Opinion

LaShip, L.L.C. v. Hayward Baker, Incorporat

  • 680 F. App'x 317
Court
Court of Appeals for the Fifth Circuit
Filed
Mar 1, 2017
Status
Unpublished
On the bench
Jolly, Higginbotham, Prado
Nature of suit
Private Civil Diversity
Cited by
14 cases
Authority
More cited than 82.4%

holding that the district court did not abuse its discretion by concluding that a purported Rule 26(a)(1)(C) witness’s “opinion was prepared specifically for litigation and [therefore] did not equate to the ground-level opinion of an expert who was involved in the events leading up to litigation”

How later courts described this case

  • holding that the district court did not abuse its discretion by concluding that a purported Rule 26(a)(1)(C) witness’s “opinion was prepared specifically for litigation and [therefore] did not equate to the ground-level opinion of an expert who was involved in the events leading up to litigation”
  • holding that the district court did not abuse its discretion by concluding that a purported Rule 26(a)(1)(C
  • district court did not abuse its discretion in finding that the opinion of one party’s witness “was prepared specifically for litigation and did not equate to the ground-level opinion of an expert who was involved in the events leading up to litigation.”
  • “Rule 26(a)(2)(C) addresses the disclosure of expert witnesses who were involved in the events leading up to litigation and may testify both as an expert and as a fact witness”

Written by the judges who cited it.

The opinion

Case: 15-30816 Document: 00513892300 Page: 1 Date Filed: 03/01/2017

IN THE UNITED STATES COURT OF APPEALS

FOR THE FIFTH CIRCUIT

United States Court of Appeals

No. 15-30816

Fifth Circuit

FILED

March 1, 2017

LASHIP, L.L.C.; TERREBONNE PORT COMMISSION, Lyle W. Cayce

Clerk

Plaintiffs - Appellants

v.

HAYWARD BAKER, INCORPORATED,

Defendant - Appellee

Appeals from the United States District Court

for the Eastern District of Louisiana

USDC No. 2:11-CV-546

Before JOLLY, HIGGINBOTHAM, and PRADO, Circuit Judges.

PER CURIAM:*

LaShip, LLC (“LaShip”) and Terrebonne Port Commission (“TPC”)

brought this suit against Hayward Baker, Inc. (“HBI”), which performed soil

stabilization work for a large shipbuilding facility in Houma, Louisiana.

Trouble arose when the soil stabilization work began to fail. Disputes and

finger-pointing ultimately gave rise to this litigation against HBI for, inter

alia, breach of contract and negligent failure to warn under Louisiana law.

* Pursuant to 5th Cir. R. 47.5, the court has determined that this opinion should not

be published and is not precedent except under the limited circumstances set forth in 5th Cir.

R. 47.5.4.

Case: 15-30816 Document: 00513892300 Page: 2 Date Filed: 03/01/2017

No. 15-30816

The district court, after a ten-day bench trial, entered judgment for HBI,

dismissing LaShip and TPC’s claims. We AFFIRM.

I.

LaShip is the owner and operator of a shipbuilding operation in Houma,

Louisiana. TPC is a political subdivision of the State of Louisiana. From 2007

to 2011, LaShip undertook the construction of a large shipbuilding facility in

Houma (the “Project”) on land that it owned and on land belonging to TPC but

under lease to LaShip. Phases I and III of the Project were completed on

LaShip’s land; Phase II involved the bulkhead for the facility’s waterfront

access and was located on TPC’s land.

LaShip retained Lyle Stover Engineering, Inc., now known as Holon

Engineering and Construction LLC (“LSE/Holon”), to craft a design for the

foundation system in Phases I and III. Based on the results of soil borings

conducted by Burns, Cooley, Dennis, Inc. (“BCD”), David Lyle of LSE/Holon

concluded that soil-mixed columns were an appropriate option to support the

foundation system.

