Metzner v. 200 Park LP

Court
New York Supreme Court, Queens County
Filed
Jun 29, 2023
Status
Unpublished
Cited by
0 cases
Authority
More cited than 44.1%

The opinion

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

Short form Order

NEW YORK SUPREME COURT-QUEENS COUNTY

Present: HONORABLE KARINA E. ALOMAR IAS PART 23 7/5/2023

JUSTICE

--------------------------------------------------------------------------------X

MARC METZNER,

Index No.: 702598/2016

Plaintiff, Motion Date: 05/04/2023

Motion Seq. Nos.: 8, 9, 10

-against-

“200 PARK LP”, d/b/a and f/k/a “200

PARK AVENUE NY”, STRUCTURE TONE, INC.,

8 TISHMAN SPEYER PROPERTIES, L.P. and

TISHMAN SPEYER PROPERTIES, INC.,

Defendants.

--------------------------------------------------------------------------------X

STRUCTURE TONE, INC.,

Third-Party Plaintiff,

-against-

LAB PLUMBING & HEATING CO., INC.,

Third-Party Defendant,

--------------------------------------------------------------------------------X

200 PARK LP. i/s/h/a “200 PARK L.P. d/b/a and f/k/a

“200 PARK AVENUE NY” and TISHMAN SPEYER

PROPERTIES, L.P.,

Second Third-Party Plaintiffs,

-against-

LAB PLUMBING & HEATING CO., INC.,

Second Third-Party Defendant,

--------------------------------------------------------------------------------X

Page 1 of 15

1 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

The following numbered papers were read on these motions by: plaintiff for an order pursuant to CPLR §3212 granting

summary judgment against all defendants pursuant to Labor Law §§240(1) and 240(2); defendants/second-third party

plaintiffs 200 Park LP f/k/a 200 Park Avenue NY, Tishman Speyer Properties, L.P., and Tishman Speyer Properties

Inc’s motion for summary judgment dismissing the plaintiff’s complaint in its entirety, and any and all crossclaims,

or in the alternative, granting summary judgment as to 200 Park and Tishman’s contractual and common law

indemnification claims as against Lab Plumbing & Heating Co. Inc.; and defendant/third-party plaintiff’s motion for

an order granting summary judgment dismissing plaintiff’s complaint in its entirety.

PAPERS NUMBERED

Notice of Motion, Affidavit, Exhibits………………… EF No: 242 – 255

Notice of Motion, Affidavit, Exhibits………………… EF No: 266 – 291

Notice of Motion, Affidavit, Exhibits………………… EF No: 292 – 337

Affirmations in Opposition, Affidavit, Exhibits……..... EF No: 256 – 363

Affirmations in Opposition, Affidavit, Exhibits……..... EF No: 340 – 357

Affirmations in Opposition, Affidavit, Exhibits……..... EF No: 342 – 358

Affirmations in Reply, Exhibits..…..………………..…. EF No: 359 – 361

Upon the foregoing cited papers, it is ordered that plaintiff’s motion pursuant to CPLR

§3212, defendants/second-third party plaintiffs 200 Park LP f/k/a 200 Park Avenue NY, Tishman

Speyer Properties, L.P. and Tishman Speyer Properties Inc’s motion for summary judgment

dismissing plaintiff’s complaint in its entirety, and any and all crossclaims, and defendant/third-

party plaintiff motion for the same relief are decided as follows:

By way of background, plaintiff commenced the action on March 07, 2016. In December

2015, defendant 200 Park LP f/k/a 200 Park Avenue NY (“200 Park”) owned real property located

at 200 Park Avenue, New York, New York (“premises”) known as the MetLife building.

Defendant Tishman Speyer Properties, L.P. and Tishman Speyer Properties Inc (collectively,

“TSP”), the site’s property manager, was “responsible for the operations of the building.” During

this time, non-party law firm Paul Hastings, LLP, signed a lease for five floors (26 - 30) at the site.

Defendants 200 Park and TSP negotiated the lease with Paul Hastings. Paul Hastings, thereafter,

retained general contractor defendant Structure Tone to perform gut renovations of the 29th floor

(the “project”). Defendant TSP approved the construction drawings, approved contractors for the

project, and had its site general manager attend construction meetings. TSP also, retained, as the

owner’s agent, authority to stop unsafe work.

Defendant Structure Tone hired subcontractors and was responsible for overall site safety.

It had the unilateral authority to stop work Structure Tone believed was unsafe and walked the site

daily inspecting for unsafe conditions. Structure Tone prepared a document entitled Site Specific

Safety Plan for Paul Hastings (“Site Safety Plan”). The plan provided that for the Paul Hastings

project, “Structure Tone, as a leader in safety, has instituted a six (6) foot rule for all fall protection

issues namely hard barricades or personal fall arrest systems.”

Structure Tone retained third-party defendant Lab Plumbing & Heating Co., Inc. (“Lab”)

as the plumbing subcontractor and tasked Lab to install overhead waste and water pipes and floor

drains. On December 9, 2015, plaintiff Marc Metzner was employed by Lab as a plumber’s helper

and assigned to the Paul Hastings renovation for approximately one month working under

journeyman plumber John Mannarino (“Mannarino”). It is alleged that on the date of the accident,

Page 2 of 15

2 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

after lunch, Metzner and Mannarino began working in the mechanical room of the 29th floor. Once

in the mechanical room, Mannarino set up a six-foot A-Frame ladder, owned by Lab, and instructed

Metzner to climb it and drill holes to install pipe hangers.

