stating that when a statutory definition provides that it “includes” specific terms, the “enumerated items are illustrative, not exclusive”
How later courts described this case
- stating that when a statutory definition provides that it “includes” specific terms, the “enumerated items are illustrative, not exclusive”
Written by the judges who cited it.
The opinion
03/13/2020
IN THE COURT OF APPEALS OF TENNESSEE
AT NASHVILLE
November 5, 2019 Session
HOME BUILDERS ASSOCIATION OF MIDDLE TENNESSEE ET AL.
V. WILLIAMSON COUNTY, TENNESSEE ET AL.
Appeal from the Chancery Court for Williamson County
No. 46451 James G. Martin, III, Chancellor
No. M2019-00698-COA-R3-CV
An organization of developers brought suit against Williamson County seeking a
declaratory judgment that an impact fee imposed on new developments to fund
improvements to schools throughout the county exceeded the authority granted to the
county by the legislature, or alternatively, that Tenn. Code Ann. § 13-3-413(b) exempted
the organization’s members from paying the impact fee because their property rights
vested prior to adoption of the impact fee. The trial court granted summary judgment to
the county, concluding that the impact fee did not exceed the authority granted to the
county and that Tenn. Code Ann. § 13-3-413(b) did not apply because the impact fee did
not constitute a development standard. We affirm.
Tenn. R. App. P. 3 Appeal as of Right; Judgment of the Chancery Court Affirmed
ANDY D. BENNETT, J., delivered the opinion of the Court, in which RICHARD H. DINKINS
and W. NEAL MCBRAYER, JJ., joined.
John P. Williams and Thomas V. White, Nashville, Tennessee, for the appellants, Home
Builders Association of Middle Tennessee, Drees Premier Homes, Inc., Ole South
Properties, Inc., Regent Homes, LLC, Aspen Construction, LLC, Barlow Builders, LLC,
The Jones Company of Tennessee, LLC, Ridgemont Homes, LLC, and Gateway Mosby
Cool Springs, LLC.
Jeffrey D. Moseley and Jason A. Hughes, Franklin, Tennessee, for the appellees,
Williamson County, Tennessee, Mayor of Williamson County, and Williamson County
Board of Commissioners.
OPINION
FACTUAL AND PROCEDURAL BACKGROUND
Significant growth in the construction of residential housing caused severe
financial strain on Williamson County (“the County”) to provide services such as water,
roads, parks, and schools. In 1987, to alleviate some of this strain, the General Assembly
passed a private act known as the “Williamson County Construction Impact Fee Act,”
1987 Tenn. Priv. Acts Ch. 120 (“the Private Act”). The preamble to the Private Act
provides that the County is authorized to impose an impact fee on all new residential
construction within Williamson County with the qualification that the County earmark
the fees collected “for the funding of such services necessitated by the new
development.” Notably, section 3 of the Private Act states that the intent and purpose of
the Private Act is to:
establish a regulatory procedure or system to collect fees from the
developer of any new land development activity so as to require the
developer to share in the burdens of growth by paying his pro rata share for
the reasonably anticipated expansion cost of public improvements
generated by the new land development activity.
In the years following passage of the Private Act, the County continued to
experience significant residential growth, which caused increased enrollment in the
County’s schools. When the new growth strained the capacity of the County’s schools
and existing revenue sources could not sufficiently provide for capital improvements to
the schools to accommodate the increased enrollment, the County exercised its authority
under the Private Act on November 14, 2016, and adopted Resolution No. 11-16-6. The
resolution imposes an impact fee on all new residential development in Williamson
County “for the purpose of mitigating the impact the new residential development has on
the County’s need to build or expand education facilities.” Williamson County,
Resolution No. 11-16-6, § 2. Section 6 of Resolution No. 11-16-6 created two service
areas: Williamson County Schools (“WCS”) and the Franklin Special School District
(“FSSD”). FSSD students attend FSSD schools from kindergarten through eighth grade
and then attend WCS high schools. The impact fees collected are only used to fund
capital improvements to WCS schools and must be spent in accordance with the “Capital
Improvement Program,” which is a proposed schedule of school improvement projects in
the County listed in order of priority. Id. §§ 3.3, 6. Therefore, the resolution allows the
County to spend the impact fees collected to fund school improvement projects
throughout the County, not just on the schools that serve the particular development
paying the fee.
Resolution No. 11-16-6, section 7.1 requires that the impact fee be calculated and
collected at the time a developer applies for a building permit. Thus, the County had to
-2-
determine the amount of the impact fee to be imposed. The County hired a consulting
firm, TischlerBise, to assist in establishing a method for calculating the impact fee. After
conducting a study of the County’s projected growth and the cost of educational facilities
that would be needed to serve the new growth, TischlerBise determined that the size of a
new home correlated to the number of school-age children who would live there.
