Opinion

Oracle America, Inc. v. United States

Court
United States Court of Federal Claims
Filed
Jul 26, 2019
Status
Published
Cited by
0 cases
Authority
More cited than 8.4%

The opinion

In the United States Court of Federal Claims

No. 18-1880C

(Filed: July 19, 2019)

(Re-Filed: July 26, 2019) 1

**************************

ORACLE AMERICA, INC.,

Plaintiff,

Pre-award bid protest; 10

v. U.S.C. § 2304a(d)(3)-(4)

(2012); 48 C.F.R. §

THE UNITED STATES, 16.504(c) (2018); single

award determination;

Defendant, gate criteria; qualification

requirement; individual

and conflict of interest;

organizational conflict of

AMAZON WEB SERVICES, INC., interest.

Intervenor.

**************************

Craig A. Holman, Washington, DC, for plaintiff. Kara L. Daniels,

Dana E. Koffman, Amanda J. Sherwood, and Nathaniel E. Castellano, of

counsel.

William P. Rayel, Senior Trial Counsel, United States Department of

Justice, Civil Division, Commercial Litigation Branch, Washington, DC,

with whom were Joseph H. Hunt, Assistant Attorney General, Robert E.

Kirschman, Jr., Director, Patricia M. McCarthy, Assistant Director, for

defendant. Christina M. Austin and Andrew Bramnick, Washington

1

This opinion was originally issued under seal to permit the parties an

opportunity to propose redactions by July 25, 2019. The government and

intervenor proposed two redactions; plaintiff opposed one. Because both

proposed redactions address protected information, the court adopts both.

The parties also identified several possible clerical mistakes or omissions; to

the extent we agree that they were clerical mistakes or omissions, and not

substantive changes, we corrected them. RCFC 60(a).

Headquarters Service & Pentagon Force Protection Agency, United States

Department of Defense, Office of General Counsel, of counsel.

Daniel R. Forman, Washington, DC, for intervenor. Robert J.

Sneckenberg, Olivia L. Lynch, James G. Peyster, Christian N. Curran, and

Gabrielle Trujillo, of counsel.

_________

OPINION

_________

BRUGGINK, Judge.

This protest involves the Department of Defense’s (“DoD”) Joint

Enterprise Defense Infrastructure (“JEDI”) Cloud procurement. In the JEDI

Cloud procurement, DoD is seeking an enterprise cloud services solution that

will accelerate DoD’s adoption of cloud computing technology. Oracle

America, Inc. (“Oracle”) initially filed this as a pre-award bid protest on

December 6, 2018. After it was excluded from the competition during the

protest and DoD completed several conflicts of interest determinations,

Oracle amended its complaint. It currently has three primary challenges.

First, it argues that the decision to use a single award as opposed to multiple

awards was a violation of law. This argument has two components because

the decision to use a single award had to be made both by an Under Secretary

of Defense and independently by the contracting officer (“CO”). Second, it

argues that the use of certain gate criteria, the application of which led to

Oracle’s exclusion, were improper for various reasons. Third, it contends

that conflicts of interest on the part of DoD employees and Amazon Web

Services, Inc. (“AWS”), one of the other bidders, prejudicially affected the

procurement. AWS has intervened.

The parties filed cross-motions for judgment on the administrative

record. The matter is fully briefed, and we held oral argument on July 10,

2019. As stated in the court’s July 12, 2019 order, because we find that Gate

Criteria 1.2 is enforceable, and Oracle concedes that it could not meet that

criteria at the time of proposal submission, we conclude that it cannot

demonstrate prejudice even if the procurement was otherwise flawed.

Plaintiff’s motion for judgment on the administrative record is therefore

denied. Defendant’s and intervenor’s respective cross-motions for judgment

on the administrative record are granted.

2

One feature of the protest makes resolution somewhat awkward.

Although we ultimately conclude that Gate Criteria 1.2 is enforceable and

thus a comprehensive answer to all of plaintiff’s arguments, it is necessary

to provide a virtually complete recitation of the facts and arguments because

Oracle contends that two of the asserted errors—the decisions adopting a

single award approach and the conflict of interest determinations—

influenced the formulation of Gate Criteria 1.2. The critical question as to

those two arguments, therefore, is whether, if Oracle is correct on the merits,

they impacted the formulation of the criteria on which Oracle concedes it

fails. We ultimately conclude that they did not taint the formulation of that

criteria or other aspects of the solicitation.

BACKGROUND

DoD is ready to adopt an enterprise cloud services solution. 2 It plans

to award the vast majority of DoD’s cloud services business to a single

vendor. Although DoD has been developing the JEDI Cloud procurement

for several years, we enter the development timeline in August 2017, when

the Secretary of Defense traveled to Seattle, Washington, and Palo Alto,

California, to visit cloud services companies. Administrative Record (“AR”)

Tab 91 at 5955.

Following this trip, Deputy Secretary of Defense Patrick Shanahan

sent a memorandum on September 13, 2017, to the secretaries of the military

departments. He emphasized that certain technologies “are [1] changing the

character of war; (2) commercial companies are pioneering technologies in

these areas; [and] (3) the pace of innovation is extremely rapid.” Id. The

Deputy Secretary concluded that “accelerating [DoD’s] adoption of cloud

computing technologies is critical to maintain our military’s technological

2

The agency defines “cloud” as “[t]he practice of pooling physical servers

and using them to provide services that can be rapidly provisioned with

minimal effort and time, often over the Internet.” Administrative Record

(“AR”) Tab 25 at 478. The agency explains, “The term is applied to a variety

of different technologies (often without clarifying modifiers), but, for the

purpose of this document, cloud refers to physical computing and storage

resources pooled to provide virtual computing, storage, or higher-level

services.” DoD explains that “commercial cloud means that a commercial

cloud service provider is maintaining, operating, and managing the

computing, networking, and storage resources that are being made available

to customers. Depending on the contract, the commercial cloud service

provider may be performing in commercial facilities or on premises.” Id.

3

advantage.” Id. He explained that the adoption of cloud computing

technology was “a Department priority” in which “[s]peed and security are

of the essence.” AR 5956. His memo went on to broadly outline the steps to

set the JEDI Cloud procurement in motion.

To devise a strategy to accelerate the adoption of cloud services, the

Deputy Secretary established the Cloud Executive Steering Group. The

group would brief the Deputy Secretary on a bi-weekly basis on progress

toward adoption of cloud computing technology. The Cloud Executive

Steering Group consisted of Chair Ellen Lord, Under Secretary of Defense

for Acquisition, Technology, and Logistics; Director Chris Lynch, Defense

Digital Service; Director Will Roper, Strategic Capabilities Office;

Managing Partner Raj Shah, Defense Innovation Unit Experimental;

Executive Director Joshua Marcuse, Defense Innovation Board; and advisor

John Bergin, DoD Chief Information Officer Business Technology Office.

Adoption of an enterprise cloud would proceed in two phases. First,

DoD would use “a tailored acquisition process to acquire a modern enterprise

cloud services solution that can support unclassified, secret, and top secret

information.” Id. The Deputy Secretary tasked the Defense Digital Service,

under Mr. Lynch, with leading phase one. The Defense Digital Service is a

team within DoD’s United States Digital Service. Members of Defense

Digital Service dedicated to the JEDI Cloud procurement at that time

included Mr. Lynch, legal counsel Sharon Woods, industry specialist Deap

Ubhi, Deputy Director Timothy Van Name, and engineer Jordan Kasper. In

the second phase, the Cloud Executive Steering Group would “rapidly

transition select DoD Components or agencies to the acquired cloud

solution,” using cloud services as extensively as possible. Id.

Early Commitment to a Single Award and Tailored Acquisition Plan

The Cloud Executive Steering Group held a meeting the day after the

Deputy Secretary issued his memo. 3 AR Tab 86. In attendance were Mr.

Lynch; Ms. Woods; a Defense Digital Service engineer; Mr. Ubhi; two

representatives from the Strategic Capabilities Office; Mr. Shah; Mr.

Marcuse; and a “C3 cyber and business systems AT&L” representative. AR

5927. The meeting notes record that Mr. Lynch stated “[o]ver time there

ha[ve] been considerable changes to the tech world outside of the DoD that

are so fundamental that they are now serious constraints on delivering the

3

The government’s AR index states this meeting occurred on September 14,

2017. The meeting notes do not state the date of the meeting.

4

mission of defense.” Id. Mr. Lynch further noted, “If we feel uncomfortable

moving forward, then we are probably headed in the right direction.” Id.

The group noted that “Sec Def/ DSD is afraid of vendor lock in.” AR 5928.

The notes include the following comment: “Avoid specifying that

there is a single vendor. This will create perception issues with vendors

already in use.” Id. This suggests that, from the beginning, the expectation

was that there would be a single award.

The Cloud Executive Steering Group met again on September 28,

2017, and discussed when the problem statement draft, RFI, Business Case

Analysis, and RFP would be developed. AR Tab 87. The meeting notes

read: “Questions and inquiries form [sic] industry should be directed to Deap

[Ubhi].” AR 5932. Procurement documents, such as the ones discussed at

this meeting, were developed and stored in a Google Drive accessible by

certain DoD personnel, including the Cloud Executive Steering Group and

Defense Digital Service team.

In between meetings, members of the Defense Digital Service

discussed the progress of the JEDI Cloud project on the agency’s internal

communication medium, Slack. 4 During this period, Defense Digital Service

members discussed what to include in the problem statement. For instance,

on October 2, 2017, they discussed whether “metrics” should be included in

the problem statement or if they were too difficult to articulate at that point.

Ms. Woods wrote, “Let me put the metrics in this context. The agreed upon

measures drive what acquisition strategy will be approved. So, if multiple

cloud providers can meet the metrics, then we don’t get to one. The metrics

drive how we solve the problem.” AR 3123.

The “Draft Problem Statement” was complete October 3, 2017. The

draft explained that DoD’s “current computing and storage infrastructure

environment and approach . . . is too federated, too slow, and too

uncoordinated to enable the military to rapidly utilize DoD’s vast

information to make critical, data driven decisions.” AR 60089. DoD

4

“Slack is a communication tool utilized by [the Defense Digital Service],

and other authorized collaborators, to facilitate timely communication and

coordination of work activities . . . . Slack channels are comprised of distinct

groups of Slack users and are organized by purpose.” AR Tab 221 at 58699.

The government provided an index of user names and the message

timestamps can be converted using an epoch time converter.

5

envisioned acquiring services that “seamlessly extend[] from the homefront

to the tactical edge.” 5 Id. The authors concluded that DoD “cannot achieve

this vision without a coordinated enterprise approach that does not simply

repeat past initiatives.” Id. The document repeated the ills of fragmented

infrastructure in nearly every paragraph.

On October 5, 2017, the Cloud Executive Steering Group convened

6

again. According to the meeting notes, Under Secretary Lord explained that

more than “600 cloud initiatives across” DoD currently exist and that the

“cloud initiative is about implementing an enterprise approach rather than an

uncoordinated eclectic approach that has resulted in pockets of cloud

adoption.” AR 5933. Mr. Lynch contributed: “[a] [s]ingle cloud solution [is]

necessary for this enterprise initiative to be successful and allow DoD to

achieve its mission objectives with cloud adoption.” AR 5934.

Slack messages among the Defense Digital Service team members

refer to a late October 2017 Cloud Executive Steering Group meeting at

which Mr. Ubhi, along with others, argued for a single award approach. AR

60100, 60229. The messages suggest that attendees either already favored a

single award or were persuaded at the meeting.

On October 27, 2017, Defense Digital Service’s Mr. Kasper sent the

Deputy Secretary a two-page update on the DoD Cloud efforts and the draft

Request for Information (“RFI”). AR Tab 51. Under “Acquisition Strategy

Approach,” the update anticipated an Indefinite Delivery, Indefinite Quantity

(“IDIQ”) contract and “[f]irm-fixed pricing with commercial catalog.” AR

4324. On “Single versus Multiple Providers,” the update stated: “General

consensus is that we should press forward with a single provider approach

for now . . . The [Cloud Executive Steering Group] acquisition strategy is

focusing on a single-award.” AR 4325. The primary reasoning for a single

rather than multiple award was “reduced complexity, ensuring security of

information to the greatest degree possible, ease of use and limited barriers

to entry, virtual private cloud-to-virtual private cloud peering, and seamless,

5

DoD defines tactical edge as “[e]nvironments covering the full range of

military operations, including, but not limited to forces deployed in support

of a Geographic Combatant Commander or applicable training exercises, on

various platforms . . . and with the ability to operate in austere and

connectivity-deprived environments.” AR Tab 25 at 479.

6

The principal attendees were: Under Secretary Lord; Mr. Bergin; Mr.

Lynch; Mr. Shah; Mr. Marcuse; and Dr. Roper. The notes list Ms. Woods

among additional participants.

6

secure sharing of data across the enterprise through cloud peering.” Id.

Development of the Tailored Solicitation Approach and Needs

DoD issued an RFI to the commercial world on October 30, 2017,

inquiring into available cloud computing services. DoD emphasized its need

to rely on “the cloud provider(s)” for all levels of data classification from the

homefront to the tactical edge. AR 5936. Among other items, DoD asked

for information about responders’ third-party marketplace, failover and data

replication architecture, ability to operate “at the edge of connectivity,” and

for an example of “a large commercial customer with worldwide presence

that has migrated to your infrastructure and platform services.” AR 5937-38.

Before DoD received responses, it completed a summary of the JEDI

Cloud procurement effort to date on November 6, 2017. This included an

“Acquisition Strategy” description: “Single-award [IDIQ] contract using full

and open competitive procedures. A single Cloud Service Provider (CSP) to

deliver services for cloud computing infrastructure and platform services.

Up to ten-year ordering period.” AR 5957.

The agency received RFI responses on November 17, 2017. Many

responders questioned whether a single award would offer the best cost

model, whether one vendor could possibly be the leader in all areas, and

whether a single vendor would devalue investment made by existing vendors.

Oracle argued that a single award would stifle adoption of market-driven

innovation. Microsoft concurred: “DoD’s mission is better served through a

multi-vendor cloud approach,” because “competition drives innovation,” and

offers “greater flexibility.” AR 1545. Microsoft urged DoD to preserve its

flexibility and agility to adopt the latest cloud technology and to avoid “a

single point of failure.” Id. IBM likewise responded: “Limiting the DoD to

a single cloud provider will negatively impact DoD’s source access to

innovative cloud offerings and increase risk of deployment failure.” AR

1983. Google argued that DoD must not become “beholden to monolithic

solutions or single cloud providers.” AR 1924.

AWS, on the other hand, argued that, although multiple awards might

decrease the likelihood of protests, a single award would increase

consistency, interoperability, and ease of maintenance. AWS posited that

commercial parity requirements would guarantee innovation. AWS was not

alone in noting that single awards had been used in the past and that they

might offer advantages.

7

On December 22, 2017, the Joint Requirements Oversight Council

issued a memo to twenty-two DoD stakeholders to address “Joint

Characteristics and Considerations for Accelerating to Cloud Architectures

and Services.” AR Tab 17. The council “accept[ed] the Defense Digital

Service cloud brief” and acknowledged that “accelerating to the cloud [is]

critical in creating a global, resilient, and secure information environment

that enables warfighting and mission command.” AR 321. The memo

repeated DoD’s expectations: data exchange across all classification levels

and DoD components; an environment that is scalable and elastic; security

from persistent adversary threats; use to the tactical edge; and industry-

standard high availability.

The memo identified “cloud characteristics and elements of particular

importance to warfighting missions.” AR 323. Those characteristics were:

cloud resiliency without a single point of failure, support of DoD’s cyber

defenses, enabling cyber defenders, and role-based training. The attached

presentation referred to a single “cloud provider.” AR 330.

On January 8, 2018, Deputy Secretary Shanahan circulated a

memorandum to the secretaries of the military departments providing an

“Accelerating Enterprise Cloud Adoption Update.” AR Tab 94. This memo

stated that the Cloud Executive Steering Group had provided

recommendations as requested and that “the Deputy Chief Management

Officer (DCMO), in partnership with Cost Assessment and Program

Evaluation, Chief Information Officer, and Defense Digital Service, [would

now] take the lead in implementing the initial acquisition strategy.” AR 5978.

