Opinion

James A. West, P.C. v. George A. Pugh

Court
Texas Court of Appeals, 1st District (Houston)
Filed
Jun 27, 2013
Status
Published
Cited by
0 cases
Authority
More cited than 42.1%

holding that pleading gave fair notice of affirmative defense of implied warranty of suitability because basis for defense included landlord’s failure to repair latent defects in leased premises

How later courts described this case

  • holding that pleading gave fair notice of affirmative defense of implied warranty of suitability because basis for defense included landlord’s failure to repair latent defects in leased premises

Written by the judges who cited it.

The opinion

Opinion issued June 27, 2013

In The

Court of Appeals

For The

First District of Texas

————————————

NO. 01-12-00133-CV

———————————

JAMES A. WEST, P.C., Appellant

V.

GEORGE A. PUGH, Appellee

On Appeal from the 269th District Court

Harris County, Texas

Trial Court Case No. 2009-80309

MEMORANDUM OPINION

Appellant James A. West, P.C. appeals the trial court’s take-nothing

judgment on a breach-of-contract claim against his former client, appellee George

A. Pugh, after a bench trial. In five issues, West contends that because Pugh did

not plead the affirmative defense of prior material breach and the issue was not

tried by consent, the trial court erred in finding that Pugh had cause to terminate

the contract.

We affirm.

Background

In December 2008, George Pugh was struck by a drunk driver as he left the

St. Regis Hotel. Pugh suffered serious injuries and permanent impairment as a

result of this accident. The driver, James Dugan, who had previously been

convicted of intoxication manslaughter, had become intoxicated while attending

holiday parties at the hotel that were sponsored by his employer, National Oilwell

Varco (NOV). The car he was driving when he struck Pugh was leased to NOV.

At the time of the accident, Pugh was working for attorney James West in an

administrative capacity. West, whose law practice centered on collections (not

personal-injury lawsuits), offered to represent Pugh. In May 2009, they entered

into a contingency-fee agreement. Approximately seven months later, West filed

suit against Dugan for negligence and gross negligence and against the hotel for

premises and dram-shop liability. Seven months later, NOV was added as a

defendant, and four months after that Ace Parking Management, Inc., who ran the

valet service at the hotel, was also added as a defendant.

2

On January 20, 2011, the trial court granted a motion for continuance filed

by Ace Parking. The order set the case for trial on September 5, 2011 and stated,

“No further continuances for incomplete discovery will be granted.” In April

2011, West terminated Pugh’s employment due to downsizing of the firm. Pugh

testified that he was not upset by the termination, saying, “It was a reduction in

force, and I understood.”

In May 2011, Pugh settled with the hotel and Ace Parking. * The same

month, West sent a demand letter to Jarrett E. Garner, the attorney representing

Dugan and NOV, seeking to settle Pugh’s claims for $875,000. But NOV did not

respond to the settlement demand, and on June 30, 2011, West sent NOV

“Plaintiff’s First Requests for Production” and a request for disclosure. This was

the first set of written discovery sent to NOV.

Although West settled Pugh’s premises and dram-shop liability claims

against the hotel and the parking facility, Pugh testified that he was unhappy with

the level of communication and he believed that West was not devoting sufficient

attention to his case or zealously representing his interests. Pugh testified that he

had asked West why he delayed filing suit by approximately eight months after

*

On May 17, 2011, Pugh signed a release settling his claims against the hotel for

$50,000. On May 19, 2011, Pugh signed a release settling his claims against Ace

Parking Management, Inc. for $17,000. Both releases stated, “I am completely

satisfied with the above compromised settlement, with the services of the law firm

and my attorney and with the amount of the fee charged and with the expenses

listed above.”

3

Pugh signed the contingency-fee agreement. Pugh said that West told him that he

was “waiting for the criminal proceedings against Dugan.” Pugh also said that he

had concerns that West was not aggressively pursuing his case. At West’s request,

Pugh spoke to his treating physician about preparing a written narrative. Pugh

testified that when he reported back that the narrative would cost $500, West

decided not to pursue it. Again, Pugh became concerned about his lawsuit because

“[i]t did not appear that he was willing to spend the time or spend the money to

pursue my case.” Pugh also testified that West spent only 30 minutes preparing

him to be deposed by the defendants. He said that he was not informed about

certain actions that West took, such as filing motions for continuance. He testified

that West pressured him to accept the settlement offers from the hotel and parking

facility, despite Pugh’s request for more time to consider the offers.

