Opinion

Jeffrey Bova v. Township of Jackson Planning Board

Court
New Jersey Superior Court Appellate Division
Filed
Feb 4, 2026
Status
Unpublished
Cited by
0 cases
Authority
More cited than 38.4%

The opinion

NOT FOR PUBLICATION WITHOUT THE

APPROVAL OF THE APPELLATE DIVISION

This opinion shall not "constitute precedent or be binding upon any court ." Although it is posted on the

internet, this opinion is binding only on the parties in the case and its use in other cases is limited . R. 1:36-3.

SUPERIOR COURT OF NEW JERSEY

APPELLATE DIVISION

DOCKET NO. A-3881-23

JEFFREY BOVA, CELESTE

BOVA, his wife, ARNOLD

LOMITA and PAULINE LOMITA,

his wife, and OMEGA FARM, LLC,

Plaintiffs-Appellants,

v.

TOWNSHIP OF JACKSON

PLANNING BOARD and BAIS

YAAKOV OF JACKSON, INC.,

Defendants-Respondents.

Argued October 29, 2025 – Decided February 4, 2026

Before Judges Currier, Smith and Berdote Byrne.

On appeal from the Superior Court of New Jersey, Law

Division, Ocean County, Docket No. L-1727-23.

Joseph Michelini argued the cause for appellants

(O'Malley, Surman & Michelini, attorneys; Joseph

Michelini, on the briefs).

Robert C. Shea, II argued the cause for respondent

Township of Jackson Planning Board (R.C. Shea &

Associates, attorneys; Robert C. Shea, II, on the brief).

Donna M. Jennings argued the cause for respondent

Bais Yaakov of Jackson, Inc. (Wilentz, Goldman &

Spitzer, PA, attorneys; Donna M. Jennings, of counsel

and on the brief; Anthony J. Zarillo III, on the brief).

PER CURIAM

In this matter, plaintiffs, as nearby property owners, challenged the

Jackson Township Planning Board's (Board) approval of a major site plan for

the construction of a private school campus. Plaintiffs alleged there were

undisclosed conflicts between a Board member and counsel, erroneous

statements in the Environmental Impact Statement (EIS), error in the Board's

handling of endangered species habitat, site access and parking waivers, and

lack of procedural fairness. The trial court rejected these claims and dismissed

the complaint. We affirm.

I.

In October 2022, defendant Bais Yaakov of Jackson, Inc. (BYJ) applied

to the Board for preliminary and final major site plan approval to construct a

four-building, private all-girls religious school campus in the Township of

Jackson (Township). The proposal consisted of an elementary school, two high

schools, and a gymnasium, for a total capacity of approximately 2,350 students

A-3881-23

2

and 250 staff members on 37.9 acres. The proposed layout included two new

driveways connecting to East Veterans Highway, one full-access, signalized

driveway, and one right-in/right-out driveway. The plans included new parking

areas, landscaping, stormwater management basins, and internal vehicular and

pedestrian circulation improvements.

Ian M. Borden, P.P., prepared the EIS for the project. The EIS concluded

that all major environmental concerns, including wildlife habitat, were

addressed or avoided with no expected significant impacts. The only

unavoidable impact noted was the removal of twelve acres of forest. The report

found the project complied with zoning and all relevant environmental

regulations.

John H. Rea, P.E., submitted a Traffic Impact Analysis to the Board as

part of the site plan application. His study included field visits, manual and

automated traffic counts during peak school hours, and projected traffic volumes

to the year 2032, accounting for general growth and nearby development.

Operating assumptions included that almost all students would arrive by bus ,

with only seven to ten percent dropped off by parents, and no student drivers

permitted. These factors were used to estimate site-generated traffic.

A-3881-23

3

Rea's analysis found that, with the planned improvements, including a

traffic signal and appropriate turn lanes at the main entrance, the site would

operate at acceptable traffic levels at all critical intersections, both on-site and

nearby, for the design year. He concluded that the new campus would not

generate unacceptable impacts on the public roadways, taking into account

future traffic in the area. Rea also recommended traffic control infrastructure

improvements and the implementation of busing operations.

