Opinion

Kirk Thomas v. Department of Justice

Court
Merit Systems Protection Board
Filed
Dec 10, 2014
Status
Unpublished
Cited by
0 cases
Authority
More cited than 33.7%

The opinion

UNITED STATES OF AMERICA

MERIT SYSTEMS PROTECTION BOARD

KIRK THOMAS, DOCKET NUMBER

Appellant, DA-0432-13-0109-I-1

v.

DEPARTMENT OF JUSTICE, DATE: December 10, 2014

Agency.

THIS FINAL ORDER IS NONPRECEDENTIAL 1

Kevin Curtis Crayon, II, Kennesaw, Georgia, for the appellant.

Evan Harry Perlman, Washington, D.C., for the agency.

BEFORE

Susan Tsui Grundmann, Chairman

Anne M. Wagner, Vice Chairman

Mark A. Robbins, Member

FINAL ORDER

¶1 The appellant has filed a petition for review of the initial decision, which

affirmed the agency’s action removing him under 5 U.S.C. chapter 43. Generally,

we grant petitions such as this one only when: the initial decision contains

erroneous findings of material fact; the initial decision is based on an erroneous

1

A nonprecedential order is one that the Board has determined does not add

significantly to the body of MSPB case law. Parties may cite nonprecedential orders,

but such orders have no precedential value; the Board and administrative judges are not

required to follow or distinguish them in any future decisions. In contrast, a

precedential decision issued as an Opinion and Order has been identified by the Board

as significantly contributing to the Board’s case law. See 5 C.F.R. § 1201.117(c).

2

interpretation of statute or regulation or the erroneous application of the law to

the facts of the case; the judge’s rulings during either the course of the appeal or

the initial decision were not consistent with required procedures or involved an

abuse of discretion, and the resulting error affected the outcome of the case; or

new and material evidence or legal argument is available that, despite the

petitioner’s due diligence, was not available when the record closed. See Title 5

of the Code of Federal Regulations, section 1201.115 (5 C.F.R. § 1201.115).

After fully considering the filings in this appeal, and based on the following

points and authorities, we conclude that the petitioner has not established any

basis under section 1201.115 for granting the petition for review. Therefore, we

DENY the petition for review and AFFIRM the initial decision, which is now the

Board’s final decision. 5 C.F.R. § 1201.113(b).

¶2 The agency placed the appellant on a performance improvement plan (PIP)

on April 25, 2011, because it determined that his performance in Critical Element

1 (CE1) of the performance plan for his GS-13 Human Resources (HR) Officer

position was unacceptable. Initial Appeal File (IAF), Tab 22 at 17-22. To

perform at the successful level 2 under CE1, the appellant was required to:

(1) timely provide accurate, thoroughly researched, clear and succinct

management advice and technical services, which demonstrated support of

management goals and was responsive to management needs; and

(2) communicate effectively orally and in writing regarding, and timely inform

management officials about, management advisory issues. See id. at 9.

¶3 On September 12, 2011, the agency notified the appellant that he passed the

PIP but that it would take action to reassign, demote, or remove him if his

performance in CE1 again fell below the acceptable level within 1 year of the

beginning of the PIP. Id. at 24-26. The agency proposed his removal under

2

The performance plan included three rating levels: unacceptable, successful, and

outstanding. IAF, Tab 22 at 6.

3

5 U.S.C. chapter 43 on December 8, 2011, finding that his performance in CE1

had fallen again to an unacceptable level. IAF, Tab 21 at 156-65.

¶4 The proposed action stemmed from four assignments e-mailed to the

appellant on September 28, 2011. First, in the morning, an HR Specialist from

another office e-mailed the appellant requesting clarification as to several

suspected Annual Pay Review (APR) errors. Id. at 162; IAF, Tab 22 at 169-70.

As a result of this e-mail, it was discovered that seven APR forms, which the

appellant had been responsible for ensuring contained correct pay and award

information when he signed them in June and July 2011, contained errors. See

IAF, Tab 21 at 162-63, Tab 22 at 172-78. The appellant did not identify the

errors to his supervisor until September 30, 2011. See IAF, Tab 21 at 162.

