Opinion

EWC Raleigh CV, LLC v. EWC of Cameron Vill., Inc.

Court
Court of Appeals of North Carolina
Filed
Apr 1, 2026
Status
Unpublished
Author
Judge Julee Flood
Cited by
0 cases
Authority
More cited than 39.9%

“Among proper reasons for denying a motion to amend are undue delay by the moving party and unfair prejudice to the nonmoving party.” (emphasis added)

How later courts described this case

  • “Among proper reasons for denying a motion to amend are undue delay by the moving party and unfair prejudice to the nonmoving party.” (emphasis added)
  • holding the trial court abused its discretion in denying the plaintiff’s motion to amend its complaint after a motion to dismiss where the “trial court failed to state a reason . . . nor do we perceive that there are any ‘apparent’ reasons for denial of leave to amend”

Written by the judges who cited it.

The opinion

An unpublished opinion of the North Carolina Court of Appeals does not constitute

controlling legal authority. Citation is disfavored, but may be permitted in accordance with

the provisions of Rule 30(e)(3) of the North Carolina Rules of Appellate Procedure.

IN THE COURT OF APPEALS OF NORTH CAROLINA

No. COA 25-706

Filed 1 April 2026

Wake County, No. 23CV035053-910

EWC RALEIGH CV, LLC, Plaintiff,

v.

EWC OF CAMERON VILLAGE, INC., RACHEL C. WHIDBY, and MICHELLE

HURLEY, Defendants.

Appeal by plaintiff from orders entered 17 March 2025 and 26 March 2025 by

Judge Vinston M. Rozier, Jr., in Wake County Superior Court. Heard in the Court of

Appeals 24 February 2026.

Smith, Anderson, Blount, Dorsett, Mitchell & Jernigan, L.L.P., by Edward F.

Roche, Hope C. Garber, John L. Gibbons, and Noel F. Hudson, for plaintiff-

appellant.

Ellis & Winters, LLP, by Kelly Margolis Dagger, Michelle A. Liguori, Chelsea

A. Pieroni, and Jacob V. Stewart, for defendants-appellees.

FLOOD, Judge.

Plaintiff EWC Raleigh CV, LLC, appeals from orders entered by the trial court

dismissing its breach of contract claim and denying its motion to amend its

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

complaint.1 On appeal, Plaintiff argues the trial court, first, erred by dismissing

Plaintiff’s breach of contract claim, and second, abused its discretion in denying

Plaintiff leave to amend its complaint. Upon careful review, we conclude the trial

court erred in dismissing Plaintiff’s breach of contract claim as to misrepresentations,

where Plaintiff sufficiently pled allegations, but it did not err in dismissing the breach

of indemnification clauses, where Plaintiff insufficiently pled those allegations.

Further, we conclude the trial court did not abuse its discretion in denying Plaintiff’s

motion to amend for undue delay, where Plaintiff waited over a year to move to amend

its breach of contract claim and had previously moved to amend its complaint for

other reasons.

I. Factual and Procedural Background

Plaintiff is a franchise of European Wax Center, LLC, which is a nationwide

salon chain. On 27 December 2021, Plaintiff entered into agreements with

Defendants Rachel Whidby and Michelle Hurley regarding the sale of two other

European Wax Center franchises: EWC of North Raleigh, and Defendant EWC of

Cameron Village, Inc. At issue here is the agreement between Plaintiff and

Defendants regarding the sale of Defendant EWC of Cameron Village (the

1Although Plaintiff also appeals from the trial court’s order denying Plaintiff’s motion to

reconsider, Plaintiff does not make any argument for this order in its brief; thus, we address only the

two orders substantively discussed in Plaintiff’s brief. See N.C. R. App. P. 28(b)(6) (2025) (“Issues not

presented in a party’s brief, or in support of which no reason or argument is stated, will be taken as

abandoned.”).

-2-

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

“Agreement”). The Agreement provided the purchase price for Defendant EWC of

Cameron Village would be $1,687,500.00, with $1,518,750.00 being paid at the closing

and $168,750.00 (the “Holdback”) being paid nine months after closing.

The Agreement specified the holdback carried the option of being “reduced in

accordance with Section 8.7[.]” This section of the Agreement provided:

8.7 Release of Holdback. The Holdback minus the amount

of any validly asserted but unresolved indemnification

claims or resolved but unreleased indemnification claims

of [Plaintiff] pursuant to this Section 8 will be released to

[Defendants] in certified or wired funds on the first

business day after the date that is 9 months after the

Closing Date.

Under the Agreement, the indemnification procedures provided Plaintiff “shall

promptly provide written notice of such claim to [Defendants].”

