Opinion

United Copper Industries, Inc. and Texas Natural Resource Conservation Commission v. Joe Grissom

Court
Texas Court of Appeals, 3rd District (Austin)
Filed
May 18, 2000
Status
Published
Cited by
0 cases
Authority
More cited than 35.9%

The opinion

TEXAS COURT OF APPEALS, THIRD DISTRICT, AT AUSTIN

ON MOTION FOR REHEARING

NO. 03-99-00117-CV

United Copper Industries, Inc. and Texas Natural Resource

Conservation Commission, Appellants

v.

Joe Grissom, Appellee

FROM THE DISTRICT COURT OF TRAVIS COUNTY, 98TH JUDICIAL DISTRICT

NO. 98-06046, HONORABLE MARGARET COOPER, JUDGE PRESIDING

We withdraw our original opinion and judgment issued February 3, 2000, and

substitute this one in its place.

This is a suit for judicial review of a Texas Natural Resource Conservation

Commission (the "TNRCC" or "Commission") order granting an air quality permit application

submitted by United Copper Industries, Inc. ("United Copper") and denying Joe Grissom's

request for a preliminary adjudicative hearing on whether Grissom should be entitled to a

contested-case hearing on his challenge to the issuance of the permit in question. Upon judicial

review of the decision, the district court reversed the Commission's order and remanded the cause

to the Commission for a preliminary adjudicative hearing to provide Grissom an opportunity to

present competent evidence in support of his request. United Copper and the Commission appeal

the district court's judgment, citing three independent grounds for reversal. We will affirm.

BACKGROUND

In 1997, United Copper applied to the Commission for a permit to construct and

operate two copper melting furnaces in Denton, Texas. See Tex. Health & Safety Code Ann.

§ 382.0518 (West Supp. 2000). United Copper intended to use these facilities to produce

commercial grade copper rod that would be used to manufacture electrical wire and cable. In its

application, United Copper identified the types of emissions the furnaces would release into the

environment--primarily copper and lead particulate matter--and attached the results of an "air

dispersion computer model" indicating the maximum ground-level concentrations of the

contaminants that it predicted would result from its operations. After considering the application

and the attached research data, the TNRCC determined that the proposed facilities would not have

any negative impact on the health or property interests of the public in the surrounding area--a

finding that is necessary before the TNRCC may issue an air quality permit. See id.

§ 382.0518(b); 30 Tex. Admin. Code § 116.111 (2)(A)(i) (1999). United Copper then alerted the

public of its permit application by publishing a notice in a local newspaper and posting signs

around the proposed construction site as required by statute. See Tex. Health & Safety Code Ann.

§ 382.056 (West Supp. 2000).

Shortly thereafter, Grissom, who lives within two miles of the proposed facilities,

sent a letter to the TNRCC requesting a hearing on United Copper's permit application. (1) In his

written hearing request, Grissom expressed his concern about the negative effects he anticipated

the facilities would have on his health and the health of his two sons, all of whom suffer from

serious asthmatic conditions. In response to Grissom's letter, United Copper and the

Commission's executive director filed written replies urging the Commission to deny Grissom's

request for a hearing. See 30 Tex. Admin. Code § 55.26 (e) (1999) (permitting TNRCC executive

director, Office of Public Interest Council, and permit applicant to submit written responses to

hearing requests). In its response, United Copper maintained that Grissom's request should be

denied because: (1) Grissom did not have standing as an "affected person" to request a contested-case hearing, (2) the hearing request was "unreasonable," and (3) Grissom failed to present any

competent evidence in support of his request. The Commission's executive director , on the other

hand , contended in his response that although Grissom was an affected person based on the factors

set forth in the agency's rules , Grissom's request should nevertheless be denied solely on the

ground that it was "unreasonable." He argued that it was unreasonable because the

uncontroverted evidence United Copper submitted with its application established that the

emissions would probably not negatively affect Grissom, his family, or any other members of the

public. Grissom did not reply to the responses filed by United Copper and the Commission's

executive director, despite notice from the Commission that he was permitted to do so. Nor did

Grissom ever submit any evidence in support of his request.

Apart from the hearing request itself, the only item filed in support of Grissom's

request was a report issued by the Office of Public Interest Council ("OPIC"), a division of the

Commission that represents the public's interest. Citing its concern for procedural fairness, OPIC

recommended that the TNRCC grant Grissom's request. OPIC reasoned that if the Commission

refused to grant the request, Grissom would be denied due process because he would be denied

an opportunity to prove the merits of his case on the basis of evidence that he had not been given

a fair opportunity to present or refute.