TischlerBise then developed a schedule of fees to be assessed on a pro rata basis based on
the square footage of the new home, the number of school-age children that would be
expected to live there, and the service area where the home would be located. The
County adopted TischlerBise’s proposed impact fee schedule on November 14, 2016,
with Resolution No. 11-16-7. At the time the County adopted Resolution Nos. 11-16-6
and 11-16-7, there were developers whose preliminary development plans had already
been approved. Neither resolution contained a provision exempting these developers
from paying the impact fee when they applied for a building permit following the
adoption of the impact fee.
On July 28, 2017, Home Builders Association of Middle Tennessee (“Home
Builders Association”), an organization of developers who construct homes in
Williamson County, filed a declaratory judgment action against the County, the County’s
mayor, and the County’s board of commissioners. In the complaint, Home Builders
Association contended that the impact fee, as adopted by the County, exceeded the
authority granted by the Private Act because the resolutions do not require that the funds
collected be used to fund school improvements that will directly benefit the development
paying the fee. They further contended that the impact fee, as adopted by the County,
violated the Vested Property Rights Act, as codified at Tenn. Code Ann. § 13-3-413(b),
because it failed to exempt developments for which the County had approved
development plans prior to adopting the impact fee. Finally, Home Builders Association
requested that the impact fee be declared invalid.
The parties filed cross-motions for summary judgment. After hearing argument
from both sides, the trial court concluded that the “[r]esolutions adopted by [the County]
are consistent with the General Assembly’s intent concerning the way Impact Fees are to
be implemented under [the Private Act].” The trial court found that the Vested Property
Rights Act did not apply to the impact fee adopted by the County because the
development standards referred to in that act pertain “to matters relating to the physical
aspects of development, not the payment of fees” and that the Private Act “does not affect
a developer’s rights in regards to the physical use of the land.” On March 29, 2019, the
trial court entered a memorandum and order granting the County’s motion for summary
judgment. The Home Builders Association appealed.
STANDARD OF REVIEW
We review a trial court’s summary judgment determination de novo, with no
presumption of correctness. Rye v. Women’s Care Ctr. of Memphis, MPLLC, 477 S.W.3d
-3-
235, 250 (Tenn. 2015). Therefore, “we make a fresh determination of whether the
requirements of Rule 56 of the Tennessee Rules of Civil Procedure have been satisfied.”
Id. Summary judgment is appropriate “if the pleadings, depositions, answers to
interrogatories, and admissions on file, together with the affidavits, if any, show that
there is no genuine issue as to any material fact and that the moving party is entitled to a
judgment as a matter of law.” TENN. R. CIV. P. 56.04. In this case, the relevant facts are
not disputed. The only question we must answer is whether the County was entitled to
summary judgment as a matter of law. To answer this question, we must interpret the
Private Act and the Vested Property Rights Act.
Statutory interpretation is a question of law that we review de novo with no
presumption of correctness. Home Builders Ass’n of Middle Tenn. v. Williamson Cnty.,
304 S.W.3d 812, 816 (Tenn. 2010). When construing a statute, we do so in accordance
with well-settled principles that our Supreme Court has articulated as follows:
The leading rule governing our construction of any statute is to ascertain
and give effect to the legislature’s intent. To that end, we start with an
examination of the statute’s language, presuming that the legislature
intended that each word be given full effect. When the import of a statute
is unambiguous, we discern legislative intent “from the natural and
ordinary meaning of the statutory language within the context of the entire
statute without any forced or subtle construction that would extend or limit
the statute’s meaning.”
Myers v. AMISUB (SFH), Inc., 382 S.W.3d 300, 308 (Tenn. 2012) (citations omitted). If
the statutory language is ambiguous, however, “we construe the statute’s meaning by
examining ‘the broader statutory scheme, the history of the legislation, or other sources.’”
Home Builders Ass’n, 304 S.W.3d at 817 (quoting State v. Sherman, 266 S.W.3d 395,
401 (Tenn. 2008)). Statutory language is ambiguous if it “‘is capable of conveying more
than one meaning.’” Walker v. Sunrise Pontiac-GMC Truck, Inc., 249 S.W.3d 301, 309
(Tenn. 2008) (quoting LeTellier v. LeTellier, 40 S.W.3d 490, 498 (Tenn. 2001)).
ANALYSIS
I. Validity of the County’s Impact Fee.
The first issue presented by Home Builders Association is whether the impact fee,
as implemented by the County, exceeds the authority granted by the General Assembly in
the Private Act. Home Builders Association argues that the County’s implementation of
the impact fee exceeded the authority granted by the Private Act because Resolution Nos.