Furthermore, the Agreement provided full disclosure on behalf of Defendants:

5.17 Full Disclosure. No representation or warranty by

[Defendants] in this Agreement and no statement

contained in the Disclosure Schedules to this Agreement or

any certificate or other document furnished or to be

furnished to [Plaintiff] pursuant to this Agreement

contains any untrue statement of a material fact, or omits

to state a material fact necessary to make the statements

contained therein, in light of the circumstances in which

they are made, not misleading.

After closing, and upon taking over Defendant EWC of Cameron Village,

Plaintiff alleged it learned Defendants had failed to disclose the following:

a. Gross sales declined by more than 40% year-over-year in

November 2021;

-3-

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

b. Gross sales declined by nearly 30% year-over-year in

December 2021;

c. Gross sales declined by 45% year-over-year in January

2021;

d. The Franchise lost money in November 2021 and

December 2021 and made only approximately $1,600 in

January 2022, representing a sharp decline in profitability

as compared to its performance through October 2021;

e. Four waxers departed the Franchise from September

2021 through November 2021;

f. One of the departing waxers resigned effective

immediately on October 30, 2021, to open a competing

studio;

g. Another of the departing waxers resigned in November

2021 to join that competing studio;

h. Customers of the waxers who opened the competing

studio stopped patronizing the Franchise.

i. Customers of the waxers who opened the competing

studio requested and received refunds for prepaid services

from the Franchise.

Pursuant to the Agreement, Plaintiff decided to utilize the indemnification

provision, which provided Defendants would indemnify Plaintiff “against . . . any and

all [l]osses, incurred . . . arising out of, or with respect to”:

(a) any inaccuracy in or breach of any of the

representations or warranties of Seller contained in this

Agreement, any other Transaction Document, or any

schedule, certificate, or exhibit related thereto, as of the

date such representation or warranty was made or as if

such representation or warranty was made on and as of the

Closing Date (except for representations and warranties

-4-

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

that expressly relate to a specified date, the inaccuracy in

or breach of which will be determined with reference to

such specified date)[.]

On 28 October 2022, Plaintiff sent a written notice of an indemnification claim to

Defendant Whidby; however, Plaintiff addressed this notice to “EWC of North

Raleigh, Inc. 9017 Winged Thistle Court Raleigh, NC 27617” and wrote the subject

as the agreement between Plaintiff and “EWC of North Raleigh, Inc., a North

Carolina corporation (‘Seller’), and, for limited purposes, Michelle Hurley and Rachel

Whidby (the ‘Principals’)[.]”

On 26 January 2023, Defendants responded, through counsel:

My clients are confident they made all disclosures

requested of them. While [Plaintiff] may not have seen the

November and December 2021 numbers it is not because

[Defendants] were misrepresenting anything. Those

documents had not been prepared at the time of closing.

However, there were numerous meetings via Zoom during

this time period and my client disclosed the loss of some

key employees in the fall of 2021. That certainly did have

an effect on November and December’s numbers but that

was fully disclosed.

Additionally, competition was increasing and continues to

increase around the stores. Your clients opened a store in

Olde Raleigh Village in May of 2022. Additionally, another

location was opened in March of 2022 in the Knightdale

area. Other wax stores were and have been opened (not a

part of the franchise) in the Raleigh area over the last

several months as well.

In an effort to resolve the matter my client is willing to

reduce its demand for the balance of the Cameron Village

purchase price by one half. My client still demands full

-5-

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

payment on the balance due for the North Raleigh store.

The parties did not come to an agreement, Plaintiff did not pay the Holdback,

and Plaintiff sued on 8 December 2023 for breach of contract and intentional

misrepresentation.

Regarding its breach of contract claim, Plaintiff alleged “Defendants breached

the [Agreement] by failing to disclose material information about the Business[,]”

“Defendants breached the [Agreement] by failing to indemnify Raleigh[,]” and thus

Plaintiff suffered damages “in an amount to be proven at trial.” Regarding its

intentional misrepresentation claim, Plaintiff alleged “Defendants owed [Plaintiff] a

duty to provide complete and accurate information related to the Business during the

negotiation and signing of the [Agreement] through the Closing[,]” and “Defendants

made an affirmative, knowing, or reckless misrepresentation of a material fact by

failing to disclose the Business’s significant sales decline.”

On 9 February 2024, Defendants filed a motion to dismiss, contending

“Plaintiff’s claims are based on indemnification language contained in the Agreement

between the parties and attached to the [c]omplaint. Plaintiff failed to give timely

notice of the indemnification claim as required by the Agreement and the claims

should be dismissed.” Along with their motion to dismiss, Defendants also filed an

answer putting forth several affirmative defenses to Plaintiff’s claims, including,

inter alia, Plaintiff could not recover damages for its breach of contract claim because

it also breached the contract and “Plaintiff waived all claims based on a failure to

-6-

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

produce financial documents detailed in the [c]omplaint by failing to require them

before the closing date.” Defendants also filed their own breach of contract

counterclaim:

71. The Plaintiff failed to give notice of any indemnification

claim to Defendant, as required by the [Agreement].