The memo also directed the Deputy Chief Management Officer to establish

a Cloud Computing Program Manager. The Deputy Secretary directed the

Deputy Chief Management Officer and the Chief Information Officer to

work with “the Services; the Under Secretary of Defense for Intelligence;

and the Under Secretary of Defense for Acquisition, Technology, and

Logistics to build cloud strategies for requirements related to military

operations and intelligence support.” Id.

Three months later, DoD released the first draft RFP and held an

industry day on March 7, 2018. DoD provided the draft RFP for “early and

frequent exposure to industry of the Department’s evolving requirement.”

AR 5995. DoD anticipated awarding a single award IDIQ that would issue

firm fixed-price task orders. DoD would seek Infrastructure as a Service

(“IaaS”) and Platform as a Service (“PaaS”).

IaaS is “[t]he capability provided to the consumer to provision

8

processing, storage, networks, and other fundamental computing resources

where the consumer is able to deploy and run arbitrary software, which can

include operating systems and applications.” AR Tab 25 at 478. DoD

explained, “The consumer does not manage or control the underlying cloud

infrastructure but has control over operating systems, storage, deployed

applications, and possibly limited control of select networking components

(e.g., host firewalls).” Id.

PaaS is “[t]he capability provided through software, on top of an IaaS

solution, that allows the consumer to replicate, scale, host, and secure

consumer created or acquired applications on the cloud infrastructure.” AR

479. As with IaaS, DoD explained, “The consumer does not manage or

control the underlying cloud infrastructure including network, servers,

operating systems, or storage, but has control over the deployed applications

and possibly application hosting environment configurations.” Id.

The draft included a specially crafted “New Services” clause,

providing that “DoD may acquire new products and/or services from the

contractor for capabilities not currently provided in the Cloud Services

Catalog Price List under this contract.” AR 6013. The draft also introduced

the concept of Factor 1 Gate Criteria, a number of metrics which offerors

would have to meet to advance to consideration of other factors. Three of

the criteria are at issue in this protest. Gate Criteria 1.1 required the offeror

to “provid[e] a summary report for the months of January and February 2018

that depicts each of the four metric areas detailed below.” AR 6083. Gate

Criteria 1.2 required the offeror to have no fewer than three physical,

unclassified data center locations at least 150 miles apart and to document

network availability. An additional criteria (later numbered 1.6) required the

offeror to provide a marketplace for both native and third-party programs.

On March 27, 2018, the Cloud Computing Program Office completed

its Market Research Report, which DoD used to “inform the overall

acquisition strategy.” AR 366. Market research included vendor meetings

held from October 12, 2017 to January 26, 2018, focus sessions within DoD

and with industry leaders, intelligence community meetings, and the RFI.

The Cloud Computing Program Office found that “market research

indicate[s] that multiple sources are capable of satisfying DoD’s

requirements for JEDI Cloud.” Id. The office found, however, that “[o]nly a

few companies have the existing infrastructure—in both scale and modernity

of processes—to support DoD mission requirements, worldwide.” AR 369.

The office concluded that “[i]f the JEDI Cloud contract is sufficiently

9

flexible and requires maintaining technical parity with commercial

solutions,” DoD would be able to apply cloud solutions to the tactical edge.

AR 366. The office also found that providers’ information security and

ability to operate in disconnected environments were still growing and that a

“robust, self-service marketplace” is “essential.” AR 369. The office found

that the responses did not clearly demonstrate how multiple clouds benefitted

the agency’s security needs.

The Cloud Computing Program Office completed the Business Case

Analysis on April 11, 2018. The summary provides that the Business Case

Analysis, Acquisition Strategy, Statement of Objectives, and Cybersecurity

Plan form the foundation of the procurement. The problem statement

indicated that DoD’s operations are hampered by fragmented, outdated

computing and storage infrastructure; tedious, manual management

processes; and lack of interoperability, seamless systems, standardization,

and automation. “In short, DoD’s current computing and storage

infrastructure critically fails DoD’s mission and business needs.” AR 403.

This gloomy assessment led to eight objectives: available and resilient

services; global accessibility; centralized management and distributed

control; ease of use; commercial parity; modern and elastic computing;

storage; and network infrastructure, fortified security, and advanced data

analytics.

The office turned to available alternatives. The analysis of

alternatives was “based on outcomes when the overarching goal is for JEDI

Cloud to host 80% of all DoD applications that currently reside in DoD on-

prem[ise] centers, existing cloud offerings, and legacy systems.” AR 405.

The office assumed that the solution required “significant transformation,”

because “DoD needs to extricate itself from the business of installing,

managing, and operating data centers.” AR 406. The office also assumed that

a high degree of integration is necessary and using multiple vendors would

increase complexity and cost.

Four alternatives were considered: DoD retaining 80% of the

workload; DoD splitting its workload with JEDI Cloud; a single JEDI Cloud

provider managing 80% of the workload; and multiple JEDI Cloud providers

splitting 80% of the workload. The office concluded that a single JEDI Cloud

provider would fulfill seven of the eight objectives and partially fulfill the

global accessibility objective. Multiple JEDI Cloud providers, on the other

hand, would meet only four objectives and partially meet four objectives.

The DoD-focused options all failed at least one objective.

10

The office did not see any disadvantage to adopting a single JEDI

Cloud provider approach. It found that global accessibility is problematic in

any scenario because the technology is evolving. This section concluded:

“There are significant overlaps in the commercial cloud services offered by

the various providers, such that any provider selected will meet the majority

of Department needs.” AR 410.

The office acknowledged that DoD would “benefit from the

commercial parity, investment, innovation, and technical evolution of

commercial cloud offerings driven by industry, and additional commercial

service offerings [that] will be made available” if it chose a multiple award

approach. AR 411. Ultimately, it concluded that this approach would be

“technically more complex.” Id. Using multiple vendors would

“significantly complicate[] management,” “raise[] the risk profile,”

compromise ease of use, create new security vulnerabilities, and impede

interoperability. Id. The office recommended that the agency “proceed with

the acquisition of services from a single” cloud services provider. AR 412.

The analysis set out nine “high-level programmatic success criteria”

mapped to the eight objectives. AR 415. Among the criteria were “a

commercial [cloud services provider] where total usage by DoD does not

exceed 50% of the provider’s total network, computing, and storage

capacity;” “ongoing parity with commercial offerings for unclassified

applications for pricing;” a “scalable, resilient, and accredited” cloud

services solution that can manage needs from DoD’s users; and ability to

operate in disconnected and austere environments. AR 415-16.

The analysis addressed seven program risks. Oracle highlights the

sixth risk assessed, which it believes indicates a connection between the

desire for a single awardee and the metrics selected for the gate criteria:

The JEDI Cloud program schedule could be negatively

impacted if source selection extends beyond the planned

timeline due to an unexpected number of proposals or lengthy

protest delays. To mitigate this risk, the solicitation will use a

gated evaluation approach that includes “go/ no-go” gate

criteria. Offerors must meet the established minimum criteria

in order to be considered a viable competitor. Also, [the Cloud

Computing Program Office] will communicate those criteria

through a draft solicitation process.

AR 422.

11

On April 16, 2018, DoD issued the second draft RFP, including a chart

with DoD’s responses to questions received from industry. Although many

potential offerors questioned the gate criteria, DoD made only a few changes.

For Factor 1.1, the relevant measuring period remained January through

February 2018. For Factor 1.2, the location of the three data centers was

broadened from the continental United States to “the Customs Territory of

the United States.” AR 6241. DoD added that the proposed data centers must

contain hardware used to provide IaaS and PaaS services “that are FedRAMP

Moderate compliant.” Id. Factor 1.6, a marketplace containing native

services and third-party services, remained unchanged, as did the “New

Services” provision, which allowed the introduction of new services during

the ten-year contract period.

CO’s Justification of Single Award Approach

The agency was required to explain its decision to use a single award

for the JEDI Cloud procurement. The agency must satisfy both a regulatory

requirement for the CO to consider whether a multiple award was appropriate

and a statutory requirement for the head of the agency to determine if a single

award was permissible in an acquisition of this size. We discuss those

requirements below.

On July 17, 2018, the CO issued her memo stating that the rationale

for using a single award IDIQ contract overcame the multiple award

preference stated in FAR 16.504(c) (2018). That regulation provides that,

when planning an IDIQ acquisition, the CO must determine whether multiple

awards are appropriate, giving preference to multiple awards to the

“maximum extent practicable.” FAR 16.504(c). The regulations set out six

exceptions to the single award preference; if the CO determines any of those

conditions exist, the agency “must not” use a multiple award approach. Id.

The CO relied on three exceptions to the multiple award preference.

First, “[b]ased on the CO’s knowledge of the market, more favorable terms

and conditions, including pricing, will be provided if a single award is made.”

AR 455. Second, “[t]he expected cost of administration of multiple contracts

outweighs the expected benefits of making multiple awards.” Id. Third,

“[m]ultiple awards would not be in the best interests of the Government.” Id.

The CO explained that a vendor is more likely to offer favorable price

terms and make the initial investment to serve DoD’s needs if it can be

assured it will recoup its investment through packaging prices for classified

12

and unclassified services. The CO next observed that administering multiple

contracts is costlier and less efficient. Finally, she reasoned that “[p]roviding

the DoD access to foundational commercial cloud infrastructure and platform

technologies on a global scale is critical to national defense and preparing

the DoD to fight and win wars.” AR 461-62. “Based on the current state of

technology, multiple awards . . . i) increase security risks; ii) create

impediments to operationalizing data through data analytics, machine

learning (ML), and artificial intelligence (AI); and iii) introduce technical

complexity in a way that both jeopardizes successful implementation and

increases costs.” AR 462.

She explained that “multiple awards increase security risks,” because

a single cloud can offer data encryption but with the added benefit of

seamless data transfer. Id. Multiple clouds, on the other hand, would

“frustrate the DoD’s attempts to consolidate and pool data so data analytics

capabilities can be maximized for mission benefit.” AR 463. The CO iterated

that “[o]ne of the primary goals of” the procurement “is to decrease barriers

to adoption of modern cloud technology to gain military advantage.” Id. She

found that multiple clouds inherently raise barriers, because they require

additional training, interoperability, more space, and more investment. In

the conclusion, the CO stated that a single award solution “achieves better

security, better positions the DoD to operationalize its data, and decreases

barriers to rapid adoption.” AR 464.

The Under Secretary’s Justification of Single Award Approach

Just two days after the CO signed her single award determination, on

July 19, 2018, Under Secretary Lord signed a separate Determination and

Findings (“D&F”) stating that DoD was authorized to award the JEDI Cloud

contract to a single cloud services provider. This separate determination was

required, because in 2008 Congress prohibited DoD, among other agencies,

from awarding task order contracts in excess of $112 million 7 to a single

source. National Defense Authorization Act for Fiscal Year 2008, Pub. L.

No. 110-181, § 843(a)(1), 122 Stat. 3, 236 (2008) (“Limitation on Single

Award Contracts”). This added another level of scrutiny unique to large

single award procurements in addition to the multiple award preference.

7

41 U.S.C. § 1908 (2012) (statutory inflation adjustment requirement);

Inflation Adjustment of Acquisition-Related Thresholds, 80 Fed. Reg.

38293-01, 38997 (July 2, 2015) (adjusting the $100 million single award

prohibition).

13

Exceptions are permitted, however, when the head of the agency determines

that one of four exceptions to the single award prohibition exists. 10 U.S.C.

§ 2304a(d)(3)(A)-(D) (2012).

The Under Secretary based the D&F on one exception to the statutory

prohibition: “the contract provides only for firm, fixed price (FFP) task

orders or delivery orders for services for which prices are established in the

contract for the specific tasks to be performed.” AR Tab 16 at 318. Although

the statute offers three other exceptions to the single award prohibition, the

D&F only applied this single exception to the JEDI Cloud procurement.

The D&F then set out seven findings. The fourth through seventh

findings provided more detail justifying a single award. The findings set out

that the successful offeror’s discount methodologies will be incorporated into

the contract, thus presumably minimizing concern over pricing. The

contract line item numbers for cloud offerings “will be priced by catalogs

resulting from the full and open competition, thus enabling competitive

forces to drive all aspects of [firm fixed] pricing.” AR 319. The catalogs

will cover the “full potential 10 years.” Id. The successful offeror’s catalog

will be incorporated in the contract.

The Under Secretary’s discussion acknowledged two pricing-related

clauses in Section H of the contract that warranted mentioning: sections H2

and H3. Section H2 New Services, provides:

1. Subsequent to award, when new (including improved) IaaS,

PaaS, or Cloud Support Package services are made publicly

available to the commercial marketplace in the continental

United States (CONUS) and those services are not already

listed in the JEDI Cloud catalogs . . . the Contractor must

immediately (no later than 5 calendar days) notify the JEDI

Cloud Contracting Officer for incorporation of the new

services into the contract . . . . At its discretion, the Contractor

may also seek to incorporate new services into the contract in

advance of availability to the commercial marketplace. The

JEDI Cloud Contracting Officer must approve incorporation of

any new services into the contract.

2. Any discounts, premiums, or fees . . . shall equally apply to

new services, unless specifically negotiated otherwise.

3. The price incorporated into the JEDI Cloud catalog for new

14

unclassified services shall not be higher than the price that is

publicly-available in the commercial marketplace in CONUS,

plus any applicable discounts, premiums or fees . . . .

a. New services that are proposed to be incorporated

into the contract in advance of availability to the

commercial marketplace may potentially be considered

a noncommercial item. The JEDI Cloud Contracting

Officer will make a fact specific commerciality

determination. If the new service is not a commercial

item and no other exception or waiver applies, the JEDI

Cloud Contracting Officer may require certified cost

and pricing data or other than certified cost and pricing

data under FAR Subpart 15.4 to make a fair and

reasonable price determination.

i. If there are any new fees associated with a new

service that is proposed to be incorporated into

the contract in advance of availability to the

commercial marketplace, the new proposed fee

must be provided to the JEDI Cloud Contracting

Officer for review and, if appropriate, approval

and incorporation into the contract.

4. The price incorporated into the JEDI Cloud catalog for new

classified services may include a price premium as compared

to unclassified services because of the additional security

requirements. . . .

AR Tab 35 at 740-41 (Final Amended RFP). The net effect of this provision

is to permit the addition of wholly new services to the contract over time.

Section H3 provides:

1. Within 45 calendar days of the Contractor lowering prices

in its publicly-available commercial catalog in CONUS, the

Contractor shall submit a revised catalog for incorporation into

Attachment J-1, Price Catalogs as follows:

a. For unclassified services, the revised catalog price

shall match the commercially lower price.

b. For classified services, the revised catalog price shall

be lowered by to be completed by Offeror percentage of

15

the net value difference for the newly lowered rate for

the unclassified service. . . .

2. Any discounts, premiums, or fees in Attachment J-3:

Contractor Discounts, Premiums, and Fees shall equally apply

to any services with price changes, unless specifically

negotiated otherwise.

3. The Contractor may offer new or additional discounts at any

time to be incorporated into Attachment J-3: Contractor

Discounts, Premiums, and Fees only upon JEDI Cloud

Contracting Officer approval.

4. When the JEDI Cloud Contracting Officer incorporates the

revised price into the Attachment J-1, Price Catalogs and/or

Attachment J-3: Contractor Discounts, Premiums, and Fees, as

appropriate, the Contractor shall update the listing of services

and corresponding prices in the online pricing calculator and

APIs for JEDI Cloud within 24 hours.

AR 741. This section would apparently offer some assurance that the prices

of new services would be moderated.

The attraction of these clauses was that DoD could take advantage of

changes in new cloud services that likely will emerge in the marketplace over

the ten year lifetime of the contract. They would also ensure that the awardee

could not price the new service “higher than the price that is publicly-

available in the commercial marketplace in the continental United States.”

AR 740. The CO could then choose to approve the addition of these services

to the contract. The Under Secretary reasoned that, because the CO had to

approve the new service, once the service was added, its unit price would be

fixed, and that the contract thus remained one in which all task orders had

“established” firm fixed prices within the terms required by the chosen

exception.

