Opinion

Kropp Holdings, Inc. v. United States

Court
United States Court of Federal Claims
Filed
Mar 5, 2026
Status
Published
On the bench
Zachary N. Somers
Cited by
0 cases
Authority
More cited than 39.1%

“[Plaintiff] failed to raise this argument in his opening brief, so it is waived.”

How later courts described this case

  • “[Plaintiff] failed to raise this argument in his opening brief, so it is waived.”
  • explaining that failure to raise an argument in an opening brief results in that argument being waived
  • “A reply brief, which should ‘reply to the brief of the appellee,’ is 7 not the appropriate place to raise, for the first time, an issue[.]” (citation omitted)
  • “[U]se of dictionaries as interpretive aids (e.g., ‘lexicography’) is not considered ‘extrinsic’ aids the use of which violates the plain meaning doctrine.” (citations omitted)

Written by the judges who cited it.

The opinion

In the United States Court of Federal Claims

No. 24-2155

(Filed Under Seal: February 10, 2026)

Reissued: March 5, 2026 *

* * * * * * * * * * * * * * * * * * * * * *

*

KROPP HOLDINGS, INC., *

*

Plaintiff, *

*

v. *

*

THE UNITED STATES, *

*

Defendant, *

*

and *

*

ASSOCIATED ENERGY GROUP, LLC, *

*

Defendant-Intervenor. *

*

*

* * * * * * * * * * * * * * * * * * * * * *

Craig A. Holman, with whom were Kara L. Daniels, Thomas A. Pettit, Roee Talmor, and

Nicole A. Williamson, Arnold & Porter Kaye Scholer LLP, all of Washington, D.C., for Plaintiff.

John H. Roberson, Senior Trial Attorney, Commercial Litigation Branch, Civil Division,

U.S. Department of Justice, with whom were Douglas K. Mickle, Acting Deputy Director,

Patricia M. McCarthy, Director, Brett A. Shumate, Acting Assistant Attorney General, all of

Washington, D.C., for Defendant, and Steven Sosko, Senior Counsel, Defense Logistics Agency,

of Fort Belvoir, VA, of counsel.

Todd J. Canni, with whom were Ariella M. Cassell of Los Angeles, CA, and Kevin

Barnett, Stephen Ruscus, Kevin N. Dorn, and Kaitlyn E. Toth, Baker & Hostetler LLP, all of

Washington, D.C., for Defendant-Intervenor.

*

Pursuant to the protective order entered in this case, this opinion was filed initially

under seal. The parties provided proposed redactions of confidential or proprietary information,

which the Court adopted in addition to making minor typographical and stylistic edits.

OPINION AND ORDER

SOMERS, Judge.

Associated Energy Group, LLC’s (“AEG”) motion for reconsideration is akin to an

unsuccessful challenge by an NFL coach in football. Assume, after a wide receiver catches the

football, the referee deems the pass “incomplete” for two separate reasons. First, the receiver’s

foot was out of bounds when he made the catch. Second, the receiver did not have sufficient

control of the ball for the catch to be ruled complete. The coach challenges the play, arguing at

length that the receiver did have sufficient control of the ball. The coach emphasizes that the ball

was not bobbling in the receiver’s hands, the receiver had two hands on the ball, the ball was

tucked firmly under the receiver’s arm, the ball never touched the turf, and the receiver

maintained control of the ball long enough to make a football move. See 2025 NFL RULEBOOK,

Rule 8, § 1, arts. 3–4. While these arguments, if true, may prove that the receiver did, in fact,

have control of the ball, the pass is still incomplete because the coach failed to address the fact

that the receiver’s foot was out of bounds. See id.

Much like the hypothetical NFL coach’s futile arguments regarding the receiver’s control

of the football, no matter how many new arguments AEG asserts regarding whether there was

timely government control of its proposal, AEG’s motion cannot prevail because—just as the

coach did not address the fact that the receiver’s foot was out of bounds—AEG does not address

its insufficient merits argument that its proposal was received by, 1 and not prior to, the deadline

for proposal submission. However, just as the Court held in its merits opinion, in order for the

government control exception to the late-is-late rule to apply, the proposal must be received prior

to the time set for receipt of offers. For this reason, and others discussed below, the Court’s call

stands.

Before the Court is AEG’s 37-page motion for reconsideration of an issue it devoted just

five paragraphs to in its motion for judgment on the administrative record (“MJAR”). Compare

ECF No. 92-1, with ECF No. 65-1 at 21–22. In its motion, AEG contends that the Court should

reconsider its determination that the government control exception did not apply to its otherwise

late submissions. See ECF No. 92-1 at 1; Kropp Holdings, Inc. v. United States, 176 Fed. Cl.

512, 533–39 (2025). However, notwithstanding myriad arguments that AEG asserts justify

reconsideration, at bottom AEG fails to address the Court’s actual holdings on this issue and

instead emphasizes less important portions of the Court’s opinion with which it disagrees. In

addition to missing the Court’s holdings, AEG asserts new theories not raised in AEG’s merits

briefing and attempts to reassert arguments that the Court already found unpersuasive the first

time around. Neither these new theories nor rehashed arguments justify reconsideration.

For the reasons that follow, the Court agrees with Plaintiff Kropp Holdings, Inc. (“KHI”)

and the government that reconsideration is not warranted; accordingly, the Court denies AEG’s

motion.

1

As is explained later in this opinion, AEG’s use of “by,” when read in context, clearly

meant “at” and not “before.”

2

BACKGROUND

A. Factual Background and Procedural History

The facts and procedural history of this case are largely set forth in the Court’s original

opinion in this bid protest. See Kropp Holdings, Inc., 176 Fed. Cl. at 524–26. For the sake of

brevity, the Court only recounts here the factual background and procedural history salient to

AEG’s motion.

KHI brought suit alleging eight reasons why the Court should overturn the Defense

Logistics Agency’s (“DLA”) decision to award an aviation into-plane fuel contract, known as the

AIR Card contract (“AIR Card”), to AEG. Id. at 523–24. The Court issued an opinion on May

9, 2025, finding that KHI was successful on four of its protest grounds. Id. at 524. Therefore,

the Court permanently enjoined DLA from “continuing transition activities or obtaining

performance from AEG” under the contract. Id. at 564. One of the grounds upon which KHI

was successful was its argument that AEG’s proposal was not timely submitted. It is this holding

that AEG challenges here. The Court’s holding on this point was two-fold. First, the Court

determined that:

the [Request for Proposals (“RFP”)] establishes 10:00 a.m. as the submission

deadline and states that “timeliness of an offer will be based upon the receipt time

stamp on the submission inbox.” The receipt time stamps on the

Energyfuelcards@dla.mil submission inbox show that AEG’s Volumes 1 and 2

were received after 10:00 a.m. Because DLA did not timely receive AEG’s

proposal, AEG’s proposal is late and thus “tantamount to no proposal at all.”

Id. at 533 (citations omitted). Second, the Court held that the government control exception to

the late-is-late rule did not apply to AEG’s proposal submission: “Because AEG argues that

acceptable evidence in the form of email screenshots establishes that its Volume 1 submission

was received at 10:00 a.m., and not prior to 10:00 a.m., AEG’s argument fails, and its submission

cannot fall under the government control exception.” Id. at 534 (citing ECF No. 65-1 at 21; FAR

52.212-1(f)(2)(i)(B)). The Court also observed that “[e]ven if metadata could cure AEG’s

argument (it cannot, as AEG waived any such argument by not raising it in its motion), AEG’s

Volume 1 submission was still late according to the metadata for purposes of the government

control exception.” Id. (emphasis added) (footnote omitted). And, in a footnote to the preceding

quotation, the Court further noted that “AEG does not develop this argument in briefing.

Instead, AEG tried to argue this point at oral argument. Although AEG waived any metadata

argument because it did not make such argument in its MJAR, the Court will discuss the

argument anyway, as the discussion further demonstrates the lateness of AEG’s proposal.” Id. at

534 n.7 (citations omitted).

