Opinion

Stone Cast Inc. v. Couch, Dale Marshall P.C.

Court
New York Supreme Court, Warren County
Filed
Jul 30, 2024
Status
Unpublished
Cited by
0 cases
Authority
More cited than 44.2%

The opinion

Stone Cast Inc. v Couch, Dale Marshall P.C.

2024 NY Slip Op 36045(U)

July 30, 2024

Supreme Court, Warren County

Docket Number: Index No. EF2020-68545

Judge: Allison M. McGahay

Cases posted with a "30000" identifier, i.e., 2013 NY Slip

Op 30001(U), are republished from various New York

State and local government sources, including the New

York State Unified Court System's eCourts Service.

This opinion is uncorrected and not selected for official

publication.

file:///LRB-ALB-FS1/Vol1/ecourts/Process/covers/NYSUP.2020-68545.WARREN.010.LBLX036_TO.html[08/26/2026 3:47:05 PM]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

STATE OF NEW YORK

SUPREME COURT COUNTY OF WARREN

STONE CAST INC.,

Plaintiff, DECISION AND ORDER

-against-

Index No.: EF2020-68545

COUCH, DALE MARSHALL P.C. and RJI No.: 56-1-2021-0093

MARK W. COUCH, Esq.,

Defendants.

Documents Considered: NYSCEF Document #s 9-53, 55-70, 73-99 (e-filed under Warren County

Index No.: EF2020-68545).

McGAHAY,J.

This action for money damages, sounding in legal malpractice and breach of fiduciary duty,

was commenced with the filing of the Summons with Notice with the Warren Cotmty Clerk on

December 11, 2020. The litigation before the Court centers around legal representation provided

by Defendants Mark W. Couch, Esq. and Couch Dale Marshall P.C. (hereinafter collectively

referred to as CDM), to Plaintiff Stone Cast Inc. (hereinafter Stone Cast) concerning Stone Cast's

attempts to be compensated for labor, materials and equipment that it furnished in relation to the

construction of a parking facility (hereinafter the Project) for Fordham University (hereinafter

Fordham). Such legal representation, which began in the year 2006 and concluded in the year

2017, spanned two lawsuits.

The relevant backgrotmd facts in this matter are largely undisputed. Jeffrey M. Brown

Associates, Inc. (hereinafter JMB), a New York entity, entered into a contract with Fordham, for

the construction of a parking lot in the Bronx. To provide security for claimants seeking recourse

for JMB's obligations related to the Project, JMB and Fordham entered into a contract (NYSCEF

Doc# 18) (hereinafter the Payment Bond) with Federal Insurance Company (hereinafter FIC), a

surety.

1

1 of 33

[* 1]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

On March 17, 2005, JMB, as general contractor, entered into a contract (NYSCEF Doc#

58) (hereinafter the Purchase Order) with Plaintiff Stone Cast, as subcontractor, to provide labor,

materials, and equipment for the Project.

Stone Cast, accordingly, began perfonning its work pursuant to the Purchase Order;

however, on April 24, 2006, JMB terminated its contract with Stone Cast pursuant to the

Termination for Convenience provision of the Purchase Order, contained therein at Article 12.

Action 1

On or about July 25, 2006, JMB commenced an action against Stone Cast in Supreme

Court, New York County (hereinafter Action 1) (NYSCEF Doc# 21), alleging Stone Cast's work

prior to termination was negligent and technically defective. JMB and Stone Cast were the only

parties to Action 1, where Stone Cast was represented by CDM.

In response to the Complaint in Action 1, Stone Cast, on or about October 10, 2006, served

its Answer, asserting counterclaims against JMB in the amount of $452,574.00, representing the

balance owed by JMB to Stone Cast pursuant to the Purchase Order (NYSCEF Doc# 22). The

allegations forming the counterclaims were denied by JMB in it reply of October 27, 2006

(NYSCEF Doc# 23).

Stone Cast eventually moved for summary judgment, resulting in an order of the court,

entered on April 25, 2008: 1) dismissing JMB' s Complaint on the ground that JMB was not entitled

to recover from Stone Cast the cost of curing its alleged default; and 2) severing Stone Cast's

counterclaims against JMB.

Stone Cast's counterclaims against JMB were subsequently removed to the U.S.

Bankruptcy Court in the Northern District of New York as an Adversary Proceeding. The parties

2

2 of 33

[* 2]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

then agreed by stipulation and order to transfer the case to the U.S. Bankruptcy Court in the

Southern District of New York.

Following a trial before Hon. Robert D. Drain of the U.S. Bankruptcy Court in the Southern

District of New York, and by Memorandum of Decision After Trial, entered on November 17,

20l4(NYSCEFDoc#35)(seelnreStoneCast,Inc., 11-1045-1 (REL),2014 WL6435717 [Bankr

SDNY Nov. 17, 2014]), Judge Drain found that JMB was liable to Stone Cast in the aggregate

amount of $452,211.20, stemming from JMB's breach of section 12.1 of their contract, which

entitled Stone Cast to be paid for "work properly performed in connection with the tenninated

portion of the work prior to the effective date of termination and for items properly and timely

fabricated off the Project site, delivered and stored in accordance with the Contractors

instructions".

The corresponding judgment was entered on December 18, 2014 (NYSCEF Doc# 36) in

the total amount of $762,168.58, representing the trial decision award of $452,211.20, plus pre-

judgment interest at the rate of9% in the amount of $309,957.381, with post-judgment interest to

be paid at the Federal rate.

1 The awarded amount of$309,957.38 in prejudgment interest is based upon computations provided to the Court by

CDM's letter of November 26, 2014 (NYSCEF Doc# 62) as follows:

$121,199.57 ($176,050.00 Retainage on first seven bills due upon termination, April 24, 2006 through

November 17, 2014, seven [7] years at $15,844.50 per annum, plus 237 days at $43.4056

per diem, $15.844.50 [7] + $43.4056 [237])

$104,013 .27 ($121,411.20 plus $30,000.00: retainage on eighth bill due 30 days after billed on April

30, 2006 through November 17, 2014, seven [7] years at $13,627.008 per annum, plus

231 days at $37.3343 per diem: $13,627.008 [7] + $37.3343 [231])

+ $84,744.54 ($124,750.00 Award for work after eighth bill but before termination, as billed May 2,

2006, due 30 days after billed or June 1, 2006 through November 17, 2014, seven [7]

years at $17,227.50 per annum plus 200 days at $30.7602 per diem, $11,227.50 [7] +

$30.7602 [200])

Total: $309, 957 .38

3

3 of 33

[* 3]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

With the December 18, 2014 entry of the Judgment, which was not appealed and thus

became final on January 3, 20152 , the litigation encompassing Action 1 concluded.

Action 2

CDM also represented Stone Cast, as plaintiff, in an action brought against the Project

surety, FIC (hereinafter Action 2), which was commenced by Summons and Complaint (NYSCEF

Doc# 39) filed in the New York State Supreme Court, New York County, on February 27, 2007.

Action 2 was premised upon FIC's alleged failure, as surety, to remit payment to Stone Cast for

its claim against the Payment Bond in the amount of $452,540.00, representing money owed by

JMB to Stone Cast, after having notified FIC of its claim against the Payment Bond, by letter dated

November 29, 2006 (NYSCEF Doc# 38).

By Answer dated March 30, 2007 (NYSCEF Doc# 40), FIC denied its liability to Stone

Cast for the money sought under the Payment Bond, and asserted various affinnative defenses, to

include Stone Cast's alleged failure to comply with the notice of provisions of the Payment Bond.

The Payment Bond for the Project, which was the subject of Action 2, named JMB as

"Contractor", Fordham as "Owner", while FIC served as "Surety" (NYSCEF Doc # 60). In

relevant part, the Payment Bond provides as follows:

1 The Contractor and the Surety, jointly and severally bind themselves, their heirs,

executors, administrators, successors and assigns to the Owner to pay for labor,

materials and equipment furnished for use in the performance of the Construction

Contract which is incorporated herein by reference.

4 The Surety shall have no obligation to Claimants under this bond until:

2 Pursuant to Fed. R. Bankr. P. 8002(a)(l), an appeal of the judgment was required to be filed within fourteen (14)

days after entry of such judgment. However, since the fourteenth day was January 1, 2015, a legal holiday, Rule

9006 extended the deadline to appeal to the end of the next day, Friday, January 2, 2015. (see Fed. R. Bankr. P.

9006[a][l][C], 9006[a][6][A]).

4

4 of 33

[* 4]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

4.1 Claimants who are employed by or have a direct contract with

Contractor have given notice to the Surety (at the address described in

Paragraph 12) and sent a copy or notice thereof to the Owner stating that a

claim is being made under this Bond and with substantial accuracy, the

amount of the claim.

6 When the Claimant has satisfied the conditions of paragraph 4, the Surety shall

promptly and at the surety's expense take the following actions:

6.1 Send an answer to the Claimant with a copy to the owner, within 45

days after receipt of the claim, stating the amounts that are tmdisputed.

