Opinion

Noem

Court
District Court, D. Oregon
Filed
Dec 23, 2025
Cited by
0 cases
Authority
More cited than 37.8%

“The Tucker Act grants exclusive jurisdiction to the Court of Federal Claims over breach-of- contract actions for money damages.”

How later courts described this case

  • “The Tucker Act grants exclusive jurisdiction to the Court of Federal Claims over breach-of- contract actions for money damages.”
  • holding that a federal court must generally determine if it has jurisdiction before ruling on the merits of a case
  • noting that, by the plain text of the statute, there must be a contract between the plaintiff and the government “to maintain a cause of action pursuant to the Tucker Act that is based on a contract”
  • “once the court reached the conclusion that the rule was indeed illegal (i.e., not merely that the plaintiffs had a reasonable probability of success on the merits, as would be necessary for a preliminary injunction

Written by the judges who cited it.

The opinion

IN THE UNITED STATES DISTRICT COURT

FOR THE DISTRICT OF OREGON

EUGENE DIVISION

STATE OF MICHIGAN, STATE OF Case No. 6:25-cv-02053-AP

OREGON, STATE OF ARIZONA, STATE

OF COLORADO, STATE OF HAWAII, OPINION & ORDER

STATE OF MAINE, STATE OF MARYLAND,

STATE OF NEVADA, STATE OF NEW

MEXICO, STATE OF WISCONSIN, and OFFICE

OF THE GOVERNOR, ex rel. ANDY BESHAR,

Plaintiffs,

v.

KRISTI NOEM, UNITED STATES DEPARTMENT

OF HOMELAND SECURITY, DAVID

RICHARDSON, and FEDERAL EMERGENCY

MANAGEMENT AGENCY,

Defendants.

______________________________________

POTTER, United States Magistrate Judge:

For the past twenty years, the Federal Emergency Management Agency (FEMA), now an

agency of the Department of Homeland Security,1 has worked to improve our nation’s ability to

respond to threats and disasters. In that role, it administers grants for States that allow them to

plan for emergencies ranging from natural disasters to acts of terrorism. This year, as in past

years, FEMA published Notices of Funding Opportunity (NOFOs) for two grants; the NOFOs

1 Defendants in this action are FEMA, the Department of Homeland Security, Kristi Noem, the

Secretary of Homeland Security, and David Richardson, the former Acting Head of FEMA.

Because Mr. Richardson resigned, he is automatically replaced by the current head of FEMA,

Karen Evans. Fed. R. Civ. P. 25(d).

contained the proposed terms for the grants which were consistent with FEMA’s past practice

over decades. States applied for the grants but were surprised to learn when they received their

grant awards that the period of performance for the grants went from three years to one year and

that the states would have a new responsibility of certifying their populations instead of using

census data. Plaintiff States—Michigan, Oregon, Arizona, Colorado, Hawai‘i, Maine, Maryland,

Nevada, New Mexico, Wisconsin, and Kentucky—view those terms as unlawful and have yet to

accept their grants despite significant need for the funds for emergency services. Plaintiffs now

bring claims under the Administrative Procedures Act (APA), seeking to have the terms vacated.

Compl., ECF No. 1.

The parties have moved for summary judgment. Pls.’ Mot., ECF No. 30; Defs.’ Cross-

Mot., ECF No 49. All parties have consented to jurisdiction by a U.S. Magistrate Judge. ECF

No. 52. Because Defendants’ actions in changing the terms of the grants were arbitrary and

capricious, Plaintiffs’ Motion for Summary Judgment is GRANTED and Defendants’ Cross-

Motion for Summary Judgment is DENIED.

BACKGROUND

I. FEMA GRANT PROGRAMS

The Federal Emergency Management Agency (FEMA) was created in 1979, by President

Carter’s Executive Order. History of FEMA, https://www.fema.gov/about/history (last visited

December 23, 2025). Following the September 11, 2001, terrorist attacks and the passing of the

USA PATRIOT Act, FEMA was incorporated into the Department of Homeland Security. Id.

FEMA’s mission is to help people before, during, and after disasters. How FEMA Works,

https://www.fema.gov/about/how-fema-works (last visited December 23, 2025). As part of that

mission, FEMA administers a number of grants established by Congress. Id. The grant programs

at issue here are the Emergency Management Performance Grant (EMPG) and the Homeland

Security Grant Program (HSGP).