Accordingly, for these two reasons, and several other reasons not relevant to AEG’s

motion for reconsideration, the Court issued a permanent injunction and required the agency to

reconsider its decision awarding the fuel card contract to AEG. See id. at 538, 564. AEG

subsequently filed its own bid protest challenging DLA’s re-award of the AIR Card contract to

KHI in accordance with the Court’s opinion. See Complaint, Associated Energy Grp. v. United

3

States, No. 25-917 (Fed. Cl. May 29, 2025), ECF No. 1. At a status conference held on June 4,

2025, the parties agreed that, to come to the most efficient resolution of this case, the Court

should stay the new bid protest, and AEG should file a motion for reconsideration of the Court’s

opinion in the instant case. Accordingly, the Court stayed AEG’s protest the next day. See Order

Staying Case, Associated Energy Grp., No. 25-917 (Fed. Cl. June 5, 2025), ECF No. 29.

Five days after the status conference, on June 9, 2025, AEG filed its motion for

reconsideration pursuant to Rule 59(a) of the Rules of the U.S. Court of Federal Claims

(“RCFC”). ECF No. 92. The government filed its response to AEG’s motion on June 27, 2025.

ECF No. 98. KHI filed its response to AEG’s motion on July 1, 2025. ECF No. 100. AEG filed

a reply in support of its motion on July 18, 2025. ECF No. 102. The motion is now ripe for

adjudication.

DISCUSSION

A. Legal Standard

RCFC 59(a) provides the grounds for reconsideration. The decision whether to grant

such a motion lies within the sound discretion of the Court. Yuba Nat. Res., Inc. v. United States,

904 F.2d 1577, 1583 (Fed. Cir. 1990). To establish that reconsideration is warranted, the moving

party must make “a showing of extraordinary circumstances which justify relief.” Caldwell v.

United States, 391 F.3d 1226, 1235 (Fed. Cir. 2004) (quoting Fru-Con Constr. Grp. v. United

States, 44 Fed. Cl. 298, 300 (1999), aff’d, 250 F.3d 762 (Fed. Cir. 2000)). To meet this high

standard, the moving party typically must show either “an intervening change in the controlling

law, newly discovered evidence, or a need to correct clear factual or legal error or prevent

manifest injustice.” Biery v. United States, 818 F.3d 704, 711 (Fed. Cir. 2016). Where a movant

seeks reconsideration “on the ground of manifest injustice, it cannot prevail unless it

demonstrates that any injustice is ‘apparent to the point of being almost indisputable.’” Griffin v.

United States, 96 Fed. Cl. 1, 7 (2010) (quoting Pac. Gas & Elec. Co. v. United States, 74 Fed. Cl.

779, 785 (2006), rev’d on other grounds, 536 F.3d 1282 (Fed Cir. 2008)).

Importantly, a movant for reconsideration under RCFC 59(a) will not be successful by

citing to evidence that “was manifestly available at [the] time of the hearing,” Parsons ex rel.

Linmar Prop. Mgmt. Tr. v. United States, 174 F. App’x 561, 563 (Fed. Cir. 2006) (alteration in

original) (quoting Gelco Builders & Burjay Constr. Corp. v. United States, 177 Ct. Cl. 1025,

1036 n.7 (1966)), or by merely recapitulating “cases and arguments considered by th[e] court

before rendering its original decision,” Fru-Con Const. Corp., 44 Fed. Cl. at 301 (alteration in

original) (quoting Carteret Sav. Bank, F.A. v. Shushan, 721 F. Supp. 705, 706 (D.N.J. 1989)).

Similarly, a motion for reconsideration is an inappropriate vehicle for litigants to attempt to

assert new arguments or raise legal theories not asserted or raised before the original decision.

E&I Glob. Energy Servs., Inc. v. United States, 152 Fed. Cl. 524, 533 (2021) (“[U]nder RCFC

59(a), litigants are forbidden from asserting new arguments or raising legal theories for the first

time in a motion for reconsideration.”).

4

B. Analysis

AEG seeks reconsideration of the Court’s disposition of one subpart of the Court’s

decision on one of seven errors KHI alleged in its MJAR. Specifically, AEG contends that (1)

the Court erred in its analysis of whether the government control exception applied to rectify

AEG’s otherwise late proposal submission by “reaching a conclusive ruling against control,” and

(2) by failing to remand this question to the agency, “the Court got out ahead of DLA and

usurped its role.” ECF No. 92-1 at 3. AEG’s remand argument, however, sidesteps crucial

aspects of the Court’s holding, ignores what AEG actually argued on the merits, and introduces

new arguments in seeking reconsideration that AEG could have raised on the merits but did not.

For these reasons and others explained below, AEG’s motion for reconsideration is denied.

1. The Late-is-Late Rule.

Before turning to why AEG’s motion fails, it is important to recount the Federal

Acquisition Regulation’s (“FAR”) late-is-late rule. As the Court observed in its merits opinion,

in accordance with the FAR, the Federal Circuit has made clear that proposals for government

contracts that are submitted after the deadline for proposal submission are unawardable:

All errors are not equal. There are inherent competitive advantages to submitting

a proposal after all other parties are required to do so . . . . To avoid this potential

for abuse, submission deadlines are strictly enforced across the board. When the

rules and procedures of a bid process are applied equally to all parties, but one party

submits a proposal past the deadline for doing so, the untimely submission becomes

a stranger to the process, and is disqualified from the procurement. A late proposal

is tantamount to no proposal at all. Such a party has no “substantial chance” of

award, and no more standing to sue than the proverbial man on the street.

Kropp Holdings, Inc., 176 Fed. Cl. at 527 (omission in original) (quoting Labatt Food Serv., Inc.

v. United States, 577 F.3d 1375, 1381 (Fed. Cir. 2009)); see also 48 C.F.R. § 52.212-1(f)(2)(i)

(“Any offer . . . received at the Government office designated in the solicitation after the exact

time specified for receipt of offers is ‘late’ and will not be considered.”). “Put more succinctly,

‘late is late’ and late submissions are not awardable.” Kropp Holdings, Inc., 176 Fed. Cl. at 527.

As also was observed in the Court’s merits opinion, the FAR contemplates exceptions to

the late-is-late rule that can excuse an offeror’s late submission if certain criteria are met. Under

the FAR, “[a]ny offer . . . received at the Government office designated in the solicitation after

the exact time specified for receipt of offers is ‘late’ and will not be considered” unless the offer

was “received before [the] award [was] made, the Contracting Officer determines that accepting

the late offer would not unduly delay the acquisition,” and one of the following circumstances

exists:

(A) If it was transmitted through an electronic commerce method authorized by the

solicitation, it was received at the initial point of entry to the Government

infrastructure not later than 5:00 p.m. one working day prior to the date specified

for receipt of offers; or

5

(B) There is acceptable evidence to establish that it was received at the Government

installation designated for receipt of offers and was under the Government’s control

prior to the time set for receipt of offers; or

(C) If this solicitation is a request for proposals, it was the only proposal received.

48 C.F.R. § 52.212-1(f)(2)(i)(A)–(C). The first exception listed above is referred to as the

“electronic commerce” exception, and the second exception listed above is referred to the as the

“government control” exception. Kropp Holdings, Inc., 176 Fed. Cl. at 533.

Most relevant here, as it is the exception AEG invoked to attempt to cure its otherwise

late proposal, is the government control exception. Of secondary importance is the electronic

commerce exception and how that exception relates to the government control exception in the

regulatory scheme. With all this in mind, the Court can now address, in turn, what AEG argued

on the merits, what the Court held on the merits, and AEG’s new arguments on reconsideration.

2. AEG’s Merits Arguments and the Court’s Actual Holding on Government

Control.

While recounting the arguments that a party made on the merits is important in

considering any motion for reconsideration, it is especially important here, because AEG makes

new arguments in its motion for reconsideration that it did not raise in its pre-judgment merits

briefing and selectively overemphasizes portions of the Court’s opinion with which it disagrees.