Further, one of the forms contained a pay setting error that resulted in an

employee’s pay increase not being timely implemented. See id. at 163. The

appellant was unable to respond to management inquiries as to whether the

employee at issue was entitled to receive retroactive payment and failed to

conduct research in order to provide a response. See id. The pay-setting error

ultimately caused a budget shortfall for the 2011 fiscal year and also required

agency management to recalculate its budget for the 2012 fiscal year due to the

unexpected increase to salary costs. See id.

¶5 Second, that afternoon, the appellant’s supervisor requested that he review

and update an employee listing by noon on September 30, 2011. Id. at 157-58;

IAF, Tab 22 at 34. The e-mail was sent with high importance and listed the

deadline in the subject line. IAF, Tab 21 at 158, Tab 22 at 34. On September 30,

2011, when his supervisor inquired shortly before noon as to the status of the

assignment, the appellant seemed unaware of it and indicated that he must not

have read the e-mail. IAF, Tab 21 at 158, Tab 22 at 38. The appellant then

assigned the task to a subordinate employee but, because he failed to properly

relay the instructions set forth in the e-mail, his subordinate did not correctly

complete it. IAF, Tab 21 at 158, Tab 22 at 38. Specifically, his subordinate

4

turned in a hard copy with handwritten edits, although the e-mailed instructions

indicated that the changes should be made in Microsoft Word. IAF, Tab 21

at 158, Tab 22 at 38.

¶6 Third, also in the afternoon, the appellant’s supervisor asked him to

determine whether there was a minimum amount of time which an employee

could use from a time-off award. IAF, Tab 21 at 161, Tab 22 at 99. The e-mail

did not include a deadline, and the appellant failed to respond, so his supervisor

e-mailed him on September 29, 2011, indicating that she needed a response that

day. IAF, Tab 21 at 161, Tab 22 at 99. On October 7, 2011, and October 12,

2011, the appellant’s supervisor sent him follow-up inquiries, as he had yet to

respond. IAF, Tab 21 at 161, Tab 22 at 85, 88. The appellant responded on

October 13, 2011, but his supervisor concluded that the information he provided

was unclear and incomplete. IAF, Tab 21 at 161-62, Tab 22 at 101.

¶7 Fourth, in the evening, the appellant’s supervisor asked him to edit several

draft organizational charts by October 5, 2011. IAF, Tab 21 at 159, Tab 22 at 46.

The appellant failed to complete the assignment by October 5, 2011. IAF, Tab 21

at 159, Tab 22 at 58.

¶8 On October 6, 2011, the appellant’s supervisor advised him that one of the

organizational charts he had been assigned to edit needed to be submitted to

another office by October 7, 2011. IAF, Tab 21 at 159, Tab 22 at 82. The

appellant’s subordinate e-mailed the document to the appellant’s supervisor on

October 6, 2011, but the chart did not include the changes the appellant’s

supervisor had requested in the September 28, 2011 e-mail. IAF, Tab 21 at 159,

Tab 22 at 82. The appellant’s supervisor e-mailed him to inform him of this

issue, and he provided a corrected version later that day, explaining that he was

unaware that she had sent an e-mail requesting specific changes and that he had

not yet completed the other charts because he was “still working through emails”

from the previous week. IAF, Tab 21 at 160, Tab 22 at 82.

5

¶9 As to the remaining organizational charts, which the appellant failed to

submit by October 5, 2011, his supervisor granted him an extension until

October 11, 2011. IAF, Tab 21 at 160, Tab 22 at 88. The appellant failed to

submit the charts by the extended deadline. IAF, Tab 21 at 160, Tab 22 at 89.

When he did submit them on October 12, 2011, in response to his supervisor’s

inquiry as to the status, they contained numerous errors. IAF, Tab 21 at 160-61,

Tab 22 at 88. The assignment was not finally completed until October 13, 2011.

IAF, Tab 21 at 161, Tab 22 at 101.

