Opinion

Flats Management Group v. L.A. County Metro. Trans. Auth. CA2/8

Court
California Court of Appeal
Filed
Apr 24, 2026
Status
Unpublished
Cited by
0 cases
Authority
More cited than 40.3%

The opinion

Filed 4/24/26 Flats Management Group v. L.A. County Metro. Trans. Auth. CA2/8

NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS

California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions

not certified for publication or ordered published, except as specified by rule 8.1115(b). This opinion

has not been certified for publication or ordered published for purposes of rule 8.1115.

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

SECOND APPELLATE DISTRICT

DIVISION EIGHT

FLATS MANAGEMENT GROUP, B333260, B334627

LLC, et al.,

Los Angeles County

Plaintiffs and Appellants, Super. Ct. No. BC691935

v.

LOS ANGELES COUNTY

METROPOLITAN

TRANSPORTATION

AUTHORITY, et al.,

Defendants and Appellants.

APPEALS from orders and a judgment of the Superior

Court of Los Angeles County, Gregory Keosian, Judge. Affirmed

in part, reversed in part, and remanded.

Century Law Group, Edward O. Lear; Evans Kingsbury,

Noreen M. Evans for Plaintiffs and Appellants.

Horvitz & Levy, Robert H. Wright and Mark A. Kressel;

Lewis Brisbois Bisgaard & Smith, Edward E. Ward, Jr. and

Judith J. Steffy for Defendants and Appellants.

____________________

On the southeast corner of Wilshire Boulevard and South

Gale Drive in a bustling Beverly Hills neighborhood sits a single-

story commercial building that has housed various restaurants

and businesses since the 1930s. The physical address of the

building is 8400 Wilshire Boulevard.

Two blocks west, at the corner of Wilshire and La Cienega

Boulevard, is the location for a subway station that the Los

Angeles Metropolitan Transportation Authority (“Metro”) had

been planning for years in the expansion of its Purple Line

westward. Construction on the Wilshire/La Cienega station

began in 2015.

2015 was also the year that a new restaurant hoped to open

at 8400 Wilshire Boulevard. However, because of the ongoing

construction at the Wilshire/La Cienega station, the restaurant’s

owners delayed their plans twice before officially opening in May

2017.

Despite positive reviews, business at the restaurant was

not good.

In January 2018, the restaurant and its landlord sued

Metro, the City of Beverly Hills (“City”), and Skanska Traylor

Shea, the contractor building the station (“Skanska,” and

collectively with Metro and City, “Defendants”), bringing claims

for inverse condemnation, nuisance, negligence, and intentional

interference with contracts.

The restaurant remained open throughout 2018 but closed

in January 2019 due to expenses exceeding revenues.

2

Defendants prevailed at the bench trial on the inverse

condemnation claim. They then moved for a nonsuit on the

remaining claims, and the trial court granted the motions by the

City and Skanska. The court denied Metro’s nonsuit, allowing

the plaintiffs’ remaining claims to proceed against Metro. Then

the jury found Metro negligent and awarded over $4 million in

damages to the plaintiffs. The court denied Metro’s post-trial

motions.

Both sides appealed.

Flats and Simon seek reversal of the trial court’s decisions

on inverse condemnation and granting nonsuit to the City and

Skanska.

City and Skanska moved to dismiss the plaintiffs’ appeal

against them on untimeliness grounds.

Metro asks that we reverse the judgment against it,

contending the trial court erred in denying its motion for

judgment notwithstanding the verdict.

Flats and Simon filed a second appeal, seeking reversal of

the trial court’s post-judgment award of prevailing party costs to

City and Skanska. We consolidated that appeal with the first for

purposes of oral argument and decision.

We grant City and Skanska’s motion to dismiss the Flats

and Simon’s appeal against them. We affirm the trial court’s

decision on inverse condemnation. We reverse its decision

denying Metro’s motion for judgment notwithstanding the verdict

and order it to enter judgment for Metro. We dismiss as moot

Flats and Simon’s second appeal. And we remand for

proceedings consistent with this opinion.

Undesignated statutory citations refer to the Code of Civil

Procedure.

3

I

We recount the facts and procedural history.

A

When Victor Alexandroff was contemplating retirement,

some of his friends found for him what seemed to be an ideal

investment property. Alexandroff, a licensed attorney who had

practiced since 1987 and worked for over 25 years at the Los

Angeles City Attorney’s Office, was looking for a way to

supplement the income he would receive from his pension.

Alexandroff visited the property, located at 8400 Wilshire

Boulevard (“Property”). In his own words, he “fell in love with it.”

Originally built in the 1930’s, the Property, a standalone single-

story art deco building, has one of the oldest liquor licenses in the

state and a history of successful restaurants as tenants, including

a sushi restaurant owned by Matt Damon and Ben Affleck. The

Property’s history, along with its proximity to the Saban Theatre,

which hosted many events, impressed Alexandroff.

While he was still doing due diligence and researching the

Property, Alexandroff learned that Metro was in the process of

expanding its Purple Line and constructing the Wilshire/La

Cienega subway station very close to the Property. He

understood from his research and the papers he read that the

above-ground construction would finish in 2017. Alexandroff

thought that in the long run, it would actually be beneficial to

own property next to the station.

Alexandroff and his wife, through an entity called Simon A.

Management, LLC (“Simon”), purchased the Property at the end

of 2013. At the time of purchase, the Property had, as a tenant

for several years, a popular high-end restaurant named Red

Medicine. Adam Fleischman, a self-taught restaurateur who

4

started the restaurant brands Umami Burger and 800 Degrees

Pizza, had founded Red Medicine as a Beverly Hills destination

restaurant. Alexandroff thought owning the Property would be

“headache free” because Red Medicine would be a good tenant.

Not long after Simon bought the Property, at some point in

2014, Fleischman decided to close Red Medicine to pursue his

other restaurants. But around that time, the Property had

caught the eye of Kyle Schutte, an up-and-coming chef.

Schutte knew Fleischman and had been working with

restaurateurs Lisa Long and Emily Mura-Smith to develop a

restaurant concept they named “The Flats,” which would serve

gourmet flatbreads and sandwiches with an extensive cocktail

selection. Mura-Smith and Long had decades of experience

running restaurants together. They had previously collaborated

with celebrity chef Fabio Viviani, who had appeared on the

television series Top Chef, to open an Italian restaurant.

Schutte believed the Property would be the perfect flagship

location for their restaurant. Long, Mura-Smith, and Schutte

envisioned the restaurant as a concept they could eventually

franchise to other locations. Long and Mura-Smith set up an

entity called Flats Management Group, LLC (“Flats”), to run the

restaurant.

In 2014, Long approached Alexandroff to inquire about

leasing the Property. Alexandroff met with Long and learned of

her history as an experienced restaurateur who had opened

multiple successful restaurants in the past. Given her track

record, Alexandroff decided Long was someone that he wanted to

work with.