6.2 Pay or arrange for payments of any undisputed amounts.

12 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered

to the address shown on the signature page·. Actual receipt of the notice by Surety,

the Owner or the Contractor, however accomplished, shall be sufficient compliance

as of the date received at the address shown on the signature page.

On July 8, 2015, Stone Cast moved for summary judgment on its claim, or in the

alternative, dismissal ofFIC affirmative defenses (NYSCEF Doc# 45). FIC filed a cross-motion

for summary judgment dismissal of the Complaint, or in the alternative, partial summary judgment

dismissal of Stone Cast's claim for pre-judgment interest (NYSCEF Doc# 46).

By Decision and Order dated November 10, 2016, Hon. Lucy Billings resolved the pending

summary judgment motions (NYSCEF Doc# 48) (see Stone Cast, Inc. v Fed. Ins. Co., 57 Misc

3d 1220(A) [Sup Ct 2016], ajfd 154 AD3d 614 [1st Dept 2017]) and in doing so made

determinations concerning: 1) the sufficiency of Stone Cast's compliance with the Payment

Bond's notice requirements, contained at§ 4.1 of the Payment Bond; and 2) Stone Cast's claim

for prejudgment interest against FIC.

The Court provides the relevant portion of Judge Billings' Decision and Order, as modified

to remove citations to the record, which states as follows:

5

5 of 33

[* 5]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

C. The Payment Bond's Notice Requirement

In the Payment Bond, defendant and Jeffrey M. Brown Associates bound

themselves to pay the owner of the construction project premises, nonparty

Fordham University, for labor, materials, and equipment furnished for use in the

perfonnance of the construction contract. Under the Payment Bond ,r 4.1, defendant

owed no obligation to plaintiff until it (1) provided notice to defendant and (2) "sent

a copy, or notice thereof to the Owner." Thus plaintiffs notice to both defendant

and the owner is a condition precedent to defendant's obligation to pay plaintiff.

Tishman Westwide Constr. LLC v. ASF Glass, Inc., 33 A. D. 3d 539 , 539-40 (1st

Dep't 2006); 153 Hudson Dev., LLC v. DiNunno, 8 A.D.3d.77, 78 (1st Dep't 2004);

Clurman v. Bronfinan, 245 A.D.2d 201,202 (1st Dep't 1997). See 135 E. 57th St.

LLC v. Daffy's Inc., 91 A.D.3d 1, 5 (lstDep't2011); Provident Loan Socy. ofN.Y.

v. 190 E. 72nd St. Corp., 78 A.D. 3d 501,502 (1st Dep't 2010). Since the Payment

Bond does not require notice before commencing an action on the bond, notice is

not a condition precedent to suit as defendant contends. Walter Concrete Constr.

Corp. v. Lederle Labs., 99 N.Y.2d 603, 605 (2003).

The Payment Bond ,r 12 provides:

Notice to the Surety, the Owner or the Contractor shall be

mailed or delivered to the address shown on the signature page.

Actual receipt of the notice by Surety, the Owner or the Contractor,

however accomplished, shall be sufficient compliance as of the date

received at the address shown on the signature page.

When plaintiff has satisfied ,r 4.1 's notice requirement, ,r 6 requires

defendant to respond to the claim within 45 days and pay any undisputed amounts.

A failure to comply with notice conditions precedent warrants dismissal of

a claim under the Payment Bond against the surety. High Tech Enters. & Elec.

Servs. ofNY, Inc. v. Expert Elec., Inc., 113 A.D.3d 546,547 (1st Dep't 2014); 150

Nassau Assoc., LLC v. Liberty Mut. Ins. Co., 36 A.D.3d 489,489 (1 st Dep't 2007);

Tishman Westwide Constr. LLC v. ASF Glass. Inc., 33 A.D.3d at 539-40; 153

Hudson Dev .. LLC v. DiNunno, 8 A.D.3d at 78. See HRH Constr., LLC v. Elite

Constr. ofN.Y., Inc., 36 A.D.3d 560, 560 (1st Dep't 2007). Here, only plaintiffs

attorney attests that plaintiff sent notices to defendant and the owner by certified

mail, without demonstrating plaintiffs regular mailing procedures or the attorney's

personal knowledge of the mailing. Hermitage Ins. Co. v. Zaidman, 107 A.D.3d

579,580 (1st Dep't 2013); Tower Ins. Co. ofN.Y. v. Ray & Frank Liq. Store, Inc.,

104 A.D.3d 482,483 (1st Dep't 2013); People v. Torres, 99 A.D.3d 429,430 (1st

Dep't 2012). See Badio v. Liberty Mut. Fire Ins. Co., 12 A.D.3d 229,229 (1st Dep't

2004). His authentication of the return receipts by defendant and the owner of the

mailings, returned to plaintiffs attorney, the author of the mailed notices, by the

6

6 of 33

[* 6]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

United States Postal Service, however, demonstrate receipt of notice by defendant

December 7, 2006, and by the owner February 24, 2015, after the litigation in the

Bankruptcy Court concluded. E. g., Tower Ins. Co. of N.Y. v. Ray & Frank Lig.

Store. Inc., 104 A.D.3d at 483; Matter of State Farm Mut. Auto, Ins. co (Kankam),

3 A.D.3d 418,419 (1st Dep't 2004); 8112-24 18th Ave. Realty Corp. v. Aetna Cas.

& Sur. Co., 240 A.D.2d 287,288 (1st Dep't 1997); Gelbart v. Borglum, 195 A.D.2d

416,416 (1st Dep't 1993).

Although defendant's witness, its Manager of its Surety Claims Department,

does not attest that he was employed by defendant in 2006, he denies that defendant

received the notice dated November 29, 2006, that plaintiff shows was received

December 7, 2006. Insofar as defendant's witness raises a factual issue regarding

receipt of this notice, however, the witness resolves the issue by admitting that

"Federal actually received notice that a claim was being made by Plaintiff Stone

Cast under the Bond . .. in or about March 2007," when plaintiff served its

complaint in this action. No one demonstrates on personal knowledge or with

admissible documentary evidence that this notice did not satisfy the Payment

Bond's requirements.

Nor does anyone demonstrate on personal knowledge or with admissible

documentary evidence that the owner did not receive notice from plaintiffF ebruary

24, 2015, as required by the Payment Bond. Therefore the court grants plaintiff

summary judgment on plaintiffs claim and denies defendant summary judgment

dismissing plaintiffs claim for $452,211.20 based on the Bankruptcy Court's

findings and plaintiffs satisfaction of the notice requirements under the Payment

Bond as of February 24, 2015.

D. Prejudgment Interest

Defendant contends that plaintiff is not entitled to prejudgment interest

added to the judgment against Jeffrey M. Brown Associates because the Payment

Bond only covered labor, materials, and equipment. As set forth above, however,

the Bankruptcy Court awarded damages only for labor, materials, and equipment.

In breach of contract actions such as that one for breach of the construction contract

and this one for breach of the Payment Bond, the court must award interest to make

the injured party whole. C.P.L.R. § 5001(a); J. D'Addario & Co., Inc. v. Embassy

Indus., Inc., 20 N.Y.3d 113, 117-18 (2012); St. Stephen Community A.M.E.

Church v. 2131 8th Ave., LLC, 123 A.D.3d 642, 642-43 (1st Dep't 2014).

Preverdict interest "shall be computed from the earliest ascertainable date

the cause of action existed." C.P.L.R. § 5001(b); Village of Ilion v. County of

Herkimer, 23 N.Y.3d 812, 821 (2014). See Levin & Glasser, P.C. v. Kenmore

Prop., LLC, 70 A.D.3d 443,445 (1st Dep't 2010). Defendant admits that it received

its required notice of plaintiffs claim under the Payment Bond at least by March

2007 and does not dispute that the owner received its required notice of plaintiffs

claim February 24, 2015. Based on these facts, the earliest date defendant was

7

7 of 33

[* 7]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

obligated to pay plaintiff under the Payment Bond was April 10, 2015, 45 days after

the owner received plaintiffs notice. Singer Asset Fin. Co., LLC v. Melvin, 33

A.D.3d 355,359 (1st Dep't 2006); Siegel v. Laric Entertainment Corp .. 307 A.D.3d

861, 863 (1st Dep't 2003).

The Payment Bond does not impose a time limit on when plaintiff may

notify the owner of plaintiffs claim. Therefore plaintiff did not forfeit any right to

payment by its delayed notice. Any time after defendant answered the complaint

served in March 2007, before February 24, 2015, defendant was free to move for

swnmary judgment dismissing plaintiffs claim due to its failure to satisfy the

condition precedent of notice to the owner. High Tech Enters. & Elec. Servs. of

NY, Inc. v. Expert Elec., Inc., 113 A.D.3d at 547; 150 Nassau Assoc .. LLC v.

Liberty Mut. Ins. Co., 36 A.D.3d at 489; Tishman Westwide Constr. LLC v. ASF

Glass, Inc., 33 A.D.3d at 539-40; 153 Hudson Dev., LLC v. DiNunno, 8 A.D.3d at

78.