BYJ's application was submitted to the Township's Environmental

Commission (EC) and on November 22, 2022, the EC wrote to the Board,

stating: "The E[C] has reviewed the plans listed above. There are no immediate

environmental concerns with the application."

Ernest J. Peters Jr., P.E., P.P., C.M.E., a licensed professional engineer

and planner who served as the Township planner, reviewed BYJ's site plan

proposal and issued a planning review letter. His role was to evaluate the

application for conformance with the Township's zoning and planning

regulations, identify areas of concern, and provide recommendations or

questions for the Board's consideration.

In his letter, Peters reviewed the zoning for the area and found the

proposal did not comply with several key standards: the minimum required lot

A-3881-23

4

width (the project proposes about 130 feet where 200 feet are required), the

building height for at least one building (thirty-six feet proposed versus thirty-

five feet maximum),1 and the minimum required on-site parking for both the

elementary and high schools, although BYJ's application proposed significant

parking shortfalls to be made up with "land banked" spaces if later needed.

Peters noted that these deficiencies would require the Board to consider granting

variances or design waivers, depending on the facts and justifications presented

by BYJ.

Peters raised environmental concerns about the use of an on-site septic

system and included questions about traffic circulation, adequacy of parking,

site layout, Americans with Disabilities Act access, landscaping, lighting,

stormwater, and trash management. He requested that BYJ address each of these

points in detail during further testimony and submissions.

Douglas F. Klee, P.E., P.P., C.M.E., Board Engineer for the Township,

reviewed the BYJ application and submitted a letter to the Board regarding the

need for variances concerning the zoning requirements, as also noted by Peters.

He also identified a significant on-site parking shortfall for the elementary and

1

During the hearing, BYJ's engineer advised there was a typographical error on

the architectural plans and the building heights would comply with the zoning

ordinance.

A-3881-23

5

high schools, with "land banked" future spaces proposed and requiring

justification. Klee expressed concern about the use of a large on-site septic

system, which is atypical for schools, and flagged the need for testimony on its

environmental impact, especially regarding local wells and any required New

Jersey Department of Environmental Protection (DEP) permitting. Additional

comments focused on traffic and access safety, site grading and stormwater

management, landscaping and lighting, adequacy of trash handling, and

architectural compliance. He noted that many plans and technical documents

were incomplete or needed revision, and that multiple outside agency approvals

would be required. Klee recommended that only preliminary site plan approval

be considered until all zoning, design, environmental, and permit issues were

fully resolved through additional testimony and plan revisions.

The Board held public hearings on February 21 and March 20, 2023, to

review BYJ's application. Plaintiffs, who own properties adjacent to the project,

objected to the application. Their concerns included the impact on

neighborhood character, density, increased traffic, the environment, and

adequacy of the proposed septic and stormwater systems.

BYJ representative Rabbi Aharon Rottenberg, a board member and

volunteer of the Lakewood Cheder School, testified about the proposed new

A-3881-23

6

school's operations, student and staff numbers, busing, parking, building

maintenance, food service, and hours and sessions of operation.

William A. Stevens, P.E., P.P., BYJ's engineer and planner, presented the

overall vision and technical details of the proposed private school. Stevens

highlighted the circulation plan, noting that each school would have separate

lanes for buses and parent drop-offs, as well as safe pedestrian access with

sidewalks and crosswalks. He acknowledged the project sought "land banking"

for 136 of the required parking spaces, meaning these would be used initially as

a green play area, available for conversion to parking if future needs demanded

it.

Addressing the Board's concerns, Stevens explained that the project would

comply with all stormwater and environmental requirements, and that public

water, but not public sewer would be available, necessitating a state-licensed

large septic system. He stated the buildings would meet height and lot width

requirements once the lots were consolidated and the plans revised. Stevens

also described the placement of refuse enclosures, site lighting, and proposed

fencing around stormwater and play areas for safety.

A-3881-23

7

The hearing continued on March 20, 2023, during which BYJ's experts

Rea, Borden, and architect Melissa Mermelstein, RA, testified. Rea reiterated

the traffic analyses set forth in his report.

During Borden's testimony regarding the EIS, plaintiffs' counsel

questioned the EIS's designation of a particular area as rank three rather than

rank four when considering the presence of endangered/threatened species. The

referenced portion of the site was in the rear of the property, within the

undisturbed wetland buffer.

