stating that in McDill, the court “held that an insurer was liable for statutory penalties even though the 11 No. 07-30963 insurer’s first notice of the claim was the filing of suit almost a year after the accident occurred”

How later courts described this case

  • stating that in McDill, the court “held that an insurer was liable for statutory penalties even though the 11 No. 07-30963 insurer’s first notice of the claim was the filing of suit almost a year after the accident occurred”
  • stating that “arguments not raised before the district court are waived and cannot be raised for the first time on appeal”
  • stating that “a trial court’s determination that an insurer was not provided with a satisfactory proof of loss is a factual finding that may not be disturbed on appeal absent manifest error”
  • “The resolution of conflicting testimony and the making of credibility choices are within the province of the court sitting without a jury, subject only to the clearly erroneous standard.”

Written by the judges who cited it.

The opinion

IN THE UNITED STATES COURT OF APPEALS

FOR THE FIFTH CIRCUIT United States Court of Appeals

Fifth Circuit

FILED

January 8, 2009

No. 07-30963 Charles R. Fulbruge III

Clerk

XAVIER GRILLETTA, JR; RANDY LAUMAN

Plaintiffs-Appellees-Cross-Appellants

v.

LEXINGTON INSURANCE COMPANY

Defendant-Appellant-Cross-Appellee

Appeal from the United States District Court

for the Eastern District of Louisiana

Before KING, DeMOSS, and PRADO, Circuit Judges.

PER CURIAM:

Hurricane Katrina wreaked havoc on the New Orleans area, destroying

homes and businesses. One such casualty was a large vacation house located on

the southeastern shore of Lake Pontchartrain. This appeal considers whether

the insurer of the property must cover that damage.

I. FACTUAL AND PROCEDURAL BACKGROUND

Plaintiffs-Appellees-Cross-Appellants Xavier Grilletta (“Grilletta”) and

Randy Lauman (“Lauman”) (collectively, the “Plaintiffs”) owned a huge vacation

home on the shores of Lake Pontchartrain. The house was approximately 6,000

square feet and included nine bedrooms, seven and a half bathrooms, three

kitchens, two dens, a large main room measuring 25 by 60 feet, and an elevator.

No. 07-30963

Water surrounded the house on three sides. The elevation of the lowest floor of

the house was 16.22 feet NAVD,1 with the lowest “horizontal member” at 15.21

feet NAVD. The property also included a large boathouse.

The Plaintiffs obtained homeowners’ insurance from Defendant-Appellant-

Cross-Appellee Lexington Insurance Company (“Lexington”). The insurance

policy covers most damage—including damage from wind—but excludes

coverage of “water damage,” defined as damage caused by “flood, surface water,

waves, tidal water, overflow of a body of water, or spray from any of these,

whether or not driven by wind.” In essence, therefore, if wind destroyed the

house, then Lexington’s insurance policy covers the damage; if water destroyed

the house, then Lexington is not liable based on the water-damage exclusion.

The policy limits are $400,000 on the dwelling, $40,000 on other structures, and

$200,000 on contents in the house.

On August 29, 2005, Hurricane Katrina completely destroyed the house.

Two days after the hurricane, the Plaintiffs reported the loss to Lexington.

Lexington hired an outside adjuster, Wayne Wagner (“Wagner”), to work on the

claim. Wagner met with the Plaintiffs at the property on September 27, 2005.

After that meeting, Wagner requested additional information from the Plaintiffs,

which they provided at another meeting on October 28, 2005. On November 10,

2005, Grilletta faxed a lost contents list to Wagner. On November 12, 2005,

Wagner submitted a final report to his superiors, who then forwarded the report

to Lexington on November 13, 2005. Wagner concluded, “[t]he damage appears

to be wind related” and “[t]he home was destroyed from wind and not flood.” He

recommended that Lexington pay the Plaintiffs $400,000 for the dwelling (the

policy limit) and an additional $140,448 for the loss of contents, minus a

deductible of $8,000, for a total payment of $532,448.

1

NAVD stands for North American Vertical Datum. In essence, “16.22 feet NAVD”

means 16.22 feet above sea level.