Since the Bankruptcy Court's decision was November 17, 2014, well before

the earliest date defendant was obligated to pay plaintiff under the Payment Bond,

April 10, 2015, defendant's further contention that interest did not accrue until

conclusion of the action between Jeffrey M. Brown Associates and plaintiff is

academic. Plaintiff may not claim interest on plaintiffs claim against defendant

from the same date as awarded on its claim against Jeffrey M. Brown Associates or

even from the conclusion of that action, because defendant was not a party to that

action, City ofNew York v. Welsbach Elec. Corp., 9 N.Y.3d 124, 128 (2007); Juan

C. v. Cortines, 89 N.Y.2d 659, 672 (1997); Green v. Santa Fe Indus., 70 N.Y.2d

244,253 (1987); Commercial Ins. Co. ofNewark, N.J. v. Popadich, 68 A.D.3d 401,

401 (1st Dep't 2009), and it adjudicated Jeffrey M. Brown Associates' default under

the construction contract, not defendant's default under the Payment Bond. Weiss

v. Manfredi, 83 N.Y.2d 974, 976 (1994); Lind v. Greenspan, 101 A.D.3d 428,429

(1st Dep't 2012); World City Found., Inc. v. Sachetti, 48 A.D.3d 213, 213-14 (1st

Dep't 2008). Most importantly, plaintiff had not at that point satisfied a condition

precedent to plaintiffs claim against defendant and established defendant's default.

N.Y. Gen. Oblig. Law§ 7-301; Tri-City Elec. Co. v. People, 63 N.Y.2d 969, 971

(1984) ; Casa Redimix Concrete Corp. v. Cosner Constr. Corp., 68 A.D.3d 673,

673 (1st Dep't 2009).

On the other hand, defendant has not contended, let alone shown, that it was

unaware when plaintiff provided notice to the owner and that any such unawareness

would toll the accrual of interest. The Payment Bond nowhere requires plaintiff to

notify defendant that plaintiff has provided notice of plaintiffs claim to the owner.

Since plaintiff has established that both defendant and the owner received the

requisite notice as ofFebruary 24, 2015, and raises no factual issue regarding earlier

satisfaction of the notice requirements, that date determines when interest accrues

on the Bankruptcy Court's damages award of$452,211.20 for labor, materials, and

equipment under the construction contract.

8

8 of 33

[* 8]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

Judge Billings concluded the Decision and Order by granting Stone Cast's motion for

summary judgment to the extent that: 1) FIC's affirmative defenses were dismissed; and 2)

judgment was awarded in favor of Stone Cast, and against FIC, in the amount of$452,211.20, with

interest thereon at the statutory rate of9% per year from April 10, 2015.

Significantly, and central to this lawsuit, unlike the judgment issued in Action 1 in favor

of Stone Cast against JMB, which provided for prejudgment interest on the judgment amount of

$452,211.20 dating back to the year 2006, totaling an additional $309,957, the Judgment in Action

2 only awarded Stone Cast prejudgment interest against FIC on the judgment amount of

$452,211.20 from April 10, 2015.

FIC subsequently appealed the above referenced Decision and Order to the Appellate

Division, First Deparb.nent (NYSCEF Doc# 49). By Opinion entered on October 31, 2017, the

First Department unanimously affinned Judge Billings' Decision and Order (NYSCEF Doc# 50)

(see Stone Cast, Inc. v Fed. Ins. Co. , 154 AD3d 614 [1st Dept 2017]).

Stone Cast, through its counsel CDM, ultimately collected the full Action 2 judgment

amount from FIC and on November 14, 2017 issued a satisfaction of said judgment (NYSCEF

Doc# 51). With the issuance of the satisfaction of judgment, CDM's representation of Stone Cast

concluded.

This Action

On December 11, 2020, Stone Cast commenced this action (NYSCEF Doc# 12), asserting

causes of action for legal malpractice and breach of fiduciary duty against its fonner counsel, CDM

(NYSCEF Doc# 13).

For the legal malpractice cause of action, Stone Cast alleges CDM was negligent, and thus

committed legal malpractice, for failing to timely satisfy the condition precedent to recovery on

9

9 of 33

[* 9]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

the Payment Bond, contained at § 4.1, to put Fordham on notice of its claim against the Payment

Bond, and/or to properly create and retain sufficient proof of compliance with the notice

requirement, at the same time that notice was given to FIC, in the year 2006. Stone Cast alleges

that had notice of its claim against the Payment Bond been given to Fordham on the same day it

allegedly served notice to FIC, December 6, 2006, then Stone Cast would have been entitled to

collect to fromFIC in Action 2, the full award of damages of$ 762,168.58 3 made in Action 1, plus

post-judgment interest from November 17, 2014. Stone Cast asserts the damages caused by

CDM' s legal malpractice consist of the loss of approximately $309,957.38 in prejudgment interest,

and the loss of post-judgment interest on said lost balance of prejudgment interest.

Stone Cast also asserts a cause of action against CDM for Breach of Fiduciary Duty,

alleging that CDM while acting as an attorney for, and performing work for Stone Cast, inter alia,

"failed to engage in work that was necessary, engaged in work that was unnecessary, engaged in

work and delays that were counter-productive, counter-indicated, or simply worthless ...

perfonned legal work that was of no value, caused delay and lost the opportunity to obtain adequate

and fair compensation for Plaintiffs injuries and damages". Stone Cast states "the breach of

fiduciary duty was a substantial factor in damages to Plaintiff and the conflict of interest between

Defendants' own interests along with the delay, excessive litigation, unnecessary litigation, and

loss of the ability to move forward on the litigation." As alleged, "the violations and breaches were

a substantial factor in the negative financial outcome for Plaintiff, and proximately caused

financial damage to Plaintiff'. As a result of CDM's alleged breach of fiduciary duty and conflict

of interest with CDM, Stone Cast claims it has been damaged in an amount to be determined by

the Court.

3 $452,211.20 (contractual damages)+ $309,957.38 (prejudgment interest)=$ 762,168.58

10

10 of 33

[* 10]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

Defendants CDM appeared in this action through service of its Answer, which contained

affinnative defenses, on March 12, 2021.

Presently before the Court are the parties' competing motions for summary judgment,

which the Court decides herein.

STANDARDFORSUMMARYJUDGMENT

The proponent of a motion for summary judgment must establish a prima facie case by

submitting proof in admissible form which eliminates any material issue of fact; only then does

the burden shift to the opponent to rebut that proof (see Winegrad v. New York Univ. Med. Ctr.,

64 NY2d 851, 853 [1985]; Candelario v. Watervliet Haus. Auth., 46 AD3d 1073, 1074 [3d 2007]).

LEGAL MALPRACTICE

Defendants CDM seek summary judgment dismissal of Stone Cast's cause of action for

legal malpractice and opposes so much of Plaintiff Stone Cast's motion for the same.

CDM initially notes that the Payment Bond, at §1, expressly limits FIC's coverage to "pay

for labor, materials and equipment furnished for use in the performance of the Construction

Contract" and contains no express provision assuming liability for money owed to a covered party

for prejudgment interest. Based thereon, CDM claims FIC could not have been found liable to

Stone Cast, in Acton 2, for JMB's prejudgment interest owed to Stone Cast, as determined in

Action 1. CDM argues, instead, that FIC's liability for prejudgment interest to Stone Cast accrues

as of the date of FIC 's material breach of the Payment Bond, not as a result of the imposition of

prejudgment interest against JMB.

CDM argues that pursuant to the Payment Bond, three things had to occur to trigger FI C's

obligation to pay claims to claimants, such as Stone Cast, who had a direct contract with the

11

11 of 33

[* 11]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

surety's principal: (1) pursuant to §4.1, a claimant was to give notice to FIC "stating that a claim

[was] being made under this Bond and, with substantial accuracy, the amount of the claim"; (2)

pursuant to §4.1, a claimant also had to provide Fordham, as the owner, with a copy of or notice

of the claim against the surety; and (3) pursuant to§ 6, FIC had forty-five (45) days to respond

and pay any undisputed amount of the claim.

CDM argues, that by the time the December 6, 2006 notice of the claim against the Payment

Bond was sent to FIC, which is when Plaintiff states notice should have also been sent to Fordham,

the entire amount of Stone Cast's claim against the Payment Bond, $452,540.00, was clearly in

dispute in Action 1. Notably, JMB, in its October 26, 2006 Answer to Stone Cast's counterclaim

for the same amount of money, $452,400.00, denied the allegations that it owed such money to

Stone Cast.

Additionally, FIC, in its March 30, 2007 Answer to Stone Cast's Complaint in Action 2,

denied its liability to Stone Cast for the same amount of money, $452,400.00, pursuant to the

Payment Bond. Based thereon, CDM argues that even if it had sent notice of its claim against the

Payment Bond to Fordham in December of the year 2006, FIC would have merely denied all

liability to pay any amount of the claim pursuant to §6 of the Payment Bond, and in fact had no

liability to pay any amount of the claim, as the entire claim was in dispute, and remained in dispute,

until such time as the judgment in Action 1 became final on January 3, 2015 4• In other words,

CDM argues if the notice had been sent to Fordham in 2006, while Stone Cast would have satisfied

all of its requirements under §4 of the Payment Bond, prejudgment interest could still only accrue

as ofFIC ' s breach; however, FIC could not be found in breach for non-payment until the claimed

amount was undisputed, and the entire claimed amount was disputed until Action 1 resolved.

