Opinion

Center for Biological Diversity v. Cal. Dept. of Forestry etc.

Court
California Court of Appeal
Filed
Dec 30, 2014
Status
Published
Cited by
0 cases
Authority
More cited than 33.8%

The opinion

Filed 12/2/14; pub. order 12/30/14 (see end. of opn.)

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FIRST APPELLATE DISTRICT

DIVISION FIVE

CENTER FOR BIOLOGICAL

DIVERSITY et al.,

Plaintiffs and Appellants,

v.

CALIFORNIA DEPARTMENT OF A138914

FORESTRY AND FIRE PROTECTION

et al., (Mendocino County Super. Ct.

Defendants and Respondents; No. SCUK-CVG-10-55593)

NORTH GUALALA WATER COMPANY

et al.

Real Parties in Interest and

Respondents.

The California Department of Forestry and Fire Protection (CAL FIRE) approved

a “Nonindustrial Timber Management Plan” (NTMP) authorizing logging on

approximately 615 privately held acres of north coast redwood and Douglas fir forest

located in Mendocino County. Appellants Center for Biological Diversity, Friends of the

Gualala River, and Coast Action Network (collectively Petitioners) initiated

administrative mandamus proceedings (Code Civ. Proc., § 1094.5) seeking to set aside

CAL FIRE’s approval of the NTMP, alleging violations of the California Environmental

Quality Act (CEQA; Pub. Resources Code, § 21000 et seq.)1 and the California

1

Undesignated statutory references are to the Public Resources Code.

1

Endangered Species Act (CESA; Fish & G. Code, § 2050 et seq.). Petitioners also sought

a writ of mandate (Code Civ. Proc., § 1085) and declaratory relief against the California

Department of Fish and Wildlife (DFW),2 alleging that DFW failed to fulfill its public

trust and statutory obligations by failing to object to the NTMP. The trial court denied

relief. We affirm.

I. BACKGROUND

The Forest Practice Act

Timberland use in California is governed in significant part by the Z’berg-Nejedly

Forest Practice Act of 1973 (§ 4511 et seq.; hereafter Forest Practice Act) and the Forest

Practice Rules promulgated by the State Board of Forestry (Cal. Code Regs., tit. 14,

§ 895 et seq.).3 The purpose of the Forest Practice Act is to regulate the use of

timberlands to ensure their productivity while also “giving consideration to values

relating to sequestration of carbon dioxide, recreation, watershed, wildlife, range and

forage, fisheries, regional economic vitality, employment, and aesthetic enjoyment.”

(§ 4513; see also § 4514, subd. (c).) These purposes are accomplished in part by

management of nonindustrial timberlands. (§§ 4593–4594.7.)

An NTMP, as provided in the Forest Practice Act, is a long-term plan for sustained

yield timber production which may be utilized by owners of less than 2500 acres of

timberland who are not primarily engaged in the manufacture of forest products.

(§ 4593.2.) The plan must be prepared by a registered professional forester (forester).4

(§ 4593.3; FP Rules, rule 895.1.) “[CAL FIRE] is the public agency initially charged

2

Formerly the Department of Fish and Game (Fish & G. Code, § 700).

3

Rule references cited as the Forest Practice Rules in text and as FP Rules

parenthetically are to title 14 of the California Code of Regulations.

4

A “professional forester,” is “a person who, by reason of his or her knowledge of

the natural sciences, mathematics, and the principles of forestry, acquired by forestry

education and experience, performs services, including, but not limited to, consultation,

investigation, evaluation, planning, or responsible supervision of forestry activities when

those professional services require the application of forestry principles and techniques.”

(§ 752, subd. (a).)

2

with the duty of determining whether or not a proposed timber harvesting plan

incorporates feasible silvicultural systems,[5] operating methods, and procedures to

substantially lessen significant adverse impacts on the environment. ([FP Rules,

rule 898.1(c)(1)].)” (Sierra Club v. State Bd. of Forestry (1994) 7 Cal.4th 1215, 1228

(Sierra Club).) CAL FIRE serves as the “lead agency” in conduct of environmental

reviews for such projects. (FP Rules, rule 1037.5(c).) The Forest Practice Rules require

CAL FIRE to establish interdisciplinary review teams to review plans and assist it in “the

evaluation of proposed timber operations and their impacts on the environment.” (Id.,

rule 1037.5) A DFW representative is to be included “when possible.”6 (Id., rule

1037.5(a).) DFW and other members of the review team serve in an “advisory capacity”

and “assist the Director” in determining if plans conform to the Forest Practice Act and

Forest Practice Rules. (Id., rule 1037.5(b).)

CAL FIRE’s approval of timber operations is generally subject to CEQA, but the

Forest Practice Act’s regulatory scheme has been certified for exemption from CEQA’s

requirements for preparation of an environmental impact report (EIR) before approval of

a project. (§ 21080.5; Sierra Club, supra, 7 Cal.4th at p. 1230.) The Forest Practice Act

and Forest Practice Rules together constitute a certified regulatory program under CEQA.

(Environmental Protection Information Center, Inc. v. Johnson (1985) 170 Cal.App.3d

604, 611.) An NTMP “functions as the equivalent of an EIR.” (Sierra Club, at p. 1230.)

“[A]s the functional equivalent of an EIR, a timber harvest plan must ‘provide public and

governmental decisionmakers with detailed information on the project’s likely effect on

the environment, describe ways of minimizing any significant impacts, point out

mitigation measures, and identify any alternatives that are less environmentally

5

“ ‘Silviculture’ is the theory and practice of controlling the establishment,

composition and growth of forests.” (FP Rules, rule 895.1.)

6

DFW, as trustee for state fish and wildlife resources, is also charged by statute

with consulting with lead and responsible agencies on CEQA projects and providing its

biological expertise in reviewing and commenting upon environmental documents and

impacts arising from project activities. (Fish & G. Code, § 1802.)

3

destructive.’ [Citation.]” (Ebbetts Pass Forest Watch v. California Dept. of Forestry &

Fire Protection (2008) 43 Cal.4th 936, 943.)

The Bower NTMP and Unit 9 Parcel

On October 29, 2008, real parties in interest John and Margaret Bower, Bower

Limited Partnership, and North Gualala Water Company (collectively Bower) submitted

a proposed NTMP to CAL FIRE, seeking authorization for timber harvesting activities in

an area of approximately 615 acres located adjacent to and to the north and northeast of

the town of Gualala. The plan was divided into 10 harvest units, across four CAL FIRE

planning watersheds (Roseman Creek, Big Pepperwood Creek, Doty Creek, and

Robinson Creek).7 Forest stands in the NTMP units generally range from young trees to

second and third growth redwood and Douglas fir forests, with scattered late seral8

“residual” components.