Drawing from the LSE/Holon design specifications and the soil boring

tests performed by BCD, HBI submitted a bid to complete the soil mixing and

drilled shaft work on the Project. In July 2008, LaShip accepted HBI’s

proposal. The contractual agreement between LaShip and HBI involved

several documents: HBI’s original proposal, the Revised Schedule of Price, the

Performance Specifications, the Field Execution Plan, and a mobilization

credit agreement.

The contractual agreement between LaShip and HBI called for HBI to

install subterranean soil-mix columns to form the foundation of the

shipbuilding facility and prevent it from falling victim structurally to the soft

and compressible Louisiana soil. As part of its Project obligations, HBI was to

obtain “wet grab” samples from two of the columns made each day to ascertain

2

Case: 15-30816 Document: 00513892300 Page: 3 Date Filed: 03/01/2017

No. 15-30816

the columns’ strength. The sampling process required the lowering of a tool

into the column at varying depths to recover a sample of the mixed material.

The samples were then submerged in cylinders and tested for “unconfined

compressive strength” intermittently over the course of twenty-eight days. Of

the samples tested in Phase I, at least 90% possessed an unconfined

compressive strength of at least 100 psi. All of the Phase II and III samples

demonstrated a strength of at least 125 psi and 100 psi, respectively.

Some of the six-foot diameter columns that were installed met the

strength requirements, but nonetheless exhibited unwelcome spiraling,

indicative of the presence of both mixed and unmixed soil. In addition, HBI

experienced several cave-ins during its installation of the drill shafts on some

of the columns. In November 2008, against HBI’s wishes, LaShip decided to

abandon the 156 six-foot columns, move the footprint, and switch to eight-foot

columns. HBI recommenced the installation in the new location but

nonetheless continued to encounter difficulties.

No written contract linked HBI to TPC for HBI’s work on Phase II of the

Project, because TPC awarded the Phase II contract to F. Miller Construction,

which then subcontracted with HBI to complete the soil-mixing job. The work

for Phase II was completed in 2010.

Unwanted settlement of the foundation columns occurred during Phase

III much like it did during Phase I. After all of the foundation columns had

been installed, LaShip commissioned additional strength testing of the

columns—the results of which exhibited a range of column strengths—and

hired A.H. Beck Foundation Co. (“Beck”) to perform what LaShip alleged to be

remedial work on Phase I.

On January 21, 2011, LaShip filed suit in state court in the 32nd Judicial

District Court for the Parish of Terrebonne, Louisiana, asserting numerous

claims against HBI. In March 2011, HBI filed a notice of removal to federal

3

Case: 15-30816 Document: 00513892300 Page: 4 Date Filed: 03/01/2017

No. 15-30816

court on the basis of diversity. LaShip, LLC v. Hayward Baker, Inc., No. 11-

0546, 2013 WL 5781688, at *2 (E.D. La. Oct. 25, 2013). The federal district

court dismissed LaShip’s unjust enrichment claim, and its claims for breach of

contract, negligence, and breach of the implied duty of workmanlike

performance proceeded to trial. HBI, in turn, brought a counterclaim against

LaShip for breach of contract when LaShip failed to compensate HBI for the

additional soil mixing that it completed during Phase I. TPC joined the lawsuit

on March 6, 2013, when it filed a negligence claim against HBI, contending

that HBI’s column installation was insufficient and that HBI acted negligently

in failing to warn of a dangerous condition.

At the conclusion of a ten-day bench trial, the district court’s 66-page

ruling and judgment concluded with a holding in favor of LaShip with respect

to a $375,000 mobilization refund that HBI owed to LaShip pursuant to their

agreement. In addition, the court held that LaShip failed to prove by a

preponderance of the evidence its remaining claims against HBI. The court

issued judgment in favor of HBI on its breach of contract counterclaim against

LaShip. It also found that TPC’s claims against HBI were delictual in nature

and were therefore prescribed because they were filed after the one-year cutoff

date under Louisiana law. LaShip and TPC timely appealed.