4 See footnote 2.

12

12 of 33

[* 12]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

CDM, in its reply papers, also addresses what it claims are various misstatements of law

and fact made by Plaintiff's Cotmsel and expert and argues that Plaintiff's expert's opinion should

be disregarded. CDM further argues "Plaintiffs putative expert opinion regarding both departure

from the appropriate standard of care and proximate cause are based upon the fallacious premise

that "whether Plaintiff had a 'disputed' or an 'undisputed' amount or claim has no bearing on

whether preverdict interest accrued."

In support of its motion, and in opposition to Plaintiff's motion, Defendants have submitted

the affidavit of Kevin Laurilliard, Esq. (NYSCEF Doc# 11 ), an attorney admitted practice law in

the State of New York, who offers his opinion as an expert in the field of construction litigation

based on his training, education and experience as an attorney practicing construction law for over

thirty-five (35) years. Attorney Laurilliard largely confinns the Defendants' arguments, above, and

further opines, in relevant part, as follows:

34. Based on my training, education and experience as an attorney practlcmg

construction law for over thirty-five (35) years, it is my opinion that CDM did not

commit malpractice, or any failure to exercise the ordinary reasonable skill and

knowledge commonly possessed by a member of the legal profession. In fact, I

believe that CDM provided excellent professional services to plaintiff.

35. Inasmuch as the bond agreement did not enumerate a specific order in which the

conditions must be satisfied, it was not a deviation from the appropriate standard of

care for CDM to wait until there was an undisputed amount to serve notice upon

Fordham. (Ex. 7 §§ 4, 6).

36. While there was a brief delay between the fmality of the Bankruptcy Court's

judgment on January 3, 2015, and notice to Fordham on February 20, 2015 5, it is

clear CDM was attempting to avoid further costly litigation with FIC, in the hope

FIC would simply comply with its obligations under the bond. Such efforts were

also reasonable, under the circumstances. (Ex. 32).

37. Given that the entire amotmt remained in dispute until a trier of fact could resolve

the various defenses raised simultaneously by both JMB and FIC (i.e., that plaintiff

had not provided quality products as required by the contract, or had delayed in

5 This date appears to be an error/typo, as Judge Billings found, in her Decision and Order in Action 2, that such

notice was made on February 24, 2015. For purposes of this motion, the Court is treating this 4 day discrepancy as

de minimis.

13

13 of 33

[* 13]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

meeting its benchmarks, thereby resulting in delays and damages to JMB), it was

inconsequential whether notice to Fordham was provided in 2006 or early 2015,

since FIC was not obligated to make any payment to plaintiff until resolution of

those issues, which did not occur until January 3, 2015.

38. Based upon the foregoing, it is my professional opinion, to a reasonable degree of

legal certainty, that CDM's notice to Fordham of plaintiffs claim following entry

of judgment in the adversary proceeding between plaintiff and JMB was not

negligent, did not commit malpractice, or any failure to exercise the ordinary

reasonable skill and knowledge commonly possessed by member of the legal

profession.

39. Even in the unlikely event the Court disagrees and finds, as a matter of law, that

CDM's failure to send such notice in November 2006 somehow constituted

malpractice, the recoverable damages should be limited to the lost prejudgment

interest which accrued on the undisputed amount from February 18, 2015 to April

9, 2015 when the underlying Supreme Court actually imposed prejudgment interest

upon FIC beginning April 10, 2015, (Ex. 38 at 13).

40. As set forth above, Supreme Court, New York County held FIC had no obligation

under the tenns of the bond to remit any payment until forty-five (45) days after

the amount was undisputed, i.e., upon finality of the judgment from Bankruptcy

Court on January 3, 2015. (Ex. 38 at 9-11). Thus, even if Fordham had been on

notice in 2006, FIC had no obligation to pay until February 17, 2015, or forty-five

(45) days after the amount due plaintiff became undisputed.

41 . As courts frequently hold, prejudgment interest is intended to compensate a party

for the deprivation of the use of funds.

42. In the underlying matter, plaintiff was only deprived of funds due from FIC

beginning on February 18, 2015, in the undisputed amount of$452,211.20, (Ex. 25

at 22).

43 . Moreover, as held by Supreme Court, New York County, since FIC did not commit

itself to liability for JMB's prejudgment interest or any other costs or fees arising

from JMB's default, and instead limited itself to coverage for "labor, materials and

equipment" provided in connection with the Fordham project, plaintiff was not

entitled to any prejudgment interest from FIC until FIC was in default of its own

obligations. (Ex. 7 § 1; Ex. 38 at 8-9).

44. Assuming an award of prejudgment interest from FIC from February 18, 2015, at

the statutory rate of nine percent (9%) per annum, simple prejudgment interest

accrued from that date at an annual rate of $40,699.01, or $111.50 per day. See

CPLR § 5004. 45. However, Supreme Court actually awarded prejudgment interest

on that principal amount beginning April 10, 2015, which continued to accrue until

FIC actually made full payment to plaintiff in November 2017, including the

principal and all accrued interest from April 10, 2015 to the date of payment. (Ex.

38 at 13; Ex. 41).

14

14 of 33

[* 14]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

46. Plaintiff cannot recover any prejudgment interest on the principal amount after

April 9, 2015 against CDM, based upon any alleged malpractice because any such

award would constitute a double recovery and a windfall for plaintiff.

47. Thus, if any damages in this matter are recoverable at all as a result of CDM's

alleged malpractice, those damages are limited to the prejudgment interest of

$111.50 per day which accrued during the fifty-one (51) days from February 18,

2015 to April 9, 2015, or $5,686.50.

48. An award of prejudgment interest beginning in 2006 is not appropriate, since FIC

was under no obligation to pay any amounts to plaintiff at that time.

49. As previously stated, it is my professional opinion that CDM provided excellent

legal services to their client. CDM skillfully, successfully, and tenaciously reserved

and pursued plaintiffs legal rights through its multiple bankruptcy cases. During

my thirty-five (35) years of practicing law, I have witnessed many debtors who

have not had the skill to preserve their claims in the bankruptcy codes stringent and

rigorous procedural and substantive requirements. CDM not only preserved their

client's claims during the multiple bankruptcy cases in changing venues, but CDM

successfully prevailed in a very contentious trial. CDM was able to get their client

paid $452,211.20 plus interest from April 10, 2015. In my professional opinion

CDM obtained an extraordinarily successful outcome for their client.

Plaintiff Stone Cast, in support of its summary judgment motion, and in opposition to

Defendants' motion, argues Defendants CDM confound FIC's obligation to make a payment to

Stone Cast under the Payment Bond, with the obligation to pay pre-verdict interest when it did not

make that payment. In other words, the fact that fault had not yet been fotmd against JMB did not

toll the accrual of interest.

Stone Cast argues that there remains no doubt that JMB breached the contract, as found by

Judge Drain, and that such breach took place on April 24, 2006. According to Stone Cast, if notice

been given to the Fordham on December 7, 2006, the same day notice was given to FIC, then FIC

would have been required to make payment to Stone Cast 45 days later. Plaintiff argues that in

such scenario, ifFIC failed to make such payment, and Stone Cast proved JMB's breach, as it did

before Judge Drain, then the automatic application of CPLR §§ 5001, 5004 and 5007 would have

15

15 of 33

[* 15]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

awarded prejudgment interest at 9% from that date. Plaintiff also highlights narrowly selected

portions of Judge Billings' decision in support of its position.

In forther support of its motion, and in opposition to CDM's summary judgment motion,

Stone Cast has submitted the affidavits of Oscar Michelen, Esq., an attorney admitted to practice

law in the State of New York in the year 1986, who has represented parties in commercial

litigation, construction litigation, litigation regarding liability under performance and surety bonds

in construction, and insurance coverage. Attorney Michelen offers his opinions to a reasonable

degree oflegal certainty, stating in pertinent part, as follows 6:

46. It is my opinion that Defendants failed to exercise the ordinary, reasonable skills

and knowledge commonly possessed by a member of the legal profession,

especially attorneys who practice in construction litigation, claims concerning

construction and payments, or real property taking law in the preparation of the

case and in handling notifications and conditions precedent to the payment of

Bonds.

47. It is my opinion that Defendant law firm was aware of or should have been aware

of cases and case law concerning notification requirements for claims of money

damages in the context of a construction litigation, in the context of a Payment

Bond in the handling of claims against an owner of property a contracting party or

an insurance company.

48. Even while aware of the prevailing law and aware of an authoritative method of

giving notification and satisfying a condition precedent Defendants failed to serve

proper notification of the Owner in a timely fashion.

49. Defendants had the opportunity to give notification to the owner in 2006, yet

inexplicably and negligently waited until 2015. Defendants had the opportunity

resolve all conditions precedent to payment tmder the payment bond, and if no

payment was made for the imposition of pre-judgement interest in 2006 yet

waited until 2015.