At issue here is CAL FIRE’s approval of (and DFW’s nonobjection to) logging

activity on an approximately 17-acre section of “Unit 9,” located in the Doty Creek

Watershed.9 Unit 9 covers approximately 84 acres in total, composed primarily of

second growth redwood and Douglas fir. The portion of Unit 9 that is the focus of this

litigation was identified by DFW as “a stand embedded in Unit 9 that meets the structural

definition of Late Succession Forest Stands as defined in the [Forest Practice Rules,

rule 895.1].”10 We refer to this stand, as have the parties, as the LSFS.

7

The NTMP “Management Unit Description” section also identifies a “Unit 11”

to be used for “forest health, powerline corridor, fuel hazard reduction and limited timber

production.”

8

As described by DFW, late seral (i.e., old or mature) forest habitats “emerge over

time from the general accumulation of growth, small disturbances, natural tree mortality

and colonizing species . . . produc[ing] structural complexity . . . .”

9

DFW estimated the disputed portion of Unit 9 to be approximately 18 acres.

10

“ ‘Late succession forest stands’ means stands of dominant and predominant

trees that meet the criteria of [California Wildlife Habitat Relationships] class 5M, 5D, or

6 with an open, moderate or dense canopy closure classification, often with multiple

canopy layers, and are at least 20 acres in size. Functional characteristics of late

succession forests include large decadent trees, snags, and large down logs.” (FP Rules,

4

The Marbled Murrelet

It appears largely undisputed that the LSFS in its present condition is potentially a

“functional nesting habitat”11 for the marbled murrelet, a small seabird which is federally

listed as a threatened species and classified under CESA as an endangered species. The

murrelet is found off California coastal waters from Del Norte to Santa Cruz Counties “in

marine and pelagic habitats and nests in coastal coniferous forests,” and requires “dense

old growth or mature forests of redwood and Douglas-fir” and “[l]arge diameter, moss

covered or mistletoe branches that create a broad flat surface (referred to as a platform)”

for nesting and breeding. It also appears undisputed that murrelets have no known

history of actually nesting in the LSFS. As discussed post, the parties take very different

views as to the NTMP’s impact on the functionality of the murrelet habitat and on

murrelet populations generally.

rule 895.1.) DFW, and Petitioners, generally use the phrase “late seral forest” as a

descriptor for this parcel. This is not a defined term under the Forest Practice Act or

Forest Practice Rules, and the parcel does not meet the definition of “late succession

forest stands,” which applies only to stands “at least 20 acres in size.” (Ibid.) DFW

considered its own “late seral” definition “more ecological.” Bower and his forester

disputed the “late seral” characterization of the LSFS, but the NTMP nevertheless treats

the LSFS as if it were a late succession forest stand.

11

“ ‘Functional Nesting Habitat’ means habitat with a dominant and codominant

tree canopy closure of at least 40% and a total canopy (including dominant, codominant,

and intermediates) of at least 60%. Usually the stand is distinctly multi-layered with an

average stem diameter in dominant, codominant conifers, and hardwoods > 11[-inch

diameter at breast height]. The stand usually consists of multi-specied trees (including

hardwoods) of mixed sizes. All nests, snags, down logs, and decadent trees shall also be

considered as part of the habitat. Nesting substrates are provided by broken tops,

cavities, or platforms such as those created by a hawk or squirrel nest, mistletoe broom,

or accumulated debris. Owls are known to occasionally nest in less than optimal habitat.

Nesting areas may also be associated with topographical relief and aspect which alter

microclimates.” (FP Rules, rule 895.1.)

5

Procedural History

The Bower NTMP was resubmitted to CAL FIRE in late October 2008.12

CAL FIRE, DFW and other agency personnel attended a preharvest inspection of

Bower’s property in December 2008. During that inspection, a DFW biologist

characterized certain areas in Unit 9 as “emerging” late seral forest and suggested that the

area might need to be evaluated for murrelet habitat. A preharvest inspection report,

discussing Unit 9 and murrelet habitat, was filed by CAL FIRE on December 19, 2008.

DFW recommended a murrelet consultation and requested that the perimeter of the late

seral area in Unit 9 be walked and estimated. Bower’s forester subsequently inventoried

and photographed all large trees in the area. A second preharvest inspection was

conducted by CAL FIRE, DFW, Bower and Bower’s forester in February 2009, focusing

on the large tree area. The inspection and consultation included an assessment of

“several residual old growth redwood trees and one residual old growth Douglas-fir” and

assessment of murrelet habitat. DFW submitted its preharvest inspection and murrelet

consultation reports in June 2009. The consultation report opined that suitable murrelet

habitat existed within the LSFS and proposed specific mitigation measures to avoid

“take” of murrelets pending completion of protocol surveys within the LSFS.13

Bower’s forester submitted a response to the DFW murrelet consultation report on

August 5, 2009—identifying and mapping a total of 67 trees meeting the DFW definition

and description of late seral habitat, ranging from 25 to 106 inches DBH.14 A majority of

the 67 trees are located within a 13-acre core area of the LSFS. Bower’s forester

characterized only seven as late seral and asserted that the LSFS had only “marginal

potential for marbled murrelet occupation,” given the parcel’s small size and close

proximity to a local airport and a residential area. DFW recommended retention of

12

The plan was originally submitted on April l8, 2008, but returned for

noncompliance with provisions of the Forest Practice Rules.

13

Protocol surveys were conducted in 2010 and 2011.

14

DBH is “diameter at breast height,” and is a standard measurement for tree size.

(See FP Rules, rule 895.)

6

39 large diameter trees (≥ 40-inch DBH) identified in and around the LSFS. A revised

NTMP submitted in November 2009, required retention of 30 out of the 67 large

diameter trees to provide structural characteristics beneficial to wildlife, with seven of

these being adjacent to, but outside the boundaries of the LSFS.15

On December 3, 2009, the CAL FIRE review team chair recommended approval

of the revised NTMP, subject to compliance with additional mitigation measures which

were incorporated into the NTMP. These measures included replacement of fallen or

dead wildlife trees, in a two for one ratio, with other trees selected for their wildlife

value; prohibition of all group selection harvesting within the LSFS and within a 100-foot

buffer zone around the LSFS; retention of two additional trees per acre with minimum of

24 inches DBH throughout Unit 9; and imposition of a three-year harvest moratorium

within LSFS Area, to allow DFW to attempt acquisition of a conservation easement on

the LSFS.