11-16-6 and 11-16-7 do not require the County to spend the funds collected from the
impact fee solely for improvements at the specific schools that serve the residents of the
new developments paying the fee. Like the County, an increasing number of local
-4-
governments across the country are relying on impact fees as a source of revenue to
provide expanded public facilities, such as schools, that are necessitated by new
development. Tyson Smith and Julian Conrad Juergensmeyer, Development Impact Fees
2006: A Year in Review, 59 PLANNING & ENVTL. LAW 3 (Feb. 2007). The increased
reliance on impact fees has led to an increase in legal challenges to impact fee laws in
various jurisdictions. Id. This is the first time a Tennessee appellate court has been
asked to address the validity of an impact fee. Thus, we must look to other jurisdictions
for guidance on this issue.
A. Authority to Impose an Impact Fee.
When determining the validity of an impact fee, many courts begin by determining
whether a statute or constitutional provision authorized the local government to impose
the impact fee. See Mayor & Bd. of Aldermen, City of Ocean Springs v. Homebuilders
Ass’n of Miss., Inc., 932 So. 2d 44, 50-51 (Miss. 2006); Durham Land Owners Ass’n v.
Cnty. of Durham, 630 S.E.2d 200, 203-06 (N.C. Ct. App. 2006); Idaho Bldg. Contractors
Ass’n v. City of Coeur d’Alene, 890 P.2d 326, 328 (Idaho 1995); N.J. Builders Ass’n v.
Mayor Twp. Comm. of Bernards Twp., Somerset Cnty., 528 A.2d 555, 560 (N.J. 1987);
15 McQuillin THE LAW OF MUNICIPAL CORPORATIONS § 39.5 (3d ed. 2019). Courts
have generally held that impact fees are invalid in situations where a local government
imposes an impact fee without statutory or constitutional authority to do so. See City of
Ocean Springs, 932 So. 2d at 53; Durham Land Owners Ass’n, 630 S.E.2d at 206, 208;
N.J. Builders Ass’n, 528 A.2d at 562.
In the present case, the preamble to the Private Act states that the County is
authorized “to levy impact fees upon new developments” so as “to provide that new
development[s] contribute [their] fair share of the cost of providing public improvements
and services.” Section 2 of the Private Act defines “capital or public improvements” as:
[T]he construction, reconstruction, building, replacement, extension,
enlargement, or repair of any street, road, alley, sidewalk, gutter, and other
similar improvements; schools; parks and playgrounds; waterworks, water
distribution systems, sewers, sewerage, storm water or drainage system
authorized by the governing body; and includes any one (1) or more or any
combination of these public improvements.
1987 TENN. PRIV. ACT Ch. 120. As evidenced by the above language, the construction or
enlargement of schools constitutes a “public improvement.” The language of the Private
Act, therefore, clearly and unambiguously authorizes the County to impose an impact fee
on new developments so that the new developments contribute their fair share of the cost
incurred by the County to construct or enlarge schools to accommodate the increased
enrollment generated by the new developments.
-5-
B. Tax vs. Fee.
Once it is determined that a local government has statutory or constitutional
authority to impose an impact fee, courts then analyze whether the impact fee constitutes
a tax or a fee. See 15 McQuillin THE LAW OF MUNICIPAL CORPORATIONS § 39.5 (3d ed.
2007). The power to tax resides in the General Assembly, but the General Assembly may
“delegate to counties and incorporated towns the power to tax for county or corporation
purposes.” Williams v. Taxing Dist., 84 Tenn. 531, 536 (1886). Generally, impact fees
are deemed invalid if they are determined to be unauthorized taxes. See City of Ocean
Springs, 932 So. 2d at 59; Idaho Bldg. Contractors Ass’n, 890 P.2d at 331; Broward
Cnty. v. Janis Dev., Corp., 311 So.2d 371, 375 (Fla. Dist. Ct. App. 1975); see also Smith
and Juergensmeyer, PLANNING & ENVTL. LAW at 3. Thus, in the present case, if the
impact fee assessed by the County exceeded the authority granted by the General
Assembly in the Private Act, it would constitute an unauthorized tax. In order to address
this issue, we must briefly discuss the difference between a tax and a fee.