JEDI Cloud RFP

On July 26, 2018, DoD issued the RFP for the JEDI Cloud. DoD

anticipated awarding a single IDIQ contract, incorporating the awardee’s

fixed unit price information and catalog offerings to serve as the basis for

firm-fixed price task orders. The performance period could extend over ten

years: a two-year base period, two three-year option periods, and a final two-

16

year option period.

Section M provides that the agency will evaluate proposals according

to the RFP requirements and for best value to the government. The

evaluation includes two phases. First, the agency will evaluate the offeror’s

submission against the seven gate criteria. An offeror which receives an

“Unacceptable” rating for any gate criteria “will not be further evaluated.”

AR 805.

The second phase begins with the agency evaluating the remaining

proposals against Factors 2 through 6 (non-price) and Factor 9 (price). After

applying those factors, the agency will establish a competitive range.

Offerors in the competitive range will be invited to submit materials for

evaluation on non-price Factors 7 and 8 and to engage in discussions. The

agency will eliminate any offerors that are rated “Marginal” or

“Unacceptable” for Technical Capability or are rated “High” risk under

Factor 8 Demonstration. Once any discussions conclude, remaining offerors

will be permitted to submit a final proposal revision. The agency will

evaluate final proposals, eliminate any proposals with a “High” risk rating or

that are rated below “Acceptable” on non-price factors, and determine the

proposal that offers the best value.

We return now to phase one, application of the seven gate criteria

from Factor 1: 1.1 Elastic Usage; 1.2 High Availability and Failover; 1.3

Commerciality; 1.4 Offering Independence; 1.5 Automation; 1.6

Commercial Cloud Offering Marketplace; and 1.7 Data. The protest puts

Gate Criteria 1.1, 1.2, and 1.6 at issue.

Under Gate Criteria 1.1, the agency evaluates offers for whether “the

addition of DoD unclassified usage will not represent a majority of all

unclassified usage.” AR 806. To comply with this gate criteria, the offeror

must submit a summary report reflecting its capacity in terms of “Network,”

“Compute,” and “Storage” parameters for the period of January to February

2018. AR 791. “JEDI unclassified usage [must be] less than 50% of the

[Commercial Cloud Offering] usage as demonstrated by” the three metrics:

Network, Compute, and Storage. Id. Under Network, for the selected two

months, offerors had to assume JEDI Cloud unclassified ingress was 10.6

Petabytes and 6.5 Petabytes for unclassified egress. Under Compute,

offerors had to assume the JEDI Cloud unclassified average physical

compute cores in use by application servers was 46,000 cores. Under

Storage, offerors had to assume JEDI unclassified data storage usage

averaged 50 Petabytes online, 75 Petabytes nearline, and 200 Petabytes

17

offline across the 2 months.

Three days prior to the release of the JEDI Cloud RFP, Timothy Van

Name, Deputy Director of the Defense Digital Service, submitted a

memorandum to the CO justifying the use of the gate criteria. It states that

Gate Criteria 1.1 exists “to ensure that JEDI Cloud: 1) is capable of providing

the full scope of services even under surge capacity during a major conflict

or natural disaster event; and 2) experiences ongoing innovation and

development and capability advancements for the full potential period of

performance (10 years).” AR 944.

Mr. Van Name continued, “Not including this criteria will risk future

military operations that depend on the overall ability of the Offeror to support

surge usage at vital times.” Id. He explained that, “Limiting JEDI Cloud to

50%, excluding the Offeror’s own usage, is essential to ensuring the

Offeror’s ability to support commercial innovation by requiring a critical

mass of non-JEDI customers and usage that will drive further development

of the service offerings.” AR 945. Mr. Van Name justified the requirement

for offerors to present summary reports based on data from January 2018 and

February 2018 as necessary in order “to facilitate fair competition, as this

prevents potential Offerors from taking measures to change their numbers

once they became aware of this [Gate Criteria] requirement at the release of

the draft RFP in March 2018.” Id.

The next challenged Gate Criteria is 1.2. There are four elements

within Gate Criteria 1.2, but only the first is relevant to this protest:

No fewer than three physical existing unclassified

[Commercial Cloud Offering] data centers within the Customs

Territory of the United States . . . that are all supporting at least

one IaaS offering and at least one PaaS offering that are

FedRAMP Moderate “Authorized” by the Joint Authorization

Board (JAB) or a Federal agency as demonstrated by official

FedRAMP documentation.

AR 792.

Concerning Gate Criteria 1.2, Mr. Van Name wrote, “The rationale

for including these minimum requirements in the RFP is to validate that JEDI

Cloud can provide continuity of services for DoD’s users around the world.”

AR 947. He notes that “[h]igh availability and failover requirements are long

standing within the DoD, particularly around the critical infrastructure that

18

supports warfighters.” Id. Plaintiff specifically challenges the inclusion of

the FedRAMP Moderate “Authorized” requirement, which it was admittedly

unable to meet at the time of proposal submission. Mr. Van Name explained

at the time that, even though the successful offeror would not have to be

FedRAMP Moderate “Authorized” during performance, such authorization

“is the Federal cloud computing standard and represents the Department’s

minimum security requirements for processing or storing DoD’s least

sensitive information.” Id. (emphasis added). The authorization process

“validates [that] the physical data center security requirements are

appropriately met.” Id. Upon award, the offeror has thirty days to “meet the

more stringent security requirements outlined in the JEDI Cyber Security

Plan for unclassified requirements, but being able to meet the more stringent

requirements are contingent on the underlying physical data center security

requirements that are approved during the FedRAMP Moderate review

process.” Id.

The third gate criteria at issue is 1.6. The marketplace will be used

“to deploy [Commercial Cloud Offering] and third-party platform and

software service offerings onto the [Commercial Cloud Offering]

infrastructure.” AR 793. It exists “to enable DoD to take advantage of the

critical functionality provided by modern cloud computing providers to

easily ‘spin up’ new systems using a combination of IaaS and PaaS offerings

as well as offerings provided through the vendor’s online marketplace.” AR

950-51. The marketplace provides ease of use and rapid adoption. Mr. Van

Name concluded that “all [s]ub-factors under Factor 1 Gate Criteria are

necessary and reflect the minimum requirements for JEDI Cloud.” AR 952.

Post-Solicitation Events

Oracle filed a pre-bid, pre-award protest at the GAO on August 6,

2018, challenging the single award approach. The agency then amended the

RFP, and Oracle filed a supplemental protest on August 23, 2018,

challenging the three gate criteria discussed above. The agency amended the

RFP again on August 31, in relevant part permitting an offeror to demonstrate

that it met Gate Criteria 1.2, FedRAMP Moderate “Authorized,” through

authorization by the Joint Authorization Board or by an agency. Oracle then

filed a consolidated protest on September 6, 2018, raising its conflicts of

interest argument (the facts of which are discussed in the next section).

Four offerors, including Oracle, submitted proposals on October 12,

2018. GAO subsequently denied Oracle’s protest. Oracle filed its protest in

this court on December 6, 2018. Oracle did not move for a preliminary

19

injunction. The agency informed the court that it did not intend to make an

award until midsummer 2019.

Meanwhile, the agency continued to perform its evaluation, starting

with Factor 1 Gate Criteria. On December 12, 2018, the Technical

Evaluation Board (“TEB”) found Oracle’s proposal “Unacceptable” under

Factor 1 Gate Criteria 1.1 and it ended evaluation of Oracle’s proposal.

Oracle was found “Unacceptable” under the Network component of

Gate Criteria 1.1 because its “proposal does not specify a comparison of the

aggregate network usage as required, it only specifies a comparison against

installed network capacity in the Summary Report.” AR 57848. The board

also found Oracle’s proposal unacceptable for the Compute component,

because Oracle placed its table for JEDI Cloud and Cloud Commercial

Offering average physical compute cores in use in its Tab A narrative instead

of in its Summary Report. For the Storage component, the board concluded,

“The JEDI Cloud RFP requires that ‘JEDI unclassified usage must be less

than 50% of the [Commercial Cloud Offering] [average storage] in use’.

This proposal is found ‘Unacceptable’ for Subfactor 1.1(2) because the

calculated JEDI Cloud daily average storage usage is 50.79%.” AR 57849.

The proposal also failed to provide detailed storage information in bytes for

each of the required categories, instead providing an aggregate for all types

of storage. Id. Because Oracle did not meet Gate Criteria 1.1, the agency

did not consider whether it met the other five criteria.

The TEB also completed the gate criteria evaluations for the other

three offerors. The board found AWS and Microsoft “Acceptable” under all

gate criteria. It found IBM “Unacceptable” under Gate Criteria 1.2 and ended

its evaluation.

On February 19, 2019, the TEB completed its evaluation of the only

two remaining offerors, AWS and Microsoft, for non-price Factors 2-6. [

]

In late February 2019, the Source Selection Evaluation Board

completed its Executive Summary Reports, confirming that it had reviewed

the technical evaluations. The Source Selection Advisory Council then

affirmed the TEB’s consideration of the gate criteria submissions and

completed the Executive Summary Report. The Source Selection Advisory

Council Chair concluded: “[I]t is not recommended that the SSA make award

20

based on the initial proposal, as both [AWS] and [Microsoft] proposals have

deficiencies that make them unawardable.” AR 58641. After discussion with

the Source Selection Authority Council, however, the Chair recommended

“that the [Procuring Contracting Officer] make a competitive range

determination of two, to include both AWS and Microsoft.” Id. The CO

determined that AWS and Microsoft would be the competitive range. The

evaluation process is ongoing.

Conflicts of Interest Relating to the JEDI Cloud Procurement

Oracle alleges that, throughout this procurement, three individuals

with conflicts of interest (Deap Ubhi, Tony DeMartino, and Victor Gavin)

affected the integrity of the JEDI Cloud acquisition and that AWS has an

organizational conflict of interest. On July 23, 2018, the CO completed a

memo for the record stating her assessment that the possible conflicts of

interest of five individuals, including Mssrs. Ubhi and DeMartino, had “no

impact” on the procurement. She applied FAR 3.104-7. Her initial analysis

is considered below.

Tony DeMartino

Mr. DeMartino was an AWS consultant prior to joining DoD. In

January 2017, he became the Deputy Chief of Staff for the Secretary of

Defense. In March, he transitioned to Chief of Staff for the Deputy Secretary.

On April 24, 2017, a Senior Attorney in the Office of General

Counsel, Standards of Conduct Office, emailed Mr. DeMartino a

“Cautionary Notice.” AR 4345. The attorney wrote: “[Y]ou may have a

regulatory prohibition under 5 C.F.R. § 2635.502 on participating in matters

where one of the entities for whom you served as a consultant during the last

year is or represents a party to the matter.” Id. The attorney reminded Mr.

DeMartino that DoD does business with “Amazon” and that he must “be

vigilant and consult with our office before participating in any matters

involving these entities until the one-year period has expired.” Id. The email

concluded, “If you have potentially conflicting duties, please discuss with

your supervisor and coordinate with our office to ensure that any conflicts

are properly resolved.” Id.

As a part of his duties as Chief of Staff, Mr. DeMartino performed

work related to the JEDI Cloud procurement. He did not, however, have

access to the Google Drive or the Slack channels. He coordinated staffing of

the September 13, 2017 Accelerating Enterprise Cloud Adoption

21

Memorandum. In October 2017, he participated in editing an opinion piece

for the Deputy Secretary regarding the procurement just before the release of

the RFI. He coordinated meetings for the Deputy Secretary relating to the

procurement through early 2018.

Mr. DeMartino’s position required him to communicate the Deputy

Secretary’s questions to members of the Cloud Executive Steering Group and

the Defense Digital Service, among others. He also attended meetings where

the development of procurement documents was discussed.

Mr. DeMartino worked for the Deputy Secretary through March 2018.

He then returned to his position as Deputy Chief of Staff for the Secretary of

Defense. Inquiries arose in 2018 regarding his former position as an AWS

consultant. Only then did Mr. DeMartino seek advice from the Standards of

Conduct Office. The office determined that Mr. DeMartino had not

participated in the JEDI Cloud procurement in a manner covered by

regulations. The office verbally advised Mr. DeMartino, however, that given

the high visibility of the procurement, he should consider recusing himself

from anything to do with the acquisition. The office also notified those

working on the JEDI Cloud procurement of that warning.

On April 2, 2018, Mr. DeMartino communicated with Defense Digital

Service Director Lynch regarding a JEDI Cloud Update document, providing

comments and questions on that document. Between April 4 and June 5, he

emailed with members of the Defense Digital Service about an unrelated

matter, received a final briefing paper for the Secretary of Defense, and was

copied on an email from Ms. Woods regarding the second draft RFP. Mr.

DeMartino resigned from federal employment in July 2018. The record does

not reflect Mr. DeMartino negotiating for or returning to any form of AWS

employment after his resignation.

The CO considered whether Mr. DeMartino was impartial in

performing his official duties. She found that he did not have “input or

involvement in the reviewing or drafting of the draft solicitation package, the

Acquisition Strategy, Business Case Analysis, or other pre-decisional

sensitive documents relative to the JEDI Cloud acquisition.” AR 685. She

also found that he “worked with [Standards of Conduct Office] throughout

his DoD employment to ensure compliance with all applicable ethical rules.”

Id. The CO concluded that his “involvement was ministerial and perfunctory

in nature” and he “did not participate personally and substantially in the

procurement. Therefore, Mr. DeMartino’s involvement did not negatively

impact the integrity of the JEDI Cloud acquisition.” Id. In her testimony

22

during the GAO hearing in Oracle’s bid protest, the CO repeated this

conclusion. The CO did not revisit her conclusion on Mr. DeMartino’s

actions in her 2019 assessment.

Deap Ubhi

The CO also evaluated Mr. Ubhi’s impact on the JEDI Cloud

procurement. She listed five findings. First, “Mr. Ubhi was previously

employed with AWS, which ended in January 2016.” AR 686. Second, “Mr.

Ubhi was employed with Defense Digital Service from August 22, 2016 to

November 27, 2017.” Id. Third, “Mr. Ubhi was involved with JEDI Cloud

market research activities between September 13, 2017 and October 31,

2017.” Id. Fourth, “[b]ecause greater than one year had lapsed between when

his AWS employment ended and when his participation in JEDI Cloud

started, no restrictions attached to prohibit Mr. Ubhi from participating in the

procurement.” Id. Her fifth finding was:

In late October 2017, AWS expressed an interest in purchasing

a start-up owned by Mr. Ubhi. On October 31[,] 2017, Mr.

Ubhi recused himself from any participation in JEDI Cloud.

His access to any JEDI Cloud materials was immediately

revoked, and he was no longer included in any JEDI Cloud

related meetings or discussions.

Id.

The CO detailed what the agency knew at the time. Mr. Ubhi had

access to the Google Drive and Slack channels. He attended meetings within

DoD and with industry, acting as a point of contact for industry

representatives. He participated in drafting and editing some of the first

documents shaping the procurement. He argued that DoD should adopt a

single award approach. In short, Mr. Ubhi was involved in developing the

JEDI Cloud procurement until he left DoD on November 24, 2017.

On October 31, 2017, Mr. Ubhi emailed Mr. Lynch and Mr. Van

Name, copying counsel for the Standards of Conduct Office and Ms. Woods.

Mr. Ubhi wrote:

As per guidance from [Standards of Conduct Office]

(Eric Rishel) and our in-house general counsel Sharon Woods,

I am hereby recusing myself from the [Defense Digital

Service’s] further involvement in facilitating SecDef and

23

[Defense Digital Service’s] initiative to accelerate adoption of

the cloud for the DoD enterprise, due to potential conflicts that

may arise in connection to my personal involvement and

investments. Particularly, Tablehero, a company I founded,

may soon engage in further partnership discussions with

Amazon, Inc., which also owns and operates one of the world’s

largest cloud service providers, Amazon Web Services,

fulfilling that responsibility to my fullest. This project is

critical to the national security of our country, and I regret that

I can no longer participate and contribute.