A. EMPG Grant

“The Emergency Management Performance Grant (EMPG) provides state, local, tribal

and territorial emergency management agencies with the resources required for implementation

of the National Preparedness System and works toward the National Preparedness Goal of a

secure and resilient nation.” Preparedness Grants, https://www.fema.gov/grants/preparedness

(last visited December 23, 2025). “States and territories use EMPG funds to prepare for and

respond to emergencies, which can include funding operations personnel who coordinate disaster

response efforts, supporting emergency management training programs, conducting disaster

response exercises, purchasing equipment and technology resources to support emergency

management teams, and performing community outreach to educate residents on disaster

preparedness and response.” Compl. ¶ 32.

EMPG funds were initially appropriated in 2003; the program was codified at 6 U.S.C. §

762 in 2006. The allocation of EMPG funds is formulaic and according to statute. As a baseline

amount, each state receives .75 percent of the appropriated funds.2 6 U.S.C. § 762(d)(1). The

remaining funds are then divided amongst the states according to their population. As a general

rule, each state must match the grant funds with their own state or local funds. 6 U.S.C. § 762(c).

The states develop programs or projects and then apply to FEMA to draw down their

grant funds. AR Ex. 6, ECF No. 27. FEMA must approve each program or project before the

states may access the money. Approvals can take months. Some states focus on state-wide

2 And American Samoa, the Commonwealth of the Northern Mariana Islands, Guam, and the

Virgin Islands each receive .25 percent of the total appropriated funds.

programs while other states send money to local areas that are particularly vulnerable and

without resources. See Compl. ¶¶ 33-47. Many of the programs or projects are designed to

extend over multiple years and depend on continued access to grant funds. Compl. ¶ 49. For

more than a decade, these funds have also been backdated, meaning that many states had

incurred significant expenses for ongoing programs even before the grant issued. Compl. ¶ 50.

For example, in Kentucky, EMPG funding is crucial to “the state’s ability to prepare for,

respond to, and recover from disasters.” Gibson Decl. ¶ 17, ECF No. 37. Since 2020, Kentucky

has experienced 15 major disasters, including severe storms, tornados, flooding, and the COVID-

19 pandemic. Id. “Many of Kentucky’s 120 counties would not have an effective emergency

management program without the assistance of the EMPG funding due to the abject poverty

particularly across the Appalachian region.” Id.

In Arizona, EMPG grants fund approximately 50% of the state’s emergency management

functions and services. Lavine Decl. ¶ 13, ECF No. 33. Funds are used “at the state and local

level to develop and maintain all-hazards emergency plans, support emergency management

training programs, conduct disaster response exercises, fund emergency management personnel

conducting these activities, provide equipment and technology resources, and perform

community outreach to educate residents on disaster preparedness and response.” Id.

In Hawai‘i, EMPG grants fund the Hawai‘i Emergency Management Agency’s

communications, facilities, and utilities. Mark Decl. ¶ 13, ECF No. 35. “EMPG funds support

community outreach programs that prepare Hawai‘i residents to be ready for a disaster.” EMPG

grants also fund Hawai‘i’s Public Information and Warning System. Id. EMPG funding is also

used “to conduct preparedness trainings and exercises with the counties and other state agencies

to prepare for disasters and coordinate disaster response.” Id.

In North Carolina, EMPG funds were used to “enhance and sustain” the state’s

“preparedness and response operations during Tropical Strom Helene.” Ray Decl. ¶ 19, ECF No.

44. The funds “supported the activation and deployment of trained emergency management

personnel across state and local jurisdictions, enabling coordination of response efforts, shelter

operations, and logistics management.” Id. Equipment that had been purchased with EMPG

funds “ensured operational continuity during widespread power outages and communications

failures.” Id.

In Maryland, “severe flash flooding caused more than $33 million in damages to small

rural towns” in May 2025. Strickland Decl. ¶ 18, ECF No. 40. “EMPG-funded staff and assets

proved critical in both the response and recovery stages of this disaster.” Id. “[L]ives were saved

thanks to the search-and-rescue resources that quickly surged to the area.” Id.

B. HSGP Grants

The Homeland Security Grant Program provides “risk-based grants to assist state, local,

tribal and territorial efforts in preventing, protecting against, mitigating, responding to and

recovering from acts of terrorism and other threats.” Preparedness Grants,

https://www.fema.gov/grants/preparedness (last visited December 23, 2025). HSGP is divided

into three different grants: the State Homeland Security Program (SHSP), the Urban Area

Security Initiative (UASI), and Operation Stonegarden. Id. Each state receives at least one HSGP

award, but not all states receive each subgrant. Compl. ¶ 57.

