Opinion

1.9 Little York, Ltd. v. Allice Trading Inc.

Court
Texas Court of Appeals, 1st District (Houston)
Filed
Mar 15, 2012
Status
Published
Cited by
0 cases
Authority
More cited than 42.2%

The opinion

Opinion issued March 15, 2012.

In The

Court of

Appeals

For The

First District

of Texas

————————————

NO. 01-11-00390-CV

———————————

1.9 Little York, LTD. , Appellant

V.

allice

trading inc. ,

Appellee

On Appeal from the County Civil Court at Law No. 1

Harris County, Texas

Trial Court Case No. 956852

MEMORANDUM OPINION

Appellant,

1.9 Little York, Ltd. (“Little York”), challenges the trial court’s judgment,

entered after a jury trial, in favor of appellee, Allice

Trading Inc. (“ Allice Trading”), in Allice Trading’s suit for breach of contract and quantum

meruit. In its first two issues, Little

York contends that the evidence is legally and factually insufficient to

support Allice Trading’s recovery on its breach-of-contract

claim and the jury’s damage award. In

its third issue, Little York contends that that the trial court erred in denying

Little York additional time to present rebuttal witnesses.

We affirm.

Background

In its second amended petition, Allice Trading alleged that Little York, the owner and

general contractor of a warehouse construction project, had hired Allice Trading to provide “site preparation, utilities

installation, and concrete work” for the project. Pursuant to their contract, Little York was

to pay Allice Trading $315,292.10 for its

services. Allice

Trading sought damages in the amount of $28,529.21 for breach of contract and

quantum meruit.

In

its counterclaim, Little York alleged that Allice

Trading “abruptly stopped” working on the project and left “the job incomplete

and wholly unacceptable.” Little York

specifically claimed that Allice Trading had failed

to complete a detention pond, which was required for Little York to obtain a

water detention permit from Harris County.

Little York asserted that any alteration to the “scope” of the work

required by the contract was done “unilaterally and without agreement” by Allice Trading. As a

result, the construction site had deteriorated to the point that Little York

needed to undertake “a total renovation of the project.” Little York alleged, thus, that Allice Trading breached the contract by leaving the project,

and it sought actual and consequential damages to salvage the project.

At

trial, Allice Trading owner Dan Allice

testified that he had previously worked with Little York’s owner, Moe Nasr, on

two prior projects. In his original

estimate, Allice Trading was to provide 200 loads of

dirt for the project, but Nasr contacted him and explained that “the dirt

portion was a bit over his budget.” Nasr

suggested that he could supply the dirt at a less expensive price than Allice Trading, so the two agreed that Nasr would supply

the dirt for the project and Allice “deduct[ ed ] the dirt cost” from his estimate.

While

on site, Allice took direction from Mario Lanza , the engineer and project manager for the Little York

project. Lanza

was at the site every day and, to Allice’s knowledge,

served as Nasr’s representative.

Although the original agreement called for Allice

Trading to remove the driveway used for construction vehicles, Lanza instructed Allice that the

removal was not needed. Lanza also instructed Allice to perform

at the construction site several other jobs that were not included in the

original contract, but were added to the final estimate.

At

one point, Allice Trading had “completely finished”

the detention pond and was preparing to add a pilot channel to connect the

ingoing and outgoing pipes in the pond. Before

Allice Trading could begin pouring the concrete for

the pilot channel, Lanza informed it that Little York

had “ran out of dirt for the foundation” of the warehouse. Lanza then

instructed Allice Trading to “pull the dirt” that

Little York needed “from the pond” and the adjacent “green space.” As a result, although the foundation was

finished, the “green space” and the detention pond needed more dirt. Allice then

“continually” asked Lanza for the dirt required to

fill the “green space” and the detention pond, but Lanza

only brought in enough to fill the “green space.” When Allice

Trading had “maybe four more days” left on the project, Lanza

“stopped bringing dirt in.” Without

enough dirt in the detention pond, Allice Trading

could not construct the pilot channel. Allice “called [ Lanza ] for the

next eight months . . . every couple of weeks . . . asking for dirt,” but each

time Lanza assured Allice

that he would bring it in “later.” After

eight months of Allice Trading asking Lanza for dirt, Lanza informed Allice that because the detention pond “may need to hold

additional water,” Allice Trading was no longer

required to fill in the detention pond or construct the pilot channel.