II.

When a judgment from a bench trial is appealed, we review the district

court’s conclusions of law de novo and findings of fact for clear error. Steele v.

Leasing Enterprises, Ltd., 826 F.3d 237, 242 (5th Cir. 2016). Factual findings

are clearly erroneous if they lack “substantial evidence to support [them], the

court misinterpreted the effect of the evidence, or this court is convinced that

the findings are against the preponderance of credible testimony.” Id. (quoting

Bd. of Trs. New Orleans Emp’rs Intern. Longshoremen’s Ass’n v. Gabriel,

Roeder, Smith & Co., 529 F.3d 506, 509 (5th Cir. 2008)).

4

Case: 15-30816 Document: 00513892300 Page: 5 Date Filed: 03/01/2017

No. 15-30816

III.

A.

LaShip contends that the district court erred in finding that HBI

satisfied its contractual obligations to LaShip and that HBI owed no duty to

warn LaShip about alleged defects in the design of the columns. Moreover,

LaShip argues that the district court erred in instructing LaShip to

compensate HBI for its installation of 156 columns that were later abandoned

when the footprint of the facility was moved.

1.

Because jurisdiction in federal court was based on diversity of citizenship

between the parties, the district court properly applied Louisiana law in

analyzing LaShip’s breach of contract claim. See Mozeke v. Int’l Paper Co., 856

F.2d 722, 724 (5th Cir. 1988). To prevail on a claim of breach of contract in

Louisiana, a plaintiff must prove the following by a preponderance of the

evidence: “(1) the obligor’s undertaking an obligation to perform, (2) the obligor

failed to perform the obligation (the breach), and (3) the failure to perform

resulted in damages to the obligee.” Favrot v. Favrot, 68 So. 3d 1099, 1108-09

(La. Ct. App. 2011). The mutual intent of the parties dictates the terms of the

contract, and when the terms of the contract are “clear and explicit and lead to

no absurd consequences, no further interpretation may be made in search of

the parties’ intent.” LA. CIVIL CODE art. 2046. Furthermore, each provision of

the contract should be interpreted in the light of the other provisions, so as to

give meaning to each. LA. CIVIL CODE art. 2050.

Here, the district court based its holding on the express language of the

Performance Specifications and found that LaShip failed to prove by a

preponderance of the evidence that HBI breached the contract. It is

undisputed that HBI fulfilled the Performance Specifications, namely that 90%

of the Phase I and 100% of the Phase II and Phase III samples crossed the

5

Case: 15-30816 Document: 00513892300 Page: 6 Date Filed: 03/01/2017

No. 15-30816

minimum threshold for unconfined compressive strength. LaShip’s position is

that the Performance Specifications were merely a component of HBI’s

overarching obligation to properly install soil-mixed columns—it is with

respect to this ultimate obligation that LaShip contends HBI fell short.

LaShip, however, is unable to point to a specific provision of the contract that

HBI allegedly breached.

We commend the district court on its thorough decision. We find that the

court did not err in identifying HBI’s obligation under the contract as the

installation of soil-mix columns “such that, when tested as set out in the

specifications, 90 percent of the Phase I samples demonstrated an unconfined

compressive strength of at least 100 psi.” LaShip, LLC v. Hayward Baker, Inc.,

No. 2:11-cv-00546-NJB-SS, slip op. at 29 (E.D. La. Aug. 13, 2015). Moreover,

because the express specifications were met and because LaShip could not

identify a specific provision in the contract as a point of breach, we hold that

the district court did not clearly err in determining that HBI did not breach

the contract with LaShip.

2.