¶10 The agency’s removal action became effective on January 26, 2012. IAF,

Tab 21 at 133, 135-39. The appellant subsequently timely 3 filed an appeal with

the Board regarding his removal and requested a hearing. IAF, Tab 1. He

disputed that his performance in CE1 following the PIP was unacceptable as a

whole, and also asserted that the agency: (1) did not provide him with an

adequate opportunity to improve; (2) improperly relied on a 2-week time period

to justify his removal; 4 and (3) failed to consider extenuating circumstances that

explained some of the alleged performance deficiencies. Id. He raised

affirmative defenses of sex and race discrimination, disability discrimination

based on a failure to accommodate, as well as reprisal for engaging in EEO

activity. Id. He also alleged that the agency violated his due process rights by

3

The appellant first filed a formal equal employment opportunity (EEO) complaint.

IAF, Tab 8 at 46-51. The agency issued its final agency decision in that matter on

November 2, 2012. IAF, Tab 7 at 7-8. The appellant’s appeal was therefore timely

filed under 5 C.F.R. § 1201.154.

4

On review, citing Muff v. Department of Commerce, 117 M.S.P.R. 291 (2012), the

appellant seems to suggest that the agency was not permitted to rely solely on a 2-week

period to justify his removal. See Petition for Review (PFR) File, Tab 6 at 5, 20-21.

We find this argument to be without merit because Muff does not announce an absolute

rule requiring an agency to rely on a minimum period of performance in order to

remove an employee. To the contrary, as explained in Muff, the Board determines what

constitutes substantial evidence of genuinely unacceptable performance in the context

of an employee’s annual performance plan on a case-by-case basis. Muff, 117 M.S.P.R.

291, ¶ 8.

6

failing to provide him clear notice as to the basis for the proposed action, thereby

depriving him of a meaningful opportunity to respond. Id.

¶11 After holding the requested hearing, the administrative judge issued an

initial decision affirming the agency’s removal action. IAF, Tab 45, Initial

Decision (ID). She found that: (1) the agency’s performance appraisal system

was approved by the Office of Personnel Management; (2) the agency’s

performance standards were valid; (3) the agency clearly communicated its

performance standards to the appellant and notified him that his performance was

unacceptable in CE1; (4) the agency offered the appellant a reasonable

opportunity to improve his performance, but he failed to do so; and (5) the agency

proved by substantial evidence that the appellant’s performance in CE1 was

unacceptable. See ID. She also found that the appellant failed to prove his

affirmative defenses 5 and that the agency did not violate his due process rights.

See ID.

¶12 The appellant has filed a petition for review. PFR File, Tab 6. He argues

that: (1) the agency failed to clearly communicate its performance standards,

thereby depriving him of a reasonable opportunity to improve; (2) the agency

failed to prove by substantial evidence that his performance in CE1 was

unacceptable following the PIP; (3) the administrative judge erred in finding that

he failed to prove his affirmative defenses of disability discrimination and

reprisal; and (4) the administrative judge erred in finding that the agency did not

violate his due process rights. Id. The agency filed a response in opposition and

the appellant filed a reply. PFR File, Tabs 12, 14.

5

We will not disturb the administrative judge’s findings concerning the appellant’s

affirmative defenses of race and sex discrimination because the appellant does not

challenge them on review. See generally PFR File, Tab 6.

7

The agency clearly communicated its performance standards to the appellant and

afforded him a reasonable opportunity to improve.

¶13 The appellant asserts that the agency did not provide him a reasonable

opportunity to improve because it: (1) failed to hold many of the weekly

meetings scheduled to discuss his progress; (2) “disparaged” him during the

weekly meetings that did occur, rather than providing him with guidance on how

to improve his performance; and (3) failed to clearly communicate its

performance standards. 6 PFR File, Tab 6 at 9-14, 17-20.

¶14 As to weekly progress meetings, there is no dispute that the appellant’s

first-level supervisor indicated in the PIP that she would meet with him weekly to

discuss his performance but only met with him five times during the 90-day PIP

period. IAF, Tab 22 at 21, Tab 43 at 3, 6-10; see PFR File, Tab 14 at 9.