Because

Allice Trading had “been waiting all this time to

finish . . . the pilot channel,” which was no longer required ,

it sought payment on the final invoice and “tried to bill the job.” Allice noted that $31,229.21

was due on the invoice, and he “discounted” it $3,000 to account for the fact

that the pilot channel was not constructed, at a cost of approximately $1,678,

and the driveway was not removed. Allice sent to Little York invoices demanding payment of

$28,229.21, but, when he went to Little York’s office, Nasr told him to “get a

lawyer and sue” because Allice Trading had “walked

off the job.” On cross-examination, Allice admitted that he had negotiated the original

contract with Nasr, not Lanza . He also admitted that the pond lacked a

“restrictor pipe,” but he asserted that this was not brought to his attention

until the trial.

Lanza testified that he had never represented that he was

authorized to modify the contract between Allice

Trading and Little York. He did not tell

Allice not to remove the driveway, not to fill in the

detention pond, or not to construct the pilot channel. Lanza also did not

agree to obtain the dirt to fill in the detention pond. He explained that Allice

Trading should have obtained the dirt to fill in the detention pond and

submitted a change order to seek compensation from Nasr. On cross-examination, Lanza

admitted that he was at the project site about “every other day.”

Nasr testified

that he was the only person from Little York with the authority to modify the parties’

contract and, at the outset, their agreement was for Allice Trading to take any dirt needed for the rest of the

project out of the detention pond. Allice Trading was then to determine how much dirt it

needed to fill in the detention pond and give Nasr a change order for any

needed dirt. When Allice

contacted Nasr eight months after “walk[ ing ] away

from the project,” Nasr told him to “come finish the job” and only then would Allice Trading “get paid in full.” Nasr held the remaining 10% of the contract

price as retainage “in case the contractor does not show up at the end,” a

practice common in the construction industry.

He asserted that as a result of Allice Trading

leaving the detention pond unfinished, it would cost approximately $40,000 to

fully complete the detention pond.

The

jury found that both Allice Trading and Little York

had failed to comply with their agreement but Allice

Trading’s failure was excused. The jury also

found that Allice Trading’s breach was not material

while Little York’s breach was material.

The jury further found that a sum of $28,229.21 would fairly and

reasonably compensate Allice Trading for Little

York’s unexcused failure to comply with the agreement. Based on the jury’s findings, the trial court

entered judgment in favor of Allice Trading, awarding

it $28,229.21 on its breach-of-contract claim.

Little York filed a motion for a judgment notwithstanding the verdict

and a motion for new trial, arguing that the evidence is legally and factually

insufficient to support the verdict and the jury’s damage award is excessive.

Sufficiency of the Evidence

In its

first issue, Little York argues that the evidence is legally and factually

insufficient to support the jury’s findings because it is “undisputed” that Allice Trading committed the first material breach by

abandoning the project and, as a result, Allice

Trading could only recover on a theory of substantial performance for which it

did not plead or request a jury issue. In its second issue, Little York

argues that the evidence is legally and factually insufficient to support the

jury’s damage award because Allice’s testimony

regarding the cost of completion of the pilot channel was based on an

“approximate guess” and “speculative testimony.”

We

will sustain a legal-sufficiency or “no-evidence” challenge if the record shows

one of the following: (1) a complete absence of evidence of a vital fact, (2)

rules of law or evidence bar the court from giving weight to the only evidence

offered to prove a vital fact, (3) the evidence offered to prove a vital fact

is no more than a scintilla, or (4) the evidence establishes conclusively the

opposite of the vital fact. City of Keller v. Wilson , 168 S.W.3d 802, 810 (Tex. 2005).

In conducting a legal-sufficiency review, a “court must consider evidence in

the light most favorable to the verdict, and indulge every reasonable inference

that would support it.” Id. at 822 . The term “inference” means,

In the law of

evidence, a truth or proposition drawn from another which is supposed or

admitted to be true. A process of

reasoning by which a fact or proposition sought to be established is deduced as

a logical consequence from other facts, or a state of facts, already proved. .