Like the EMPG grant, states design projects or programs and then apply to draw from

their grant funds. AR Ex. 8. FEMA must approve all projects and programs. The primary

difference is that these grants tend to fund law enforcement services while EMPG grants focus

more on other emergency services.

1. The SHSP Grant

The SHSP provides “federal funding to States to build the necessary capacity to prevent,

prepare for, protect against, and respond to acts of terrorism.” Compl. ¶ 58. It was created by the

USA PATRIOT Act in 2001 and is codified at 6 U.S.C. §§ 603, 605-609. These grants are also

formulaic, based on a state’s “relative threat, vulnerability, and consequences from acts of

terrorism” 6 U.S.C. § 608(1). States “use SHSP funds for an array of counterterrorism and

emergency preparedness purposes, including developing emergency response plans, conducting

risk assessments, funding specialized training for first responders, and purchasing equipment for

specialized teams, such as bomb squads and tactical units.” Compl. ¶ 62.

For example, in Wisconsin, SHSP funds are used for equipment and training for SWAT

teams, bomb squads, dive teams, and urban search and rescue teams. Engle Decl. ¶ 27, ECF No.

46. The funds are also used in “Wisconsin’s two intelligence fusion centers, which are part of a

national network established to detect, prevent, investigate, and respond to criminal and terrorist

activity.” Id. This allows “for threat information sharing among federal, state, local and tribal law

enforcement, emergency management, fire service, public health, corrections, military, and

private sector partners” throughout the state. Id.

In Michigan, SHSP funds also “support intelligence and information sharing.” Sweeney

Decl. ¶ 32, ECF No. 31. The Michigan Intelligence Operations Center (MIOC) relies on SHSP

funding for two critical positions as well as for training for all intelligence analysts. Id. MIOC

“was heavily involved in monitoring events taking place at the state capital due to an increase in

civil unrest and protests during the COVID-19 pandemic.” Id. MIOC was also responsible for

“the planning, collecting, analyzing, sharing, and reviewing of intelligence information” during

campaign visits during the 2024 presidential election. Id.

In Colorado, SHSP funds are “the sole source of funding for the ‘All-Hazards Regions’

program.” Haney Decl. ¶ 29, ECF No. 34. This program focuses on preventing terrorism and

funds are used for “planning, organizing, equipping, training, and exercising.” Id.

In Hawai‘i, SHSP funds have been used to “establish a Hawai‘i Digital Forensic

Laboratory to provide centralized resources, training, and standardized practices across the state

and ensure that law enforcement agencies have access to cutting-edge technology and highly

skilled personnel trained in handling digital evidence.” Pace Decl. ¶ 13, ECF No. 36.

2. UASI Grants

The UASI grants are used “to enhance the security and resilience of [states’] high-risk

urban areas by building, sustaining, and improving their capabilities to prevent, prepare for, and

respond to acts of terrorism.” Compl. ¶ 73. UASI funds were first appropriated in 2003, and the

program is codified at 6 U.S.C. §§ 603-604, 606-609. Like SHSP, these grants are formulaic and

based on the high-risk urban area’s “relative threat, vulnerability, and consequences from acts of

terrorism” 6 U.S.C. § 608(1). States “use UASI funds to strengthen security measures, secure

critical and cyber infrastructure, equip responders, and support initiatives that help communities

respond effectively to threats and emergencies.” Compl. ¶ 77.

For example, in Oregon, UASI funds are used to “prevent, protect against, respond to,

and recover from threats of terrorism” in the Portland Metro area. McMahon Decl. ¶ 30, ECF

No. 45. The funds have been used to purchase “regional rescue vehicles, explosive containment

vehicles, and other tactical gear for specialized law enforcement teams.” McMahon Decl. ¶ 31.

Funds are also used for specialized training for the Metropolitan Explosive Disposal Unit,

hazmat teams, search and rescue personnel, and emergency responders. McMahon Decl. ¶ 32.

Funds have also been used to provide active assailant training for law enforcement, government

agencies, schools, and the private sector. Id.

In Nevada, UASI funds are similarly used in the Las Vegas area to “prevent, protect

against, respond to, and recover from threats of terrorism.” Compston Decl. ¶ 25, ECF No. 41.

The funds are used to “strengthen security measures, secure critical infrastructure and cyber

infrastructure, equip responders, and support initiatives that help communities respond

effectively to threats and emergencies.” Id. UASI funds have been used to purchase license plate

readers, UAS technology, ballistic vests, helmets, and other tactical gear from specialized law

enforcement teams.” Compston Decl. ¶ 26.