50. If Defendants gave notice to an opposing party or to an entity which had the right

to receive notice, it was incumbent upon Defendants to prepare, maintain and

eventually demonstrate transmission of that notice. Failure to prepare, maintain

and present objective proof of the transmission of notice is a departure from good

6 These excerpts were taken from Attorney Michelin's affidavit in opposition of Defendants swnmary judgment

motion (NYSCEF Doc# 68); however, they almost mirror paragraphs 49-64 as contained in Attorney Michelin's

affidavit in support of Plaintiffs cross-motion for swnmary judgment (NYSCEF Doc# 87).

16

16 of 33

[* 16]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

practice by an attorney of reasonable skill, familiar with the applicable rules of

practice and who exercises reasonable care in representing the client. PJI 2: 152.

52. Failure to prepare, obtain, maintain and eventually demonstrate through

admissible evidence that notice was transmitted to an entity which was due that

notice demonstrates a failure "to exercise that degree of care, skill and diligence

commonly exercised by a member of the legal profession in New York. PJI 2:152.

53. Defendants instead were able only to, or chose to give notification some 9 years

later, thus giving up 9 years of interest on the payment amount at the annual rate

of Nine Percent per annum.

54. It is my opinion that instead of collecting$ 762,168.58 in pre-judgment interest,

Plaintiff was limited to collecting$ 452,211.20. Post-judgment interest started

thereafter is on the smaller amount.

55. Pursuant to Judge Billings' Decision and Order, Defendants gave good notice to

Federal Insurance in 2006, and could have given good notice to Fordham

University at the same time. P9, p7.

55.a It is my opinion that had Defendant notified Fordham University, or been able to

demonstrate actual notice to Fordham University in 2006, Plaintiff would have

been able to obtain the full Bankruptcy Court award of$ 762,168.58 in interest.

Prejudgment interest in New York runs at the rate of nine percent per annum.

N.Y. C.P.L.R. 500l(a), 5004. The starting date from which a court computes this

interest is "the earliest ascertainable date the cause of action existed." Conway v.

Icahn & Co., 16 F.3d 504,512 (2d Cir. 1994) (quoting N.Y. C.P.L.R. 5001(b)).

However, "[w]here such damages were incurred at various times, interest shall be

computed upon each item from the date it was incurred or upon all of the damages

from a single reasonable intermediate date." N.Y. C.P.L.R. 5001(b); see also

Marjla v. T.C. Ziraat Bankasi, 147 F.3d 83, 91 (2d Cir. 1998) ("New York law

leaves to the discretion of the court the choice of whether to calculate

prejudgment interest based upon the date when damages were incurred or 'a single

reasonable intermediate date' .... ") (quoting 155 Henry Owners Corp. v. Lovlyn

Realty Co., 231 A.D.2d 559, 560-61,(2d Dep't 1996)).

56. It is my opinion that this failure to exercise the ordinary, reasonable skills and

knowledge commonly possessed by a member of the legal profession,

proximately and fatally damaged Plaintiff in calculation of pre-judgment interest

to the extent stated above, as well as post-judgment interest in a smaller amount.

It is a departure from good practice by an attorney of reasonable skill, familiar

with the applicable rules of practice and who exercises reasonable care in

representing the client. PJI 2:152

57. It is my opinion that this failure was a departure from good practice as it failed to

actually make timely notification to the Owner, or to be able to demonstrate

17

17 of 33

[* 17]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

notice by admissible evidence and to satisfy all conditions precedent to a claim on

the bond. Had Plaintiff been properly represented there would have been an award

of$ 762,168.58 in pre-judgment interest, rather than$ 452,211.20.

58. Failure to make timely notifications, or the failure to obtain, maintain and present

proof of actual notice to the owner proximately damaged Plaintiff and doomed

those claims for prejudgment interest.

59. It is my opinion that but for the failure to make timely notification or to

demonstrate through admissible evidence that notice was given in 2006 and to

satisfy the conditions precedent Plaintiff would have had a recovery of

$762,168.58 rather than$ 452,211.20 and would have had a better economic

outcome.

60. It is my opinion that Plaintiff was inadequately represented and was incorrectly

represented and as a result its claims for complete pre-judgment interest were

denied. This order damaged Plaintiff to the extent of the loss of prejudgment

interest in the amount of$ 309,957.38

61 . It is my opinion that the damage consisted of the loss of approximately

$309,957.38 in prejudgment interest and further post-judgment interest on the lost

balance of prejudgment interest along with potential consequential damages

which proximately result from the loss of use of the pre-judgment interest.

To succeed on their respective motions in this legal malpractice claim, plaintiff is required

to prove each of the elements of his cause of action and defendant is required to establish that

plaintiff could not prove at least one of the elements (see Huffner v Ziff, Weiermiller, Hayden &

Mustico, LLP, 55 AD3d 1009, 1011 [3d Dept 2008]; c£ Guiles v. Simser, 35 AD3d 1054, 1055

[3d Dept 2006]; Tabner v. Drake, 9 AD3d 606, 609 [3d Dept 2004]). Those elements are an

attorney-client relationship between the parties, negligence by defendant in their legal

representation, proximate cause between defendant's negligence and plaintiffs loss, and actual and

ascertainable damages suffered by plaintiff (see Guiles v. Simser, 35 AD3d at 1055; Tabner v.

Drake, 9 AD3d at 609). An attorney is negligent in their legal representation of a client if they

have failed to exercise the ordinary and reasonable skill and knowledge that a member of the legal

profession possesses (see Miazga v Assaf, 136 AD3d 1131, 1133 [3d Dept 2016]); however, "the

18

18 of 33

[* 18]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

'selection of one among several reasonable courses of action does not constitute malpractice' ".

(Bernstein v Oppenheim & Co., 160 AD2d 428, 430 [1 st Dept 1990])

After reviewing the motion papers and having spent extensive time with counsel attempting

to settle this matter, it is clear to the Court that the issue concerning the point in time at which

prejudgment interest would have accrued against FIC, had service of the notice of claim against

the Payment Bond been made upon Fordham in 2006, has loomed large over this suit. This issue

which, based upon the tmdisputed facts in this matter is purely legal, is not only relevant to the

parties' respective arguments on damages at trial, but also appears to factor into the opinions of

both parties' experts when addressing whether the Defendants' conduct breached the standard of

care. Under the unique circumstances of this case, and to limit the issues at trial, the Court finds

it appropriate to address and resolve this legal issue at this time.

"As relevant here, '[s]urety bonds-like all contracts-are to be construed in accordance

with their terms" (Matter of Seneca Ins. Co. v People, 40 AD3d 1151 [3d Dept 2007], quoting

Walter Concrete Constr. Corp. v. Lederle Labs., 99 NY2d 603, 605 [2003]) under established

rules of contract construction (see General Phoenix Corp. v. Cabot, 300 NY 87, 92 [1949];

Mendel-Mesick-Cohen-Architects v. Peerless Ins. Co., 74 AD2d 712, 713 [3d Dept 1980]).

Where the terms are unambiguous, interpretation of the surety bonds is a question oflaw (see State

of New York v. Peerless Ins. Co., 67 NY2d 845, 848 [1986]; General Phoenix Corp. v. Cabot,

supra at 92). Under settled principals, they must be construed strictly in the surety's favor and the

surety's obligations cannot be extended beyond the plain language of the bonds (see Becker v.

Faber, 280 NY 146, 148-149 [1939]; United States Fid. & Guar. Co. v. Orix Credit Alliance, 290

AD2d 504, 504 [2d Dept 2002]; Mendel-Mesick-Cohen-Architects v. Peerless Ins. Co., supra, at

713; People v. Henry, 33 AD2d 1031, 1032 [2d Dept 1970]).

19

19 of 33

[* 19]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

In U.S. Fid. and Guar. Co. v Orix Credit All., Inc. (supra at 504), appellant Orix Credit

All., Inc. challenged so much of a lower court's Order and Judgment in a declaratory judgment

action that failed to award it certain interest for its claim against a surety. In affinning the lower

court's decision, the Appellate Division, Second Department, held, in relevant part, "[s]ince the

undertaking in this case did not obligate the plaintiff surety to pay interest which accrued prior to

its default, the Supreme Court properly detennined that the appellant was not entitled to such

interest from the plaintiff' (id.; c.£ Mid-State Precast Sys. Inc. v Corbetta Const. Co. Inc., 202

AD2d 702, 706 [3d Dept 1994][Surety found liable for prejudgment interest, as contemplated by

the express language of its bond, where the bond provided that a claimant "may sue on this bond

[and] prosecute the suit to final judgment for such sum or sums as may be justly due [the]

claimant", with the Appellate Division, Third Department finding, "[t]hat interest is justly due

plaintiff is established by CPLR 5001(a), which provides that interest is recoverable in a breach of

contract action"][This Court's emphasis added]).