Plaintiff testified that the six-foot A-frame ladder was the only one available because their

eight-foot A-frame ladder had been taken by an apprentice at the express direction of the Lab

foreman for use elsewhere on site. Plaintiff further testified that he relied on Mannarino’s

positioning and setting of the A-frame ladder, climbed the ladder and asked Mannarino to pass

him a drill. However, Mannarino left the mechanical room and was unable to hand him a drill.

Plaintiff then descended from the third rung to the second rung to retrieve the drill, when the ladder

wobbled and threw him to the ground. Plaintiff testified that just before the ladder wobbled, he

was facing straight with his hands on the siderails. Plaintiff further testified that he was not

provided with a fall arrest system such as a harness on or before the date of the accident.

Shortly after the accident, John O’Connell (“O’Connell”), Lab’s site foreman, arrived at

the accident scene. Mr. O’Connell testified that plaintiff was under the stress of the accident and

observed that the ladder, after the accident had occurred, “appeared to be damaged.” Mr. James G.

Bickerstaff, vice president of Structure Tone, testified that the ladder “was taken into custody”

after the accident but does not know the current whereabouts of the ladder.

Plaintiff’s motion for Summary Judgment pursuant to §240(1)

Plaintiff now moves for an order granting summary judgment with respect to liability under

Labor Law §240(1) as against 200 Park LP f/k/a 200 Park Avenue NY (“200 Park”), Structure

Tone, Inc. (“Structure Tone”), 8 Tishman Speyer Properties, LP (“8 Tishman”), and Tishman

Speyer Properties (“TSP”) (collectively “defendants”) on the basis that he fell from a wobbly six-

foot A-frame ladder in violation of the Labor Law. Defendants/Second Third-Party Plaintiffs, 200

Park, Tishman Speyer Properties, L.P. and Tishman Speyer Properties Inc. and Defendant/third-

party plaintiff Structure Tone, Inc. also moves to dismiss plaintiff’s complaint under this Labor

Law section.

The proponent of a summary judgment motion has the burden of submitting evidence in

admissible form demonstrating the absence of any triable issues of fact and establishing

entitlement to judgment as a matter of law (see, Giuffrida v Citibank Corp., 100 NY2d 72 [2003];

see also Alvarez v Prospect Hosp., 68 NY2d 320 [1986]). Only when the movant satisfies its prima

facie burden will the burden shift to the opponent “to lay bare his or her proof and demonstrate the

existence of triable issues of fact” (see, Alvarez, 68 NY2d at 324; see also, Zuckerman v City of

New York, 49 NY2d 557 [1980]; Chance v Felder, 33 AD3d 645, 645-646 [2d Dept 2006]).

Pursuant to Labor Law §240(1), all contractors and owners and their agents in the

erection, repairing, altering, or pointing of a building or structure shall furnish or erect, or cause to

be furnished or erected for the performance of such labor, scaffolding, hoists, stays, ladders, slings,

hangers, blocks, pulleys, braces, irons, ropes, and other devices which shall be so constructed,

placed and operated as to give proper protection to a person so employed. To prevail on a cause of

action pursuant to §240(1), a plaintiff must establish that an owner or contractor failed to provide

appropriate safety devices at an elevated work site and that such violation of the statute was the

Page 3 of 15

3 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

proximate cause of his or her injuries.” (Vetrano v J. Kokolakis Contracting, Inc., 100 AD3d 984,

985 [2d Dept 2012]; Ramsey v Leon D. DeMatteis Const. Corp. 79 AD3d 720 [2d Dept 2010]).

Labor Law 240(1) imposes a nondelegable duty upon owners and contractors to provide or

cause to be furnished certain safety devices for workers at an elevated work site, including the

provision of safety equipment to protect workers against falling from a height, and the absence of

appropriate safety devices constitutes a violation of the statute as a matter of law. Narducci v

Manhasset Bay Assocs., 96 NY2d 259 (2001); Misseritti v Mark IV Constr. Co., Inc., 86 NY2d

487 (1995); Ross v Curtis-Palmer Hydro-Elec. Co., 81 NY2d 494 (1993); Rocovich v

Consolidated Edison Co., 78 NY2d 509 (1991); Riccio v NHT Owners, LLC, 51 AD3d 897

(2d Dept 2008); Cambry v Lincoln Gardens, 50 A.D.3d 1081 (2nd Dept. 2008); Natale v City of

New York, 33 A.D.3d 772 (2d Dept 2006). “[T]he purpose of the statute is to protect workers by

placing ultimate responsibility for safety practices on owners and contractors instead of on workers

themselves (citations omitted).” Panek v County of Albany, 99 NY2d 452 (2003).

A cause of action under section 240(1) of the Labor Law is stated when an injury is the

result of one of the elevation-related risks contemplated by that section. See, Rose v A. Servidone,

Inc., 268 AD2d 516 (2000). However, “[t]he extraordinary protections of Labor Law 240(1)

extend only to a narrow class of special hazards and do ‘not encompass any and all perils that may

be connected in some tangential way with the effects of gravity.” Nieves v Five Boro Air

Conditioning & Refrig. Corp., 93 NY2d 914, 915-916 (1999); see, Meng Sing Chang v Homewell

Owner's Corp., 38 AD3d 625 (2d Dept 2007); Natale v City of New York, 33 AD3d 772 (2d Dept

2006). Thus, “liability cannot be imposed under Labor Law § 240(1) where ‘there is no evidence

of violation and the proof reveals that the plaintiff’s own negligence was the sole proximate cause

of the accident’ (citations omitted)” Destefano v City of New York, 39 AD3d 581, 582-583 (2d

Dept 2007); Blake v. Neighborhood Housing Services. of N.Y. City, 1 NY3d 280 (2003). A

defendant moving for summary judgment dismissal of a section 240(1) claim thus bears “the prima

facie burden of demonstrating by proof in admissible form that the plaintiff’s accident was not

proximately caused by a violation of Labor Law § 240(1) (citation omitted), or that the plaintiff’s

own negligent conduct in failing to use an available and adequate safety device was the sole

proximate cause of the accident (citations omitted).” Santo v Scro, 43 AD3d 897 (2d Dept

2007); see, Gittleson v Cool Wind Ventilation Corp., 46 AD3d 855 (2d Dept 2007); Leniar v

Metropolitan Transit Authority, 37 AD3d 425 (2d Dept 2007).