72. As there was no proper indemnification claim, Plaintiff

was required to pay the sum of $168,750.00 to Defendant

on November 1, 2022.

73. Plaintiff failed to pay the sum due on or before

November 1, 2022.

Plaintiff replied to Defendants’ counterclaim on 11 March 2024, and trial was

set for 17 March 2025.

On 3 January 2025, Plaintiff filed a motion for partial summary judgment,

contending it was entitled to judgment as a matter of law on its breach of contract

claim. Within this motion, although not included in the Record, Plaintiff noted to the

trial court, “[i]n addition, Plaintiff currently has a motion pending for leave to amend

the [c]omplaint to assert a claim under the North Carolina Unfair and Deceptive

Trade Practices Act.” Five days later, Defendants responded in opposition and moved

for summary judgment on both of Plaintiff’s claims.

On 17 February 2025, the trial court heard arguments on, inter alia,

Defendants’ motion to dismiss, Plaintiff’s motion for partial summary judgment, and

Plaintiff’s motion to amend. {T 17 Feb. 2025 p 2} At the hearing, while the parties

were discussing Plaintiff’s motion to amend, the following conversation took place:

-7-

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

[PLAINTIFF’S COUNSEL]: If I may note just at the outset,

some of the minor changes in the amended complaint are

actually just tweaks on the contractual claims. Defendants

have raised no objections to those in their motion, in their

brief or anywhere else. So we see them to be conceding that

those are proper amendments and those --

[DEFENDANTS’ COUNSEL]: We would not concede that,

Your Honor, just for edification.

THE COURT: You can hold onto it.

[DEFENDANTS’ COUNSEL]: Thank you.

[PLAINTIFF’S COUNSEL]: -- those would be allowed for

that reason. If not I would like to respond to their argument

on that because we haven’t heard it before. The issue here

I think, the primary issue as Your Honor raised, is can the

plaintiff add the Unfair and Deceptive Trade Practices Act

claim and their related allegations.

After hearing arguments on Plaintiff’s motion to amend, the trial court then

heard arguments on the other motions. The trial court subsequently dismissed

Plaintiff’s breach of contract claim without prejudice but denied Defendants’ motion

to dismiss Plaintiff’s intentional misrepresentation claim. The trial court also denied

Plaintiff’s motion to amend. Although the trial court did not enter this order until 17

March 2025, the parties were notified via email of the trial court’s ruling on 20

February 2025.

On the following day, on 21 February 2025, Plaintiff filed another motion to

amend its complaint (the “Second Motion to Amend”), seeking “to amend its

[c]omplaint to replead its breach of contract claim, and, specifically, to add further

-8-

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

factual allegations about the contractual provisions on which it is relying and

regarding its compliance with the [Agreement]’s pre-suit notice provisions.” Plaintiff

wished to add the following factual allegations:

24. [Defendants] also included representations that no

material changes had occurred between December 2020

and signing, or between signing and closing.

25. They also included a representation that the purchased

assets were “sufficient for the continued conduct of the

Business after the Closing in substantially the same

manner as conducted” before Closing.

....

39. [Plaintiff] fully complied with the requirements of

Section 8.5 of the [Agreement]. On October 28, 2022,

[Plaintiff] sent notice of its claims to Defendants. . . . .

40. The letter contained a scrivener’s error in that it was

addressed to Defendant Whidby at EWC of North Raleigh,

Inc. instead of to her at EWC of Cameron Village Inc. The

parties had simultaneously consummated a transaction for

the North Raleigh location, which is not at issue in this

lawsuit.

41. The October 28, 2022 letter plainly refers to the

Cameron Village location by (1) identifying the loss of

waxers, an issue that all parties agreed was unique to

Cameron Village and was not being experienced at North

Raleigh, (2) by including the [H]oldback amount for the

Cameron Village location in its statement about the value

of Plaintiff’s claim, and (3) by copying the Plaintiff in this

action.

42. Accordingly, the letter was sufficient to put Defendants

on notice of Plaintiff’s claim.

43. Providing reasonable notice is all that is required under

-9-

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

the [Agreement] and under North Carolina law. . . . .

44. Defendants had actual notice of Plaintiff’s claims

regarding the Cameron Village location[.]

45. Upon receiving the letter on October 28, 2022,

Defendant Whidby sent a text message to Defendant

Hurley about the claim and acknowledging that it was for

at least “the remaining amount of sales of $375,000,”

referencing the [H]oldbacks for both the North Raleigh and

Cameron Village locations.

46. Defendant Whidby expressed no confusion about what

was at issue in this text message.

47. Further, on November 8, 2022, Defendants responded,

through counsel, to the October 28, 2022 letter on behalf of

both the Cameron Village and North Raleigh locations and

refuting the allegations with respect to Cameron Village.