For the same reason asserted by the Second Department in U.S. Fid. and Guar. Co. v Orix

Credit All., Inc. (id.), the Court cannot find that the imposition of prejudgment interest against

JMB in the amount of $309,957.38, in and of itself, would have obligated FIC to pay such interest

to Stone Cast pursuant to the terms of the Payment Bond, had notice been served upon Fordham

in the year 2006. As stated in§ 1 of the Payment Bond, FIC's liability as surety was expressly and

unambiguously limited to the "labor, materials and equipment" fornished in the performance of

JMB's Contract with Fordham. The Payment Bond, which must be construed in FIC's favor,

contains no provision that imposes joint liability on FIC for JMB's prejudgment interest.

In the absence of a contractual provision to assume liability for JMB' s prejudgment interest

(see id.), FIC 's liability to Stone Cast for prejudgment interest stems from FI C's own default under

20

20 of 33

[* 20]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

its obligations of the Payment Bond (see Saratoga Spa & Bath, Inc. v Beeche Sys. Corp., 230

AD2d 326, 333 [3d Dept 1997]; CPLR § 5001 [b ]).

In the matter before the Supreme Court, New York County, Judge Billings found that FIC

was in default of the Payment Bond as of April 10, 2015, which was 45 days after the February

24, 2015 service of notice of the claim against the Payment Bond upon the owner, Fordham. This

is because notice of the claim against the Payment Bond to Fordham, a condition precedent to

FI C's obligations under the Payment Bond, was the last event that needed to occur to trigger FI C's

45-day window to pay any undisputed claims, pursuant to §6 of the Payment Bond. Significantly,

by the time this service occurred, the claimed amount had already become undisputed as JMB' s

liability to Stone Cast for labor, materials and equipment furnished by Stone Cast had already been

detennined by Judge Drain's Memorandum of Decision After Trial of November 17, 2014, the

corresponding judgment related thereto had been filed on December 18, 2014, and the judgment

had already become final on January 3, 2015 7 •

Had CDM served notice of the claim against the Payment Bond upon Fordham at any time

before January 3, 2015, the date the judgment issued in the matter before Judge Drain became

final, then as a matter of law, the earliest FIC could have been adjudged to be in default of the

Payment Bond in the matter before Judge Billings, and thus subject to prejudgment interest, would

have been February 18, 2015. This is because, as Defendants argue, pursuant to §6 of the Payment

Bond, FIC was under no obligation to pay any claims against the Payment Bond that were disputed,

and the entirety of Stone Cast's claim against the Payment Bond was in dispute until such time as

it was resolved by the judgment entered by Judge Drain, on December 18, 2014. FIC, however,

still could not have safely treated the claimed amount as undisputed until the judgment became

7 See footnote 2.

21

21 of 33

[* 21]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

final, on January 3, 2015. Significantly, had FIC made payment of any part of Stone Cast's claim

against the Payment Bond before Judge Drain's decision became final, and it was later determined

after such payment was made that JMB was not liable to Stone Cast for such amount, then FIC

would not have been able to recover such payment back from Stone Cast, pursuant to the voluntary

payment doctrine (See, e.g., Frontier Ins. Co v. Renewal Arts Contracting Corp., 12 AD3d 891,

893 [3d Dept 2004]; National Union Fire Ins. Co. v. Ranger Ins. Co., 190 AD2d 395, 397 [4th

Dept 1993]; Fidelity & Cas. Co. ofN.Y. v. Finch, 3 AD2d 141, 144 [3d Dept 1957]).

In addition thereto, pursuant to Judge Billings' interpretation of §6 of the Payment Bond,

FIC would have had 45 days from January 3, 2015 (the date the claimed amount became

undisputed), until Febrnary 17, 2015, to timely remit payment to Stone Cast.

Therefore, as a matter oflaw, CDM's service of the notice of claim against the Payment

Bond upon Fordham on Febrnary 24, 2015, instead of serving such notice in the year 2006, as

Plaintiff states should have occurred, could have only prevented Stone Cast from collecting from

FIC an additional 51days8 of statutory pre-judgment interest on the judgment amount of

$452,211.20, from that which was actually ordered by Judge Billings. Such amount totals

$5,686.71 9• In making such determination, the Court has considered and rejected the Plaintiffs

arguments that such detennination is inconsistent with the findings of Judge Billings' decision of

November 10, 2016.

Having resolved the disputed legal issue concerning the accrnal date of prejudgment

interest, and upon consideration of the arguments and proofs, the Court nevertheless finds there is

8 From February 18, 2015 (the day after FIC's 45 days to pay undisputed claims would have expired) to April 9,

2015 (after which Judge Billings actually awarded prejudgment interest on the judgment amount of$452,211.20)

9 (452,211.20 x .09) /365=

$111.5041315068493 daily prejudgment interest

$111.5041315068493 x 51 days= $5,686.710706849315

22

22 of 33

[* 22]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

a disputed issue of fact to be resolved by the fact finder as to whether CDM deviated from the

standard of care by not putting Fordham on notice of its claim against the Payment Bond at the

same time it FIC on notice of such claim, in the year 2006, and/or properly documenting notice at

such time.

As stated above, CDM's expert opined that it was not a deviation from the appropriate

standard of care for CDM to wait until there was an undisputed claim amount to serve notice of

the claim upon Fordham, and further opined the "brief delay" between the finality of the

Bankruptcy Court's judgment and service upon Fordham was reasonable under the circumstances

as "CDM was attempting to avoid further costly litigation with FIC, in the hope FIC would simply

comply with its obligations under the bond".

Conversely, Plaintiff's expert opined CDM deviated from the standard of care by failing

to serve Fordham with notice of the claim against the Payment Bond, at the same time it such

served notice upon FIC, in the year 2006, and/or properly documenting the same.

Resolution of this factual dispute requires credibility determinations to be made by the fact

finder at trial. The Court makes such determination, notwithstanding the Plaintiffs expert's

misapplication of the law on the accrnal of prejudgment interest.

Finally, CDM argues Stone Cast's damages at trial for the malpractice cause of action

should be limited to the 51 days of prejudgment interest on the judgment amount of $452,211.20,

from February 18, 2015 to April 9, 2015, which this court has calculated to be $5,686.71. While

recognizing that recovery in legal malpractice actions is limited to pecuniary damages ( see

McPhillips v Bauman, 133 AD3d 998, 1000 [3d Dept 2015]; Kaufman v. Medical Liab. Mut. Ins.

Co., 121 AD3d 1459, 1460 [3d Dept 2014], Iv. denied25 NY3d 906 [2015]), the Court declines to

find, at this time, such amount is the full extent of pecuniary damages for which the Defendants

23

23 of 33

[* 23]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

can be found liable on the malpractice cause of action. The Court does find, however, that so much

of Plaintiffs claim for pecuniary damage that is based upon lost prejudgment interest, is limited

to 51 days of prejudgment interest on the judgment amount of $452,211.20, from February 18,

2015 to April 9, 2015, totaling $5,686.71.

BREACH OF FIDUCIARY DUTY

Plaintiff and the Defendants also move this Court for summary judgment related to the

Second Cause of Action, for Breach of Fiduciary Duty.

In support of their motion, and in opposition to so much of Plaintiffs summary judgment

cross-motion, Defendants argue Plaintiff, in its sworn responses to CDM's Interrogatories

(NYSCEF Doc # 17), confinned that its allegations of CDM's purported breach of its fiduciary

duties and its claims of CDM's supposed legal malpractice are identical and seek to recover the

very same damages. The Court has reviewed Defendants' interrogatories, wherein they request as

follows:

INTERROGATORY NO. 8:

Is plaintiff alleging defendants committed legal malpractice? If so, state in

detail:

A. An exact statement of the alleged legal malpractice; and

B. The date(s) of the alleged legal malpractice.

INTERROGATORY NO. 9:

Please set forth an itemized statement of each and every item of damage

which it will be claimed plaintiff has incurred as a result of the alleged legal

malpractice of defendants.

INTERROGATORYNO.10:

Does plaintiff contend that defendants breached a fiduciary duty to

plaintiff? Is so, set forth precisely:

A. An exact statement of the alleged breach of fiduciary duty; and

B. The date(s) of the allege breach of fiduciary duty.

24

24 of 33

[* 24]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

INTERROGATORY NO. 11:

Set forth an itemized statement of each and every item of damage which

it will be claimed that plaintiff has incurred as a result of the alleged breach of

fiduciary duty.

Although Interrogatory No. 8 was only addressed to Plaintiffs legal malpractice cause of

action, Plaintiff seemingly responded to that interrogatory by setting forth its theories for both the

legal malpractice cause of action and its breach of fiduciary case of action. Concerning the breach

of fiduciary claim, Plaintiffs response states as follows:

By virtue of the attorney-client relationship, Defendants owed Plaintiff a

fiduciary duty to deal fairly, honestly and with undivided loyalty, including

maintaining confidentiality, avoiding conflicts of interest, operating competently,

safeguarding client property and honoring the client's interests over their own,

performing the work in a timely fashion, not incurring unnecessary work or

expenses, acquainting the finn with up-to-date infonnation on the rights and

liabilities in the subject area and in general, being knowledgeable about how to

prosecute this constitutional violation and unconstitutional taking matter, file an

adequate complaint and not file incompetent pleadings. Defendants were under a

duty to Plaintiff to act for it, to act correctly for it, and to avoid conflicts of interest

in its representation of Plaintiff by performing work that was unnecessary, contra-

indicated, not solely for its benefit finn and of no benefit to the client, to give advice

for Plaintiffs benefit on all matters within the scope of the representation of

Plaintiff and not to place their own interests ahead of Plaintiffs.