In support of plaintiff’s motion, he submits, the deposition transcripts of plaintiff, the

deposition transcript of Mark Landstrom, on behalf of Tishman Speyer Properties, L.P., James G.

Bickerstaff, on behalf of Structure Tone, Inc., and John O’Connell, on behalf of Lab Plumbing &

Heating Co., Inc.

Plaintiff testified that on the date of the accident he was working for Lab Plumbing &

Heating on the 200 Park Avenue project. He explained that he was not required to wear any specific

uniform for this project and at no time did he attend any safety meetings. Plaintiff testified that his

journeyman, Mannarinno provided him with the directions as to where he would work each day,

including the date of the accident. Plaintiff confirmed that no one other than a Lab Plumbing &

Heating employee ever instructed him how to perform his work and where he would be working.

Page 4 of 15

4 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

Plaintiff averred that all the tools that he used on this project came exclusively from Lab. At the

time of the accident, he was instructed to drill holes to place hangers according to where

Mannarinno had indicated. However, he was unable to drill the holes because Mannarinno did not

hand him the drill and left the work area. At that time, he was on the ladder and descended to

retrieve the power drill, the ladder tipped over, and caused him to fall. Plaintiff stated that there

were no witnesses to his accident and acknowledged that Lab owned the ladder involved in his

accident.

Metzner described the ladder as being blue, six feet high and had an A-frame. He did not

recall seeing any warnings and admitted he carried the ladder over to his work area and that John

Mannarinno setup the ladder. Plaintiff acknowledged that before he began doing work on the date

of the accident, Lab did not provide a harness, he did not ask for one and could not recall if he was

wearing any personal protective equipment. He acknowledged that the legs of the ladder were on

the concrete floor, and no one was holding ladder at the time of the accident. He recalled that the

ladder was not tall enough for the job he intended to use it for and did not ask for a taller ladder.

He further stated that he and Mannarino had to use the six-foot ladder after an apprentice took their

eight-foot ladder at the direction of the Lab site foreman. Also, he did not know why the ladder

tipped over.

Landstrom also testified that he is the general manager for 200 Park Avenue and his duties

include contractor management. He stated that after he received the complaint for this action, he

performed an investigation, and his search revealed no records of the incident. Landstrom

explained that at the time of the incident, Paul Hastings, LLP, a New York City law firm, lease

several floors from 200 Park, L.P. Pursuant to this lease agreement he averred that the tenant was

required to submit a list of names of contractors or entities that it was using to do the work and

provide certificate of insurance for all the subcontractors. It was his understanding that Tishman

kept and maintained the certificates of insurance and drawings from the tenant. He stated that he

would attend construction meetings from time to time and would walk the floor to ensure that there

were no fire safety hazards. Landstrom acknowledged that Paul Hastings, LLP hired Structure

Tone as the general contractor to perform work on the 29th floor of the building. During the project,

he explained, a tenant construction team would contact him to request a sprinkler shutdown or an

electric shutdown. Landstrom further testified that no one from 200 Park L.P. had any involvement

with respect to the construction. He was unsure if Structure Tone performed any of the physical

labor or the construction work for this project. As to safety, he stated that if he were walking

thought the site and saw a condition that he thought was unsafe, he would have the authority,

depending on the level of unsafeness, to stop the work that was being done.

He averred that during the time he did his walkthroughs of the site, he observed electricians,

plumbers, drywallers, carpeting and flooring guys working. He did not recall seeing individuals

working at the site utilizing ladders when he did the walkthrough. Landstrom stated that if a tenant

was issued any type of violation in connection with the work, they would be required to report the

violation to either the building owner or Tishman. Other than Structure Tone and the

subcontractors themselves, he was not aware of anyone else responsible for site safety at the

worksite.

Page 5 of 15

5 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

Bickerstaff on behalf of Structure Tone was also deposed and stated that his current title is

vice president. He stated that his role and responsibilities included overseeing the construction

operations, change order management and safety. He stated that his role as to safety was to make

sure that the subcontractors operate in a safe manner throughout construction. Bickerstaff

acknowledged that Structure Tone was responsible for overall safety at the job site. He further

testified that daily weekly meetings were held with the subcontractors to discuss safety. Bickerstaff

acknowledged that the name “Lab” was written on the ladder and stated that they are the owner of

the ladder. He further acknowledged that Lab was the plumbing contractor for this job. Bickerstaff

explained that Structure Tone initiated an investigation, and an accident report was prepared.

Bickerstaff stated that he and an outside investigator visited the worksite and inspected the ladder

shortly after the incident. He further acknowledged that he took the ladder and locked it up in his

field office within the building at the time but is unsure where the ladder is today. Furthermore,

he stated that he was unsure if the ladder was ever returned to Lab.

