Opinion

Behrens v. United States

Court
United States Court of Federal Claims
Filed
Jun 16, 2021
Status
Published
On the bench
Patricia E. Campbell-Smith
Cited by
0 cases
Authority
More cited than 15.7%

holding that a deed exchanged for nominal consideration is a “voluntary grant” under Missouri law

How later courts described this case

  • holding that a deed exchanged for nominal consideration is a “voluntary grant” under Missouri law
  • holding that language stating “to have and to hold the same together with all singular rights, immunities, privileges and appurtenances to the same” conveys a fee simple interest
  • “[A]t the summary judgment stage the judge’s function is not [herself] to weigh the evidence and determine the truth of the matter but to determine whether there is a genuine issue for trial.”
  • holding that the words “grant, bargain, and sell” are evidence of a conveyance in fee

Written by the judges who cited it.

The opinion

In the United States Court of Federal Claims

No. 15-421L

(E-Filed: June 16, 2021)

)

DAVID H. & ARLINE M. )

BEHRENS, et al., )

)

Plaintiffs, ) Motion for Summary Judgment; RCFC

) 56; Rails-to-Trails; Trails Act; Fifth

v. ) Amendment Takings; Railbanking.

)

THE UNITED STATES, )

)

Defendant. )

)

Thomas S. Stewart, Kansas City, MO, for plaintiffs.

Edward C. Thomas, Trial Attorney, with whom were John C. Cruden, Assistant Attorney

General, Environment and Natural Resources Division, United States Department of

Justice, Washington, DC, for defendant. Evelyn Kitay, Associate General Counsel,

United States Surface Transportation Board, Washington, DC, of counsel.

OPINION

CAMPBELL-SMITH, Judge.

Plaintiffs in this case allege that they have suffered takings of their property

pursuant to the Fifth Amendment of the United States Constitution. See ECF No. 24

(fourth amended complaint). Plaintiffs’ motion for partial summary judgment, ECF No.

96, and defendant’s cross-motion for partial summary judgment, ECF No. 97, both

brought pursuant to Rule 56 of the Rules of the United States Court of Federal Claims

(RCFC), are currently before the court.

In evaluating these motions, the court considered the following: (1) plaintiffs’

fourth amended complaint, ECF No. 24; (2) plaintiffs’ motion for partial summary

judgment, ECF No. 96; (3) defendant’s response and cross-motion for partial summary

judgment, ECF No. 97; (4) plaintiffs’ response to defendant’s cross-motion and reply in

support of its motion for partial summary judgment, ECF No. 98; (5) defendant’s reply in

support of its cross-motion, ECF No. 101; and (6) the parties’ joint supplement attaching

legible transcriptions of the deeds at issue, ECF No. 111.

Briefing is now complete and the motions are ripe for decision. The court has

considered all of the parties’ arguments and addresses the issues that are pertinent to the

court’s ruling in this opinion. For the following reasons, plaintiffs’ motion for partial

summary judgment, ECF No. 96, is DENIED; and defendant’s cross-motion for partial

summary judgment, ECF No. 97, is GRANTED.

I. Background

Plaintiffs are landowners along a 144.3-mile rail corridor owned by the Missouri

Central Railroad Company (MCRR). See ECF No. 24 at 4. The rail corridor stretches

through the center of Missouri, from Pettis County to Franklin County. See id. Plaintiffs

claim they have suffered a Fifth Amendment taking of their property interests as a result

of MCRR’s efforts to discontinue use of the rail corridor, and allow use of the property as

a recreational trail. See id. at 20.

The parties previously filed cross-motions for summary judgment, which the court

resolved in defendant’s favor. 1 See ECF No. 43 (reported opinion at Behrens v. United

States, 132 Fed. Cl. 663 (2017)). Plaintiffs then moved for reconsideration, which the

court granted in part. See ECF No. 52 (reported opinion at Behrens v. United States, 135

Fed. Cl. 66 (2017)). In its opinion ruling on plaintiffs’ motion for reconsideration, the

court summarized its conclusions in its initial summary judgment opinion as follows:

In ruling on the parties’ cross-motions for summary judgment, the court drew

five conclusions: (1) “Missouri law does not support a presumption that

easements conveyed to a railroad by voluntary grant are limited in scope to

railroad purposes only,” see ECF No. 43 at 5; (2) “Defendant is not liable for

a taking where the rail corridor is owned by [the railroad] in fee,” see id. at

6; (3) “Plaintiffs have failed to prove that they possess a valid property

interest in [several specific claims],” see id. at 10; (4) “[Several specific

claims] involve property outside the scope of this case,” see id. at 12; and (5)

“Defendant is not liable for a taking where the conveyed easements are broad

enough to encompass trail use and railbanking,” see id. at 13.