The rankings refer to a map found on DEP's website which uses

documented species location data, land-use and land-cover information, and

species life history data to produce habitat maps across the state and assigns

"ranks" for conservation. Rank five is the highest rank which refers to a habitat

with state and/or federally listed endangered and threatened species. The lower

ranks indicate urban areas with less concern. Borden responded that, even if the

proposed site had been ranked erroneously, it did not matter because the

designated portion was not being developed. The EIS and Borden concluded

there were no endangered or threatened species present outside the undisturbed

buffer areas.

A-3881-23

8

Mermelstein testified about the design of the proposed campus. She

described the building layouts and materials and confirmed that the building

heights would comply with the thirty-five-foot maximum after plan corrections.

The Board approved the application on March 20, 2023, memorializing it

in a resolution on June 19, 2023. The Board granted approval subject to BYJ's

compliance with all terms and conditions in the resolution. The Board found

that BYJ's requests for variances and waivers at the proposed site would not

substantially harm the public good or intent of the zoning ordinance, and the

benefits outweighed any detriments, as required by N.J.S.A. 40:55D-70(c).

II.

In July 2023, plaintiffs filed an amended complaint in lieu of prerogative

writs, challenging the Board's approval of BYJ's application. They alleged the

Board acted arbitrarily and capriciously by granting variances and design

waivers without sufficient factual or legal justification. Plaintiffs further

asserted the Board's decision was procedurally and substantively deficient,

failed to address expert concerns, and was tainted by conflicts of interest and

due process violations during the public hearing process.

In November 2023, plaintiffs filed a motion to enlarge the record and for

discovery. Plaintiffs alleged that BYJ's counsel and Board Chairman Tsvi

A-3881-23

9

Herman had an attorney-client relationship during the hearings in this matter

because counsel represented Herman's synagogue in an application before the

Township Zoning Board. Plaintiffs submitted: (1) three emails from BYJ's

counsel to the Township Zoning Board confirming her representation of Bais

Medrash of Jackson, Inc. (BMOJ); (2) an article in the online magazine—

Jackson Pulse—written by Herman as its editor in March 2023, commending

Jackson for approving the construction of an orthodox school; (3) an article from

October 2021 discussing "[p]lans for the first authorized Orthodox Jewish

synagogue in Jackson;" (4) a deed reflecting Herman's ownership of property in

the Township; and (5) a notice from the Township Zoning Board of Adjustment

listing BYJ's counsel as the attorney for BMOJ.

On January 5, 2024, the trial court denied the motion to supplement the

record and to conduct discovery. The court found the attorney representing BYJ

in this application before the Board also represented an alleged interested party

before a separate board—the Township Zoning Board. Herman was not a

member of the zoning board. The court noted that in the zoning board case,

counsel represented the applicant—BMOJ, not Herman. The court found any

connection was too tenuous and remote to find a conflict in this matter. The

A-3881-23

10

court stated "there's no basis to expand the record, and the . . . documents . . .

ha[d] no relevance" to the BYJ application.

On June 6, 2024, the court issued a comprehensive oral decision finding

the Board's decision approving BYJ's application was not arbitrary or

capricious. In a June 28, 2024 memorializing order, the court dismissed the

complaint with prejudice.

III.

On appeal, plaintiffs reiterate their arguments made before the trial court

and contend the court erred in dismissing their complaint.

"When reviewing a trial court's decision regarding the validity of a local

board's determination," appellate courts "are bound by the same standards as

was the trial court." Jacoby v. Zoning Bd. of Adj. of Borough of Englewood

Cliffs, 442 N.J. Super. 450, 462 (App. Div. 2015) (quoting Fallone Props., LLC

v. Bethlehem Twp. Plan. Bd., 369 N.J. Super. 552, 562 (App. Div. 2004)). We

"give deference to the actions and factual findings of local boards and may not

disturb such findings unless they were arbitrary, capricious, or unreasonable."

Ibid.

The trial court addressed each of plaintiffs' assertions regarding the

Board's conclusions and found them to be without merit. After careful review,

A-3881-23

11

we discern no reason to disturb the court's order dismissing plaintiffs' complaint.

