Opinion

B&W Pipeline, LLC v. Tennessee Regulatory Authority

Court
Court of Appeals of Tennessee
Filed
Nov 6, 2017
Status
Published
On the bench
Judge Thomas R. Frierson, II
Cited by
0 cases
Authority
More cited than 4.0%

The opinion

11/06/2017

IN THE COURT OF APPEALS OF TENNESSEE

AT NASHVILLE

August 24, 2017 Session

B&W PIPELINE, LLC v.

TENNESSEE REGULATORY AUTHORITY ET AL.

Appeal from the Tennessee Regulatory Authority

No. 15-00042

No. M2016-02013-COA-R12-CV

B&W Pipeline, LLC (“B&W”), a public utility that owns a gas pipeline in three

Tennessee counties, filed a petition with the Tennessee Regulatory Authority1 (“the

Authority”) seeking a rate increase. As part of the rate increase request, B&W sought to

include in the rate base $2.6 million in acquisition costs that it had incurred when it

purchased the pipeline and several oil and gas wells in 2010. A contested case hearing

took place on September 14, 2015. Following deliberation, the Authority denied B&W’s

proposed acquisition adjustment and instead utilized a 2008 federal income tax return

filed by the pipeline’s previous owner to establish the pipeline’s value for the purpose of

determining the rate base. The Authority issued its final order on March 10, 2016. B&W

timely filed a motion for reconsideration. The Authority denied the motion for

reconsideration with respect to the value of the pipeline while granting the motion for

reconsideration with respect to certain due diligence and other costs B&W incurred in the

acquisition. After the submission of briefs, the Authority affirmed its decision to exclude

the additional acquisition costs. The Authority issued a final order concerning

reconsideration on August 4, 2016. B&W filed a timely petition for review with this

Court on October 3, 2016. Discerning no error, we affirm the Authority’s decision.

Tenn. R. App. P. 12 Direct Review of Administrative Proceeding; Judgment of the

Tennessee Regulatory Authority Affirmed; Case Remanded

THOMAS R. FRIERSON, II, J., delivered the opinion of the court, in which D. MICHAEL

SWINEY, C.J., and W. NEAL MCBRAYER, J., joined.

1

Effective April 4, 2017, the Tennessee Regulatory Authority was renamed the Tennessee Public Service

Commission. See 2017 Tenn. Pub. Acts Ch. 94 (S.B. 747). Because this name change occurred during

the pendency of this appeal and after submission of the appellant’s initial brief, we will continue to utilize

the moniker, Tennessee Regulatory Authority, for purposes of this appeal.

Patricia Head Moskal and Henry M. Walker, Nashville, Tennessee, for the appellant,

B&W Pipeline, LLC.

Kelly Cashman-Grams and Ryan McGehee, Nashville, Tennessee, for the appellee,

Tennessee Regulatory Authority.

Herbert H. Slatery, III, Attorney General and Reporter; Andrée Blumstein, Solicitor

General; Vance L. Broemel, Senior Counsel; and Daniel P. Whitaker, III, Assistant

Attorney General, for the appellee, the Consumer Protection and Advocate Division

Office of the Tennessee Attorney General.

OPINION

I. Factual and Procedural Background

B&W is a public utility that owns a natural gas pipeline located in parts of Pickett,

Morgan, and Fentress counties in Tennessee. The pipeline was originally built in the

1980s. The pipeline has one primary customer for regulated service, Navitas TN NG

LLC (“Navitas”). B&W delivers natural gas to Navitas, which, in turn, distributes gas to

a number of residential and commercial customers in Tennessee and Kentucky.

Prior to 2010, the pipeline and the distribution system were both owned and

operated by Gasco Distribution Systems, Inc. (“Gasco”). As part of Gasco, the pipeline

operated pursuant to Gasco’s certificate of convenience and necessity (“CCN”), granted

by the Authority. In 2010, Gasco, while in bankruptcy, sold the local distribution system

to Navitas, and Gasco’s CCN was transferred to Navitas. Gasco subsequently sold the

pipeline and ninety-six oil and gas wells to Highland Rim Energy, B&W’s parent

company, for $2,633,085.00. The pipeline and wells were later assigned to B&W. B&W

presented testimony that the pipeline and wells, many of which were inactive, were a

“package deal,” such that B&W was “stuck with the wells.”