. .

Marshall Field Stores,

Inc. v. Gardiner , 859 S.W.2d 391, 400 (Tex. App.—Houston

[1st Dist.] 1993, writ dism’d w.o.j .)

( citing Black’s

Law Dictionary 700 (5th ed. 1979)).

For a jury to infer a fact, “it must be able to deduce that fact as a

logical consequence from other proven facts.”

Id .

If there is more than a scintilla of evidence to

support the challenged finding, we must uphold it. Formosa Plastics Corp. USA v. Presidio Eng’rs

& Contractors, Inc. , 960 S.W.2d 41, 48 (Tex. 1998). “‘[W]hen the evidence offered to prove a

vital fact is so weak as to do no more than create a mere surmise or suspicion

of its existence, the evidence is no more than a scintilla and, in legal

effect, is no evidence.’” Ford Motor Co. v. Ridgway , 135 S.W.3d

598, 601 (Tex. 2004) (quoting Kindred v.

Con/ Chem , Inc. , 650 S.W.2d 61, 63 (Tex.

1983)). However, if the evidence at

trial would enable reasonable and fair-minded people to differ in their

conclusions, then jurors must be allowed to do so. City of

Keller , 168 S.W.3d at 822 ; see also King Ranch, Inc. v. Chapman ,

118 S.W.3d 742, 751 (Tex. 2003). “A

reviewing court cannot substitute its judgment for that of the trier-of-fact,

so long as the evidence falls within this zone of reasonable disagreement.” City of

Keller , 168 S.W.3d

at 822 .

In a factual-sufficiency review, we must examine both the

evidence supporting and contrary to the verdict. See Dow Chem. Co. v.

Francis ,

46 S.W.3d 237, 242 (Tex. 2001); Plas –Tex,

Inc. v. U.S. Steel Corp. , 772 S.W.2d 442, 445 (Tex. 1989). We note that the jury is the sole judge of the

witnesses’ credibility, and it may choose to believe one witness over another;

a reviewing court may not impose its own opinion to the contrary. See Golden Eagle

Archery, Inc. v. Jackson , 116 S.W.3d 757, 761 (Tex. 2003). In our review of the factual sufficiency of

the evidence, we must consider and weigh all of the evidence, and we will set

aside a verdict only if the evidence is so weak or the finding is so against

the great weight and preponderance of the evidence that it is clearly wrong and

manifestly unjust. Pool

v. Ford Motor Co. , 715 S.W.2d 629, 635 (Tex. 1986).

Breach

of Contract

In order to prevail on its breach-of-contract

claim, Allice Trading was required to prove (1) the

existence of a valid contract between it and Little York, (2) its performance

or tender of performance, (3) Little York’s breach of the contract, and (4) its

damages as a result of the breach. Prime

Prods., Inc. v. S.S.I. Plastics, Inc. , 97 S.W.3d

631, 636 (Tex. App.—Houston [1st Dist.] 2002, pet. denied). “A breach of contract occurs when a party

fails or refuses to do something he has promised to do.” B & W Supply, Inc. v. Beckman , 305 S.W.3d 10, 16 (Tex.

App.—Houston [1st Dist.] 2009, pet. denied).

Little York argues that because Allice Trading abandoned the project in January 2009,

leaving the detention pond unfinished, Allice Trading

committed the first breach of the contract.

As a result, Little York asserts that Allice

Trading would have to recover under the doctrine of substantial performance. However, the jury found that any breach by Allice Trading was excused and Little York’s failure to

comply with the agreement was material.

The trial court instructed the jury that a failure to comply with an

agreement may be excused by “the other party’s previous failure to comply with

a material obligation of the . . . agreement” or by “the other party’s prior

repudiation of the . . . agreement.”

Thus, within its substantial-performance argument, Little York

challenges the sufficiency of the evidence supporting the jury’s finding that

any breach by Allice Trading was excused.

Allice

Trading argues that the evidence supports the jury’s finding that Allice Trading’s breach of the contract was excused. It asserts that it completed its obligations

with the exception of the pilot channel and its failure to construct the pilot

channel was excused either by Little York’s failure to supply the necessary

materials under the contract or Little York’s repudiation of the contract.