The Commission gave Grissom and United Copper one month's notice of the public

meeting scheduled to evaluate and act on Grissom's hearing request. The notice stated that

Grissom was free to attend the meeting and might be called upon to answer any questions the

Commission might have; however, the notice provided that this was to be a formal meeting at

which no testimony would be taken. At this meeting and after reviewing Grissom's request and

the responses filed by United Copper, OPIC, and the Commission's executive director, the

Commission denied Grissom's hearing request after concluding that he had not satisfied the

requirements set out in the Commission's rules; it also granted the air quality permit United

Copper needed in order to construct and operate its furnaces.

Grissom proceeded to file suit in district court, seeking judicial review of the

Commission's decision. (2) Grissom contended that, at the very least, he was entitled to a

preliminary hearing where he would have an opportunity to offer competent evidence in support

of his request. The TNRCC responded with a general denial, and United Copper intervened to

protect its interest in the permit it had been granted. The district court ultimately agreed with

Grissom and decided that the Commission erred in determining that the hearing request was

unreasonable and not supported by competent evidence without first providing Grissom an

opportunity to present his evidence at a preliminary adjudicative hearing. In its final judgment,

the district court reversed the TNRCC's order and remanded the cause to the Commission for a

preliminary hearing at which Grissom would have the opportunity to present competent evidence

in support of his request.

United Copper and the Commission now appeal the district court's judgment,

maintaining that the Commission properly denied the hearing request because: (1) Grissom did

not have standing as an "affected person" to request a contested-case hearing, (2) the hearing

request was "unreasonable," and (3) Grissom failed to present any competent evidence in support

of his request.

STANDARD OF REVIEW

Grissom filed his request for a contested-case hearing in accordance with the Texas

Clean Air Act. See Tex. Health & Safety Code Ann. § § 382.001-.143 (West 1992 & Supp.

2000). Authority to sue the Commission under the Act is found in section 382.032(a), which

provides that "[a] person affected by a ruling, order, decision, or other act of the commission or

of the executive director . . . may appeal the action by filing a petition in a district court of Travis

County." Tex. Health & Safety Code Ann. § 382.032 (a) (West Supp. 2000) . When judicial

review of a decision is sought, the only issue for the court to decide is "whether the

[Commission's] action is invalid, arbitrary, or unreasonable." Id. § 382.032(e). This Court has

applied this unusual standard of review only once before. See Smith v. Houston Chem. Servs.,

Inc ., 872 S.W.2d 252 , 257 n.2 (Tex. App.--Austin 1994, writ denied). In Smith , we indicated that

this standard seems to imply the applicability of the scope of review set forth in the Administrative

Procedure Act (the "APA"). See id. ; Tex. Gov't Code Ann. § 2001.174 (West 2000). Because

the statutory grounds for reversal in the APA are legal questions subject to de novo review by a

court of appeals, we will treat as a question of law the issue here of whether the Commission's

order was invalid, arbitrary, or unreasonable . See Texas Dep't of Public Safety v. Doyle , 987

S.W.2d 897, 899 (Tex. App.--Fort Worth 1998, no pet.); cf. In re Humphreys , 880 S.W.2d 402,

404 (Tex. 1994).

DISCUSSION

The issue presented in this appeal is quite narrow. Our review is limited to the

confines of the district court's judgment granting Grissom a preliminary hearing to provide him

an opportunity to offer competent evidence in support of his request. Contrary to what appellants

suggest, the district court did not grant Grissom a contested-case hearing on the merits of his case

against United Copper's application; rather, the district court merely ordered the Commission to

provide Grissom a preliminary hearing where he would have a meaningful opportunity to offer

competent evidence in support of his request. It is this narrow decision that we are called upon

to review. We do not comment on the ultimate issue of whether the Commission should grant

Grissom's request for a contested-case hearing on the merits of his case against United Copper's

permit application.

The TNRCC is charged with the duty of administering many of the laws designed

to safeguard this state's environment and conserve its natural resources. This includes the crucial

task of overseeing the regulatory protection of the State's air quality. See Tex. Health & Safety

Code Ann. § 382.011 (West Supp. 2000). The legislature was undoubtedly mindful of the

magnitude of this responsibility when it enacted the Texas Clean Air Act (the "Act"), which

begins:

The policy of this state and the purpose of this chapter are to safeguard the

state's air resources from pollution by controlling or abating air pollution and

emissions of air contaminants, consistent with the protection of public health,

general welfare, and physical property, including the esthetic enjoyment of air

resources by the public and the maintenance of adequate visibility.

Id. § 382.002. The legislature mandates that the Act be "vigorously enforced." Id.