Following its purchase of the pipeline, B&W continued providing gas to Navitas

at the rate of $.60 per Mcf,2 according to a pre-existing contract. A representative for

B&W testified that two to three years following the purchase of the pipeline, the

Authority informed B&W that the pipeline had to be regulated. The Authority granted

B&W a CCN on January 8, 2015. B&W filed a petition to increase rates with the

Authority on April 2, 2015, following expiration of the aforementioned contract. B&W

sought to increase its rates from $.60 per Mcf to $3.69 per Mcf, representing a significant

rate increase. Both Navitas and the Consumer Protection and Advocate Division of the

Office of the Tennessee Attorney General (“Consumer Advocate”) were allowed to

2

This is the abbreviation for one thousand cubic feet of natural gas.

2

intervene and oppose the rate increase, and the Authority opened a contested case

proceeding.

In its petition, B&W combined the purchase price of the pipeline and gas and oil

wells, as well as certain acquisition costs, such as due diligence costs, into the proposed

rate base. B&W argued that it should be allowed to charge a rate that covered its

expenses, including depreciation, and that allowed B&W to earn a reasonable rate of

return on its investment in physical assets. The parties engaged in discovery prior to the

hearing, which was scheduled for September 2015. During discovery, B&W stated that it

had no records from the prior owner disclosing the original cost of the pipeline.

On August 11, 2015, the Consumer Advocate and Navitas submitted pre-filed

testimony in opposition to the proposed rate increase, including the proposed value of the

pipeline for rate-making purposes. The Consumer Advocate’s witness, Ralph Smith,

asserted that the rate base should not include the acquisition costs of the pipeline in 2010

but that it should include only the original pipeline cost minus depreciation pursuant to

the Uniform System of Accounts, which the Authority required B&W to utilize. B&W

submitted pre-filed rebuttal testimony, wherein B&W’s witness, William Novak,

contended that the investment made in purchasing the pipeline and wells, totaling over

$2.6 million, should be included in the rate base as a reasonable “estimate” of the original

cost of the pipeline.3 In response to a request from the Authority seeking additional

information concerning the value of the pipeline, on September 8, 2015, Navitas

submitted a 2008 federal income tax return filed by Gasco.

The contested case hearing took place before the Authority on September 14,

2015. During the hearing, the Consumer Advocate submitted the 2008 Gasco tax return

as evidence with no objection from B&W. Mr. Smith, on behalf of the Consumer

Advocate, testified that the 2008 Gasco tax return was the most reliable information

regarding the pipeline’s depreciated original cost. This tax return listed depreciable

assets of $854,826.00 and reported depreciation for that year in the amount of

$22,564.00. Mr. Smith opined that the pipeline had thus been almost fully depreciated by

the time of the hearing. Mr. Novak opined that tax return information relied upon by Mr.

Smith was actually referring to the oil and gas wells rather than the pipeline. At the

conclusion of the hearing, B&W’s counsel acknowledged that “no clear evidence of what

the rate base ought to be” existed and that the issue was one of “policy and fairness.”

On November 16, 2015, the hearing officer issued an order indicating that the

parties had informed him that they “d[id] not seek additional argument, evidence, or new

cross-examination of any evidence.” No new evidence was thereafter filed by either

party. On December 14, 2015, the Authority deliberated and set rates. As part of its

3

Both Mr. Smith and Mr. Novak are certified public accountants.

3

ruling, the Authority rejected B&W’s position that the 2010 purchase price of $2.6

million for the pipeline and wells should be included in the rate base. Instead, the

Authority utilized the 2008 Gasco tax return, determining it to be the “most sound

support for the prior owner’s original cost and the value of the pipeline at the time of

acquisition.” Based on the information contained in the tax return, the Authority

concluded that the original cost of the pipeline had been almost fully depreciated by the

time of the 2015 rate hearing.

Following issuance of the Authority’s order setting rates, B&W filed a timely

motion for reconsideration. In this motion, B&W claimed that assigning a value of $1.2

million to $1.6 million to the pipeline would equitably balance the interests of the parties.

B&W attached new documents, including a non-notarized affidavit of a prior president of

Gasco and additional Gasco tax documentation, for the Authority to consider as

additional evidence with respect to the value of the pipeline. B&W also argued in the

motion that the Authority had erred by failing to include related acquisition costs of

$225,585.31 in the rate base calculation.

In an order dated May 16, 2016, the Authority declined to grant reconsideration

with respect to the value of the pipeline, determining that the issue had been fully

litigated during the hearing on the merits and that no good cause was presented to justify

B&W’s failure to introduce the additional evidence during the original proceeding. The

Authority did, however, grant reconsideration regarding the issue of acquisition costs,

directing the hearing officer to schedule arguments addressing this issue. Subsequently,

on August 4, 2016, the Authority denied the inclusion of such acquisition costs in the rate

base, determining that such costs had been included in the $2.6 million dollar purchase

price previously rejected by the Authority. B&W filed a timely petition for review with

this Court.