LaShip also asserts a negligent failure to warn claim on appeal. It

argues that the district court erred in finding that HBI owed no duty to warn

LaShip about alleged defects in the design of the columns. Although LaShip

raised this argument in the district court for the first time in post-trial briefing,

we need not address the merits of this tardy assertion because we conclude

that HBI is statutorily immune from this claim under Louisiana Revised

Statute 9:2771. The applicable statute provides:

No contractor, including but not limited to a residential building

contractor . . . shall be liable for destruction or deterioration of or

defects in any work constructed, or under construction, by him if

he constructed, or is constructing, the work according to plans or

specifications furnished to him which he did not make or cause to

6

Case: 15-30816 Document: 00513892300 Page: 7 Date Filed: 03/01/2017

No. 15-30816

be made and if the destruction, deterioration, or defect was due to

any fault or insufficiency of the plans or specifications. This

provision shall apply regardless of whether the destruction,

deterioration, or defect occurs or becomes evident prior to or after

delivery of the work to the owner or prior to or after acceptance of

the work by the owner. . . .

LSA-R.S. 9:2771. Generally, a contractor may rely on LSA-R.S. 9:2771 to

shield it from liability for any defects that may arise as a result of the

contractor’s adherence to plans and specifications that were provided to it.

Such a contractor cannot escape liability, however, “if he has a justifiable

reason to believe that adherence to plans and specifications would create a

hazardous condition.” Oxley v. Sabine River Auth., 663 So. 2d 497, 504 (La. Ct.

App. 3 Cir. 1995) (quoting Nolan v. S&W Steel Fabricators, Inc., 600 So. 2d

929, 932 (La. Ct. App. 2 Cir. 1992)).

Here, HBI was given performance specifications that it did not “make or

cause to be made.” LSA-R.S. 9:2771. Furthermore, the district court found

based on the evidence presented at trial that the settlement of the structure in

Phases I and III stemmed from a design defect in the length of the columns.

LaShip, slip op. at 47. Thus, the “defect was due to . . . fault or insufficiency of

the plans or specifications.” LSA-R.S. 9:2771. The statutory immunity,

therefore, applies and relieves HBI of liability based on its installation of the

columns according to the Performance Specifications. In addition, LaShip is

unable to point to specific evidence indicating that HBI had a “justifiable

reason to believe that adherence to the plans and specifications would create a

hazardous condition.” Oxley, 663 So. 2d at 504. LaShip instead underscores

HBI’s geotechnical expertise and asserts that HBI knew or should have known

that the design was allegedly defective and thus had an affirmative tort duty

7

Case: 15-30816 Document: 00513892300 Page: 8 Date Filed: 03/01/2017

No. 15-30816

to warn LaShip. 1 We decline to broaden the scope of the affirmative tort duty

of contractors under Louisiana law to the extent urged by LaShip. We

therefore hold that HBI is immune from liability from the plaintiff’s tort claim

under LSA-R.S. 9:2771. 2

3.

LaShip further challenges the district court’s ruling in favor of HBI on

HBI’s counterclaim against LaShip. HBI asserted in its counterclaim that it

was not compensated for the 156 soil-mix columns that it installed prior to

LaShip’s decision to move the facility footprint. LaShip argues that it does not

owe HBI compensation for the 156 columns because they “were necessarily

abandoned due to their defects and lack of reliability.” HBI argues, in turn,

that it disagreed with LaShip’s decision to abandon the columns, a decision

that was also opposed by LSE/Holon. Further, HBI asserts, LaShip did not

allow HBI to load test the 156 columns before they were abandoned.