However, the PIP explicitly directed the appellant to meet with his second-level

supervisor if his first-level supervisor was not available. IAF, Tab 22 at 21. The

appellant admits that he never contacted his second-level supervisor on the

occasions when his first-level supervisor was unavailable for the weekly progress

meetings. IAF, Tab 36 at 60. We find wholly unpersuasive the appellant’s

assertion that he did not know how to meet with his second-level supervisor

because he was located in another part of the state, several hundred miles away.

See PFR File, Tab 6 at 19. If the appellant were truly uncertain as to how these

meetings were to take place, he could have taken the simple step of contacting his

6

Regarding his performance standards, the appellant states that the agency: (1) did not

notify him as to whether he successfully completed the PIP until 2 months after the PIP

period had ended; (2) confused him by rating his performance as successful in other

critical elements which had requirements similar to CE1; (3) confused him by rating his

performance as unacceptable in CE1, although he had received favorable ratings in CE1

in previous years; (4) issued a PIP completion letter that confused him because it

indicated that he had passed the PIP but also stated that his performance had only

improved to “a minimally acceptable level”; and (5) failed to counsel him about timely

responding to e-mail communications, complying with deadlines, proofreading his work

product, or any other performance deficiencies, prior to placing him on the PIP. PFR

File, Tab 6 at 12-14, 16.

8

second-level supervisor by telephone or e-mail to seek clarification. We also

reject the appellant’s purely speculative contention that any meetings with his

second-level supervisor would not have been fruitful. See id.

¶15 The appellant states that during the progress meetings that did take place,

his first-level supervisor was “disparaging,” failed to make positive comments

about his work, and instead used these meetings to “be negative” and “point[ ] out

errors.” Id. at 11-12. During his deposition, the appellant explained that he

found the meetings “discouraging” because his supervisor “complained about

everything [he] did” and always made comments such as “you missed doing this

. . . I don’t like this; you messed up this; you forgot to put the link here . . . you

didn’t correct the edits that I gave you.” IAF, Tab 36 at 61-62. He believed that

not every meeting should have been about his errors. Id. at 62. Although the

appellant may have preferred to receive positive feedback about his work, it is

unclear how the agency was to communicate performance deficiencies to him

without identifying errors.

¶16 In any event, we find that the agency adequately informed the appellant of

the performance standards for his position. 7 Based on the appellant’s own

description of what took place during progress meetings, it appears to us that his

supervisor counseled him regarding his performance by pointing out areas in

which he remained deficient. There are also numerous examples in the record of

7

The appellant also asserts that the agency held him to a higher standard than his

performance plan required. PFR File, Tab 6 at 13-14. We do not agree that requiring

the appellant to timely respond to e-mails, meet deadlines, and proofread his work

product constitutes an improper enlargement of his job duties. CE1 explicitly required

the appellant to provide advice and technical services in a “timely” manner. IAF,

Tab 22 at 9. Moreover, no counseling should have been necessary for the appellant,

who was notably a supervisory employee, to understand that he needed to respond to

communications from his supervisor and complete assignments in a timely manner

without numerous errors. Cf. Goodwin v. Department of the Air Force, 75 M.S.P.R.

204, 207-08 (1997) (finding that, given the types of tasks the employee was required to

complete during a PIP, training was not required and, to the extent counseling may have

been necessary, it needed to occur in response to the work product submitted by the

employee).