Defendants were under a fiduciary duty to avoid engaging in conduct which

caused financial harm to Plaintiff and to avoid engaging in conduct, which was

unnecessary, counter-productive, counter-indicated, or simply wrongful. While

acting as an attorney for, and performing work for Plaintiff, Defendants failed to

engage in work that was necessary, engaged in work that was unnecessary, engaged

in work and delays that were counter-productive, counter-indicated, or simply

worthless.

Defendants performed legal work that was of no value, caused delay and

lost the opportunity to obtain adequate and fair compensation for Plaintiffs injuries

and damages. This contraindicated work of no value included the failure to make

notifications and the work associated with the defense of those departures from

good practice.

It was a breach of fiduciary duty to engage in any of these acts. This breach

of fiduciary duty caused Plaintiff to pay for unnecessary or contra-indicated

services, become billed for those and similarly wrongful services, all to the

detriment of Plaintiff Defendants breached their fiduciary duty to Plaintiff by

perfonning work that was unnecessary, counter-indicated, solely for the benefit of

25

25 of 33

[* 25]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

the finn and of no benefit to Plaintiff on all matters within the scope of the

representation of Plaintiff That breach of fiduciary duty was a substantial factor in

damages to Plaintiff and the conflict of interest between Defendants' own interests

along with the delay, excessive litigation, unnecessary litigation, and loss of the

ability to move forward on the litigation.

But for the acts of, and fiduciary advice of Defendants, Plaintiff would have

obtained fair and adequate compensation for its injuries and damages. Defendants

were in violation of their fiduciary duties, were in breach of fiduciary duty, and

were in violation of their ethical obligations of attorneys to their client. These

violations and breaches were a substantial factor in the negative financial outcome

for Plaintiff, and proximately caused financial damage to Plaintiff.

As a proximate result of these shortcomings in representation, Plaintiff has

been damaged by this breach of fiduciary duty and the attendant conflict of interest

between Defendants and Plaintiff in an amount to be determined by the Court.

After responding to Interrogatory No. 8, by setting forth its theories for legal malpractice

and breach of fiduciary duty, Plaintiff then responded to Interrogatory Nos. 9, 10 and 11 as follows:

9. Please see the answer to 8.

10. Please see the answer to 8.

11. Please see the answer to 8. The loss of interest along with legal fees and

costs oflitigation are all part of the damages.

CDM further argues, in its affidavit in opposition to Plaintiffs cross-motion seeking partial

summary judgment on the issue of liability for breach of fiduciary duty, that Plaintiff's expert

merely recites a laundry list of potential conduct which could support a claim for this cause of

action (paragraphs 62-65 quoted below), without any factual support that CDM engaged in any

such acts in the case at bar.

CDM further accuses the Plaintiff's expert of incorrectly opining that the that Plaintiff was

"caused ... to pay for unnecessary or contra-indicated services" (paragraph 65 quoted below),

despite the fact the contingency arrangement between the parties in the underlying action resulted

in an identical fee to CDM, regardless of whether unnecessary work was perfonned. In support of

the claim that this was a contingency fee arrangement, to rebut Plaintiff's Expert's claim

26

26 of 33

[* 26]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

concerning Plaintiff's payment for unnecessary services, Defendants' counsel submits an email

between the Defendant Couch and Stone Cast's president, Terry Karanikas (NYSCEF Doc# 91),

which gives a breakdown of the money received from FIC pursuant to the judgment in Action 2,

with Stone Cast receiving 70% of such amount after expert fee expenses were removed.

CDM also argues in its opposition and reply papers that except for the allegations that make

up the legal malpractice cause of action, Plaintiff's various claims for breach of fiduciary claims

are unsupported by any specific facts, and further notes multiple statements and arguments in

Plaintiff's papers that are not applicable to this case.

In opposition to so much of Defendants' motion seeking dismissal of the breach of

fiduciary duty claims as duplicative, Plaintiff's Counsel argues in his memorandum of law in

opposition, as follows:

As attorney for plaintiff, there is unquestionably a fiduciary relationship

between plaintiff and defendants. The damages in this portion of the case arise

from, and are directly linked to the acts of defendants, and the proximate damages

which flowed directly from the breached fiduciary obligations including the

disgorgement of legal fees, which would not be available in legal malpractice.

Hence the damages are different from, arise from different sources, and are not

duplicative of legal malpractice damages. Reicherbaum v. Cilmi, 64 A.D.3d 693

(2d Dept 2009) Damages her [sic] arise from the unnecessary legal fees paid to the

defendant, which are not an element of the legal malpractice claims.

Plaintiff's Counsel further states that Defendants breached their fiduciary duty to Plaintiff

by their evasive, untruthful practice, in their failure to acknowledge law office failures or errors,

in their failure to admit that the law office was aware that notice had not been given, and in the

failure to give any notice during the 8-year period. Counsel further states, "[i]t is significant that

the retention agreement between Plaintiff and Defendants was to pay hourly rate payments to the

law finn in its representation of the insured".

27

27 of 33

[* 27]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

It is Plaintiffs position that the action for breach of fiduciary duty is governed by a

considerably lower standard ofrecovery, as it requires only that the plaintiff"identify a conflict of

interest which amounts to merely a substantial factor in the loss" (Estate ofRev. Kornstein, Veisz

& Wexler, 958 F.Supp 907 [1997]), and Plaintiff seemingly claims that the Defendants were

disloyal to the Plaintiff

Plaintiff also relies on the opinions of its expert, Attorney Michelen, who addresses the

breach of fiduciary duty cause of action as follows 10:

62. It is my opinion that by virtue of the attorney-client relationship, Defendants

owed Plaintiff a fiduciary duty to deal fairly, honestly and with undivided loyalty,

including maintaining confidentiality, avoiding conflicts of interest, operating

competently, safeguarding client property and honoring the client's interests over

their own, performing the work in a timely fashion, not incurring unnecessary work

or expenses, acquainting the firm with up-to-date information on the rights and

liabilities in the subject area and in general, being knowledgeable about how to

prosecute this constitutional violation and unconstitutional taking matter, file an

adequate complaint and not file incompetent pleadings.

63. It is my opinion that Defendants were tmder a duty to Plaintiff to act for it,

to act correctly for it, and to avoid conflicts of interest in its representation of

Plaintiff by performing work that was unnecessary, contra-indicated, not solely for

its benefit firm and of no benefit to the client, to give advice for Plaintiffs benefit

on all matters within the scope of the representation of Plaintiff and not to place

their own interests ahead of Plaintiffs. It is my opinion that Defendants were under

a fiduciary duty to avoid engaging in conduct which caused financial harm to

Plaintiff and to avoid engaging in conduct, which was unnecessary, counter-

productive, counter-indicated, or simply wrongful.

64. It is my opinion that while acting as an attorney for, and performing work

for Plaintiff, Defendants failed to engage in work that was necessary, engaged in

work that was unnecessary, engaged in work and delays that were counter-

productive, counter-indicated, or simply worthless. Defendants performed legal

work that was of no value, caused delay and lost the opportunity to obtain adequate

and fair compensation for Plaintiffs injuries and damages. This contraindicated

work of no value included the failure to make notifications and the work associated

with the defense of those departures from good practice.

10 These excerpts were taken from Attorney Michelin's affidavit in opposition of Defendants swnmary judgment

motion (NYSCEF Doc# 68); however, they almost mirror paragraphs 65-71 as contained in Attorney Michelin's

affidavit in support of Plaintiffs cross-motion for swnmary judgment (NYSCEF Doc# 87).

28

28 of 33

[* 28]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

65. It is my opinion that it was a breach of fiduciary duty to engage in any of

these acts. This breach of fiduciary duty caused Plaintiff to pay for unnecessary or

contra-indicated services, become billed for those and similarly wrongful services,

all to the detriment of Plaintiff Defendants breached their fiduciary duty to Plaintiff

by performing work that was unnecessary, counter-indicated, solely for the benefit

of the finn and of no benefit to Plaintiff on all matters within the scope of the

representation of Plaintiff.

66. It is my opinion that the breach of fiduciary duty was a substantial factor in

damages to Plaintiff and the conflict of interest between Defendants' own interests

along with the delay, excessive litigation, unnecessary litigation, and loss of the

ability to move forward on the litigation.

67. It is my opinion that but for the acts of, and negative fiduciary advice of

Defendants, Plaintiff would have obtained all prejudgment interest awarded to it,

Defendants were in violation of their fiduciary duties, were in breach of fiduciary

duty, and were in violation of their ethical obligations of attorneys to their client.