He also testified that Structure Tone had individuals on the ground and laborers working

on debris removal. Bickerstaff stated that Structure Tone did not provide any ladders, PPP or safety

equipment to be used by any subcontractors. He further stated that there had not been any other

injuries that occurred prior to the date of this accident involving a ladder on this site. Bickerstaff

explained that as to their incident report which stated in part, “Coming down a ladder on the east

side of the 29th floor he fell off the ladder. Marc was installing pipe in the ceiling and claims he

approx. three-fourth step down form top when he fell off ladder.” He acknowledged that this

information was ascertained from the Lab Plumbing foreman, John O’Connell.

As to the weekly safety meetings, Bickerstaff averred that ladder safety was discussed as

well as the fact that subcontractors are responsible to inspect their own tools and equipment daily,

and anything that was defective or damaged needed to be taken out of service and removed from

the job. He did not recall hearing that the ladder involved in plaintiff’s accident was defective or

damaged in any way. Bickerstaff stated that if he or one of the Structure Tone superintendents

saw a subcontractor’s ladder than appeared to be damaged or defective in some way, he had the

authority to tell them to stop using the ladder. In particular, he stated that he would look for broken

steps, broken supports on the side, any kind of physical damage or visible damage to any of the

rungs, and the legs. He averred that every day during the time of the project, walkthroughs were

performed by Structure Tone and if any safety concerns were observed work would be stopped,

the foreman would be contacted, or the concern would be remedied immediately on site. He further

explained that no workers from Lab Plumbing ever complained to Structure Tone about the ladders

they were using on the project. He also verified that it was custom and practice that the

superintendents would walk the floors all day long from area to area, floor to floor. Bickerstaff

testified that on the date of plaintiff’s accident, other trades were performing work on the 29th floor.

John O’Connell on behalf of Lab Plumbing & Heating Co. also testified. He stated that at

the time of plaintiff’s accident he was a foreman with Lab and was responsible for overseeing

multiple projects, attending the job meetings, making sure that proper safety was being conducted

on site, order the materials, order the tools, set up the manpower, coordinating with the general

contractor, where they are working and what they are working on. O’Connell acknowledged that

Page 6 of 15

6 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

they had toolbox talks and would instruct new employees on how to use or operate tools that they

were unfamiliar with. As for ladder safety, he explained that they conducted ladder safety toolbox

discussions and stated that “…as to how to use a ladder most of the guys have been working for

this company for years, have a general understanding of that.” He averred that the toolbox talks

focused on proper setup, what height to stand at, not leaning ladders against walls and making sure

that they are secure.

As to the 200 Park Avenue project, O’Connell acknowledged that there were multiple sizes

of ladders at the job site. He further stated that at the time of the accident, the plaintiff was working

with John Mannarino, who was the journeyman assigned to the plaintiff. As to guidelines or rules

given by the general contractor to Lab about inspecting ladders before they are opened or used,

O’Connell explained that the ladders were delivered to the site, they were inspected, and they were

new. He further stated that when you take a ladder out, you are routinely supposed to check your

ladder before you even walk up the steps and report anything that may be problematic to the safety,

shop steward or the journeyman. His procedure is if a ladder is damaged it is broken into a

container immediately on the site. O’Connell testified that Lab’s procedure as to a defective ladder

consist of a report, the ladder is then taken out of work, and if it is broken or cracked, it is placed

in the garbage. He acknowledged that the 200 Park Avenue project received brand new ladders

and they were supplied by Lab. As to the chain of command at the job site, O’Connell would give

instruction to the plaintiff’s journeyman, Mannarino and he would in turn instruct the plaintiff as

to his job function.

With respect to the ladder that was used by the plaintiff at the time of the accident,

O’Connell and an individual from Structure Tone inspected the ladder, it was open and lying flat

on the floor and appeared to be damaged. He opined that the ladder was damaged from the fall.

O’Connell acknowledged that no complaints were made to him about this specific ladder.

O’Connell further stated that he believed Structure Tone took custody of the ladder and it was

brought to their office, almost like evidence, and then may have been given back to Lab at some

point. O’Connell was asked if the plaintiff ever received any type of harness on the day of the

accident and he replied that, “[i]f a harness was required, they are usually located inside the gang

box, or they are locked up in my box. If anybody requests a harness, they are accessible.”

Defendants herein maintain that plaintiff’s actions in deciding to use a ladder he knew was

not suitable for the job he intended to use it for, failure to look for other ladders before ascending

the subject ladder and failure to establish that a violation of the Labor Law 240(1) was the sole

proximate cause of plaintiff’s injury, plaintiff’s motion for summary judgment should be denied.

It is well established that in order to raise a triable issue of fact as to whether a plaintiff was the

sole proximate cause of an accident, the defendant must produce evidence that adequate safety

devices were available, that the plaintiff knew that they were available and was expected to use

them, and that the plaintiff unreasonably chose not to do so, causing the injury sustained.

(See Nacewicz v Roman Catholic Church of the Holy Cross, 105 AD3d 402 [1st Dept 2013];

citing Gallagher v New York Post, 14 NY3d 83, 88 [2010]).

As to the personal safety equipment, defendants take the position that pursuant to Structure

Tone’s Safety Plan, the plan did not require the use of harnesses on ladders, and only mentions the

Page 7 of 15

7 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

use of such safety equipment in accordance with aerial/scissor lifts, swing scaffolds, and guard

rails. Moreover, defendants reference the Safety Orientation Guide for Construction, which states

that employees must use the correct ladder for the task.