48. Defendants’ counsel followed up again, unprompted, on

January 26, 2023, seeking to settle Plaintiff’s claim

regarding Cameron Village and not making any concession

regarding North Raleigh. . . . .

49. Under the circumstances, Plaintiff’s notice of its claim

was sent promptly.

50. There is no deadline to assert a claim under the

[Agreement].

51. Plaintiff’s notice of claim was sent before any

[H]oldback amount was due to be released Defendants.

52. Plaintiff operated the Business for several months in

an attempt to turn around the franchise’s poor financial

performance that Defendants had intentionally and

fraudulently concealed before the sale. It was reasonable

for Plaintiff to want to see if the Business’s performance

improved, especially during the typically busy summer

season, in the hopes that it would become unnecessary to

- 10 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

raise a dispute. The Business’s performance remained

depressed, and Plaintiff promptly sent the notice of claim.

Plaintiff additionally filed a motion to reconsider with the trial court on 24

February 2025. On 4 March 2025, Plaintiff filed a motion to continue the upcoming

trial until 5 May 2025. Defendants responded to these motions, arguing Plaintiff’s

Second Motion to Amend should be denied for undue delay, undue prejudice, and

futility, and requesting Plaintiff’s motion to continue be denied. As to undue delay,

Defendants specifically argued that Plaintiff received notice of Defendants’ motion to

dismiss on 9 February 2024, but did not move to amend the complaint regarding

indemnification allegations until over a year later on 21 February 2025, and that

Plaintiff had the opportunity to address the pleadings in its first motion to amend but

did not do so.

On 17 March 2025, the day trial was set to begin, the trial court heard

arguments on Plaintiff’s motions, which it subsequently denied. After the trial court

denied Plaintiff’s motions, Plaintiff moved to stay the proceedings for appeal, and the

trial court granted Plaintiff’s motion. Plaintiff timely appealed.

II. Jurisdiction

We first address whether we have jurisdiction to hear an appeal from these

interlocutory orders. “An interlocutory order is one made during the pendency of an

action, which does not dispose of the case, but leaves it for further action by the trial

court in order to settle and determine the entire controversy[,]” and is “generally not

- 11 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

immediately appealable.” Batesville Casket Co. v. Wings Aviation, Inc., 214 N.C. App.

447, 453 (2011).

Nonetheless, in two instances a party is permitted to

appeal interlocutory orders. First, a party is permitted to

appeal from an interlocutory order when the trial court

enters a final judgment as to one or more but fewer than

all of the claims or parties and the trial court certifies in

the judgment that there is no just reason to delay the

appeal. Second, a party is permitted to appeal from an

interlocutory order when the order deprives the appellant

of a substantial right which would be jeopardized absent a

review prior to a final determination on the merits. Under

either of these two circumstances, it is the appellant’s

burden to present appropriate grounds for this Court’s

acceptance of an interlocutory appeal and our Court’s

responsibility to review those grounds.

Id. (citation modified). As we do not have a certification from the trial court in this

case, we analyze whether the trial court’s orders affect a substantial right.

Plaintiff argues its “dismissed contract claim overlaps significantly with both

its misrepresentation claim and Defendants’ counterclaim” and that “[f]actual

overlap between claims—particularly involving misrepresentations—is a well-worn

avenue for interlocutory appeal[,]” invoking the “inconsistent verdicts doctrine.” See

Shearon Farms Townhome Owners Ass’n II, Inc. v. Shearon Farms Dev., LLC, 272

N.C. App. 643, 647 (2020).

“The inconsistent verdicts doctrine is a subset of the substantial rights

doctrine[.]” Id. at 646. Importantly,

when the same fact is determinative of the same issue in

multiple claims, there is a substantial right to have those

- 12 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

factual issues determined by the same jury to avoid the risk

that two juries decide that fact differently, leading to two

judgments from the same initial lawsuit with incompatible

outcomes.

Id. at 647 (holding the plaintiff met its burden of showing there was a risk of

inconsistent verdicts where “some claims against both sets of [the] defendants

involve[d] questions of whether the windows [were] defective and caused the alleged

damage to the siding of neighboring homes”).

Here, Plaintiff’s breach of contract claim and Defendants’ breach of contract

counterclaim involve the same question of whether Plaintiff gave proper notice of the

indemnification claim such that Defendants breached the contract by failing to

indemnify Plaintiff. Thus, Plaintiff has met its burden of showing there is a risk of

inconsistent verdicts, and we proceed to review the merits of Plaintiff’s appeal from

these interlocutory orders. See id. at 647.

III. Analysis

On appeal, Plaintiff argues the trial court erred by (A) dismissing Plaintiff’s

breach of contract claim, and (B) denying Plaintiff’s Second Motion to Amend.