II. Issues Presented

B&W presents the following issues for our review, which we have restated

slightly:

1. Whether the Authority acted in an arbitrary and capricious fashion

when it refused to include in the rate base the acquisition price paid

for the pipeline by B&W in 2010.

2. Whether the Authority abused its discretion by denying B&W’s

petition for reconsideration with respect to the value of the pipeline.

3. Whether the Authority’s final order fails to comply with the

requirements of Tennessee Code Annotated § 4-5-314(c) because it

4

contains no findings of fact or conclusions of law with regard to the

acquisition costs.

III. Standard of Review

This Court’s review of the Authority’s decision is governed by Tennessee Code

Annotated § 4-5-322(h) (Supp. 2017). See Consumer Advocate Div. ex rel. Tenn.

Consumers v. Tenn. Regulatory Auth., No. M1999-01170-COA-R12-CV, 2001 WL

575570, at *3 (Tenn. Ct. App. May 30, 2001). Tennessee Code Annotated § 4-5-322(h)

provides:

The court may affirm the decision of the agency or remand the case for

further proceedings. The court may reverse or modify the decision if the

rights of the petitioner have been prejudiced because the administrative

findings, inferences, conclusions or decisions are:

(1) In violation of constitutional or statutory provisions;

(2) In excess of the statutory authority of the agency;

(3) Made upon unlawful procedure;

(4) Arbitrary or capricious or characterized by abuse of

discretion or clearly unwarranted exercise of discretion;

or

(5)(A) Unsupported by evidence that is both substantial

and material in the light of the entire record.

(B) In determining the substantiality of evidence, the

court shall take into account whatever in the record

fairly detracts from its weight, but the court shall

not substitute its judgment for that of the agency as

to the weight of the evidence on questions of fact.

The review by this Court is for the “very limited purpose of determining whether

the [Authority] has acted arbitrarily, or in excess of its jurisdiction, or otherwise

unlawfully.” Consumer Advocate & Prot. Div. of Office of Atty. Gen. v. Tenn.

Regulatory Auth., No. M2011-00028-COA-R12-CV, 2012 WL 1964593, at *13 (Tenn.

Ct. App. May 30, 2012) (quoting CF Indus. v. Tenn. Pub. Serv. Comm’n, 599 S.W.2d

536, 540 (Tenn. 1980)) (in turn quoting City of Whitwell v. Fowler, 343 S.W.2d 897, 899

5

(Tenn. 1961)). Such issues are reviewed de novo based upon the Authority’s record. See

Consumer Advocate & Prot. Div. of Office of Atty. Gen., 2012 WL 1964593, at *13. As

this Court has further explained:

[I]n reviewing an administrative decision, a court “shall not substitute its

judgment for that of the agency as to the weight of the evidence on

questions of fact.” T.C.A. § 4-5-322(h)(5); Humana of Tennessee v.

Tennessee Health Facilities Comm’n, 551 S.W.2d 664 (Tenn. 1977).

Factual issues are reviewed upon a standard of substantial and material

evidence, and not upon a broad, de novo review. Southern Ry. Co. v. State

Bd. of Equalization, 682 S.W.2d 196, 199 (Tenn. 1984) (citing CF Indus. v.

Tennessee Pub. Serv. Comm’n, 599 S.W.2d 536, 540 (Tenn. 1980)).

Substantial and material evidence is “‘such relevant evidence as a

reasonable mind might accept to support a rational conclusion and such as

to furnish a reasonably sound basis for the action under consideration.’”

Sweet v. State Tech. Inst. at Memphis, 617 S.W.2d 158, 161 (Tenn. App.

1981) (quoting Pace v. Garbage Disposal Dist. of Washington County, 54

Tenn. App. 263, 390 S.W.2d 461, 463 (1965)). It is “something less than a

preponderance of the evidence, but more than a scintilla or glimmer.”

Wayne County v. Tennessee Solid Waste Disposal Control Bd., 756 S.W.2d

274, 280 (Tenn. App. 1988). A court will not disturb a reasonable decision

of an agency with expertise, experience, and knowledge in the appropriate

field. Southern Ry. Co., 682 S.W.2d at 199.