In Colorado, UASI grants have provided critical funding to a number of entities in the

Denver area, including local governments and municipalities, emergency services, law

enforcement, schools, UASI Regional Search and Rescue, and hospitals. Haney Decl. ¶ 32. The

new Colorado Springs UASI will provide that same critical funding. Haney Decl. ¶ 33.

In Maryland, UASI funds supported the state, local, and national response to the January

29, 2025, “catastrophic collision over the Potomac River between American Airlines Flight 5342

and Priority Air Transport 25.” Strickland Decl. ¶ 34. The Maryland Department of Emergency

Management was able to initiate information sharing and facilitate a coordinated response

because of the relationships nurtured through UASI funding. Strickland Decl. ¶ 35.

3. Operation Stonegarden

Operation Stonegarden “supports enhanced cooperation and coordination between

Customs and Border Protection and federal, state, local, tribal, and territorial law enforcement

agencies to strengthen border security.” Compl. ¶ 84. These grants are for states that share a

border with Mexico, Canada, or international waters; of the Plaintiff States, this includes

Arizona, Maine, Michigan, and New Mexico. Compl. ¶¶ 85-86. Funds are “allocated based on

the risk to border security and the anticipated effectiveness of the proposed projects.” Compl. ¶

85.

For example, in New Mexico, Operation Stonegarden funds have been used to support

“law enforcement overtime, fuel costs, communications equipment, and vehicle maintenance

necessary for conducting border security operations, particularly along New Mexico’s southern

border with Mexico.” Rye Decl. ¶ 33, ECF No. 43.

In Maine, Operation Stonegarden funds have been used “to support activities such as

operational overtime for law enforcement and the purchase of license plate readers, marine

vessels, police cruisers, snowmobiles, and all-terrain vehicles to assist with patrols in a variety of

environments.” Rogers Decl. ¶ 32, ECF No. 39.

II. PLAINTIFFS’ ALLEGATIONS AND CLAIMS

The facts related to the notice and awards of the grants are undisputed.

A. The EMPG Grant Notice and Awards

On July 28, 2025, FEMA released a Notice of Funding Opportunity (NOFO) for the

EMPG. AR Ex. 2. Award notices were sent to each state, including Plaintiff States, on

September 27, 2025. AR Ex. 6. Amended award notices were sent to the states on September 30,

2025. AR Ex. 7. Awards for the Plaintiff states range from $3,180,010 for Maine and $8,558,068

for North Carolina. Id.

The 2025 EMPG NOFO advertised a period running from October 1, 2024, through

September 30, 2027. AR Ex. 4. This was consistent with past practice; FEMA had typically used

a backdated three-year period for EMPG awards. AR Ex. 4 (“this Program is typically awarded

with a retroactive Period of Performance dating back to the beginning of the respective fiscal

year”). Under the award notices, however, funding was limited to a one-year period of

performance, from October 1, 2025, to September 30, 2025; notably it was also not backdated.

Plaintiffs refer to this as the Performance Period Change (PPC).

There was an additional change in the EMPG grants. The amended award notices did not

change the award amounts, but they did contain a funding hold provision, that Plaintiffs refer to

as the Population Certification Hold (PCH):

Funding Hold: Verification of State’s Population

FEMA has placed a funding hold on this award, and the full amount of the award

is on hold in the FEMA financial systems. The recipient is prohibited from

obligating, expending, or drawing down the funds associated with the award. To

release the funding hold, the [State Administering Agency] must provide a

certification of the recipient state’s population as of September 30, 2025. In so

doing, the State will explain the methodology it used to determine its population

and certify that its reported population does not include individuals that have been

removed from the State pursuant to the immigration laws of the United States.

FEMA will rescind the funding hold upon its review and approval of the State’s

methodology and population certification.

AR Ex. 7. This funding hold was not in the original award notice, nor was it in the July

NOFO. No prior EMPG grant has ever instituted a similar funding hold based on states

“confirming” their populations.3

B. The HSPG Grant Notices and Award

On August 1, 2025, FEMA released a NOFO for the HSGP. AR Ex. 3. FEMA then

issued HSGP award notices on September 26, 2025. AR Ex. 8. Total award amounts for Plaintiff

states (including SHSP, UASI, and OPSG, as applicable) range from $5,722,750 for Maine to

$41,521,460 for Arizona.4 Id.

3 Further, Defendants cannot identify a single time when states have been asked to supplement

census data, for any reason whatsoever.

4 Plaintiffs do not challenge the amount awarded under either grant program. See Compl. n. 9

(“The amount of these awards differed from the amounts listed in the HSGP NOFO, with all of

Like the EMPG grant, the 2025 HSGP NOFO offered funding running from September 1,

2025, through August 31, 2028. AR Ex. 3 at 4. Again, that was a standard three-year period. Id.