9

the agency’s efforts to explain to the appellant his performance requirements and

how his performance fell short of those standards. The appellant received a copy

of his performance plan, which set forth the performance expectations for CE1, in

February 2010. IAF, Tab 22 at 6, 9. On his performance appraisal and the

associated PIP, the agency cited various assignments wherein the appellant’s

performance was deficient under CE1, indicating that he had failed to include

requested changes in a document, failed to conduct thorough research and provide

a clear response to an inquiry, and failed to timely complete assignments. Id.

at 9, 18-20. During the PIP, the appellant’s supervisor held a progress review

meeting wherein she counseled the appellant to review his work for grammatical

errors before turning in assignments. See IAF, Tab 11 at 54. She also informed

him that his work on a project that involved revising a policy was incomplete

because it did not include certain edits she had requested and contained other

errors. Id. at 47. The PIP completion letter reiterated that the appellant must

ensure his assignments were complete and fully responsive to management needs,

accurate, and proofread for grammatical and typographical errors. IAF, Tab 22

at 24-26. During the period following the PIP, the appellant’s supervisor notified

him on several occasions of the importance of checking his e-mail and providing

timely responses and again noted assignments that contained errors and were not

fully responsive to management requests. See, e.g., IAF, Tab 15 at 97-98,

103-04. We therefore discern no basis to conclude that the appellant did not

receive a reasonable opportunity to improve his performance. 8

The agency proved by substantial evidence that the appellant’s performance in

CE1 was unacceptable.

¶17 The appellant disputes the administrative judge’s finding that the agency

proved by substantial evidence that his performance was unacceptable, arguing

that she failed to consider various extenuating circumstances. PFR File, Tab 6

8

The appellant also asserts that the agency “bombarded” him with tasks that it knew his

disability made it difficult for him to complete, but failed to provide him with a

reasonable accommodation. PFR File, Tab 6 at 8. This argument is addressed below.

10

at 20-27. He suggests that, to the extent that he failed to timely respond to

e-mails during the period at issue, this was because: (1) he did not have a

desktop computer in his immediate office because he had recently moved offices;

(2) agency management did not communicate any policy to him concerning

responding to e-mails; (3) his supervisor failed to follow-up on important e-mails

with a “more effective” form of communication; and (4) he was working on

preparing for a complex retirement counseling session, which was time intensive.

Id. at 22-25. However, there is no dispute that the appellant had access to a

desktop computer in a conference room and also had an agency-issued

Blackberry. Id. at 22; IAF, Tab 36 at 74-75. As previously stated, the appellant

should not have required counseling or a written policy to understand the

importance of timely reviewing and responding to e-mails. We also see no reason

why his supervisor should have been required to personally seek him out to notify

him of e-mails she had sent him. Further, the retirement counseling session to

which the appellant refers took place on September 29, 2011, so this assignment

does not explain why he failed to respond regarding the time-off award

assignment until October 13, or why he failed to complete the majority of the

organizational charts until October 12, even after the initial deadline of

October 5, was extended to October 11. 9 See IAF, Tab 11 at 120.

¶18 The appellant takes issue with the agency’s determination that his

performance on specific assignments was deficient. He contends that his

response to the time-off award assignment was adequate and that he could not

9

The appellant asserts that he timely completed all assignments because he believes

that initial deadlines are merely targets and that assignments are not truly due until the

“hard deadline” when no further extensions are available. PFR File, Tab 6 at 25-26.

This argument is not persuasive. We see no indication that the appellant’s supervisor

communicated to him that she did not actually expect to receive assignments from him

by the deadlines she established. That the appellant’s supervisor apparently attempted

to work with him by extending deadlines he had missed without forewarning or

explanation does not establish that he was justified in failing to timely complete

assignments.

11

provide a clearer answer because the issue is open to interpretation. PFR File,

Tab 6 at 26. He also argues that, although he was ultimately responsible for the

APR forms that were found to contain errors, the errors were minor and were

partially due to his supervisor’s failure to provide him and his staff with

information necessary to complete the forms sufficiently far in advance. Id.

at 26-27. However, the agency is only required to prove by substantial evidence

that the appellant’s performance was deficient. See Thomas v. Department of

Defense, 95 M.S.P.R. 123, ¶ 7 (2003), aff’d, 117 F. App’x 722 (Fed. Cir. 2004).

Regardless of whether reasonable persons might disagree, we find that a

reasonable person could conclude that his performance on these assignments was

deficient. See 5 C.F.R. § 1201.56(c)(1). The appellant’s subjective belief that his

performance was adequate does not provide a basis for review.