Flats signed a lease with Simon in November 2014, and

Alexandroff understood that Long and her team would be doing

5

some renovations at the Property before opening their

restaurant. Fleischman agreed to guarantee the lease for a year.

Long and Mura-Smith were also aware that construction

would begin in 2015 near the Property. Long had experienced

Metro’s expansion of its Red Line near one of her previous

restaurants in North Hollywood. While the construction was

somewhat inconvenient, Long did not feel that it significantly

detracted from her restaurant’s operations. Long did not

anticipate any problems with the construction near the Property

and even touted the Property’s proximity to the Wilshire/La

Cienega station as a potential boon for business to prospective

investors.

Since signing the lease, Long and Mura-Smith continued to

make improvements on the Property, including building out the

walls to make space for large pizza ovens they had imported from

Italy, and getting the necessary permits for their remodeling.

Long invested $875,000 of her own money into the business and

borrowed additional money to help cover the costs. By May 2015,

Long was satisfied with the progress of renovations and hoped to

open the restaurant by the end of the year. Her hope was that

the restaurant would be profitable within two years of opening.

B

At some point in 2015, before the construction began, Long

met Mindy Lake, a community relations officer with Metro.

Lake’s job was to maintain communication with stakeholders in

the community and be the liaison between Metro and Skanska as

Metro continued to expand the Purple Line through Beverly

Hills. In this capacity, she went door-to-door along the path of

the Purple Line extension, introduced herself, and gave people

her contact information so they could reach out if they had

6

questions about the construction. Lake also helped facilitate

monthly meetings in the community to provide updates on the

construction’s progress.

Long told Lake she hoped to open the restaurant in time for

the holiday season in 2015, and Lake responded that this was

“terrific.” From her discussions with Lake, Long believed that

the restaurant’s access to Wilshire Boulevard would be closed for

no longer than two months at a time and that access to Gale

Drive might be “sporadic.”

In late August or September of 2015, Long told Lake she

was worried the restaurant would not be able to open in time for

the holidays because Gale had only limited parking for potential

restaurant patrons, and Flats had not yet gotten its valet permits

from the City. Around this time, there was some construction

near the Property, and Long heard the sound of jackhammers

and saw workers cutting and moving asphalt.

Because of the construction and what Lake had told her,

Long decided to delay the restaurant opening and instead focus

on a second phase of remodeling to elevate the restaurant’s

branding. Long thought Flats might be able to open the

restaurant by spring or summer of 2016.

Through early 2016, construction around the Property

ramped up. The amount of construction caused Long to worry

that opening in April 2016 was not realistic. She was concerned

that people would not be able to access the restaurant from either

Gale or Wilshire. Long decided to push the opening to Christmas

2016. After a meeting with Lake and some other people involved

in the construction around November of 2016, Long decided to

delay the opening again into 2017.

7

In January 2017, Mura-Smith attended one of the monthly

meetings about the construction’s progress. Based on what

Mura-Smith learned at the meeting, Long, Schutte, and Mura-

Smith decided they could open the restaurant in April 2017.

Their understanding was that there would be, at a maximum,

only two months of above-ground construction directly by the

Property. They believed that after April 2017, all construction

would move underground, so they could do a soft opening in April

and officially open in May 2017. Flats began to hire restaurant

staff in March 2017.

By April 2017, however, Metro and Skanska were in the

midst of drilling potholes along Wilshire to install soldier piles

that would go deep underground to support the excavation of the

subway station box. There was still a barrier directly in front of

the Property obscuring its view from certain angles, which would

remain until the end of June 2017.

Throughout April 2017, noise, dust and vibration from the

construction disrupted the ambiance of the restaurant. Patrons

had difficulty finding parking. Many of them left. Nonetheless,

Long felt that she had no choice but to proceed with the May 1,

2017 opening.

By June 2017, Long thought things in front of the

restaurant were looking better. A sidewalk was now open, and

Long felt optimistic. By July 2017, there were two lanes open on

Wilshire, and at least one lane on Gale was open. Flats got a

sidewalk dining permit in the fall of 2017. Sidewalk dining was

up and running for a few months before Flats decided to shut it

down because of the construction noise.

By December 2017, Schutte had left Flats and Long began

to work with other chefs. Long used her payroll from another

8

restaurant to help with Flats’ expenses, which were piling up.

She continued to take out loans, including some with extremely

high interest rates. Long’s efforts kept the restaurant afloat for

several months, and the restaurant garnered positive reviews.

But the restaurant’s revenue was nowhere near what Long and

Mura-Smith had projected. Long, Mura-Smith, and Alexandroff

believed the construction was the reason for the restaurant’s lack

of business.

C

In January 2018, Flats and Simon sued Metro, City, and

Skanska for inverse condemnation, nuisance, negligence, and

intentional interference with contracts. Their complaint alleged

that starting in December 2016, Defendants subjected them to “a

continuing nuisance and profound interference and disruption,”

including obstruction with their free use of the Property;

obstruction of sidewalks and public streets; the placement of

fences near the Property’ entrance; the creation of dust, noise,

vibration, and odors; and impairment of ingress and egress for

both pedestrian and car access. They further alleged Defendants

knew the restaurant “would lose customers and clientele as a

result of their careless and insensitive approach to the

construction of the [subway] segment” and that Defendants

“repeatedly made false representations” about the progress of the

construction and Defendants’ ability to mitigate inconveniences

from the construction.

The restaurant remained open for all of 2018. Sometimes

the restaurant was busy. Construction directly in front of the

restaurant had ceased. But Flats, which had begun paying rent

to Simon in 2014 and had continued to pay rent for over two

years before it officially opened, could no longer pay rent to

9

Simon, despite Alexandroff reducing the rent and returning some

of the $250,000 security deposit.

Simon evicted Flats in January 2019, shuttering the

restaurant.

The Property would remain vacant for over four years.

Alexandroff was not able to rent the Property until March 2023,

when Simon signed a 20-year lease with Panera Bread. The rent

under this lease was substantially below market, and the lease

included a provision that any construction in front of the

Property would further reduce the rent by half.

D

In September 2020, the parties agreed to bifurcate

proceedings: a bench trial for the inverse condemnation claim and

a jury trial for the remaining claims.

The five-day bench trial began in January 2022. In

addition to Long, Mura-Smith, and Alexandroff, Flats and Simon

offered the testimony of restaurateur Adam Fleischman and

Victor Zamora, the president of ZG Valet, a Beverly Hills

company that Flats had hired to assist with parking.

Long, Mura-Smith, and Alexandroff testified about the

ways in which the construction obstructed access to the

restaurant, including a staging area that was directly across the

street. Mura-Smith described trucks constantly coming in and

out of the staging area with large pieces of equipment. Long and

Mura-Smith opined that convenient and consistent access was

necessary for a restaurant to survive. But Long conceded that

access was “intermittent” and was not able to testify as to exactly

how long the construction blocked access to the restaurant.