In re All Assessments, No. 01A01-9812-BC-00642, 1999 WL 632824, at *4 (Tenn. Ct.

App. Aug. 20, 1999).

IV. Fixing Just and Reasonable Rates: Original Cost versus Acquisition Cost

The Authority “has the power . . . to fix just and reasonable individual rates, joint

rates, tolls, fares, charges or schedules thereof . . . .” Tenn. Code Ann. § 65-5-101(a)

(2015). Additionally, Tennessee Code Annotated § 65-5-103 (2015) states in pertinent

part:

(a) When any public utility shall increase any existing individual rates, joint

rates, tolls, fares, charges, or schedules thereof, or change or alter any

existing classification, the authority shall have power either upon written

complaint, or upon its own initiative, to hear and determine whether the

increase, change or alteration is just and reasonable. The burden of proof to

show that the increase, change, or alteration is just and reasonable shall be

upon the public utility making the same. In determining whether such

6

increase, change or alteration is just and reasonable, the authority shall take

into account the safety, adequacy and efficiency or lack thereof of the

service or services furnished by the public utility.

With regard to utility rates, this Court has previously explained:

The utility is permitted to set base rates that allow it to recover its operating

expenses and earn a profit from the consumer from the operation of its

business; in overseeing these base rates, the TRA is required to balance the

interests of the utility with the interests of Tennessee consumers. See Tenn.

Am. Water Co. v. Tenn. Reg. Auth., No. M2009-00553-COA-R12-CV, 2011

WL 334678, at *15 (Tenn. Ct. App. Jan. 28, 2011). On one hand, the rate

approved by the TRA must provide the utility the opportunity to earn a just

and reasonable return on its investment; on the other hand the rate must not

be exorbitant, so as to avoid the exploitation of consumers. See Bluefield

Water Works & Improvement Co. v. Public Serv. Comm’n of the State of

West Va., 262 U.S. 679, 690, 43 S. Ct. 675, 67 L. Ed. 1176 (1923). “A rate

need only fall within the ‘zone of reasonableness’ . . . that takes into

consideration the interests of both the consumer and the utility.” Tenn.

Cable Television Ass’n. v. Tenn. Pub. Serv. Comm’n, 844 S.W.2d 151, 159

(Tenn. Ct. App. 1992).

Consumer Advocate & Prot. Div. of Office of Atty. Gen., 2012 WL 1964593, at *1.

In the instant action, the Authority in its order similarly explained the criteria

utilized to set “just and reasonable rates” as follows:

In setting rates for public utilities, the Authority balances the

interests of the utilities subject to its jurisdiction with the interests of

Tennessee consumers, i.e., it is obligated to fix just and reasonable rates.

The Authority must also approve rates that provide regulated utilities the

opportunity to earn a just and reasonable return on their investments. The

Authority considers petitions for a rate increase, filed pursuant to Tenn.

Code Ann. § 65-5-[1]03, in light of the following criteria:

1. The investment or rate base upon which the utility should be

permitted to earn a fair rate of return;

2. The proper level of revenues for the utility;

3. The proper level of expenses for the utility; and

7

4. The rate of return the utility should earn.

As the Authority also explained in its order, “[t]he primary contested issue

concerning rate base centered on whether to allow the inclusion of B&W’s acquisition

cost of $2,633,085 in rate base calculations, as proposed by [B&W].” With regard to this

issue, the Authority made the following extensive findings:

B&W acquired the pipeline and ninety-six (96) oil and natural gas wells for

$2,633,085 from Gasco’s bankruptcy proceeding in 2010. [B&W] had no

records for the net book value of the pipeline, but rather recorded the

acquisition price as plant in service. According to [B&W], because the

seller would not sever the pipeline from the wells, B&W had to take the

wells in order to get the pipeline; therefore B&W assigned none of the

acquisition cost to the wells. B&W estimated the value of the producing

wells to be $60,943 and the net liability of capping the inactive wells to be

$29,845.

***

B&W believes it made a good business decision in purchasing the pipeline

for $2.6 million because it is less than the cost to build one. Mr. Ramon

further testified that [B&W] became aware after the purchase that

approximately 40 to 50 of the wells had already been plugged or handed

over to the landowners. Further, only thirteen (13) of the wells are

currently producing oil or gas.

In addition, [B&W] supported its acquisition cost with an

independent analysis performed by Bell Engineering. The Bell analysis

estimates the 2013 replacement cost of the pipeline to be $12,885,858 and

the undepreciated costs are $6,559,308, which far exceeds the acquisition

cost included in rate base. Even if this amount is depreciated back to the

pipeline’s construction date, its replacement value still exceeds the amount

included in rate base. . . .