After close of the public comment period,16 CAL FIRE issued its “Official

Response” to public comments and approved the NTMP on December 31, 2009,

concluding that large wildlife trees were being preserved, and “species largely dependent

on late seral habitat features [would] not be adversely impacted.” DFW did not submit a

nonconcurrence. (See FP Rules, rule 1037.5(e) [“[i]f a member of the review team does

not concur with the chairperson’s recommendation to the Director, the member shall

submit in writing, within 5 days of the review team meeting and before the action

required by [rule] 1037.4, the specific reasons why the recommendation does not provide

adequate protection of the resources for which his or her agency has responsibility”].)

15

Seven of the trees identified for retention are potentially subject to later harvest

if a qualified wildlife biologist certifies, in a written amendment to the NTMP, that one or

more of these trees does not provide significant functional wildlife habitat, in the

aggregate with habitat opportunities provided by other permanently retained trees and the

managed stand structure.

16

On November 16, 2009, CAL FIRE extended the public comment period for

30 days.

7

The Litigation

On February 5, 2010, Petitioners filed their “Verified Petition for Writ of

Mandate, Complaint for Declaratory Relief for Breach of Public Trust, and Request for

Injunctive Relief” (Petition). The Petition sought orders requiring CAL FIRE to set aside

approval of the NTMP, a declaration that DFW was in violation of its statutory and

public trust obligations, and an injunction prohibiting timber harvesting pursuant to the

NTMP. The matter was tried to the court on May 14, 2013.17 The court issued a

statement of decision on May 24, 2013, denying the Petition in its entirety.18 A notice of

appeal was filed on June 10, 2013. Judgment was entered on June 19, 2013. On July 2,

2013, we granted Petitioners’ request for a writ of supersedeas to stay logging activities

within the LSFS pending resolution of this appeal.

II. DISCUSSION

Petitioners contend that CAL FIRE, in approving the NTMP, failed to comply

with the requirements of CEQA and the Forest Practice Rules. They insist that

cumulative impacts of proposed logging in the NTMP will eliminate over 90 percent of

the large trees in the LSFS, significantly reducing the overhead canopy, and rendering the

stand unsuitable for murrelet nesting. They argue that approval of the NTMP also

violates CESA by authorizing logging that would adversely modify late seral nesting

habitat essential for survival and recovery of the murrelet. Finally, they contend that

DFW violated its public trust obligations by failing to oppose the NTMP.

A. CAL FIRE’s Approval of the NTMP

1. Standard of Review

CAL FIRE’s approval of timber operations is subject to CEQA’s standard of

judicial review. (§§ 21168, 21168.5; Sierra Club, supra, 7 Cal.4th at pp. 1235–1236.)

“In reviewing an agency’s compliance with CEQA in the course of its legislative or

17

The parties represent that they stipulated to stay the litigation for some period to

permit settlement discussions.

18

Although labeled a “Tentative Decision,” the parties agree that the decision was

intended to be the final order of the court.

8

quasi-legislative actions, the courts’ inquiry ‘shall extend only to whether there was a

prejudicial abuse of discretion.’ [Citation.] Such an abuse is established ‘if the agency

has not proceeded in a manner required by law or if the determination or decision is not

supported by substantial evidence.’ [Citations.]” (Vineyard Area Citizens for

Responsible Growth, Inc. v. City of Rancho Cordova (2007) 40 Cal.4th 412, 426–427,

fns. omitted (Vineyard).) “ ‘Judicial review of these two types of error differs

significantly: While we determine de novo whether the agency has employed the correct

procedures, “scrupulously enforc[ing] all legislatively mandated CEQA requirements”

[citation], we accord greater deference to the agency’s substantive factual conclusions.’ ”

(Ebbetts Pass Forest Watch v. California Dept. of Forestry & Fire Protection, supra,

43 Cal.4th at p. 944.)

Under CEQA, “substantial evidence includes fact, a reasonable assumption

predicated upon fact, or expert opinion supported by fact.” (§ 21080, subd. (e)(1).)

“Substantial evidence is defined as ‘enough relevant information and reasonable

inferences from this information that a fair argument can be made to support a

conclusion, even though other conclusions might also be reached.’ [Citations.]”

(Association of Irritated Residents v. County of Madera (2003) 107 Cal.App.4th 1383,

1391.) A reviewing court “shall not exercise its independent judgment on the evidence

but shall only determine whether the [agency’s] act or decision is supported by

substantial evidence in light of the whole record.” (§ 21168.)19 In determining whether

an agency has prejudicially abused its discretion, “ ‘the power of the appellate court

begins and ends with a determination as to whether there is any substantial evidence,

contradicted or uncontradicted, which will support the [agency’s decision].’ ” (Western

States Petroleum Assn. v. Superior Court, supra, 9 Cal.4th at p. 571.) Our review for

substantial evidence applies a deferential standard that is satisfied if “the record contains

19

Petitioners frequently cite to a different administrative record compiled by the

DFW. The trial court sustained objections to this evidence. We do not consider extra-

record evidence. (See Western States Petroleum Assn. v. Superior Court (1995) 9 Cal.4th

559, 576.)

9

relevant information that a reasonable mind might accept as sufficient to support the

conclusion reached.” (Great Oaks Water Co. v. Santa Clara Valley Water Dist. (2009)

170 Cal.App.4th 956, 968.) The administrative determinations are presumed correct and

we indulge all reasonable inferences from the evidence supporting those determinations.

If more than one inference can be drawn from the evidence, “ ‘a reviewing court is

without power to substitute its deductions’ ” for those of the agency. (Western States

Petroleum Assn., at p. 571.) “In reviewing for substantial evidence, the reviewing court

‘may not set aside an agency’s [decision] on the ground that an opposite conclusion

would have been equally or more reasonable,’ for, on factual questions, our task ‘is not to

weigh conflicting evidence and determine who has the better argument.’ [Citation.]”

(Vineyard, supra, 40 Cal.4th at p. 435.)

Our task is essentially identical to that of the trial court. (American Canyon

Community United for Responsible Growth v. City of American Canyon (2006)

145 Cal.App.4th 1062, 1070.) Accordingly, “we review the agency’s actions directly and

are not bound by the trial court’s conclusions. [Citations.]” (Friends of Lagoon Valley v.