Zamora testified as to the importance of convenient parking

for restaurants and his unsuccessful efforts to get a valet parking

10

permit for Flats. Instead of a normal valet service, Zamora had

one of his employees stand outside the restaurant and direct

customers to nearby parking facilities.

Fleischman testified about his own experience with the

Property and how it appealed to him for his Red Medicine

restaurant because of its art deco architecture, freestanding

nature, parking lot, visibility on a major street, and beautiful

interior. In his opinion, a successful restaurant in Beverly Hills

would need good visibility from the street, valet parking, and

aesthetic appeal. These qualities enabled Fleischman to operate

Red Medicine for about five years. Fleischman testified that this

meant Red Medicine was successful because “most restaurants

don’t make it past a year or two” and the decision to close Red

Medicine was “elective.”

Defendants presented the testimony of Mohamad Ramlawi,

the Skanska manager responsible for the construction activities

at the Wilshire/La Cienega station, and Mindy Lake.

Ramlawi, a licensed civil engineer who had started his

construction career in 2000, provided an overview of the

construction near the Property and the Purple Line expansion

project more broadly, along with a timeline of the construction.

The entire Purple Line expansion was 3.9 miles. Ramlawi said

that Metro did the same work all along the expansion.

Ramlawi explained that construction on the south side of

Wilshire directly in front of the Property took place over four

months, from March 2017 to June 2017. During this four-month

period, at least two lanes in each direction on Wilshire were open.

In June 2017, construction began on the north side of Wilshire.

Ramlawi also testified that Skanska and Metro were

contractually mandated to maintain access to the Property at all

11

times. There was only one week when they completely closed the

sidewalk in front of the Property.

Ramlawi also described the “decking” process, which began

in September 2017 on Wilshire. Decking enables above-ground

traffic to proceed over underground construction. Decking only

took place on weekends, and entailed Skanska blocking off 120 or

140 feet on Wilshire, removing the pavement, excavating enough

to expose the utilities, covering the hole with a pre-cut deck

panel, and paving it in time for Monday morning traffic. There

was one weekend in December 2017 where Skanska did decking

directly in front of the Property. After that weekend, there was

no further construction activity at the street level in front of the

Property.

Throughout the construction, Ramlawi maintained that it

was possible to get to the Property because Skanska and Metro

never blocked the building or doors. If Skanska and Metro did

close a sidewalk, it “always created a way-finding map that was

distributed to the residents and to the businesses.”

Ramlawi further testified that there were noise limitations

that Skanska and Metro had to respect throughout the

construction process. Skanska used sound blankets to block the

noise from reaching residential areas.

Lake testified that since she began her job in 2014, it was

always possible to access the Property whenever she tried to do

so.

In addition to the witness testimony, the court received into

evidence many photographs of the construction in front of the

Property during the relevant time periods.

In May 2022, the trial court rendered its statement of

decision on the inverse condemnation claim. The court found

12

there was no taking by Defendants. While finding there to be “no

dispute the construction was a major source of aggravation for

[Flats and Simon], especially in light of the fact they were

attempting to establish themselves as a new, up and coming

restaurant,” the court concluded this “appears to be a case of bad

timing, not a case of a taking under either the California or

United States Constitution.”

E

In January 2023, Flats and Simon requested dismissal with

prejudice of their inverse condemnation claim with respect to

Skanska.

The jury trial began in May 2023. The jury heard

testimony from the same witnesses who testified during the

bench trial, with additional witnesses who testified to Flats and

Simon’s alleged damages.

Following Flats and Simon’s case-in-chief, Defendants

moved for nonsuit. On May 24, 2023, the court issued a written

order granting the nonsuit motion as to City and Skanska, but

denying it as to Metro.

After the defense rested, Metro moved for a directed

verdict, which the court denied on the same day.

On May 31, 2023, the jury returned a verdict against Metro

on Flats and Simon’s negligence claim. The jury awarded $1.7

million in damages to Simon and $2.35 million to Flats.

On July 7, 2023, the trial court entered three documents.

First, an order dismissing with prejudice Flats and Simon’s

action against City and Skanska. Second, a minute order

dismissing with prejudice Flats and Simon’s complaint against

City and Skanska and judgment in Flats and Simon’s favor

against Metro for the amount of $4,050,000. Third, the proposed

13

judgment form from Flats and Simon that provided a summary of

the proceedings and verdict, and ordered dismissal with prejudice

of City and Skanska and judgment for Flats and Simon against

Metro for $4,050,000.

On July 19, 2023, Flats and Simon filed a notice of entry of

final judgment.

On August 23, 2023, Metro filed motions for a new trial and

for judgment notwithstanding the verdict. Flats and Simon

opposed both.

On September 19, 2023, the court issued a written order

denying both of Metro’s post-trial motions.

On October 16, 2023, Metro filed a notice of appeal,

checking two boxes from the list of appealable orders on the form:

the July 7, 2023 judgment after jury trial and the September 19,

2023 order denying its motion for judgment notwithstanding the

verdict.

On October 19, 2023, Flats and Simon filed a notice of

appeal, seeking review of the court’s decisions denying their

inverse condemnation claim and granting nonsuit in favor of City

and Skanska. The notice specified that Flats and Simon are

“NOT APPEALING [THE] VERDICT AS TO THE MTA.”

On October 26, 2023, the court held a hearing on the

parties’ dueling motions to tax costs. That same day, the court

issued a minute order granting in part each motion and awarding

prevailing party costs to Flats, Simon, City and Skanska.

On December 6, 2023, Flats and Simon filed a notice of

appeal, seeking review of the court’s order awarding costs to City

and Skanska.

On February 1, 2024, City and Skanska moved to dismiss

Flats and Simon’s appeal against them. Flats and Simon filed

14

their opposition. We deferred deciding the motion until

completion of the briefing in the main appeal.

II

We first address City and Skanska’s motion to dismiss

Flats and Simon’s appeal against them.

In their motion, City and Skanska correctly argue this

appeal is untimely, because the trial court entered an order of

dismissal of the entire complaint as the City and Skanska on July

7, 2023, the clerk served the order that same day, the deadline to

appeal this order was thus 60 days later on September 5, 2023,

and Flats and Simon did not file a notice of appeal until October

19, 2023.

We start by looking at the “one final judgment rule” (see

Code Civ. Proc., § 904.1) before turning to the rule extending the

deadline to file a notice of appeal in certain circumstances (Rule

8.108 of the Rules of Court).

The one final judgment rule means what it says—that

there is generally only one final judgment terminating trial court

proceedings from which an appeal may be taken. (See Code Civ.