Leaving aside for now three legal arguments that AEG made in its MJAR related to the

government control exception—a discussion of Watterson Construction Company v. United

States, an undeveloped argument that the contracting officer’s declaration is entitled to the

presumption of regularity, and an argument that KHI was not prejudiced by AEG submitting a

late proposal—the entirety of AEG’s argument on the government control exception in its MJAR

is as follows:

Moreover, even in the presence of conflicting timestamps, DLA acted

rationally because acceptable evidence exists showing that, in any event, the

government control exception to the “late-is-late” rule applies. Under this

exception, set forth at FAR 52.212-1(f)(2)(i), DLA has the discretion to accept a

proposal received if:

(1) the offer was received before award is made; (2) the CO

determines that accepting the offer would not unduly delay the

acquisition; and (3) there is at least acceptable evidence to establish

that the offer was received at the Government’s installation

designated for receipt of offers and was under the Government’s

control prior to the time set for receipt of offers.

[eSimplicity, Inc. v. United States, 162 Fed. Cl. 372, 386 (2022)] (quoting FAR

52.212-1(f)(2)(i)). All three boxes are checked in this case.

6

First, AEG’s proposal was “received before award was made.” In fact, by

any measure, AEG’s proposal was received on August 19, 2021, and the relevant

award was not made until October 2024. See Tab 260, Screenshots of AEG Offer

at AR 9589–91.

Second, the contracting officer (“CO”) accepted the proposal and thus

determined that accepting the proposal would not unduly delay the acquisition. See

ECF No. 50-2, Decl. of CO at 1 (“I determined AEG’s initial proposal was

submitted timely based on the time stamped that showed on the emails received in

Outlook, which showed all 4 required volumes were received on or before 10:00

a.m. EDT on August 19, 2021.”).

Third, the offer was received at the government installation designated for

receipt of offers, as shown by the submission inbox screenshots, and was under

DLA’s control by 10:00 a.m. See Tab 260, Screenshots of AEG Offer at AR 9589–

91.

Finally, the Court need not conclusively resolve conflicting screenshots.

The government control exception’s low threshold referred to as the “acceptable

evidence” standard obviates the need for further inquiry into this point. The FAR

confirms that “acceptable evidence to establish the time of receipt at the

Government installation includes . . . other documentary evidence of receipt

maintained by the installation, or oral testimony or statements of Government

personnel.” FAR 15.208(c). DLA has provided both—documentary screenshots

showing receipt by no later than 10:00 a.m., see Tab 260, Screenshots of AEG Offer

at AR 9589–91, and sworn statements by the contracting officer. This matter need

not be debated further as the record contains “acceptable evidence” to support

DLA’s determination.

ECF No. 65-1 at 21–22 (emphasis in original; over-emphasis removed).

The Court emphasizes the arguments raised in AEG’s MJAR because what a party argues

in its opening brief is what controls, and AEG’s MJAR was its opening brief in the pre-judgment

merits phase of this litigation. Abbott Lab’ys v. Syntron Bioresearch, Inc., 334 F.3d 1343, 1355

(Fed. Cir. 2003) (explaining that failure to raise an argument in an opening brief results in that

argument being waived); Hynix Semiconductor Inc. v. Rambus Inc., 645 F.3d 1336, 1354 (Fed.

Cir. 2011) (“To the extent [defendant] relies on other arguments in its reply brief, those

arguments are waived as not presented in its opening brief.”); Walker v. Health Int’l Corp., 845

F.3d 1148, 1156 (Fed. Cir. 2017) (“[Plaintiff] failed to raise this argument in his opening brief, so

it is waived.”); Shimano, Inc. v. Rea, 527 F. App’x 1002, 1004 n.1 (Fed. Cir. 2013) (“In post-

argument submissions, the parties have debated whether particular arguments were made . . . .

Rather that [sic] address those issues, we address the arguments made in the parties’ opening

briefs on appeal and cross-appeal. Arguments not made in the [parties’] opening briefs are

ordinarily deemed waived . . . .” (citation omitted)); see Amhil Enters. Ltd. v. Wawa, Inc., 81 F.3d

1554, 1563 (Fed. Cir. 1996) (“A reply brief, which should ‘reply to the brief of the appellee,’ is

7

not the appropriate place to raise, for the first time, an issue[.]” (citation omitted)); Corrigan v.

United States, 70 Fed. Cl. 665, 668 (2006) (“[B]y failing to raise an issue when it is first

available to be litigated, a party waives consideration by the court of the issue on

reconsideration, even when the party is pro se.” (emphasis added)). In short, what truly matters

is what AEG argued in its MJAR. And in terms of what was in dispute at the merits stage of this

litigation, the Court can further boil the above five paragraphs down to one:

Third, the offer was received at the government installation designated for receipt

of offers, as shown by the submission inbox screenshots, and was under DLA’s

control by 10:00 a.m. See Tab 260, Screenshots of AEG Offer at AR 9589–91. . . .

The FAR confirms that “acceptable evidence to establish the time of receipt at the

Government installation includes . . . other documentary evidence of receipt

maintained by the installation, or oral testimony or statements of Government

personnel.” FAR 15.208(c). DLA has provided both—documentary screenshots

showing receipt by no later than 10:00 a.m., see Tab 260, Screenshots of AEG Offer

at AR 9589–91, and sworn statements by the contracting officer. This matter need

not be debated further as the record contains “acceptable evidence” to support

DLA’s determination.

ECF No. 65-1 at 21–22 (emphasis in original; over-emphasis removed). In essence, this one

paragraph of argument is what AEG’s 37-page motion for reconsideration is about (or at least

should be about). The Court addressed this argument in one subsection in its merits opinion but,

for ease, will divide its explanation here into two subsections.

a. The Court held that for the government control exception to apply,

AEG’s proposal needed to be received prior to 10:00 a.m.

As can be seen from the regulatory text above, the government control exception is two-

pronged. For the exception to apply, a party must show that its offer was: (1) “received at the

Government installation designated for receipt of offers”; and (2) “under the Government’s

control prior to the time set for receipt of offers.” 48 C.F.R. § 52.212-1(f)(2)(i)(B) (emphasis

added). It is important in relation to AEG’s merits arguments to note the precise language used

within these two prongs. For the first prong, it is not enough that any federal official or any

federal installation received the otherwise late proposal; rather, the proposal must be received at

the “Government installation designated for receipt.” And for the second prong, the proposal

must be under the government’s control prior to the deadline for submitting proposals—not at

that deadline.

In its merits opinion, the Court plainly held that “AEG’s argument that ‘acceptable

evidence’ in the form of email time stamp screenshots showing ‘10:00 AM’ for receipt of AEG’s

Volume 1 fails because a 10:00 a.m. time stamp does not show that the email was in the

government’s control ‘prior to the time set for receipt of offers,’ which was 10:00 a.m.” Kropp

Holdings, Inc., 176 Fed. Cl. at 534 (emphasis in original) (citing ECF No. 65-1 at 20–21 (citing

Tab 260 at AR 9589)). Moreover, the Court noted that

8

[n]either the government nor AEG proffered evidence or moved to supplement the

administrative record with any other information indicating that DLA had control

of AEG’s proposal prior to the 10:00 a.m. deadline. Without more, the Court cannot

conclude that the Energyfuelcards@dla.mil submission inbox, or even DLA servers

for that matter, received AEG’s proposal before the deadline.

Id. at 538. But even more importantly, AEG did not even argue in its MJAR that its proposal

was received and under the government’s control prior to 10:00 a.m. Rather, AEG argued that its

“offer was received at the government installation designated for receipt of offers,

as shown by the submission inbox screenshots, and was under DLA’s control by 10:00 a.m.”