In deciding in favor of HBI, the district court considered the Project’s

Revised Schedule of Prices, which provided that “final payment will be based

on the actual quantities.” Both parties agreed that “HBI originally agreed to

mix 40,290 cubic yards of soil on Phase I, but that HBI actually mixed

65,571.69 cubic yards of soil on that Phase.” LaShip, slip op. at 64. In the light

1 LaShip relies on the Louisiana case Bunge Corp. v. GATX Corp., 557 So. 2d 1376

(La. 1990), in which the Louisiana Supreme Court held that the contractor of a grain storage

tank had a duty to warn the owner of the possibility of rupture resulting from the contractor’s

construction of the tank. The Bunge court’s reasoning was that “the superior knowledge of

the builder” renders him logically in a position, when he “acquires knowledge that can

prevent personal injury or property loss,” to “convey that information to those for whom he

has built.” Id. at 1385. The court in Bunge, however, did not address statutory immunity

under LSA-R.S. 9:2771. Moreover, the contractor in Bunge both designed and constructed

the storage tank; such a situation is distinguishable from that of the instant case, in which

HBI did not design the soil-mix column specifications. Thus, LaShip’s reliance on Bunge is

misplaced.

2 Our holding on the negligent failure to warn issue encompasses any argument by

LaShip that HBI negligently failed to warn it of a dangerous condition resulting from

allegedly deficient column construction.

8

Case: 15-30816 Document: 00513892300 Page: 9 Date Filed: 03/01/2017

No. 15-30816

of this fact and other corroborating evidence, the court held that HBI was not

compensated for 23,652.69 cubic yards of soil and thus requires compensation.

Id. at 65. We agree with the district court’s findings.

B.

We now turn to the claims of TPC against HBI. TPC contends that the

district court erred in rejecting TPC’s claim of contra non valentem and finding

that TPC’s claims were prescribed. Even if TPC’s claims were not prescribed,

the district court found that they would have nonetheless failed on the merits.

TPC also appeals the district court’s exclusion of the expert testimony of TPC

witness Joseph Waxse and argues that the district court’s reliance on HBI’s

experts was improper. We hold that the district court did not err in its findings

and holdings.

1.

In general, Louisiana Civil Code Article 3492 applies a one-year

prescription period to all delictual actions—that is, actions involving the

causing of damages to another that are not governed by a contract. Specific to

immovable property, Article 3493 provides, “[T]he one year prescription

commences to run from the day the owner of the immovable acquired, or should

have acquired, knowledge of the damage.” LA. CIVIL CODE art. 3493. Although

HBI completed its work on Phase II of the Project in 2010, TPC did not file suit

until March 2013. Thus, the action is prescribed on its face. Louisiana case

law recognizes that when an action is facially prescribed, the plaintiff bears

the burden of proving that prescription was “interrupted, suspended, or

renounced.” Gary v. Camden Fire Ins. Co., 676 So. 2d 553, 555 (La. 1996).

TPC contends that the doctrine of contra non valentem applies and

should have suspended the running of prescription, thereby preserving the

viability of TPC’s claim. Under Louisiana law, the doctrine of contra non

valentem suspends the running of prescription in “exceptional circumstances.”

9

Case: 15-30816 Document: 00513892300 Page: 10 Date Filed: 03/01/2017

No. 15-30816

Lapuyade v. Rawbar, Inc., 190 So. 3d 1214, 1220 (La. Ct. App. 2016). Louisiana

courts apply the doctrine of contra non valentem in four situations:

(1) where there was some legal cause which prevented the courts

or their officers from taking cognizance of or acting on the

plaintiff’s action;

(2) where there was some condition coupled with the contract or

connected with the proceedings which prevented the creditor

from suing or acting;

(3) where the debtor himself has done some act effectually to

prevent the creditor from availing himself of his cause of action;

or

(4) where the cause of action is neither known nor reasonably

known by the plaintiff even though plaintiff’s ignorance is not

induced by the defendant.

Marin v. Exxon Mobil Corp., 48 So. 3d 234, 245 (La. 2010). The Louisiana

Supreme Court has also noted that the analysis of the fourth prong of the

contra non valentem doctrine and that of Article 3493 of the Louisiana Civil

Code are the same, because they both involve the suspension of prescription

until the plaintiff knew, or reasonably should have known, of the damage

caused. Id. The key inquiry in the analysis is whether knowledge, either

actual or constructive, existed to trigger the running of the prescriptive period.