But under the award, funding was limited to the one-year period from October 1, 2025, to

September 30, 2025 (the Performance Period Change (PPC)).

Faced with the change in terms, Plaintiffs declined to accept their awards by the original

deadline and filed this suit. Defendants have extended the deadline for Plaintiff States to accept

the awards to December 31, 2025. Stip. Prop. Sched. Order, ECF No. 18.

Plaintiffs bring claims under the Administrative Procedure Act, 5 U.S.C. § 706(2).

Plaintiffs allege that the Population Certification Hold and the Performance Period Change are

arbitrary and capricious. They also allege that the Population Certification Hold is in excess of

statutory authority, contrary to law, and without observance of required procedure.

DISCUSSION

I. JURISDICTION

As an initial matter, this Court must determine if it has jurisdiction to hear Plaintiffs’

challenge to the new grant terms. Sinochem Int'l Co. v. Malaysia Int'l Shipping Corp., 549 U.S.

422, 430-31 (2007) (holding that a federal court must generally determine if it has jurisdiction

before ruling on the merits of a case). Here, the Court finds it has jurisdiction.

the Plaintiff States receiving more funding than indicated in the NOFO. Other States received

significantly less funding than indicated in the NOFO. In late September, Illinois and several

other states filed suit in the District of Rhode Island contesting the reallocation of the 2025

HSGP awards. See Illinois, et al. v. Noem, et al., No. 1:25-cv-00495 (D.R.I.). The court

preliminarily reverted all HSGP awards to the amounts listed in the HSGP NOFO. (Id. at Docs.

14, 31.) Plaintiff States do not contest the allocation of the HSGP awards through this

litigation.”).

A. The Tucker Act Does Not Deprive this Court of Jurisdiction

Defendants contend that Plaintiffs are simply bringing a contract claim and, as such,

jurisdiction lies exclusively with the Court of Federal Claims. Defs.’ Cross-Mot. 8-11.

Defendants are correct that, pursuant to the Tucker Act, “the Court of Federal Claims

[has] jurisdiction over suits based on ‘any express or implied contract with the United States.’”

Dep’t of Educ. v. California, 604 U.S. 650, 651 (2025) (quoting 28 U.S.C. § 1491(a)(1)); see

also United Aeronautical Corp. v. United States Air Force, 80 F.4th 1017, 1027 (9th Cir. 2023)

(“The Tucker Act grants exclusive jurisdiction to the Court of Federal Claims over breach-of-

contract actions for money damages.”). The APA, on the other hand, provides a limited waiver

of sovereign immunity which allows district courts to hear challenges to “[a]gency action[s]

made reviewable by statute and final agency action[s] for which there is no other adequate

remedy in a court are subject to judicial review.” 5 U.S.C. § 704. The APA does not waive

immunity for claims seeking “money damages.” Dep’t of Educ., 604 U.S. at 651.

Plaintiffs have clearly brought claims under the APA in their Complaint. But that is not

dispositive. Courts “must look beyond the form of the pleadings to the substance of the claim” to

determine if the suit is to be heard in district court or the Court of Federal Claims. Suburban

Mortg. Assocs., Inc. v. U.S. Dep’t of Hous. & Urb. Dev., 480 F.3d 1116, 1124 (Fed. Cir. 2007).

The Ninth Circuit has cautioned that plaintiffs cannot “ dress[] up a claim for money as one for

equitable relief” to avoid the Tucker Act. Id. The question is whether a money judgment—

which is the only remedy the Court of Federal Claims can provide under the Tucker Act—

provides an adequate remedy.5 Id. at 1125.

5 The Court of Federal Claims cannot grant equitable relief. Bowen v. Massachusetts, 487 U.S.

879, 893 (1988).

Here, a money judgment is not the remedy sought much less an adequate one. Indeed,

Plaintiffs did not need to bring this suit to access the grant money. As Defendants made clear at

oral argument, the grant money is available, and the United States wants the states to have access

to the funds. The sole question is whether Plaintiffs must accept terms they believe are unlawful

to access that money.

Despite this, Defendants focus on the fact that the result of a decision in Plaintiffs’ favor

would mean Plaintiffs would be able to access the grant funds on their terms. That does not turn

this case into a case that is subject to the Tucker Act. Bowen v. Massachusetts, 487 U.S. 879, 893

(1988). What the Tucker Act “‘impliedly forbid[s]’” is an APA case that seeks equitable relief

when the action is really a breach of contract case. That is not this case.