ECF No. 65-1 at 22 (emphasis added) (citing Tab 260 at AR 9589–91). Although the word “by”

as used in this sentence encompasses both prior to 10:00 a.m. and at 10:00 a.m., this is because

AEG’s proposal was transmitted in multiple emails. The cited screenshots purportedly show

Volumes 3 and 4 being received at 9:53 a.m., Volume 2 being received at 9:58 a.m., and

Volume 1 being received at 10:00 a.m. See Tab 260 at AR 9589–91. Thus, when AEG argued its

proposal was received “by 10:00 a.m.”—which generally means “not later than” 10:00 a.m.—it

is clear from the documents in the administrative record to which this sentence cites that AEG is

arguing that Volume 1 of its proposal was received at 10:00 a.m. See By, MERRIAM-WEBSTER’S

COLLEGIATE DICTIONARY (10th ed. 1993) (“3 . . . b : not later than”). Stated differently, the only

linguistically logical reading of AEG’s MJAR is that AEG is arguing that the first volume of its

proposal was received at 10:00 a.m., not prior to 10:00 a.m., as the cited evidence shows a 10:00

a.m. timestamp on Volume 1. Furthermore, this reading is entirely consistent with AEG’s

argument that, “because all four volumes of AEG’s initial proposal were received by the

submission inbox on time and prior to 10:01 AM, AEG’s initial proposal was timely.” ECF No.

65-1 at 21 (emphasis added) (citing Castle-Rose, Inc. v. United States, 99 Fed. Cl. 517, 525–26

(2011)). And it is further consistent with AEG’s statement, which included the time not only in

italics but in bold font as well, that “Volume 1 reached Energyfuelcards@dla.mil at 10:00 AM.”

Id. (emphasis in original) (citing Tab 260 at AR 9589).

Therefore, the Court’s holding was that, because AEG argued that the evidence showed

that its proposal was received at 10:00 a.m., the government control exception could not apply as

a matter of law because application of the government control exception would require receipt

prior to 10:00 a.m. Kropp Holdings Inc., 176 Fed. Cl. at 534. 2 This is all the Court had to hold.

To apply, the government control exception requires submissions to be received “prior to the

time set for receipt of offers.” 48 C.F.R. § 52.212-1(f)(2)(i)(B). Because AEG argued that its

offer was received at the time set for receipt of offers, AEG’s government control exception

2

As the Court explained, “to fall under the government control exception, AEG’s Volume

1 must have been received at 9:59:59 a.m. or earlier to have been received ‘prior to’ 10:00 a.m.,

which was the ‘time set for receipt of offers.’” Id. at 534 (quoting 48 C.F.R. § 52.212-

1(f)(2)(i)(B)). But because AEG argued “that acceptable evidence in the form of email

screenshots establishes that its Volume 1 submission was received at 10:00 a.m., and not prior to

10:00 a.m.,” the Court found that “AEG’s argument fails, and its submission cannot fall under

the government control exception.” Id. (citing ECF No. 65-1 at 21; FAR 52.212-1(f)(2)(i)(B)).

9

argument failed at the outset. 3 AEG could have included in its MJAR an argument that the

submission was received prior to 10:00 a.m.; proffered evidence to that effect or moved the

Court to supplement, correct, or complete the administrative record with such evidence; or

moved for a remand to the agency to see if acceptable evidence existed. But AEG did none of

these things. Instead, AEG rested its argument on its legally insufficient assertion that the

submission was received at 10:00 a.m. To look at this issue slightly differently, if AEG had made

this argument in a complaint instead of an MJAR, the Court would be forced to find that AEG

failed to state a claim upon which relief can be granted. This is because even if the Court read

AEG’s “alleged fact” of a 10:00 a.m. receipt in the light most favorable to AEG, AEG would still

not be entitled to relief as a matter of law because an email received at 10:00 a.m. does not fall

under the government control exception.

Turning to its merits reply brief, AEG again asserted that the agency received its

submission at, and not prior to, the deadline. AEG argued that the record on which the

contracting officer relied “supports her decision to accept AEG’s proposal as timely submitted, as

each of the initial proposal volumes were received on-time according to the inbox timestamps:

Volume 1—10:00 a.m.” ECF No. 74 at 7 (emphasis in original) (citing Tab 260 at AR 9589).

Again, this argument did not properly invoke the government control exception, which requires

that the proposal be received prior to, and not at, the deadline. AEG further contended in its

reply brief that the late-is-late rule “exists to prevent one offeror from gaining a competitive

advantage—not to render untimely a proposal transmitted and received within the Government’s

control by the due date and time.” Id. at 9. The Court agrees. The problem, though, is that

while AEG may have transmitted its proposal “by the due date and time” by clicking “send”

before 10:00 a.m., AEG did not even argue (much less prove) that the government received that

proposal prior to that “due date and time.” Id. Regardless of when AEG transmitted its proposal,

without even an argument that the government received that proposal prior to 10:00 a.m., the

Court could not find that the government control exception spares AEG’s otherwise late

submission.

Ultimately, AEG made an argument in its MJAR that was bad for its case and, in

furtherance of that argument, cited evidence of a late arrival time (for purposes of the

government control exception) that further damaged its position. The Court need not reconsider

this argument. Even assuming all facts in AEG’s favor, AEG still loses in this bid protest

because, in AEG’s own words, “the offer was received at the government installation designated

for receipt of offers, as shown by the submission inbox screenshots, and was under DLA’s

control by 10:00 a.m.” ECF No. 65-1 at 22 (citing Tab 260 at AR 9589 (showing a 10:00 a.m.

time stamp)). Receipt at 10:00 a.m. is not receipt prior to 10:00 a.m., as required for the

government control exception to apply.

3

The Court notes that AEG appears to correctly formulate, but not develop, an argument

regarding the applicability of the government control exception in the introduction section of its

MJAR. See ECF No. 65-1 at 4–5 (“As the completed record illustrates, each volume of AEG’s

initial proposal was . . . at a minimum, timely received by DLA’s email server prior to the time

set for receipt of proposals.” (emphasis omitted)). However, that same sentence cites Tab 260 at

AR 9589–91, which demonstrates that AEG’s Volume 1 submission was not received prior to the

10:00 a.m. deadline. See Tab 260 at AR 9589 (showing a time stamp of 10:00 a.m.).

10

b. Even assuming the government control exception can apply, it could not

apply here and be consistent with regulatory construction principles.

Although by arguing that its proposal was received at 10:00 a.m. instead of prior to 10:00

a.m. AEG’s merits argument that the government control exception applied to its late proposal

submission necessarily failed, in its merits opinion the Court nonetheless addressed (1) whether

the government control exception can apply to electronic submissions generally, and (2) whether,

assuming the government control exception can apply, it could apply in this case.

AEG contends in its motion for reconsideration that the Court, in its merits opinion,

agreed with AEG that the government control exception applies to electronic submissions. ECF

No. 92-1 at 4–5 (“AEG did not have the burden to prove ‘acceptable evidence’ of control, but

needed solely to establish that the exception, as a legal matter, may apply to electronic

submissions, which the Court found . . . .” (emphasis omitted)). But AEG overstates the Court’s

holding, as the Court never held that the exception applies to electronic submissions. See Kropp

Holdings, Inc., 176 Fed. Cl. at 535–36. Rather, the Court stated:

A more interesting question regarding the applicability of the government control

exception to electronic submissions is whether an email server is a ‘Government

installation’ . . . . Although the undersigned is disinclined to believe that an internet

server is a ‘Government installation’ because a natural reading suggests that a

‘Government installation’ is a physical location, such as a building or military base,

the Court need not reach a definitive conclusion on that point here.

Id. (emphasis added) (footnote omitted). For this reason, the Court notes that AEG’s entire

argument on this point misstates the Court’s holding. Moreover, even if the Court had

definitively found that the government control exception can apply to electronic

communications, it still would not mean that it necessarily applied to the facts of this case. In

attempting to show that the government control exception applied here, AEG asserted a plain

language argument and a policy argument. See ECF No. 74 at 10–11. The Court discusses each

in turn.

First, AEG’s plain meaning argument—found not in its MJAR, but in its reply brief—is

as follows:

Applying the plain meaning of the government control exception, DLA properly

considered AEG’s timely proposal. At a minimum, AEG’s initial proposal reached

the Defense Information Systems Agency (“DISA”) servers before the proposal

deadline. See ECF No. 64-1 (“Decl. of S. Wallace”) at 2. Indeed, per the

Declaration, under penalty of perjury, of the government’s experienced declarant,

DISA’s Chief Technology Officer, Mr. Stephen Wallace declared: “Per the provided

message headers I observed initial contact (TLS handshake) with [DOD’s

Enterprise Email Message Security Gateway] at the following times (UTC):

Message titled “Air Card Volume 1”: 8/19/2021 1:59:59 PM (Hop 9)—Translates

to 09:59:50 AM EST; Message titled “Air Card Volume 2”: 8/19/2021 1:58:31 PM

11

(Hop 5)—Translates to 09:58:31 AM EST”. Id. Based on this “acceptable

evidence,” “the Court’s inquiry ends.” Tesoro, 405 F.3d at 1346.