Here, plaintiff only must show that a violation of Labor Law §240(1) was a contributing

cause of his fall and not the sole cause (See Blake v Neighborhood Rous. Servs, of N.Y. City, Inc.,

1 NY3d 280 [2003]). Moreover, comparative negligence is not a defense to liability under §

240(1) and an analysis of comparative fault is impermissible thus arguments as to plaintiff also

being at fault are likewise unavailing. id. Ultimately, the record before the court suggests that

defendants failed to provide adequate safety devices to ensure that the ladder remained steady and

erect while being used which was a contributing factor to plaintiff's fall and consequently, a

violation of Labor Law § 240(1). (See Hill, supra).

Although a fall from a ladder, is not, by itself, sufficient to impose liability under Labor

Law Section 240(1) (Williams v Dover Home Improvement, Inc., 276 AD2d 626 [2000]), the

failure to secure a ladder to ensure that the ladder remains “steady and erect” while a plaintiff is

working on it, has been held to constitute a violation of Labor Law Section 240(1) (see Hernandez

v Bethel United Methodist, 49 AD3d 251 [2008], quoting Montalvo v J. Petrocelli Constr., Inc., 8

AD3d 173, 174 [2004]). Furthermore, although the plaintiff was the sole witness to the accident,

defendants fail to raise a bona fide issue regarding his credibility, and makes no factual showing

beyond conjecture to warrant a denial of plaintiff's motion (see Barr v 157 5 Ave. LLC, 60 AD3d

796, 79-798 [2009]). Defendants have not shown, as a matter of law, that the plaintiff is a

recalcitrant worker, and the present record contains no evidence that the plaintiff ignored safety

instructions or refused to use supplied safety equipment.

“[A] general construction manager charged with the duty of coordinating ‘all aspects’ of a

construction project is a ‘contractor’ with nondelegable duties under Sections 240 and 241 of the

Labor Law” (see Kenny v George A. Fuller Co., 87 AD2d 183, 190 [2d Dept 1982]). On the

appellate level, construction managers have been held liable under the statute when they were

“responsible ‘for coordinating and supervising the…project and [were] invested with a

concomitant power to enforce safety standards and to hire responsible contractors’” (see Ewing v

ADF Construction Corp., 16 AD3d 1085 [4th Dept 2005]); when they “had the responsibility to

coordinate and the authority to supervise all aspects of the renovation project” (see Maniscalco v

Liro Engineering Construction Management, P.C., 305 AD2d 378, 380 [2d Dept 2003]); when

their construction management agreement “unambiguously authorized [them] to select the various

contractors and to supervise and control their work” (see Griffin v MWF Development Corp., 273

AD2d 907, 908 [4th Dept 2000]).

However, appellate courts have also found that a construction manager had no status as a

general contractor or agent when the “role was only one of general supervision, which is

insufficient to impose liability under Labor Law 240(1) and 241(6)” (see Linkowski c City of New

York, 33 AD3d 971, 975 [2d Dept 2006]), and when they “only coordinated the different

subcontractors, created work schedules, and prepared progress reports for the instant construction

project” (see Armentano v Broadway Mall Properties, 30 AD3d 450, 451 [2d Dept 2006]).

Appellate courts have also found questions of fact when “[t]he agreement [between the

Page 8 of 15

8 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

construction manager and owner] gave the construction manager many of the powers of a general

contractor” (see Nienajadlo v Infomart New York, LLC, 19 AD3d 384, 385 [2d Dept 2005]), and

when the construction manager “was on the job full time to supervise and manage the subtrades”

(see Crespo v Triad, Inc., 294 AD2d 145, 146 [1st Dept 2002]).

Here, considering the contracts between the parties and the deposition testimony, it is clear

that the defendants herein did more than exercise general supervision at the 200 Park site. As such,

plaintiff’s motion for summary judgment under Labor Law 240(1) is granted.

Defendants/Second Third-Party Plaintiffs, 200 Park LP d/b/a

and f/k/a “200 Park Avenue NY”, Tishman Speyer Properties,

L.P. and Tishman Speyer Properties, Inc. motion for summary

judgment dismissing plaintiff’s cause of action under Labor

Law §240(1); §241(6) and §200; or in the alternative granting

it summary judgment on its contractual and common law

indemnification claims as against Lab Plumbing.

The portion of 200 Park and Tishman’s motion for summary judgment under Labor Law

240(1) is denied for the aforementioned reasons.

Labor Law §241(6) imposes on owners and contractors a nondelegable duty to provide

reasonable and adequate protection and safety to persons employed in, or lawfully frequenting, all

areas in which construction, excavation or demolition work is being performed. (Bruce v 182 Main

St. Realty Corp., 83 AD3d 433, 921 NYS2d 42 [1st Dept 2011] [“Labor Law § 240(1) imposes a

nondelegable duty on owners, even when the job is performed by a contractor the owner did not

hire and of which it was unaware, and therefore over which it exercised no supervision or control.”)

As a prerequisite to a 241(6) cause of action, a plaintiff must allege a violation of a concrete

specification promulgated by the Commissioner of the Department of Labor in the Industrial Code.

Here, in plaintiff’s supplemental bill of particulars, plaintiff alleges 200 Park and Tishman

violated the following Industrial Code Rule 23 sections: 23-1.5(a)-(c), 23-1.8(c)(1), 23-1.16(a)-

(f), 1.21(a)-(e), 23-1.30. Plaintiff further alleges violations of 29 CFR (“OSHA”), specifically:

1910.23, 1910.28, 1910.29, 1910.30, 1910.135, 1910.140, 1926.20, 1926.25, 1926.26, 1926.28,

1926.100, 1926.104, 1926.501, 1926.502, 1926.503. However, plaintiff in his opposition papers

states that discovery has yielded one New York State Industrial Code section platforming

plaintiff’s 241(6) claim: Industrial Code §23-1.21. Accordingly, Industrial Code Rule 23 sections:

23-1.5(a)-(c), 23-1.8(c)(1), 23-1.16(a)-(f), 1.21(a)-(e), 23-1.30, are deemed abandoned. (see

Palomeque v Capital Improvement Services, LLC, 145 AD3d 912, 43

NYS3d 483 [2d Dept 2016]; Harsch v City of New York, 78 AD3d 781, 910 NYS2d 540 [2d Dept

2010]). The analysis will be limited to the remaining provisions, in particular:

Industrial Code 23-1.21(b)(8) states in pertinent part,”[a]ll

ladders with spreading bases, such as step and trestle ladders,

shall be equipped with locking type spreaders to hold such bases

rigid when in the open position.”

Page 9 of 15

9 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

Industrial Code 23-1.21(e)(2) directs that, “[w]hen in use every

stepladder shall be opened to its full position and the spreader

shall be locked.”

Defendants 200 Park and Tishman take the position that 23-1.21(b)(8) does not apply to

the facts of the instant matter because there is no evidence in the record that the subject ladder

utilized a spreading base. Moreover, with respect to 23-1.2(e)(2), defendants state that this code is

a general safety standard and does not set forth the specific standards of conduct to qualify as a

predicate for a Labor Law 241(6) claim.

In opposition, plaintiff submits, inter alia, the affidavit of co-worker Kalomo Glover a/k/a

Rasaan Graham (“Glover”). The court, however, will not consider this affidavit as plaintiff did not

properly disclose said witness in discovery responses. See Dunson v Riverbay Corp., 103 AD3d

578, 579 (1st Dept 2013), Perez v New York City Hous. Auth., 75 AD3d 629, 630 (2d Dept 2010),

Ravagnan v One Ninety Realty Co., 64 AD3d 481, 482 (1st Dept 2009), Concetto v Pedalino, 308

AD2d 470, 470-471 (2d Dept 2003). Moreover, defendants herein were not afforded an

opportunity to question Glover with respect to the subject ladder. As such, it will not be considered.

However, plaintiff’s undisputed testimony establishes that he did not know why the ladder

was wobbly as he was descending it and there was uncertainty as to who was present at the worksite

on the date of the accident. Since issues of fact exists as to whether a violation of these provisions

was the proximate cause of plaintiff’s injuries, summary judgment is inappropriate (see Hart, 30

AD3d at 214; Montalvo, 8 AD3d at 176; Liu v 98 Fourth Street Dev. Group, LLC, 2009 WL

2780154 [Kings Co. 2009]). Accordingly, defendants’ motion for summary judgment dismissing

the Labor Law § 241(6) claim in relation to the provisions cited above is denied.

As for plaintiff’s Labor Law §200 claim, defendants argue that this claim should be

dismissed as 200 Park and Tishman did not exercise any direction, supervision, or control over the

means and methods of the contracted work and did not create or have notice of the alleged

dangerous condition.

Plaintiff in his opposition, did not oppose that portion of 200 Park and Tishman’s motion

establishing that plaintiff has no viable claim under Labor Law 200, or common law negligence,

against 200 Park or Tishman, as such it is deemed conceded and plaintiff’s Labor Law §200 claim

as to these defendants is dismissed.

As to 200 Park and Tishman’s contractual and common law indemnification claims against

Lab Plumbing & Heating and Structure Tone, it is well established that a party is entitled to full

contractual indemnification provided that the “intention to indemnify can be clearly implied from

the language and purposes of the entire agreement and the surrounding facts and circumstances”

(see Cuellar v City of New York, 139 AD3d 996, 998 (2d Dept 2016), Barnes v New York City

Hous. Auth., 43 AD3d 842, 844 (2d Dept 2007). The party seeking contractual indemnity need

only establish that it was free from any negligence and would be held liable solely by virtue of

statutory or vicarious liability. Rainer v Gray-Line Dev. Co., LLC, 117 AD3d 634, 635-636 (1st

Dept 2014) (reasoning that summary judgment on a contractual indemnity claim should be granted

Page 10 of 15

10 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

unconditionally since defendant’s liability was purely vicarious), Jamindar v Uniondale Union

Free School Dist., 90 A.D.3d 612, 616 (2d Dept 2011).

Defendants 200 Park and Tishman take the position that the subcontract entered into by

Structure Tone and Lab evidences a clear intent on behalf of Lab to indemnify 200 Park, as owner

of the property, and Tishman as 200 Park’s managing agent. Moreover, they highlight that the

subcontract was in full effect at the time of plaintiff’s accident and his alleged injuries arose out

of the work he was performing in connection with the subcontract. Additionally, 200 Park and

Tishman reference the AIA Contract between Structure Tone and Paul Hastings requiring

Structure Tone to indemnify and hold harmless the Landlord’s non-design agents and

representatives.

Structure Tone’s subcontract with Lab was entered into on October 20, 2015, in connection

with the 200 Park Avenue project.

Section 11.2 of the subcontract states in pertinent part:

To the fullest extent by Law, Subcontractor will indemnify and

hold harmless Structure Tone, Inc., the owner of the property

where the job/project is located, and all parties required to be

indemnified by the prime contract entered into by Structure

Tone, Inc. in connection with the job/project work, and any of

their trustees, officers, members, directors, agents, affiliates,

parents, subsidiaries, and servants and employees from and

against any and all claims, suits, liens, judgments, damages,

losses and expenses including reasonable legal fees and costs

arising in whole or in part and in any manner from the acts,

omissions, breach or default of Subcontractor. . .[its]

employees. . .in connection with the performance of any work

by subcontractor, its employees and subcontractors pursuant

to this Subcontract/Purchase Order. . .Subcontractor will

defend and bear all costs of defending any action or

proceedings brought against Structure Tone Inc/ and or

Owner, their officers, directors, agents and employees, arising

in whole or in part out of any such acts, omission, breach or

defaults.

Moreover, there was an AIA contract between Structure Tone and Paul Hastings, which

states in pertinent part that:

“Indemnity” requires Structure Tone, “to the fullest extent permitted by law” to indemnify

and hold harmless, among others, the Landlord and included Landlord’s non-design agents and

representatives.

200 Park and Tishman must establish that the indemnity provisions of the contract to which

they are not a party clearly and unambiguously includes them as third-party beneficiaries. A party

Page 11 of 15

11 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

asserting rights as a third-party beneficiary must establish “(1) the existence of a valid and binding

contract between other parties, (2) that the contract was intended for [its] benefit and (3) that the

benefit to [it] is sufficiently immediate, rather than incidental. . .”. See Greater Bright Light Home

Care Servs., Inc. v Jeffries-El, 151 AD3d 818, 822 (2d Dept 2017).

The evidence submitted herein establishes that 200 Park was the owner of the property and

Tishman serves as the property manager for 200 Park. As to the second requirement of asserting

rights as a third-party beneficiary, the prime contract between Structure Tone and Paul Hastings,

in particular the Tenant Construction Guide, Section B, page 11 identifies Tishman as agent for

the landlord and the landlord is defined as 200 Park Avenue. The subcontract states that the

“Subcontractor will indemnify and hold harmless Structure Tone, Inc., the owner of the property

where the job/project is located, and all parties required to be indemnified by the prime contract

entered into by Structure Tone, Inc. in connection with the job/project work…” As to the third

requirement, Tishman was responsible for maintaining the premises and as such would be included

as a “non-design agent.” Therefore, should it be determined that 200 Park and Tishman are liable

to the plaintiff, both entities would be entitled to contractual indemnification.

With respect to common law indemnity, a party's right to indemnification may be implied

“based upon the law's notion of what is fair and proper as between the parties”. Castillo v Port

Auth. of N.Y. & N.J., 159 AD3d 792, 795 (2d Dept 2018), Mas v Two Bridges Assoc., 75 NY2d

680, 690 (1990). Common law indemnity is a restitution concept which permits shifting the loss

because to fail to do so would result in the unjust enrichment of one party at the expense of the

other. Castillo 159 AD3d 792, 795 (2d Dept 2018). The party seeking common law indemnity

must establish that it was not guilty of any negligence beyond statutory liability, and that the

proposed indemnitor was guilty of some negligence that contributed to the causation of the

accident for which the indemnitee was held liable to the injured party by virtue of some obligation

imposed by law or the party’s relation to the wrongdoer. Castillo 159 AD3d 792, 795 (2d Dept

2018). In the absence of negligence, it must be established that the proposed indemnitor was either

negligent or exclusively supervised and controlled the work giving rise to plaintiff’s injury.

Benedetto v Carrera Realty Corp., 32 AD3d 874, 875 (2d Dept 2006), Perri v. Gilbert Johnson

Enters., Ltd., 14 AD3d 681, 685 (2d Dept 2005).

It has been established from the evidence submitted that 200 Park nor Tishman neither

supplied nor inspected the equipment used at the worksite which allegedly caused plaintiff’s

injury. Moreover, it has been established that neither 200 Park nor Tishman exercised control or

supervision over the work performed. The testimony demonstrates that Lab supplied the ladders,

inspected the equipment and oversaw safety on-site along with Structure Tone. As such, 200 Park

and Tishman are entitled to common law indemnity from Lab.

As such, the portions of 200 Park and Tishman’s motion for contractual and common law

indemnification are granted.

Page 12 of 15

12 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

Defendant/Third-Party Plaintiff Structure Tone, Inc.’s

motion to dismiss plaintiff’s complaint and common law

negligence along with Lab’s counterclaims and cross-

claims against Structure Tone, and summary judgment on

the third-party complaint against Lab for contractual

defense and indemnification

In support of its motion, Structure Tone submits, inter alia, the affidavit of Geoffery B.

Wardman, P.E.

This court will not consider the affidavit of Wardman in support of the motion as no

curriculum vitae was attached to the affidavit, was executed in the State of Connecticut and is not

accompanied by a certificate of conformity as required by CPLR 2309(c), and there is no evidence

that Wardman visited the site or inspected the ladder in question.

The court nonetheless reiterates its position that plaintiff only has to show that a violation

of Labor Law §240(1) was a contributing cause of his fall and not the sole cause (See Blake v

Neighborhood Rous. Servs, of N.Y. City, Inc., 1 NY3d 280 [2003]). Moreover, comparative

negligence is not a defense to liability under § 240(1) and an analysis of comparative fault is

impermissible thus arguments as to plaintiff also being at fault are likewise

unavailing. id. Ultimately, the record before the court suggests that defendants' failed to provide

adequate safety devices to ensure that the ladder remained steady and erect while being used which

was a contributing factor to plaintiff's fall and consequently, a violation of Labor Law § 240(1).

(See Hill, supra).

As to the portion of Structure’s Tone’s motion dismissing plaintiff’s Labor Law §200

claim, that branch is granted, as plaintiff failed to oppose that branch of the motion.