City of Vacaville (2007) 154 Cal.App.4th 807, 816–817.) In that sense appellate judicial

review under CEQA is de novo (Vineyard, supra, 40 Cal.4th at p. 427), and the burden

on appeal to establish error is the same as the burden in the trial court, i.e., on the parties

who challenge the administrative decisions (San Franciscans Upholding the Downtown

Plan v. City and County of San Francisco (2002) 102 Cal.App.4th 656, 674).

2. Sufficiency of the NTMP

Petitioners present several challenges to the sufficiency of the NTMP as an

informational document. Petitioners first contend that the NTMP failed to adequately

assess cumulative impacts of logging in the LSFS, and that approval of the plan under

such circumstances resulted in CAL FIRE’s failure to proceed in the manner required by

law. Failure of the environmental review process to provide adequate information and

analysis constitutes a failure to proceed according to law and is an abuse of discretion

under Code of Civil Procedure section 1094.5. (Joy Road Area Forest & Watershed

10

Assn. v. California Dept. of Forestry & Fire Protection (2006) 142 Cal.App.4th 656,

665.)

Petitioners assert that the NTMP contains no analysis of how the LSFS will be

retained as functional habitat. In Petitioners’ view, the cumulative effects of proposed

logging activities “will eliminate the last remnant late seral forest in the entire 4,628 acre

Doty Creek watershed,” and that the resulting loss of this stand would mean that late seral

wildlife, such as the murrelet, could not survive or reproduce in the watershed.

Petitioners insist that the resulting forest, although retaining some large trees, will not

provide functional nesting habitat because it will no longer contain overstory canopy and

dense surrounding forest—the forest structure that allows large nesting trees to function

as habitat. They fault the NTMP for providing an inadequate description of the

environmental setting, murrelet presence within the assessment area, and importance of

the LSFS to long-term murrelet survival and recovery. Petitioners contend that these

errors in assessment of cumulative impacts are “informational in nature” in that they fail

to provide adequate information to ensure a meaningful evaluation of potentially

significant impacts of logging the LSFS. We disagree.

The Forest Practice Rules adopt the CEQA definition of “cumulative impacts”

from related projects: “the change in the environment which results from the incremental

impact of the project when added to other closely related past, present, and reasonably

foreseeable probable future projects. Cumulative impacts can result from individually

minor but collectively significant projects taking place over a period of time.” (Cal. Code

Regs., tit. 14, § 15355, subd. (b); FP Rules, rule 895.1.) Cumulative impacts must be

considered in timber harvest plans and are assessed “based upon the methodology

described in Board [of Forestry] Technical Rule Addendum [No.] 2 [(FP Rules, foll.

rule 952.9)].” (FP Rules, rule 898; see Ebbetts Pass Forest Watch v. California Dept. of

Forestry & Fire Protection, supra, 43 Cal.4th at p. 950.)

All elements required under Technical Rule Addendum No. 2, including biological

resources and habitat, are analyzed and considered in section IV of the NTMP. In

evaluating cumulative impacts, the NTMP utilizes a biological assessment area (BAA)

11

encompassing approximately 10,711 acres within a 1.3 mile radius of the plan area. The

NTMP discloses that the plan area is within the known range of the murrelet, and

identified the murrelet as a threatened species known or suspected to be in the assessment

area. It identified the murrelet’s habitat requirements, and two preharvest inspection

reports identified functional murrelet habitat in the LSFS. The NTMP specifically

identifies 14 trees with habitat elements suitable for the murrelet. The DFW murrelet

consultation report, with its recommendations, is also part of the administrative record.

a. Murrelet Presence

Petitioners accuse Bower of falsely denying in the NTMP murrelet sightings

within the BAA, which extends offshore approximately one mile. In a record comment

submitted to CAL FIRE, Friends of the Gualala River cited undisclosed surveys compiled

by Bower’s forester noting two positive marine sightings of murrelets within the BAA.

They argue that this information made misleading the NTMP’s disclosure of audio-visual

murrelet detection in an area 13.6 miles southeast of the plan area. The compilation,

however, covered a 28-year period from 1980 to 2008, with the latest positive marine

detection in 2000. CAL FIRE confirmed that no murrelet detections had been associated

with terrestrial portions of the BAA, and no more recent positive detections of any nature

proximate to the BAA. CAL FIRE considered the comment and found that the

information did not change the conclusions arrived at in the NTMP, finding no evidence

establishing a connection between marine detections and local nesting sites.

b. Continuity of Habitat

Petitioners heavily rely on a 1997 United States Fish and Wildlife Service report

(the Murrelet Recovery Plan) in support of its assertion that the LSFS is critical to

avoiding gaps in population distribution of murrelets in the coastal forests of Mendocino

County. The Murrelet Recovery Plan places Mendocino County in “Conservation

Zone 5,” which is identified as a significant “gap” in murrelet population distribution.

The Murrelet Recovery Plan notes that “[t]he more contiguous the habitat distribution,

the lower the likelihood of future large gaps in distribution of the species due to

catastrophic events such as oil spills or large wildfires. Preventing further erosion of the

12

already patchily-distributed nesting habitat is a key element in buffering the species

against such catastrophic events. This is especially important in areas where gaps already

occur.” Petitioners insist that the NTMP is deficient in failing to disclose or acknowledge

the importance to long-term murrelet survival of maintaining all remnant late seral

habitat, particularly in light of existing murrelet habitat shortage.

The NTMP concluded, however, that based on actual site inspections “[n]o

continuity of late seral habitat exists within the BAA. The scattered and infrequent

distribution of individual late seral trees does not provide continuity of this habitat type.”

CAL FIRE’s Official Response found no adjacent or nearby similar habitats and agreed

that there was no existing continuity of habitat within the plan area, and likely none

within the BAA, “as a result of 130 years of timber production.” CAL FIRE concluded

that the logging activities proposed under the NTMP “will not cause fragmentation or

loss of interconnectivity of suitable marbled murrelet nesting habitat available to local

nesting murrelet populations . . . within Conservation Zone 5 (the habitat gap between

Zones 4 & 6) of the Federal Murrelet Recovery Plan.”

c. Impacts of Logging on Late Seral Habitat Functionality

Petitioners contend that the NTMP fails to acknowledge that proposed logging

activity will effectively eliminate late seral habitat within the LSFS by substantially

reducing forest density, opening up the existing forest canopy and removing buffer forest

around potential murrelet nest sites. The parties again draw dramatically differing

conclusions from the same record.