Whether a charge constitutes a tax or a fee depends on its purpose. City of
Tullahoma v. Bedford Cnty., 938 S.W.2d 408, 412 (Tenn. 1997). A tax is a method for
generating revenue and is imposed “for the purpose of paying the government’s general
debts and liabilities.” Id. Generally, legislatures impose taxes on most, or all, of their
citizens. San Juan Cellular Tel. Co. v. Pub. Serv. Comm’n of Puerto Rico, 967 F.2d 683,
685 (1st Cir. 1992). The funds collected from a tax are placed in “a general fund, and
spent for the benefit of the entire community.” Id.; see also City of Tullahoma, 938
S.W.2d at 412. A fee, on the other hand, “is imposed for the purpose of regulating a
specific activity or defraying the cost of providing a service or benefit to the party paying
the fee.” City of Tullahoma, 938 S.W.2d at 412. Thus, the revenue collected from a fee
may be spent to provide a service or benefit to those paying the fee but not to pay the
general debts or liabilities incurred by the government. See id.
No party points the court to any Tennessee legal authority governing the use of
impact fees in this circumstance. Courts have developed several tests to determine
whether an impact fee is an authorized fee or an unauthorized tax. Some states apply the
reasonable relationship test. Under this test, local governments are afforded considerable
discretion in imposing impact fees and need only demonstrate that there is a reasonable
relationship between the fee and the cost of the proposed development. See Associated
Home Builders of Greater E. Bay, Inc. v. City of Walnut Creek, 484 P.2d 606, 616 (Cal.
1971); Cal. Bldg. Indus. Ass’n v. San Joaquin Valley Air Pollution Control Dist., 178
Cal. App. 4th 120, 134-35 (Cal. Ct. App. 2009).
-6-
Other states apply a more stringent test known as the specifically and uniquely
attributable test. Under this test, an impact fee constitutes an authorized fee if a local
government shows that the impact fee “‘is directly proportional to the specifically created
need.’” N. Ill. Home Builders Ass’n, Inc. v. Cnty. of Du Page, 649 N.E.2d 384, 389 (Ill.
1995) (quoting Dolan v. City of Tigard, 512 U.S. 374, 389-90 (1994)). Thus, this test
provides that a valid impact fee is one that requires a developer to assume the costs for
only the improvements “‘which are required by [his] activity.’” Id. at 390 (quoting
Pioneer Trust & Sav. Bank v. Village of Mt. Prospect, 176 N.E.2d 799, 801 (Ill. 1961)).
An impact fee requiring a developer to assume the costs “for improvements made
necessary by ‘the total activity of the community,’ would be forbidden.” Id. (quoting
Pioneer Trust, 176 N.E.2d at 802). This test provides real estate developers with the
maximum level of protection, but it allows local governments little discretion to impose
impact fees. Home Builders Ass’n of Dayton & the Miami Valley v. City of Beavercreek,
729 N.E.2d 349, 356 (Ohio 2000).
Finally, some states apply the dual rational nexus test. City of Beavercreek, 729
N.E.2d at 356; St. Johns Cnty. v. Ne. Fla. Builders Ass’n, Inc., 583 So. 2d 635, 637 (Fla.
1991). Under this test, a local government must prove: (1) that there is “a reasonable
connection, or rational nexus, between the need for additional capital facilities and the
growth in population generated” by the new development and (2) that there is “a
reasonable connection, or rational nexus, between the expenditures of the funds collected
and the benefits accruing to” the new development. Hollywood, Inc. v. Broward Cnty.,
431 So. 2d 606, 611-12 (Fla. Dist. Ct. App. 1983). If the impact fee satisfies both prongs
of the test, it constitutes an authorized fee. See St. Johns Cnty., 583 So. 2d at 637;
Hollywood, Inc., 431 So. 2d at 611-13; City of Beavercreek, 729 N.E.2d at 356-58. Of
these tests, the dual rational nexus test is the only one that balances both the interests of
real estate developers and the interests of local governments. Thus, we adopt the dual
rational nexus test for determining the validity of an impact fee.
C. Application of the Dual Rational Nexus Test.
Under the first prong of the dual rational nexus test, the County must prove that
there is a reasonable connection between the need for additional or expanded schools and
the growth in population accompanying new development. See City of Beavercreek, 729
N.E.2d at 356. To determine whether an impact fee satisfies this prong, courts focus on
the methodology used for calculating the fee. See id.; St. Johns Cnty., 583 So. 2d at 638-
39.
The County attached to its motion for summary judgment the deposition testimony
of Carson Bise, the owner of TischlerBise. Mr. Bise conducted a study regarding the
County’s projected growth and the cost of providing schools to serve that new growth.