In late June 2011, Pugh confronted West about his case:

On June 24th, I had—previous to that date, Mr. West had

gotten my deposition back from the other lawyers; and he had asked

me to come get it, take home, read it, review it, see if I had any

problems with it or whatever. I had taken it back to him on Friday,

June 24th, and told him I had no problems with it; and we were sitting

there simply discussing things . . . just very general terms about the

case. He told me at that time that he had sent a demand for 850 to the

opposing law firm. I had asked him, I said I thought we were going to

request a million; and he said, well, he was going to settle for 850

because he didn’t think they would negotiate on a million.

I advised him that I probably was not going to come off that

much. That wasn’t giving us a whole lot of negotiation room, and I

was not going to come off that number very much. At this point he

4

said, “Well, you’ve just wasted a month of my time. We might as

well go to trial. You need to get the hell out of my office.”

And I asked him, “I need to know this. Are you still in this?

Are you still going to do this?”

He proceeds to stand up—and excuse me, You Honor—and

tells me, “You need to get the F out of my office. I’m about to put a

boot up your ass.” I stood up and walked out of the office.

Approximately a week later, Pugh terminated West’s representation in a

letter that stated: “Based on your actions, behavior, and conduct you are fired for

cause. Do not perform any more work or incur additional expenses relative to this

case.” At that time, West had represented Pugh for approximately 785 days. Pugh

engaged new counsel, but West opposed their substitution on the basis that he was

still entitled to his one-third contingency fee in any further recovery Pugh might

obtain. In early August 2011, West communicated to Pugh that NOV had offered

to settle his claims for $70,000.

Meanwhile, Pugh’s new attorneys represented him for approximately two

months, during which time they took three depositions, proved up medical and

billing records, obtained a life care plan report, took a video deposition for trial

substantiating $160,000 in future medical costs, and served a 32-page designation

of expert witnesses. They also defended a motion for summary judgment and

participated in mediation. As a result of these efforts, Pugh settled his claims with

NOV for $375,000 several days before trial.

5

Just before the mediation, West intervened in the lawsuit, seeking to recover

his contingency fee from any further recovery that Pugh would obtain. In response

to the petition in intervention, Pugh filed an answer with a general denial and a

counterclaim based on breach of contract and breach of fiduciary duty, seeking to

recover the attorney’s fees that West previously earned for the settlements with the

hotel and the parking facility. At no time, however, did West file any special

exceptions pertinent to Pugh’s counterclaims.

The case on West’s claims in intervention proceeded to trial before the court.

At trial West testified about the contingency-fee contract and said that he would

have completed all the necessary work before trial if Pugh had not discharged him.

However he also testified to a number of actions that he had not yet taken at the

time that Pugh discharged him. He testified that he had received copies of the

hotel’s “safe harbor certificates” pertinent to Pugh’s dram-shop claims, and he said

he spoke to two bartenders after filing suit. But he said he could not locate any of

the employees who had worked the night of Pugh’s accident to take depositions or

determine what had actually happened. Though he said his strategy was to depose

Dugan, the driver, before taking any other depositions, he conceded that he took no

depositions at all before settling Pugh’s claims with the hotel and Ace Parking.

And he did not take Dugan’s deposition until April 26, 2011, nearly a year and a

half after filing suit. At the time Pugh settled with the hotel and parking facility,

6

West also had not scheduled depositions of any NOV employees. He said that he

“was having a good relationship with the NOV lawyer” and that he intended to

take seven or eight depositions beginning in July 2011, though he had not actually

scheduled them. West testified that he was aware that an off-duty police officer

had witnessed the accident, but he did not depose the officer because “[h]e

wouldn’t respond to any phone calls; he wouldn’t respond to any letters. I didn’t

want to just subpoena him out of the blue until we needed to because that kind of

makes police officers hostile.” West designated Pugh’s treating physician as the

medical expert in this case, but he conceded that he never spoke to him directly.

West said he could not reach the doctor by phone. Though West had not obtained

affidavits proving-up Pugh’s medical or billing records, he testified that he was

waiting until Pugh had completed all of his medical therapies and procedures and

he said that his intention was to depose the doctor and prove-up the medical

records if they were unable to settle with Dugan and NOV. Finally, despite the

court’s order that no further continuances would be granted to complete discovery,

West believed that NOV would file a motion for continuance and the court would

grant it.