Proc., § 904.1; Bank of America v. Superior Court (1942) 20

Cal.2d 697, 701 [“there can be but one judgment in an action no

matter how many counts the complaint contains”].) It is “a

fundamental principle of appellate practice that prohibits review

of intermediate rulings by appeal until final resolution of the

case” to prevent piecemeal dispositions and multiple appeals in

the same case. (Griset v. Fair Political Practices Com. (2001) 25

Cal.4th 688, 697.)

Section 904.1 “provides a list of appealable judgments and

orders” and “permits an appeal in any unlimited civil action to be

taken from any of 14 enumerated filings.” (Meinhardt v. City of

15

Sunnyvale (2024) 16 Cal.5th 643, 652.) “The first such filing,

with exceptions not relevant here, is ‘a judgment, except an

interlocutory judgment.’ ” (Ibid. (citing § 904.1, subd. (a)(1).)

This judgment must be “not intermediate or nonfinal” but must

be the one final judgment. (Morehart v. County of Santa Barbara

(1994) 7 Cal.4th 725, 741 (Morehart).)

Flats and Simon argue the one final judgment rule requires

us to deny City and Skanka’s motion. Their briefing, however,

fails to acknowledge that there are exceptions to the one final

judgment rule. (See, e.g., In re Baycol Cases I & II (Baycol) 51

Cal.4th 751, 760–762 [explaining that in class actions, the “death

knell doctrine” renders appealable an order terminating class

claims but allowing individual claims to continue]; Wong v. Dong

(2025) 112 Cal.App.5th 109, 114–115 [orders granting or denying

an anti-SLAPP motion to strike fall within an exception to the

“one final judgment rule”].)

As City and Skanska note, another exception to the one

final judgment rule exists “in multiparty actions where a

judgment or order resolves all of the issues as to one of the

parties, in which case that judgment or order is appealable as to

that party.” While this type of order is not enumerated in section

904.1 as an appealable order, our Supreme Court has explained it

as follows: “[j]udgments that leave nothing to be decided between

one or more parties and their adversaries, or that can be

amended to encompass all controverted issues, have the finality

required by section 904.1, subdivision (a).” (Morehart, supra, 7

Cal.4th at p. 741.)

Appellate courts have recognized and applied the exception

in situations similar to the one here. (See, e,g., Save Berkeley’s

Neighborhoods v. Regents of University of California (2021) 70

16

Cal.App.5th 705, 714 (Berkeley) [appeal properly taken from an

order disposing of all issues between the plaintiff and two real

parties in interest]; Heshejin v. Rostami (2020) 54 Cal.App.5th

984, 991 (Heshejin) [order of dismissal resolving all issues as to

one set of defendants was appealable]; Martis Camp Community

Assn. v. County of Placer (2020) 53 Cal.App.5th 569, 588

[declining to dismiss appeal taken from trial court order

disposing of all the plaintiff’s claims against one defendant, even

though “unresolved issues remain” between plaintiff and another

defendant]; Ricketts v. McCormack (2009) 177 Cal.App.4th 1324,

1337–1338 (Ricketts) [dismissing as untimely one party’s appeal

from the judgment ultimately entered in the case when she failed

to appeal an earlier appealable order that resolved all of her

claims against the defendant].) We are therefore satisfied that

this final-order-as-to-one-party exception is a sufficiently “bright

line” that signals appealability. (See Baycol, supra, 51 Cal.4th at

p. 761 [“bright lines are essential [in establishing rules of

appealability] to avoid both inadvertent forfeiture of the right to

appeal and excessive protective appeals by parties afraid they

might suffer such a forfeiture”].)

This exception applies here; the July 7, 2023 order

dismissing them with prejudice from Flats and Simon’s complaint

is an appealable order because the order disposes of all claims

against them, is in writing, signed by the court, and filed in this

action. (See Code Civ. Proc. § 581d [“All dismissals ordered by

the court shall be in the form of a written order signed by the

court and filed in the action and those orders when so filed shall

constitute judgments and be effective for all purposes, and the

clerk shall note those judgments in the register of actions in the

case”].) Specifically, the order states, in relevant part, as follows:

17

“The Court having decided that Defendants [CITY] and

[METRO] are not liable for inverse condemnation, judgment is

entered for those Defendants on that claim and Plaintiffs

[FLATS] and [SIMON] shall take nothing by that claim;

“Pursuant to the Court’s May 24, 2023 Order granting in

part defendants’ motion for nonsuit, Defendants [SKANSKA] and

[CITY] are hereby dismissed and Plaintiffs [FLATS] and

[SIMON] shall take nothing by way of their complaint against

Defendants [SKANSKA] and [CITY].”

This July 7, 2023 order was the final appealable order,

under section 904.1(a), as to Flats and Simon’s claims against

Skanska and City. (See, e.g., Berkeley, 70 Cal.App.5th at p. 714;

Heshejin, 54 Cal.App.5th at p. 991; Martis, 53 Cal.App.5th at p.

588; Ricketts, 177 Cal.App.4th at pp. 1337–1338.)

Under the Rules of Court, the corresponding deadline for

Flats and Simon to file a notice of appeal as to their claims

against Skanska and City was September 5, 2023. (Cal. Rules of

Court, rule 8.104(a)(3).) They did not do so until more than a

month later. Accordingly, Flats and Simon’s failure to file a

timely notice of appeal doomed their ability to appeal the court’s

dismissal of their claims against City and Skanska. (See Baycol,

supra, 51 Cal.4th at p. 761 fn. 8 [“California follows a “one shot”

rule under which, if an order is appealable, appeal must be taken

or the right to appellate review is forfeited”]; see also Kinoshita v.

Horio (1986) 186 Cal.App.3d 959, 967 [“If [a] ruling is appealable,

the aggrieved party must appeal or the right to contest it is

lost”].)

In their opposition, Flats and Simon argue their appeal

against City and Skanska is still timely under Rule 8.108 of the

Rules of Court, which describes the various circumstances that

18

extend the time to appeal. Specifically, they cite two of these

circumstances: posttrial motions and cross-appeals of the same

judgment. (See Cal. Rules of Court, rules 8.108(b), (d), (g).)

Posttrial motions, including motions for a new trial and for

judgment notwithstanding the verdict, extend for all parties the

time to appeal from the judgment until “30 days after the

superior court clerk or a party serves an order denying the

motion or a notice of entry of that order.” (Cal. Rules of Court,

rules 8.108(b), (d).) Flats and Simon point out that the document

dismissing City and Skanska also included a judgment in their

favor against Metro, stating: “Plaintiffs [FLATS] and [SIMON]

shall recover from Defendant [METRO] the sum of $4,050,000.00

with interest thereon at the rate of seven percent (7%) per annum

from the date of entry of this judgment until paid.” They urge us

to find that under Rules 8.108(b) and (d), because Metro filed

motions for a new trial and for judgment notwithstanding the

verdict from the July 7, 2023 judgment against it, which also

included the dismissal of City and Skanska, and the trial court

denied both on September 19, 2023, the deadline for Flats and

Simon to appeal from the July 7, 2023 order dismissing City and

Skanska extended from September 5, 2023 to October 19, 2023.