Based on this study, he determined that the square-footage of a home corresponded to the
number of school-age children expected to live in that home. Mr. Bise then created a fee
-7-
schedule, which the County adopted, based on the projected square footage of a new
home and the expected cost to the County to provide schools to serve children that would
live in that new home. For instance, Mr. Bise determined that, per 1,400 square-foot
home, there would be 0.259 children in grades kindergarten through eight and 0.117
children in grades nine through twelve. According to Mr. Bise, for a 1,400 square-foot
home, it would cost the County $3,404 to provide schools for children in grades
kindergarten through eight and $1,914 to provide children with high schools. Therefore,
if a new 1,400 square-foot home were to be located in the WCS service area, it would be
assessed an impact fee of $5,317, the combined expected cost of providing schools for
children in kindergarten through twelfth grade. If a new 1,400 square-foot home was
located within the FSSD, however, it would only be assessed an impact fee of $1,914, the
expected cost of providing high schools to serve the development. The evidence
presented by the County regarding its methodology for calculating the impact fee shows
there is a reasonable connection between the need for school capital improvements and
the growth in population due to new development. Home Builders Association presented
no evidence challenging the County’s methodology for calculating the impact fee. We
conclude, therefore, that the impact fee satisfies the first prong of the dual rational nexus
test.
Determining whether the impact fee satisfies the second prong of the test is more
difficult. For this prong, the County must show that a development is paying its
proportionate share of the costs necessary to expand or construct schools to serve the
development by demonstrating that a reasonable connection exists between the
expenditure of funds collected by the impact fee and the benefit accruing to the
development paying the impact fee. See City of Olympia v. Drebick, 126 P.3d 802, 806-
07 (Wash. 2006); City of Beavercreek, 729 N.E.2d at 357; Hollywood, Inc., 431 So. 2d at
612.
Sections 2 and 11.1 of Resolution No. 11-16-6 provide that the impact fee shall be
calculated and collected from all new residential development “for the purpose of
mitigating the impact the new residential development has on the County’s need to build
or expand education facilities,” and that the funds collected “shall be expended only in
conformance with the Capital Improvement Program.” Thus, the County may assess the
impact fee on a countywide basis and spend the money collected on school construction
projects throughout the County based on the project’s assigned priority in the Capital
Improvement Program. For instance, the impact fee funds collected from a developer for
a new home in Spring Hill could be used to fund capital improvements to a school in
Brentwood rather than to a school specifically serving the development in Spring Hill.
Home Builders Association argues that implementing the impact fee in such a way
means that no reasonable connection exists between the expenditure of funds and the
benefit received by the development paying the fee. Home Builders Association
contends that, for there to be a reasonable connection, the funds collected from the impact
-8-
fee must be spent on capital improvements to schools that would provide a direct benefit
to the particular new development that paid the fee. According to Home Builders
Association, the County could achieve this result by imposing the impact fee one
development at a time, rather than on a countywide basis, after determining the specific
costs for capital improvements to schools caused by that particular new development.
The County responds that the impact fee is assessed to address the strain on the capacity
of all the County’s schools. Thus, the County asserts, capital improvements to a school
anywhere in the district increases the overall capacity of the system, which benefits all
new developments paying the impact fee.
To support its argument, Home Builders Association relies on section 3 of the
Private Act which authorizes the County to assess an impact fee against “the developer of
any new development activity so as to require the developer to share in the burdens of
growth by paying his pro rata share for the reasonably anticipated expansion cost of
public improvements generated by the new land development activity.” (Emphasis
added). Home Builders Association argues that the General Assembly’s use of “the”
clearly and unambiguously refers to the particular new development paying the impact
fee. We agree. Other sections of the Private Act reinforce this interpretation. For
instance, section 5 of the Private Act provides that the County “shall establish an impact
fee formula that requires the developer to pay an impact fee that does not exceed a pro
rata share of the reasonably anticipated cost for the public improvements created by the
new land development activity.” (Emphasis added). Moreover, section 6 of the Private
Act requires the County to “provide a schedule and method for the payment of the fees in
a manner appropriate to the particular circumstances of the proposed new development.”
(Emphasis added). We conclude that the Private Act clearly and unambiguously provides
that the impact fees imposed by the County are to be a pro rata share of the costs of
public improvements (that is schools, sewers, roads, parks) that are reasonably
anticipated to be created by the particular new development paying the impact fee.
We disagree, however, that this language requires the County to spend impact fee
funds on improvements to schools directly benefitting the particular new development
that paid the impact fee. All the County need prove is that a reasonable connection exists
between the expenditure of impact fee funds and the benefit accruing to the new
development paying the fee. The Private Act is silent about what benefit the
development must receive for the impact fee paid by the particular development to
constitute its proportionate share of the costs of public improvements.
The question, then, is what benefit the new development paying the impact fee
must receive in order to satisfy the “benefits” prong of the test. In St. Johns County v.