Additionally, Defendants contend on appeal, if this Court concludes the trial court

erred in dismissing Plaintiff’s breach of contract claim, this Court may decide

whether Defendants were entitled to summary judgment on Plaintiff’s breach of

contract claim. We address each argument in turn.

A. Breach of Contract

- 13 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

Plaintiff first argues the trial court erred by dismissing its breach of contract

claim. Specifically, Plaintiff contends it set forth sufficient facts in its complaint for a

breach of contract claim and that “Defendants’ assertion that [Plaintiff] ‘failed to give

timely notice of the indemnification claim,’ . . . has no bearing on the allegations

required to state a claim.” We disagree.

This Court reviews the granting of a motion to dismiss de novo. See Taylor v.

Bank of Am., N.A., 382 N.C. 677, 679 (2022). “[U]nder de novo review, the appellate

court as the reviewing court considers the Rule 12(b)(6) motion to dismiss anew: It

freely substitutes its own assessment of whether the allegations of the complaint are

sufficient to state a claim for the trial court’s assessment.” Id. at 679. We do not

“assess[] or review of the trial court’s reasoning. Rather, the appellate court affirms

or reverses the disposition of the trial court—the granting of the Rule 12(b)(6) motion

to dismiss—based on the appellate court’s review of whether the allegations of the

complaint are sufficient to state a claim.” Id. We are to “liberally construe[]” the

complaint, “viewing all permissible inferences in the light most favorable to the

nonmovant,” and we “should not dismiss the complaint unless it appears beyond

doubt the plaintiff could prove no set of facts in support of his claim which would

entitle him to relief.” Gouch v. Rotunno, 291 N.C. App. 7, 10 (2023) (citation and

internal quotation marks omitted). “A complaint is without merit if: (1) there is an

absence of law to support a claim of the sort made; (2) there is an absence of fact

sufficient to make a good claim; or (3) there is the disclosure of some fact which will

- 14 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

defeat a claim.” Id. (citation and internal quotation marks omitted).

“In an action for breach of contract, the complaint must allege (1) the existence

of a contract between the parties, (2) the specific provisions breached, (3) the facts

constituting the breach, and (4) the damages resulting to the plaintiff from the

breach.” Thompson v. Bass, 261 N.C. App. 285, 290 (2018).

Here, there is no dispute that Plaintiff’s complaint sufficiently alleged a valid

contract existed between the parties; instead, on appeal, Plaintiff argues it alleged

sufficient facts to show that “Defendants breached four provisions, sections 5.3, 5.5,

5.17, and 8.2.” In its complaint, Plaintiff alleged, in relevant part:

23. Under Section 5.3 of the [Agreement], Defendants

provided Business financial statements for all of 2020 and

through October of 2021. Under Section 5.3 of the

[Agreement], Defendants represented that the Business

financial statements fairly and accurately presented the

financial position of the Business.

24. Under Section 5.5 of the [Agreement], Defendants

represented that since October 31, 2021 (almost two

months prior to the Closing of [Agreement]): there has not

been any change, event, condition, or development that is,

or could reasonably be expected to be, individually or in the

aggregate, materially adverse to: (a) the business, results

of operations, condition (financial or otherwise), or assets

of the Business; or (b) the value of the Purchased Assets.

25. Under Section 5.17 of the [Agreement], Defendants

represented that: No representation or warranty by Seller

in this Agreement and no statement contained in the

Disclosure Schedules to this Agreement or any certificate

or other document furnished or to be furnished to Buyer

pursuant to this Agreement contains any untrue statement

of a material fact, or omits to state a material fact

- 15 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

necessary to make the statements contained therein, in

light of the circumstances in which they are made, not

misleading.

26. Under Section 8.2 of the [Agreement], Defendants

agreed to: jointly and severally indemnify and defend each

of [Plaintiff] and its Affiliates and their respective

Representatives, . . . against, and shall hold each of them

harmless from and against, any and all Losses, incurred or

sustained by, or imposed upon, [Plaintiff] based upon,

arising out of, or with respect to any inaccuracy in or

breach of any of the representations or warranties of

[Defendant] contained in this Agreement.

27. Under Section 8.2 of the [Agreement], Defendants also

agreed to indemnify [Plaintiff] for Losses arising from, “any

breach or non-fulfillment of any covenant, agreement, or

obligation to be performed by Seller or any Principal

pursuant to this Agreement.”

....

29. Under Section 8.5 of the [Agreement], “[w]henever any

claim shall arise for indemnification hereunder, the

Indemnified Party shall promptly provide written notice of

such claim to the Indemnifying Party.”

30. Under [] Section 8.7 of the [Agreement]:

“The Holdback minus the amount of any validly

asserted but unresolved indemnification claims or

resolved but unreleased indemnification claims of

Buyer pursuant to this Section 8 will be released to

Seller in certified or wired funds on the first

business day after the date that is 9 months after the

Closing Date.”