A material breach by one party to a

contract can excuse the other party from any obligation to perform. Mustang Pipeline Co. v. Driver Pipeline

Co. ,

134 S.W.3d 195, 196 (Tex. 2004) (per curiam) (“It is a fundamental principle of

contract law that when one party to a contract commits a material breach of

that contract, the other party is discharged or excused from further performance .”). The materiality of a breach, i.e., the question

of whether a party’s breach of a contract will render the contract unenforceable,

generally presents a dispute for resolution by the trier of fact. See Cont’l

Dredging, Inc. v. De– Kaizered , Inc. , 120 S.W.3d

380 , 394–95 (Tex. App.—Texarkana 2003, pet. denied) (citing Hudson v.

Wakefield ,

645 S.W.2d 427, 430 (Tex. 1983)).

There are five significant factors to

consider in determining whether a failure to perform is material:

(a) the extent

to which the injured party will be deprived of the benefit which he reasonably

expected;

(b) the extent

to which the injured party can be adequately compensated for the part of that

benefit of which he will be deprived;

(c) the extent

to which the party failing to perform or to offer to perform will suffer

forfeiture;

(d) the

likelihood that the party failing to perform or to offer to perform will cure

his failure, taking account of the circumstances including any reasonable

assurances;

and

(e) the extent to which the behavior of

the party failing to perform or to offer to perform comports with standards of

good faith and fair dealing. [ [1] ]

See

Mustang Pipeline ,

134 S.W.3d at 200 (quoting Restatement

(Second) of Contracts § 241 (1981)).

A

contractor who is unjustifiably prevented by an owner from finishing his work

may sue and recover as provided by the contract. Farris v. Smith Erectors, Inc. , 516 S.W.2d 281, 283 (Tex.

App.—Houston [1st Dist.] 1974, no pet.).

Also, delay caused by an owner on a construction project may constitute

a breach of contract. See, e.g., Beard Family P’ship

v. Commercial Indem . Ins. Co. , 116 S.W.3d

839, 847 (Tex. App.—Austin 2003, no pet.) (holding that owner

breached contract for construction project when owner’s initial plans were

inadequate and required several revisions over course of project); see also Anderson Dev. Corp. v. Coastal

States Crude Gathering Co. , 543 S.W.2d 402, 406 (Tex. Civ. App.—Houston

[14th Dist.] 1976, writ ref’d n.r.e.) ( holding that

contractor’s failure to timely perform under contract was excused when it was

prevented from timely performing by owner).

Here, there is

evidence that Little York prevented Allice Trading

from completing its contract. Allice testified that the two parties had agreed that

Little York would supply the necessary dirt, and it submitted into evidence a

change order removing the cost of dirt from the amount due to Allice Trading. And,

when Allice Trading’s only remaining obligation was

to install the pilot channel in the detention pond, Lanza

told him to remove dirt from the detention pond. Little York then failed to supply the dirt

needed to fill in the detention pond, halting its completion. Lanza , who had been

directing the contractors on site, then informed Allice

Trading that Little York no longer needed the detention pond to be

completed.

Viewing this evidence

in the light most favorable to the verdict, we conclude that the jury could

have reasonably found that Little York committed the first breach of the

contract, either by failing to supply the necessary materials or by repudiating

Allice Trading’s remaining obligations. See Farris ,

516 S.W.2d at 283 .

Furthermore, considering all of the evidence, we cannot conclude that

the evidence supporting the jury’s findings is so weak that the findings are

clearly wrong and manifestly unjust. See Pool , 715 S.W.2d at 635 .

Little York asserts that it is “undisputed” that Allice Trading committed the first material breach and the

jury’s answers do not reflect a finding that Little York was the first to

materially breach the contract. The jury

found that both parties breached the contract, but, in Question 2, further

found that Allice Trading’s breach was

“excused.” Question 2 included an

instruction that a “[f] ailure to comply by a party is

excused by the other party’s previous failure to comply with a material

obligation of the same agreement.” We

conclude that the evidence presented supports the jury’s implied finding that

Little York committed the first material breach.