2

No. 07-30963

Lexington took no action until January 26, 2006, when it requested a

damage causation analysis from Halliwell Engineering Associates, Inc.

(“Halliwell Engineering”). The engineering firm retained meteorologist Andy

Johnson (“Johnson”) to examine the cause of the damage. Johnson determined

that the maximum winds sustained at the property were between 95 and 100

miles per hour, with wind gusts possibly as high as 116 miles per hour. He

concluded that this wind might have damaged the roof, doors, and windows, but

was unlikely to have totally destroyed the property. He also found that the

storm surge was between fifteen to sixteen feet, with waves superimposed on

top. Johnson therefore concluded that a storm surge was the proximate cause

of the destruction. His report stated, however, that wind damage to the roof

might have occurred prior to any flood or storm surge. Halliwell Engineering

submitted Johnson’s report to Lexington on April 18, 2006.

Lexington told Wagner, the claims adjuster, to re-adjust the claim based

on the Halliwell Engineering report, and specifically to assume that wind

damaged the roof, which in turn could have led to interior damage. Wagner then

submitted a report detailing the damage to the roof, siding, interior drywall

ceilings and walls, insulation, flooring, cabinets, and contents. On June 5, 2006,

Lexington paid the Plaintiffs $311,055.38, consisting of $191,674.58 for the

house and $119,380.80 for contents.

On June 23, 2006, Grilletta wrote to Lexington to dispute its conclusion

that the proximate cause of the destruction was anything other than wind,

question Lexington’s failure to pay for the destruction of the boathouse, and

state that he and Lauman reserved the right to submit a supplemental claim for

lost contents. Lexington responded with a form denial letter. Thereafter, on

August 15, 2006, the Plaintiffs brought suit.

In June 2007, the Plaintiffs included a supplemental claim for contents in

a proposed trial exhibit. Lexington did not respond to this supplemental

3

No. 07-30963

contents claim. The district court conducted a bench trial on August 23-24,

2007. At trial, the Plaintiffs sought payments for total destruction of the house,

total destruction of the boathouse, supplemental contents coverage, and

statutory penalties.

Regarding the destruction of the house, the Plaintiffs offered the testimony

of engineer Leonard Quick (“Quick”). Quick stated that “[t]he property was

destroyed by high wind forces, more probably than not, a tornado by way of the

forensic physical evidence well in advance of the maximum height of flood water

associated with a storm surge on the back end of the storm.” Quick came to this

conclusion by examining the forensic evidence at the property, albeit

approximately fourteen months after the hurricane. Quick also stated that if

there were not a tornado, then winds of 125-155 miles per hour destroyed the

property. Regarding a storm surge, Quick stated that the house sustained a

surge of only ten to twelve feet.

In response, Lexington submitted the testimony of two experts who

provided a completely different analysis. Meteorologist Johnson stated that he

examined the radar images of the area from the National Weather Service’s

Doppler radar in Slidell and could not find any evidence of a tornado. Lexington

argued that Johnson’s analysis of the radar images rules out the possibility of

a tornado crossing the Plaintiffs’ property. Johnson also used data from the

National Climatic Data Center to conclude that the property sustained

maximum winds of approximately 100 miles per hour, with gusts at 129 miles

per hour. Johnson testified that these winds were Category 2 winds on the

Saffir-Simpson scale and could damage roofs, doors, or windows but could not

cause major damage to the structure. Providing his theory of the cause of the

destruction, Johnson stated that the height of the storm surge at the

property—not counting the waves on top—was 15.3 feet, just touching the lowest

horizontal members of the house. Engineer Todd Cormier (“Cormier”) reviewed

4

No. 07-30963

this meteorological data and described how, in his opinion, the force of the waves

destroyed the house. He explained that a large storm surge exerted upward

pressure and lifted the wood-frame house off of its foundation. He also noted

that a storm surge destroyed a property known as “Old Glory” close to the

Plaintiffs’ property.