Nearly all of Pugh’s testimony regarding his dissatisfaction with West’s

performance was admitted without objection. Only when Pugh was specifically

asked why he dismissed West and sought other legal counsel did West object on

7

the grounds that prior material breach of contract is an affirmative defense that

must be specifically pleaded under Texas Rule of Civil Procedure 94. West argued

that because Pugh did not specifically plead that affirmative defense, he should be

precluded from introducing any evidence pertaining to it:

West: Your Honor, I’m going to object to any testimony as to

why he did this [terminated West as his lawyer]. Under

Rule 94, anything trying to void the matter would require

an affirmative pleading. They’ve only given a general

denial in this matter. Why would he breach a contract or

terminate a contract certainly would be an affirmative

pleading, a defense that—and absent a pleading, he is not

allowed to assert it.

The case law is clear. He can talk about the contract, but

as to why he did it would have been an affirmative

defense as to why the plaintiff should not be awarded.

And good case law says: Such defenses as opposed to a

general denial of the proposition to which a defendant

may assert to defeat in a prima facie case made by the

plaintiff—and he has not pled. All he has pled is a

general denial. So he should not be able to present any

affirmative defense as to why he believes he should be

able to terminate the contract.

In response, Pugh argued that his answer to the question was relevant to his

breach of contract and breach of fiduciary duty counterclaims, that the question of

the affirmative defense of prior material breach had been tried by consent

throughout the trial, and that West had the burden of proof to show that “he did not

do anything which caused the termination.” The trial court overruled West’s

objection. Pugh then explained, consistent with his prior testimony elicited

8

without objection, that he was frustrated with the lack of communication from

West and he believed that West was not zealously or aggressively representing

him.

In addition, Pugh’s trial attorney testified without objection about the state

of the case file when he substituted for West. Pugh’s attorney testified that he

believed certain discovery responses were inadequate and would have resulted in

exclusion of testimony favorable to Pugh at trial. He testified that his review of the

case file showed no indication that West had communicated with Pugh’s treating

physicians or that he had interviewed the bartenders. Trial counsel also testified

that he would have filed the civil suit immediately rather than waiting for the

criminal proceedings to end. He explained that a defendant facing both civil and

criminal liability for his actions might assert his Fifth Amendment rights in

response to videotaped deposition questions, and such a response could be

favorable to Pugh’s claims.

On cross-examination, West asked Pugh’s attorney about his substitution as

attorney of record. Pugh’s attorney recalled that West had asked them to “protect”

his interest in his contingency fee and that they declined to do that because it

would have conflicted with their duties to Pugh. West then offered into evidence

an email from Pugh’s lawyer, which stated, “Mr. Pugh’s position is that you were

discharged for cause and thus not entitled to recovery of any fee.”

9

Pugh also offered testimony from an expert on legal ethics, who testified

generally about a lawyer’s duty of diligence and the meaning of “neglect.” The

expert testified that he had heard all of the evidence presented in the case and it

was his opinion that Pugh had cause to terminate West as his attorney based on the

following justifications:

neglect, conscious disregard or inattentiveness involving a conscious

disregard for the responsibilities that James West, P.C. owed to Mr.

Pugh in this representation over an extended period of time; and . . .

the lack of communication that Mr. Pugh has testified to, the lack of

not only keeping him informed proactively but also being responsive

to his questions about the status and progress of the matter.

West did not object to this testimony at trial on the grounds that Pugh had failed to

plead the affirmative defense of prior material breach.

After the trial, the trial court sua sponte issued findings of fact and

conclusions of law. On appeal, West alleges that the following findings of fact are

not supported by admissible evidence:

35. James A. West P.C. was not diligent in prosecuting Mr. Pugh’s

case.

36. James A. West P.C. did not fulfill its obligation to respond to

reasonable inquiries from Mr. Pugh.

37. James A. West P.C. did not keep Mr. Pugh reasonably informed

regarding significant events in the lawsuit.

38. James A. West P.C. did not adequately explain important

matters in a manner so that Mr. Pugh could understand them.

39. Mr. Pugh had good cause to terminate his contingent-fee

agreement.

40. Mr. Pugh terminated the contingent-fee agreement for cause.

41. James A. West P.C. failed to comply with its obligations under

the contingent-fee contract.

10

42. James A. West P.C.’s failure to comply with its obligations was

material.

....

46. Mr. Pugh did not breach the contingent-fee contract.

West also challenges the following conclusions of law:

1. George Pugh had cause to terminate the contingent-fee contract

for representation with James A. West P.C. because the law

firm committed material breaches of the contract.