To determine whether the action is—at its core—a breach of contract case, courts look at

“the source of the rights upon which the plaintiff bases its claims, and upon the type of relief

sought (or appropriate). Megapulse, Inc. v. Lewis, 672 F.2d 959, 968 (D.C. Cir. 1982); United

Aeronautical Corp., 80 F.4th at 1026.

Here, Plaintiffs’ rights are statutory. Plaintiffs bring this action to assert their rights under

the APA. Cf. Thakur v. Trump, 148 F.4th 1096, 1103 (9th Cir. 2025) (“Plaintiffs contend that the

form termination notices, which did not state any reason specific to the recipient for termination

of their grants, violated their right to be free from arbitrary and capricious agency action. The

source of that right is statutory, and it ‘existed prior to and apart from rights created under the

contract.’”) (internal citations omitted). Indeed, at this juncture there is not even a contract at

issue; Plaintiff States have not yet accepted the terms of the award, so no contract exists.6 Cf.

6 Plaintiff North Carolina “inadvertently accepted the 2025 EMPG award containing the PCH.”

Pls.’ Opp. 3. However, like the other Plaintiff States, North Carolina seeks to enforce their rights

under the APA, not under any contract with Defendants.

Cmty. Legal Servs. In E. Palo Alto v. United States Dep’t of Health & Hum. Servs., 137 F.4th

932, 938 (9th Cir. 2025) (noting that, by the plain text of the statute, there must be a contract

between the plaintiff and the government “to maintain a cause of action pursuant to the Tucker

Act that is based on a contract”).

But even if the unaccepted grants could be considered contracts, the relief Plaintiffs seek

is primarily declaratory and injunctive in nature. Cf. Thakur, 148 F.4th at 1104 (“Plaintiffs

sought—and the district court awarded—vacatur of the termination notices and reinstatement of

the terminated grants. These well-established APA remedies are not contractual in nature.”).

While Plaintiffs ask that the Court “bar[] Defendants from rejecting Plaintiff States’ drawdown

requests for funds [during the three-year period],” the money that flows from such a ruling “is a

mere by-product of that court's primary function of reviewing the [agency’s] interpretation of

federal law.” Bowen, 487 U.S. at 910.

This Court follows the lead of many other courts across the country faced with the

question of whether the Tucker Act applies to challenges to grant terms and concludes it has

jurisdiction over Plaintiffs’ APA claims. Cnty. of Santa Clara v. Noem, No. 25-CV-08330-WHO,

2025 WL 3251660, at *28 (N.D. Cal. Nov. 21, 2025) (“District courts ‘have found with near or

total uniformity that [they] have jurisdiction over claims such as these.’” (collecting cases)).

B. The PCH AND PPC are Subject the Judicial Review Under the APA

Defendants also argue that that the Population Certification Hold and the Performance

Period Change are not subject to judicial review under the APA because they are committed to

agency discretion by law. Again, this Court disagrees.

The APA’s limited waiver of sovereign immunity does not apply when “agency action is

committed to agency discretion by law.” 5 U.S.C. § 701(a)(2). However, this exception is read

“quite narrowly, restricting it to ‘those rare circumstances where the relevant statute is drawn so

that a court would have no meaningful standard against which to judge the agency's exercise of

discretion.’” Weyerhaeuser Co. v. U.S. Fish & Wildlife Serv., 586 U.S. 9, 23 (2018) (quoting

Lincoln v. Vigil, 508 U.S. 182, 191 (1993)). This narrow reading is necessary to give effect to the

APA’s requirement that courts “hold unlawful and set aside agency action, findings, and

conclusions found to be [] arbitrary, capricious, an abuse of discretion, or otherwise not in

accordance with law.” 5 U.S.C. § 706. “A court could never determine that an agency abused its

discretion if all matters committed to agency discretion were unreviewable.” Weyerhauser Co.,

586 U.S. at 23.

Here, the Court has a meaningful standard against which to judge the agency’s exercise

of discretion. The statues that establish the EMPG and the HSGP obligate Defendants to issue

the grants to assist states in emergency management, disaster relief, and terrorism prevention.

And the statutes provide guidelines for how the funds are to be allocated. It is against that

backdrop that this Court must examine the new grant terms and how they were implemented.

Again, like other courts around the country, this Court finds that “the grants at issue here are

governed by statutory and regulatory frameworks that provide judicially manageable standards

for review.” Illinois v. Fed. Emergency Mgmt. Agency, No. 25-CV-206-WES, 2025 WL

2716277, at *10 (D.R.I. Sept. 24, 2025); see also Cnty. of Santa Clara, 2025 WL 3251660, at

*40-41 (collecting cases).