We reject this argument. It would require us to conflate

the order dismissing City and Skanska with the judgment

resolving Flats and Simon’s claims against Metro. Despite being

on the same July 7, 2023 document, these are discrete judicial

actions on separate tracks. There can be multiple appealable

orders on the same document. Flats and Simon are cognizant of

this fact on some level, as their notice of appeal specified that

they were only appealing the dismissal of City and Skanska and

19

the court’s denial of their inverse condemnation claim, and “NOT

APPEALING [THE] VERDICT AS TO [METRO].”

Likewise, as City and Skanska note, Metro filed posttrial

motions on the judgment against it, not the court’s order

dismissing City and Skanska. Thus, Rules 8.108(b) and (d) only

extended the deadline to appeal as to the judgment resolving

Flats and Simon’s claims against Metro, not the order dismissing

City and Skanska. Rules 8.108(b) and (d) only came into play

here because Metro filed posttrial motions on the judgment

against it, and it only applies to Flats and Simon’s claims against

Metro. Thus, Flats and Simon’s appeal against Metro is timely

because it also stems from the court’s judgment resolving their

claims against Metro.

For the same reason, Flats and Simon cannot construe

their notice of appeal against City and Skanska as a cross-appeal

under Rule 8.108(g) from Metro’s notice of appeal. To be clear,

Metro’s notice of appeal applied only to the judgment against it,

and not the order dismissing City and Skanska. All Rule 8.108(g)

could do for Flats and Simon is allow a twenty-day window for

them to file a cross-appeal from the same judgment from which

Metro appealed. And because part of Flats and Simon’s appeal

did pertain to its claims against Metro, Rule 8.108(g) is an

alternative basis to find timely Flats and Simon’s appeal against

Metro. But the rule does not reach the order dismissing City and

Skanska.

Our finding that Flats and Simon’s appeal against City and

Skanska is untimely is consistent with how appellate courts have

ruled on the timeliness of appeals in other contexts involving a

party’s failure to file a timely notice of appeal of an immediately

appealable order. For example, courts have found untimely

20

appeals that were not based on the trial court’s immediately

appealable orders resolving anti-SLAPP motions. (See, e.g. Reyes

v. Kruger (2020) 55 Cal.App.5th 58, 62 [appeal untimely where

“the appellants did not appeal from the order granting the anti-

SLAPP motions but from the judgment of dismissal that followed

later, which they relied on as the appealable order”]; Melbostad v.

Fisher (2008) 165 Cal.App.4th 987, 995–997 [same]; Maughan v.

Google Technology, Inc. (2006) 143 Cal.App.4th 1242, 1246–1257

[same].) And in Williams v. Impax Laboratories, Inc. (2019) 41

Cal.App.5th 1060, 1071, the plaintiff’s failure to appeal an

appealable “death knell” order terminating class claims

foreclosed her from later attacking the dismissal of her class

allegations. (Ibid.)

Flats and Simon’s appeal against City and Skanska was

untimely. We therefore grant City and Skanska’s motion to

dismiss that portion of Flats and Simon’s appeal. The trial

court’s dismissal of Flats and Simon’s claims against City and

Skanska will remain undisturbed.

III

We now proceed to the merits of Metro’s appeal and Flats

and Simon’s cross-appeal. First, we examine the court’s

statement of decision on Flats and Simon’s inverse condemnation

claim, which Flats and Simon ask us to reverse. Next, we review

the trial court’s decision to deny Metro’s motion for judgment

notwithstanding the verdict, which Metro contends was

erroneous. Lastly, we address the trial court’s order awarding

costs, which is the subject of Flats and Simon’s second appeal.

A

We affirm the trial court’s inverse condemnation decision

against Flats and Simon.

21

Article 1, section 19 of the California Constitution

guarantees “just compensation” whenever the government takes

or damages private property for a public use. (Weiss v. People ex

rel. Dept. of Transportation (2020) 9 Cal.5th 840, 852 (Weiss).)

An inverse condemnation action is a property owner’s procedure

to vindicate their constitutional right to just compensation after

the government has taken or damaged their property. (Id. at p.

853.) The threshold requirement for a property owner in such an

action is to establish that the government has, in fact, taken or

damaged his or her property before he or she can reach the issue

of “just compensation.” (San Diego Gas & Electric Co. v. Superior

Court (1996) 13 Cal.4th 893, 940 (San Diego).)

The government “takes or damages” property when it (1)

causes physical damage to that property without physically

invading it; (2) physically invades that property in any tangible

manner; or (3) causes an intangible intrusion burdening the

property that is “direct, substantial, and peculiar to the property

itself.” (San Diego, supra, 13 Cal.4th at p. 940.) Whether the

government has “taken or damaged” private property is a mixed

question of law and fact for the trial court to decide. (Weiss,

supra, 9 Cal.5th at p. 865.)

In making its legal conclusion that there was no taking by

City and Metro, the trial court made the following factual

findings. First, the court summarized the conditions facing the

restaurant. It found “[a]ll new restaurants face great

challenges,” and acknowledged Flats and Simon faced many

challenges in the “perfect storm” of “opening a restaurant in the

midst of metro construction on Wilshire Boulevard in the City of

Beverly Hills.” While acknowledging that the “[t]he corner upon

which the restaurant sat acted as a staging area and apparent

22

storage venue for the large machinery and equipment used

during the construction process,” the court also found “this was

not unique to the Flats location. As the construction moved along

Wilshire Boulevard, so did the staging area.”

The court went on to describe the construction as “clearly

messy, dusty, noisy” and observe that it caused vibrations

impervious to the effect of sound blankets, which also temporarily

obscured the visibility of the front of the restaurant. The court

further noted “[m]ost importantly for [Flats and Simon], they

contend access to the restaurant itself was lost due to the closure

of Wilshire Boulevard, as well as [Gale]” and that “[t]hey also lost

street parking, metered parking and access to their own parking

lot at times.”

Next, the court found “[t]he injuries sustained by [Flats and

Simon] were temporary in nature and there was never a total loss

of access.” On this issue, the trial court cited the testimony of

defense witness Ramlawi, who testified “that the above ground

construction on the Flats side of Wilshire Boulevard lasted

approximately four months, of which two to three weeks was in

front of Flats.” The decision additionally noted Long “testified to

only inconsistent access, there was always access through the

front door during construction,” and that when she was

questioned about the construction conditions, “she often

responded she was unaware of how long the conditions were

present.”

1

On appeal from a mixed question of law and fact, we

independently determine applicable legal principles but defer to

the trial court’s factual findings. (Border Business Park, Inc. v.