In sum, the Plaintiffs’ expert, an engineer, asserted that either a tornado

or high winds destroyed the house and that there was a small storm surge of ten

to twelve feet. Lexington’s experts, a meteorologist and an engineer, stated that

there was no evidence of a tornado or winds strong enough to destroy the house

and that a storm surge of at least fifteen feet caused the destruction.

The district court considered this evidence and issued written findings of

fact and conclusions of law. The court noted that there was no dispute that the

house was worth more than the $400,000 policy limit. It also stated that there

was no dispute that the boathouse was worth more than the $40,000 policy limit

for other structures, although Lexington did dispute this finding.

In its conclusions of law, the court recognized that an insurer has the

burden of proving that a policy exclusion applies (once an insured suffers a loss),

and it determined that Lexington had not met its burden here. Specifically, the

court stated that “[a]t best, it is ambiguous as to what caused the destruction of

the property.” The court noted that Lexington and its experts conceded that

wind could have caused some of the damage. Accordingly, the court held that

the Plaintiffs were entitled to the full $400,000 payment for loss of the house.

The court also found that Lexington did not meet its burden of showing that

water destroyed the boathouse and awarded the Plaintiffs the full $40,000 policy

limit for this loss.

Regarding the Plaintiffs’ claim for supplemental contents coverage, the

district court ruled that because the Plaintiffs had not actually submitted a

supplemental contents claim to Lexington itself, Lexington was not liable for any

5

No. 07-30963

additional payments for contents coverage. The court then awarded the

Plaintiffs statutory damages pursuant to Louisiana insurance law. Specifically,

the court awarded 25% of the undisputed amount that Lexington eventually paid

based on the satisfactory proof of loss, or 25% of $311,055.38 ($77,763.84). The

court rejected the Plaintiffs’ request for statutory penalties for the additional

amount that the court had awarded. In sum, the court awarded the Plaintiffs

$208,325.42 in additional payments for loss of the house, $40,000 for the loss of

the boathouse, and statutory penalties in the amount of $77,763.84. Both

parties appeal this ruling. Because the district court, which had diversity

jurisdiction, issued a final judgment, we have jurisdiction pursuant to 28 U.S.C.

§ 1291.

II. DISCUSSION

A. The House

1. Standard of Review

“The standard of review for a bench trial is well established: findings of

fact are reviewed for clear error and legal issues are reviewed de novo.” Bd. of

Trs. New Orleans Employers Int’l Longshoremen’s Ass’n v. Gabriel, 529 F.3d 506,

509 (5th Cir. 2008) (quoting Water Craft Mgmt. LLC v. Mercury Marine, 457

F.3d 484, 488 (5th Cir. 2006)). Accordingly, we review the allocation of the

burden of proof de novo and the decision on whether the party met that burden

for clear error. See Guajardo v. Tex. Dep’t of Criminal Justice, 363 F.3d 392, 395

(5th Cir. 2004) (per curiam).

2. Analysis

As the district court correctly explained, under Louisiana law, once an

insured suffers a covered loss, the insurer has the burden of proving that a policy

exclusion applies to avoid liability. See LA. REV. STAT. ANN. § 22:658.2(B) (“If

damage to immovable property is covered, in whole or in part, under the terms

6

No. 07-30963

of the policy of insurance, the burden is on the insurer to establish an exclusion

under the terms of the policy.”). The insurer must demonstrate that the policy

exclusion applies by a preponderance of the evidence. See Ferguson v. State

Farm Ins. Co., No. 06-3936, 2007 WL 1378507, at *1 (E.D. La. May 9, 2007)

(citing Ferro v. Gebbia, 252 So. 2d 545, 547 (La. Ct. App. 1971)). As there is no

dispute that the Plaintiffs suffered a covered loss, Lexington had the burden of

proving by a preponderance of the evidence that the water-damage exclusion

applied, i.e., that water destroyed the house.

When reviewing a district court’s factual findings, this court may not

second-guess the district court’s resolution of conflicting testimony or its choice

of which experts to believe. See Ayers v. United States, 750 F.2d 449, 455 (5th

Cir. 1985) (“The resolution of conflicting testimony and the making of credibility

choices are within the province of the court sitting without a jury, subject only

to the clearly erroneous standard.”). As we have previously stated, “[t]he

credibility determination of witnesses, including experts, is peculiarly within the

province of the district court. Consequently, we give deference to the findings

and credibility choices trial courts make with respect to expert testimony.”