2. Because Mr. Pugh had cause for terminating the law firm, the

contractual claim for 1/3 fee of the recovery is unenforceable

and no further fee is owed to James A. West P.C. or Mr. West

beyond the fee already collected from the settlement with

Starwood Hotels and Resorts and Ace Valet Parking.

3. Alternatively and only in the event that Mr. Pugh is found to

have materially breached the contingent-fee contract, his breach

is excused by the prior material breach of James A. West, P.C.

4. James A. West P.C. should take nothing on its claim against

Mr. Pugh.

The trial court rendered judgment that West take nothing on his claim

against Pugh and that Pugh take nothing on his counterclaims against West. West

appealed.

Analysis

West argues that because Pugh failed to plead prior material breach as an

affirmative defense, the trial court should not have considered any of the evidence

of West’s prior material breach of the contingent-fee contract. West’s arguments

fail because Pugh specifically pleaded breach of contract and breach of fiduciary

duty in response to West’s petition in intervention and because evidence and

11

testimony pertaining to West’s prior material breach was admitted without

objection at trial.

“Texas follows a ‘fair notice’ standard for pleading, which looks to whether

the opposing party can ascertain from the pleading the nature and basic issues of

the controversy and what testimony will be relevant.” Horizon/CMS Healthcare

Corp. v. Auld, 34 S.W.3d 887, 896–97 (Tex. 2000); Commerce & Indus. Ins. Co. v.

Ferguson-Stewart, 339 S.W.3d 744, 748 (Tex. App.—Houston [1st Dist.] 2011, no

pet.). When no special exceptions have been sustained, we construe pleadings

liberally in favor of the pleading party. Horizon/CMS Healthcare Corp., 34

S.W.3d at 897; Commerce & Indus. Ins. Co., 339 S.W.3d at 748.

Rule 94 of the Texas Rules of Civil Procedure requires a party to expressly

plead those affirmative defenses listed in the rule “and any other matter

constituting an avoidance or affirmative defense.” TEX. R. CIV. P. 94. Prior

material breach of contract is an affirmative defense to a breach of contract claim.

See Tony Gullo Motors I, L.P. v. Chapa, 212 S.W.3d 299, 314 (Tex. 2006). Thus,

a party asserting that he should not be held liable for breach of contract because the

opposing party’s prior material breach excused his performance must plead and

prove the elements of prior material breach. See Compass Bank v. MFP Fin.

Servs., Inc., 152 S.W.3d 844, 852 (Tex. App.—Dallas 2005, pet. denied). If an

affirmative defense is not pleaded or tried by consent, it is waived. See RE/MAX of

12

Tex., Inc. v. Katar Corp., 961 S.W.2d 324, 327–28 (Tex. App.—Houston [1st

Dist.] 1997, pet. denied).

In response to West’s petition in intervention, Pugh purported to plead

counterclaims for breach of contract and breach of fiduciary duty. Pugh’s

responsive pleading, “Plaintiff’s Original Answer and Counter-Claim,” stated:

TO THE HONORABLE JUDGE OF SAID COURT:

COMES NOW, George A. Pugh, Plaintiff, in the above numbered and

entitled cause, and files this his Original Answer to Petition in

Intervention.

I. General Denial

Plaintiff enters a general[] denial [of] the allegations contained in

Petition in Intervention and demands strict proof thereof.

II. Counter-Claim

George Pugh hereby asserts a counterclaim. Mr. Pugh seeks recovery

of the one-third fee collected by Mr. West in the Ace Parking and St.

Regis Hotel settlements. The basis for the claim is Mr. West’s breach

of contract, breach of fiduciary duty and violation of rules governing

the conduct of attorneys in Texas.

WHEREAS, PREMISES CONSIDERED, George A. Pugh prays that

Intervenor be required to prove his allegation according to law and

that any of all relief prayed and sought by Intervenor be denied.

Plaintiff takes nothing by reason of this suit, and for all such other and

further relief, both general and special, at law and in equity to which

the Intervenor may show himself justly entitled.

West did not specially except to this pleading, and thus we construe it

liberally in favor of Pugh. See Horizon/CMS Healthcare Corp., 34 S.W.3d at 897;

Commerce & Indus. Ins. Co., 339 S.W.3d at 748. First, by pleading for recovery

13

of the fee West collected for settling claims before he was discharged as Pugh’s

attorney, Pugh necessarily alleged a prior material breach. See McGraw v. Brown

Realty Co., 195 S.W.3d 271, 275 (Tex. App.—Dallas 2006, no pet.) (“A petition is

sufficient if a cause of action or defense may be reasonably inferred from what is

specifically stated.”). Second, although Pugh stated that he “seeks recovery of the

one-third fee,” his prayer for relief did not seek to recover any specified amount.