ECF No. 74 at 10 (alterations and emphasis in original). Leaving aside the fact that this

argument was waived because it was made for the first time in AEG’s reply brief, as the Court

explained in its merits opinion, this plain meaning argument is flawed because it conflates a key

term used in the electronic commerce exception with a key term used in the government control

exception. See Kropp Holdings, Inc., 176 Fed. Cl. at 535–36.

The electronic commerce exception covers proposals that are “received at the initial point

of entry to the Government infrastructure”; whereas the government control exception covers

proposals that are received at the “Government installation designated for receipt of offers.” As

long as these two terms are read to have different meanings, a harmonious reading of the

electronic commerce and government control exceptions, as it relates to electronic transmissions

of proposals, can be accomplished. Id. However, as discussed below, AEG’s conflation of these

two terms would impermissibly read the electronic commerce exception out of the regulation.

As a starting point, it is important to note that the “rules of statutory interpretation apply

when interpreting an agency regulation,” such as the FAR. Roberto v. Dep’t of Navy, 440 F.3d

1341, 1350 (Fed. Cir. 2006) (citing Wronke v. Marsh, 787 F.2d 1569, 1574 (Fed. Cir. 1986)).

Thus, like statutory construction, regulatory interpretation begins with the language of the

regulation, see Williams v. Taylor, 529 U.S. 420, 431 (2000) (citing United States v. Ron Pair

Enters., Inc., 489 U.S. 235, 241 (1989)), and the Court derives the plain meaning of a regulation

from its text and structure, Norfolk Dredging Co. v. United States, 375 F.3d 1106, 1110 (Fed. Cir.

2004) (citing Alexander v. Sandoval, 532 U.S. 275, 288 (2001)). Additionally, it is a cardinal

principle of statutory construction “to give effect, if possible, to every clause and word of a

statute,” Duncan v. Walker, 533 U.S. 167, 174 (2001) (quoting United States v. Menasche, 348

U.S. 528, 538–39 (1955)), and when “Congress uses different parallel words in the alternative in

the same statutory provision, it is reasonable to assume that the words have different meanings,”

Walton v. United States, 551 F.3d 1367, 1370 (Fed. Cir. 2009) (citing Bowers v. N.Y. & Albany

Lighterage Co., 273 U.S. 346, 349–50 (1927)). This is because “courts must presume that a

legislature says in a statute what it means and means in a statute what it says there.” Barnhart v.

Sigmon Coal Co., Inc., 534 U.S. 438, 461–62 (2002) (quoting Conn. Nat. Bank. v. Germain, 503

U.S. 249, 253–54 (1992)).

In its reply brief, AEG emphasized that, because the Wallace declaration establishes that

AEG’s proposal made initial contact with a DISA server prior to the deadline, its proposal was

within the government’s control in a timely manner. ECF No. 74 at 10. The Court rejected this

argument, stating that contact with a DISA server is akin to contact with the “initial point of

entry to the Government infrastructure” under the electronic commerce exception than receipt at

“the Government installation designated for receipt of offers” under the government control

exception. Kropp Holdings, Inc., 176 Fed. Cl. at 536–37. This is because the

Energyfuelcards@dla.mil email inbox, which was designated as the government installation 4 for

4

This assumes, arguendo, that the government control exception applies to electronic

submissions and that an inbox can serve as a “government installation” under that exception.

12

receipt of offers for this procurement, see Tab 10 at AR 210, is housed in a DLA server which

itself is housed in a DISA server, see Kropp Holdings, Inc., 176 Fed. Cl. at 536. Therefore,

because an email would first have to pass through a DISA server before reaching the designated

email inbox on a DLA’s server, evidence that an email reached a DISA server prior to the

deadline for proposal submissions may be sufficient to show that the email reached the “initial

point of entry to the Government infrastructure” for electronic commerce exception purposes.

However, such evidence would be legally insufficient to show that the email reached the

“Government installation designated for receipt of offers,” and would thus fall short of

establishing the applicability of the government control exception. See Kropp Holdings, Inc.,

176 Fed. Cl. at 536 (“AEG relies on the DISA chief technology officer’s declaration to argue that

its proposal was received at a ‘Government installation’ because all four of its volume

submissions ‘reached [DISA] servers before the proposal deadline.’ However, alleging receipt

by DISA servers is not enough, as DLA, not DISA, is the procuring entity.” (alterations in

original) (citations omitted)).

This is a necessary distinction because, if evidence that a proposal “made initial contact”

with a DISA server could suffice for government control exception purposes, the government

control exception would swallow the electronic commerce exception. Under AEG’s

interpretation, for electronic submissions, all that would have to be shown to establish

government control is that an offeror clicked “send” and a government server (in this case, a

DISA server) initiated contact with the sent email file. But under the plain meaning of FAR

52.212-1(f)(2)(i), this is not enough for the government control exception to apply.

Instead, the FAR provision at issue already contemplates such a rule for electronic

submissions: the electronic commerce exception. 48 C.F.R. § 52.212-1(f)(2)(i)(A). Under that

exception, evidence that an offeror clicked “send” and that a DISA server initiated contact with

the email file would satisfy the exception as long as “it was received at the initial point of entry

to the Government infrastructure not later than 5:00 p.m. one working day prior to the date

specified for receipt of offers.” Id. But if clicking “send” and making initial contact with a

government server was sufficient to meet the requirements of both the electronic commerce and

the government control exceptions, the electronic commerce exception would be rendered

superfluous and thereby violate the canon against surplusage: there would be no reason to invoke

an exception that required initial contact at 5:00 p.m. the day before the deadline if an offeror

could simply rely on an exception that permitted initial contact up to one second prior to the

deadline. Frank v. United States, 171 Fed. Cl. 392, 413 (2024) (“The canon against surplusage

instructs that ‘statutes should be read to avoid superfluity.’” (quoting Marx v. Gen. Revenue

Corp., 568 U.S. 371, 392 (2013) (Sotomayor, J., dissenting))); see Marx, 568 U.S. at 386 (“[T]he

canon against surplusage is strongest when an interpretation would render superfluous another

part of the same statutory scheme.” (citing United States v. Jicarilla Apache Nation, 564 U.S.

162, 185 (2011))).

13

Here, AEG essentially argues that, because its proposal was sent to the designated email

inbox and reached 5 a DISA server prior to the deadline, it was within the government’s control.

But this cannot be without rendering the electronic commerce exception “inoperative or

superfluous, void or insignificant . . . .” Hibbs v. Winn, 542 U.S. 88, 101 (2004). DLA did not

designate “a DISA server” as the government installation for receipt of offers; it designated the

Energyfuelcards@dla.mil email address for that purpose. See Tab 10 at AR 210. As in the

physical world, where merely dropping off a bid for a DLA procurement at DISA headquarters

just before the deadline is insufficient to establish government control, merely initiating contact

with a DISA server seconds before the deadline cannot, without more, establish government

control in the electronic world.

Second, AEG’s policy argument, also found only in its reply brief, similarly missed the

mark. AEG contended that “[b]eyond meeting the plain language of the exception, accepting

AEG’s proposal as timely is also consistent with the late-is-late rule’s stated purpose—ensuring

no offeror obtains extra time after the due date and time and creating a competitive advantage.”

ECF No. 74 at 11 (citing Geo-Seis Helicopters v. United States, 77 Fed. Cl. 633 (2007)). 6 AEG

continued, stating that it “gained no unfair competitive advantage because AEG submitted its

proposal before the deadline—and thus had no more time than the amount allotted to work on its

proposal.” Id.

