
judgment, against plaintiff-relator;
e DENY Parekh’s motion, ECF No. 341, for summary judgment
against plaintiff-relator;
e GRANT Mehta’s motion, ECF No. 342, for summary judgment
against plaintiff-relator and DISMISS all claims against Mehta; and
e DISMISS AS MOOT Madan, Narula, and OST’s motion, ECF
Nos. 366 & 367, to strike portions of the record.
A separate Order will be filed with this memorandum opinion.
Date: July /# , 2022 “eres CQ Konbeli
Hon. Royce C. Lamberth
United States District Judge
33