See id. at 2. The court granted reconsideration only with regard to the last point—the

scope of the easements at issue in this case. See id. at 4. The court noted that under

1

In its opinion ruling on the parties’ previous motions for summary judgment, the court

explained the background of this case in detail. See ECF No. 43. The court will only reiterate

the portions of that background that are directly relevant to the present motions.

2

Missouri law, easements must have a definable scope, and held that “[n]either party ha[d]

successfully established the facts necessary to determine the precise scope of the

easement with respect to the grants that do not include explicitly stated purposes.” Id.

The scope of each easement remains at issue in this case, see id. at 5, and are the subject

of the parties’ present motions for summary judgment. 2

Both parties acknowledge that the deeds at issue do not include express

restrictions on how MCRR uses the parcels. See ECF No. 96 at 30-31 (“Since an

easement requires a definable scope and these easements do not specifically say that they

are ‘for railroad purposes’ only, . . . the [c]ourt recognized the need to consider and

analyze extrinsic evidence on the subject upon reconsideration and directed the parties to

focus on extrinsic evidence to ascertain the scope of the railroad’s easement consistent

with the requirement to construe the deeds to give effect to the intention of the parties.”);

ECF No. 97 at 18 (“The deeds do not contain any language expressly limiting their scope

to railroad purposes.”).

Under Missouri law, when an easement does not include an expressly stated

purpose, it is “incomplete or ambiguous,” and the court may consider extrinsic evidence

“to determine the parties’ intention.” See Maasen v. Shaw, 133 S.W.3d. 514, 519 (Mo.

Ct. App. 2004) (citing Fisher v. Miceli, 291 S.W.2d 845, 848 (Mo. 1956)). Relevant

evidence may include the circumstances surrounding creation of the easement, its

location, and its prior use. See id. (citing Hoelscher v. Simmerock, 921 S.W.2d 676, 679

(Mo. Ct. App. 1996)). For this reason, following the court’s ruling on plaintiffs’ motion

for reconsideration, the parties engaged in discovery in an attempt to develop evidence of

the intended scope of the easements created by the subject deeds. See ECF No. 97 at 11;

see also ECF No. 62, ECF No. 65 (discovery orders).

After “reviewing and evaluating the arguments made by the parties, the court . . .

concluded that this case requires the resolution of tension between various precepts of

Missouri law,” and issued an order staying this case and inviting the parties to consider

seeking “guidance from the Supreme Court of Missouri on the interpretations of Missouri

law at issue in the case.” ECF No. 116 at 1, 4. On June 4, 2021, the parties filed a joint

status report in which they state that “[t]he parties have conferred and have researched the

issue as delineated by the [c]ourt and do not presently see a practical course” to seek

guidance from the Supreme Court of Missouri. ECF No. 118 at 1. As such, the parties

2

Plaintiffs maintain their position that under Missouri law, the grants at issue must

necessarily be limited to use for “railroad purposes only.” See ECF No. 96 at 12-31. Because

the court resolved this issue against plaintiffs in its first summary judgment decision, see ECF

No. 43 at 5-6, and left its conclusion undisturbed on reconsideration, see ECF No. 52 at 3-4, it

will not consider this argument for a third time in this opinion.

3

requested “that the [c]ourt lift the stay and rule on the pending motions before the

[c]ourt.” Id.

II. Legal Standards

Summary judgment is appropriate when there is no genuine issue of material fact

and the moving party is entitled to judgment as a matter of law. RCFC 56(a); Celotex

Corp. v. Catrett, 477 U.S. 317, 322 (1986). A fact is material if it “might affect the

outcome of the suit under the governing law.” Anderson v. Liberty Lobby, Inc., 477 U.S.