In furtherance of this policy, the Act requires that any person intending to

construct, modify, or operate a facility that may emit air contaminants first apply to the TNRCC

for an air quality permit which must be granted before that person may construct or operate the

facility. See id . §§ 382.051, .0518. Once the application is complete, the applicant must provide

the public with notice of its application. See id. § 382.056. This requirement affords individuals

who may be affected by the grant or denial of the permit a meaningful opportunity to voice their

concerns and participate in the permitting process by requesting a contested-case hearing on the

permit application.

Here, United Copper gave the required notice, and Grissom timely responded with

a written request for a hearing on the issue of whether the Commission should grant the permit.

At the time Grissom submitted his request in 1998, one of the statutes governing the hearing

process provided that "the commission or its delegate shall hold a hearing on the permit

application or permit renewal application before granting the permit or renewal if a person who

may be affected by the emissions . . . requests a hearing within the period set by commission

rule." Act of May 4, 1995, 74th Leg., R.S., ch. 149, § 2, 1995 Tex. Gen. Laws 996 , 997 ( Tex.

Health & Safety Code Ann. § 382.056 (d), since amended by Act of May 30, 1999, 76th Leg.,

R.S., ch. 62, § 11.04(c), ch. 1350, § 5(g), 1999 Tex. Gen. Laws 4570 , 4574) . Thus, to be

entitled to a hearing, the individual requesting it must be "a person who may be affected" by the

emissions that would result if the permit were granted.

In its first point of error, United Copper argues that Grissom is not a person who

would be affected by the proposed facility. An affected person is "one who has a personal

justiciable interest related to a legal right, duty, privilege, power, or economic interest affected

by the application." 30 Tex. Admin. Code § 55.29 (a) (1999). An interest that is common to

members of the general public does not qualify as a personal justiciable interest. See id . This

standard does not require parties to show that they will ultimately prevail on the merits; it simply

requires them to show that they will potentially suffer harm or have a justiciable interest that will

be affected. See Heat Energy Advanced Tech., Inc. v. West Dallas Coalition for Envtl. Justice ,

962 S.W.2d 288, 289 (Tex. App.--Austin 1998, pet. denied) (analyzing identical standard as

articulated in section 5.115(a) of Texas Water Code) .

In support of its contention, United Copper specifically cites two of the six factors

the TNRCC considers in determining whether an individual is an affected person. See 30 Tex.

Admin. Code § 55.29 (c)(1)-(6). The first factor demands consideration of "whether a reasonable

relationship exists between the interest claimed and the activity regulated." Id. § 55.29 (c)(3).

The second requires consideration of the "likely impact of the regulated activity on the health,

safety, and use of the property of the person." Id. § 55.29(c)(4). Although United Copper

presumably concedes that the serious health and safety concerns Grissom has raised are reasonably

related to the proposed regulated activity, it argues that Grissom is not an affected person because

United Copper's unrefuted evidence conclusively establishes that Grissom's health, safety, and

property will not be affected . We disagree.

Contrary to United Copper's contention, the modeling data (3) provided to the

Commission does not prove that Grissom and his family will not be affected. Rather, the data

merely suggests that Grissom may not be affected to a sufficient degree to entitle him to prevail

in a contested-case hearing on the merits of his case against United Copper's application. United

Copper confuses the preliminary question of whether an individual has standing as an affected

person to request a contested-case hearing with the ultimate question of whether that person will

prevail in a contested-case hearing on the merits. In essence, United Copper suggests that

Grissom should be required to prove that he will prevail in a contested-case hearing just to show

that he has the standing necessary to request such a hearing. We reject this argument here just

as we did in Heat Energy . See 962 S.W.2d at 295 .

In his hearing request, Grissom raised specific concerns about the possible negative

impacts that the copper plant could have on his health and the health of his family. As stated,

Grissom lives within two miles down-wind of the proposed facility, and he and his sons suffer

from serious asthma. United Copper's own data indicates that the operations will result in

increased levels of lead and copper at the site of Grissom's home and the elementary school one

of his sons attends. Considering Grissom's unique health concerns and his close proximity to the

proposed facility, we conclude that he is more likely than other members of the general public to

be adversely affected by the facility. Although the parties dispute the severity of the impact that

the emissions will have on Grissom and his family, it is clear that the Grissoms will be affected

to some degree. As even the TNRCC's executive director concluded, Grissom and his family

have a personal, justiciable interest affected by United Copper's application, and this interest is

different than that of the general public. (4) Thus, Grissom is a person who may be affected by the

permit as contemplated by the statute and the Commission's rules. We overrule appellants' first

point of error.