AEG’s argument is simply incorrect. In procurements involving sensitive technologies,

like the AIR Card contract at issue here, it should come as no surprise to experienced military

contractors that their electronic proposals would undergo security screening to protect DLA

information technology systems from viruses or other risks. Indeed, the RFP explicitly warned

prospective offerors that the “closing time . . . is intentionally set to avoid any potential receipt

issues due to electronic transmission delays such as fire walls” and encouraged offerors “to

submit proposals as early as possible to the closing time to ensure a timely proposal and to allow

system transmission time.” Tab 10 at AR 208. Knowing that this was the case, it behooved

offerors to set aside additional time within their proposal preparation window to ensure that their

proposals had ample time to be electronically transmitted to DLA prior to the deadline. Whether

an offeror set aside a whole day or just an hour is of no moment. The point is, when other

offerors set aside time to ensure a seamless transmission before the deadline, and thereby forego

using that time to modify their proposals, those offerors are prejudiced if the agency selects a

competitor’s bid that was sent on time but received late because that competitor failed to ensure a

seamless transmission and sent its proposal minutes or seconds before the deadline. That

competitor would enjoy the very “inherent competitive advantages” warned of in Labatt Food

Services: the ability to access news and market information that “could result in last minute

changes to the proposal” not available to the contractor who already submitted its bid. See 577

5

The Court again notes that the Wallace declaration, on which AEG relies to argue that

its submission “reached” a DISA server, only states that the precursor to any transmission of

information—a “TLS Handshake with EEMSG”—occurred ten seconds before the deadline. See

Kropp Holdings, Inc., 176 Fed. Cl. at 537 (citation modified) (citing ECF No. 78-1 at 2).

6

The Court surmises that the citation to “Geo-Seis, 77 Fed. Cl. at 64,” is in error, as the

opinion does not appear on page 64 of the reporter.

14

F.3d at 1381 (citation omitted). For these reasons, AEG’s policy argument was also

unpersuasive.

The remaining arguments in AEG’s MJAR on the government control exception did

nothing to revive its above-discussed failure to make an argument that would make the

government control exception applicable. Despite this failure, the Court outlines the remainder

of AEG’s argument in its MJAR on this point. First, AEG argued that, under Watterson

Construction Company v. United States, 98 Fed. Cl. 84 (2011), “timeliness is determined by

when the submission reaches the agency’s servers regardless of when it arrives to the end

destination inbox.” ECF No. 65-1 at 22–23. But AEG’s invocation of that case misses the mark,

as Watterson does not address the particular requirement that submissions must arrive “prior to

the time set for receipt of offers” but rather more generally discusses whether the government

control exception can apply to proposals sent by email and at what point in the transmission

chain timeliness is determined. See 98 Fed. Cl. at 93–97. Unlike here, however, in Waterson,

the protestor argued its proposal was received prior to the deadline, not at the deadline. Id. at 97

(“It is particularly appropriate that the ‘Government Control’ exception be available to offerors

where there is ‘acceptable evidence’ to establish that the offeror’s e-mail proposal ‘was received

at the Government installation designated for receipt of offers and was under the Government's

control prior to the time set for receipt of offers,’ as was the case here.” (emphasis added)).

Because AEG argued that its proposal was received at 10:00 a.m., Watterson offers AEG no help

on this crucial point. 7

AEG next very briefly asserts that the contracting officer’s “sworn statement is entitled to

the presumption of regularity and KHI has failed to provide ‘clear and convincing evidence’ to

overcome that presumption.” ECF No. 65-1 at 24. This argument is completely undeveloped in

AEG’s MJAR and amounts to nothing more than a legal conclusion. See Rodriguez v. Dep’t of

Veterans Affs., 8 F.4th 1290, 1305 (Fed. Cir. 2021) (“An issue that is merely alluded to and not

developed as an argument in a party’s brief is deemed waived.” (citing cases)).

Finally, AEG argued that, because KHI “is not prejudiced by the finding that AEG’s

proposal was timely submitted or within the government’s control,” the Court cannot find in

KHI’s favor on this point. ECF No. 65-1 at 24–25. This argument is also off-base. It is beyond

peradventure that KHI would have a substantial chance of receiving the AIR Card contract if

AEG’s proposal was disqualified for being submitted late. Indeed, KHI was the only other

offeror to submit a technically acceptable proposal. See Tab 91 at AR 2739–42. Accordingly,

this prejudice argument cannot revive AEG’s fatal argument that its submission was received by,

and not prior to, the deadline.

7

Additionally, the analysis of the government control exception in Watterson is at odds

with the above analysis of how to harmonize the electronic commerce and government control

exceptions, because Watterson improperly conflates “the Government installation designated for

receipt of offers” and “the initial point of entry to the Government infrastructure.” See 98 Fed.

Cl. at 97.

15

3. AEG’s Post-Judgment Reconsideration Arguments Are Unavailing.

As established above, the Court held that the government control exception did not

excuse AEG’s late proposal because AEG argued that its proposal was received at, and not prior

to, the time set for receipt of offers. See ECF No. 65-1 at 21; Kropp Holdings, Inc., 176 Fed. Cl.

at 533. Despite this holding, AEG expends much effort and many pages in its motion for

reconsideration challenging the Court’s discussion of how a reading of the government control

exception that does not render the electronic commerce exception surplusage also means that the

government control exception cannot apply here. See ECF No. 92-1 at 2, 14–23, 27–30. But this

effort is futile, as AEG never addresses in its motion for reconsideration the fatal deficiency in its

original argument. For this reason, the Court finds that reconsideration is not warranted in this

case. Nonetheless, the Court will briefly discuss the arguments raised in AEG’s motion for

reconsideration, all of which are unavailing.

In its motion, AEG asserts four reasons why the Court should reconsider its decision.

First, AEG contends that DLA did not have the opportunity to determine whether the government

control exception spared AEG’s late proposal; therefore, contrary to what AEG argued on the

merits, AEG now for the first time maintains that the Court should have remanded this question

to the agency for resolution. ECF No. 92-1 at 12–17. Second, AEG asserts that the Court

created a “heightened standard” for “acceptable evidence” of government control by finding that

DISA servers were insufficient for control purposes, not accepting DLA’s “reasonable”

interpretation of the Wallace declaration, making use of “extrinsic information” for definitions,

and finding no government control despite there being “time left on the clock” to establish such

control. Id. at 17–27. Third, AEG argues that the Court made a mistake of fact in finding that

AEG’s proposal did not timely enter DLA servers because, according to AEG’s reading of the

declaration (which it only now cites for the first time on reconsideration), such entrance

was timely made. Id. at 27–30. Finally, AEG argues that it did not waive any arguments related

to metadata, requests for agency remand, or the insufficiency of the record to establish the

applicability of the government control exception. Id. at 31–37. The Court discusses each

argument in turn.

a. AEG explicitly argued in its prejudgment merits briefing that the Court

should not remand.

AEG essentially contends that reconsideration is warranted because once the Court

“found that the [government control] exception ‘may’ apply, but that the evidence was

inadequate due to its identified inadequacies, it should have remanded the issue to DLA decision-

makers and not conclusively ruled out government control.” Id. at 16. Because the Court did not

remand to the agency, AEG maintains that the “Court inserted itself into DLA’s shoes” by

evaluating “the very limited information before it on control.” Id. After all, according to AEG,

due to its role in this case as a defendant-intervenor, AEG did not have “the ‘burden’ to

demonstrate that the [government control exception] applied to AEG’s initial Volumes 1 and 2.”

See id. at 12.

It is axiomatic that a party, in furtherance of a motion for reconsideration, may not

“reassert the same arguments [ ] made in earlier proceedings” or “raise new arguments that could

16

have been made earlier.” Lee v. United States, 130 Fed. Cl. 243, 252 (2017), aff’d, 895 F.3d

1363 (Fed. Cir. 2018) (citing Freeman v. United States, No. 01–39L, 2016 WL 943859, at *2

(Fed. Cl. Mar. 1, 2016); Stueve Bros. Farms, LLC v. United States, 107 Fed. Cl. 469, 475

(2012)). In other words, “[m]otions for reconsideration are not a vehicle for parties to present

arguments that they should have made during the regular briefing.” Seldovia Native Ass’n, Inc.

v. United States, 36 Fed. Cl. 593, 598 (1996) (citing Gen. Elec. v. United States, 189 Ct. Cl. 116,

117–18 (1969) (per curiam)).