242, 248 (1986). An issue is genuine if it “may reasonably be resolved in favor of either

party.” Id. at 250. “[T]he mere existence of some alleged factual dispute between the

parties will not defeat an otherwise properly supported motion for summary judgment;

the requirement is that there be no genuine issue of material fact.” Id. at 247-48

(emphasis in original).

The moving party bears the initial burden of demonstrating the absence of any

genuine issue of material fact. Celotex Corp., 477 U.S. at 323. The burden then shifts to

the nonmoving party to show that a genuine issue of material fact does exist such that the

case should proceed to trial. Id. at 324.

The court must view the inferences to be drawn from the underlying facts in the

light most favorable to the nonmoving party. Matsushita Elec. Indus. Co. v. Zenith Radio

Corp., 475 U.S. 574, 587 (1986); Mingus Constructors, Inc. v. United States, 812 F.2d

1387, 1391 (Fed. Cir. 1987). The court, however, must not weigh the evidence or make

findings of fact. See Anderson, 477 U.S. at 249 (“[A]t the summary judgment stage the

judge’s function is not [herself] to weigh the evidence and determine the truth of the

matter but to determine whether there is a genuine issue for trial.”); Ford Motor Co. v.

United States, 157 F.3d 849, 854 (Fed. Cir. 1998) (“Due to the nature of the proceeding,

courts do not make findings of fact on summary judgment.”).

Because the parties have developed an extensive factual record through discovery,

the issues presently before the court are primarily legal in nature. Thus, summary

judgment is appropriate, and to the extent any factual disagreements remain, the court

finds them to be immaterial to the issues at hand.

III. Analysis

A. Evidence Of Grantors’ Intent

Under Missouri law, “[t]he cardinal rule regarding an interpretation of a deed is to

ascertain the intention of the parties and to give that intention effect.” Hinshaw v. M-C-

M Props., LLC, 450 S.W.3d 823, 827 (Mo. Ct. App. 2014) (citing Dean Machinery Co. v.

Union Bank, 106 S.W.3d 510, 520 (Mo. Ct. App. 2003)). The evidence now before the

4

court includes the language of the various deeds at issue and evidence of multiple uses of

the parcels—as an active rail line, for the placement of fiber optic cables, and for other

forms of transportation. 3

1. Deed Language

With only minor differences in capitalization and punctuation, each of the twenty

deeds states that the grantors: “grant, bargain and sell, and convey and confirm unto [the

railroad] the following described real estate . . . To have and to hold the same, together

with all the rights, immunities, privileges and appurtenances to the same . . . , and to its

successors and assigns forever . . . .” ECF No. 111-2 at 2-3 (Schoening deed); see also

id. at 5-6 (Bowles deed); id. at 8 (Stuhlmacher deed); id. at 11 (Groff deed); id. at 14

(Dreysse deed); id. at 17 (first Backues deed); id. at 20-21 (second Backues deed); id. at

23, 24-25 (first Thompson deed); id. at 27 (Yarger deed); id. at 30-31 (Lackland deed);

id. at 33 (second Thompson deed); id. at 36 (Linke deed); id. at 39 (Vaughn deed); id. at

42-43 (Ridenhour deed); id. at 45 (Wilcoxson deed); id. at 48 (Lacy deed); id. at 51

(Marriott deed); id. at 54 (Yaws deed); id. at 57 (Crewson deed); id. at 60 (Hatler deed).

In addition, seventeen of the deeds are titled “Warranty Deed.” Id. at 2, 5, 8, 11,

14, 17, 20, 30, 36, 39, 42, 45, 48, 51, 54, 57, 60. One of the three deeds that are not

explicitly described as warranty deeds describes the conveyance as a “quit claim.” Id. at

23. And one of the warranty deeds is joined by two mortgagees “for the purpose of

releasing the foregoing strip of land from the lien of their [m]ortgages against it.” Id. at

48.

2. Extrinsic Evidence

The parties have offered several pieces of extrinsic evidence in support of their

positions. Plaintiffs note that the grantee was a railroad, see ECF No. 96 at 32, and the

long, narrow shape of the property at issue, see id. at 33. For its part, defendant points to

relatively recent uses of the property—including the installation of fiber optic cable and

the use of recreational vehicles on the property. See ECF No. 97 at 19-20.