¶19 The appellant also states that the administrative judge erroneously found

that his performance deficiencies continued until December 8, 2011, which he

argues constitutes a material error because the agency only relied upon

performance deficiencies through October 13, 2011, in proposing his removal.

PFR File, Tab 6 at 5, 20-22; see ID at 16. The agency concedes that it “did not

rely upon any specific performance deficiencies in November and December 2011

to effect [the appellant’s] removal.” See PFR File, Tab 14 at 25. To the extent

that an error occurred, we discern no harm because we find that the agency

proved by substantial evidence that the appellant’s performance in CE1 was

unacceptable based upon the deficiencies identified in its proposal notice. See

Panter v. Department of the Air Force, 22 M.S.P.R. 281, 282 (1984) (an

adjudicatory error that is not prejudicial to a party’s substantive rights provides

no basis for reversal of an initial decision).

The appellant failed to prove his affirmative defense of retaliation.

¶20 The appellant asserts that the administrative judge failed to properly

analyze the evidence in the record establishing that the agency placed him on a

12

PIP and removed him in retaliation for his EEO activity, 10 including that agency

management: (1) did not place him on a PIP until 4 months after the last alleged

performance deficiency forming the basis for the PIP, which violated its own

policy and agency managers’ stated beliefs regarding the appropriate manner of

addressing performance deficiencies; 11 (2) had not counseled him on any of the

alleged deficiencies prior to placing him on the PIP; (3) placed him on the PIP

just 1 week after learning of his EEO activity; (4) removed him from the EARS

team 2 days after he amended his EEO complaint to include his 2010 performance

appraisal and the PIP; and (5) proposed his removal approximately 5 months after

he filed his formal EEO complaint and 2 months after he requested a reasonable

accommodation. PFR File, Tab 6 at 6-7, 32-34. He also states that he has a

history of good performance and numerous professional achievements. Id. at 34.

¶21 The administrative judge indicated in the initial decision that she was not

convinced, based on her observation of the behavior and demeanor of witnesses

who testified at the hearing, that retaliation was the reason for the agency’s

removal action. ID at 33-34. We must give deference to an administrative

judge’s credibility determinations when they are based, explicitly or implicitly,

on the observation of the demeanor of witnesses testifying at a hearing. Haebe v.

10

The appellant initiated EEO contact on April 11, 2011, and amended his informal

complaint on April 25, 2011, to include his 2010 performance appraisal and the PIP,

and on April 27, 2011, to include his removal from an Evaluation and Review Staff

(EARS) team. IAF, Tab 8 at 254, 262-64. He filed a formal EEO complaint on July 21,

2011, and made additional amendments on August 24, September 25, and October 13.

Id. at 47-51, 174, 176, 178. He filed a reasonable accommodation request on October 9,

2011. IAF, Tab 13 at 114.

11

The appellant also asserts that this delay violated 5 C.F.R. § 432.104. PFR File,

Tab 6 at 14-16. To the extent that he is attempting to raise an affirmative defense of

harmful procedural error, we decline to consider it because he has provided no

explanation for his failure to raise such a claim below. See Arndt v. Department of

Transportation, 16 M.S.P.R. 221, 225 (1983) (the Board will not review claims of

affirmative defenses raised for the first time on review, where they are not supported by

any new evidence which was unavailable before the record closed below); see also IAF,

Tab 37 at 5-6, Tab 40 at 1-3.

13

Department of Justice, 288 F.3d 1288, 1301 (Fed. Cir. 2002) . We may overturn

such determinations only when there are “sufficiently sound” reasons for doing

so. Id. We discern no basis to disturb the administrative judge’s findings in this

instance.