The DFW, in its June 2009 preharvest inspection report, found the LSFS to be a

multi-layered stand, with large dominant trees over smaller understory trees. DFW

estimated the overstory layer as a size Class 5,20 and the understory layer as at least a size

20

Tree size and density classifications are utilized in the California Wildlife

Habitat Relationships System, a standardized habitat classification system incorporated

by reference in the Forest Practice Rules (see rules 895, 895.1; Mayer & Laudenslayer,

A Guide to Wildlife Habitats of California (1988) <http://www.dfg.ca.gov/biogeodata/

cwhr/wildlife_habitats.asp> (as of Dec. 2, 2014)). Size class 5M and 5D are trees greater

than 24 inches (Class 5), which may have moderate (5M) canopy of 40–60 percent, or

13

Class 3.21 In Petitioners’ view, logging will reduce the number of large trees (≥ 24-inch

diameter) from 31 per acre, to 1.3 or 1.7 larger trees (≥ 40-inch diameter) per acre and

two additional trees over 24 inches in diameter. By Petitioners’ calculations, the NTMP

will reduce the overall number of large trees in the LSFS (≥ 24-inch diameter) by

approximately 90 percent and entirely eliminate Class 5 habitat in the stand.

Bower acknowledges that there will be removal of certain overstory trees within

the LSFS, but notes that 30 of 67 large diameter trees (45 percent), selected in

consultation with DFW, will be retained and continue to contribute to the overstory.

These retained trees will provide “stocking control, uneven aged diameter distribution,

WLPZ[22] canopy protection, shade and temperature control, . . . [and] biological diversity

for wildlife habitat.” Two replacement trees must be recruited for any large diameter tree

scheduled for retention that falls or becomes a snag, and must be selected from the upper

20 percent of tree diameters in or within 100 feet of a WLPZ. Beyond the initial

inventoried trees to be harvested, the LSFS basal area of conifers and hardwoods may not

be reduced below 175 square feet, with trees of 36-inch DBH or greater constituting not

less than 40 percent of the LSFS basal area, and not less than 30 percent of the basal area

of trees over 36-inch DBH must be in trees 48-inch DBH or greater. Harvesting activities

must leave “at least 50% of the total canopy covering the ground in a well distributed

multi-storied stand configuration.” The NTMP concludes that “multistoried

characteristics which exist on the plan area within the WLPZ will be represented in the

post-harvest stand.”

dense (5D) canopy of greater than 60 percent. (Cal. Dept. of Forestry & Fire, CWHR

Classification System (2014) <http://frap.cdf.ca.gov/projects/frap_veg/

classification.html> (as of Dec. 2, 2014).)

21

Bower’s forester contended that the appropriate California Wildlife Habitat

Relationships System class was MHC-2-D and MHC-3-D.

22

WLPZ (Watercourse and Lake Protection Zone) “means a strip of land, along

both sides of a watercourse or around the circumference of a lake or spring, where

additional practices may be required for protection of the quality and beneficial uses of

water, fish and riparian wildlife habitat, other forest resources, and for controlling

erosion.” (FP Rules, rule 895.1.) The LSFS contains two areas designated as WLPZ.

14

d. Maintenance of Functional Late Seral Nesting Habitat

Petitioners argue that the NTMP contains no discussion or analysis about how an

adequate amount of large trees, canopy or stand structure around potential nest trees will

be retained to ensure preservation of functional nesting habitat for murrelets.

Petitioners ignore the fact that the NTMP requires permanent retention of 14 trees

specifically identified within the LSFS as presenting nesting elements suitable for the

murrelet. In addition to multistory canopy elements discussed ante, the NTMP further

requires compliance with specific DFW recommendations to “retain and buffer suitable

nesting habitat” until completion of protocol murrelet surveys, including no logging

activity within a 300-foot zone around suitable nesting habitat. Only if DFW determines

that proposed logging activity will not adversely affect the murrelet, will a logging

moratorium in this area be lifted, and only for a period of three years, following which

protocol surveys must again be conducted if logging is proposed within 825 feet of the

LSFS.23

e. Retention of Only “Elements” of Late Seral Forest

Petitioners assert that the NTMP proposes only to retain “elements” of late seral

forest, rather than a functional late seral habitat. They contend that the NTMP is not

“designed to maintain the mature forest density and canopies necessary for the stand to

function as late seral nesting habitat,” and that following logging activities, “the

remaining forest will not look or function like late seral habitat, but rather as young,

second and third growth forest with a smattering of old forest elements.” They contrast

what they argue are higher resulting basal areas and number of large trees in other NTMP

units that are not considered late seral, with those that they calculate will result in the

LSFS. Respondents challenge the accuracy of Petitioners’ calculations, and the

assumptions upon which those calculations are based. More significantly, however, the

23

On April 2, 2012, following completion of the original protocol surveys, DFW

advised CAL FIRE that it had determined that “the harvest within or adjacent to [the

LSFS] is unlikely to ‘take’ or adversely affect the marbled murrelet for a period of three

years.”

15

calculations and comparisons Petitioners attempt to make, even if accurate, do not appear

to offer a complete description of the resulting environment. The record does not

indicate that late seral habitat is defined by basal areas or tree size (or species) alone. The

definition of a “late succession forest stands” in the Forest Practice Rules includes not

only tree size and canopy, but also notes that “[f]unctional characteristics of late

succession forests include large decadent trees, snags, and large down logs.” (FP Rules,

rule 895.1.) The Forest Practice Rule definition of “functional nesting habitat” likewise

includes not only canopy parameters, but includes “multi-specied trees (including

hardwoods) of mixed sizes. All nests, snags, down logs, and decadent trees shall also be

considered as part of the habitat.” (Ibid.) DFW criticized the focus of the Forest Practice

Rule definition of “late succession forest stands” on tree size and tree density and its own

“more ecological” late seral forest habitat definition focused on broader “structural

complexity” elements of such a habitat and multiple environmental factors that “affect

the ecological function of the late-succession stand.” The concerns voiced by DFW, and

addressed in the revised NTMP, were identification and preservation of specifically

identified “late seral components in the LSFS,” which Petitioners elsewhere repeatedly

insist are unique within the NTMP. Petitioners’ claim that “there is no basis for assuming

the post-logged 18 acre stand will be any different” from the other units in the NTMP

which are considered nonfunctional for late seral wildlife thus lacks support.

f. Feasibility of Alternatives

Petitioners fault the NTMP and CAL FIRE for failure to address feasibility of

alternatives that might avoid significant impacts of logging. Specifically, it criticizes the

absence of a “CEQA-equivalent analysis in the record why regulation to [prevent logging

in the LSFS] would render the overall NTMP . . . an economically infeasible

proposition.” (Fn. omitted.)