68. It is my opinion that these violations and breaches were a substantial factor

in the negative financial outcome for Plaintiff, and proximately caused financial

damage to Plaintiff As a proximate result of these shortcomings in representation,

Plaintiff has been damaged by this breach of fiduciary duty and the attendant

conflict of interest between Defendants and Plaintiff in the loss of prejudgment

interest and potentially in consequential losses in an amount to be determined by

the Court.

To state a claim for breach of fiduciary duty, a movant must allege (1) the existence of a

fiduciary duty between the parties, (2) the breach of that duty, and (3) damages suffered by the

movant as a result of the breach (see Testani v Russell & Russell, LLC, 204 AD3d 1260, 1262 [3d

Dept 2022]). In the event that a claim "arises out of the same facts as an asserted legal malpractice

cause of action and does not allege distinct damages," that claim is deemed "duplicative of the

malpractice claim" (DiTondo v. Meagher, 85 AD3d 1385, 1385 [3d Dept 2011]; see Miazga v

Assaf, 136 AD3d 1131, 1135 [3d Dept 2016])." 'A cause of action sounding in breach of fiduciary

duty must be pleaded with the particularity required by CPLR 3016(b)' " (Dehlinger v. Sani-Pine

Prods. Co., Inc., 107 AD3d 659, 660 [2d Dept 2015], quoting Palmetto Partners, L.P. v. AJW

Qualified Partners, LLC, 83 AD3d 804, 808 [2d Dept 2011 ]; see CPLR § 3016[b]). Additionally,

29

29 of 33

[* 29]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

and notwithstanding Plaintiffs argument to the contrary, it has been held that in the context of an

action asserting attorney liability, the claims of malpractice and breach of fiduciary duty are

governed by the same standard of recovery (see Ulico Cas. Co. v. Wilson, Elser, Moskowitz,

Edelman & Dicker, 56 AD3d 1 [1st Dept 2008]).

Here, the Plaintiff's claims for breach of fiduciary duty do not wholesale repeat the same

allegations made for the legal malpractice cause of action, which is narrowly premised upon

CDM's alleged failure to timely serve, and/or properly document service of, notice of the claim

against the Payment Bond upon Fordham. Plaintiff makes various additional allegations for the

breach of fiduciary duty claim, to include Defendants' failure to engage in work that was

necessary, and their engagement in work that was unnecessary/counter-indicated/worthless, which

caused Plaintiff to become billed for those and similarly wrongful services, solely for the

Defendants' benefit, to the detriment of Plaintiff. The Plaintiff also seemingly alleges some

conflict of interest on the part of the Defendants, although Court recognizes that the fact pattern

before the Court is not one where Defendants were tenninated for cause by Plaintiff. Counsel

further states it is seeking to recoup attorney fees for its breach of fiduciary duty claims, which are

unavailable for, and are not a component of, its legal malpractice cause of action 11 •

While Defendants, in their reply papers to their motion, and in their opposition papers to

the Plaintiff's motion, argue that except for the allegations that make up the legal malpractice cause

of action, Plaintiff's various claims for breach of fiduciary claims are unsupported by any specific

facts, Defendants never affirmatively moved to dismiss these claims for failure to state a cause of

11 Despite this characterization, the Court notes that damages in a legal malpractice case are designed to make the

injured client whole (see, Campagnola v Mulholland, Minion & Roe, 76 NY2d 38, 556 NYS2d 239 [1990]; Baccash

v Sayegh, 53 AD3d 636 [2d Dept 2008]), and a plaintiffs damages may include litigation expenses incurred in an

attempt to avoid, minimize, or reduce the damage caused by the attorney's wrongful conduct (see, Rudolfv Shayne,

Dachs, Stanisci, Corker & Sauer, 8 NY3d 438 [2007]; DePinto v Rosenthal & Curry, 237 AD2d 482 [2d Dept 1997]).

30

30 of 33

[* 30]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

action (see CPLR § 321 l[a][7]) and/or for failure to plead the breach of fiduciary claim with the

specificity required at CPLR § 3016(b).

The Court further notes that although Defendants' Counsel argues Plaintiff cannot establish

the damages it seeks, in the fonn of recoupment of attorney's fees paid to Defendants, as

Defendants were working for Plaintiff pursuant to a contingency fee arrangement, Defendants have

failed to establish their argument with admissible proof in evidentiary form. Significantly,

Defendants neither submitted a copy of the retainer agreement between Plaintiff and Defendants,

nor submitted an affidavit from Defendant Couch, or someone else with personal knowledge,

establishing the contingency fee arrangement between the parties, and the Plaintiffs papers

contain various claims to the contrary12 • The email that was submitted in support of Defendants'

argument, which tends to show a contingency fee arrangement, is hearsay. The Defendants' proof

in support of summary judgment also fails to directly address these vague claims in a meaningful

way, to establish entitlement to summary judgment dismissal.

Under the circumstances, for the above stated reasons, the Court does not find it

appropriate, at this time, to dismiss the breach of fiduciary duty claims as duplicative; however,

depending on the proof at trial, the Court recognizes the possibility that such claims may not

ultimately survive a CPLR § 4401 motion, based on similar arguments.

Conversely, the Court cannot find that the Plaintiff has met its initial burden for summary

judgment on the breach of fiduciary duty cause of action. Although Plaintiff's expert opines, inter

12 The Plaintiffs Counsel, and its expert, have represented to the Court in Plaintiff's papers that Plaintiff was billed

by CDM at an hourly rate for their services, while Defendant's Counsel has represented to the Court that the fee paid

to CDM was on a contingency basis. The information concerning whether this was a contingency fee arrangement

or if Plaintiff was billed at an hourly rate is clearly within the knowledge of the parties that counsel represent. It is

concerning to the Court that whichever Counsel is responsible for misrepresenting the fee arrangement to the Court

has not come forward to correct the misrepresentation and has allowed this misrepresentation to stand. Even if

Counsel was simply mistaken about the fee arrangement at the time the papers were submitted, receipt of the

opposing party's papers should have alerted them to the fact that their representation to the Court was perhaps

incorrect, which should have prompted a further investigation and a correction to the Court and opposing counsel.

31

31 of 33

[* 31]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

alia, that "while acting as an attorney for, and perfonning work for Plaintiff, Defendants failed to

engage in work that was necessary, engaged in work that was unnecessary, engaged in work and

delays that were counter-productive, counter-indicated, or simply worthless .... [and] caused

delay", he has failed to provide the Court with any specific facts upon which this determination is

made, rendering his opinion conclusory and unsupported.

The Court, accordingly, is denying so much of the plaintiffs motion for summary

judgment.

BREACH OF CONTRACT

Finally, the Court notes that in Plaintiffs Counsel memorandum of law in opposition,

reference is made to a breach of contract cause of action, as follows:

When Defendants agreed to be retained by Plaintiffs to represent them a contractual

specific competent and professional legal services and to bill appropriately for these

services. (Michelen Affidavit)

Plaintiffs and Defendants entered into a contract in which Defendants agreed to

represent Plaintiffs according to the standards of good and adequate representation

by an attorney, and Plaintiffs agreed to pay fees as demanded by Defendants.

Defendants breached the contract by the nature of their bills and by billing failures

as set forth above.

Plaintiffs were damaged by the settlement amounts in excess of a reasonable

compensation for Ms. Stratton, attorney fees, in view of the negligence and

malpractice which attended the fees billed by MDAF.

As a result, Plaintiffs were injured in Breach of Contract, and Plaintiffs are due

partial summary judgment on the Breach of Fiduciary Duty claim. (Michelen

Affidavit)

Nowhere else in the Complaint, or other papers, does Plaintiff allege a breach of contract

cause of action. Furthermore, the above arguments are clearly applicable to some other matter, as

the record in this action is otherwise devoid of any reference to "MDAF" or "Mr. Stratton". The

Court is therefore treating this portion of Plaintiffs papers as a nullity.

32

32 of 33

[* 32]

FILED: WARREN COUNTY CLERK 07/31/2024 08:09 AM INDEX NO. EF2020-68545

NYSCEF DOC. NO. 111 RECEIVED NYSCEF: 07/30/2024

Accordingly, it is hereby

ORDERED that Defendants' motion for summary judgment is granted, in part, to the

extent that the that so much of Plaintiff's claim for pecuniary damage on the malpractice cause of

action, representing lost prejudgment interest, is limited to 51 days of prejudgment interest on the

judgment amount of $452,211.20, from February 18, 2015 to April 9, 2015, totaling $5,686.71,

and such motion is denied in all other respects; and it is further

ORDERED that Plaintiff's motion for cross-motion for summary judgment is denied in

its entirety; and it is further

ORDERED that this original decision and order is being uploaded to NYSCEF and

counsel for Defendants shall , within twenty (20) days of the date hereof, serve a copy of this

Decision and Order, with notice of entry, upon all individuals and/or entities entitled to notice

under the law, and shall thereafter file proof of service.

SO ORDERED.

Dated: July 30, 2024

Lake Placid, NY Hon. Allison M. McGahay, J.S.C.

07/31/2024

33

33 of 33

[* 33]