¶22 The record contains contemporaneous written communications between

members of agency management indicating that, in January 2011, the agency

determined that the appellant’s performance in CE1 was unacceptable and thus

began preparing the PIP. IAF, Tab 16 at 21, 23-27. The agency apparently

planned to issue the PIP in late March 2011. Id. at 65-68. However, the

appellant was then out of the workplace for medical reasons for approximately 1

month, beginning on March 21, 2011. Id. at 72, 83-84, 133. The appellant did

not initiate EEO contact until April 11, 2011, and agency management did not

learn of it until April 18, 2011. IAF, Tab 8 at 254, 270, 273, Tab 15 at 199.

Based on the foregoing, we agree with the administrative judge that the agency

had already identified the appellant’s performance issues and devised a plan to

address them before he engaged in protected EEO activity, thus negating any

inference of a retaliatory motive as to the implementation of the PIP. See ID

at 33-34.

¶23 The appellant appears to suggest that his removal from the EARS team, and

his subsequent removal from the agency, are indicative, because of “suspicious

timing,” of a pattern of retaliation stemming from his EEO activity. See PFR

File, Tab 6 at 33. However, temporal proximity alone is not sufficient to

establish, by preponderant evidence, that the agency’s articulated reasons for its

action are a pretext for retaliation. Betz v. Department of Justice, EEOC App.

No. 0120073557, 2009 WL 363135, at *8 (Jan. 30, 2009). 12 The appellant offers

no evidence to dispute the agency’s assertion that it removed him from the EARS

12

The Board generally defers to decisions of the U.S. Equal Employment Opportunity

Commission concerning issues of substantive discrimination law. See Southerland v.

Department of Defense, 119 M.S.P.R. 566, ¶ 20 (2013).

14

team because, given that the team is tasked with evaluating district operations, it

was not appropriate to retain him on the team while he was working under a PIP

to raise his performance to an acceptable level. See IAF, Tab 8 at 75, 264, Tab 10

at 25-27. Notably, in September 2011, agency management again authorized him

to participate as an EARS evaluator following his successful completion of the

PIP. IAF, Tab 17 at 19; see IAF, Tab 10 at 27-28. Moreover, as previously

stated, we find that the appellant has not offered any evidence or argument that

would cause us to disturb the administrative judge’s finding that the agency

proved by substantial evidence that it removed the apellant from his position

because of his continued unacceptable performance in CE1 following the PIP.

The appellant failed to prove his affirmative defense of disability discrimination.

¶24 The appellant suffers from the eye condition esotropia, which he asserts

affects his ability to read small font and causes him to experience eye fatigue and

double vision after reading for prolonged periods, thereby “imped[ing] his ability

to complete tasks that involve substantial reading.” 13 PFR File, Tab 6 at 8, 28;

13

The administrative judge found that the appellant is an individual with a disability

because of his esotropia. ID at 28. We question this finding. In late-October and

early-November 2011, the appellant’s ophthalmologist indicated that his initial

treatment would be an adjusted eyeglass/contact lens prescription, with use of

“over-the-counter reading glasses for near work” and that they would reassess his

condition after 2 months to determine whether surgery would be necessary. IAF,

Tab 13 at 124, 126-27. The agency proposed the appellant’s removal before this

2-month trial period ended. To the extent that his esotropia could have been corrected

with eyeglasses or contact lenses, it would not constitute a disability. See 29 C.F.R.

§ 1630.2(j)(1)(vi) (the ameliorative effects of ordinary eyeglasses or contact lenses

shall be considered in determining whether an impairment substantially limits a major

life activity). Moreover, it is unclear whether the appellant is substantially limited in

the major life activity of seeing simply because he is “limited in his ability to read for

prolonged periods, especially small print” and experiences double vision when looking

at a computer screen, which “correct[s] itself after [he is] able to close [his] eyes for an

hour or more.” See IAF, Tab 13 at 115-16, 127. We need not decide these issues,

however, because even assuming arguendo that the appellant was entitled to an

accommodation which the agency failed to provide, he has not shown that his

performance deficiencies and removal have any connection to the agency’s alleged

failure to accommodate his disability.

15

IAF, Tab 1 at 19-20, Tab 13 at 124, 126-27. He contends that the tasks which the

agency assigned him, and upon which it relied to find his performance

unacceptable following the PIP period, required “heavy proofreading,” which he

could not complete successfully because the agency failed to provide him with

magnification equipment and software as an accommodation for his disability.