In its motion for reconsideration, AEG advances an argument regarding remand that it did

not raise on the merits and that directly contradicts its merits’ position. AEG’s reconsideration

argument that the Court should have remanded the question of whether the government control

exception applies is particularly misplaced considering that AEG emphasized in its MJAR that

“acceptable evidence” existed for the Court to determine whether the exception applied without

need for a remand. See ECF No. 65-1 at 20 (“In sum, the record contains acceptable evidence

that AEG’s initial proposal was timely received by DLA and within DLA’s control.”); id. at 21

(“[E]ven in the presence of conflicting timestamps, DLA acted rationally because acceptable

evidence exists showing that, in any event, the government control exception to the ‘late-is-late’

rule applies.”); id. at 22 (“The government control exception’s low threshold referred to as the

‘acceptable evidence’ standard obviates the need for further inquiry into this point . . . . This

matter need not be debated further as the record contains ‘acceptable evidence’ to support DLA’s

determination.”).

AEG continued this argument in its merits reply brief as well.

At a minimum, AEG’s initial proposal reached [DISA] servers before the proposal

deadline. Indeed, per the [Wallace] Declaration . . . Mr. Stephen Wallace declared:

“Per the provided message headers I observed initial contact (TLS handshake) with

[DOD’s Enterprise Email Message Security Gateway] at the following times

(UTC): Message titled ‘Air Card Volume 1’: 8/19/2021 1:59:59 PM (Hop 9) –

Translates to 09:59:50 AM EST; Message titled ‘Air Card Volume 2’: 8/19/2021

1:58:31 PM (Hop 5) – Translates to 09:58:31 AM EST.” Based on this “acceptable

evidence,” “the Court’s inquiry ends.”

ECF No. 74 at 10 (citation modified) (first quoting ECF No. 64-1 at 2, then quoting Tesoro, 405

F.3d at 1346) (emphasis added). Nowhere in its merits briefing did AEG even hint that it thought

remand was necessary. Indeed, as KHI points out in its brief in response to AEG’s motion for

reconsideration, the word “remand” appears “forty-four times in AEG’s [motion for

reconsideration], yet the word does not appear in AEG’s MJAR or its Reply.” ECF No. 100 at 2

(citing ECF Nos. 65-1, 74).

The Court conducted a trial (on the paper record), throughout which AEG urged that

acceptable evidence existed for the Court to conclusively determine that the government control

exception applied. See, e.g., ECF No. 65-1 at 2, 5, 20–22. The sole reason that the Court even

engaged in depth with AEG’s merits arguments on this point was because AEG adamantly

insisted that the record was sufficient for the Court to make a ruling on government control. As

discussed in the preceding section, because AEG only argued that its complete proposal was

17

received at (and not prior to) 10:00 a.m., the Court did not need to engage in the discussion for

which AEG now seeks reconsideration. But the Court engaged in this discussion nonetheless,

observing that “[a]lthough AEG waived any metadata argument because it did not make such

argument in its MJAR, the Court will discuss the argument anyway, as the discussion further

demonstrates the lateness of AEG’s proposal.” Kropp Holdings, 176 Fed. Cl. at 534 n.7.

Now, on reconsideration, only after the Court decided against AEG on an issue that AEG

urged the Court to decide in its merits reply brief, AEG argues that the Court erred by deciding

the question rather than remanding this question to the agency. This is an unacceptable basis on

which to argue for reconsideration. See Lee, 130 Fed. Cl. at 252 (finding that a plaintiff may not

“raise new arguments that could have been made earlier” (citing cases)). If AEG wanted the

Court to remand the question for agency determination, AEG should have argued that before the

Court’s ruling on the merits. See Seldovia Native Ass’n, Inc., 36 Fed. Cl. at 598 (“The purpose of

a motion for reconsideration is not to reargue the case.” (citing Roche v. District of Columbia, 18

Ct. Cl. 289, 290 (1883))). AEG’s attempt to do so now cannot succeed, not only because it was

nonessential to the Court’s ruling but also because it contradicts AEG’s merits argument.

Prejudgment hearings are not to be treated by litigants as some sort of experimental

laboratory in which they can test their original hypotheses and, after learning that the Court

disagrees with those hypotheses in its ruling on the merits, come afresh with new theories to

prove its point on reconsideration or appeal. Litigation is not a science experiment. Unlike how

a scientist engages in multiple trial runs to test his or her theories over time, litigants have one

opportunity to develop and assert their arguments to convince the Court to rule in their favor.

And once the Court rules, the time to assert new arguments has long passed.

Moreover, to the extent AEG asserts that its post-judgment remand argument will

uncover new evidence of government control under RCFC 59(a), the Court agrees with the

government’s contention that AEG has the standard backwards. See ECF No. 98 at 6. Newly

discovered evidence is the predicate that warrants reconsideration—not the other way around.

See id. Therefore, to the extent that AEG asserts that a remand may uncover new evidence

proving the applicability of the government control exception to its late proposal, AEG has the

standard wrong.

Because AEG argued in its merits briefing that remand was not warranted, the Court is

not convinced by AEG’s about-face argument in its motion for reconsideration that the Court

should have remanded to the agency.

b. The Court did not create a heightened standard for “acceptable

evidence” of government control.

AEG next asserts that the Court created a “heightened standard” for “acceptable

evidence” of government control by finding DISA servers insufficient for control purposes,

rejecting DLA’s “reasonable” interpretation of the Wallace declaration, making use of “extrinsic

information” for definitions, and finding no government control despite there being time left on

the clock to establish such control. ECF No. 92-1 at 17–27.

18

Taking these arguments one at a time, the Court did not create a heightened standard as

AEG alleges. Specifically, AEG contends that the FAR “defines ‘acceptable evidence,’ and

makes clear that the [government control exception] does not require ‘conclusive’ evidence or

evidence beyond a reasonable doubt.” Id. at 17 (citing 48 C.F.R. § 52.212-1(f)(3)). However, as

the Court did not require either conclusive evidence or evidence beyond a reasonable doubt,

AEG’s arguments are inapposite.

Under the FAR, “acceptable evidence to establish the time of receipt at the government

installation includes the time/date stamp of that installation on the offer wrapper, other

documentary evidence of receipt maintained by the installation, or oral testimony or statements

of Government personnel.” 48 C.F.R. § 52.212-1(f)(3). AEG stresses that the Wallace

declaration, which is a “statement of Government personnel,” is acceptable evidence that the

government control exception applies. See ECF No. 92-1 at 18–19. The Court agrees that the

declaration fits the bill for “acceptable evidence” in that it is indeed a “statement of Government

personnel.” However, just because an agency proffers a declaration containing a “statement of

Government personnel,” it does not automatically mean that the statement’s content establishes

or even addresses the relevant question for application of the government control exception.

Rather, the substance of that statement may or may not provide sufficient information for the

Court to conclude that such exception applies.

Here, the Court concluded that the substance of Mr. Wallace’s statements did not confirm

whether the government control exception applied to AEG’s submission for two reasons. First,

Mr. Wallace only testified that he “observed initial contact” of AEG’s Volume 1 submission with

DISA servers ten seconds prior to the deadline. See ECF No. 78-1 at 2. The Court’s conclusion

that testimony recounting an observation of the “precursor to the transmission of data between

servers” is insufficient to establish government control does not by any means create a

“heightened standard” for acceptable evidence. See Kropp Holdings, Inc., 176 Fed. Cl. at 537.

To the contrary, the Court merely found that the information that the declaration provided did not

establish government control because the contact discussed in the Wallace declaration was

insufficient to “establish that it was received at the Government installation designated for

receipt of offers and was under the Government’s control prior to the time set for receipt of

offers.” 48 C.F.R. § 52.212-1(f)(2)(i)(B) (emphasis added). Recall that the FAR lists the

“time/date stamp of that installation on the offer wrapper” as a form of acceptable evidence. 48

C.F.R § 52.212-1(f)(3). If the Court had rejected a time/date stamp as establishing receipt at the

relevant government installation or government control because the stamp was from the wrong

installation or because the timestamp was after the deadline for receipt of proposals, the Court

would not be creating a “heightened standard” for acceptable evidence. It would simply be

pointing out that the stamp does not, in fact, establish that the requirements of the government

control exception are met. That is exactly what the Court did here regarding the Wallace

declaration. The Court need not reconsider this conclusion.