To identify constructive knowledge, the court looks to “the reasonableness of

the plaintiff’s action or inaction in light of his education, intelligence, and the

nature of the defendant’s conduct.” Id. at 246.

The district court concluded here that the contra non valentem doctrine

was inapplicable because TPC failed to establish the “reasonableness of its

inaction with respect to filing [a] lawsuit within the one year prescription

period.” LaShip, slip op., at 62. The district court pointed out that the only

evidence presented in support of TPC’s contra non valentem argument was the

testimony of TPC’s Executive Director, David Rabalais. Rabalais testified that

he became aware for the first time in early 2013 that the soil-mixed columns

10

Case: 15-30816 Document: 00513892300 Page: 11 Date Filed: 03/01/2017

No. 15-30816

exhibited problems. He also noted, however, that TPC’s engineer and

representatives had continuously monitored the work site and HBI’s

installation of the soil-mix columns. The court reasoned that the ongoing

presence of these officials on-site was sufficient to demonstrate the existence

of constructive knowledge on the part of TPC. Thus, the court held that TPC

could not rely on contra non valentem to shield it from prescription. We find

that the district court thoroughly considered the evidence before it and agree

with the district court’s conclusion that TPC’s claims against HBI were

prescribed because they were filed after the one-year prescriptive period for

delictual actions.

2.

TPC also contends that the district court erred in excluding the expert

testimony of geotechnical engineer Joseph Waxse, which TPC attempted to

enter under Rule 26(a)(2)(C) of the Federal Rules of Civil Procedure. Further,

TPC argues that the district court erred by relying on HBI’s experts. We

disagree.

Rule 26(a)(2)(C) addresses the disclosure of expert witnesses who were

involved in the events leading up to litigation and may testify both as an expert

and as a fact witness. The rule states:

(C) Witnesses Who Do Not Provide a Written Report. Unless

otherwise stipulated or ordered by the court, if the witness is not

required to provide a written report, this disclosure must state:

(i) the subject matter on which the witness is expected to present

evidence under Federal Rule of Evidence 702, 703, or 705; and

(ii) a summary of the facts and opinions to which the witness is

expected to testify.

FED. R. CIV. P. 26(a)(2)(C). Subsection (C) is to be contrasted with Rule

26(a)(2)(B), which accounts for experts who are retained specifically for

11

Case: 15-30816 Document: 00513892300 Page: 12 Date Filed: 03/01/2017

No. 15-30816

litigation. Rule 26(a)(2)(B) expert witnesses are required to file a written

report. See FED. R. CIV. P. 26(a)(2)(B).

The district court found that Waxse did not fit the criteria for

classification as a Rule 26(a)(2)(C) witness. Waxse works with Terracon

Consultants, Inc. When Beck contracted with LaShip and TPC to complete

LaShip’s remediation work on the Project, Beck subcontracted with Terracon

to complete Cone Penetrometer Testing (“CPT”) to “measure soil strength and

compressibility and to assess the soil type in areas where HBI had installed

soil-mixed columns.” To explain its reasoning, the court referred to emails

between the plaintiffs and Waxse, as well as the content of Waxse’s

testimony—both of which supported the district court’s conclusion that

Waxse’s opinion was prepared specifically for litigation and did not equate to

the ground-level opinion of an expert who was involved in the events leading

up to litigation. We apply an abuse of discretion standard and agree that the

district court did not err in excluding Waxse’s expert testimony because an

expert report pursuant to Rule 26(a)(2)(B) was not filed.

With respect to TPC’s claim that the district court improperly relied on

the testimony of HBI’s experts, we decline to disturb the district court’s expert

witness credibility determination. Moreover, because we hold that TPC’s

claims are prescribed, we need not analyze this issue further.

IV.

In sum, we have considered the arguments of each party with respect to

the issues present in the instant case, and we AFFIRM the judgment of the

district court on all the issues.

12

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.