31. . . . . Defendants delayed producing November 2021,

December 2021, and January 2022 financials. These

financials coincided with a drastic drop in Business sales.

Defendants knew the sales dramatically declined because

- 16 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

they had access to the Zenoti, a cloud-based business

management system for salons and spas, that provides

daily sales information.

32. Upon information and belief, the Business’s sales

dropped by over 40% year over year in November 2021,

nearly 30% year over year in December 2021, and

approximately 45% year over year in January 2022.

33. During due diligence and other calls leading up to the

[Agreement] signing in December 2021 and the Closing in

January 2022, Defendants indicated that although full

financials had not been completed for November and

December 2021, the Business was doing well. At the time

Defendants made those statements, Defendants knew of

the significant decline in sales, especially because

Defendants had access to the Zenoti system which provides

daily sales information.

34. Defendants’ failure to provide sales information, at a

minimum, for November 2021, December 2021, and

January 2022 was particularly inappropriate because the

Business uses Zenoti which provides daily sales

information. Thus, Defendants could have easily provided

[Plaintiff] with sales information at any point in November

2021, December 2021, or January 2022.

35. During these same diligence calls, Defendants

indicated that an unspecified number of employees had

left, but that the departing employees had been or being

replaced with new employees. Defendants never indicated

that it was experiencing precipitous sales declines for this

or any reason.

36. The undisclosed precipitous drop in sales was

materially adverse to the business, results of operations,

condition, and the value of the Business.

37. Had [Plaintiff] known about the precipitous drop in

sales, [Plaintiff] would not have paid the purchase price

stated in the [Agreement] and may have cancelled the

- 17 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

transaction all together as such adverse changes were a

failure of a material condition to closing.

38. Just after the Closing in January of 2022, [Plaintiff]

learned about Defendants’ nondisclosure of the material

adverse changes and attempted to try to resolve the issues

with Defendants over a period of months. However,

Defendants failed to provide a reasonable resolution.

39. After it became clear that Defendants would not

voluntarily address the issues caused by its non-disclosure,

[Plaintiff] demanded that Defendants indemnify [Plaintiff]

for the Losses it incurred as a result of Defendants’

breaches of the [Agreement] on October 28, 2022.

40. Defendants have refused to indemnify [Plaintiff] for its

losses.

Although Plaintiff references sections 8.2, 8.5, and 8.7, Plaintiff does not allege

it properly performed section 8.5’s trigger for an indemnification claim under the

Agreement, which required a “written notice”; instead, Plaintiff only claimed it

“attempted to try to resolve the issues with Defendants over a period of months.”

Furthermore, even though Plaintiff attached the notice with its complaint, it did not

allege any facts indicating this was a proper notice to Defendant EWC of Cameron

Village rather than the addressed EWC of North Raleigh. Plaintiff sought to include

the necessary facts only after learning the trial court had granted Defendants’ motion

to dismiss. Even viewing the alleged pleadings in the light most favorable to Plaintiff,

the complaint fails to include facts “sufficient to make a good [breach of contract for

the indemnification provision] claim”; thus, we conclude the trial court properly

dismissed this specific part of the claim. See Gouch, 291 N.C. App. at 10.

- 18 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

This does not, however, end our analysis; Plaintiff’s breach of contract claim

also pled that “Defendants breached the [Agreement] by failing to disclose material

information about the Business.”

Here, the Agreement provided,

[s]ubject to Section 3.2, Section 7.3(c), and Section 9.11, the

Parties acknowledge and agree that their sole and

exclusive remedy with respect to any and all claims (other

than claims arising from intentional misrepresentation or

fraud on the part of a Party hereto in connection with the

transactions contemplated by this Agreement) for any

breach of any representation, warranty, covenant,

agreement or obligation set forth herein or otherwise

relating to the subject matter of this Agreement shall be

pursuant to the indemnification provisions set forth in this

Section 8. Nothing in this Section 8.8 shall limit any

Party’s right to seek and obtain any equitable relief to

which such Party shall be entitled.

(Emphasis added.) Thus, the Agreement specifically provides that nothing shall limit

Plaintiff’s right to seek equitable relief from any breach of representation done

intentionally. As such, Plaintiff’s breach of contract claim for misrepresentation is not

contingent on Plaintiff’s claim for the breach of the indemnification provision, nor on

notice of that claim, if pled, as breached intentionally. We therefore analyze whether

Plaintiff, on the face of the pleadings, has sufficiently pled a breach of contract for

misrepresentation done intentionally so as to survive a motion to dismiss. We agree

with Plaintiff that it did.

Plaintiff specifically pled Defendants breached sections 5.3, 5.5, and 5.17 of the

Agreement regarding representations, and factually alleged:

- 19 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

During due diligence and other calls . . . Defendants

indicated that although full financials had not been

completed for November and December 2021, the Business

was doing well. At the time Defendants made those

statements, Defendants knew of the significant decline in

sales, especially because Defendants had access to the

Zenoti system which provides daily sales information.