Navitas noted that 100% of the purchase price is attributed in

B&W’s rate case to the pipeline although other assets, including wells,

were included in the transaction. Mr. Hartline asserts that there is no sound

economic basis for spending $2 million on a pipeline that earns $20,000

annually. Therefore, a substantial portion of the purchase price is and

should be attributed to the other assets purchased in the transaction. Mr.

8

Hartline testified that the Bell Engineering report was an inappropriate

basis to support inclusion of the acquisition costs as replacing the pipeline

today would be uneconomic in the rural area the pipeline services.

In the pre-filed testimony of Mr. Smith, the Consumer Advocate

proposed to exclude from Plant in Service the pipeline purchase costs and,

instead, treat it as an Acquisition Adjustment because B&W failed to

provide reliable information on the original cost of the pipeline. Mr. Smith

explains that any amount paid for utility plant in excess of the utility’s

original costs are referred to as “Goodwill” or Acquisition Premium, and

not allowed recovery in rates because it is not used or useful in the

provision of utility service. Disallowance of Goodwill or Acquisition

Premium discourages companies from marking up the cost of assets used to

provide utility service through the transfer or selling to different owners.

Mr. Smith states that B&W was unable to provide the original cost, and the

pipeline cost was not available from the books of Gasco (the seller) or the

property tax information on file for Gasco. He determined from the

responses to data requests that B&W did acquire 96 oil and gas wells along

with the pipeline and that B&W determined the net value of these wells to

be a negative $29,845 due to the cost of capping inactive wells. Therefore,

none of [the] purchase price was assigned by B&W to the wells.

From B&W’s 2012 trial balance, Mr. Smith ascertained that there

was a gross profit of $182,582, which included $19,729 for gas

transportation and $162,853 from oil and gas sales and royalties. Thus,

according to Mr. Smith, of the revenues generated by the pipeline, 11%

were from transportation service and 89% from oil and gas sales and

royalties. The wells in question have since been transferred to a B&W

affiliate, Rugby Energy, LLC, and are operated by another affiliate,

Enrema, which is the same affiliate charging B&W an annual operator fee.

Because of the gross profit in 2012 and the transfer taking place between

two affiliates with the same ownership, Mr. Smith questions the lack of

compensation for the wells. For these reasons, the Consumer Advocate

removed the acquisition amount of $2,597,285 from Plant in Service and

left only the $437,715 as the cost of the pipeline. This represents the

amount spent by B&W for safety improvements after B&W acquired the

pipeline. Removing this amount from Plant in Service results in a

reduction of the attrition year mid-point accumulated depreciation by

$568,367 for a total rate base reduction of $2,028,918 related to the cost of

the pipeline.

9

In response to data requests from Authority Staff, Navitas provided

records from the previous owner of the pipeline, including a 2008 tax

return. During the hearing, Mr. Smith addressed the 2008 federal income

tax return, stating that the reported pipeline assets at the end of 2008 were

$854,926 as plant-depreciable assets. The tax return reported accumulated

depreciation of $703,017 as of December 31st, 2008 and a land asset

reported in the amount of $68,538. The reported tax year depreciation was

$22,564, which is representative of a depreciable life of approximately 38

to 40 years; reasonable for a gas pipeline. Mr. Smith points out the return

was prepared by a CPA and signed by an officer of the Company and as

such, appeared to be the most reasonable and reliable information available

on the value of the pipeline.

With respect to Gasco’s 2008 tax return, Mr. Novak responded that

the affiliate IRS PBA code listed is for mineral extraction. Therefore the

return is not really applicable in this case because it does not represent a

value for the pipeline. Rather it represents a value for the oil and gas wells.

Mr. Smith was cross-examined regarding the IRS PBA codes noted by Mr.

Novak. Mr. Smith noted that Schedule L of the return lists these as

depletable assets, and a pipeline or building should be classified as

depreciable assets. Therefore, the tax return is applicable and if one carries

the amount out through the midpoint of the attrition year, it would be

almost zero ($17,182) as the Consumer Advocate proposed. Mr. Smith

agrees that either zero or $17,182 would be an acceptable cost of the

pipeline at the midpoint of the 2016 attrition year.

Mr. Novak asserts that the Consumer Advocate has ignored the data

provided by [B&W] and the State of Tennessee’s tax assessment of the

pipeline when he disallows the acquisition cost of the pipeline in his

analysis. The tax assessment relied upon by the Company reported to the

State of Tennessee as the cost of the pipeline in exact and equal amounts in

each county the pipeline operates within, which Mr. Smith questions. Mr.