League of United Latin Am. Citizens No. 4552 v. Roscoe Indep. Sch. Dist., 123

F.3d 843, 846 (5th Cir. 1997) (internal quotation marks and citations omitted).

Thus, we review the district court’s finding that water did not destroy the house

only for clear error.

The Louisiana Fourth Circuit Court of Appeal recently decided a very

similar case, which guides our analysis. See Veade v. La. Citizens Prop. Corp.,

985 So. 2d 1275 (La. Ct. App. 2008). That case involved a house near the

Grilletta-Lauman property that Hurricane Katrina also destroyed. Id. at 1277.

At trial, the plaintiffs presented the testimony of the same engineer as in this

case, Leonard Quick, who stated that high winds or a tornado, and not water,

destroyed the property. Id. at 1279. The insurer presented the opinions of its

7

No. 07-30963

own experts, who determined that water caused the destruction. Id. at 1279-80.

The trial court weighed these competing views and concluded that the insurer

had not met its burden of showing that the water damage exclusion applied. Id.

at 1280. On appeal, the court noted that “Mr. Quick is an experienced forensic

engineer who had conducted many Katrina related claim inspections.” Id. The

court ruled that the trial court had not committed “manifest error” in its

findings, especially because there were “two opposing theories” as to the

destruction of the property. Id.

Similarly, much of the bench trial in this case involved a battle of the

experts. As discussed above, the Plaintiffs presented the testimony of Quick, the

engineer, who stated that his review of the forensic physical evidence suggested

that a tornado or high winds destroyed the house. Lexington responded with the

testimony of two experts, who discounted the Plaintiffs’ expert and concluded

that the only plausible explanation was that water or flooding caused the

destruction. On appeal, Lexington strenuously objects to the district court’s

finding that it did not meet its burden of showing that water caused the damage,

arguing that “objective meteorological evidence” completely discounts the theory

that a tornado or high winds destroyed the house. It notes that its meteorologist

expert, Johnson, used objective data from the National Weather Service, the

National Hurricane Center, the National Oceanic Atmospheric Administration,

the National Climatic Data Center, and the United States Geological Survey.

Lexington also points out that Quick did not offer any meteorological data and

instead relied on “unreliable” forensic evidence on the property, which he had

examined roughly fourteen months after the hurricane.

However, Lexington’s experts also conceded that a tornado or high winds

could have damaged the house. Further, Lexington’s engineer, Cormier,

admitted that Halliwell Engineering originally concluded that a storm surge

destroyed “Old Glory,” the property nearby, but later removed that conclusion

8

No. 07-30963

from future reports regarding that property. Thus, the evidence at trial was not

as clear-cut as Lexington suggests.

Most tellingly, much like in Veade, our review of the record shows that

there were “two permissible views of the evidence,” meaning that “the

factfinder’s choice between them cannot be clearly erroneous.” Anderson v. City

of Bessemer City, 470 U.S. 564, 574 (1985). Although Lexington presented a

persuasive argument that the meteorological data suggests that water was the

proximate cause of the damage, the district court did not view that evidence as

conclusive. Indeed, the main basis of this lawsuit is that it is unclear whether

wind or water destroyed the house, and several experts offered differing views.

Given that the trial consisted of a battle of qualified experts who all presented

plausible theories, the district court was free to choose among these reasonable

explanations in rendering its decision. Accordingly, by definition, the district

court’s resolution of this issue cannot be clearly erroneous, and we affirm the

district court’s finding.

B. The Boathouse

1. Standard of Review

At the close of the Plaintiffs’ case-in-chief, Lexington moved for judgment

on partial findings under Federal Rule of Civil Procedure 52(c), arguing that the

Plaintiffs failed to prove the value of the boathouse, which was an element of

their claim. The district court denied the motion. In its final judgment, the

court awarded $40,000 for coverage of the boathouse, the full policy limit for

“other structures.” When considering a district court’s ruling under Rule 52(c),

this court reviews the district court’s legal conclusions de novo and its factual

findings for clear error. Bursztajn v. United States, 367 F.3d 485, 488-89 (5th

Cir. 2004).