Thus, Plaintiff properly pled a breach via misrepresentation resulting from

intentional actions, and the trial court erred in dismissing this portion of Plaintiff’s

breach of contract claim. See id. at 10.

Defendants argue on appeal, however, even if we hold the trial court erred in

dismissing Plaintiff’s breach of contract claim pursuant to Rule 12(b)(6), this Court

may conclude the trial court could have granted summary judgment in favor of

Defendants on this matter.

Our Supreme Court has explained that “[i]f the granting of summary judgment

can be sustained on any grounds, it should be affirmed on appeal. If the correct result

has been reached, the judgment will not be disturbed even though the trial court may

not have assigned the correct reason for the judgment entered.” Shore v. Brown, 324

N.C. 427, 428 (1989). “Summary judgment is appropriate when no genuine issue of

material fact exists, and a party is entitled to judgment as a matter of law.” Value

Health Sols., Inc. v. Pharm. Rsch. Assocs., Inc., 385 N.C. 250, 267 (2023). We cannot

say as a matter of law, however, that Defendants are entitled to summary judgment

where a question of fact exists as to whether Defendants intentionally hid this

information from Plaintiff and whether this information was material pursuant to

- 20 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

the Agreement. Thus, we affirm the trial court’s granting of Defendants’ motion to

dismiss in part regarding Plaintiff’s claim for breach of the indemnification provision,

but we reverse in part and remand to the trial court regarding Plaintiff’s claim for

breach via misrepresentation.

B. Amending Complaint

Plaintiff next argues the trial court erred by denying its Second Motion to

Amend its complaint. Specifically, Plaintiff contends the trial court abused its

discretion in denying Plaintiff’s motion because Defendants could not show they

would be materially prejudiced. Alternatively, Plaintiff asserts the trial court denied

its motion on a misapprehension of the law, which is reversible error. We disagree.

This Court reviews the denial of a motion to amend for an abuse of discretion.

Pruett v. Bingham, 238 N.C. App. 78, 86 (2014), aff’d, 368 N.C. 709 (2016). “A trial

court’s denial of a motion to amend a complaint can only be reversed upon proof by a

litigant that the challenged actions are manifestly unsupported by reason.” Id.

(citation and internal quotation marks omitted).

After a party has responded to a plaintiff’s original pleading, “a party may

amend his pleading only by leave of court or by written consent of the adverse party;

and leave shall be freely given when justice so requires.” N.C.G.S. § 1A-1, Rule 15(a)

(2023). “Under Rule 15(a) of the North Carolina Rules of Civil Procedure, leave to

amend a pleading shall be freely given except where the party objecting can show

material prejudice by the granting of a motion to amend.” Williams v. Craft Dev.,

- 21 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

LLC, 199 N.C. App. 500, 509 (2009), writ denied, review denied, 363 N.C. 859 (2010).

“If the trial court articulates a clear reason for denying the motion to amend,

then our review ends. Acceptable reasons for which a motion to amend may be denied

are undue delay, bad faith, dilatory motive, repeated failure to cure deficiencies,

undue prejudice and futility of the amendment.” JPMorgan Chase Bank, Nat’l Ass’n

v. Browning, 230 N.C. App. 537, 541 (2013) (citation and internal quotation marks

omitted); see also News & Observer Pub. Co. v. Poole, 330 N.C. 465, 485 (1992)

(“Among proper reasons for denying a motion to amend are undue delay by the moving

party and unfair prejudice to the nonmoving party.” (emphasis added)).

“In the absence of any declared reason for the denial of leave to amend, this

Court may examine any apparent reasons for such denial.” Williams, 199 N.C. App.

at 510; see also Gro-Mar Pub. Rels., Inc. v. Billy Jack Enters., Inc., 36 N.C. App. 673,

679 (1978) (holding the trial court abused its discretion in denying the plaintiff’s

motion to amend its complaint after a motion to dismiss where the “trial court failed

to state a reason . . . nor do we perceive that there are any ‘apparent’ reasons for

denial of leave to amend”). Additionally, “[t]here is . . . no time limit for amendment

under Rule 15.” Watson v. Watson, 49 N.C. App. 58, 61 (1980). “It is [the p]laintiff’s

burden to prove the trial court abused its discretion in denying her motion to amend.”

Williams, 199 N.C. App. at 510.

Here, Defendants argued before the trial court that Plaintiff’s Second Motion

to Amend would cause undue delay and undue prejudice or would be futile. When

- 22 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

ruling on the Second Motion to Amend, the trial court stated:

All right. You all used very strong words in terms of -- you

used strong words. This is a matter to be considered in my

discretion. Unfortunately it seems as though there may

have been lines of communication that apparently were

challenging between the parties, lines of communication,

for me being aware of the Order that was out there that

had not been addressed yet. So that’s my fault for whatever

fell through with that.