Smith points out that the previous owner had a total assessment of

$756,000, with $976 assessed in Fentress County, $227,660 in Pickett

County and the remainder in Campbell County, including Jellico. Mr.

Smith notes that the tax assessment is prepared by the Company and

requires information regarding B&W’s last rate case. In sum, the

Consumer Advocate contends that the tax assessment relied upon by the

Company is an unreasonable basis to support the inclusion of the

acquisition price in rate base.

10

***

There is no persuasive evidence that suggests that including the entire

purchase price is in the public interest. Under the circumstances of this

case, the most reasonable determination is based upon information that is

related to the actual cost of the plant when it was constructed. Based on the

evidence in the proceeding, the panel finds that including the pipeline at the

original cost, rather than the acquisition cost, is the solution that is most fair

to both customers and B&W.

The panel further finds that the 2008 tax return of Gasco Distribution

Systems, Inc. and Subsidiaries provides the most sound support for the

prior owner’s original cost and the value of the pipeline at the time of

acquisition. Therefore, the panel concludes that B&W’s Plant in Service

include $923,364 as the original cost of the pipeline, which includes the

prior owner’s original cost of plant of $854,826 and land of $68,538.

Further, including $923,364 as the original cost of the pipeline, along with

$437,715 of uncontested additions since B&W’s acquisition, as well as

uncontested land, structures and intangible property of $119,842, results in

total Plant in Service of $1,480,921. Finally, the panel further adopts

Accumulated Depreciation of $919,975 which includes accumulated

depreciation of $854,826 related to the original pipeline acquired by B&W

and $65,149 of accumulated depreciation related to the new additions.

(Footnotes omitted).

B&W argues that the rate base set by the Authority was unjust, due to the

Authority’s reliance upon “a document that was misinterpreted, which led the Authority

to understate the value of the pipeline.” B&W contends that the Authority abused its

discretion by accepting the depreciated “tax value” of the pipeline rather than its “book”

value. B&W further contends that the Authority’s decision was not supported by

substantial and material evidence. We disagree.

This Court “shall not substitute its judgment for that of the agency as to the weight

of the evidence on questions of fact.” See In re All Assessments, 1999 WL 632824, at *4

(quoting Tenn. Code Ann. § 4-5-322(h)(5)). Factual issues are reviewed upon a standard

of substantial and material evidence, which this Court has defined as “‘such relevant

evidence as a reasonable mind might accept to support a rational conclusion and such as

to furnish a reasonably sound basis for the action under consideration.’” See In re All

Assessments, 1999 WL 632824, at *4 (quoting Sweet v. State Tech. Inst. at Memphis, 617

S.W.2d 158, 161 (Tenn. App. 1981)) (in turn quoting Pace v. Garbage Disposal Dist. of

Washington Cty., 54 Tenn. App. 263, 390 S.W.2d 461, 463 (1965)). This Court will not

11

disturb a reasonable decision of an agency with “expertise, experience, and knowledge in

the appropriate field.” See In re All Assessments, 1999 WL 632824, at *4.

The Authority’s decision to exclude the $2.6 million purchase price of the pipeline

and wells from the rate base was supported by substantial and material evidence. Mr.

Smith testified at length regarding his interpretation of the 2008 Gasco tax return, which

was the only evidence presented regarding the prior owner’s cost or valuation. Mr. Smith

explained that the tax return showed $854,926.00 as plant/depreciable assets, which he

opined could only refer to the pipeline because oil and gas wells constituted depletable

rather than depreciable assets. Mr. Smith further explained that the amount of

depreciation shown on the return, $22,564.00, was in accordance with a thirty-eight to

forty-year depreciation schedule, which would be reasonable for a pipeline. Mr. Smith

opined that the 2008 tax return was the most reliable information concerning the prior

owner’s assessment of value and that its reliability was further supported by its

preparation by a certified public accountant and submission to the IRS. Based on this

proof, we determine that the Authority’s decision was based on evidence that is “both

substantial and material in the light of the entire record.” See Tenn. Code Ann. § 4-5-

322(h).