Northeast Florida Builders Association, Inc., the Florida Supreme Court considered the
validity of an impact fee imposed on new residential development in St. Johns County to
fund the construction of new schools. St. Johns Cnty., 583 So. 2d at 636. St. Johns
County assessed the impact fee on a county-wide basis after determining that “for every
-9-
one hundred units that are built, forty-four new students will require an education at a
public school.” Id. at 638. Applying the dual rational nexus test, the Court noted that “an
impact fee to be used to fund new schools is different from one required to build water
and sewer facilities or even roads” because “[m]any of the new residents who will bear
the burden of the fee will not have children who will benefit from the new schools.” Id.
The Court concluded, however, that the impact fee imposed by St. Johns County satisfied
the first prong of the test because the fee was “designed to provide the capacity to serve
the educational needs of all one hundred dwelling units.” Id. at 638-39. The Court
further concluded that an impact fee assessed on a countywide basis in order to construct
new schools throughout the county as needed would satisfy the second prong of the test,
explaining as follows:
As indicated, we see no requirement that every new unit of development
benefit from the impact fee in the sense that there must be a child residing
in that unit who will attend public school. It is enough that new public
schools are available to serve that unit of development. Thus, if this were a
countywide impact fee designed to fund construction of new schools as
needed throughout the county, we could easily conclude that the second
prong of the test had been met.
Id. at 639.
In Wellington River Hollow, LLC v. King County, 54 P.3d 213, 215 (Wash. Ct.
App. 2002), the Washington legislature adopted statutes authorizing local governments to
impose impact fees on new developments. Although not expressly stated, language
indicative of the dual rational nexus test appears in the statutes providing that local
governments may levy impact fees that:
(a) Shall only be imposed for system improvements that are reasonably
related to the new development;
(b) Shall not exceed a proportionate share of the costs of system
improvements that are reasonably related to the new development; and
(c) Shall be used for system improvements that will reasonably benefit the
new development.
King Cnty., 54 P.3d at 219 (quoting Wash. Rev. Code Ann. § 82.02.050(3). If a local
government imposed a school impact fee, the local government was required to
“‘establish one or more reasonable service areas within which it shall calculate and
impose impact fees for various land use categories per unit of development.’” Id. at 220
(quoting Wash. Rev. Code Ann. § 82.02.060(6)). The Washington legislature defined
“service area” as “‘a geographic area defined by a county, city, town, or
intergovernmental agreement in which a defined set of public facilities provide service to
development within the area.’” Id. (quoting Wash. Rev. Code Ann. § 82.02.090(8)).
- 10 -
King County exercised the authority granted by the legislature and imposed an
impact fee on new developments in order to fund school improvements. Id. at 219. King
County established the entire Northshore School District as the reasonable service area
for calculating the school impact fee a new development must pay. Id. at 220. The
revenue collected from the impact fee would be spent on improvements to schools
throughout the Northshore School District in accordance with the district’s capital
facilities plan, which planned improvements “based on projected student enrollment
growth.” Id. at 219.
After being assessed the school impact fee, a developer challenged its validity,
arguing that the fee was unjust because it was not reasonably related to the development
and because it would fund school improvements that would not reasonably benefit the
development. Id. The Washington Court of Appeals concluded that the school impact
fee was not unjust. In reaching this conclusion, the court determined that, to meet the
“reasonably benefit the new development” requirement of the statute, an impact fee
“need not be spent on infrastructure that would specifically benefit a particular
development.” Id. Rather, an impact fee “need only provide a general benefit to the
entire school district.” Id. The court explained the developer’s benefit as follows:
The school impact fees are to ensure adequate facilities for the school
district as new students enroll. Northshore School District will benefit from
the infrastructure improvements set forth in the 1996 Capital Facilities
Plan, and the students from [the developer’s] development will have
adequate facilities to be able to attend.
Id. at 219-20.
In City of Olympia v. Drebick, the Washington Supreme Court upheld an impact
fee imposed to fund transportation improvements on a jurisdiction-wide basis. City of
Olympia, 126 P.3d at 803, 810. The Court explained that “a reasonable relationship
would be achieved between the funded improvements and the individual development if
the local government defined a reasonable service area, identified the public facilities
therein that would require improvement . . ., and prepared a fee schedule taking into
account the type and size of the development seeking approval as well as the type of
public facility being funded.” Id. at 807. The Court further explained that, “for a service
area to be reasonable,” it is not necessary that every public facility in that service area
“directly serve each new development project.” Id. at 810. Instead, all that is required is
that the “improvements considered as a whole will benefit the [new] development.” Id.