C. Plaintiffs’ Challenges to the PCH are Ripe for Review

Finally, Defendants argue that Plaintiffs’ claims regarding the Population Certification

Hold are not ripe and request that this Court decline to review the PCH at this juncture. Defs.

Cross-Mot. 13-15.

To avoid review at this stage, Defendants invoke the doctrine of prudential ripeness, a

discretionary doctrine that allows courts to defer ruling until additional facts develop. Thomas v.

Anchorage Equal Rts. Comm'n, 220 F.3d 1134, 1142 (9th Cir. 2000). “Prudential ripeness turns

on two considerations: (1) ‘the fitness of the issues for judicial decision,’ and (2) ‘the hardship to

the parties of withholding court consideration.’” Flaxman v. Ferguson, 151 F.4th 1178, 1188

(9th Cir. 2025) (quoting Ass'n of Irritated Residents v. U.S. Env't Prot. Agency, 10 F.4th 937, 944

(9th Cir. 2021)).

To determine fitness for judicial decision, courts consider “whether the administrative

action is a definitive statement of an agency's position; whether the action has a direct and

immediate effect on the complaining parties; whether the action has the status of law; and

whether the action requires immediate compliance with its terms.” Skyline Wesleyan Church v.

California Dep’t of Managed Health Care, 968 F.3d 738, 752 (9th Cir. 2020). Based on this

test, the PCH is ripe for judicial review.

The PCH is a clear statement of FEMA’s position; to obtain the grants, the States must

agree that they will certify their populations consistent with the PCH. At this point, though, the

States have no idea how they will be asked to do that because FEMA has failed to issue any

guidance. But even if FEMA had issued guidance, Plaintiff States contend compliance will be

impossible because they do not maintain the requested population date. Compl. ¶ 110. Indeed,

according to Plaintiffs, it is Defendant DHS that has access to this data.

Defendants use their own lack of guidance to contend that any claim that compliance is

impossible is premature. Under Defendants’ reasoning, Plaintiffs should simply accept the grants

with the PCH terms and raise a challenge only if compliance is, in fact impossible. Defs.’ Cross-

Mot. 14-15. But that ignores the fact that regardless of how the PCH is calculated, Plaintiffs

allege that the term is unlawful. Nothing requires Plaintiffs to accept a grant award with unlawful

terms. California v. United States Dep’t of Transportation, No. 25-CV-208-JJM-PAS, 2025 WL

3072541, at *7 (D.R.I. Nov. 4, 2025) (“where threatened action by government is concerned, we

do not require a plaintiff to expose himself to liability before bringing suit to challenge the basis

for the threat”) (quoting MedImmune, Inc. v. Genentech, Inc., 549 U.S. 118, 128–29 (2007)).

At this juncture, with the deadline for accepting grants looming, if the Court declines to

rule on the PCH condition, Plaintiffs will face a Hobson’s choice: accept the grant subject to a

term they feel is unlawful or decline to accept. Asking this Court to force this scenario on

Plaintiffs because Defendants have not yet developed any guidance on the PCH would result in

clear harm to Plaintiffs. And Defendants have not made any showing that the purported guidance

will moot Plaintiffs’ core claim—that the PCH is arbitrary and capricious and contrary to law.

This case is ripe for decision.

II. THE PCH AND PPC VIOLATE THE APA

The Administrative Procedure Act both sets forth the procedure agencies must follow

when they take certain action as well as provides for limited judicial review of those decisions.

see 5 U.S.C. §§ 701-706. Courts reviewing agency actions must “hold unlawful and set aside”

actions that are “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with

law” or are unconstitutional, violate a statute, or fail to follow the required procedures. 5 U.S.C.

§ 706(2)(A)-(D). While the APA requires courts to be deferential to agency policymaking and

factfinding, no such deference is owed to agency legal conclusions. Loper Bright Enters. v.

Raimondo, 603 U.S. 369, 392 (2024).

Plaintiffs contend that Defendants’ decision to implement the PCH and the PPC was

arbitrary and capricious. Specifically, they contend that the PCH and PPC amount to a change in

policy that ignored the Plaintiff States reliance interests and was not well-reasoned. Plaintiffs

further contend that the PCH exceeds the agency’s statutory authorization and is contrary to law.

A. The PCH and PPC are Arbitrary and Capricious

An agency’s action is “arbitrary and capricious” when “it is not ‘reasonable and

reasonably explained.’” Ohio v. Env't Prot. Agency, 603 U.S. 279, 292 (2024) (quoting FCC v.