23

City of San Diego (2006) 142 Cal.App.4th 1538, 1554 (Border

Business Park).)

Flats and Simon bring both legal and factual challenges to

the inverse condemnation decision. We address each in turn.

a

Before tackling the parties’ dispute on the applicable law,

we start with what they agree on: the general legal theory of

what would constitute a taking in this case. Both parties cite our

decision in Today’s IV, Inc. v. Los Angeles County Metropolitan

Transportation Authority (2022) 83 Cal.App.5th 1137, 1167

(Today’s IV), a case we decided a few months after the bench trial

in this case. Like the situation here, Today’s IV involved the

intangible intrusion theory of inverse condemnation. In Today’s

IV, we explained that a substantial impairment of the right of

ingress and egress could support an inverse condemnation claim,

so long as the intrusion upon access resulted in a burden on the

property that is “direct, substantial, and peculiar to the property

itself.” (Id. at p. 1171 [emphasis in original].)

The parties disagree, however, on what exactly a “direct,

substantial, and peculiar” burden would entail. While not using

those exact words, the trial court essentially found that the

access burden on Flats and Simon was not direct, substantial,

and peculiar, because the burden was temporary, not unique to

their property, and never fully deprived them of access. In so

finding, the court relied on the following cases: People ex rel

Department of Public Works v. Ayon (1960) 54 Cal.2d 217, 228

(Ayon); Heimann v. City of Los Angeles (1947) 30 Cal.2d 746, 755

(Heimann), overruled on other grounds by Los Angeles County v.

Faus (1957) 48 Cal.2d 672, 679; and Border Business Park, supra,

142 Cal.App.4th at pp. 1554–1557.) Citing Boxer v. City of Beverly

24

Hills (2016) 246 Cal.App.4th 1212, 1222, the court also found

that “[i]mpairment to visibility does not in and of itself constitute

a taking or compensable damage.”

Flats and Simon argue the trial court defined “access” too

narrowly. Citing Rose v. State (1942) 19 Cal.2d 713, 729 (Rose),

they believe the court should have given more weight to the

property’s history of successful restaurants, and the nature of the

restaurant business in Beverly Hills, which, according to their

witnesses Zamora and Fleischman, requires a high degree of curb

appeal, reliable and convenient parking, and ease of entry. They

cite People v. Ricciardi (1943) 23 Cal.2d 390, 399 (Ricciardi) for

the notion that “[a]n owner also has an easement of reasonable

view of their property from the adjacent roadway.” Flats and

Simon’s definition of a “direct, substantial, and peculiar” access

burden would thus include interference with the visibility of the

restaurant’s storefront and a customer’s ability to locate the

restaurant easily and park nearby or leave their car with a valet.

Defendants counter that Flats and Simon’s proposed

definition of “access” is “contrary to law,” and that the trial court

properly defined “access” as “access to the property as property,

not access to the specific type of business using the property.”

Defendants are right. Courts have consistently used a

literal definition of the word “access” and never defined “access”

differently for business owners facing commercial losses in the

face of public works projects. (See, e.g., Ayon, supra, 54 Cal.2d at

p. 228 [“[i]t is often necessary to break up pavement, narrow

streets and provide inconvenient modes of ingress and egress to

abutting property during the time streets are being repaired or

improved. Such reasonable and temporary interference with the

property owner’s right of access is noncompensable”]; Holloway v.

25

Purcell (1950) 35 Cal.2d 220, 230 [no taking in highway

relocation despite potential loss in business because plaintiffs

were not “deprived of access as abutting owners” and had no right

to the continued flow of traffic past their business

establishments]; Heimann, supra, 30 Cal.2d at p. 756 [“[m]erely

rendering private property less desirable for certain purposes . . .

will not constitute the damage contemplated by the

constitution”]; Today’s IV, supra, 83 Cal.App.5th at pp. 1171–

1172 [“[t]raffic detours and delays cannot be characterized as

burdens that are direct and substantial such that it is not far

removed from a direct physical intrusion”]; Hecton v. People ex

rel. Dept. of Transportation (1976) 58 Cal.App.3d 653, 657

(Hecton) [shopping center owner’s losses of revenue due to

adjacent freeway construction could not support an inverse

condemnation claim because owner still had access and there was

“no authority for the proposition that plaintiffs have a right to

continued availability of a particular clientele that has

patronized in the past the particular commercial ventures

developed by plaintiffs on their property”].)

The cases cited by Flats and Simon do not help them. In

Rose, the plaintiffs sued for inverse condemnation under an

impairment of access theory after a public construction project

near their property turned a 66-foot thoroughfare with four lines

of traffic and 12-foot sidewalks into two “blind” one-way lanes 14

feet wide for vehicular traffic, and 3.6 feet wide for pedestrians on

either side of a 24-foot underpass. (Rose, supra, 19 Cal.2d at pp.

718, 729.) Although the opinion mentions that the plaintiffs’

property was in an “industrial” zone, the nature of the plaintiffs’

business was ultimately incidental to the Supreme Court’s

conclusion that a taking had occurred. (See id. at p. 729.)

26

Instead, the court focused on the fact that several witnesses

testified to the difficulty of gaining access to the property using

the “blind” alleyways and the trial judge’s personal examination

of the property demonstrating that the lane “was too narrow for

two vehicles to pass each other if traversing thereon in opposite

directions.” (Ibid.) The court further clarified that compensable

damages could only relate to “interference with the [plaintiffs’]

right of access” and not any loss in business from the diversion of

traffic that the construction caused because “a landowner has no

property right in the continuation or maintenance of the flow of

traffic past his property.” (Id. at p. 737.)

Similarly, in Ricciardi, the Supreme Court found a taking

because a proposed underpass would “effectively block all ingress

and egress to and from the main highway [for the property

owners] except by traversing the service road… .” (Ricciardi,

supra, 23 Cal.2d at pp. 395.) Like Rose, Ricciardi also

“recognize[d] that [owners] have no property right in any

particular flow of traffic over the highway adjacent to their

property, but they do possess the right of direct access to the

through traffic highway and an easement of reasonable view of

their property from such highway.” (Id. at p. 399.) An “easement

of reasonable view” simply means that a property must be visible

from the street. (See id. at 404 [“it was for the trial court to

determine whether the obstruction caused by the underpass

would unreasonably cut off [the owners’] property from visibility

by travelers on the main highway”].) It does not, as Flats and

Simon would have us find, mean a property owner is entitled to a

certain amount of curb appeal.

The trial court rightly used the standard definition of the

word “access” for purposes of inverse condemnation.