Second, far from requiring “conclusive evidence” or evidence “beyond a reasonable

doubt,” the Court applied basic principles of regulatory interpretation to determine that the

declaration did not provide acceptable evidence to establish government control. While cautious

to not entirely belabor the point discussed in detail above, the Court recognized that “the initial

point of entry to the Government infrastructure” under the electronic commerce exception and

19

the “Government installation designated for receipt of offers” under the government control

exception must have two different definitions. If they did not, the two exceptions would cover

the same field, and the electronic commerce exception would be rendered superfluous in

contravention of the canon against surplusage. See Frank, 171 Fed. Cl. at 413 (“The canon

against surplusage instructs that statutes should be read to avoid superfluity.” (citations

omitted)); see also Kropp Holdings, Inc., 176 Fed. Cl. at 535. Thus, under the plain meaning of

the FAR language at issue, a DISA server, through which emails must first pass before reaching

DLA servers or the Energyfuelcards@dla.mil email address, is best read to be the “initial point of

entry to the Government infrastructure” as used in the electronic commerce exception. 48 C.F.R.

§ 52.212-1(f)(2)(i)(A). Having established this, a DISA server cannot also be the “Government

installation designated for receipt of offers” because such a reading would render the two phrases

synonymous and, therefore, the electronic commerce exception superfluous. For this reason, Mr.

Wallace’s declaration that he only observed contact with AEG’s proposal and a DISA server,

without more, cannot establish government control of AEG’s proposal prior to the deadline.

Turning to its next argument, AEG contends that “the Court endeavored to find extrinsic

evidence—outside the record and not presented to any party—to aid in its efforts to discredit the

Wallace Declaration further.” ECF No. 92-1 at 24. Specifically, AEG asserts that the Court

“became hyper-focused on the technical jargon used by Mr. Wallace, including the ‘TLS

Handshake’ and ‘EEMSG’ terms, and went on to utilize third-party, extra-record evidence to

define the terms rather than remand the issue to DLA for additional information.” Id. In other

words, AEG is arguing that the Court’s use of what are essentially dictionaries to define a few

technical terms was impermissible. Were it correct, this argument would come as quite a shock

to judges throughout the country.

Consulting a dictionary for the definition of a technical term is not considered an

impermissible resort to extrinsic evidence, especially when the judge, as here, is simply using a

dictionary for its intended purpose: to define a word. As the undersigned’s Legal Research &

Writing professor has explained, courts regularly use dictionaries for definitions “when the Court

simply does not know (or believes that the reader may not know) the accurate definition of a

word that it is using; these are typically technical terms or foreign terms. Needless to say, [use of

a dictionary] is completely appropriate when ‘definition’ is the Court’s sole objective.” Craig

Hoffman, Parse the Sentence First: Curbing the Urge to Resort to the Dictionary When

Interpreting Legal Texts, 6 N.Y.U.J. LEGIS. & PUB. POL’Y 401, 415 (2002) (footnotes omitted);

see also Travelers Cas. & Sur. Co. of Am. v. United States, 75 Fed. Cl. 696, 708–09 (Fed. Cl.

2007) (“[U]se of dictionaries as interpretive aids (e.g., ‘lexicography’) is not considered

‘extrinsic’ aids the use of which violates the plain meaning doctrine.” (citations omitted)).

Moreover, any contention that the Court erred by using dictionaries to define certain

terms used in the declaration instead of remanding the issue to the agency to define the terms is

undermined by AEG’s repeated assertion that the Court could rule on the applicability of the

government control exception based on the complete record before it. See ECF No. 65-1 at 20–

22; ECF No. 74 at 10. AEG insisted that “acceptable evidence” existed and that the record was

sufficiently supplied for the Court to make its ruling. As explained above, AEG cannot now

reverse course and claim that the Court should have remanded to the agency to define technical

terms. See ECF No. 92-1 at 25.

20

d. AEG has waived any arguments related to metadata, requests for remand,

and the insufficiency of the record to establish applicability of the

government control exception.

Despite AEG’s efforts to recharacterize its arguments before the Court’s merits ruling by

stating in its motion for reconsideration that it “relied upon the very limited information before

the Court,” see ECF No. 92-1 at 32, in actuality, AEG repeatedly urged on the merits that the

record was complete and that “acceptable evidence” of government control existed for the Court

to make a ruling regarding applicability of the exception, see ECF No. 65-1 at 20–22; ECF No.

74 at 10. Perhaps AEG made that argument because it was originally selected for the AIR Card

contract and wanted to go full steam ahead to preserve its contract without the delay of an

agency remand or additional proceedings before this Court. Regardless of AEG’s motivation to

make such an argument, as the Court has thoroughly explained above, AEG cannot now ask the

Court to go back in time, ignore the arguments AEG made on the merits, and order remand for

issues AEG either did not address on the merits or previously argued were ripe for resolution.

See Fru-Con Const. Corp., 44 Fed. Cl. at 301 (“Put simply, the rulings of a court are not ‘mere

first drafts, subject to revision and reconsideration at a litigant’s pleasure.’” (quoting Quaker

Alloy Casting Co. v. Gulfco Indus., Inc., 123 F.R.D. 282, 288 (N.D. Ill. 1988))).

Although GAO decisions are not binding on this Court, the Court notes the similarity of

the protestor’s situation in In re ALJUCAR, LLC to AEG’s predicament here. See B-401148,

2009 WL 1588827 (Comp. Gen. June 8, 2009). That case involved an untimely delivery of a

hard-copy proposal to a physical government installation. Id. at *2. The protester there argued

that the “sole cause” of its untimely proposal was “delay caused by the guard at the security

checkpoint” who erroneously failed to “allow the [protestor’s] representative who lacked

adequate identification to either wait at the checkpoint or leave the checkpoint, unescorted, to

exit the base.” Id. at *3. The GAO stated that, even if the guard’s actions were in error, it could

not conclude that such actions were “the sole or paramount cause of the proposal being received

late,” since the protestor, who “had the primary responsibility for delivering its proposal on

time[,] significantly contributed to the lateness of the proposal.” Id. This is because, as the GAO

explained, “[d]espite numerous RFP instructions emphasizing [an] offeror’s responsibility for

timely submission, including that [an] offeror should anticipate it taking up to an hour to

complete the required security screening for proposal submissions, the [protestor] arrived on the

base only 8 minutes before closing.” Id. All in all, the GAO, in concluding that the protestor’s

proposal was late, remarked that the protestor “simply did not allow sufficient time to fulfill its

responsibility to deliver its proposal by the proper time.” Id.

Here, AEG similarly waited until the last minute to submit its proposal for the AIR Card

contract. Determining whether its strategy in doing so was to make last-minute improvements to

its proposal or for other reasons is beyond the scope of this Court’s review. Nonetheless, the

Court must observe that, like the protestor in ALJUCAR, AEG took a gamble by waiting until the

last minute to submit its proposal, especially in light of the clear warnings given in the RFP for

offerors to submit their proposals as early as possible to prevent this exact situation. See Tab 10

at AR 208. AEG’s counsel even conceded the riskiness of his client’s gamble in submitting its

proposal so close to the deadline. See ECF No. 85 at 93:3–8. Unfortunately, his gamble did not

pay off, and the Court must deny AEG’s motion for reconsideration.

23

CONCLUSION

Although the Court acknowledges that it may seem unfortunate that AEG was eliminated

from competition due to the untimeliness of its proposal, the law is clear that the government

control exception to the late-is-late rule is inapplicable to spare AEG’s otherwise untimely

submission. For the foregoing reasons, the Court hereby DENIES AEG’s motion for

reconsideration.

IT IS SO ORDERED.

s/ Zachary N. Somers

Zachary N. Somers

Judge

24