Turning to the case at bar, we note that school zones within the County can change
from year to year due to shifts in population and enrollment. The boundaries of school
zones must be redrawn as growth in one school zone of the County affects the capacity of
- 11 -
school zones elsewhere in the County. Thus, we find the reasoning of the Florida and
Washington courts persuasive and adopt their rationale to determine whether the impact
fee imposed by the County satisfies the second prong of the dual rational nexus test. The
Private Act authorized the County to establish procedures for collecting and expending
impact fee funds. In accordance with this authority, the County designated the entire
county as the service area and spent impact fee funds on school improvements throughout
the County as needed. As discussed above, to satisfy the “benefits” prong of the test, it is
not necessary that the County spend the impact fee funds on improvements to schools
that directly benefit a particular development. All that is necessary is that the County’s
school impact fee has a reasonable connection to the benefits accruing to a particular
development paying the fee.
The County’s school impact fee satisfies this requirement. We agree with the trial
court’s finding that,
as a countywide district, the construction of a school anywhere in the
district increases the overall capacity of the system. . . . [T]he increase in
capacity lowers the student-teacher ratio at each school and the need to
utilize portable classrooms. Each individual student benefits from the
decrease in the student-teacher ratio by having a more productive and
personal classroom experience.
The particular development paying the impact fee, therefore, benefits from the added
capacity to the school system overall. Thus, a reasonable connection exists between the
expenditure of the impact fee funds and the benefit received by the new development
paying the fee.
In light of the foregoing, we conclude that the school impact fee imposed by the
County satisfies both prongs of the dual rational nexus test and constitutes an authorized
fee, not an unauthorized tax.
II. Vested Property Rights Act.
Home Builders Association next contends that the Vested Property Rights Act
exempts its individual members from assessment of the school impact fee because their
development plans had already been approved prior to the County adopting Resolution
Nos. 11-16-6 and 11-16-7. Tennessee Code Annotated section 13-3-413(b) provides as
follows:
A vested property right shall be established with respect to any property
upon the approval, by the local government in which the property is
situated, of a preliminary development plan or a final development plan
where no preliminary development plan is required by ordinance or
- 12 -
regulation or a building permit allowing construction of a building where
there was no need for prior approval of a preliminary development plan for
the property on which that building will be constructed. During the vesting
period described in subsections (c) and (d), the locally adopted
development standards which are in effect on the date of approval of a
preliminary development plan or the date of approval of a building permit,
as described by this subsection (b), shall remain the development standards
applicable to that property or building during the vesting period.
Thus, once property rights have vested in a particular property, the development
standards in effect at the time of vesting remain the development standards with which
that property must comply. Development standards subsequently adopted by the local
government would not apply to that property.
Home Builders Association asserts that the impact fee constitutes a development
standard and, therefore, does not apply to its individual members because their property
rights vested prior to the County adopting Resolution Nos. 11-16-6 and 11-16-7. The
question, then, is what is a development standard. The statute defines “development
standards” as follows:
[A]ll locally adopted or enforced standards, regulations or guidelines
applicable to the development of property, including, but not limited to,
planning; local storm water requirements, layout, design; local construction
standards for buildings, streets, alleys, curbs, sidewalks; zoning as provided
for in subsection (g); lot size; lot configuration; yard dimensions; and off-
site improvements, including public or private infrastructure, in which an
applicant may acquire vested rights or vested property rights according to
this section[.]
Tenn. Code Ann. § 13-3-413(k)(4). Although impact fees are not expressly identified as
development standards, Home Builders Association asserts that the school impact fee is
included in this definition because the fee “is a locally adopted regulation applicable to
the development of property in Williamson County.” Home Builders Association
correctly points out that, by using the phrase “including, but not limited to,” the general
assembly clearly intended for the list of relevant “standards, regulations or guidelines
applicable to the development of property” to be non-exhaustive. Id.; see also Gragg v.
Gragg, 12 S.W.3d 412, 415 (Tenn. 2000) (stating that when a statutory definition
provides that it “includes” specific terms, the “enumerated items are illustrative, not
exclusive”). Therefore, our task is to determine whether the General Assembly intended
for impact fees to be included among the non-exhaustive list of terms enumerated in the
statutory definition of development standards.
- 13 -
To aid in our interpretation of Tenn. Code Ann. § 13-3-413(b), we use the doctrine
of ejusdem generis. The Tennessee Supreme Court has explained this doctrine as
follows:
Under this doctrine of statutory construction, “where general words follow
the enumeration of particular classes of things, the general words will be
construed as applying only to things of the same general class as those
enumerated.” In other words, “‘where it clearly appears that the lawmaker
was thinking of a particular class of persons or objects, his words of more
general description may not have been intended to embrace any other than
those within the class.’”
Sallee v. Barrett, 171 S.W.3d 822, 829 (Tenn. 2005) (citations omitted). Ejusdem
generis, therefore, “limits the breadth of the general phrase so that neither the general
phrase nor the specific terms are inoperative.” State v. Marshall, 319 S.W.3d 558, 562
(Tenn. 2010).