AR Tab 45 at 2777. Although the agency was not aware at the time, Mr.

Ubhi’s reason for leaving DoD was fabricated. On November 13, 2017, Mr.

Ubhi resigned.

Although the agency listed Mr. Ubhi on its list of individuals

submitted to GAO who were personally and substantially involved in the

JEDI Cloud procurement, the CO nevertheless concluded that Mr. Ubhi’s

participation did not negatively affect the integrity of the procurement,

because (1) his impartiality restriction had expired prior to working on the

JEDI Cloud procurement; (2) his participation was limited; and (3) Mr. Ubhi

“promptly recused himself.” AR 687.

Oracle challenged the CO’s conclusions before GAO and before this

court. Oracle also raised a question as to whether AWS had an organizational

conflict of interest and whether the actions of another individual, Anthony

DeMartino, tainted the integrity of the JEDI Cloud procurement. During the

early stages of this protest, the agency represented that it was evaluating

whether AWS had an organizational conflict of interest.

Shortly after Oracle filed its original motion for judgment on the

administrative record, the agency filed a motion to stay this case, prompted

by an unsolicited letter it had received from AWS pointing out that some of

the information provided by Mr. Ubhi to the agency was false. The agency

therefore decided to reevaluate the impact of Mr. Ubhi’s actions in light of

the new information. The agency also planned to complete its organizational

conflict of interest evaluation of AWS. The court granted the motion to stay.

On April 15, 2019, the government filed a status report updating the court

that the agency had completed those evaluations.

When she reassessed the facts, the CO determined that, even with the

new information, Mr. Ubhi’s conflict of interest had not tainted the JEDI

24

Cloud procurement. The reassessment began with Mr. Ubhi’s involvement.

Mr. Ubhi was selected by Mr. Lynch to serve as “a product manager with a

business focus” on the Defense Digital Service JEDI Cloud team. AR 58699.

Mr. Ubhi was involved in acquisition planning. He had administrative

privileges on the Google Drive and participated in vendor meetings, although

it was DoD’s practice to have two representatives present at those meetings.

The information supplied by AWS related to Mr. Ubhi’s relationship

with AWS during his Defense Digital Service employment. AWS

maintained throughout its communication with the CO that it hired Mr. Ubhi

without knowing that he had lied to DoD about his reason for resigning and

lied to AWS about complying with DoD ethics rules. Mr. Ubhi in fact hid

relevant information and misdirected both DoD and AWS. The CO recited:

“‘AWS did not offer to purchase Tablehero . . . at any time, while he was

engaged in market research activity or otherwise. . . . Those discussions

concluded (with no deal and no future business relationship) in December

2016, long before the JEDI Cloud procurement began.’” AR 58701-02. Mr.

Ubhi’s discussions with AWS regarding Tablehero thus ended after he

started at Defense Digital Service but before he began working on the

procurement.

AWS further informed DoD that Mr. Ubhi had communicated with

AWS as early as April 26, 2017, to discuss future AWS employment. 8 Prior

to beginning work on the procurement, Mr. Ubhi had applied for, been

offered, and declined a job at AWS. Mr. Ubhi indicated in August 21 and

23, 2017 emails that he would be interested in future employment at AWS.

At nearly the same time he began work on the JEDI Cloud

procurement, Mr. Ubhi had discussions “with his former Supervisor at AWS

regarding the possibility of rejoining AWS in a commercial startup role

unrelated to AWS’s government business.” AR 58702. On October 4, 2017,

Mr. Ubhi made a “[v]erbal commitment to rejoin AWS.” AR 58703.

Throughout October, Mr. Ubhi “[m]et with companies as part of

market research” related to the JEDI Cloud project. AR 58703. In that same

period, on October 17, 2017, he applied for “an open position in AWS’s

commercial organization.” AR 58702. On October 19, 2017, Mr. Ubhi

completed an AWS Government Entity Questions form on which he

“specifically represented to AWS that he ‘confirmed by consulting with [his]

8

After AWS’s February 12, 2019 letter, the CO and AWS communicated

through March 2019.

25

employer’s ethics officer’ that he was permitted to have employment

discussions with AWS.” AR 58702 (alteration original). On that form he

also represented that he did not have “any employment restrictions

[preventing him] ‘from handling any specific types of matters if employed

by Amazon or its subsidiaries.’” AR 58705. Both representations were false.

AWS made Mr. Ubhi an offer on October 25, 2017, which Mr. Ubhi

accepted two days later. Mr. Ubhi sent the email recusing himself to Mr.

Lynch on October 31, 2017, which falsely represented his reason for leaving

DoD. He resigned on November 13, 2017. He worked at Defense Digital

Service until November 24, 2017. He rejoined AWS as “Senior Manager,

Startup Programs Management in AWS Business Development” on

November 27, 2017. 9 Id.

When considering Mr. Ubhi’s impact on the procurement, the CO

placed his actions in the context of the RFP-drafting process, which included

multiple stages and involved various DoD offices. She noted, “[M]ore than

70 individuals participated personally and substantially in the JEDI Cloud

acquisition prior to the receipt of proposals.” AR 58700. Under Secretary

Lord considered many documents that “had extensive reviews,” including

technical and legal review. AR 58699. The draft RFP went through a

Defense Procurement and Acquisition Policy peer review in April 2018. The

DoD Chief Information Officer also performed “a full top-down, bottom-up

independent review of JEDI Cloud pre-solicitation acquisition documents,

including the RFP.” Id. He consulted security, technical, and acquisition

experts. Additionally, industry offered comment on the RFI and draft RFPs.

The CO held eight interviews and reviewed numerous documents in

an effort to determine whether anyone knew that the information in the 2018

determination was inaccurate, whether anyone would adjust their opinion

about Mr. Ubhi’s influence based on the new information, and whether there

was any other undisclosed information. The CO spoke with Mr. Lynch, Mr.

9

Beyond the 2019 investigation materials, the CO also refers to AWS’s

Organizational Conflict of Interest Mitigation Plan, submitted with its

proposal, which included an affidavit from Mr. Ubhi. In it he stated that he

was only involved in the planning stages of the JEDI Cloud procurement and

that he did not provide input regarding any draft of the RFP. She relied on

her personal knowledge of the procurement development to corroborate Mr.

Ubhi’s statements. Mr. Ubhi stated that he had complied with AWS’s

information firewall and had not and would not share nonpublic information

or documentation with AWS.

26

Van Name, Ms. Woods, Mr. Kasper, Mr. Daniel Griffith, two other Defense

Digital Service representatives, and an attorney with the Standards of

Conduct Office. The CO also spoke with Ms. Christina Austin, who is

Associate General Counsel at the Washington Headquarters Service &

Pentagon Force Protection Agency within DoD.

The CO reviewed documents that she believed “were apropos to the

timeframe when Mr. Ubhi was actively involved with JEDI Cloud related

details.” AR 58707. She reviewed the draft problem statement, the notes and

questions from vendor meetings that Mr. Ubhi attended, the RFI, and Slack

conversations. She also considered AWS’s employment offer to Ubhi to

determine if it reflected payment in exchange for information.

The CO reached six conclusions. First, Mr. Ubhi violated the FAR

3.101-1 requirement that officials “avoid strictly any conflict of interest or

even the appearance of a conflict of interest in Government-contractor

relationships” and the matter therefore had to be referred to the DoD

Inspector General. AR 58707-09. The CO reported that interviewees were

surprised by Mr. Ubhi’s lie that AWS had or would be acquiring Tablehero.

He apparently did not mention any other communications with AWS. The

CO found that Mr. Ubhi had been aware of his ethical obligations and had

ignored them. She found that he should have ceased work on the

procurement after he began employment discussions with AWS. She was

“disconcert[ed]” that Mr. Ubhi’s actions called into question the integrity of

the procurement. In this section, the CO also found that the facts “warrant

further investigation concerning whether Mr. Ubhi violated 18 U.S.C. § 208,

5 CFR § 2635.604, and 5 CFR § 2635.402.” AR 58709. She referred the

issue for assessment to the Inspector General and concluded, “Whether Mr.

Ubhi’s conduct violated these particular laws does not affect my

determinations below that his unethical behavior has no impact on the []

pending award or selection of a contractor in the JEDI procurement.” Id.

Second, she found that there was no violation of FAR 3.104-3(a) by

Mr. Ubhi and no violation of FAR 3.104-3(b) by AWS. FAR 3.104-3(a)

prohibits officials with access to contractor, proposal, or source selection

information from “knowingly disclos[ing] contractor bid or proposal

information or source selection information before the award of a Federal

agency procurement to which the information relates.” FAR 3.104-3(b)

prohibits “knowingly obtain[ing] contractor bid or proposal information or

source selection information before the award of a Federal agency

procurement contract to which the information relates.”

27

The CO broadly investigated “whether there was any evidence of quid

pro quo between AWS and Mr. Ubhi.” AR 58709. The CO examined the

emails between Mr. Ubhi and his former supervisor and that supervisor’s

affidavit. She found that it was apparent that “Mr. Ubhi wanted to return to

AWS dating back to at least February 2017,” and AWS wanted him to return

as of April 2017. AR 58710. She concluded that “the AWS hiring efforts,

which started long before the JEDI Cloud, were not related to JEDI Cloud

even though the hiring occurred after the JEDI Cloud initiative started.” AR

58711.

The CO compared his employment offer to “a review of Glassdoor

and discussion with others about typical AWS employment offers.” Id. She

found that his [ ] employment package was “relatively

standard,” even if the bonus was slightly higher due to his “personal

relationship with” his former supervisor. Id. Because the offer did not appear

connected to the JEDI Cloud procurement or the sharing of nonpublic

information, the CO found that neither Mr. Ubhi nor AWS entered into the

discussions or job offer for the exchange of non-public information.

Regarding FAR 3.104-3(a)-(b), the CO noted that Mr. Ubhi stated that

he had not shared any non-public JEDI Cloud information and that, in any

event, he did not have access to RFI responses, RFP drafts, or other

acquisition sensitive documents. The CO also evaluated AWS’s statements.

Based on the company’s Organizational Conflict of Interest Response and its

emails with the CO, she concluded that it had not received non-public JEDI

Cloud information. The Senior Manager of United States Federal Business

Development and JEDI Proposal Manager provided an affidavit stating that

Mr. Ubhi had not provided any information to him, or anyone else, on the

AWS JEDI team that would have affected AWS’s proposal. AWS’s DoD

Programs Director represented that no one from the AWS Commercial

Startup team had anything to do with AWS’s JEDI proposal. AWS’s DoD

Programs Director also represented that Mr. Ubhi was “organizationally and

geographically” prevented from providing nonpublic information to her

team. Id. She had “confidence that Mr. Ubhi had absolutely no involvement

whatsoever in the AWS JEDI capture effort and that he has been truly

firewalled.” Id. The Director of Startups at Amazon Web Services World

Wide Commercial Sector Business Development stated that Mr. Ubhi “has

never revealed or attempted to reveal nonpublic information to me about the

JEDI Cloud procurement or any of the offerors involved.” Id. The CO noted

that Mr. Ubhi has not been assigned to any tasks or teams interacting with

the AWS JEDI proposal team. Id. Based on this review, she found that

neither Mr. Ubhi nor AWS violated FAR 3.104-3(a)-(b).

28

Third, she concluded that even if there had been a violation of FAR

3.104-3(a) and (b), Mr. Ubhi could not have provided competitively useful

information. Regarding the vendor meetings, she found that the information

would not have been useful to AWS and, in any event, her research indicated

that the information regarding a competitor such as Microsoft was publicly

available. Nor was the CO convinced that any DoD meetings in which Mr.

Ubhi participated were competitively useful, because they occurred prior to

the decisional documents and addressed individual needs rather than the

actual procurement strategy. Furthermore, she concluded that much of his

information relating to costs or needs would be outdated.

Fourth, there was no violation of FAR 3.104-3(c). FAR 3.104-3(c)

requires officials such as Mr. Ubhi to promptly report contacting or being

contacted “by a person who is an offeror in that Federal agency procurement

regarding possible non-Federal employment for that official” and then to

disqualify himself from further personal and substantial participation in the

procurement. The CO found that although Mr. Ubhi failed to promptly report

the contact with AWS in writing to his supervisor and the agency ethics

official and failed to timely recuse himself from JEDI Cloud activities,

because the offers were not submitted until October 12, 2018, AWS

technically was not an “offeror” until then and therefore Mr. Ubhi did not

violate the regulation. Id. She nevertheless found “Mr. Ubhi’s actions to be

unethical and improper.” Id.

Fifth, Mr. Ubhi’s participation in the preliminary stages of the JEDI

Cloud procurement did not introduce bias in favor of AWS. Mr. Ubhi was

involved in JEDI Cloud for seven weeks during the preliminary stages of

planning and no “critical decisions” were made during this period. AR

58716. The CO apparently asked “[a]ll individuals directly involved in the

JEDI Cloud effort” whether the revelations in the AWS letter changed their

opinion on Mr. Ubhi’s effect on the procurement. They uniformly said no.

She reviewed Slack messages to determine whether Mr. Ubhi

expressed bias toward any potential offeror. She determined that he did not,

because, although Mr. Ubhi had strong, sometimes coarsely-expressed

opinions, he did not show bias in favor of AWS in particular. 10 Instead, he

10

The court reviewed hundreds of pages of Slack messages—generally an

unedifying exercise, except as a cautionary tale about ill-considered use of

instant messaging. One would have thought that in this litigious culture,

people would be less promiscuous about sharing every stray mental hiccup.

29

believed that there were very few companies who could offer the services

that DoD would need to adopt an enterprise cloud solution; those companies

apparently included both Microsoft and AWS. The CO also reviewed Mr.

Ubhi’s emails and found similar sentiments. The CO pointed out that, if

anything, the Slack channels demonstrate that no one person could have

swayed the planning decisions because so many people contributed.

Sixth, even if Mr. Ubhi had attempted to introduce bias in favor of

AWS, he did not impact the procurement, for three reasons. First, Mr. Ubhi

lacked the technical expertise to substantively influence the JEDI Cloud

procurement. Second, his actual attempts to influence the procurement were

limited. “Third, and most importantly, all the key decisions for the JEDI

Cloud procurement, such as the actual RFP terms and whether to award one

or multiple contracts, were made well after Mr. Ubhi recused himself, after

being vetted by numerous DoD personnel to ensure that the JEDI Cloud RFP

truly reflects DoD’s requirement.” AR 56719-23. The CO reiterated that Mr.

Ubhi was a product manager focused on market research, not an engineer.

In her interview with Mr. Lynch, Mr. Lynch explained that Mr. Ubhi was

one member of a large group of people including “engineers, business

owners, and entrepreneurs” who favored a single provider strategy absent

Mr. Ubhi’s influence. AR 58720. The other interviewees expressed the view

that Mr. Ubhi was effective at his job, but he did not have the ability to bias

vendor meetings, RFI questions, or the single award decision.

The CO then turned to Mr. Ubhi’s contributions to procurement

documents. Regarding the problem statement, the CO found that Mr. Ubhi

contributed 100 changes to the document, along with other collaborators.

She concluded that his contributions were outdated, because the Defense

Digital Service Product Manager who was tasked with drafting the Business

Case Analysis after Mr. Ubhi left found the Problem Statement tone helpful,

but the content too limited to form the basis of the Business Case Analysis.

The CO determined that Mr. Ubhi’s RFI edits were minor, relating to how

responders discussed Tactical Edge abilities. Technical interviewees

expressed the view that Mr. Ubhi lacked the technical expertise to contribute

substantively to those documents.

Procurement documents created or received after Mr. Ubhi’s

departure included the RFI responses, Market Research Report, Joint

Requirements Oversight Council Memorandum, Single Award D&F, the

Mr. Ubhi, in particular, contributed any number of banal, puerile, profane

and culinary messages.

30

CO’s justification for a single award, Business Case Analysis, Acquisition

Strategy, RFP and draft RFPs, and justification for the gate criteria. She

iterated that multiple DoD teams developed the documents. She concluded

that, even if Mr. Ubhi had exhibited bias in favor of AWS, he had not

impacted the procurement. In summary, “[e]ven though I find that Mr. Ubhi

violated FAR 3.101-1 and may have violated 18 U.S.C. § 208 and its

implementing regulations, I determine that there is no impact on the pending

award or selection of a contractor in accordance with FAR 3.104-7.” AR

58720.