27

b

Flats and Simon dispute the trial court’s factual findings

that “there never was a total loss of access” and that the access

interference was “temporary,” claiming the trial court should

have given more weight to the testimony of “witnesses with

restaurant expertise,” such as Mura-Smith, Long, Zamora, and

Fleischman, than it did to that of Ramlawi, and the photographs

depicting the construction. They also argue the trial court’s

factual findings did not account for the evidence they proffered of

the way in which City and Metro “targeted” the Property “with

construction activities unique to its corner location.”

In their response, Defendants contend Flats and Simon

have forfeited their challenge to the trial court’s factual findings

because they failed to explain how these findings were not

supported by substantial evidence, did not address any evidence

the trial court cited, and instead rehashed “the evidence they

claim supports their view of the facts” in an attempt to relitigate

these facts on appeal. And citing our decision in Schmidt v.

Superior Court (2020) 44 Cal.App.5th 570, 581–582 (Schmidt),

they note that our review of the trial court’s factfinding at a

bench trial must be “highly deferential” to the parties who

prevailed at trial and that Flats and Simon bear an “enormous

burden” in challenging the trial court’s factfinding. Once again,

Defendants are correct.

In Schmidt, we described the three pillars of reviewing a

trial court’s bench trial factfinding as follows: accepting all

evidence supporting the trial court’s order; completely

disregarding contrary evidence; and drawing all reasonable

inferences to affirm the trial court. (Schmidt, supra, 44

Cal.App.5th at p. 581.) We also stated that “[o]ur job is only to

28

see if substantial evidence exists to support the [judgment] in

favor of the prevailing party, not to determine whether

substantial evidence might support the losing party’s version of

events.” (Id. at p. 582.)

Flats and Simon’s factual challenges to the trial court’s

ruling essentially amount to a request to reweigh the evidence,

which the standard of review forbids. (See Schmidt, supra, 44

Cal.App.5th at p.586; see also Vasquez v. LBS Financial Credit

Union (2020) 52 Cal.App.5th 97, 109.) The trial court was

undoubtedly aware that Mura-Smith, Long, and Alexandroff

testified to a lack of “access” as they wished to define the term.

But the court was well within its discretion not to credit this

testimony and instead find probative Ramlawi’s testimony on the

issue of access. (See Schmidt, supra, 44 Cal.App.5th at p. 582

[“the trial court is the sole judge of witness credibility” [internal

quotation marks omitted].]) Ramlawi testified that, while

construction was in front of the Property, it was nonetheless

always possible for someone to get to the Property. Aside from

one week, the sidewalk in front of the restaurant was always

open. And there were always two westbound lanes and two

eastbound lanes of traffic open on Wilshire. This is substantial

evidence supporting the court’s factual finding that there was

sufficient access to the Property.

Moreover, Flats and Simon’s repeated claim that there was

evidence of construction “targeting” the Property cannot disprove

the trial court’s factual finding that the construction burdens

were “not unique to the Flats location” because the construction

and staging areas moved along Wilshire Boulevard. In making

this finding, the trial court properly relied on substantial

evidence—namely, Ramlawi’s testimony that the nature of the

29

work in front of the Property was the same work Metro completed

along all 3.9 miles of the subway expansion.

Another problem with Flats and Simon’s factual challenge

is their failure to provide a fair summary of the evidence. As the

appellants contesting the sufficiency of the evidence, Flats and

Simon had the burden of marshalling all of the record evidence

and to demonstrate affirmatively its insufficiency to sustain the

trial court’s findings. (See Pilliod v. Monsanto Co. (2021) 67

Cal.App.5th 591, 621.) Instead, Flats and Simon spend a great

deal of their opening brief rehashing evidence favorable to them,

including Long and Mura-Smith’s long and successful history in

the restaurant industry, Fleischman’s experience with the

Property and Beverly Hills, and their opinions of how the

construction affected the restaurant’s operations. And they

ignore unfavorable evidence, including the testimony of their own

witnesses that contradicted their theory that the construction

impaired the access so much that it led to the failure of the

restaurant. For instance, Long admitted that the construction

disruption was “intermittent” and that in June 2017 she felt

“optimistic” on days when there was less construction. And

Fleischman, who testified to observing “a perfect storm of access

problems” at the Property during construction and opined that a

Beverly Hills restaurant could not survive only on pedestrian

traffic, nonetheless admitted that “most restaurants don’t make

it past a year or two.”

Flats and Simon’s factual challenges to the inverse

condemnation decision therefore fail.

2

In sum, the trial court made detailed and substantiated

factual findings about the burdens the construction inflicted on

30

Flats and Simon. And it properly determined these burdens did

not amount to a taking. Accordingly, we need not consider Flats

and Simon’s remaining argument that the court erred in not

making separate findings as to Simon’s additional damages, for

they never established City or Metro took their property.

B

We reverse the judgment against Metro. The trial court

should have granted Metro’s motion for judgment

notwithstanding the verdict because Metro is immune to common

law negligence under the Government Claims Act, Government

Code, § 810 et seq. (“Act”).

1

In Flats and Simon’s operative complaint, the negligence

count cites Government Code § 815.4, which makes public

entities liable for the tortious acts or omissions of their

independent contractors, and alleged that Metro and City was

liable for the acts and omissions of Skanska.

Metro’s answer to the complaint includes an affirmative

defense in asserting it is “not liable except as provided by statute

and is otherwise immune from liability under state, federal, and

local laws and regulations.”

After the trial court granted Skanska’s nonsuit motions,

Flats and Simon asked the trial court to instruct the jury using

CACI No. 400, the common law negligence instruction. They do

not dispute that they did not assert a statutory basis for Metro’s

liability before the jury trial. Thus, according to their request,

the trial court instructed the jury as follows on their negligence

claim:

“[Flats and Simon] claim[] that [they] were harmed by

[Metro]’s negligence.

31

“To establish this claim, [Flats and Simon] must prove all

of the following:

“One, that [Metro] was negligent.

“Two, that [Flats and Simon] were harmed.

“And three, that [Metro’s] negligence was a substantial

factor in causing [Flats and Simon] harm.

“Negligence is the failure to use reasonable care to prevent

harm to oneself or to others. A person can be negligent by acting

or by failing to act.

“A person is negligent if that person does something that a

reasonably careful person would not do in the same situation or

fails to do something that a reasonably careful person would do in

the same situation.

“You must decide how a reasonably careful person would

have acted in defendant [Metro’s] position.”

It was not until Metro filed its motion for judgment

notwithstanding the verdict that Metro explicitly raised the Act,

and the legal principle that “[t]he liability of a governmental

entity is entirely statutory,” citing Government Code §§ 815,

subdivision (a) (§ 815(a)) and 815.2, subdivision (b) (§ 815.2(b)).

Then, in their opposition to Metro’s motion, Flats and

Simon raised for the first time a statutory basis for Metro’s

liability: Government Code § 815.6 (§ 815.6), which allows for

liability against public entities if they fail to discharge “a

mandatory duty imposed by an enactment that is designed to

protect against the risk of a particular kind of injury.”