Having concluded that Grissom is an affected person, we next turn to the question

of whether his request was reasonable and supported by competent evidence. Although affected

persons generally are entitled to a hearing upon request, this right is qualified. In certain

circumstances, a hearing request shall not be granted, even if submitted by "a person who may

be affected":

The Commission shall not hold a hearing if the basis of a request by a

person who may be affected is determined to be unreasonable . Reasons for which

a request for a hearing on a permit amendment, modification, or renewal shall be

considered to be unreasonable include, but are not limited to, an amendment,

modification, or renewal that would not result in an increase in allowable emissions

and would not result in the emission of an air contaminant not previously emitted.

Act of May 4, 1995, 74th Leg., R.S., ch. 149, § 2, 1995 Tex. Gen. Laws 996 , 997 ( Tex. Health

& Safety Code Ann. § 382.056 (d), since amended) (emphasis added). Prior to its amendment in

1999, section 5.115 of the Texas Water Code went even further in qualifying a requestor's right

to a hearing: "The commission is not required to hold a hearing if the commission determines

that the basis of a person's request for a hearing as an affected person is not reasonable or is not

supported by competent evidence." (5) Act of May 28, 1995, 74th Leg., R.S., ch. 882, § 1, 1995

Tex. Gen. Laws 4380 , 4381 ( Tex. Water Code Ann. § 5.115 (a), since amended by Act of May

30, 1999, 76th Leg., R.S., ch. 1350, § 1, 1999 Tex. Gen. Laws 4570 ); see also 30 Tex. Admin.

Code § 55.27 (b)(2) (1999).

Citing these two statutory provisions, United Copper and the Commission argue

in their final two points of error that the Commission's decision to deny Grissom's request was

proper because the hearing request was both unreasonable and not supported by competent

evidence. We disagree. After carefully reviewing the facts, we are persuaded that the

Commission's decision was unreasonable because it denied Grissom a meaningful opportunity to

offer evidence in support of his request and a chance to refute the proof offered by United Copper.

It is undisputed that when Grissom submitted his request, he did not simultaneously

offer any evidence in support of his request. Despite this apparent failure to satisfy the burden

of offering competent evidence in support of his request, Grissom nevertheless argued--and the

district court agreed--that at the very least the Commission should have granted him a preliminary

hearing to provide him an opportunity to offer such evidence. Appellants counter that Grissom

had a sufficient opportunity to offer evidence and that he simply failed to take advantage of this

opportunity. They maintain that Grissom's failure to meet his burden of production resulted from

his own mistake and, furthermore, that his request was unreasonable in light of the evidence

United Copper introduced suggesting that the emissions would not significantly affect the

Grissoms.

Although appellants' argument appears persuasive on its surface, it ultimately fails

because it erroneously presupposes that Grissom had a meaningful opportunity to present the

necessary evidence. Furthermore, it disregards the confusing nature of the Commission's notices

and the language used in the Commission's own rule governing hearing requests. See 30 Tex.

Admin Code § 55.21(c), (d). While we remain mindful of the statutory provision requiring

Grissom to submit competent evidence in support of his request, we believe that individuals

requesting a hearing should be provided , at the very minimum, a fair and meaningful opportunity

to present such evidence. The fundamental ideals of fairness implicit in the rationale behind

providing public notices and opportunities for hearings demand this much. Basic due process

requires that when a decision maker is called upon to make a decision grounded on evidence, the

parties involved should be provided fair notice and a meaningful opportunity to present their

evidence. Given the facts of this case, we are convinced that because of the lack of clarity of the

Commission's notices and its rule governing hearing requests, Grissom was not provided a

meaningful opportunity to meet his burden of production. (6)

First, we observe that in the public notice United Copper published following the

submission of its application, Grissom was told that to request a hearing he must submit the

following:

(1) your name (or for a group or association, an official representative), mailing

address, daytime phone number, and fax number, if any; (2) the applicant's name

and permit number; (3) the statement "I/we request a public hearing"; (4) a brief,

specific statement of how and why emissions from the proposed facility would

adversely affect you in any way not common to members of the general public ; and

(5) the location of your property relative to the proposed facility.

(Emphasis added.) This notice makes no reference to any evidentiary requirement. Likewise, in

its written response to Grissom's request, the Commission never alluded to any need to offer

evidence , although it acknowledged receiving the request and explained how it would be

reviewed. Next, in a letter sent to Grissom and the other parties interested in United Copper's

permit application, the Commission stated that it would not permit any oral argument or public

comment at its formal meeting and indicated that its decision to grant or deny the hearing request

would be based on "the hearing request, written responses to the hearing request, any written

replies to those responses, and any responses to questions." Again, the Commission never

indicated that its decision might depend upon whether Grissom submitted evidence in support of

his request.