As to the portion of Structure Tone’s motion to dismiss plaintiff’s 241(6) claim, and as

stated above, plaintiff’s undisputed testimony establishes that he did not know why the ladder was

wobbly as he was descending it and there was uncertainty as to who was present at the worksite

on the date of the accident. Since issues of fact exists as to whether a violation of these provisions

was the proximate cause of plaintiff’s injuries, summary judgment is inappropriate (see Hart, 30

AD3d at 214; Montalvo, 8 AD3d at 176; Liu v 98 Fourth Street Dev. Group, LLC, 2009 WL

2780154 [Kings Co. 2009]). Accordingly, defendants’ motion for summary judgment dismissing

the Labor Law § 241(6) claim as to Industrial Code 23-1.21(b)(8) and Industrial Code 23-

1.21(e)(2) is denied.

As to the portion of the motion that seeks summary judgment as to its contractual defense

and indemnification and common claims against Lab, the two agreements essentially contain

different triggers. It is evident that section 11.2 of the Structure Tone/Lab subcontract is triggered

only as to claims “arising in whole or in part and in any manner from the acts, omissions, breach

of default of subcontractor…” It is firmly established that an indemnity clause that includes an

“acts or omissions” trigger requires some showing of culpable conduct on the part of the

indemnitor that gives rise to the alleged injury. In Lopez v Consolidated Edison Co., 40 NY2d 605,

357 NE2d 951, 389 NYS2d 295 (1976).

Page 13 of 15

13 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

Although Structure Tone makes the argument that plaintiff’s fall was as a result of losing

his balance, it does not demonstrate how that scenario, if true, would trigger an “acts or omissions”

indemnity agreement. Moreover, if that is the case, there could be no liability against Structure

Tone and nothing for Lab to indemnify it for. Also, the indemnity clause within the Blanket

Insurance/Indemnity Agreement which states that it applies only to claims “arising out of or in

connection with or as a consequence of the performance of the work under this agreement, the

rental of any equipment, the acts, omissions, or breaches of this agreement, or default as to this

agreement…” does not clearly conclude that plaintiff’s alleged accident was as a result of Lab

performance of work under this agreement. As such, these ambiguities presents questions of fact

precluding summary judgment for this branch of Structure Tone’s motion. Therefore, it is

premature to determine if the contractual indemnification clauses were triggered as it is disputed

whether negligence existed See Gomez v Sharon Baptist Bd. Of Directors, Inc., 55 AD3d 446, 447

(1st Dept 2008) (holding “[t]hus far there has been no finding that either [third party defendant] or

its agents were negligent let alone that such negligence proximately caused plaintiff's injuries.

Accordingly, summary judgment on the contractual indemnification claim is premature”).

As to the portion of Structure Tone’s motion for common law indemnity against Lab, “[t]o

establish a claim for common law indemnification, ‘the one seeking indemnity must prove not

only that it was not guilty of any negligence beyond the statutory liability but must also prove that

the proposed indemnitor was guilty of some negligence that contributed to the causation of the

accident.’ ” Perri v Gilbert Johnson Enters., Ltd., 14 AD3d 681, 684-685 (2d Dept

2005) quoting Correia v Professional Data Mgmt., 259 AD2d 60, 65 (1st Dept 1999). As it is

evident that plaintiff was a Lab employee and no evidence was submitted establishing a grave

injury pursuant to the Workers Compensation Law, the branch of the motion for this relief is

denied.

Accordingly, it is hereby

ORDERED that, plaintiff’s motion for summary judgment against “200 Park LP”, d/b/a

and f/k/a “200 Park Avenue NY”, Structure Tone, Inc., Tishman Speyer Properties, L.P. and

Tishman Speyer Properties, Inc. pursuant to Labor Law §240(1) is granted, it is further

ORDERED that, Defendants/second-third party plaintiffs 200 Park LP f/k/a 200 Park

Avenue NY, Tishman Speyer Properties, L.P., and Tishman Speyer Properties Inc’s motion for

summary judgment dismissing the plaintiff’s Labor Law §200 claim is granted, and it is further

ORDERED that, Defendants/second-third party plaintiffs 200 Park LP f/k/a 200 Park

Avenue NY, Tishman Speyer Properties, L.P., and Tishman Speyer Properties Inc’s motion for an

order granting summary judgment dismissing the plaintiff’s Labor Law §241(6) claim is denied,

and it is further

ORDERED that, Defendant/third-party plaintiff Structure Stone Inc’s motion for an order

granting summary judgment dismissing the plaintiff’s Labor Law §200 claim is granted, and it is

further

ORDERED that, Defendant/third-party plaintiff Structure Stone Inc’s motion for an order

granting summary judgment dismissing the plaintiff’s Labor Law §241(6) claim is denied; and it

is further

Page 14 of 15

14 of 15

FILED: QUEENS COUNTY CLERK 07/05/2023 09:23 AM INDEX NO. 702598/2016

NYSCEF DOC. NO. 366 RECEIVED NYSCEF: 07/05/2023

ORDERED that, 200 Park and Tishman’s contractual and common law indemnification

claims as against Lab Plumbing is granted, and it is further

ORDERED that, Structure Tone’s motion for contractual and common law

indemnification as against Lab Plumbing is denied.

Any requested relief not expressly addressed herein has nonetheless been considered and

is hereby expressly rejected and this constitutes the decision and order of the court.

This constitutes the Decision and Order of this Court.

Dated: June 29, 2023

___________________________________

KARINA E. ALOMAR, J.S.C.

7/5/2023

Page 15 of 15

15 of 15