Rather, his general prayer asked for denial of all relief sought by “Intervenor” and

requested that “Plaintiff take nothing by reason of this suit.” Construing this in

Pugh’s favor, we conclude that Pugh’s answer gave fair notice of his intent to raise

the affirmative defense of prior material breach. See My-Tech, Inc. v. Univ. of N.

Tex. Health Sci. Ctr., 166 S.W.3d 880, 884 (Tex. App.—Dallas 2005, pet. denied)

(stating that in absence of prayer for affirmative relief, pleading is an affirmative

defense not a counterclaim); see also McGraw, 195 S.W.3d at 275 (holding that

pleading gave fair notice of affirmative defense of implied warranty of suitability

because basis for defense included landlord’s failure to repair latent defects in

leased premises).

Moreover, a party may obtain a judgment on an unpleaded claim when it is

tried by consent. TEX. R. CIV. P. 67 (“When issues not raised by the pleadings are

tried by express or implied consent of the parties, they shall be treated in all

respects as if they had been raised in the pleadings.”). “Trial by consent is

14

intended to cover the exceptional case where it clearly appears from the record as a

whole that the parties tried the [unpleaded] issue.” RE/MAX of Tex., 961 S.W.2d at

328. To determine whether an unpleaded issue was tried by consent, we examine

the record not for evidence of the issue, but rather for evidence of trial of the issue.

See Pickelner v. Adler, 229 S.W.3d 516, 523 (Tex. App.—Houston [1st Dist.]

2007, pet. denied). A determination of trial by consent is applied with care and

never in a doubtful situation. Id. A party’s unpleaded issue may be deemed tried

by consent when evidence on the issue is developed under circumstances

indicating both parties understood the issue was in the case, and the other party

failed to make an appropriate complaint.” Moore v. Altra Energy Techs., Inc., 321

S.W.3d 727, 734 (Tex. App.—Houston [14th Dist.] 2010, pet. denied).

When Pugh was asked on direct examination why he dismissed West and

sought other legal counsel, West objected, arguing that Pugh’s failure to plead the

affirmative defense of prior material breach should foreclose this testimony. The

trial court overruled the objection. However, Pugh’s testimony that he was

unhappy with the communication, and that he felt that West was not adequately

representing his interests, was consistent with his prior testimony already admitted

without objection. More notably, West himself elicited testimony from Pugh’s

counsel and introduced into evidence an email that showed that Pugh had

dismissed West for cause and therefore believed he was not entitled to recover any

15

additional fee. No objection was raised to the testimony of Pugh’s expert on legal

ethics, who opined that West was not diligent and had neglected his duty in this

case. In fact, West thoroughly cross-examined the expert about diligence, neglect,

and cause for termination. Finally, West discussed Pugh’s reasons for dismissing

him in his closing statement. West said, “George Pugh testified that the reason he

terminated the contract was because he lost confidence that James A. West, P.C.

was serving his best interest.” Likewise, Pugh’s attorney focused on the prior

breach in his closing statement as well, saying, “This case is about whether or not

George Pugh had cause to terminate the contract.” West did not object to Pugh’s

closing based on any pleading defect.

Although some of the testimony regarding the course of litigation was

relevant to West’s breach of contract claim, other evidence admitted without

objection was relevant only to the affirmative defense of prior material breach,

such as expert testimony that Pugh had cause to dismiss West and the email stating

Pugh’s position that West was discharged for cause. The parties’ closing

arguments also focused on whether Pugh had cause to discharge West as his

attorney. Considering the record as a whole it is apparent that both West and Pugh

understood the issue of prior material breach was in the case and that this issue was

actually tried. See Pickelner, 229 S.W.3d at 523.

16

We hold that Pugh’s pleading, liberally construed, raised the affirmative

defense of prior material breach, and, in the alternative, we hold that the issue was

tried by consent. Although West states that “[t]here is no admissible evidence in

the record to justify the Court’s Findings of Fact Numbers 35-46 . . . or Court’s

Conclusions of Law Numbers 1, 2, 3, & 4,” he makes no sufficiency of the

evidence argument in his brief. Rather, all of his issues on appeal depend on his

argument about the alleged defect in Pugh’s pleading. In light of our holding, we

overrule all of West’s appellate issues.

Conclusion

We affirm the judgment of the trial court.

Michael Massengale

Justice

Panel consists of Justices Jennings, Bland, and Massengale.

17

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies