finding that challenger to board’s approval of construction certificate for a major utility facility failed to show how the board’s decision resulted in harm to him

How later courts described this case

  • finding that challenger to board’s approval of construction certificate for a major utility facility failed to show how the board’s decision resulted in harm to him

Written by the judges who cited it.

The opinion

[Until this opinion appears in the Ohio Official Reports advance sheets, it may be cited as In

re Application of S. Branch Solar, L.L.C., Slip Opinion No. 2025-Ohio-5679.]

NOTICE

This slip opinion is subject to formal revision before it is published in an

advance sheet of the Ohio Official Reports. Readers are requested to

promptly notify the Reporter of Decisions, Supreme Court of Ohio, 65

South Front Street, Columbus, Ohio 43215, of any typographical or other

formal errors in the opinion, in order that corrections may be made before

the opinion is published.

SLIP OPINION NO. 2025-OHIO-5679

IN RE APPLICATION OF SOUTH BRANCH SOLAR , L.L.C., FOR A CERTIFICATE

OF ENVIRONMENTAL C OMPATIBILITY AND P UBLIC NEED TO CONSTRUCT A

SOLAR-POWERED ELECTRIC-GENERATION FACILITY IN HANCOCK COUNTY,

OHIO; B OHN, APPELLANT; POWER SITING BOARD, APPELLEE; SOUTH

BRANCH S OLAR, L.L.C., INTERVENING APPELLEE.

[Until this opinion appears in the Ohio Official Reports advance sheets, it

may be cited as In re Application of S. Branch Solar, L.L.C., Slip Opinion No.

2025-Ohio-5679.]

Power Siting Board—R.C. 4906.10(A)—Solar-powered electric-generation

facility—Application for certificate of environmental compatibility and

public need—Board’s determinations under R.C. 4906.10(A)(2), (3), and

(6) were not unlawful or unreasonable—Board’s order granting certificate

affirmed.

(No. 2023-1020—Submitted January 8, 2025—Decided December 24, 2025.)

APPEAL from the Power Siting Board, No. 21-669-EL-BGN.

__________________

SUPREME COURT OF OHIO

BRUNNER, J., authored the opinion of the court, which FISCHER, DEWINE,

DETERS, HAWKINS, and SHANAHAN, JJ., joined. KENNEDY, C.J., concurred, with

an opinion.

BRUNNER, J.

{¶ 1} Appellee, the Ohio Power Siting Board, approved the application of

intervening appellee, South Branch Solar, L.L.C., for a certificate of environmental

compatibility and public need to construct an approximately 130-megawatt1 solar-

powered electric-generation facility in Hancock County (“the project”). Appellant,

Travis Bohn, who claims that he lives across the street from and adjacent to the

project site, has appealed the board’s order granting the certificate. Bohn argues

that the board misapplied the statutory criteria, unreasonably weighed the evidence,

and decided the case on incomplete information when analyzing local-government

and public opposition to the project and the project’s impacts on the local economy,

the wildlife in the project area, and the community’s stormwater and drainage

system.

{¶ 2} Because Bohn has not established that the board unlawfully or

unreasonably applied the statutory criteria and because the board’s determinations

were supported by sufficient probative evidence, we affirm the board’s order.

I. OVERVIEW OF THE REGULATORY PROCESS

{¶ 3} The General Assembly has established standards for the construction

of major utility facilities2 in Ohio and delegated to the board the authority to

implement those standards. See R.C. 4906.03. R.C. 4906.06(A)(6) establishes that

1. South Branch initially applied for certification of a 205-megawatt facility, but it modified the

application during the certification process.

2. Included within the definition of “major utility facility” is an “[e]lectric generating plant and

associated facilities designed for, or capable of, operation at a capacity of fifty megawatts or more.”

R.C. 4906.01(B)(1)(a).

2

January Term, 2025

an applicant seeking a certificate of environmental compatibility and public need

to construct a major utility facility must file with the board chairperson an

application containing “[s]uch . . . information . . . as the board by rule or order may

require.” The board is authorized to adopt rules “as are necessary and convenient

to implement” R.C. Ch. 4906. R.C 4906.03(C).

A. Application components

{¶ 4} R.C. 4906.06(A)(1) through (6) explain broadly the information that

must be contained in an application, including, among other things, a description

of the proposed facility and its location, a summary of the environmental-impact

studies performed regarding the facility, and a statement explaining the need for the

facility. The board’s rules3 required more specific information, such as an estimate

of the economic impact of the facility on local commercial and industrial activities,

see former Adm.Code 4906-4-06(E)(4), 2015-2016 Ohio Monthly Record 2-1885

(effective Dec. 11, 2015); the results of specific studies related to animal species

that may be affected by the facility, see former Adm.Code 4906-4-08(B)(1)(c) and

(d), 2017-2018 Ohio Monthly Record 2-2998, 2-3000 (effective Apr. 26, 2018);

and an analysis of and mitigation plan for potential flooding in the area of the

facility, see former Adm.Code 4906-4-08(A)(4)(e), 2017-2018 Ohio Monthly

Record 2-2998, 2-2999 (effective Apr. 26, 2018). The board is permitted to waive

a requirement of its rules so long as the requirement is not mandated by statute.

Adm.Code 4906-4-01(B).

{¶ 5} After an application is filed, the board’s rules require that within 60

days following receipt, the board chairperson or the chairperson’s designee must

either accept the application as complete and compliant with the board’s rules or

3. We will utilize the rules in effect at the time South Branch filed its application. The board has

since amended its rules. See 2023-2024 Ohio Monthly Record 2-2946 through 2-2994 (effective

May 30, 2024).

3

SUPREME COURT OF OHIO

reject the application as incomplete with a statement explaining the basis of the

rejection. Adm.Code 4906-3-06(A)(1) and (A)(2).

B. Public participation

{¶ 6} Once notice is given from the board chairperson to the applicant that

an application is complete, the applicant must, among other tasks, serve copies of

the accepted, complete application on the government officials identified in

Adm.Code 4906-3-07(A)(1)(a). The board must also schedule a local public

hearing. See R.C. 4906.07(A). The purpose of the hearing is to allow members of

the public to provide sworn testimony about the proposed facility. See Ohio Power

Siting Board, Public Participation at the OPSB, https://opsb.ohio.gov

/processes/public-participation (accessed July 17, 2025) [https://perma.cc/FHJ8-

P3RK]. The board also accepts informal written comments about a case, which are

filed in a public-comment section of the case record. See id.

C. Staff investigation

{¶ 7} Once the board chairperson certifies that an application is complete,

the chairperson must direct board staff to investigate the application. See R.C.

4906.07(C); Adm.Code 4906-3-06(C). Following its investigation, staff must issue

a written report at least 15 days before the public hearing on the application, and

the report must describe the nature of the investigation and contain recommended

findings with regard to R.C. 4906.10(A). See R.C. 4906.07(C); Adm.Code 4906-

3-06(C)(1). A copy of the report can be obtained by any person upon request. R.C.

4906.07(C); Adm.Code 4906-3-06(C)(4). The report not only provides the board

with recommended findings with regard to R.C. 4906.10(A), but it also provides

interested parties with the information and materials necessary to make an informed

challenge to the application, see Duff v. Pub. Util. Comm., 56 Ohio St.2d 367, 376

(1978).

4

January Term, 2025

D. The adjudicatory hearing

{¶ 8} Before the board may issue a certificate for the construction of a major

utility facility, it must make eight substantive determinations. R.C. 4906.10(A)(1)

through (8). Bohn challenges three of the board’s determinations in this appeal.

R.C. 4906.10(A) provides:

The board shall not grant a certificate . . . unless it finds and

determines . . .

...

(2) The nature of the probable environmental impact;

(3) That the facility represents the minimum adverse

environmental impact, considering the state of available technology

and the nature and economics of the various alternatives, and other

pertinent considerations;

...

(6) That the facility will serve the public interest,

convenience, and necessity;

....

{¶ 9} Throughout the certification process, the board has the authority to

require an applicant to provide information that “it considers necessary to assist in

the conduct of hearings and any investigations or studies it may undertake,” R.C.

4906.03(A), and to “[c]onduct any studies or investigations that it considers

necessary or appropriate to carry out its responsibilities under [R.C. Ch. 4906],”

R.C. 4906.03(B).

5

SUPREME COURT OF OHIO

{¶ 10} The board conducts an adjudicatory hearing on the application, at

which the parties4 may present prefiled testimony, cross-examine witnesses, and

develop the evidentiary record that the board will consider in arriving at its

decision. See Ohio Power Siting Board, Public Participation at the OPSB. The

board may consider a stipulation entered into by two or more parties that resolves

some or all the issues pending before the board, but the stipulation is not binding

on the board. Adm.Code 4906-2-24(A) and (D). The board here used a three-part

test to evaluate the reasonableness of a stipulation and whether to adopt it, Power

Siting Bd. No. 21-669-EL-BGN, ¶ 102 (Feb. 16, 2023), a test we have endorsed as

evaluating “‘whether the settlement is a product of serious bargaining among

capable, knowledgeable parties; whether the settlement, as a package, benefits

ratepayers and the public interest; and whether the settlement package violates any

important regulatory principles or practices,’” In re Application of E. Ohio Gas Co.,

2023-Ohio-3289, ¶ 11, quoting Ohio Consumers’ Counsel v. Pub. Util. Comm.,

2006-Ohio-4706, ¶ 16. Parties that do not join a stipulation may present arguments

and evidence in opposition to it. Adm.Code 4906-2-24(D).

{¶ 11} Finally, we have explained that R.C. Ch. 4906 authorizes a “dynamic

process,” In re Application of Buckeye Wind, L.L.C., 2012-Ohio-878, ¶ 16, which

confers authority on the board to impose conditions on the issuance of a certificate

so that the board may monitor compliance with those conditions, which could

include ensuring the mitigation of potential negative impacts of the project, see id.

4. R.C. 4906.08(A) provides that “parties to a certification proceeding” include (1) the applicant,

(2) each person entitled to receive service of a copy of the application under R.C. 4906.06(B) if the

person has timely filed a notice of intervention as a party, and (3) any person residing in a municipal

corporation or county entitled to receive service of a copy of the application under R.C. 4906.06(B)

and any other person, if the person has timely petitioned the board for leave to intervene as a party

and if that petition has been granted by the board for good cause shown.

6

January Term, 2025

II. SOUTH BRANCH’S APPLICATION

{¶ 12} On July 22, 2021, South Branch filed an application with the board

for a certificate of environmental compatibility and public need to construct a solar-

powered electric-generation facility in Washington Township, Hancock County.

The project will consist of rows of solar panels affixed to metal rackings and of

associated facilities and equipment, including access roads, electrical-collection

lines, inverters, transformers, four meteorological stations, an operations and

maintenance building, and a substation. The project will be located on 700 acres

of private, mostly agricultural land.5 On September 20, the board sent South

Branch a letter indicating that the application was in compliance with Adm.Code

Ch. 4906-01 et seq. and that the board staff had received sufficient information to

commence its investigation.

{¶ 13} South Branch served a copy of the application on local-government

officials, including the Washington Township Trustees, the Hancock County Board

of County Commissioners, the Hancock County engineer, the Hancock Soil and

Water Conservation District, and the Hancock Regional Planning Commission. Of

these local-government officials, only the county commissioners filed a notice of

intervention as a party. Several other nongovernmental parties sought and were

granted leave to intervene as parties, including the Ohio Farm Bureau Federation

and Bohn.

{¶ 14} The board staff investigated the project and submitted a report on

April 11, 2022. The staff’s report contained a summary of its investigation and

recommendations based on its assessment of the eight substantive determinations

set forth in R.C. 4906.10(A) that the board must make. The board staff

recommended that a certificate be issued, subject to 50 enumerated conditions.

5. The footprint of the project was reduced from approximately 1,000 acres to approximately 700

acres during the certification process.

7

SUPREME COURT OF OHIO

{¶ 15} On April 27, a local public hearing was held. Eleven people spoke

in support of the project, highlighting job creation, the positive economic impacts

of the project, and the benefits of solar power in the community. Twenty-six people

expressed apprehension or opposition to the project, stressing the importance of

preserving agricultural land and raising concerns over potentially negative

aesthetics, decrease in property values, noise, ecological impacts, and perceived

inefficiencies with solar power. The board also received more than 285 public

comments.

{¶ 16} On May 31, a joint stipulation and recommendation was filed, which

was intended to resolve all matters relevant to the certification and construction of

the project. The stipulation was agreed to by South Branch, board staff, the county

commissioners, and the farm bureau. These parties recommended that the board

issue a certificate to South Branch, subject to the conditions recommended in the

staff report. Bohn did not join the stipulation and continued to oppose the

application. On June 1, the board held an adjudicatory hearing on the stipulation.

{¶ 17} On February 16, 2023, the board issued an opinion and order

adopting the stipulation and issuing a certificate to South Branch for construction

of the project, subject to the conditions set forth in the stipulation. Power Siting

Bd. No. 21-669-EL-BGN at ¶ 108, ¶ 137, ¶ 141 (Feb. 16, 2023). After

unsuccessfully seeking rehearing, Power Siting Bd. No. 21-669-EL-BGN, ¶ 39

(June 15, 2023), Bohn appealed to this court, raising eight propositions of law. The

board filed a brief in defense of its order. We granted South Branch leave to

intervene as an appellee, 2023-Ohio-4409, and it urges us to affirm the board’s

order.

III. ANALYSIS

A. Standard of review

{¶ 18} Under R.C. 4906.12, we apply the same standard of review to power-

siting determinations that we apply to orders of the Public Utilities Commission.

8

January Term, 2025

In re Application of Icebreaker Windpower, Inc., 2022-Ohio-2742, ¶ 12, citing In

re Application of Black Fork Wind Energy, L.L.C., 2013-Ohio-5478, ¶ 10. Under

this standard, we will reverse, vacate, or modify an order of the board only when,

upon consideration of the record, we conclude that the order was unlawful or

unreasonable. R.C. 4903.13. “We will not reverse or modify a board decision as

to questions of fact when the record contains sufficient probative evidence to show

that the board’s decision was not manifestly against the weight of the evidence and

was not so clearly unsupported by the record as to show misapprehension, mistake

or willful disregard of duty.” In re Application of Champaign Wind, L.L.C., 2016-

Ohio-1513, ¶ 7. We review questions of law de novo. Icebreaker Windpower at

¶ 12.

B. The board’s determinations under R.C. 4606.10(A)(2) and (A)(3) were not

unlawful or unreasonable

{¶ 19} In determining the nature of the project’s probable environmental

impact under R.C. 4906.10(A)(2) and whether the project, subject to the stipulated

conditions, represents the minimum adverse environmental impact under R.C.

4906.10(A)(3), the board explained that it had relied on the experienced staff

professionals who thoroughly investigated the application and were familiar with

the requirements of R.C. 4906.10. Power Siting Bd. No. 21-669-EL-BGN at ¶ 107

(Feb. 16, 2023); Power Siting Bd. No. 21-669-EL-BGN at ¶ 34 (June 15, 2023).

{¶ 20} The staff report included the results of groundwater and surface-

water studies; information obtained from the Ohio Department of Natural

Resources (“ODNR”) and the United States Fish and Wildlife Service (“USFWS”),

field studies, and published ecological literature regarding the presence of

threatened or endangered plant and animal species in the project area; summaries

of geological surveys; and information regarding community impacts like

aesthetics and noise. The board noted the staff’s conclusion that “while the Project

will result in temporary and permanent environmental impacts, those impacts are

9

SUPREME COURT OF OHIO

unlikely to be significantly adverse such that the Project represents the minimum

adverse environmental impact.” Power Siting Bd. No. 21-669-EL-BGN at ¶ 73

(Feb. 16, 2023).

{¶ 21} Bohn argues that the board did not require South Branch to provide

all the information required by its rules to properly determine the nature of the

project’s probable impacts on wildlife and flooding under R.C. 4906.10(A)(2) or

whether the project represents the minimum adverse environmental impact under

R.C. 4906.10(A)(3), rendering its order unlawful and unreasonable. He also argues

that despite testimony from local residents regarding flooding in the area of the

project site, the board did “virtually nothing” to analyze the impacts of the project

on flooding and the local community’s drain-tile system.

{¶ 22} For the following reasons, we find that the board acted in accordance

with its rules and that its determinations under R.C. 4906.10(A)(2) and (A)(3) were

not unreasonable.

1. Wildlife

{¶ 23} At the time South Branch filed its application, former Adm.Code

4906-4-08(B)(1) required an applicant to “provide information regarding

ecological resources in the project area.” 2017-2018 Ohio Monthly Record at 2-

3000. Under this rule, South Branch was required to do the following:

(c) Provide the results of a literature survey of the plant and

animal life within at least one-fourth mile of the project area

boundary. The literature survey shall include aquatic and terrestrial

plant and animal species that are of commercial or recreational

value, or species designated as endangered or threatened.

(d) Conduct and provide the results of field surveys of the

10

January Term, 2025

plant and animal species identified in the literature survey.6

Id.

{¶ 24} Bohn argues in his merit brief that the board failed to require South

Branch to “provide the results of a literature survey for all wildlife in and near the

Project area,” including information about bald eagles. (Emphasis in original.)

Bohn claims that without the literature searches and corresponding field surveys

for wildlife, the board could not determine the nature of the probable environmental

impact of the project on wildlife in the area or what would constitute the minimum

adverse environmental impact of the project on wildlife in the area.

{¶ 25} While the first sentence of former Adm.Code 4906-4-08(B)(1)(c)

required South Branch to “[p]rovide the results of a literature survey of the plant

and animal life within at least one-fourth mile of the project area boundary”

generally, the rule further explained that the wildlife species that must be reported

in the survey are those that are “of commercial or recreational value, or species

designated as endangered or threatened.” Id.

{¶ 26} Nothing in the rule required the literature survey to report on each

wildlife species that may be found near the project site. In In re Application of

Alamo Solar I, L.L.C., 2023-Ohio-3778, ¶ 48, we found that literature surveys that

included “specific discussions of all sorts of birds (including raptors such as bald

eagles), bats, and aquatic life in and near the project areas” satisfied former

Adm.Code 4906-4-08(B)(1)(c). Although the literature survey submitted by South

Branch arguably may not have been as robust as the survey provided in Alamo,

Bohn cannot establish that the board’s order was unlawful or unreasonable.

6. Adm.Code 4906-4-08(B), 2023-2024 Ohio Monthly Record 2-2972, 2-2974 (effective May 30,

2024), still requires an applicant to “provide information on ecological resources.” However,

Adm.Code 4906-4-08(B) specifies that the information that was required to be included under

former Adm.Code 4906-4-08(B)(1)(a) through (e) now serves as “[e]xamples of relevant

information,” 2023-2024 Ohio Monthly Record at 2-2974.

11

SUPREME COURT OF OHIO

{¶ 27} A wildlife-literature survey is a component of an application, but it

is not the only information the board receives about the potential ecological impacts

of a project. For example, at the adjudicatory hearing, the board heard testimony

from South Branch’s experts, including Lynn Gresock, a consultant with over 37

years of experience providing environmental permitting and compliance services.

Gresock managed or coordinated the environmental and cultural surveys that were

completed for the project. She explained that based on her environmental

consulting company’s research, the wildlife species that use the project area are

those typically found in Ohio agricultural fields, such as turkey vultures, Canada

geese, American robins, woodchucks, and eastern grey squirrels. Gresock

concluded that there is abundant availability of similar agricultural fields within

and near the project area that common species can use as similar habitats and that

the solar project will therefore not eliminate habitats for those common species.

She also explained that after construction is complete, the project area will be

stabilized with permanent vegetation, which provides a more consistent habitat for

birds and other wildlife species compared to farm fields with rows of crops.

{¶ 28} Board staff also conducted its own field assessments and reviewed

published ecological information for the project area and concluded that other than

potential impacts to certain bat species, the project would not impact any other

threatened or endangered wildlife species. Staff further concluded that South

Branch’s vegetation-management plan will likely enrich the local wildlife habitat.

{¶ 29} Bohn argues that bald eagles are a particular wildlife species that the

board failed to consider when evaluating the project’s probable environmental

impact and whether the project represents the minimum adverse environmental

impact. Bohn’s argument is premised on his belief that “evidence filed in this case

clearly shows a number of bald eagles present in the Project area.” Bohn

acknowledges that the board heard public-hearing testimony of residents who had

seen bald eagles nesting on their property or flying near the project site. The board

12

January Term, 2025

also heard expert testimony at the adjudicatory hearing about the project’s potential

impacts on bald eagles. Gresock testified that in 2020, ODNR identified 12 bald-

eagle nests in Hancock County but that none of those nests were in proximity to the

project area, the project area was not considered to have a strong nesting habitat

potential for bald eagles, and no bald eagles were observed during her company’s

field survey of the project area.

{¶ 30} Contrary to Bohn’s assertion, the board considered the impact of the

project on bald eagles. It concluded that at the time South Branch filed its

application, the bald eagle was not listed as endangered or threatened by USFWS

or ODNR, and it determined that the record evidence supported a finding that the

nature of the ecological impact of the project was properly evaluated under R.C.

4906.10(A)(2) and that the project represents the minimum adverse environmental

impact under R.C. 4906.10(A)(3). Power Siting Bd. No. 21-669-EL-BGN at ¶ 26

(June 15, 2023). Moreover, R.C. 4901.10(A)(3) “does not require the elimination

of all adverse impacts,” Alamo Solar, 2023-Ohio-3778, at ¶ 43.

{¶ 31} Bohn also attempts to argue that the bald eagle is a species of

“recreational value” and because the second sentence of former Adm.Code 4906-

4-08(B)(1)(c), 2017-2018 Ohio Monthly Record at 2-3000, required South

Branch’s literature survey to identify animal species of “recreational value,” South

Branch violated the rule by omitting bald eagles from its survey. However, Bohn

did not preserve this argument in his application for rehearing and is therefore

jurisdictionally barred from raising it on appeal, see R.C. 4903.10(B); In re Letter

of Notification Application of Columbia Gas of Ohio, Inc., 2024-Ohio-4747, ¶ 16.

Moreover, Bohn did not present any evidence to support finding that bald eagles

are a species of recreational value.

{¶ 32} Because sufficient probative evidence supported the board’s

determination of the project’s probable impact to wildlife as well as the board’s

determination that the project represents the minimum adverse environmental

13

SUPREME COURT OF OHIO

impact, it was not unreasonable. It is the board’s duty to ascertain what information

is necessary to carry out its responsibilities. See R.C. 4906.03(A) and (B). At the

same time, the board may waive a requirement contained in its rules so long as it is

not mandated by statute. Adm.Code 4906-4-01(B). Bohn does not point to any

statute that requires an applicant to provide literature-survey results that document

every wildlife species found near a project site. Therefore, the board’s failure to

require South Branch to provide results of a literature survey of all wildlife species

in and near the project area was not unlawful. See Alamo Solar at ¶ 47-48.

{¶ 33} Finally, even if the board failed to consider the impacts of the project

on all wildlife species that may be found near the project site, including bald eagles,

Bohn has not explained how any alleged error committed by the board resulted in

harm. See In re Black Fork Wind Energy, L.L.C., 2018-Ohio-5206, ¶ 25 (finding

harm when the “appellants have shown a realistic possibility of a different outcome

but for the board’s error”). Bohn has left us to speculate only about the harm that

might be caused by the board’s failure to require more robust wildlife surveys. This

court “will not reverse a [board] order based on speculation.” In re Application of

Ohio Power Co., 2018-Ohio-4698, ¶ 50.

2. Drainage and flooding issues

{¶ 34} Former Adm.Code 4906-4-08(A)(4)(e) required South Branch to

“[p]rovide an analysis of the prospects of floods for the area, including the

probability of occurrences and likely consequences of various flood stages, and

describe plans to mitigate any likely adverse consequences.” 2017-2018 Ohio

Monthly Record at 2-2999. Bohn argues that South Branch did not submit the

information required by this rule and that the board erred in determining the nature

of the probable environmental impact of the project under R.C. 4906.10(A)(2) and

that the project represents the minimum adverse environmental impact under R.C.

4906.10(A)(3).

14

January Term, 2025

{¶ 35} Contrary to Bohn’s assertion, South Branch’s application and

amended application provided an analysis of the prospects of floods in the area and

described plans to mitigate related adverse consequences. South Branch stated in

its application that no portion of the project area was included in a floodplain or

flood hazard and therefore the project was not expected to increase the potential for

flooding. It also submitted a stormwater-management report prepared by

Westwood Professional Services, which concluded that when the project is

operational, it will not alter existing flow and drainage patterns. Westwood also

found that because the land under the solar panels will be filled with vegetation (as

opposed to row crops), runoff rates in most drainage areas will be reduced after the

project is operational.

{¶ 36} To mitigate concerns about the potential for flooding, South Branch

committed to obtaining and implementing stormwater controls required by the Ohio

Environmental Protection Agency’s “General Permit Authorization for Storm

Water Discharges Associated with Construction Activity.” South Branch also

submitted a drain-tile-mitigation plan, which included a commitment to locating

existing drain tiles7 in the project area, implementing drain-tile-avoidance

measures, repairing any drain tiles damaged during construction, and retaining a

local drain-tile expert to survey potential low-lying areas where ponding could

occur in the event drain tiles are damaged.

{¶ 37} Contrary to Bohn’s contention, South Branch’s application and

amended application provided an analysis of the prospects of floods in the area and

described plans to mitigate adverse consequences. Therefore, South Branch

complied with former Adm.Code 4906-4-08(A)(4)(e).

7. Although the parties have not defined the term “drain tile,” it is generally known that “[a] tile is

a tube or pipe used to drain land,” State ex rel. Wasserman v. Fremont, 2014-Ohio-2962, ¶ 3 (lead

opinion); see also Webster’s Third New International Dictionary (2002) (defining “tile” as a pipe

“laying out underground . . . to drain fields”).

15

SUPREME COURT OF OHIO

{¶ 38} Bohn also argues that the board improperly issued a certificate

without requiring South Branch to “legitimately and significantly evaluate

information related to flooding in the area” and therefore “violate[d] the Board’s

duties” under R.C. 4906.10(A)(2) and (A)(3). The record, however, does not

support these arguments.

{¶ 39} In addition to the information provided in the application, the

stipulation included two conditions designed to mitigate potential flooding risks.

The board recognized that the project area occasionally floods but concluded that

South Branch had implemented adequate mitigation plans relating to stormwater

runoff, flooding, and drain tiles. Power Siting Bd. No. 21-669-EL-BGN at ¶ 28-29

(June 15, 2023). South Branch also committed to avoid damaging drain tiles as

much as possible, promptly repairing damaged tiles, and implementing a

complaint-resolution procedure during construction and operation of the project.

{¶ 40} Therefore, the board did not act unlawfully or unreasonably in

determining the nature of the project’s probable impacts on flooding and drainage

to the project area or in determining that the project represents the minimum

adverse environmental impact.

3. Setbacks

{¶ 41} After the adjudicatory hearing but before the board issued its final

order, South Branch filed a notice indicating that it had incorporated the setback

distances that the board had approved in a different power-siting case, In re

Application of Harvey Solar I, L.L.C., Power Siting Bd. No. 21-164-EL-BGN, and

that the board had proposed in its rules. Under the modification, South Branch

committed to increasing the minimum setbacks from its solar panels to the

following:

• 300 feet from a nonparticipating residence;

• 150 feet from a public road; and

• 50 feet from a nonparticipating property line.

16

January Term, 2025

The board rejected Bohn’s argument that the project’s increased setbacks were not

appropriate. Power Siting Bd. No. 21-669-EL-BGN at ¶ 21-23 (June 15, 2023).

{¶ 42} Bohn argues that the setbacks are unreasonable because they “offer

no meaningful isolation from the Project’s harmful impacts.” Bohn identifies only

one purported harmful impact—the visibility of the project. He claims that the solar

panels and fencing will be visible from neighbors’ homes, expose neighbors to

unpleasant views for at least 35 years, and “ruin the scenic, rural quality of the

area.”

{¶ 43} The board’s statutory obligation under R.C. 4906.10(A)(3),

however, was to determine that the proposed facility “represents the minimum

adverse environmental impact, considering the state of available technology and

the nature and economics of the various alternatives, and other pertinent

considerations.” South Branch is not required to ensure that the solar panels will

be invisible or completely screened off from a neighbor’s property.

{¶ 44} Moreover, the record contained sufficient probative evidence of the

mitigating measures that South Branch will implement to soften unsightly views

from nonparticipating residences, including (1) preparing a landscape plan in

consultation with a licensed landscape architect that addresses the aesthetic impacts

of the project with an emphasis on any nonparticipating residence with a direct line

of sight to the project, (2) ensuring that the plan incorporates planting-design

features to address aesthetic impacts to the traveling public and nearby

communities, (3) maintaining the vegetative screening for the life of the project and

replacing any failed plantings so that after five years, at least 90 percent of the

vegetation has survived, and (4) submitting the landscape plan to the board staff for

confirmation that it complies with the stipulation. The board approved the project’s

increased setbacks in conjunction with the landscaping requirements and the other

mitigating measures that are intended to minimize the visual impact of the project

17

SUPREME COURT OF OHIO

on surrounding residences. Power Siting Bd. No. 21-669-EL-BGN at ¶ 108 (Feb.

16, 2023).

{¶ 45} Whether setbacks are sufficient to protect the public is an evidentiary

issue, and this court will not substitute its judgment for the board on evidentiary

matters. See In re Application of Champaign Wind, L.L.C., 2016-Ohio-1513, ¶ 30.

Bohn has not cited any contrary evidence indicating that the 300-foot setback from

nonparticipating residences coupled with the landscaping plan is insufficient to

minimize adverse visual impacts of the project. The board’s findings regarding the

visual impacts of the project under R.C. 4906.10(A)(3) were supported by sufficient

and probative evidence in the record.

{¶ 46} Bohn also argues that the board acted unlawfully by approving the

increased setbacks that are similar to the ones approved in Harvey Solar; in Bohn’s

view, the board’s approach “does not account for the unique challenges facing the

residents of the Village of Arcadia and Washington Township.” But Bohn has not

identified those unique challenges or further explained the basis for his argument

as to why it was unlawful for the board to apply uniform setbacks across different

solar projects. Bohn bears the burden of demonstrating reversible error, which must

be supported by more than conclusory statements. In re Complaint of Toliver v.

Vectren Energy Delivery of Ohio, Inc., 2015-Ohio-5055, ¶ 30 (“Unsupported legal

conclusions do not demonstrate error.”).

C. The board’s determination under R.C. 4606.10(A)(6) was not unlawful or

unreasonable

{¶ 47} In determining whether the project will serve the “public interest,

convenience, and necessity” under R.C. 4906.10(A)(6), the board adopted its staff’s

findings and recommendations, as modified by the stipulation, and noted that it had

relied on the experienced staff professionals who thoroughly investigated the

application and were familiar with the requirements of R.C. 4906.10. Power Siting

Bd. No. 21-669-EL-BGN at ¶ 107 (Feb. 16, 2023); Power Siting Bd. No. 21-669-

18

January Term, 2025

EL-BGN at ¶ 34 (June 15, 2023). The board found that the county commissioners’

joinder in the stipulation was “strong evidence” of the project’s beneficial impacts

to the local community. Power Siting Bd. No. 21-669-EL-BGN at ¶ 107 (Feb. 16,

2023). The board concluded that several conditions contained in the stipulation

were “enhanced to further the public interest as a result of the negotiation process.”

Id. at ¶ 106. The board also identified specific benefits of the project, such as the

“generation of zero emission energy, increases in local revenues, including the local

school district, and enhancements to the state and local economy.” Power Siting

Bd. No. 21-669-EL-BGN at ¶ 34 (June 15, 2023).

{¶ 48} Bohn argues that the board improperly weighed the evidence

concerning local-government input and public opinion regarding the project,

determined the economic impacts of the project based on incomplete and “one-

sided” information, and accepted unreasonable setbacks proposed by South Branch.

1. Local-government and public opposition

{¶ 49} In Bohn’s view, had the board properly considered the local-

government and public opposition to the project, it would not have determined that

the project will serve the “public interest, convenience, and necessity” under R.C.

4906.10(A)(6). Bohn argues that the board gave too much weight to the position

of the county commissioners while discounting other governmental officials who

voiced opposition. What Bohn is asking us to do is reweigh the evidence and find

that the opposition testimony of two township trustees at the public hearing and

public comments filed by the township fiscal officer and the county public-health

director outweigh any benefits of the project that were explained by experts and

supported by data submitted during the certification process. Reweighing evidence

is beyond the scope of our review. See In re Complaints of Lycourt-Donovan v.

Columbia Gas of Ohio, Inc., 2017-Ohio-7566, ¶ 35.

{¶ 50} We find that the board’s determination was sufficiently supported by

probative evidence in the record. At the outset, we note that contrary to Bohn’s

19

SUPREME COURT OF OHIO

argument, the board’s opinion is not misleading on the description of the public

input it received. The information obtained throughout the public-hearing and

public-comment processes included both support and opposition for the project,

which the board in its opinion thoroughly explained. Power Siting Bd. No. 21-669-

EL-BGN at ¶ 37-43 (Feb. 16, 2023).

{¶ 51} Bohn was the only party who formally intervened and opposed the

project at the adjudicatory hearing and on appeal. South Branch, board staff, the

county commissioners, and the farm bureau agreed and stipulated that the project

would serve the “public interest, convenience, and necessity” under R.C.

4906.10(A)(6). It was not improper for the board to give significant weight to the

stipulation, which was the product of serious bargaining between the parties8 and

was supported by expert testimony and data.

{¶ 52} Moreover, while local-government and public input regarding the

project are informative, they are not determinative of whether the proposed facility

will serve the “public interest, convenience, and necessity” under R.C.

4906.10(A)(6). As discussed in the following section, the board also considered

the economic impacts of the project to be a “net positive” for the community.

Power Siting Bd. No. 21-669-EL-BGN at ¶ 20 (June 15, 2023).

2. Economic impacts

{¶ 53} Former Adm.Code 4906-4-06(E)9 required South Branch to include

in its application “information regarding the economic impact of the project.”

2015-2016 Ohio Monthly Record at 2-1885. Specifically, division (E)(1) required

8. South Branch claims that Bohn did not respond to invitations to participate in the discussions

leading to the stipulation.

9. Adm.Code 4906-4-06(D), 2023-2024 Ohio Monthly Record 2-2968, 2-2969 (effective May 30,

2024), still requires an applicant to “provide information regarding the economic impact of the

project.” However, Adm.Code 4906-4-06(D) specifies that the information that was required to be

included under former Adm.Code 4906-4-08(E)(1) through (4) now serves as “[e]xamples of

relevant economic impact information,” 2023-2024 Ohio Monthly Record at 2-2969.

20

January Term, 2025

an estimate of the value of the project’s payroll, division (E)(2) required an estimate

of how many people will be employed during construction and operation of the

project, division (E)(3) required an estimate of the increase in local-tax revenue

accruing from the project, and division (E)(4) required “an estimate of the economic

impact of the proposed facility on local commercial and industrial activities.” Id.

Bohn argues that the board did not require South Branch to provide information

about potential negative economic impacts of the project, such as potential losses

to local businesses and from converting agricultural land to a solar facility. In

Bohn’s view, the board’s analysis was unreasonable and unlawful because it did

not ensure compliance with former Adm.Code 4906-4-06(E)(4) and was based on

incomplete information.

{¶ 54} But Bohn does not point to any statute or rule that explicitly requires

an applicant to provide an analysis of any one specific negative impact of a major

utility facility on local businesses or industries, and we recently rejected such an

interpretation of former Adm.Code 4906-4-06(E)(4), see In re Application of

Firelands Wind, L.L.C., 2023-Ohio-2555, ¶ 58 (finding the rule did not require the

applicant “to specifically quantify potential losses to tourism, farmers, or other

energy providers”). Instead, we concluded that the rule required only that the

applicant “provide an estimate of the economic impact on local commercial and

industrial activities.” Id.

{¶ 55} South Branch provided what the rule required, an estimate, which

included consideration of some potentially negative impacts. South Branch

submitted with its application and amended application an economic-impact study

prepared by the Ohio University Voinovich School of Leadership and Public

Affairs, which used the National Renewable Energy Laboratory’s “Jobs and

Economic Development Impact” model. The researchers estimated that

construction of the project would create 294 full-time direct positions and that

indirect and induced impacts of the project would support another 463 jobs in

21

SUPREME COURT OF OHIO

Ohio—with a total economic output of $125.2 million. The researchers estimated

that when the project becomes operational, it will directly employ six full-time

employees and indirect and induced impacts would support five additional jobs in

Ohio—with a total annual economic output of $3.9 million.

{¶ 56} In addition to the economic study that was investigated and reviewed

by board staff, South Branch also provided testimony from Erin C. Bowen, a senior

manager for CohnReznick, L.L.P., who specialized in property-value impact

studies. Bowen looked at the home sales occurring near another solar project in

Ohio and found that the home sales in the vicinity of that project occurred during a

normal marketing time of 30 to 90 days on market and sold for prices from 2.2

percent below list price to 12.6 percent above list price. Based on studies performed

in other states, Bowen concluded that no consistent and measurable negative

impacts to home values have been found to have occurred that could be attributed

to proximity to the adjacent, commercial-scale, solar-energy use.

{¶ 57} Bohn argues that the board lacked information about the potential

economic losses that may occur because the project will be located on land that will

no longer be used for agricultural purposes. He also argues that the project will

restrict positive economic growth in the Village of Arcadia. But the board heard

public testimony of purported negative economic impacts of the project and found

them to be collectively “unsubstantiated layperson testimony.” Power Siting Bd.

No. 21-669-EL-BGN at ¶ 20 (June 15, 2023). Bohn had access to the application

for over ten months and the staff report for almost two months before the

adjudicatory hearing. He had notice of what economic impacts were being

evaluated, and he could have submitted his own evidence to refute South Branch’s

application or bolster his claims. As it stands, Bohn’s claims about the negative

impacts of the project are unsubstantiated theories.

{¶ 58} The board explained that it evaluated the net economic impact of the

project from a broad perspective and that the record evidence supported a finding

22

January Term, 2025

“of the net positive economic impact of the Project.” Id. Further, the estimate of

the economic impacts of the project on local commercial and industrial activities in

the application is a subset of information about the overall economic impacts the

board considers in evaluating whether the project will serve the “public interest,

convenience, and necessity” under R.C. 4906.10(A)(6). See former Adm.Code

4906-4-06(E)(1) through (4), 2015-2016 Ohio Monthly Record at 2-1885. Bohn

cannot establish that the board acted unlawfully or unreasonably in considering the

economic impacts of the project.

3. Setbacks

{¶ 59} Bohn argues that the modified setbacks discussed above are also

unreasonable because they do not serve the “public interest, convenience, and

necessity” under R.C. 4906.10(A)(6). But Bohn does not develop this argument

beyond this cursory statement and therefore has failed to demonstrate error. See

Toliver, 2015-Ohio-5055, at ¶ 30.

4. Conclusion

{¶ 60} For the reasons discussed above, the board’s determination that the

project will serve the “public interest, convenience, and necessity” under R.C.

4906.10(A)(6) was not unlawful or unreasonable.

D. The board’s approval of the stipulation was not unlawful or unreasonable

{¶ 61} Bohn argues that the board acted unlawfully and unreasonably when

it found that the stipulation satisfied two parts of the three-part test for evaluating

the reasonableness of a stipulation. See E. Ohio Gas Co., 2023-Ohio-3289, at ¶ 11.

First, he argues that the stipulation was not in the public interest for all the reasons

we have addressed regarding R.C. 4906.10(A)(2), (3), and (6). But the board did

consider evidence in the record, contrary to what Bohn argues. See Power Siting

Bd. No. 21-669-EL-BGN at ¶ 36-93 (Feb. 16, 2023). The board considered the

arguments and evidence presented by Bohn, see id. at ¶ 98-99, 104, as well as

opposition evidence from the public hearing and the public comments, see id. at

23

SUPREME COURT OF OHIO

¶ 37-40, 42. Ultimately, the board gave more weight to the evidence presented by

South Branch and to the findings of board staff following its investigation.

{¶ 62} Second, Bohn argues that the project did not comply with the

regulations and statutes governing the certification process and that the stipulation

failed to cure those deficiencies. However, we have already explained that Bohn

has not established a violation of a statute or administrative rule. Therefore, he

cannot establish that the board erred in concluding that the stipulation was the result

of a process that “did not violate any important regulatory princip[le] or practice,”

id. at ¶ 107.

{¶ 63} We find no error in the board’s approval of the stipulation between

South Branch, board staff, the county commissioners, and the farm bureau.

E. The board complied with R.C. 4903.09

{¶ 64} Under R.C. 4903.09, which applies to the board pursuant to R.C.

4906.12, the board must file “findings of fact and written opinions setting forth the

reasons prompting the decisions arrived at, based upon said findings of fact.” The

purpose of the statute is to provide the court with “enough information to know

how the [board] reached its result.” In re Application of FirstEnergy Advisors for

Certification as a Competitive Retail Elec. Serv. Power Broker & Aggregator,

2021-Ohio-3630, ¶ 21. “The ‘statute requires the [board] to set forth the reasons

for its decisions and prohibits summary rulings and conclusions that do not develop

the supporting rationale or record.’” Id., quoting In re Application of Ohio Power

Co., 2018-Ohio-4698, ¶ 24.

{¶ 65} Bohn argues that the board failed to identify the facts and reasoning

“supporting many of its conclusions.” But other than relying on his arguments that

we have already addressed above, Bohn has not specifically identified which of the

board’s conclusions lack the detail required by R.C. 4903.09 or amount to a

summary ruling. Bohn has the burden of demonstrating reversible error on appeal,

24

January Term, 2025

Toliver, 2015-Ohio-5055, at ¶ 30, but he has not succeeded in satisfying that burden

here.

{¶ 66} Moreover, the board’s 58-page order granting the certificate to South

Branch—subject to 50 conditions—included findings of fact and conclusions of

law. Power Siting Bd. No. 21-669-EL-BGN at ¶ 109-137 (Feb. 16, 2023). The

board’s order specifically adopted the staff’s findings as modified by the

stipulation. Id. at ¶ 107. It also included lengthy sections summarizing the

evidence, id. at ¶ 36-93, and a section analyzing the reasonableness of the joint

stipulation under the three-part test that this court has previously endorsed, id. at ¶

102-108. We find that the board in its order set forth sufficient reasons for its

decision.

IV. CONCLUSION

{¶ 67} For the foregoing reasons, we affirm the board’s order granting the

certificate to South Branch.

Order affirmed.

__________________

KENNEDY, C.J., concurring.

{¶ 68} I concur in the majority opinion. I write separately to discuss in more

detail what exactly an applicant must provide to appellee, the Ohio Power Siting

Board, to meet its burden in order for the board to issue a certificate of

environmental compatibility and public need to construct a solar-powered electric-

generation facility.

{¶ 69} Former Adm.Code 4906-4-06(E)(4) required intervening appellee,

South Branch Solar, L.L.C., to “provide an estimate of the economic impact of [its]

proposed facility on local commercial and industrial activities,” 2015-2016 Ohio

Monthly Record 2-1885 (effective Dec. 11, 2015). I agree with the majority that

this provision does not “explicitly require[] . . . an analysis of any one specific

negative impact” (emphasis in original), majority opinion, ¶ 54. The provision

25

SUPREME COURT OF OHIO

gives the board some flexibility in choosing what data an applicant must provide.

Still, the provision’s language is clear, and it would be nonsensical to conclude that

an estimate could be provided without an assessment of both the positive and

negative economic impacts of the proposed facility.

{¶ 70} An “estimate” is “the act of appraising or valuing.” Webster’s Third

New International Dictionary (2002). An accurate appraisal cannot ignore

downsides, including by refusing to determine whether downsides exist. While it

is likely impossible to turn over every proverbial stone while on the hunt for

negative economic data, the board must, at minimum, require an applicant to check

for such economic data in the most likely places. “[T]he board cannot properly

evaluate what is in the public’s interest without evidence of positive and negative

economic impacts.” (Emphasis added.) In re Application of Harvey Solar I, L.L.C.,

2025-Ohio-1503, ¶ 81 (Kennedy, C.J., concurring in judgment only).

{¶ 71} Of course, what exactly the board must require of an individual

applicant will be as variable as the communities in which applicants propose to

build their facilities. An assessment of the economic impact of a proposed facility

on a farming community would likely require different considerations than a similar

assessment on a beach resort, a college town, an urban-metropolitan area, a fast-

growing suburb, an old mining settlement, or an industrial boomtown. But it would

be intellectually dishonest to say that former Adm.Code 4906-4-06(E)(4) required

anything less than an honest estimate of the expected economic impact of the

proposed facility on the local economy, which necessarily includes potential harms.

{¶ 72} Because South Branch presented evidence showing a range of

economic impacts of its proposed solar-powered electric-generation facility,

including list-to-sale price adjustments of 2.2 percent below list price to 12.6

percent above list price on home sales in the vicinity of another solar facility in

Ohio, I concur in the majority opinion.

__________________

26

January Term, 2025

Travis Bohn, pro se.

Dave Yost, Attorney General, and John H. Jones, Thomas Lindgren,

Rhiannon Howard, and Janet Gregory, Assistant Attorneys General, for appellee.

Bricker Graydon, L.L.P., Sommer L. Sheely, and Dylan F. Borchers, for

intervening appellee.

__________________

27

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.