The NTMP analysis of project alternatives included consideration, and rejection

of, a no-project alternative, a reduced project size, public purchase of the LSFS, or sale of

16

a conservation easement on that parcel.24 The Official Response also dealt with

comments that the NTMP did not adequately consider alternatives. CAL FIRE

concluded that because mitigation measures included in the plan would avoid significant

impacts and address the environmental concerns expressed by the review team agencies,

there were few reasonable alternatives that would actually lessen impacts below the level

produced by the revised NTMP, and that “it is not demonstrated that simply no

harvesting in Unit 9 would reduce impacts.” “ ‘An EIR need not consider every

conceivable alternative to a project.’ [Citation.] Moreover, ‘alternatives shall be limited

to ones that would avoid or substantially lessen any of the significant effects of the

project.’ [Citations.]” (North Coast Rivers Alliance v. Marin Municipal Water Dist. Bd.

of Directors (2013) 216 Cal.App.4th 614, 649, italics omitted.)

3. Substantial Evidence

While Petitioners seek to frame the issues as failure to provide adequate

information and analysis, the real question presented is whether CAL FIRE’s conclusions

are supported by substantial evidence. We find that they are.

Petitioners’ challenges to the NTMP’s adequacy ultimately arise from

fundamental disagreement with the conclusions reached by CAL FIRE in its approval of

the plan. Petitioners envision intensive logging within and around the LSFS resulting

from the NTMP, with a consequent total and catastrophic loss of viable murrelet habitat.

CAL FIRE concludes that, with appropriate mitigation measures, the selective and

limited timber harvesting permitted in and around the LSFS will have no significant

impact on an existing marginal but viable habitat, which will be preserved without

significant adverse impact on wildlife, including the murrelet. “[M]ere disagreement is

insufficient. [Citations.]” (North Coast Rivers Alliance v. Marin Municipal Water Dist.

Bd. of Directors, supra, 216 Cal.App.4th at p. 653.) The burden is on Petitioners to

“affirmatively show there was no substantial evidence in the record to support [CAL

24

The project alternatives analysis is located in “Section IV: Cumulative Impacts

Assessment” (part O, pp. 245.15–256) of the revised NTMP.

17

FIRE’s] findings.” (California Native Plant Society v. City of Rancho Cordova (2009)

l72 Cal.App.4th 603, 626.)

CAL FIRE’s views were based on silvicultural analysis by Bower’s forester and

its own experts, its participation in at least two site inspections of the LSFS, consideration

of DFW’s recommendations and its murrelet consultation, and public participation and

comment. A public agency may choose between differing expert opinions, and may also

properly rely upon the opinion of its staff in reaching decisions. (Oakland Heritage

Alliance v. City of Oakland (2011) 195 Cal.App.4th 884, 900.) We have neither the

authority nor the expertise to resolve the conflicting views of Petitioners and CAL FIRE

and to determine whose view of the future of the LSFS (and the murrelet) is more

prescient. (See Laurel Heights Improvement Assn. v. Regents of University of California

(1988) 47 Cal.3d 376, 393; North Coast Rivers Alliance v. Marin Municipal Water Dist.

Bd. of Directors, supra, 216 Cal.App.4th at p. 653.) We are limited to a determination of

whether substantial evidence supports CAL FIRE’s determination. It does.

B. Failure to Recirculate the NTMP

Petitioners contend that “significant new information” was added to the NTMP

prior to certification, requiring recirculation for public review. (See § 21092.1; FP Rules,

rule 898.1(d).) Petitioners cite a December 2, 2009 single-page memo from CAL FIRE

wildlife biologist, Robert Motroni, commenting on Bower’s November 12, 2009 revised

NTMP proposal for retention of large trees within the LSFS. Motroni recommended four

additional protective measures, including retention of all trees with basal fire scars and

hollows, and retention of trees “immediately adjacent to the retained tree of interest” to

create a “management zone” approximately 50 feet in diameter, dependent on site

specific conditions, to maintain “wind firmness.” The internal memo was not circulated

for public review. The issues Motroni raised were, however, presented and discussed in a

second review by the CAL FIRE interdisciplinary review team on December 3, 2009.

Each of Motroni’s recommendations were addressed in additional mitigation measures,

including creation of a 100-foot buffer area adjacent to the boundary of the LSFS, from

which group harvest was excluded, and requiring a minimum postharvest conifer basal

18

area of 100 square feet. Bower accepted these additional measures, as well as others, on

December 8, 2009. Petitioners argue that, by failing to circulate Motroni’s comments,

the public was deprived of the right to address whether these mitigation measures were

adequate.

A “final EIR will almost always contain information not included” in the

circulating draft. (Laurel Heights Improvement Assn. v. Regents of University of

California (1993) 6 Cal.4th 1112, 1124.) Recirculation based on the addition of new

information after the close of the public comment period is not required unless that

information is “significant.” (Id. at p. 1129.) The information is not considered

significant unless the document “is changed in a way that deprives the public of a

meaningful opportunity to comment upon a substantial adverse environmental effect of

the project or a feasible way to mitigate or avoid such an effect (including a feasible

project alternative) that the project’s proponents have declined to implement. [Citation.]”

(Ibid.) “[R]ecirculation is not required where the new information added to the EIR

‘merely clarifies or amplifies [citations] or makes insignificant modifications in [citation]

an adequate EIR.’ [Citation.] On the other hand, recirculation is required, for example,

when the new information added to an EIR discloses: (1) a new substantial

environmental impact resulting from the project or from a new mitigation measure

proposed to be implemented [citation]; (2) a substantial increase in the severity of an

environmental impact unless mitigation measures are adopted that reduce the impact to a

level of insignificance [citation]; (3) a feasible project alternative or mitigation measure

that clearly would lessen the environmental impacts of the project, but which the

project’s proponents decline to adopt [citation]; or (4) that the draft EIR was so

fundamentally and basically inadequate and conclusory in nature that public comment on

the draft was in effect meaningless [citation].” (Id. at pp. 1129–1130, fn. omitted.)