Moreover, the Authority’s determination to rely upon original cost information

aligns with other rate base decisions. For example, in a factually similar case, the

Authority held:

[T]he commission finds that the book value of the Franklin system at the

time of the United Cities acquisition should be based on the original cost

figures developed by Mr. Crenshaw and approved by the comptroller in

1973 rather than on the much higher estimate arrived at by the company’s

witness more than ten years later. The customers of the Franklin system

have paid once for the system’s assets; to accept the company’s argument

that the cost of those assets has now doubled would force ratepayers to pay

once again for these same assets.

Company witness Fleming recognized the danger to ratepayers of

permitting a gas utility to write up the value of its assets above their book

value, and readily acknowledged that “as everyone is well aware, this

commission generally allows the original costs of utility facilities in rate

base.” He noted that the reason why regulatory commissions insist on

using original cost “is to keep people from double paying, in effect,

artificially inflating the rate base” as the result of purchasing assets at a

price higher than book value.

12

See Re: United Cities Gas Co., No. U-84-7333, 1985 WL 1213311 (Tenn. P.S.C. June

10, 1985) (footnote omitted). See also In Re: Petition of Chattanooga Gas Co. to Place

into Effect A Revised Natural Gas Tariff, No. 97-00982, 1998 WL 35628746 (Tenn.

P.S.C. Oct. 7, 1998) (rejecting the utility’s request to include acquisition costs in rate

base upon determining that additional benefit to customers came from subsequent

investments in plant system that were already incorporated into rate base).

As the Authority also noted in this action, B&W’s acquisition cost included oil

and gas wells. Testimony demonstrated that a significant portion of the income generated

by B&W in the past came from oil and gas sales rather than pipeline operations.

Testimony further demonstrated that rather than purchasing the pipeline and wells to

maintain the status quo with regard to operations, B&W administrators hoped to utilize

the pipeline for other uses in the future that may or may not involve providing utility

service. For the foregoing reasons, we conclude that the Authority’s determination

regarding rate base should be affirmed.

IV. Denial of Petition to Reconsider Pipeline Value

B&W alleges that the Authority abused its discretion by denying B&W’s petition

to reconsider the valuation of the pipeline and thus refusing to consider the new evidence

presented by B&W with its petition. With regard to a petition for reconsideration, the

Uniform Administrative Procedures Act states:

(a) Any party, within fifteen (15) days after entry of an initial or final order,

may file a petition for reconsideration, stating the specific grounds upon

which relief is requested. However, the filing of the petition shall not be a

prerequisite for seeking administrative or judicial review.

***

(d) An order granting the petition and setting the matter for further

proceedings shall state the extent and scope of the proceedings, which shall

be limited to argument upon the existing record, and no new evidence shall

be introduced unless the party proposing such evidence shows good cause

for such party’s failure to introduce the evidence in the original proceeding.

Tenn. Code Ann. § 4-5-317 (2015) (emphasis added).

In its petition, B&W argued that the 2008 Gasco tax return had been

misinterpreted by the Authority. B&W stated that it had located the former president of

Gasco, Fred Steele, who had in turn located and provided the depreciation schedules and

13

other tax information for Titan Energy, a subsidiary of Gasco that owned the pipeline

prior to B&W’s purchase. Mr. Steele’s unsworn affidavit and the additional tax

information were attached to B&W’s petition. B&W asserted that this additional tax

information demonstrated that the pipeline had been depreciated at an accelerated rate for

tax purposes over a period of seven years. According to B&W, this tax information also

demonstrated that the sale of the pipeline was recorded in 2010 at a value of

$1,212,892.80. Importantly, however, B&W’s petition failed to contain any information

concerning good cause for B&W’s failure to present this evidence at the original hearing,

as required by Tennessee Code Annotated § 4-5-317(d).

As the Authority points out, B&W had ample opportunity during the contested

case hearing and for approximately sixty days thereafter to present any necessary

evidence to meet its burden of proof, but B&W chose not to present additional evidence

until after the Authority ruled. Because B&W failed to demonstrate good cause why this

evidence could not have been presented earlier, we conclude that the Authority did not

abuse its discretion by declining to consider the additional evidence. See Tenn. Code

Ann. § 4-5-317(d). See, e.g., Pavement Restorations Inc. v. Ralls, No. W2016-01179-

COA-R3-CV, 2017 WL 657775, at *8 (Tenn. Ct. App. Feb. 17, 2017) (“The refusal [by

an administrative agency] . . . to grant a rehearing will not be found to be arbitrary or

capricious unless the appellant can ‘show specifically why [the appellant] was unable to

procure the “newly discovered” evidence and that [the appellant] exercised due diligence

in attempting to obtain the evidence prior to’ the hearing.”) (quoting Bridges v.