Victor Gavin

The CO also investigated the potential impact of Victor Gavin on the

integrity of this procurement and completed that investigation during the stay

in the protest. During the procurement, Mr. Gavin was a Deputy Assistant

Secretary of the Navy for C41 and Space Programs. In the summer of 2017,

Mr. Gavin discussed with Navy ethics counsel future employment with

defense contractors. He then discussed retirement plans with an AWS

recruiter and with AWS Director of DoD programs from August 2017 to

January 2018.

Mr. Gavin attended the October 5, 2017 meeting of the Cloud

Executive Steering Group to share the Navy’s experience with cloud

services. He submitted a Request for Disqualification from Duties on

January 11, 2018, requesting he be excluded from matters affecting the

financial interests of AWS. He interviewed with AWS on January 15, 2018.

On March 29, 2018, AWS offered Mr. Gavin a position and he accepted.

Mr. Gavin then attended a JEDI Cloud meeting on April 5, 2018,

where, among other things, the attendees discussed the draft Acquisition

Strategy. The CO attended the meeting as well. She recalled that Mr. Gavin

did not show bias toward a particular vendor and advocated for a multiple-

award approach. He did not edit the Acquisition Strategy.

Mr. Gavin retired from the Navy on June 1, 2018. He began work at

AWS on June 18 as Principal, Federal Technology and Business

Development. After he began work at AWS, but before AWS implemented

an information firewall, he “had a few informal conversations with AWS’s

Director, DoD, Jennifer Chronis, in which JEDI came up.” AR 24550. He

“provided only general input on DoD acquisition practices and Navy cloud

usage based on [his] years of experience as an information technology

acquisition professional at the Navy.” AR 24550-51. He represented to DoD

31

that he did not provide any JEDI Cloud procurement information to AWS’s

Director of DoD Programs.

AWS first informed Mr. Gavin of an information firewall on July 26,

2018. In separate emails on July 31, AWS informed Mr. Gavin that he is

“strictly prohibited from disclosing any non-public information about DoD’s

JEDI procurement (were he to have any) to any AWS employee” and

informed the AWS JEDI team of the firewall. AR 24544-45. Mr. Gavin said

that he would comply with the firewall.

The CO determined that, although Mr. Gavin’s attendance at the

October 5, 2017 meeting did not constitute personal and substantial

participation in the JEDI Cloud procurement, his attendance at the April 5,

2018 meeting may have constituted such participation. The CO did not

consider his participation of any significance, however, but referred the issue

to ethics counsel for further review.

The CO decided that Mr. Gavin violated FAR 3.101-1, and possibly

18 U.S.C. § 208 (2012), but that his involvement did not taint the

procurement. The CO specifically found that he had limited access to the

draft Acquisition Strategy and did not furnish any input on the document; he

did not disclose any competitively useful nonpublic information; he did not

obtain or disclose other bid information to AWS; and he did not introduce

bias into the meetings he attended. Regarding AWS, she concluded that it

had not received any competitively useful information or an unfair advantage

through Mr. Gavin.

Organizational Conflict of Interest

Finally, the CO determined that AWS did not receive an unfair

competitive advantage in the JEDI Cloud procurement and that no

organizational conflict of interest exists. She relied on FAR 9.505 as she

considered whether a significant potential conflict exists, particularly

whether AWS has received an unfair competitive advantage. She considered

whether AWS possesses “[p]roprietary information that was obtained from a

Government official without proper authorization; or [s]ource selection

information (as defined in 2.101) that is relevant to the contract but is not

available to all competitors, and such information would assist that contractor

in obtaining the contract.” FAR 9.505(b).

When submitting a proposal, the offeror was required to disclose any

actual or perceived conflicts of interest and identify measures to avoid or

32

mitigate those conflicts. The CO reviewed the AWS Organizational

Conflicts of Interest Response and supplemental materials. She considered

whether Mr. Ubhi, Mr. Gavin, and two other individuals, Brandon Bouier

and Cynthia Sutherland, could provide information to AWS that would give

it an unfair competitive advantage.

The CO began with AWS’s plan as it relates to Mr. Ubhi. Due to Mr.

Ubhi’s misrepresentations, she understandably “did not give much weight or

credibility to the statements Mr. Ubhi provided in his declarations.” AR

58750. Instead, she relied on AWS’s Organizational Conflicts of Interest

Response, which offered three assurances: (1) Mr. Ubhi has not supported

the AWS sector handling its JEDI Cloud proposal and has not been involved

in any JEDI Cloud proposal activities. (2) He has not had “any substantive

communications” with any AWS employee regarding the JEDI Cloud

procurement and has not disclosed nonpublic information. Id. (3) AWS

implemented an information firewall on May 11, 2018, sending the notice to

both Mr. Ubhi and the AWS JEDI Cloud team. It prohibited any contact,

disclosure, or discussion of information between Mr. Ubhi and AWS’s JEDI

Cloud team.

AWS’s letter provided more information regarding the information

firewall. The letter represents that, upon arrival, Mr. Ubhi “‘informally

firewalled himself by duly notifying his manager that he should not be

involved in JEDI Cloud activities because of potential conflict issues.’” AR

58751. The formal information firewall has functional, organizational, and

geographic components. The AWS Senior Lead Recruiter, the Director of

Startups of AWS Commercial Sector Business Development, the AWS JEDI

Proposal Team Lead, and the Director of DoD Programs at AWS each

provided an affidavit regarding whether Mr. Ubhi shared nonpublic

information. The materials consistently described Mr. Ubhi’s exclusion from

working with AWS’s JEDI Cloud proposal team.

The AWS Senior Lead Recruiter stated that Mr. Ubhi represented

during the hiring process, falsely as it turned out, that he had spoken with

DoD ethics officials and was engaging in employment discussions with

AWS. The recruiter also stated that Mr. Ubhi did not provide detail regarding

his work at Defense Digital Service; this was consistent with Mr. Ubhi’s

application materials. The Director of Startups of AWS Commercial Sector

Business Development—Mr. Ubhi’s manager—stated that no one on his

team, including Mr. Ubhi, worked with the AWS JEDI Cloud proposal team.

Although the CO could not determine exactly when Mr. Ubhi’s manager

became aware of Mr. Ubhi’s conflict, she explained that the exact date did

33

not matter since the manager was aware of the conflict and his sector did not

overlap with the AWS JEDI Cloud proposal team. Both the AWS JEDI

Proposal Team Lead and the Director of DoD Programs at AWS stated that

Mr. Ubhi had not communicated information to them and that they would

not seek any in the future.

Based on the mitigation plan and AWS’s representations, the CO

determined that “Mr. Ubhi’s employment with AWS Commercial Sector

Business Development does not create an [organizational conflict of

interest].” AR 58752. The CO also found that “AWS did not receive any

nonpublic information or documentation JEDI Cloud-related, including

potential competitors, from Mr. Ubhi.” AR 58753. She iterated that, even if

Mr. Ubhi had shared the early planning information, that information would

not have been competitively useful.

The CO next turned to AWS’s Organizational Conflicts of Interest

Plan as it related to Mr. Gavin. The plan stated that Mr. Gavin was not

involved in the AWS JEDI Cloud proposal preparation; had not seen AWS

proposal materials; had not provided input on the AWS proposal; and had

not disclosed nonpublic information to anyone at AWS. AWS emailed

notices to Mr. Gavin and the AWS JEDI Cloud proposal team on July 31,

2018, establishing an information firewall. Mr. Gavin provided an affidavit

stating that he participated in only one JEDI Cloud procurement meeting

while he was with the Navy (which was an inaccurate statement because he

attended a second meeting); he had no access to competitively useful

information; and he has not shared JEDI Cloud procurement information.

The CO concluded that Mr. Gavin’s employment at AWS did not create a

potential organizational conflict of interest and that Mr. Gavin had not

provided competitively useful information to AWS because he did not have

any to provide.

Reaching beyond the AWS Organizational Conflicts of Interest Plan,

the CO requested information relating to Brandon Bouier, who was

employed at Defense Digital Service in 2017. He resigned from Defense

Digital Service on August 18, 2017 and concluded his employment there on

September 1, 2017. He began work at AWS on September 25, 2017. AWS

submitted an affidavit from him. The CO noted that Mr. Bouier departed

Defense Digital Service prior to the Deputy Secretary’s September 14, 2017,

Accelerating Enterprise Cloud Adoption Memorandum. The CO, and others

at Defense Digital Service, did not recall him working on the JEDI Cloud

procurement. She thus found that he did not have nonpublic information

34

related to the procurement and that his employment at AWS did not create

an organizational conflict of interest.

The CO considered one last person: Cynthia Sutherland. Dr.

Sutherland worked for the Cybersecurity and Defenses Branch, Cyberspace

Division, Joint Chiefs of Staff. Dr. Sutherland reached out to the CO on

February 26, 2019. She was the cloud expert for the Joint Staff Chief

Information Officer. Dr. Sutherland was personally and substantially

involved in the JEDI Cloud procurement, “principally” in November and

December 2017. AR 58755. She contributed work to the Joint Requirements

Oversight Council Memorandum. She addressed cloud concerns from

council members and adjusted the memo based on the council’s feedback.

Dr. Sutherland attended the Cloud Cybersecurity Working Group’s initial

conversations, recommended how to shape cybersecurity requirements, and

provided a data dictionary to that group. She “led the development of the

cloud characteristics/requirements for the JEDI Cloud based on the needs of

the Combatant Commands, warfighter.” Id. After the Joint Requirements

Oversight Council Memorandum was signed, she provided bi-weekly

updates to the Vice Chief of the Joint Chiefs of Staff regarding the JEDI

Cloud procurement and other cloud efforts through April 2018. At that point

she only relayed information without providing input on decisions.

Dr. Sutherland applied to be an AWS Public Sector Specialist on

January 9, 2019, approximately a year after her work on the JEDI Cloud

procurement. Between her application date and February 26, 2019, she

completed four interviews with AWS. During those interviews, she

discussed “‘her level of understanding and creation of cloud requirements for

her current customers, the warfighter.’” Id. She had a final interview on

February 27, 2019. Dr. Sutherland represented that she did not discuss the

JEDI Cloud procurement in any of her conversations with AWS, instead

sticking to her understanding of cloud computing generally and her work

developing cybersecurity requirements for “global customers.” AR 58756.

AWS offered Dr. Sutherland the position of Industry Specialist on

AWS’s Security Assurance team on March 11, 2019. She accepted on the

same day. When she was communicating with the CO, she had not started

working at AWS. The AWS JEDI Proposal Team Lead and the Director of

DoD Programs at AWS stated that they were unaware that AWS had

interviewed Dr. Sutherland. AWS represented that Dr. Sutherland had not

contributed to the AWS JEDI Cloud proposal submitted in October 2018.

35

The CO found that, other than the drafts of the Joint Requirements

Oversight Council Memorandum and the initial conversations of the Cloud

Cybersecurity Working Group, Dr. Sutherland did not have access to

nonpublic information related to the JEDI Cloud procurement. The CO

concluded that Dr. Sutherland had not provided nonpublic information to

AWS, that Dr. Sutherland’s prospective employment did not create an

organizational conflict of interest, and that AWS’s plan to institute an

informational firewall when Dr. Sutherland began work was reasonable.

In conclusion, the CO decided that AWS had proposed a reasonable

risk mitigation plan, did not have an organizational conflict of interest, and

had not received nonpublic information. In its amended complaint and

supplemental motion for judgment on the administrative record, Oracle

challenges the 2019 conflicts of interest determinations.

After we lifted the stay in this protest, the parties briefed cross motions

for judgment on the administrative record. We held oral argument on July

10, 2019. On July 12, 2019, we issued an order denying plaintiff’s motion

and granting defendant’s and intervenor’s motions because Oracle has not

shown prejudice as a result of the errors discussed below.

DISCUSSION

This court has jurisdiction over actions “objecting to a solicitation by

a Federal agency for bids or proposals for a proposed contract . . . or any

alleged violation of statute or regulation in connection with a procurement or

a proposed procurement.” 28 U.S.C. § 1491(b)(1) (2012). We review such

actions for whether the agency decision was “arbitrary, capricious, an abuse

of discretion, or otherwise not in accordance with law.” 5 U.S.C. § 706(2)(A)

(2012); 28 U.S.C. § 1491(b)(4). In other words, the court’s “task is to

determine whether the procurement official’s decision lacked a rational basis

or the procurement procedure involved a violation of a regulation or

procedure.” Tinton Falls Lodging Realty, LLC v. United States, 800 F.3d

1353, 1358 (Fed. Cir. 2015) (citation omitted).

If we conclude that DoD’s conduct fails under this standard of review,

we then “proceed[] to determine, as a factual matter, if the bid protester was

prejudiced by that conduct.” Bannum, Inc. v. United States, 404 F.3d 1346,

1351 (Fed. Cir. 2005). To show that it was prejudiced by an error, the

protestor must demonstrate “that there was a ‘substantial chance’ it would

have received the contract award but for the [agency’s] errors.” Id. at 1353.

The “substantial chance” standard has been applied in pre-award bid protests

36

in which offerors have submitted their proposals, the protestor has been

evaluated and excluded from competition, and the agency has established the

competitive range. E.g., Orion Tech., Inc. v. United States, 704 F.3d 1344,

1348-49 (Fed. Cir. 2013); Ultra Elecs. Ocean Sys., Inc. v. United States, 139

Fed. Cl. 517, 526 (2018).

Plaintiff argues that, in a pre-award bid protest, the court applies the

“non-trivial competitive injury” standard articulated in Weeks Marine, Inc.

v. United States, 575 F.3d 1352, 1358 (Fed. Cir. 2009). But the court in

Weeks Marine applied the “non-trivial competitive injury test” where the

potential offeror had not submitted a bid, “because at that stage it is difficult,

if not impossible, to establish a substantial chance of winning the contract

prior to the submission of any bids.” Orion, 704 F.3d at 1348. Here, on the

other hand, we cannot ignore the fact that it is now possible to determine

whether Oracle had a substantial chance of winning this award. We have the

necessary factual predicate, because Oracle’s proposal was evaluated and

excluded from competition based on its failure to meet Gate Criteria 1.1 and

Oracle concedes that it also could not meet Gate Criteria 1.2. Thus, while

Oracle meets the most basic element of standing—it submitted a serious

proposal—we have to consider whether it was prejudiced, even if some of its

substantive arguments are valid.

For this reason, defendant contends that it is pointless to consider most

of plaintiff’s arguments. Plaintiff responds, however, that its inability to

meet the gate criteria is not dispositive if the gate criteria are unenforceable,

either because they violate the law or because they would have been drafted

differently if the agency had not employed a single award strategy. That

question, in turn, depends in part, on whether the single award determination

was tainted by the participation of, among others, Mr. Ubhi. In short, the

merits of Oracle’s arguments are wrapped around the axle with the prejudice

question. We believe the tidiest approach, therefore, is to deal with the merits

of Oracle’s arguments, and if any survive, determine if they are nevertheless

off limits because Oracle cannot demonstrate that it was prejudiced. We

begin with Oracle’s initial contention that the single award determinations of

the Under Secretary and the CO were flawed. We conclude that one was,

and one wasn’t.

I. The Contracting Officer Reasonably Justified Her Determination

Under 10 U.S.C. § 2304a(d)(4) And FAR 16.504(c) To Use A Single

Award Approach.

As discussed in the background, two single award determinations

37

were made, by different officials under different standards. This is because,

as currently codified, 10 U.S.C. § 2304a (2012) is a mixture of different

legislative efforts at promoting competition in IDIQ contracts. Separate

legislative and regulatory efforts have been layered on top of one another

over time, resulting in the two distinct single award determinations in the

JEDI Cloud acquisition.