Little York argues that Allice

Trading is nevertheless precluded from recovering on its breach-of-contract

claim because it is undisputed that Allice Trading breached

the contract by failing to complete the detention pond, which was “essential to

the project.” In support of this

argument, Little York relies on Atkinson

v. Jackson Bros. , 270 S.W. 848 (Tex. 1925).

In Atkinson , the Texas Supreme

Court held that in order to recover on its breach-of-contract claim, a

“contractor must have in good faith intended to comply with the contract” and

any defects could not be “pervasive” or “a deviation from the general plan

contemplated for the work.” Id. at 851 . However, in Atkinson , the defendant’s only breach was a failure to fully pay

for lumber and materials that the plaintiff had already acquired for the

job. Id. at 848–49. Here, in contrast, the jury found that Little

York had committed the first breach of the contract and any failure by Allice Trading to comply with the contract was a result of

Little York’s prior breach or repudiation.

“Substantial

performance is a doctrine that allows breaching

parties who have substantially completed their obligations to recover on a

contract,” but a lack of substantial performance does not preclude recovery for

a breach of contract when the other party has committed the first material

breach. Tips v. Hartland Developers, Inc. , 961

S.W.2d 618, 623 (Tex. App.—San Antonio 1998, no pet.). For example, in Tips , the plaintiff alleged that the defendant had failed to make

the final payment on a construction contract, although he had not completed

some of the requirements under the contract himself. Id. at 620–21. The

Fourth Court of Appeals conceded that the plaintiff had not substantially

performed under the contract but found substantial performance “irrelevant to

the resolution of [the] case.” Id. at 623 . Because the plaintiff was injured by the

defendant’s anticipatory breach, it could sue for damages under a

breach-of-contract theory, despite not having substantially performed

itself. Id. In such a case, “[a]

contractor can recover on a contract when the failure to substantially perform

is the fault of the other party.” Id. ;

see also Fuentes v. San Anastacio Dev. Ltd. , No.

13-08-00743-CV, 2010 WL 2967158 , at *2–3 (Tex. App.—Corpus Christi July 29,

2010, no pet.) ( mem . op.)

(holding that because jury found that defendant committed first material

breach, plaintiff did not have to obtain jury finding on its substantial

performance); Flood Control Dist. v.

Calgary Inc. , No. 05-01-01462-CV, 2002 WL 1495017 , at *1–2 (Tex.

App.—Dallas July 15, 2002, no pet.) ( mem .

op.) ( not designated for publication) (“The trial

court’s determination that the [defendant] breached the contract first renders

whether [the plaintiff] substantially performed immaterial.”).

Likewise, here,

although the jury found that Allice Trading had

breached the contract, the issue of Allice Trading’s

substantial performance was irrelevant because the jury further found that any

breach by Allice Trading was excused by Little York’s

prior material breach. Because the jury

found that Little York committed the first material breach, and the evidence supports

that finding, Allice Trading was relieved from the

obligation of further performance. See Mustang Pipeline Co. , 134 S.W.3d at 196 .

Accordingly, we hold that Allice Trading was

not required to prove its substantial performance under the contract.

We overrule Little York’s first issue.

Damages

In its second issue, Little York argues that the evidence is legally and

factually insufficient to support the jury’s damages award because Allice’s testimony regarding the cost of completion for the

pilot channel was based on an “approximate guess” and “speculative testimony.” Little York asserts that the only competent

evidence of the cost of completion was given by Nasr, who testified that it

would cost about $40,000 for him to complete the detention pond.

In

support of this argument, Little York relies upon Malone v. E.I. du Pont de Nemours & Co. , 8 S.W.3d 710 (Tex.

App.—Fort Worth 1999, pet. denied). In Malone , the court held that the

plaintiff had submitted no evidence on the issue of damages for lost profits

where the defendant had allegedly sold him defective paint. Id. at 715–16. The

plaintiff testified that he had “bought about 100,000 gallons of paint and

about 5,000 gallons was bad and it cost me about $1 a gallon.” Id. at 716 . He

further testified that his estimate of 5,000 gallons of paint being defective

was “pulled out of the air” and “purely a guess.” Id.