Recirculation is an exception, rather than the general rule. (Id. at p. 1132.) “An agency’s

decision not to recirculate a draft [EIR] is entitled to substantial deference; the petitioner

bears the burden of proof to show no substantial evidence supports the agency’s decision.

[Citations.]” (North Coast Rivers Alliance v. Marin Municipal Water Dist. Bd. of

19

Directors, supra, 216 Cal.App.4th at p. 655.) “[W]e resolve reasonable doubts regarding

the agency’s decision in favor of upholding the administrative decision. [Citation.]”

(California Oak Foundation v. Regents of University of California (2010)

188 Cal.App.4th 227, 266.)

Here, the Motroni memo disclosed no new environmental impacts nor any

substantial increase in the severity of an environmental impact. Motroni, during the

comment period, suggested strengthening of certain mitigation measures already

proposed by DFW for protection of habitat within the LSFS. The protection of habitat

(for the murrelet and other species) within the LSFS had been a principal focus of

environmental review for the NTMP since at least the first DFW preharvest inspection

report in June 2009. The time for public comment had been extended from November 16

to December 16, 2009, to allow consideration, among other things, of “[a]dditional

information pertaining to retention of large-diameter trees with structural features, and

the maintenance of functional wildlife habitat” within the LSFS. The public was not

deprived of a meaningful opportunity to comment on these matters. In fact, members of

the public, including Petitioner Friends of the Gualala River, participated in the second

review in which the additional recommendations and alternatives were discussed.

Finally, Bower did not decline to adopt the additional measures CAL FIRE required, but

accepted these measures on December 8, 2009, eight days prior to the close of the public

comment period. Substantial evidence supports CAL FIRE’s decision not to recirculate

the NTMP.

C. CESA

Petitioners contend that, in approving the NTMP, CAL FIRE violated the mandate

of CESA to conserve endangered species such as the murrelet. (Fish & G. Code,

§ 2053.)25 Petitioners argue that even unoccupied nesting habitat is critical to the

25

“The Legislature . . . finds and declares that it is the policy of the state that state

agencies should not approve projects as proposed which would jeopardize the continued

existence of any endangered species or threatened species or result in the destruction or

adverse modification of habitat essential to the continued existence of those species, if

20

viability of murrelets in the region. They assert that “the record demonstrates that

preserving remnant stands of late seral habitat, especially in the Zone 5 region, will be

necessary to maintain the ability of murrelets to persist into the future” and that logging

in the LSFS will “contribute to the catastrophic, incremental loss of habitat essential to

the long term conservation of the murrelet.” CAL FIRE addressed this contention in the

Official Response, finding that, with the mitigation measures imposed, the NTMP would

not cause significant impacts to any threatened or endangered species. As discussed ante,

we have already found this conclusion to be supported by substantial evidence.

Moreover, the mitigation conditions imposed in and adjacent to the LSFS require

adherence to specific DFW recommendations to “retain and buffer suitable nesting

habitat” until completion of protocol murrelet surveys, including no logging activity

within a 300-foot zone around suitable nesting habitat. DFW must determine that

proposed logging activity will not adversely affect the murrelet before logging activity is

permitted.26 CAL FIRE found that implementation of the plan, as mitigated, would not

result in take, jeopardy or adverse modification of habitat in violation of CESA. That

finding is supported by substantial evidence.

D. Petitioners’ Claim against DFW

Petitioners presented a separate claim against DFW, seeking ordinary mandamus

(Code Civ. Proc., § 1085) and declaratory relief, alleging that DFW failed to fulfill its

public trust and statutory obligations by failing to submit a nonconcurrence in the

there are reasonable and prudent alternatives available consistent with conserving the

species or its habitat which would prevent jeopardy.” (Fish & G. Code, § 2053.) As

Respondents note, that section further provides that “it is the policy of this state and the

intent of the Legislature that reasonable and prudent alternatives shall be developed by

the department, together with the project proponent and the state lead agency, consistent

with conserving the species, while at the same time maintaining the project purpose to the

greatest extent possible.” (Ibid.)

26

As noted ante, the initial DFW protocol murrelet surveys found that “the harvest

within or adjacent to [the LSFS] is unlikely to ‘take’ or adversely affect the marbled

murrelet for a period of three years.”

21

NTMP.27 The Petition as to DFW seeks a writ setting aside approval of the NTMP

“based on [DFW’s] violations of, and failure to fulfill, its public trust and statutory

obligations . . . .” They allege that the public has a right to a judicial determination of

whether DFW’s actions in failing to submit a nonconcurrence to the NTMP violated its

common law and statutory duties to protect and conserve wildlife resources, and were

consequently arbitrary and capricious, citing Center for Biological Diversity, Inc. v. FPL

Group, Inc. (2008) 166 Cal.App.4th 1349 (Center for Biological Diversity).28 The trial

court found that the Petition did not state a cause of action against DFW. We agree and

find no authority for Petitioners’ position that they may compel, through traditional

mandamus, an administrative agency with only advisory authority to provide that advice

in a particular manner.

In seeking traditional mandamus, Petitioners necessarily acknowledge that DFW is

not a lead agency with decisional authority over the approval or denial of an NTMP and

serves in a purely advisory role. (FP Rules, rule 898.1; § 1037.5, subds. (b), (c).)

Approval of an NTMP must be reviewed by administrative mandamus. (Joy Road Area

Forest & Watershed Assn. v. California Dept. of Forestry & Fire Protection, supra,

142 Cal.App.4th at p. 665.) We find no authority, and Petitioners cite none, for the

proposition that approval of an NTMP is subject to review, directly or indirectly, through

traditional mandamus under Code of Civil Procedure section 1085, particularly when the

petition is not directed to the only agency with authority to approve or reject the project.

The Petition as to DFW therefore fails on this ground alone.

Center for Biological Diversity does not suggest a different result. Division Three

of this court held only that members of the public may have standing to bring actions

against public agencies to prevent those agencies from abandoning or neglecting the

27

Respondents do not argue here that they are entitled to pursue a claim for

declaratory relief. “It is settled that an action for declaratory relief is not appropriate to

review an administrative decision. [Citations.]” (State of California v. Superior Court

(1974) 12 Cal.3d 237, 249; Tejon Real Estate, LLC v. City of Los Angeles (2014)

223 Cal.App.4th 149, 155.)

28

Apparently DFW prepared a draft nonconcurrence, which it elected not to file.