Applying this doctrine to Tenn. Code Ann. § 13-3-413(k)(4), we interpret the
phrase “including, but not limited to” in reference to the other words or phrases in the
statute. Tennessee Code Annotated section 13-3-413(b) provides that the following
“standards, regulations or guidelines” constitute development standards: (1) “planning,”
(2) “local storm water requirements, layout, design,” (3) “local construction standards for
buildings, streets, alleys, curbs, sidewalks,” (4) “zoning as provided for in subsection
(g),” (5) “lot size”, (6) “lot configuration,” (7) “yard dimensions,” and (8) “off-site
improvements, including public or private infrastructure.” All of these provisions pertain
to the physical aspects of developing property, especially where and how developments
are to be constructed. In other words, they place limits on the physical use of the
property. There is no indication that payment of an impact fee places limits on the
physical use of developing property. As such, an impact fee is different than the class of
“standards, regulations or guidelines” enumerated in Tenn. Code Ann. § 13-3-413(k)(4).
We conclude, therefore, that the General Assembly did not intend for the non-exhaustive
list of terms in the statutory definition of development standards to include payment of an
impact fee.
Although payment of an impact fee is not included in the non-exhaustive list of
terms in Tenn. Code Ann. § 13-3-413(k)(4), Home Builders Association argues that the
impact fee is a development standard because Tenn. Code Ann. § 66-5-211(b)(3) defines
“impact fee” as “a monetary charge imposed by a county or municipal government
pursuant to any act of general or local application, to regulate new development on real
property.” (Emphasis added). Thus, Home Builders Association contends, the impact
fee constitutes a development standard because it is a “locally adopted . . . regulation . . .
applicable to the development of property.” Tenn. Code Ann. § 13-3-413(k)(4). We
respectfully disagree.
- 14 -
Tennessee Code Annotated section 66-5-211 merely establishes that sellers of
residential property must disclose to first-time purchasers the amount of any impact fees
or adequate facilities taxes paid on the property. This section of the code bears no
relation to the County’s authority to impose impact fees or to a developer’s vested
property rights. In contrast, Section 3.10 of Resolution No. 11-16-6 bears a relation to
the County’s authority to impose impact fees, and it specifically defines the term “impact
fee” as “the fee assessed to a Developer for the proportionate share of the cost of
Education Facilities needed to serve the new Development, which is reasonably related to
the demand created by new Development, and which is used for Education Facilities that
benefit the new development.” If the County had intended to use the definition of
“impact fee” provided in Tenn. Code Ann. § 66-5-211, it would have done so or, at the
very least, it would have incorporated that definition into Resolution No. 11-16-6.
We further note that, as previously discussed, the Tennessee Supreme Court has
recognized two distinct purposes for fees: (1) to “regulate[] a specific activity” or (2) to
“defray[] the cost of providing a service or benefit to the party paying the fee.” City of
Tullahoma, 938 S.W.2d at 412. Here, section 3 of the Private Act states that the purpose
of the act is to authorize the County to impose an impact fee on new development “so as
to require the developer to share in the burdens of growth by paying his pro rata share for
the reasonably anticipated expansion cost of public improvements generated by the new
land development activity.” Moreover, sections 4 and 5 of the Private Act provide that
the County may perform public improvements “and defray the expense thereof by an
impact fee.” The General Assembly intended the Private Act to authorize the County to
impose impact fees to defray the cost of providing public improvements necessitated by
new development, not to regulate new development or the use of land. Thus, use of the
term “impact fee” as it is defined in Tenn. Code Ann. § 66-5-211 would be inconsistent
with the General Assembly’s intent in passing the Private Act. “Any interpretation of the
statute that ‘would render one section of the act repugnant to another’ should be
avoided.” In re Estate of Tanner, 295 S.W.3d 610, 614 (Tenn. 2009) (quoting Tenn.
Elec. Power Co. v. City of Chattanooga, 114 S.W.2d 441, 444 (Tenn. 1937)). We, like
the trial court, can find no basis for incorporating the definition of “impact fee” located in
an unrelated statute when Resolution No. 11-16-6 specifically defines the term. The
impact fee, therefore, does not constitute a development standard and does not violate
Home Builders Association’s individual members’ vested rights under the Vested
Property Rights Act.
In light of the foregoing, we conclude that the trial court did not err in granting
summary judgment to the County.
CONCLUSION
- 15 -
The judgment of the trial court is affirmed, and this matter is remanded with costs
of appeal assessed against the appellant, Home Builders Association, for which execution
may issue if necessary.
________________________________
ANDY D. BENNETT, JUDGE
- 16 -