This is a matter that would be in the Court’s discretion in

terms of the Motion to Amend. It’s easier for me to, I say

easy, I can rule on this one somewhat confidently actually

from filing -- from ruling on the Motion to Dismiss. The

motion is denied. At the time that it was ruled upon

previously I actually anticipated that there may have been

a voluntary dismissal to go back and redo everything. But

you don’t have to. You’re well within your rights to try to

go about it this way.

Before me to hear the Motion to Amend today in my

discretion that would be denied. I don’t know if or when I

will get to the point that I would grant a Motion to Amend

the day of trial, the day that a matter’s called for trial, but

these are not the facts nor the circumstances that would

get me to the level of doing so [f]or granting a Motion to

Amend.

Again, that is making a -- I understand that there --

and I think the Court can take appropriate consideration

of the factors that may go around the events that led up to

a trial, whether or not there’s been some inability to

communicate. But a lot of the argument of what I heard,

in addition to the things that went specifically to the facts,

was a suggestion of equity but not equity for the parties,

somewhat equity for the parties, equity or consideration of

witnesses but as I referenced before, it was almost as if I

should have been keeping a scorecard about tit for tat and

who did what and I’m very aware and sensitive to the

pressures and the stressors that attorneys face, but it

- 23 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

almost seemed as though I heard more about things going

on around the case then I did specifically about what I

needed to hear just for this motion.

For the past eight years I’ve heard a lot of motions to

amend so it’s not as if this is new. But, no, that motion is

denied.

Plaintiff argues Defendants did not show the amendments would cause undue

delay or prejudice because, “[i]f Defendants truly were prepared ‘to proceed on the

issues . . . before’ the court on 17 March, . . . they were prepared to try [Plaintiff]’s

contract claim” since Defendants’ own counterclaim involves a breach of contract for

indemnification provisions, nor can Defendants be “surprised” because “[Plaintiff]’s

contract claim had been part of the case from the start.” We do not discern, however,

an abuse of discretion by the trial court in finding Defendants showed undue delay

where Plaintiff waited over a year to amend its complaint as to the breach of contract

claim, had already moved to amend its complaint for other reasons, and then argued

the Second Motion to Amend on the day of trial. See News & Observer Pub. Co., 330

N.C. at 485 (“[The p]laintiffs here moved to amend their complaint three months after

obtaining new information from deposition testimony, and three days before the

action was scheduled for hearing. Although the trial court did not reach the issue of

delay and possible prejudice to [the] defendants, the circumstances would have

supported a denial of [the] plaintiffs’ motion on those grounds.”).

Lastly, Plaintiff also contends the trial court reversibly erred because it

misapprehended the law twice. First, Plaintiff claims that, because the trial court

- 24 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

heard the motion “on the day that [the] matter[ was] called for trial” and asked in the

hearing whether granting the Second Motion to Amend would “automatically result

in the matter being continued[,]” the trial court mistakenly believed granting the

motion could only result in a continuance, which is not a valid reason for denial.

Second, Plaintiff claims the trial court “mistakenly believed [Plaintiff] could replead

its contract claim[.]” This was evidenced by the trial court’s statement during the

hearing: “At the time that [the motion to dismiss] was ruled upon previously[,] I

actually anticipated that there may have been a voluntary dismissal to go back and

redo everything. But you don’t have to. You’re well within your rights to try to go

about it this way.” Plaintiff contends it could not have repled without Defendants’

consent or without an order with a Rule 41(b) saving clause.

Plaintiff’s arguments mistake the trial court’s question about, and opinion on,

how things might have gone for the trial court’s subsequent reasoning and application

of the law and are thus overruled. Accordingly, we conclude the trial court did not

abuse its discretion in denying Plaintiff’s Second Motion to Amend. See Pruett, 238

N.C. App. at 86.

IV. Conclusion

Upon careful review, we conclude the trial court erred in dismissing Plaintiff’s

breach of contract claim as to misrepresentations, where Plaintiff sufficiently pled

allegations, but it did not err in dismissing the breach of contract claim as to the

indemnification clauses, where Plaintiff insufficiently pled those allegations.

- 25 -

EWC RALEIGH CV, LLC V. EWC OF CAMERON VILLAGE, INC.

Opinion of the Court

Further, the trial court did not abuse its discretion in denying Plaintiff’s Second

Motion to Amend for undue delay where Plaintiff waited over a year to move to amend

its breach of contract claim, Plaintiff had previously moved to amend its complaint

for other reasons, and the motion was being heard on the day trial was supposed to

start.

AFFIRMED IN PART; REVERSED AND REMANDED IN PART.

Judges TYSON and GRIFFIN concur.

Report per Rule 30(e).

- 26 -