The court heard argument from both sides on Metro’s

motion. Metro’s counsel stated: “I want to turn back to those

immunities directly tied to the case, Government Code [sections]

815(a) . . . I’d ask the court to take another look at those

32

immunities.” Then, the court, in discussing whether it was “error

in instructing on just a standard negligence in a case like this,”

stated: “I think I made that call, and I don’t think it was [error].”

In its written order denying Metro’s motion, the trial court

made no mention of §§ 815(a), 815.2(b) or 815.6. The court

evidently found viable Flats and Simon’s negligence theory,

which the court described as “includ[ing] a communicative

element, e.g., ‘not getting the information properly in order to

make a decision when we could have ,” along with Metro’s

"failure to mitigate the impact of their construction and to

guarantee access to Plaintiffs’ restaurant.” The court then

concluded that “[s]ubstantial evidence exists to support these

contentions.”

2

Metro’s appeal of the judgment against it raises a purely

legal issue of statutory interpretation and applying the law to

undisputed facts: whether the trial court erred in not finding it

immune to Flats and Simon’s negligence claim under the Act. We

independently review this question. (See Brown v. City of

Sacramento (2019) 37 Cal.App.5th 587, 598.)

The Act “is a comprehensive statutory scheme governing

the liabilities and immunities of public entities and public

employees for torts.” (Quigley v. Garden Valley Fire Protection

Dist. (2019) 7 Cal.5th 798, 803 (Quigley).) “The basic architecture

of the Act is encapsulated in Government Code section 815.

Subdivision (a) of that section makes clear that under the [Act],

there is no such thing as common law tort liability for public

entities; a public entity is not liable for an injury ‘[e]xcept as

otherwise provided by statute.” (Id. [citing Gov. Code, § 815].)

33

Flats and Simon do not dispute that their complaint no

longer identified a valid statutory basis for Metro’s liability

following the court’s dismissal of Skanska as a defendant. And

they never amended their original complaint to add additional

statutory bases for liability. They did not raise § 815.6 as a

statutory basis for liability until after they asked the court to

instruct the jury using CACI No. 400 and Metro filed its post-

trial motions.

On the flip side, while Metro included a broad government

immunities affirmative defense in its answer, it did not reference

§ 815(a) by name until it filed its motion for judgment

notwithstanding the verdict. In its earlier efforts to defeat the

negligence claim, Metro’s motions for nonsuit and for a directed

verdict only argued it had no duty to Flats and Simon and that

there was no causation.

Flats and Simon argue that Metro waived its immunity

under the Act by not objecting to the use of CACI No. 400, by

failing to ask for a jury instruction on governmental immunity,

and by “failing to litigate the defense until this appeal.” The

main case they rely on is Quigley, supra, 7 Cal.5th at p. 807–815,

where the Supreme Court held that immunity under the Act is

not a jurisdictional bar to liability but an affirmative defense that

a defendant can forfeit if they do not adequately invoke it.

The contentions of Flats and Simon lack merit. Metro is

correct that Quigley does not help Flats and Simon because they

did not have a viable statutory basis for liability against Metro

during the jury trial, and it was their burden to identify such a

statutory basis once the court dismissed Skanska from the case.

(See § 815(a); see also Lopez v. Southern Cal. Rapid Transit Dist.

(1985) 40 Cal.3d 780, 795 [because government tort liability is

34

based on statute, “to state a cause of action against a public

entity, every fact material to the existence of its statutory

liability must be pleaded with particularity”]; Foster v. County of

San Luis Obispo (1993) 14 Cal.App.4th 668, 672 [a plaintiff must

identify in a pleading a public entity’s statutory duty because “all

government tort liability is dependent upon the existence of an

authorizing statute”]; Searcey v. Hemet Unified School Dist.

(1986) 177 Cal.App.3d 792, 802 [same].) Flats and Simon did not

try to fix this problem until it was too late, and not until after the

jury had rendered a verdict of common law negligence against

Metro.

As for jury instructions, it is true that each side has the

duty to deliver to the court “all proposed instructions to the jury

covering the law as disclosed by the pleadings.” (Code Civ. Proc.

§ 607a.) But it was not Metro’s obligation to help Flats and

Simon craft a viable theory of negligence by objecting to the use

of CACI No. 400 in order to preserve this issue for appeal. (See

Hensley v. Harris (1957) 151 Cal.App.2d 821, 825 [a party “has no

duty to propose instructions which relate only to the opposing

theories of his adversary, and having no duty respecting them he

has no responsibility for the latter’s mistakes”].) Nor did Metro’s

failure to request a special jury instruction on government

immunity result in forfeiture of its ability to challenge Flats and

Simon’s instructions “that erroneously contain legal standards

inapplicable to the facts.” (See Alaniz v. Sun Pacific Shippers,

L.P. (2020) 48 Cal.App.5th 332, 339.)

Lastly, while Flats and Simon are wrong that Metro did not

litigate this immunity defense until its appeal, Metro did not

explicitly raise the Act until its post-trial motions. Given the

obvious applicability of the Act to Metro’s defense, it is surprising

35

that Metro did not raise the Act earlier in the proceedings. This

case is now in its ninth year. While we cannot turn back time, we

can correct the trial court’s reversible error. This error, giving

the jury CACI No. 400 and thereby allowing it to render a verdict

contrary to the Act, was a miscarriage of justice. (See Cassim v.

Allstate Ins. Co. (2004) 33 Cal.4th 780, 800.) We are certain that

the jury would not have reached this verdict in the absence of the

trial court’s error. (See id.) We therefore reverse the judgment

against Metro.

Because the trial court committed legal error in allowing

Flats and Simon’s fatally flawed negligence claim, we remand the

case for the entry of judgment in Metro’s favor. (See, e.g., Kim v.

New Life Oasis Church (2025) 115 Cal.App.5th 659, 669) We need

not address the parties’ remaining arguments about the

applicability of § 815.6 or whether the negligence claim was

actually about negligent misrepresentation.

C

Our reversal of the judgment against Metro automatically

vacates the cost award from which Flats and Simon filed their

second appeal. (See Ducoing Management, Inc. v. Superior Court

(2015) 234 Cal.App.4th 306, 314.) This appeal is now moot and

we accordingly dismiss it. (See Sturgell v. Dept of Fish & Wildlife

(2019) 43 Cal.App.5th 35, 43.)

DISPOSITION

We dismiss Flats and Simon’s appeals against City and

Skanska. We reverse the judgment against Metro, vacate the

associated award of costs, and order the trial court to enter

judgment in Metro’s favor. In all other respects, the judgment

and orders are affirmed and we remand this matter to the trial

36

court for proceedings consistent with this opinion. Metro, City,

and Skanska shall recover their costs on appeal.

WILEY, J.

We concur:

STRATTON, P. J.

SCHERB, J.

37