22

public’s rights with respect to resources subject to the public trust. (Center for Biological

Diversity, supra, 166 Cal.App.4th at pp. 1366–1367.) The court noted that it made no

attempt to define the scope of public trust duties subject to individual enforcement, and

had “no occasion [t]here to address the responsibilities that sundry agencies bear in this

regard, whether such obligations be imposed by statute or by common law.”29 (Id. at

p. 1369.) What Center for Biological Diversity clearly did not do is relax in any manner

the substantive requirements to obtain writ relief under Code of Civil Procedure

section 1085.

“A writ of mandate may be issued by any court to any inferior tribunal,

corporation, board, or person, to compel the performance of an act which the law

specially enjoins, as a duty resulting from an office, trust, or station . . . .” (Code Civ.

Proc., § 1085, subd. (a).) “To obtain writ relief, a petitioner must show: ‘ “(1) A clear,

present and usually ministerial duty on the part of the respondent . . . ; and (2) a clear,

present and beneficial right in the petitioner to the performance of that duty . . . .”

[Citation.]’ [Citation.]” (Agosto v. Board of Trustees of Grossmont-Cuyamaca

Community College Dist. (2010) 189 Cal.App.4th 330, 335–336; see also Building

Industry Assn. v. Marin Mun. Water Dist. (1991) 235 Cal.App.3d 1641, 1645–1646

[mandate is not available to compel the exercise of discretion by a public body or official

in a particular manner or to reach a particular result].) “A ministerial duty is an

obligation to perform a specific act in a manner prescribed by law whenever a given state

29

The Center for Biological Diversity court also did not suggest the standard of

review that would apply in such circumstances. We note that in a somewhat different

context (legislatively delegated authority to an administrative agency for issuance of

transportation bonds), the Third District Court of Appeal recently held that where an

administrative agency performs a discretionary quasi-legislative act, “judicial review is at

the far end of a continuum requiring the utmost deference. [Citation.] An agency’s

exercise of discretionary legislative power will be disturbed ‘only if the action taken is so

palpably unreasonable and arbitrary as to show an abuse of discretion as a matter of law.

This is a highly deferential test. [Citation.]’ [Citation.]” (California High-Speed Rail

Authority v. Superior Court (2014) 228 Cal.App.4th 676, 699.)

23

of facts exists, without regard to any personal judgment as to the propriety of the act.

[Citation.]” (People v. Picklesimer (2010) 48 Cal.4th 330, 340.)

Petitioners demonstrate no such duty on the part of DFW. Fish and wildlife

resources clearly are protected by both statute (Fish & G. Code, § 711.7, subd. (a) [“fish

and wildlife resources are held in trust for the people of the state by and through

[DFW]”]) and by the public trust doctrine, which encompasses the protection of wildlife.

(Center for Biological Diversity, supra, 166 Cal.App.4th at p. 1363.) But “the duty of

government agencies to protect wildlife is primarily statutory. Fish and Game Code

section 1801, which declares that it is ‘the policy of the state to encourage the

preservation, conservation, and maintenance of wildlife resources under the jurisdiction

and influence of the state,’ also declares in subdivision (h) that ‘[i]t is not intended that

this policy shall provide any power to regulate natural resources or commercial or other

activities connected therewith, except as specifically provided by the Legislature.’ ”

(Environmental Protection Information Center v. California Dept. of Forestry & Fire

Protection (2008) 44 Cal.4th 459, 515.)

DFW’s statutory responsibility on CEQA projects, as trustee for fish and wildlife

resources, is to “consult with lead and responsible agencies and . . . provide, as available,

the requisite biological expertise to review and comment upon environmental documents

and impacts arising from project activities . . . .” (Fish & G. Code, § 1802.) A public

agency is required to take its public trust responsibilities into account in providing its

review and comment. (Center for Biological Diversity, supra, 166 Cal.App.4th at

p. 1366.) The evidence is that DFW fulfilled its responsibilities, and Petitioners make no

challenge to the substantive comments or recommendations made by DFW. What

Petitioners seek to challenge is DFW’s decision not to actively oppose action for which

another agency is ultimately responsible. That decision appears to be quintessentially an

exercise of agency judgment and discretion, and anything but “ministerial,” “clear” or

“mandatory.” (See US Ecology, Inc. v. State of California (2001) 92 Cal.App.4th 113,

138–139.) Petitioners have failed to show otherwise. Thus, mandamus is not an

available remedy in this context.

24

III. DISPOSITION

The judgment is affirmed. Respondents are to recover their costs on appeal.

_________________________

BRUINIERS, J.

WE CONCUR:

_________________________

SIMONS, Acting P. J.

_________________________

NEEDHAM, J.

25

Filed 12/30/14

CERTIFIED FOR PUBLICATION

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FIRST APPELLATE DISTRICT

DIVISION FIVE

CENTER FOR BIOLOGICAL

DIVERSITY et al.,

Plaintiffs and Appellants,

v.

CALIFORNIA DEPARTMENT OF A138914

FORESTRY AND FIRE PROTECTION

et al., (Mendocino County Super. Ct.

Defendants and Respondents; No. SCUK-CVG-10-55593)

NORTH GUALALA WATER COMPANY

et al. ORDER CERTIFYING OPINION

Real Parties in Interest and FOR PUBLICATION

Respondents.

BY THE COURT:

The opinion in the above-entitled matter filed on December 2, 2014, was not

certified for publication in the Official Reports. Requests for publication as authorized

by California Rules of Court, rule 8.1120(a) have been filed in this matter: the

December 16, 2014 request by the California Building Industry Association, Building

Industry Legal Defense Foundation, Building Industry Association of the Bay Area, and

California Business Properties Association, which was joined by respondents and real

parties in interest North Gualala Water Company et al. on December 18, 2014; and the

December 19, 2014 request by the Attorney General on behalf of defendants and

1

respondents California Department of Forestry and Fire Protection and California

Department of Fish and Wildlife.

Good cause appearing, this court grants these requests and orders the opinion

certified for publication pursuant to California Rules of Court, rule 8.1105(b), (c).

Date____________________ ___________________________Acting P.J.

2

Superior Court of Mendocino County, No. SCUK-CVG-10-55593, Cindee F. Mayfield,

Judge.

Michael W. Graf and Justin J. Augustine for Plaintiffs and Appellants.

Kamala D. Harris, Attorney General, Robert W. Byrne, Assistant Attorney General,

Annadel A. Almendras, Anita E. Ruud and Michael W. Neville, Deputy Attorneys

General, for Defendants and Respondents.

Mannon, King & Johnson and James F. King for Real Parties in Interest and

Respondents.

3