Culpepper, No. 02A01-9704-CH-00074, 1997 WL 589242, at *4 (Tenn. Ct. App. Sept.

24, 1997)) (in turn quoting Brown v. Weik, 725 S.W.2d 938, 947 (Tenn. App. Oct. 3,

1983)). See also Tenn. Code Ann. § 65-2-116 (providing that a petition for rehearing

before the Authority can be maintained where new evidence is discovered “which could

not have been previously discovered by due diligence.”).

V. Requirements of Tennessee Code Annotated § 4-5-314(c)

Finally, B&W argues that the Authority failed to make sufficient findings of fact

and conclusions of law regarding its exclusion of B&W’s related acquisition costs in the

amount of $225,585.31 from the rate base. As B&W points out, the Uniform

Administrative Procedures Act requires the following, in relevant part, with regard to a

decision of the Authority:

(c) A final order, initial order or decision . . . shall include conclusions of

law, the policy reasons therefor, and findings of fact for all aspects of the

order, including the remedy prescribed . . . . Findings of fact, if set forth in

language that is no more than mere repetition or paraphrase of the relevant

provision of law, shall be accompanied by a concise and explicit statement

14

of the underlying facts of record to support the findings. The final order . . .

must also include a statement of the available procedures and time limits

for seeking reconsideration or other administrative relief and the time limits

for seeking judicial review of the final order.

Tenn. Code Ann. § 4-5-314 (2015). Additionally, Tennessee’s statutory scheme

specifically applicable to proceedings before the Authority provides:

Every final decision or order rendered by the authority in a contested case

shall be in writing, or stated in the record, and shall contain a statement of

the findings of fact and conclusions of law upon which the decision of the

authority is based. Copies of such decisions or orders shall be delivered or

mailed to each party or to the party’s attorney of record.

Tenn. Code Ann. § 65-2-112 (2015).

In the case at bar, B&W alleges that the Authority failed to make specific findings

of fact regarding the related acquisition costs. We disagree. The Authority specifically

held in its order upon reconsideration:

B&W included the acquisition costs of $225,585.31 as part of the

purchase price of $2.6 million as part of [B&W’s] proposed rate base. The

Authority previously set rates in a decision which rejected the purchase

price of the system put forth by [B&W] and included the acquisition costs

of $225,585.31 at issue upon reconsideration. By rejecting [B&W’s]

proposal to establish rates based on the purchase price, the Authority also

tacitly rejected the acquisition costs related to the purchase. After

reviewing and reconsidering the record, the panel found that the Authority

made its decision based on the best evidence it had before it and voted

unanimously to affirm its decision.

As this Court has previously explained:

An agency, when issuing a final order, must provide a concise and explicit

statement of the underlying facts supporting the agency’s findings. Tenn.

Code Ann. § 4-5-314(c). Findings of fact made by the agency should be

based exclusively on the evidence of the record and on matters noted in the

proceeding. Tenn. Code Ann. § 4-5-314(d). Exactness in form and

procedure is not required; rather, the findings based on the evidence need

only be specific and definite enough so that a reviewing court may

determine the pertinent questions of law and whether the agency’s general

15

findings should stand, particularly when the findings are material facts at

issue. See Levy v. State of Tennessee Bd. Of Exam’rs for Speech Pathology

and Audiology, 553 S.W.2d 909, 911-12 (Tenn. 1977) (quoting State Bd. of

Med. Exam’rs v. Grandy, 149 S.E.2d 644, 646 (S.C. 1966)). “The

sufficiency of an agency’s findings of fact must be measured against the

nature of the controversy and the intensity of the factual dispute.” CF

Industries v. Tennessee Pub. Serv. Comm’n, 599 S.W.2d 536, 541 (Tenn.

1980).

Consumer Advocate Div. ex rel. Tenn. Consumers, 2001 WL 575570, at *4 (emphasis

added).

In this matter, the Authority clarified that its rejection of the related costs stemmed

from its decision to exclude the overall acquisition costs of $2.6 million, and the reasons

for such exclusion were explained in great detail in the Authority’s earlier order setting

rates, as set forth above. We conclude that the Authority made sufficient factual findings

to facilitate this Court’s review. We therefore determine this issue to be without merit.

VI. Conclusion

For the foregoing reasons, we affirm the Authority’s decision in all respects.

Costs on appeal are taxed to the appellant, B&W Pipeline, LLC. This case is remanded

to the Authority for enforcement of the judgment below.

_________________________________

THOMAS R. FRIERSON, II, JUDGE

16