3

On October 16, 2020, the parties filed a joint supplement attaching transcribed copies of

the deeds at issue, pursuant to the court’s September 2, 2020 scheduling order. See ECF No.

111. Therein, they corrected an error in the number of deeds at issue, noting the discovery of a

corrected deed during the transcription process, bringing the total number of deeds from nineteen

to twenty. See id. at 1 n.1. Despite the previous omission of the corrected deed, the parties

reported that no further briefing on the pending motions was warranted. See id. at 2.

Accordingly, the court will rule on the motions for summary judgment based on the briefs which

were filed prior to the parties’ supplement, and which refer to nineteen deeds. For this reason,

there may be a discrepancy in the number of deeds referenced in the fact section, and the number

of deeds referenced in discussing the parties’ briefs.

5

B. Easements Are Broad Enough to Encompass Trail Use

The evidence before the court presents a complicated question of interpretation in

this case. As the court has previously noted, “[d]efendant concedes that each identified

deed likely conveys an easement as opposed to a fee interest because each deed involves

nominal consideration.” See ECF No. 43 at 14 (citing ECF No. 36 at 39). See also

Brown v. Weare, 152 S.W.2d 649, 653-54 (Mo. 1941) (holding that a deed exchanged for

nominal consideration is a “voluntary grant” under Missouri law); MO. ANN. STAT. §

388.210(2) (West 1969) (stating that a “voluntary grant” to a railroad “shall be held and

used for the purpose of such grant only”). And an easement, by its nature, must have a

definable scope. See Maasen, 133 S.W.3d at 518 (“By definition, an easement is ‘the

mere right of a person to use for a definite purpose another [person]’s land in connection

with his [or her] own land.’”) (quoting Mahnken v. Gillespie, 43 S.W.2d 797, 800-01

(Mo. 1931)).

While the court recognizes the force of these rules under Missouri law, they do not

fit comfortably with the language in the deeds that seems to indicate the intention to

convey a fee interest in the properties. See Nixon v. Franklin, 289 S.W.2d 82, 88 (Mo.

1956) (holding that the words “grant, bargain, and sell” are evidence of a conveyance in

fee); Bayless v. Gonz, 684 S.W.2d 512, 513 (Mo Ct. App. 1984) (holding that language

stating “to have and to hold the same together with all singular rights, immunities,

privileges and appurtenances to the same” conveys a fee simple interest).

Thus, in order to act in accordance with Missouri law, the court must both

consider the broad granting language and habendum clauses that seem to convey a fee

interest, but also remain mindful of the legal construction of the grants as easements that

must be limited in scope. The tension in this analysis is marked.

As noted above, the court has previously found that the scope of the easements at

issue is unclear. See ECF No. 52 at 4. And when the scope of an easement is unclear,

Missouri courts will consider extrinsic evidence that may include the circumstances

surrounding creation of the easement, its location, and its prior use. See Maasen, 133

S.W.3d at 519 (citing Hoelscher v. Simmerock, 921 S.W.2d 676, 679 (Mo. Ct. App.

1996)). Unfortunately, the evidence submitted by the parties in the briefs now before the

court is inconclusive. Plaintiffs point to the fact that the grantee was a railroad, see ECF

No. 96 at 32, and the long, narrow shape of the property at issue, see id. at 33, neither of

which are facts that compel the conclusion that the conveyance is limited to what

plaintiffs define as railroad purposes. For its part, defendant points to relatively recent

uses of the property that are quite far removed in time from the execution of the deeds—

including the installation of fiber optic cable, and the use of recreational vehicles on the

property—raising doubts about how probative of the grantors’ intent those activities are.

See ECF No. 97 at 19-20.

6

In light of the parties’ request that the court rule on their motions without guidance

from the Supreme Court of Missouri, on the record currently before it, the court believes

that the best course is to hew closely to the rule articulated in Hinshaw v. M-C-M

Properties, LLC, 450 S.W.3d 823 (Mo. Ct. App. 2014). Under Missouri law, “[t]he

cardinal rule regarding an interpretation of a deed is to ascertain the intention of the

parties and to give that intention effect.” Id. at 827 (citing Dean Mach. Co., 106 S.W.3d

at 520). In this case, the best evidence available of the grantor’s intent remains the

language of the deeds themselves, which indicates a broad grant to the railroad. See ECF

No. 96 at 32 (plaintiffs arguing that “[t]he most critical evidence concerning the

circumstances surrounding the creation of the easements are actually the deeds

themselves”).