PFR File, Tab 6 at 8, 27-32. We disagree. We discern no basis to conclude that

any difficulties the appellant may have had with his vision are responsible for his

repeated failure to timely open e-mails and comply with deadlines, his failure to

conduct thorough research and provide clear advice on technical questions, or his

failure to correctly relay instructions when delegating assignments.

The agency did not violate the appellant’s due process rights.

¶25 The appellant alleges that the agency violated his due process rights

because the deciding official stated, regarding his failure to timely complete

e-mailed assignments, that the record evidence implied that he “ignored [his]

supervisor’s emails until she forced [him] to recognize that she was directing

[him] to provide her with certain advisory services.” PFR File, Tab 6 at 34-35;

IAF, Tab 21 at 138. According to the appellant, these statements constituted

“material allegations that differed from the proposal letter” because the proposal

notice did not characterize his actions as willful. PFR File, Tab 6 at 34-35. He

therefore argues that he did not have a fair opportunity to respond to the charges

against him. Id.

¶26 When proposing an action under chapter 43, an agency’s proposal notice

must identify the “specific instances of unacceptable performance by the

employee on which the proposed action is based” and the critical elements

involved in each instance of unacceptable performance. 5 U.S.C. § 4303(b)(1).

The agency afforded the appellant all of the process he was due; it notified him of

the specific instances of unacceptable performance upon which the proposed

action was based, explained that all of the instances related to his performance in

16

CE1, afforded him over 2 weeks to submit a reply, and considered his reply when

reaching its decision. See IAF, Tab 21 at 135-39, 141-54, 156-65. While the

appellant objects to the deciding official’s alleged characterization of the

instances of unacceptable performance included in the proposal notice as willful,

he does not argue that the deciding official relied upon instances of unacceptable

performance not included in the proposal notice. We thus discern no basis to

conclude that the agency violated the appellant’s due process rights.

NOTICE TO THE APPELLANT REGARDING

YOUR FURTHER REVIEW RIGHTS

You have the right to request further review of this final decision.

Discrimination Claims: Administrative Review

You may request review of this final decision on your discrimination

claims by the Equal Employment Opportunity Commission (EEOC). See Title 5

of the United States Code, section 7702(b)(1) (5 U.S.C. § 7702(b)(1)). If you

submit your request by regular U.S. mail, the address of the EEOC is:

Office of Federal Operations

Equal Employment Opportunity Commission

P.O. Box 77960

Washington, D.C. 20013

If you submit your request via commercial delivery or by a method

requiring a signature, it must be addressed to:

Office of Federal Operations

Equal Employment Opportunity Commission

131 M Street, NE

Suite 5SW12G

Washington, D.C. 20507

You should send your request to EEOC no later than 30 calendar days after

your receipt of this order. If you have a representative in this case, and your

representative receives this order before you do, then you must file with EEOC no

17

later than 30 calendar days after receipt by your representative. If you choose to

file, be very careful to file on time.

Discrimination and Other Claims: Judicial Action

If you do not request EEOC to review this final decision on your

discrimination claims, you may file a civil action against the agency on both your

discrimination claims and your other claims in an appropriate United States

district court. See 5 U.S.C. § 7703(b)(2). You must file your civil action with

the district court no later than 30 calendar days after your receipt of this order. If

you have a representative in this case, and your representative receives this order

before you do, then you must file with the district court no later than 30 calendar

days after receipt by your representative. If you choose to file, be very careful to

file on time. If the action involves a claim of discrimination based on race, color,

religion, sex, national origin, or a disabling condition, you may be entitled to

representation by a court-appointed lawyer and to waiver of any requirement of

prepayment of fees, costs, or other security. See 42 U.S.C. § 2000e-5(f)

and 29 U.S.C. § 794a.

FOR THE BOARD: ______________________________

William D. Spencer

Clerk of the Board

Washington, D.C.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.