We need only briefly discuss some of the issues.

A.

Plaintiffs assert the Board, and in turn the court, erred in disregarding the

testimony that the EIS mistakenly stated the property was rank three regarding

endangered or threatened species habitat on the property.

In the EIS, Borden stated that the rear portion of the site, within the

undisturbed riparian and wetland buffer, was mapped as rank three on the

project, and asserted that "[t]here is no mapped threatened or endangered species

habitat on or within close proximity to the site." During cross-examination,

plaintiffs' counsel presented the DEP map showing that some of the areas within

the designated project site were mapped as rank four, contradicting Borden's

EIS.

Borden agreed that the map which showed that portion of the property as

rank four (habitat for species identified by the State as endangered), was

different from the EIS's determination of rank three (habitat for species

identified as threatened). However, Borden explained that identifying the area

as rank four instead of rank three did not make a difference "[b]ecause [the

ranked area] . . . would be in the portion of the site that we're not developing."

A-3881-23

12

In addressing this issue, the court stated:

[BYJ] provided the testimony of an environmental

expert. Although plaintiff[s] argue[] that . . . Bova's lay

opinion testimony as to his opinion[2] with regard to the

presence of endangered species based on the review of

the printed out geo map was credible and sufficient to

rebut the testimony of their expert, Borden, the [B]oard

was free to disregard that testimony in the face of the

[EC's] recommendation and . . . [BYJ's] expert

testimony.

Further, it was reasonable for the [B]oard to

disregard plaintiffs' reference to the N.J. GeoWeb Map

where . . . plaintiff[s] produced no expert to introduce

and explain the map and . . . how it . . . conflicted with

the expert report and the EIS.

Borden provided the only expert evidence on this issue, informing the

Board that the ranking made no difference as the area lay outside the intended

development site of the project. Borden also stated that he did not believe the

Board had authority to reject an application based on wildlife habitat

disturbance, testifying that "is firmly in the DEP['s] [jurisdiction]." The court

did not err in finding it was reasonable for the Board to disregard the harmless

error in the EIS.

2

The court misspoke here. As stated, it was plaintiffs' counsel who presented

the DEP map during his cross-examination of Borden. This harmless error did

not affect the court's analysis.

A-3881-23

13

Moreover, BYJ complied with Jackson, N.J. Code § 244-189, which

requires applicants for major site plans to submit an EIS prepared by qualified

professionals, detailing the project's environmental effects and proposed

mitigation measures. The Code provides that "[t]he [EIS] . . . shall be submitted

to the [EC] for its review and recommendation."

Borden prepared the EIS for BYJ's application, and it was submitted to

the EC. The EC reviewed it and found no concerns. The trial court stated:

[T]he record shows that BYJ submitted an EIS, which

was reviewed by the town's [EC], which operates in an

advisory role pursuant to township ordinances, where

the commission found that there [were] no immediate

concerns. . . . and recommended the application.

Thus, BYJ and the Board complied with the procedural requirements for

submitting the EIS.

Furthermore, the Resolution conditioned approval of BYJ's application

upon subsequent approval from other governmental agencies:

BE IT FURTHER RESOLVED, that this approval is

further conditioned on the agreed upon terms set forth

within this document as well as the following:

1. The receipt by the Applicant of all approvals and

compliance with all permit conditions from any

Federal, State, County or local regulatory agency

having jurisdiction over this Application. Upon receipt

of such approvals, the Applicant shall provide a copy

of any permit or written evidence of approval to the

A-3881-23

14

Board and its professional staff. IF any agency requires

a change in the plans approved by the Board, the

Applicant must reapply to the Board for approval of

that change.

Therefore, the Board's decision was not arbitrary and capricious. The court did

not err in declining to overturn the Board's decision on this issue.

B.

After reviewing plaintiffs' arguments regarding Board error in: (1)

granting BYJ's proposal regarding two-way entrances to the school; (2) not

requiring a variance for the lot width; and (3) not according counsel sufficient

time to cross-examine certain witnesses, we conclude they lack sufficient merit

to warrant discussion in a written opinion. R. 2:11-3(e)(1)(E).

C.