Finally, TNRCC's own administrative rule governing the submission of hearing

requests does not require those requesting hearings to submit evidence with their requests; i t

merely establishes the deadline by which hearing requests must be received and restates the same

requirements set out in the Commission's public notice, including the need to submit a "brief, but

specific, written statement" explaining how the requestor will be affected in a manner not common

to members of the general public. See 30 Tex. Admin. Code § 55.21 (c), (d). Grissom satisfied

these requirements. Therefore, based upon the notices in the record and the administrative rules

governing this cause, we hold that the Commission acted unreasonably in not granting Grissom

a preliminary hearing affording him a meaningful opportunity to present evidence. We overrule

appellants' final two points of error.

CONCLUSION

The Commission's decision to deny Grissom's request without first providing him

an opportunity to present evidence in support of his request, as well as a chance to rebut the

evidence produced by United Copper, was unreasonable. Our holding, however, is a narrow one

and is restricted to the facts of this case. We do not decide the issue of whether the Commission

should ultimately grant Grissom a contested-case hearing on the merits or whether United

Copper's permit application should be granted; those issues can only be decided after Grissom is

provided a preliminary hearing where he will have a meaningful opportunity to offer his own

evidence in support of his request, as well as the chance to rebut the evidence already submitted

by United Copper. Having overruled all of appellants' points of error, we affirm the district

court's judgment.

Mack Kidd, Justice

Before Justices Jones, Kidd and Patterson

Affirmed

Filed: May 18, 2000

Publish

1. Three other concerned residents in the area also filed hearing requests. Although their

hearing requests were also denied, these individuals did not seek judicial review of the TNRCC's

decision. The issue in this appeal is therefore limited to the denial of Grissom's request.

2. Initially, Citizens for Healthy Growth ("Citizens"), a local community action group

interested in protecting the local environment and aligned with Grissom, was also a party at the

district court level. However, the Commission and United Copper filed pleas to the jurisdiction

and successfully argued that Citizens lacked standing to bring suit. The district court granted the

pleas to the jurisdiction and dismissed Citizens' claims, leaving only Grissom's cause of action.

Citizens chose not to challenge the district court's ruling and is not a party to this appeal.

3. Air dispersion computer modeling is a method commonly used by the TNRCC, the United

States Environmental Protection Agency, and companies applying for air quality permits to

evaluate the possible impacts of emissions on humans and the environment. Air dispersion

computer modeling predicts the maximum ground-level concentrations of air contaminants at

various off-site locations, as would result from a facility's operations in the event the requested

permit were issued.

4. In his written response to the hearing requests filed by Grissom and three of Grissom's

neighbors, the Commission's executive director stated:

All four of the individuals expressed a personal justiciable interest affected

by the application, specifically concerns relating to air pollution and exacerbated

respiratory illnesses based upon the individuals' proximity to the proposed facility.

These interests are protected by the Texas Clean Air Act, and are not common to

members of the general public, as required by 30 [Tex. Admin. Code]

§ 55.29(a). . . . Accordingly, all four individuals requesting a hearing appear to

meet the criteria for 'affected person' under § 55.29(c).

5. When the former Texas Air Control Board and Texas Water Commission were merged and

became the Texas Natural Resources Conservation Commission in 1991, the body of statutory law

applicable to the TNRCC remained divided between the Texas Water Code and the Texas Health

and Safety Code. Here, all the parties agree that former section 5.115 of the Texas Water Code

and former section 382.056(d) of the Texas Health and Safety Code both govern Grissom's

hearing request.

6. Although we note that Grissom was pro se at the time he submitted his request, we do not

apply a different standard. See Scoville v. Schaffer , 9 S.W.3d 201, 204 (Tex. App.--San Antonio

1999, no pet.); Bailey v. Rogers , 631 S.W.2d 784, 786 (Tex. App.--Austin 1982, no writ) (both

holding pro se litigants to same standard as litigants represented by licensed counsel).

nt evidence. We overrule

appellants' final two points of error.

CONCLUSION

The Commission's decision to deny Grissom's request without first providing him

an opportunity to present evidence in support of his request, as well as a chance to rebut the

evidence produced by United Copper, was unreasonable. Our holding, however, is a narrow one

and is restricted to the facts of this case. We do not decide the issue of whether the Commission

should ultimately grant Grissom a contested-case hearing on the merits or whether United

Copper's permit application should be granted; those issues can only be decided after Grissom is

provided a preliminary hearing where he will have a meaningful opportunity to offer his own

evidence in support of his request, as well as the chance to rebut the evid