9

No. 07-30963

2. Analysis

At the trial, co-plaintiff Lauman described the boathouse as a twenty-three

to twenty-four foot high structure that had sheet metal sides, a split-level pier,

a covered deck, an open fishing area with four large fishing lights, running

electricity and water, and a remote control electric launch for lifting, storing, and

launching a twenty-seven foot boat. The district court, in denying Lexington’s

Rule 52(c) motion, stated that based on this description and an aerial

photograph of the premises, it could conclude that the boathouse was worth well

more than the $40,000 policy limit for “other structures.”

Lexington challenges this finding on appeal, but it fails to demonstrate

how the court clearly erred. For example, Lexington does not explain why the

court went astray in relying on Lauman’s detailed testimony about the

boathouse. Although additional evidence might have been preferable to support

its conclusion, it is well within the fact finder’s discretion to consider this

testimony, view an aerial photograph, and make an inference that the boathouse

was, in the district court’s words, a “pretty substantial structure” that would cost

more than $40,000 to rebuild. Accordingly, we affirm the district court’s finding

on this issue.2

C. Supplemental Contents Coverage

1. Standard of Review

The district court found that the Plaintiffs did not provide Lexington with

a satisfactory proof of loss for supplemental contents coverage, and, in a cross-

appeal, the Plaintiffs challenge this conclusion. This is a factual finding that we

2

Lexington also argues that the Plaintiffs failed to provide a satisfactory proof of loss

for the boathouse. However, Lexington did not assert this argument as a basis for its Rule

52(c) motion, instead challenging only the evidence regarding the value of the boathouse, and

the district court never made any findings regarding a satisfactory proof of loss for the

boathouse. Accordingly, Lexington has waived this argument on appeal. See, e.g., Lemaire v.

Louisiana, 480 F.3d 383, 387 (5th Cir. 2007) (stating that “arguments not raised before the

district court are waived and cannot be raised for the first time on appeal”).

10

No. 07-30963

review for clear error. See Gabriel, 529 F.3d at 509; Boudreaux v. State Farm

Mut. Auto. Ins. Co., 896 So. 2d 230, 236 (La. Ct. App. 2005) (stating that “a trial

court’s determination that an insurer was not provided with a satisfactory proof

of loss is a factual finding that may not be disturbed on appeal absent manifest

error”).

2. Analysis

On November 10, 2005, Grilletta faxed to Wagner a contents list for

Wagner to use in his claim adjustment. On June 5, 2006, Lexington paid the

Plaintiffs $119,380.80 for loss of the contents of their house. On June 23, 2006,

Grilletta sent a letter to Lexington, which stated that the Plaintiffs were refining

their contents list and were viewing the list as a “work in progress.” Lexington

responded with what the Plaintiffs describe as a “form denial letter.” After the

Plaintiffs initiated this suit, they presented Lexington with an additional claim

for $79,745.00, along with a supplemental contents list, as part of a proposed

trial exhibit. The district court overruled Lexington’s objection to the submission

of the supplemental contents list. However, the court ruled that because the

Plaintiffs never officially submitted or proved the value of their supplemental

contents claim, they were not entitled to additional payments.

The Plaintiffs argue that their trial exhibit satisfies the “flexible”

requirement of providing a satisfactory proof of loss. In support, they cite McDill

v. Utica Mutual Insurance Co., 475 So. 2d 1085, 1089 (La. 1985), in which the

Louisiana Supreme Court concluded that the insured had carried its burden of

showing a satisfactory proof of loss to trigger penalties and attorneys’ fees even

though the insurer first received notice of the claim when the insured filed the

lawsuit. The Plaintiffs suggest that this means that, as a matter of law, they

validly submitted a satisfactory proof of loss through the trial exhibit. See Sher

v. Lafayette Ins. Co., 988 So. 2d 186, 198 (La. 2008) (stating that in McDill, the

court “held that an insurer was liable for statutory penalties even though the

11

No. 07-30963

insurer’s first notice of the claim was the filing of suit almost a year after the

accident occurred”).