First, Congress directed that regulations be developed to implement a

multiple award preference that would “establish a preference for awarding,

to the maximum extent practicable, multiple task or delivery order contracts

for the same or similar services or property.” 10 U.S.C. § 2304a(d)(4). The

implementing regulation is FAR 16.504(c)(1)(i) (2018), which states the

multiple award preference and sets out the circumstances in which a single

award is appropriate for an IDIQ contract of any value. The CO made her

singe award determination under this regulation.

Section 2304a(d)(3), discussed in the next section, followed after the

codification of the multiple award preference. In that section, Congress

prohibited single awards in task or delivery order contracts valued at more

than $112 million in the absence of a written finding from the head of the

agency that one of four conditions exist. For aught that appears, these

requirements operate independently—different officials make the

determination considering different factors—although they involve very

similar subject matter. The underlying goal is certainly the same: to protect

competition.

With respect to the CO’s decision under FAR 16.504(c)(1)(i), when

the agency is considering using an indefinite-quantity contract, “the CO

must, to the maximum extent practicable, give preference to making multiple

awards of indefinite-quantity contracts under a single solicitation for the

same or similar . . . services to two or more sources.” But FAR

16.504(c)(1)(ii)(B) adds that “[t]he contracting officer must not use the

multiple award approach if—

(1) Only one contractor is capable of providing performance at

the level of quality required because the supplies or services

are unique or highly specialized;

(2) Based on the contracting officer’s knowledge of the market,

more favorable terms and conditions, including pricing, will be

provided if a single award is made;

38

(3) The expected cost of administration of multiple contracts

outweighs the expected benefits of making multiple awards;

(4) The projected orders are so integrally related that only a

single contractor can reasonably perform the work;

(5) The total estimated value of the contract is less than the

simplified acquisition threshold; or

(6) Multiple awards would not be in the best interests of the

Government.

Here, the CO found that multiple awards must not be used for three

reasons: “(2) Based on the CO’s knowledge of the market, more favorable

terms and conditions, including pricing, will be provided if a single award is

made;” “(3) The expected cost of administration of multiple contracts

outweighs the expected benefits of making multiple awards;” and “(6)

Multiple awards would not be in the best interests of the Government.” AR

455.

The regulation is unambiguous: even in light of the multiple award

preference, “[t]he contracting officer must not use a multiple award approach

if” one of six listed conditions exist. FAR 16.504(c)(1)(ii)(B) (emphasis

added). The question is whether the CO rationally determined that any of

the three chosen conditions exist. We believe she did.

Oracle argues that the CO’s memorandum did not properly balance

the multiple award preference against a single award approach. It contends

that the CO “did not meaningfully consider the benefits of competition,

arbitrarily inflated the cost of competition, and violated Congressional

policy.” Pl.’s Suppl. Mot. at 26. Oracle challenges the CO’s assessment of

whether more favorable terms and conditions are available if a single award

is made, but “the CO’s knowledge of the market” is the standard set out in

the regulation. She explained her understanding of cost and vendor

investment in a multiple award and single award context and drew the

reasonable conclusion that a single award was more likely to result in

favorable terms, including price. The CO also considered the fact that even

if price might not be more favorable in a single award, two other conditions

also exist that mandate a single award.

She asserted that multiple awards are costlier to administer and that

multiple awards simply cannot meet DoD’s expectations from cloud

39

services, whether security concerns, interoperability, or global, seamless

reach. In particular, the CO considered which approach would best serve the

agency’s security needs and concluded that a single cloud services provider

would be best positioned to provide the necessary security for the agency’s

data. She was careful to document several conditions that led the agency to

conclude it must not use multiple awards and we will not second guess her

conclusion. Plaintiff offers us no real no basis for questioning any of these

conclusions. They were completely reasonable, and we have no grounds to

disturb her conclusion that multiple awards cannot be used.

II. The D&F Relies On An Exception To The 10 U.S.C. § 2304a(d)(3)

Single Award Prohibition That Does Not Accurately Reflect The

Structure Of The JEDI Cloud Solicitation.

Separate from the CO’s single award determination, DoD was also

required to decide whether it was permitted to use a single award approach

in a procurement of this size. DoD anticipates awarding a task order contract

for cloud services to a single vendor that, including the full ten-year period,

is valued at $10 billion. This triggers the application of 10 U.S.C. §

2304a(d)(3), which prohibits awarding such large task order contracts to a

single vendor, unless the agency finds that one of four exceptions to the

prohibition exist. Section 2304a(d)(3) states,

No task or delivery order contract in an amount estimated to

exceed [$112 million] (including all options) may be awarded

to a single source unless the head of the agency determines in

writing that—

(A) the task or delivery orders expected under the contract are

so integrally related that only a single source can efficiently

perform the work;

(B) the contract provides only for firm, fixed price task orders

or delivery orders for—

(i) products for which unit prices are established in the

contract; or

(ii) services for which prices are established in the contract for

the specific tasks to be performed;

(C) only one source is qualified and capable of performing the

40

work at a reasonable price to the government; or

(D) because of exceptional circumstances, it is necessary in the

public interest to award the contract to a single source.

DoD, through Under Secretary Lord’s D&F, decided that the second

exception applies to this procurement: “the contract provides only for firm,

fixed price (FFP) task orders . . . for services for which prices are established

in the contract for the specific tasks to be performed.” AR 318.

At first blush, DoD’s D&F tracks precisely with the chosen exception:

the JEDI Cloud RFP provides only for firm, fixed price task orders. It solicits

IaaS, PaaS, and support services for which offerors will propose a catalog of

prices; that catalog will be incorporated into the contract, i.e., established, at

the time of award. If the prices of all possible tasks were “established” in

this fashion, then we would agree that exception (B)(ii) could be relied upon.

That is not the case, however.

The D&F acknowledged that, during the possible ten-year life of the

contract, services not contemplated at the time of initial award would likely

be needed and added to the contract through the technology refresh

provision, Section H2 New Services. Section H2 was crafted because DoD

knows that the cloud computing sector is constantly evolving. E.g., AR Tab

130 at 8721 (“IaaS/PaaS offerings are not static and will be updated overtime

both in terms of available services and applicable pricing. The clauses are

necessary to maintain commercial parity with how cloud services evolve and

are priced.”); AR Tab 137 at 9603 (“The landscape of cloud offerings is

evolving. . . . With growing demand comes an evolving landscape of supply.

It seems new cloud providers are emerging monthly, and the service

offerings of the vendors are rapidly shifting.”).

If at some point over the ten years of the contract the cloud services

provider creates a new service, Section H2 requires it to offer that new

service to DoD at a price not “higher than the price that is publicly-available

in the commercial marketplace in the continental United States.” AR 318.

The CO will then decide whether to add the new service. The clause also

permits DoD to acquire services before they are available on the commercial

market or that will not be offered on the commercial market. After the award,

and perforce, after any competition, these new services could only be

obtained from the single awardee. Of necessity, then, these services could

not be identified as “specific tasks,” much less priced, at the time of the

award.

41

Recognizing the apparent inconsistency between Section H2 and the

requirements of § 2304a(d)(3)(B)(ii), the D&F attempted to reconcile the use

of Section H2 with the exception DoD chose to justify a single award: “As

with any other cloud offering, once the new service is added to the catalog,

the unit price is fixed and cannot be changed without CO approval.” Id. In

other words, even though the tasks are different than those described and

priced in the original contract, the contract eventually will still use only firm,

fixed price task orders. The agency found that its custom-made technology

refresh provision therefore is consistent with “[firm, fixed price] task orders

for services for which prices are established in the contract for the specific

tasks to be performed.” Id. It is difficult to treat this as anything more

sophisticated than the assertion that “these are established fixed prices for

specific services because we say they are.”

As Oracle points out, there is a logical disconnect between claiming

that prices are “established in the contract” for “specific tasks” while

simultaneously acknowledging that those tasks, and their accompanying

prices, do not yet exist. While the government and intervenor respond that

Oracle is improperly reading a term into the text of § 2304a(d)(3)(B)(ii) that

is not present, namely “at the time of entering the contract,” plaintiff does

not have to “read” this interpretation into the statute. It is already present in

the use of the term, “established,” and in the language of the prohibition itself

that “no contract may be awarded.” Reading this as a present tense

description of the status of the contract terms is much less tortured than

inserting a phrase with a future spin: “or which may be established in the

contract prior to placing future task orders.” We see no ambiguity in the

language. In an ordinary reading, prices for specific services must be

“established” at the time of contracting. Prices for new, additional services

to be identified and priced in the future, even if they may be capped in some

cases, are not, by definition, fixed or established at the time of contracting.

It should go without saying that the exception must be true at the time of

award—no task order contract exceeding $112 million “may be awarded”—

and exception (B)(ii) speaks of prices and specific tasks as “established in

the contract,” not that “will be” established in the future. Given the tenor of

the language employed in describing the need for cloud computing, Section

H2 is not a trivial addition.

The government argues that requiring prices for specific tasks to be

established at the time of contracting would prevent DoD from modifying

the contract during performance in any way. This is not entirely accurate. It

is true that the statutory prohibition prevents a particular type of change—

42

the contractor and agency cannot add new tasks at new prices after entering

the contract. Other types of modifications that fall outside of the bespoke

Section H2 are not affected, however. The use of a technology refresh

provision thus appears to be at odds with § 2304a(d)(3)(B)(ii), and the Under

Secretary apparently chose an exception under § 2304a(d)(3) which does not

fit the contract.

This conclusion is obviously somewhat in tension with our previous

decision upholding the CO’s decision that multiple awards are not allowed.

This peculiar state of affairs is an artifact of a code section which is a mixture,

rather than an alloy, of various pieces of legislation. Not surprisingly, the

parties have different views about the implications of this possible result and

whether Oracle is prejudiced by the flawed D&F.

III. Oracle Cannot Demonstrate Prejudice As A Result Of The Flawed

D&F.

Oracle argues that the requirements are independent and that it is

prejudiced by the agency’s failure to comply with 10 U.S.C. § 2304a(d)(3)

because Oracle could have competed in a properly structured multiple award

procurement. Oracle’s argument assumes there would be some purpose to

remanding to the agency to obtain a new D&F, despite the CO’s conclusion.

And not operating on that assumption treats § 2304a(d)(3) as superfluous,

which the court is reluctant to do. Moreover, Oracle argues that it is

prejudiced because the agency’s needs, as expressed in the gate criteria,

could well be different in a multiple award procurement. It argues that the

single award determination and the gate criteria are necessarily connected:

the agency improperly decided to award the majority of its cloud computing

business to one provider and, thus, the agency must have a monolithic

provider to meet its minimum needs.

The government and AWS first respond that if the CO’s decision is

upheld, the Under Secretary could not have sanctioned the use of multiple

awards, so a remand would be pointless. This assertion strikes us as a tad

sophistical, but, in any event, and fortunately for the defendant, we think their

next argument concerning prejudice has merit.

The government and intervenor argue that Oracle cannot demonstrate

prejudice as a result of the flawed D&F because the agency’s minimum needs

would not have changed in a multiple-award scenario. In other words, Gate

Criteria 1.1 and 1.2 are enforceable, Oracle cannot meet them, and there is

no connection between the single award determination, the gate criteria, and

43

possible ethics violations. Under any scenario, Oracle would be out of the

competition.

In substance we agree, at least with respect to Gate Criteria 1.2. While

Oracle may well be correct that some aspects of the gate criteria are driven

by the agency’s insistence on using a single provider to manage an immense

amount of data, one critical aspect of the gate criteria is not connected to the

choice of a single provider: data security.

The security concern is explicit in Gate Criteria 1.2. The security

component of Gate Criteria 1.2 is based on DoD’s “minimum security

requirements for processing or storing DoD’s least sensitive information.”

AR 947. Mr. Van Name explained that the challenged portion of Gate

Criteria 1.2 reflects the “minimum criteria necessary for DoD to have

confidence that the Offeror’s proposed data centers have met the underlying

physical security requirements necessary to successfully perform the

contract.” Id. Many of the acquisition documents bolster the agency’s

conviction that use of multiple cloud service providers exponentially

increases the challenge of securing data. We have no reason to doubt the

agency’s many representations that the Gate Criteria 1.2 security

requirements are the minimum that will be necessary to perform even the

least sensitive aspects of the JEDI Cloud project.

In other words, although this criteria presumes a single award, the

only logical conclusion is that, if multiple awards were made, the security

concerns would ratchet up, not down. They are, indeed, minimally stated. If

Oracle cannot meet Gate Criteria 1.2 as currently configured, it is thus not

prejudiced by the decision to make a single award. The agency’s needs

would not change, so Oracle would not stand a better chance of being

awarded this contract if the agency determined that the procurement must be

changed to multiple award.

Thus, in order to prevail, Oracle must show that both Gate Criteria 1.1

and Gate Criteria 1.2 are otherwise unenforceable. It would not be sufficient

for Oracle to demonstrate that Gate Criteria 1.1 alone is unenforceable,

because it also cannot not meet Gate Criteria 1.2. We need not consider Gate

Criteria 1.1, or 1.6 for that matter, because we are satisfied for reasons set

out below, that Gate Criteria 1.2 is enforceable.

IV. Gate Criteria 1.2 Is Enforceable.

44

Oracle argues that Gate Criteria 1.2 is unenforceable because it

exceeds the agency’s minimum needs, that it is in fact an unauthorized

qualification requirement, and it amounts to the use of “other than

competitive procedures” without proper justification.

Oracle first argues that DoD did not identify an underlying need

before imposing Gate Criteria 1.2. When preparing to procure services, the

agency must “specify the agency’s needs and solicit bids or proposals in a

manner designed to achieve full and open competition for the procurement.”

10 U.S.C. § 2305(a)(1)(A)(i) (2012). The solicitation must “include

specifications which[,] consistent with the provisions of this chapter, permit

full and open competition; and include restrictive provisions or conditions

only to the extent necessary to satisfy the needs of the agency or as authorized

by law.” § 2305(a)(1)(B). The specifications “shall depend on the nature of

the needs of the agency and the market available to satisfy such needs.” §

2305(a)(1)(C). The agency may state specifications for “(i) function, so that

a variety of products or services may qualify; (ii) performance, including

specifications of the range of acceptable characteristics or of the minimum

acceptable standards; or (iii) design requirements.” Id.

Oracle alleges that the requirement in Gate Criteria 1.2 that certain

offerings must be FedRAMP Moderate “Authorized” by the proposal

deadline exceeds DoD’s minimum needs. Oracle does not challenge any

other aspect of Gate Criteria 1.2 in terms of the agency’s need. Oracle also

does not argue that the agency could not require some security assurance at

the time of proposal, just that the agency improperly chose FedRAMP

authorization. The government responds that the agency has properly

justified the criteria based on its needs.

We agree with the government that Gate Criteria 1.2 is tied to the

agency’s minimum needs. Mr. Van Name’s memorandum explained that

“FedRAMP Moderate is the Federal cloud computing standard and

represents the Department’s minimum security requirements for processing

or storing DoD’s least sensitive information.” AR 947. The cloud services

provider will be required to work with the agency to meet the “more stringent

security requirements outlined in the JEDI Cyber Security Plan” shortly after

award, and if the cloud services provider cannot meet even the FedRAMP

Moderate standard at the time of proposal the agency will not be able to move

forward with implementing the JEDI Cloud in a timely manner. Id.

Furthermore, even though the JEDI Cyber Security Plan is a separate

requirement, Mr. Van Name explained that “FedRAMP Moderate is the

minimum criteria necessary for DoD to have confidence that the Offeror’s

45

proposed data centers have met the underlying physical security

requirements necessary to successfully perform the contract.” AR 947-48. It

is a useful proxy, in other words, for the agency’s real need. If an offeror

were unable to meet the lower threshold, it could not hope to meet the higher.

Oracle argues by pointing to Slack messages and risk statements that

DoD’s security requirements are not the real reason for this Gate Criteria 1.2

component; rather the agency wanted to decrease the possibility of too many

proposals or protests. E.g., AR 422, 3123. The Slack messages and risk

sections in acquisition planning documents that Oracle points to do not,

however, undermine Mr. Van Name’s justification. The agency’s concern

about being inundated with too many unqualified offers or protests does not

reveal a nefarious purpose for the gate criteria; that concern can coexist with

legitimate security risks. The agency’s justification provides a rational basis

for why it chose FedRAMP Moderate “Authorized” to satisfy itself that a

bidder’s offerings would be eligible to house DoD data.

Alternatively, Oracle argues that Gate Criteria 1.2 is a qualification

requirement subject to the provisions of 10 U.S.C. § 2319 (2012). The

government responds that Oracle waived this argument, because it had the

opportunity to object to the terms of Gate Criteria 1.2 as improperly imposed

qualification requirements prior to the close of the bidding process and failed

to do so. See Blue & Gold Fleet, LP v. United States, 492 F.3d 1308, 1313

(Fed. Cir. 2007). The government is correct—Oracle’s more generalized

challenges to the criteria did not raise this precise argument until post-hearing

comments submitted to GAO on October 18, 2018, after the close of bidding.

In any event, even if the qualification requirement argument was timely

raised, Gate Criteria 1.2 is not a qualification requirement.

A qualification requirement is “a requirement for testing or other

quality assurance demonstration that must be completed by an offeror before

award of a contract.” 10 U.S.C. § 2319(a). If using one, the agency must

prepare a written justification stating the requirement and explaining why it

must be completed pre-award, specifying a cost estimate, providing for a

prompt opportunity for an offeror to demonstrate its ability, and ensuring that

the offeror is provided specific information if it fails the qualification

requirement. A qualification requirement is generally “a qualified bidders

list, qualified manufacturers list, or qualified products list.” § 2319(c)(3).

This distinguishes a specification from a qualification requirement.

Specifications, the subject of 10 U.S.C. § 2305(a)(1)(A)(i)-(B)(ii), “are the

requirements of the particular project for which the bids are sought, such as

46

design requirements, functional requirements, or performance

requirements.” W.G. Yates & Sons Const. Co., Inc. v. Caldera, 192 F.3d 987,

994 (Fed. Cir. 1999). “Qualification requirements, on the other hand, are

activities which establish the experience and abilities of the bidder to assure

the government that the bidder has the ability to carry out and complete the

contract.” Id.

In W.G. Yates, the Federal Circuit found that the Army had improperly

established a qualification requirement. The Army required a potential

bidder “to have designed, manufactured, and installed ten similar door

systems in satisfactory operation for a minimum of five years” prior to award.

Id. at 993. The Federal Circuit concluded that the requirement was not a

specification, because it pertained to “to successful completion of other,

similar hangar door projects,” unrelated to the Army’s solicitation. Id. at

994. A specification would relate to the project at hand, such as “the size of

the doors, structural steel requirements, ability to withstand wind loads, and

the like.” Id.

By comparison, in California Industries Facilities Resources, Inc. v.

United States, this court considered whether the Air Force improperly

imposed qualification requirements when it required liner system, wind gust,

and snow load testing for certain military shelters prior to award. 80 Fed. Cl.

633, 641-43 (2008). The court compared the Air Force’s requirement to the

Army’s requirement in W.G. Yates and also explored GAO’s explanations of

qualification requirements. GAO considers a qualification requirement “a

systematized quality assurance demonstration requirement on a continuing

basis as an eligibility for award,” Aydin Corp.—Reconsideration, B–224185,

87–1 CPD ¶ 141 (Feb. 10, 1987), or “a system [that] is intended to be used

prior to, and independent of, the specific procurement action.” Scot, Inc., B–

292580, 2003 CPD ¶ 173 (Oct. 3, 2003). The court concluded that the Air

Force’s testing requirements were specifications, because they did not relate

to other contracts, products, or a system independent of the procurement but

were focused on the particular features of the shelters that the offerors would

propose.

Oracle argues that the FedRAMP Moderate “Authorized” requirement

in Gate Criteria 1.2 is a qualification requirement, specifically because that

authorization would have been acquired in the past through either the Joint

Authorization Board or from another agency. The substance of this

requirement is that an offeror must show that a sampling of its offerings, at

datacenters 150 miles apart, have certain security features. Oracle contends

that this is a backwards-looking, independent quality assurance mechanism

47

because the awardee will not be subject to the FedRAMP approval process

and DoD described using FedRAMP as a “mechanism to validate that the

core architecture is extensible and likely to be able to meet the JEDI Cloud

requirements across all service offerings.” AR Tab 43 at 955.

The FedRAMP authorization requirement does resemble an

independent quality assurance system in some respects, but a few facts

distinguish this component of Gate Criteria 1.2 from the “ten similar door

systems in satisfactory operation for a minimum of five years” requirement

in W.G. Yates. First, the agency did not require an offeror to prequalify in

order to submit a proposal or to be on qualified bidders list prior to submitting

its proposal. In that way the JEDI Cloud gate criteria are distinctly unlike

classic qualification requirements. Second, as Oracle acknowledges,

FedRAMP authorization is not an independent, systematic requirement that

DoD imposes in its procurements. Third, the security features that

FedRAMP authorization includes are the security features that DoD believes

are in fact the minimum necessary to store DoD data for the JEDI Cloud

project itself. The agency is not using the FedRAMP process as a way to

examine the offeror’s past performance storing government data. Rather it

is a uniform way to determine which offerors have certain security

capabilities on a number of their cloud offerings. The offeror cannot store

even the least secure data without such security features. DoD can specify

that an offeror must show that some of its offerings can meet certain security

baselines, using a uniform tool to measure that security baseline, without

triggering a qualification requirement.

Finally, Oracle argues that Gate Criteria 1.2 transforms this

procurement into one that uses other than competitive procedures. The

agency “(A) shall obtain full and open competition through the use of

competitive procedures in accordance with the requirements of this chapter

and the Federal Acquisition Regulation; and (B) shall use the competitive

procedure or combination of competitive procedures that is best suited under

the circumstances of the procurement.” 10 U.S.C. § 2304(a)(1). The agency

“may use other than competitive procedures,” when one of seven conditions

is present. § 2304(c).

Relevant here, the agency may forgo competitive procedures when

the services “are available . . . only from a limited number of responsible

sources and no other type of property or services will satisfy the needs of the

agency,” § 2304(c)(1), or the agency’s need “is of such an unusual and

compelling urgency that the United States would be seriously injured unless

the agency is permitted to limit the number of sources . . . .” § 2304(c)(2).

48

Even if the agency has grounds to forgo competitive procedures, it must not

award a contract under such circumstances “unless the contracting officer . .

. justifies the use of such procedures in writing and certifies the accuracy and

completeness of the justification;” the justification is properly approved; and

any required notice is given. § 2304(f)(1).

Oracle alleges that the agency chose the gate criteria specifically to

limit the number of bidders, effectively resulting in “other than competitive

procedures.” The statements that Oracle points to, however, are not in the

gate criteria justification memorandum. They appear either in Slack

messages between members of Defense Digital Service, or in the risk section

of acquisition planning documents.

The Federal Circuit recognized in National Government Services, Inc.

v. United States, “the unremarkable proposition that “a solicitation

requirement (such as a past experience requirement) is not necessarily

objectionable simply because that requirement has the effect of excluding

certain offerors who cannot satisfy that requirement.” 923 F.3d 977, 985

(Fed. Cir. 2019). The few record statements Oracle highlights are

insufficient to demonstrate that the agency is using “other than competitive

procedures” in the JEDI Cloud procurement. The agency structured this

procurement to use full and open competition and the gate criteria are just

the first step in the evaluation of proposals. The government aptly pointed

out that the substance of the gate criteria evaluation could have occurred at

any point in evaluation of proposals; the agency simply put the gate criteria

first to ensure its evaluation was not wasted on offerors who could not meet

the agency’s minimum needs. As Mr. Van Name’s memorandum reflects,

the gate criteria are based on more than the agency’s awareness that its

timeline would be delayed if it received too many proposals. While the gate

criteria certainly had the effect of excluding some offerors, that does not

transform the procurement into less than full and open competition.

Specific to the Gate Criteria 1.2 component that certain offerings must

be FedRAMP Moderate “Authorized,” Oracle argues that the agency knew

at the time of issuing the RFP that only two companies could meet that gate

criteria. As such, the agency knew that the necessary cloud services are

available from only a limited number of responsible sources. Because the

agency knew that only a limited number of responsible sources could offer

the services, the agency necessarily chose less than open competition without

following the proper procedure. Oracle bases this argument on the fact that

“the FedRAMP approval process is government-run (with DoD

involvement). DoD necessarily knew that only two offerors could meet this

49

requirement—Microsoft and AWS.” Pl.’s Suppl. Mot. 41. In its response and

reply brief, Oracle adds that “[b]ased on its market research, DoD necessarily

knew that only two cloud service providers had the existing infrastructure

with FedRAMP authorized offerings to meet the gate.” Pl.’s Resp. & Reply

23.

The government is correct, however, that evaluation criteria which

have the effect of limiting competition do not necessarily trigger the

procedures required by § 2304(c). Full and open competition “means that

all responsible sources are permitted to submit sealed bids or competitive

proposals on the procurement.” 41 U.S.C. § 107 (2012); 10 U.S.C. §

2302(3)(D) (2012). Here, they were. The solicitation permitted all

responsible sources to submit proposals. Four offerors submitted proposals.

Even if the agency knew that as of early 2018 only certain firms would

survive the gate criteria, it nevertheless chose to accept proposals from all

responsible sources. Indeed, the CO in her memorandum documenting the

rationale for a single award contract stated, “The results of market research

indicate that multiple sources are capable of satisfying DoD’s requirements

for JEDI Cloud and that commercial cloud services customarily provided in

the commercial marketplace are available to meet a majority of DoD’s

requirements.” AR 457. The FedRAMP authorization component does not

transform the solicitation into one for less than full and open competition.

Having considered both the single award determinations and Gate

Criteria 1.2, we can return to the question of prejudice. Assuming the agency

relied on a flawed D&F, would Oracle have had a better chance of competing

for this contract? We can confidently answer, no, because Oracle could not

meet the agency’s properly imposed security requirements.

This conclusion might normally be the natural stopping point in our

decision, but Oracle raises a few other arguments that it contends present an

independent prejudicial error requiring this procurement to be set aside. We

thus address the competitive range briefly before turning to the conflicts of

interest determinations.

V. The CO Rationally Set The Competitive Range.

Oracle’s next argument is that, regardless of the propriety of the gate

criteria, the agency unequally considered offerors when she permitted

Microsoft and AWS to advance to a competitive range, despite the fact that

they were both considered unawardable on several factors. Since all four

offerors failed some factors, Oracle contends that the agency should have

50

established a range of all four offerors.

Oracle is incorrect. DoD reasonably evaluated the offerors according

to the terms in Section M of the solicitation. Section M unambiguously

provided that any offeror who failed Factor 1, the gate criteria, would be

immediately eliminated from consideration. Oracle and IBM failed Factor 1

and were thus properly eliminated. According to the terms of Section M,

only AWS and Microsoft were eligible for further evaluation. The agency

took the next step of evaluating both under the non-price factors and, finding

both unawardable and in need of significant revisions, chose to set the

competitive range of those two offerors and continue on to discussions and

revisions. The evaluation thus equally treated all offerors in accordance with

the process set out in Section M.

VI. The CO’s Determinations Regarding Conflicts Of Interest Are

Rational And Consistent With FAR Subparts 3 And 9.

Oracle challenges the CO’s determination that the involvement in the

procurement by Mssrs. Ubhi, DeMartino, and Gavin did not taint the process.

It also argues that the CO irrationally determined that AWS does not have an

organizational conflict of interest. Oracle contends that its conflicts of

interest arguments are independent bases on which to set aside this

procurement, because the individual conflicts tainted the structure of the

procurement, particularly the single award determinations and the substance

of the gate criteria.

The facts on which Oracle rests its conflicts of interest allegations are

certainly sufficient to raise eyebrows. The CO concluded that at least two

DoD officials disregarded their ethical obligations by negotiating for AWS

employment while working on this procurement. Through lax oversight, or

in the case of Ubhi, deception, DoD was apparently unaware of this fact.

AWS, for its part, was too prepared to take at face value assurances by Mr.

Ubhi that he had complied with his ethical obligations. While there is

nothing per se illegal about capitalizing on relevant experience in moving to

the private sector, the larger impression left is of a constant gravitational pull

on agency employees by technology behemoths. The dynamic apparently is

real enough that one would hope the agency would be more alert to the

possibilities of an erosion of public confidence, particularly given the risk to

the agency in having to redo procurements of this size.

The limited question, however, is whether any of the actions called

out make a difference to the outcome. And in particular, the even narrower

51

question before the court is whether the CO’s conclusion of no impact is

reasonable. The court is fully prepared to enforce the agency’s obligation to

redo part or all of this procurement if the CO’s conclusion that there was no

impact was unreasonable in any respect, but our ultimate conclusion, after a

detailed examination of the record, is that the CO’s work was thorough and

even-handed. She understood the legal and factual questions and considered

the relevant evidence. It is unfortunate that the employees in question gave

her so much evidence to consider, making it is easy for Oracle to cherry pick

from the vast amount of communications and isolate a few suggestive sound

bites. But that volume should not compel an unreasoned leap to the

conclusion that there was fire as well as smoke.

1. Individual Conflicts of Interest

We review the CO’s determinations for a rational basis and

consistency with the applicable law. Regarding the personal conflicts of

interest, “[a] contracting officer who receives or obtains information of a

violation or possible violation of 41 U.S.C. 2102, 2103, or 2104 (see 3.104-

3) must determine if the reported violation or possible violation has any

impact on the pending award or selection of the contractor.” FAR 3.01-7(a)

(2018). If the CO determines that there is no impact on the procurement, she

must forward the information to a designated individual within the agency.

Id. If that individual concurs with the CO, the procurement may proceed.11

Id.

Here, the CO determined that, although there were some violations or

possible violations of law relating to conflicts of interest, those conflicted

individuals did not impact the decision to use a single award approach or the

substance of the evaluation factors. It is easy to critique uncritically her

analysis and characterize it as, “there were lots of people involved in the

decisions here, so it’s unlikely the persons in question impacted the result.”

We are satisfied that would be a simplistic and inaccurate critique. In fact,

there were a lot of people involved in this procurement, and the ones called

11

Oracle argues that the court must go beyond the CO’s determinations in

this matter and consider whether these personal conflicts of interest

constitute a violation of certain statutes, particularly 18 U.S.C. § 208 as it

relates to Mr. Ubhi. We disagree. Our standard of review is explicitly set

out in 28 U.S.C. § 1491(b)(4) and does not include this court holding a mini

criminal trial in the course of deciding a bid protest. In any event, the CO

here considered possible violations of 18 U.S.C. § 208 and performed an

“even if” analysis as a part of her FAR Subpart 3 determination.

52

out by the ethics investigations indeed were a very small part of the substance

of the procurement, both as a result of their limited roles and as a result of

the timing of important decisions.

We think that the conclusion the CO in effect asks us to draw, that

these individuals were bit players in the JEDI Cloud project, is correct. They

were not members of the Cloud Executive Steering Group, the Cloud

Computing Program Office, the Joint Requirements Oversight Council, or

the Cost Assessment and Program Evaluation, and that is only a partial list

of the many DoD offices and officials who had a role in the structure of this

procurement. See, e.g., AR Tab 64, 91, 94. Nor were they acting as the CO,

Under Secretary, the Chief Information Officer, the Deputy Chief

Management Officer, or other official who developed or signed off on

challenged components of this procurement. While they should not have had

the opportunity to work on the JEDI Cloud procurement at all, or at least for

certain periods of time, nevertheless, their involvement does not taint the

work of many other persons who had the real control of the direction of the

JEDI Cloud project.

A. Mr. DeMartino

The CO considered all of the relevant facts regarding Mr.

DeMartino’s involvement. None of the facts contradict her ultimate

conclusion that his involvement with JEDI did not impact the procurement.

While we might view the CO’s characterizations as a bit generous (for

instance, Mr. DeMartino clearly did not work with government ethics

personnel “throughout” his DoD employment), nevertheless, she rationally

determined that he was merely a go-between for the Deputy Secretary and

did not have substantive input into the structure or content of the solicitation.

Specifically, Mr. DeMartino did not have a voice in whether DoD should use

a single or multiple award approach and did not craft the substance of the

evaluation factors. His employer, the Deputy Secretary, was expressly

“open” to either single or multiple award at least into late 2017. AR 4352.

Moreover, DeMartino did not leave DoD to work for AWS during, or

apparently after this procurement. We view him as not relevant to the AWS

organizational conflict of interest analysis.

B. Mr. Gavin

The CO likewise considered all of the relevant facts regarding Mr.

Gavin’s involvement. First, her conclusion that “Mr. Gavin violated FAR

3.101-1, and possibly violated 18 U.S.C. § 208 and its implementing

53

regulations,” is well-supported. The CO properly went on to ask whether, in

light of the conflict, Mr. Gavin impacted the procurement. The record

supports her conclusion that Mr. Gavin was involved only to offer his

knowledge of the Navy’s cloud services experience. He was not a member

of the Cloud Executive Steering Group, Defense Digital Service, the Chief

Information Office, or any other team tasked with spearheading aspects of

this procurement. As far as we can tell from the record, he did not assist in

crafting the single award determinations or the technical substance of the

evaluation factors. At most, he attended a few JEDI Cloud meetings. He

does not appear to have obtained any contractor bid or proposal information

nor does he appear to have introduced any bias toward AWS into the

meetings he attended. It would have been proper for the CO to discount Mr.

Gavin’s affidavit as she did Mr. Ubhi’s, because she felt he had violated FAR

3.101-1. Even when his involvement is considered without his own

assurances that he did not act improperly, the CO’s review of the record was

reasonable that Mr. Gavin was involved solely to offer his past experience

with cloud computing contracts.

Oracle is correct that we do not know exactly what Mr. Gavin

communicated to AWS’s JEDI proposal team lead prior to the information

firewall. Mr. Gavin acted improperly in that regard, as did the AWS

employee who spoke with him. But the CO reasonably determined that Mr.

Gavin simply did not have access to competitively useful information to

convey to AWS. By the time Mr. Gavin began working at AWS, the draft

RFP had been released, providing AWS access to the relevant information

that also appeared in the draft Acquisition Strategy. We thus find that the

CO’s conclusion regarding Mr. Gavin was rational.

C. Mr. Ubhi

The last individual who worked on the procurement despite a personal

conflict of interest was Mr. Ubhi. We agree with the CO that his behavior

was disconcerting. Despite being aware of his ethical obligations, he ignored

them. The CO drew six conclusions regarding Mr. Ubhi; we will consider

each in turn.

First, the CO reached the obvious conclusion that Mr. Ubhi violated

the FAR 3.101-1 requirement that officials “avoid strictly any conflict of

interest or even the appearance of a conflict of interest in Government

contractor relationships” and thus the matter had to be referred to the DoD

Inspector General. AR 58707-09. She also considered related prohibitions

and reasonably concluded that Mr. Ubhi’s behavior must be referred to the

54

Inspector General for investigation of “whether Mr. Ubhi violated 18 U.S.C.

§ 208, 5 CFR § 2635.604, and 5 CFR § 2635.402.” AR 58709. The CO

continued her analysis, as FAR 3.104-7 directed her to do, assuming that Mr.

Ubhi’s participation was unethical and might have impacted events he

participated in. We find nothing irrational in this first conclusion.

Next, the CO concluded both that Mr. Ubhi’s employment package

did not reflect a quid pro quo for nonpublic information relating to the JEDI

Cloud procurement and that there is no evidence that Mr. Ubhi shared

nonpublic information with AWS. To reach this conclusion, she considered

all of the employment negotiations between Mr. Ubhi and AWS (beginning

before the JEDI Cloud procurement) and his employment offer. Based on

discussions and research, she concluded that AWS was interested in hiring

Mr. Ubhi regardless of his JEDI Cloud involvement and that his substantial

employment package did not appear to be tied to receiving nonpublic

information. Her conclusion here is reasonable and highlights an important

aspect of Mr. Ubhi’s post-DoD work: he did not return to AWS to work on

its JEDI Cloud proposal team, for its Federal Business Sector, or for the DoD

Programs section.

She went on to consider the communications DoD had with AWS and

the affidavits submitted from AWS employees stating that they had not

received, or hoped to receive, any information from Mr. Ubhi. She

considered affidavits from individuals both within AWS’s commercial sector

(where Mr. Ubhi is now employed) and AWS’s federal business sector

(where the AWS JEDI Team works). None of those affidavits suggest that

Mr. Ubhi shared any information with the JEDI Cloud team or that the team

would welcome his input. The CO did not find any evidence to suggest that

he had shared nonpublic information with AWS or that AWS had solicited

such information. The CO took the whole record into account, discounted

Mr. Ubhi’s assurances, and considered AWS’s apparent motivations and the

statements made by its employees under penalty of perjury. We did not find

any critical facts that she overlooked in reaching this conclusion and thus

find no reason to disturb it.

The CO’s third conclusion was that even if Mr. Ubhi had disclosed

nonpublic information, none of it would have been competitively useful. The

CO detailed both potential offeror information and DoD information that Mr.

Ubhi had access to as a member of the Defense Digital Service team. She

detailed her analysis that the vendor meeting information would not have

been competitively useful to AWS and that much of the DoD information

was premature, based on incorrect assumptions, and, in any event, was

55

revealed to the public during meetings and industry research. Again, the CO

considered this question closely and we have found nothing in the record to

suggest that her explanation was unsatisfactory.

Oracle takes issue with the fact that the CO, in her fourth conclusion,

applied FAR 3.104-3(c) too literally. The section requires officials such as

Mr. Ubhi to promptly report contacting or being contacted “by a person who

is an offeror in that Federal agency procurement regarding possible non-

Federal employment for that official” and then to disqualify himself from

further personal and substantial participation in the procurement. FAR

3.104-3(c) (emphasis added). The CO repeated that Mr. Ubhi was personally

and substantially involved. She found that Mr. Ubhi failed to “promptly

report the contact with AWS in writing to his supervisor and the agency

ethics official” and failed to timely recuse himself from JEDI Cloud

activities. But Mr. Ubhi did not violate this particular section of FAR

Subpart 3 because AWS was not an offeror at the time. The CO repeated

that Mr. Ubhi behaved unethically and improperly and she read and applied

FAR 3.104-3(c) as written. We find nothing objectionable in her analysis

under FAR 3.104-3(c).

Fifth, the CO concluded that Mr. Ubhi’s seven-week contribution to

the planning stage of the JEDI Cloud procurement did not introduce bias in

favor of AWS. The CO reviewed Mr. Ubhi’s work and found that, despite

often expressing vehement opinions about various people and companies, he

did not lobby in favor of a particular cloud services provider. Her conclusion

is supported in the record.

Sixth, the CO concluded that even if Mr. Ubhi tried to introduce bias

into the procurement process, he failed. Oracle argues that the reasoning

behind this determination was flawed. First, the CO found that Mr. Ubhi did

not have the technical expertise to substantially influence the procurement.

Second, she concluded that his actual attempts to influence the procurement

were limited. Third, the key decisions were made after Mr. Ubhi recused

himself.

As to Mr. Ubhi’s technical expertise, or lack thereof, the record

reflects that Mr. Ubhi’ specialty was lead product manager. The CO placed

Mr. Ubhi’s participation in the broader context of the Defense Digital Service

team, which was only one team among at least half a dozen DoD

organizations that contributed to and reviewed the content of the JEDI Cloud

solicitation. Mr. Van Name explained in his GAO testimony that Mr. Ubhi

was indeed conversant in cloud computing, as one must be to work as an

56

industry specialist in cloud computing. But his involvement early in the

planning stage of this procurement does not reflect any meaningful role in

crafting the technical aspects of this solicitation, particularly the gate criteria.

We are not aware of any step in the procurement that required his approval.

By the time DoD finished its decisions and amendments to Gate Criteria 1.2,

Mr. Ubhi had long since left DoD. In reality, the gate criteria, particularly

the security requirements, were crafted by a number of DoD teams which

focused on technical and security requirements. Mr. Ubhi’s primary role was

industry liaison; the record does not warrant attributing to him any serious

involvement in the technical or security aspects of the gate criteria.

While Oracle points to Mr. Ubhi’s loud advocacy for a single award

approach, real DoD decisionmakers had been independently in favor of a

single award approach both before and after Mr. Ubhi’s involvement. As

early as September 14, 2017, the Cloud Executive Steering Group (of which

Mr. Ubhi was not a member) expressed a preference for a single award

approach. On the other hand, after Mr. Ubhi left DoD, the Deputy Secretary

remained unconvinced regarding which approach to use; he was “[o]pen to

the first cloud contract being single source OR multiple source” and asked

for a “layout [of] all options and recommendations from Team Cloud” in

November 2017. AR 4352. The CO recalled being in a meeting in April

2018 in which “the single award decision was still being vigorously

debated.” AR 58721. Nor is it credible to suggest that Mr. Ubhi was steering

DoD toward AWS. Our narrative began with the visit to AWS (among other

cloud service providers) by DoD top brass, before Mr. Ubhi’s involvement

surfaces.

Ultimately, we find that the CO correctly concluded that although Mr.

Ubhi should have never worked on the JEDI Cloud procurement, his

involvement did not impact it. We are left with the firm conviction that the

agency was headed in the direction of a single award from the beginning,

indeed probably before Mr. Ubhi was enlisted to participate in the JEDI

Cloud project. The CO is fundamentally correct: if there was a high speed

train headed toward a single award decision, Mr. Ubhi was merely a

passenger on that train, and certainly not the conductor. Moreover, he exited

DoD prior to the substance of the evaluation factors being crafted. Although

the CO correctly found the assurances in his affidavit to be untrustworthy,

we ultimately agree with the substance of her conclusion that his self-

promoting, fabulist and often profanity-laced descriptions of his own role

were merely that.

2. Alleged Organizational Conflict of Interest

57

Finally, Oracle turns to the CO’s assessment of AWS. Oracle argues

that the CO’s determination that AWS did not violate procurement integrity

law and does not have an unfair advantage lacks a rational basis. While

Oracle’s argument focuses on Mr. Gavin’s and Mr. Ubhi’s relationship with

AWS, even though the CO properly considered both Mr. Bouier’s and Dr.

Sutherland’s relationship with the company as well.

FAR Subpart 9 prescribes rules and responsibilities regarding

organizational conflicts of interest. “An organizational conflict of interest

may result when factors create an actual or potential conflict of interest on

an instant contract, or when the nature of the work to be performed on the

instant contract creates an actual or potential conflict of interest on a future

acquisition.” FAR 9.502(c) (2018). It is the CO’s responsibility to “[i]dentify

and evaluate potential organizational conflicts of interest as early in the

acquisition process as possible” and to “[a]void, neutralize, or mitigate

significant potential conflicts before contract award.” FAR 9.504(a). The

CO “should avoid creating unnecessary delays, burdensome information

requirements, and excessive documentation. The [CO’s] judgment need be

formally documented only when a substantive issue concerning potential

organizational conflict of interest exists.” FAR 9.504(d).

The CO should examine “[e]ach individual contracting situation . . .

on the basis of its particular facts and the nature of the proposed contract.”

FAR 9.505. “The exercise of common sense, good judgment, and sound

discretion is required in both the decision on whether a significant potential

conflict exists and, if it does, the development of an appropriate means for

resolving it.” Id. Relevant here, the CO should seek to prevent “unfair

competitive advantage.” Id. Such unfair advantage “exists where a contractor

competing for award of any Federal contract possesses—(1) Proprietary

information that was obtained from a Government official without proper

authorization; or (2) Source selection information . . . that is relevant to the

contract but is not available to all competitors, and such information would

assist that contractor in obtaining the contract.” Id.

Oracle argues that there can be no question that AWS had a

significant, actual conflict and that only extreme measures would eliminate

the conflict at this stage. It contends that the CO irrationally determined that

AWS could not derive an unfair competitive advantage from the information

Mr. Ubhi or Mr. Gavin brought with them to AWS. The government

responds that the CO properly determined that a significant potential conflict

did not exist, because there is no evidence—in the CO’s determination or that

58

she missed—that indicates AWS possesses proprietary information or source

selection information not available to all competitors.

The CO’s conclusion that a conflict of interest did not exist was

sufficiently supported based on the facts presented to her. She specifically

considered whether the DoD employees who accepted jobs at AWS could

have, and did, communicate information to AWS that would give AWS an

unfair competitive advantage. She concluded that the information the three

individuals had could not offer an unfair competitive advantage and that, in

any event, there is no evidence that protected information was communicated

to AWS.

Her assessment began with whether AWS obtained source selection

information that is relevant, not available to all competitors, and would assist

AWS in winning the JEDI Cloud contract. The pertinent facts she considered

are that Mr. Ubhi participated in many JEDI Cloud meetings and assisted in

drafting several pre-RFP documents; he had access to the contents of the

Google Drive; Mr. Gavin participated in two meetings and viewed a limited

set of documents; and Dr. Sutherland apparently had access to some

documents through her work with the Joint Requirements Oversight Council.

The substance of the documents to which they had access, however, along

with the meeting notes, concerns DoD’s need to adopt cloud computing, the

disadvantages of not being able to access an enterprise cloud, the list the

cloud services DoD would need, and the processes for how to get to closure

in the procurement.

AWS could have contemporaneously gathered such information

through the November 2017 JEDI Cloud summary, the RFI, meetings with

the JEDI Cloud procurement team, and later through the draft RFP and the

final solicitation package, not to mention DoD’s 2017 meeting with AWS

prior to the kickoff of the JEDI Cloud procurement process. DoD was not

particularly secretive about its cloud services needs or its plan for the

solicitation. In fact, DoD involved industry from the beginning of this

procurement. At the time Mr. Ubhi and Mr. Gavin sought AWS

employment, no bids or other source selection information existed. We find

nothing irrational in the CO’s conclusion that Mr. Gavin and Mr. Ubhi did

not offer AWS an unfair competitive advantage based on their knowledge of

nonpublic information relating to the procurement.

Oracle also argues that Mr. Ubhi had nonpublic information regarding

AWS’s potential competitors, implying that he had imparted to AWS

“[p]roprietary information that was obtained from a Government official

59

without proper authorization.” FAR 9.505(b)(1). There is no real support for

this supposition. The CO considered this issue and concluded that the

information Mr. Ubhi had access to could be accessed publicly. She also

concluded that Mr. Ubhi’s knowledge of Microsoft’s proprietary

information, submitted to DoD during its one-on-one meeting with the JEDI

Cloud team, could be accessed publicly. Moreover, none of the information

Oracle points out appears to be sensitive to Microsoft’s future offer or

approach to tackling the JEDI Cloud project. It is a reasonable conclusion

that AWS had access to the information with or without Mr. Ubhi.

In this case, there was a significant amount of communication and

negotiation between AWS and DoD employees. As in the case of the

individual conflicts of interest, the individuals, the company, and the agency

were slow to identify the potential this created for an organizational conflict,

particularly as it might relate to a procurement of this magnitude, and less

than aggressive in heading off potential harm. Nevertheless, our review is

not de novo. The question is whether the procurement was tainted, so as to

warrant a redo or possible exclusion of AWS, a question that lies, in the first

instance, in the hands of the CO. The issue for the court is whether she

properly exercised her discretion in concluding that AWS does not have an

organizational conflict of interest based on the facts as presented. We believe

she correctly focused on the significance of the potential conflict and whether

it gave AWS any competitive advantage. Her conclusion that the errors and

omissions were not significant and did not give AWS a competitive

advantage was reasonable and well supported.

CONCLUSION

Because the court finds that Gate Criteria 1.2 is enforceable, and

because Oracle concedes that it could not meet that criteria at the time of

proposal submission, we conclude that it cannot demonstrate prejudice as a

result of any other possible errors. Plaintiff’s motion for judgment on the

administrative record is therefore denied. Defendant’s and intervenor’s

respective cross-motions for judgment on the administrative record are

granted. The Clerk is directed to enter judgment for defendant. No costs.

s/Eric G. Bruggink

ERIC G. BRUGGINK

Senior Judge

60