We briefly address plaintiffs' argument that the court erred in denying

their motion to supplement the record regarding the alleged conflict of interest

between BYJ's counsel and Board Chairman Herman.

After the complaint in lieu of prerogative writs was filed and six months

after the Board concluded its hearings, plaintiffs' counsel moved to supplement

the record and for discovery. Plaintiffs presented evidence that (1) counsel for

BYJ was representing another entity—BMOJ—on an application before the

Township Zoning Board, (2) Herman had written an article for an online

A-3881-23

15

magazine after the BYJ application was approved, and (3) Herman owned

property in Jackson. Plaintiffs' counsel believed Herman was a congregant of

BMOJ, which created a conflict of interest for him, requiring his disqualification

from the Board proceedings on this application. BYJ's counsel represented to

the court during oral argument on the motion that her client before the zoning

board was BMOJ, and she had no interaction with Herman.

"The overall objective 'of conflict of interest laws is to ensure that public

officials provide disinterested service to their communities' and to 'promote

confidence in the integrity of governmental operations.'" Piscitelli v. City of

Garfield Zoning Bd. of Adjustment, 237 N.J. 333, 349 (2019) (quoting

Thompson v. City of Atl. City, 190 N.J. 359, 364 (2007)). An analysis of

whether a conflict of interest prevented Herman from participating in the

consideration of BYJ's application is governed by the Local Government Ethics

Law (LGEL), N.J.S.A. 40A:9-22.1 to -22.25, and the Municipal Land Use Law

(MLUL), N.J.S.A. 40:55D-1 to -171. Piscitelli, 237 N.J. at 349-50.

"The [LGEL] applies to all municipal office holders, including . . .

members of planning boards and zoning boards of adjustment." Id. at 350; see

also N.J.S.A. 40A:9-22.3(g). N.J.S.A. 40A:9-22.5(d) provides that:

[n]o local government officer or employee shall act in

his official capacity in any matter where he, a member

A-3881-23

16

of his immediate family, or a business organization in

which he has an interest, has a direct or indirect

financial or personal involvement that might

reasonably be expected to impair his objectivity or

independence of judgment.

Similarly, the MLUL provides that no member of a municipal planning

board "shall be permitted to act on any matter in which he has, either directly or

indirectly, any personal or financial interest." N.J.S.A. 40:55D-23(b);

Grabowsky v. Twp. of Montclair, 221 N.J. 536, 552 (2015).

A court must determine "whether the circumstances could reasonably be

interpreted to show that [conflicting interests] had the likely capacity to tempt

the official to depart from his sworn public duty." Piscatelli, 237 N.J. at 353

(alteration in original) (quoting Wyzykowski v. Rizas, 132 N.J. 509, 523

(1993)).

However, courts should apply the conflict-of-interest rules cautiously, as

"[l]ocal governments would be seriously handicapped if every possible interest,

no matter how remote and speculative, would serve as a disqualification of an

official." Grabowsky, 221 N.J. at 554 (alteration in original) (quoting

Wyzykowski, 132 N.J. at 523). Indeed, public officials "cannot and should not

be expected to be without any personal interest in the decisions and policies of

government." N.J.S.A. 40A:9-22.4. Accordingly, "the nature of an official's

A-3881-23

17

interest must be carefully evaluated based on the circumstances of the specific

case." Grabowsky, 221 N.J. at 554 (citing Van Itallie v. Borough of Franklin

Lakes, 28 N.J. 258, 268 (1958)).

Here, the court correctly determined that plaintiffs' allegations did not

establish a claim of either an actual conflict or a potential conflict. Plaintiffs

presented evidence that Herman was on the BMOJ board. BMOJ was presenting

an application to the Township Zoning Board to construct a schul. Herman was

not a member of the zoning board. He had no input or influence regarding the

BMOJ application. Plaintiffs did not present evidence of a common interest,

coordination, or direct involvement between Herman and BYJ or their mutual

counsel. As the court found, it was "far too remote" a connection for the court

to find a conflict. The court also determined that the comments in the Jackson

Pulse magazine did not form any basis for a conflict. We are satisfied the trial

court properly exercised its discretion in denying discovery and to supplement

the record, and ultimately dismissing plaintiffs' complaint with prejudice.

Affirmed.

A-3881-23

18