In the court’s view, the broad granting language and habendum clauses in the

deeds at issue are convincing evidence that the grantors intended unrestricted

conveyances. The legal construction of these conveyances as easements does not change

that apparent intent. The court does not find, however, that these conveyances are in

fee—Missouri law clearly does not allow for such a conclusion given the nominal

consideration.

Rather, the court concurs with the reasoning articulated by this court in Burnett v.

United States, 139 Fed. Cl. 797 (2018), a case in which the court considered deeds

conveying property to the same railroad as the deeds in this case, through strikingly

similar language. The court in Burnett concluded that the deeds at issue conveyed

easements that were broad enough to encompass trail use and railbanking, and explained

its conclusion as follows:

[T]he granting clauses in these deeds state that: “the parties of the first part

. . . do by these presents, grant, bargain and sell, convey and confirm unto

said party of the second part . . .” the property conveyed. As discussed above,

the inclusion of the phrase “grant, bargain and sell” in a conveyance deed has

long been interpreted under Missouri law to convey a fee simple interest.

Nixon, 289 S.W.2d at 88. While there is no dispute that a fee simple interest

was not conveyed to the railroad here—given that the consideration provided

in these deeds is only one dollar—the inclusion of the phrase “grant, bargain

and sell,” nonetheless, indicates that the parties intended to convey a broad

easement to the railroad. This view is reinforced by the fact that the granting

clauses for these source deeds do not contain any language to limit the scope

of the easements conveyed.

In addition, the habendum clauses for the applicable source deeds similarly

indicates that the parties intended to convey a broad easement to MCRR.

These clauses state, in relevant part, that property is conveyed to the railroad:

“To have and to hold the same, together with all rights, immunities,

7

privileges and appurtenances to the same belonging to the [railroad] and to

its successors and assigns forever.” As discussed above, Missouri courts

have interpreted such language to convey a fee simple interest. Bayless, 684

S.W.2d at 513. And so, again, the Court construes the applicable source

deeds for the remaining claims in this case to convey a broad easement to the

railroad.

Indeed, while plaintiffs correctly argue that the source deeds do not contain

any language that specifically mentions trail use or railbanking, plaintiffs fail

to explain why it is necessary for the deeds to contain such language in order

to convey an easement to the railroad that is broad enough to encompass

public recreational trail use. Because the plain language in the source deeds

makes clear that the parties intended to convey a broad easement to the

railroad—and not to limit this easement to use for railroad purposes—the

Court concludes that the source deeds relevant to plaintiffs’ remaining claims

convey easements that can encompass public recreational trail use.

Burnett v. United States, 139 Fed. Cl. at 811–12 (record citations omitted).

In the court’s view, it would violate the primacy of the grantor’s intent to find that

the deeds—which otherwise appear to convey a fee interest—should be artificially

limited to plaintiffs’ definition of railroad purposes simply because Missouri law

construes conveyances for nominal consideration to be easements. For these reasons, the

court concludes that the easements at issue in the parties’ motions for summary judgment

are broad enough to encompass trail use.

IV. Conclusion

Accordingly, for the foregoing reasons:

(1) The clerk’s office is directed to LIFT the stay in this case;

(2) Plaintiff’s motion for partial summary judgment, ECF No. 96, is DENIED;

(3) Defendant’s cross-motion for partial summary judgment, ECF No. 97, is

GRANTED; and

(4) On or before July 16, 2021, the parties are directed to CONFER and FILE:

(a) A joint status report, indicating what, if any, issues remain for

resolution in this case; and

8

(b) A joint motion for entry of judgment on all claims that have been

resolved. The parties are directed to specifically identify the resolved

claims, unless no issues remain, and the case may be dismissed in its

entirety.

IT IS SO ORDERED.

s/Patricia E. Campbell-Smith

Patricia E. Campbell-Smith

Judge

9