McDill is distinguishable, however, because in that case the insurer first

learned of the entire claim when the insured filed the lawsuit, while here the

Plaintiffs sought to supplement an already-existing claim through a trial exhibit.

The district court ruled that the Plaintiffs had never submitted their

supplemental contents claim to Lexington, and McDill does not change that

finding. That is, the Plaintiffs read McDill too broadly in suggesting that a

proposed trial exhibit will always give an insurer, as a matter of law, “sufficient

information to act on the claim.” Sevier, 497 So. 2d at 1384. Moreover, the

Plaintiffs have not challenged the district court’s implicit factual finding that the

trial exhibit in this case did not satisfy the Plaintiffs’ burden of submitting a

satisfactory proof of loss. Accordingly, we affirm the district court’s decision to

deny additional payments for supplemental contents coverage.3

D. Statutory Penalties

1. Standard of Review

Under Louisiana insurance law, an insurer is liable for statutory penalties

for failing to pay a claim within thirty days if that failure was arbitrary and

capricious. LA. REV. STAT. ANN. § 22:658(B)(1); Reed v. State Farm Mut. Auto.

Ins. Co., 857 So. 2d 1012, 1019-20 (La. 2003). A determination of whether an

insurer’s failure to pay a claim was arbitrary and capricious is a finding of fact,

which this court reviews for clear error. See Hardy v. Hartford Ins. Co., 236 F.3d

287, 293 (5th Cir. 2001). We review the district court’s legal conclusions

regarding the statutory penalties de novo. See Gabriel, 529 F.3d at 509; Floors

Unlimited v. Fieldcrest Cannon, 55 F.3d 181, 184 (5th Cir. 1995) (reviewing a

district court’s interpretation of state law de novo).

3

We take no position on whether the Plaintiffs still could present a satisfactory proof

of loss under the Lexington policy.

12

No. 07-30963

2. Analysis

a. Statutory Penalties on the Undisputed Portion of the Claim

LA. REV. STAT. ANN. § 22:658(B)(1) provides,

Failure to make a written offer to settle any property damage claim

. . . within thirty days after receipt of satisfactory proofs of loss of

that claim . . . or failure to make such payment within thirty days

after written agreement or settlement . . . when such failure is found

to be arbitrary, capricious, or without probable cause, shall subject

the insurer to a penalty [of 25%].4

To recover statutory penalties, the Plaintiffs must establish three elements:

“(i) that the insurer received a satisfactory proof of loss, (ii) that the insurer

failed to pay the claim within the applicable statutory period, and (iii) that the

insurer’s failure to pay was arbitrary and capricious.” Boudreaux, 896 So. 2d at

233.

As discussed above, to show a “satisfactory proof of loss,” the insurer must

“receive[] sufficient information to act on the claim.” Sevier, 497 So. 2d at 1384.

The district court concluded that Lexington received a satisfactory proof of loss

no later than November 13, 2005, when it received Wagner’s report that wind

caused the destruction of the house. Lexington then took no action on the claim

until January 26, 2006, when it hired Halliwell Engineering to conduct a

causation analysis. That is, Lexington failed to pay the claim within thirty days,

as the statute requires. Further, the district court ruled that Lexington

arbitrarily sat on the claim for over two months before deciding to hire Halliwell

Engineering and that Lexington had no good-faith basis for delaying payment

of the claim. Accordingly, the court awarded penalties on the amount that

Lexington ultimately tendered on June 5, 2006.

4

In 2006, the Louisiana Legislature amended this provision to increase the statutory

penalties from 25% to 50%. See 2006 La. Acts 813. As that amendment is not retroactive, the

parties agree that the 25% penalty applies to the facts of this case.

13

No. 07-30963

Lexington takes issue with the court’s finding that its delay was arbitrary

and capricious. A failure to pay a claim is “arbitrary and capricious” if the

insurer’s refusal to pay is “vexatious.” Reed, 857 So. 2d at 1021. The Louisiana

Supreme Court defined “vexatious” in this context as “unjustified, without

reasonable or probable cause or excuse.” Id. The court concluded that this

standard “describe[s] an insurer whose willful refusal of a claim is not based on

a good-faith defense.” Id. As the Louisiana Supreme Court recently stated,

“there can be no good reason—or no probable cause—for withholding an

undisputed amount.” La. Bag Co. v. Audubon Indem. Co., No. 2008-C-0453,

2008 WL 5146674, at *8 (La. Dec. 2, 2008) (internal quotation marks omitted).

The district court rested its decision to award statutory penalties on the

fact that Lexington did nothing on the Plaintiffs’ claim after Wagner submitted

his report, which concluded that wind caused the damage and recommended that

Lexington pay the entire policy limit of $400,000 for the dwelling. After

Lexington received Wagner’s report on November 13, 2005, the Plaintiffs did not

hear from Lexington, even though co-plaintiff Grilletta tried calling the insurer.

Lexington had assigned the claim to file examiner Donald Fielder (“Fielder”),

and although Grilletta could not reach Fielder, Grilletta managed to track down

another file examiner, Phil Smith (“Smith”), to inquire about the status of the

payment. On January 26, 2006, Smith requested an engineering report from

Halliwell Engineering. Smith apparently had not reviewed Wagner’s report and

photographs, because in his email to Halliwell Engineering requesting the

engineering report, he wrote, “[t]he adjuster’s report does not include if a loss is

a result of wind damage or flood.” Additionally, neither Fielder nor Kristi

Fickeisen, Lexington’s corporate representative who also was involved in

handling the Plaintiffs’ claim, had reviewed Wagner’s report or photographs

until just before the trial. Thus, it appears that Lexington began to act only

after Grilletta contacted Smith, and at that point Smith decided to seek an

14

No. 07-30963

engineering report instead of simply paying the claim. Moreover, there was

never a dispute that wind caused at least some of the damage. Based on the two

and a half month delay between when Lexington received Wagner’s report and

when it sought the engineering analysis, and given Lexington’s failure to pay

any undisputed amount within thirty days, the district court did not clearly err

in concluding that Lexington’s failure to pay the claim was arbitrary and

capricious. See La. Bag Co., 2008 WL 5146674, at *8 (“Any insurer who fails to

pay said undisputed amount has acted in a manner that is, by definition,

arbitrary, capricious or without probable cause.”) Accordingly, there was ample

support for the district court’s finding that there was “no good faith basis on

which Lexington could have denied this claim,” and we affirm the award of

statutory penalties for the undisputed amount Lexington owed.5

b. Statutory Penalties on the Entire Amount Due

The Plaintiffs also sought statutory penalties for the additional amount

that the district court awarded in this case ($248,325.42), but the district court

denied that request because it concluded that there was a reasonable dispute as

to the nature of the total loss of the structure. The Plaintiffs assert on appeal

that the district court erred as a matter of law.

As the Louisiana Fourth Circuit Court of Appeal explained,

Case law reveals that where there is a reasonable disagreement

between the insured and the insurer as to the amount of a loss, the

insurer’s refusal to pay is not arbitrary, capricious or without

probable cause and failure to pay within the statutory delay does

not subject the insurer to penalties. However, if part of a claim for

property damage is not disputed, the failure of the insurer to pay

5

Lexington’s argument that the delay was simply due to the large number of cases it

had stemming from Hurricane Katrina is unavailing, as this does not explain why Smith

sought an engineering analysis instead of consulting Wagner’s report. It also does not explain

why Lexington chose not to pay some amount to cover the damage from wind. This delay was

the catalyst for the district court’s decision to award statutory penalties, because Lexington

did nothing with the claim even though the adjuster stated that wind destroyed the entire

house.

15

No. 07-30963

the undisputed portion of the claim within the statutory delay will

subject the insurer to penalties on the entire claim. Consequently,

when such a dispute arises, to avoid the imposition of penalties the

insurer must unconditionally tender to the insured the undisputed

portion of the insured’s claim.

Warner v. Liberty Mut. Fire Ins. Co., 543 So. 2d 511, 515 (La. Ct. App. 1989)

(citations omitted) (emphasis added). In Shadow Lake Management Co. v.

Landmark American Insurance Co., No. 06-4357 et al., 2007 WL 1959236, at *3

(E.D. La. July 2, 2007), the court reviewed the line of cases discussed in Warner

and concluded, “if part of a claim for property damage is not disputed, the

insurer’s failure to unconditionally tender the undisputed portion of the claim

to the insured within the statutory delay will subject the insurer to liability for

the statutory penalties on the entire claim.”

Lexington responds that the Plaintiffs’ argument for a statutory penalty

on the entire amount Lexington owed is based on outdated law. Prior to 1992,

LA. REV. STAT. ANN. § 22:658 provided for a penalty on “the total amount of the

loss.” See 1990 La. Acts 262; 1989 La. Acts 638. In 1992, the legislature

amended the statute to make the penalty a percentage of “the amount found to

be due from the insurer to the insured.” 1992 La. Acts 879. In 2003, the

legislature amended the statute to increase the penalty from 10% to 25% of “the

amount found to be due from the insurer to the insured.” 2003 La. Acts 790.

The 2003 version applies to the Plaintiffs’ case. Lexington argues that the

Louisiana courts have construed the “amount found to be due” under this statute

to mean “that amount over which reasonable minds could not differ.” Ibrahim

v. Hawkins, 845 So. 2d 471, 477 (La. Ct. App. 2003) (describing the “amount due”

after an insured submits a satisfactory proof of loss).

However, the Louisiana courts have recently provided some guidance on

this issue that undercuts Lexington’s argument. In 2007, the Louisiana Fourth

Circuit Court of Appeal cited Warner, a 1989 case, for the proposition that “if

16

No. 07-30963

part of a claim for property damage is not disputed, the failure of the insurer to

pay the undisputed portion of the claim within the statutory delay will subject

the insurer to penalties on the entire claim.” Sher v. Lafayette Ins. Co., 973 So.

2d 39, 60 (La. Ct. App. 2007) (citing Warner, 543 So. 2d at 515) (alteration

omitted). The court then awarded a penalty of 25% of the total amount due, not

just the undisputed portion. Id. at 65. On appeal, the Louisiana Supreme Court

did not cite Warner or explicitly point out this rule, but it similarly awarded a

25% penalty on the entire amount due. Sher, 988 So. 2d at 208. In Louisiana

Bag, the Louisiana Supreme Court noted that “an insurer need only fail to

tender one undisputed portion of the claim to be subject to penalties on the

difference between the amount paid or tendered and the amount found to be

due.” 2008 WL 5146674, at *13. Here, Lexington did not pay or tender anything

to the Plaintiffs within the statutory deadline, so under this rule Lexington is

liable for a statutory penalty pursuant to LA. REV. STAT. ANN. § 22:658 for the

amount found to be due, i.e., the total amount of the Plaintiffs’ loss. Thus, even

though “R.S. 22:658 . . . [is] penal in nature and must be strictly construed,”

Sher, 988 So. 2d at 206 (quoting Reed, 857 So. 2d at 1020), the Louisiana

Supreme Court has not interpreted the 1992 amendment to have changed the

meaning of the law. Accordingly, we must reverse this portion of the district

court’s judgment and remand for the imposition of a 25% penalty on the entire

amount due.

III. CONCLUSION

Much of this case involves a review of the district court’s factual findings,

and there is no indication that the district court committed clear error.

Accordingly, we AFFIRM the district court’s decision regarding the house, the

boathouse, and the supplemental contents coverage. The district court did err,

however, when it failed to impose statutory penalties on the entire amount due.

17

No. 07-30963

We therefore REVERSE that portion of the district court’s opinion and

REMAND for a recalculation of the statutory penalties.

AFFIRMED IN PART; REVERSED IN PART; REMANDED.

18

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.