Here,

Allice provided a more detailed breakdown of the

specific costs involved. Allice testified that the pilot channel would cost him

about $1,678 dollars to complete at the time that he was instructed that it was

no longer needed. To arrive at this

number, he calculated that he would have needed about $700 worth of concrete,

$95 worth of steel, $145 worth of two-inch-by-four-inch pieces of lumber, and

about $150 per day for labor. He

estimated that removing the driveway would cost $135 to procure the necessary

dump trucks and installing the restrictor pipe for the detention pond would

cost $200, arriving at a total cost of completion of approximately $2,000. Allice rounded the

number up to $3,000 when asked about the retainage. Although he, on cross-examination, testified

that the $3,000 figure was an “approximate guess” in that it was a “lump sum”

of the required cost for the pilot channel, driveway removal, and restrictor

pipe, his earlier testimony was more precise and was sufficient for the jury to

rely upon it in calculating the damages, unlike the inadequate testimony in Malone .

Viewing the evidence in the light most favorable to the jury’s award, we

conclude that the jury could have reasonably found that an award of $28,529.21

would compensate Allice Trading for Little York’s

breach of contract. We further conclude

that the evidence that supports the jury’s award is not so weak as to render

the award clearly wrong and manifestly unjust.

Accordingly, we hold that the evidence is legally and factually

sufficient to support the jury’s damage award.

We

overrule Little York’s second issue.

Rebuttal Testimony

In its third issue, Little York argues that

the trial court erred in not allowing it sufficient time to call rebuttal

witnesses because it asserts that it was prevented from challenging portions of

Allice’s testimony that were inconsistent with his

previous answers in discovery. As a

result, Little York asserts, this “handcuffed [it] from presenting a complete

case.”

A complaint is not

preserved for appellate review unless it was made to the trial court “with

sufficient specificity to make the trial court aware of the complaint.” Tex. R. App. P. 33.1(a). To preserve error in regard to the exclusion

of evidence, an offer of proof must be specific enough to enable the reviewing

court to determine the admissibility of the disputed evidence. Hooper

v. Chittaluru , 222 S.W.3d 103, 107 (Tex.

App.—Houston [14th Dist.] 2006, pet. denied); In re N.R.C. , 94 S.W.3d 799, 806 (Tex. App.—Houston [14th Dist.]

2002, pet. denied). Error may not be

predicated on the exclusion of evidence unless a party’s substantial rights are

affected and “the substance of the evidence was made known to the court by

offer, or was apparent from the context within which questions were

asked.” Wade v. Comm’n for Lawyer Discipline , 961

S.W.2d 366, 374 (Tex. App.—Houston [1st Dist.] 1997, no pet.); Tex. R. Evid .

103(a )( 2).

At the beginning of the trial, the

trial court asked both parties about the amount of time that they needed to

call their witnesses, cross-examine the other parties’ witnesses, call rebuttal

witnesses, and make closing arguments, allotting each side one hour and

forty-five minutes per their agreement.

After Allice’s testimony, the trial court informed

Little York that it had used one hour and five minutes of its allotted time

during its cross-examination of Allice . Little York informed the trial court that it

had “woefully underestimated the time that [it] need[ ed ]” and explained that it would need more time to

“call a rebuttal witness” later in trial.

The trial court denied this request, but it kept both parties informed

of their remaining time at the conclusion of each witnesses’

testimony and before their closing arguments.

Although Little York now asserts that it needed more time to call Allice as a rebuttal witness to point out inconsistencies

with his testimony and his discovery responses, [2] at trial it requested only that it

call “a rebuttal witness” without identifying the witness or its proposed line

of questioning. Under these

circumstances, we hold that Little York did not make the substance of its

proposed rebuttal testimony known with sufficient specificity and it has not

preserved this issue for our review. See Tex.

R. App. P. 33.1(a).

We overrule Little York’s third issue.

Conclusion

We affirm

the judgment of the trial court.

Terry

Jennings

Justice

Panel

consists of Justices Jennings, Sharp, and Brown.

[1]

The trial court’s charge tracked

four of these five factors to aid the jury in determining the materiality of

the breach, omitting only “the extent to which the party failing to perform or

to offer to perform will suffer forfeiture.”

[2]

We also note that Little York

had already spent a substantial amount of its time during cross-examination

confronting Allice with his previous responses in

discovery.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.