Prometheus Radio Project, 592 U.S. 414, 423 (2021)). A court reviewing an agency’s action

does not “substitute its judgment for that of the agency.” Id. Instead, a court “must ensure,

among other things, that the agency has offered ‘a satisfactory explanation for its action[,]

including a rational connection between the facts found and the choice made.’” Id.

1. The PCH and PPC are Changes in Policy that Did Not Account for Plaintiffs’

Reasonable Reliance Interests.

At the outset, Defendants argue that the PCH and PPC are not changes in policy and, as a

result, they are not required “to articulate their reasoning or consider states’ reliance interests.”

Defs.’ Cross Mot. 19 (“it simply cannot be the case that an agency must explain its thinking in

formal policy memoranda every time the agency exercises its discretion to include, in a final

grant agreement, a lawful term or condition that was not present in past grant agreements”); see

also id. at 24-25. Defendants seek to prove these are not policies by pointing to Plaintiffs’ failure

to point to a policy that says FEMA will “never condition the release of awarded EMPG fund on

the production of relevant information by grantees” or a policy “committ[ing] the agency to a

three-year performance period” for the grants. Id. at 19, 24. But Defendants offer no authority for

their position that such a policy is required. And even if it were, the changes in these grant

conditions are clearly final agency actions subject to review under the APA. 5 U.S.C. § 704.

It is certainly true when the agency action is a change in policy “the level of justification

is more exacting than if the agency had not acted in the first place.” San Francisco Unified Sch.

Dist. v. AmeriCorps, 789 F. Supp. 3d 716, 752 (N.D. Cal. 2025) (citing Motor Vehicle Mfrs.

Ass’n of U.S., Inc. v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29, 41-42, (1983)).

A new policy that contradicts prior policy is not on its own arbitrary and capricious, but a

“[s]udden and unexplained change, or change that does not take account of legitimate reliance on

prior interpretation, may be ‘arbitrary, capricious [or] an abuse of discretion.’” Smiley v. Citibank

(S. Dakota), N.A., 517 U.S. 735, 742 (1996) (internal citations omitted). When making a policy

change like this, FEMA was required to “‘assess whether there were reliance interests’ in the

prior rule, determine whether those interests ‘were significant,’ and weigh them ‘against

competing policy concerns.’” Solar Energy Indus. Ass’n v. FERC, 80 F.4th 956, 980 (9th Cir.

2023) (quoting Dep’t of Homeland Sec. v. Regents of the Univ. of California, 591 U.S. 1, 33

(2020)).

Faced with this, Defendants contend that even if they were required to consider Plaintiffs’

reliance, Plaintiffs’ reliance interests were not reasonable. That position is not reasonable. For 22

years, Defendants have been providing these grants with a two- or three-year performance

period; EMPG grants have been backdated for more than a decade. And the NOFOs for this

year’s grants advertised the three-year term also with the EMPG backdated. The PCH, by

contrast, has never before been a requirement for grants nor have it been in the NOFO.

Defendants are correct that they are not bound by past practice or the terms in the NOFOs. But

that is not the question. The question is whether it was reasonable for Plaintiffs to rely on those

things when they applied for this year’s grants. It was.

This abrupt change in policy is particularly harmful to local emergency management. In

Oregon, for example, Oregon Emergency Management passes through approximately 80% of

EMPG funding to counties, cities, and tribes. McMahon Decl. ¶ 14. OEM used the funding from

the 2024 EMPG award to cover the expenses local emergency managers incurred from July 1,

2024 to June 30, 2025. McMahon Decl. ¶ 52. Without the backdating, OEM cannot reimburse

any expenses that local emergency managers incurred from July 1, 2025 to September 30, 2025.

Id.

Here, there is no evidence Defendants even acknowledged that Plaintiffs relied on the

prior policies much less considered whether those interests were significant as compared to the

policy concerns. Absent such a justification, the changes are arbitrary and capricious.

2. Defendants Also Fail to Show the Decision was Well-Reasoned.

But even if this were not a change in policy and Defendants need not consider the

reliance interests, they were still required to show their decisions were well-reasoned. To

establish this, Defendants point to a three-page declaration by David Arnold, the Senior Official

Performing the Duties of the Deputy Administrator for Resilience at the Federal Emergency

Management Agency, dated November 19, 2025. AR Ex. 1 (Arnold Decl.). Defendants provide

no contemporaneous memoranda or other indication of the reasoning at the time the decision was

made. Plaintiffs argue that this declaration is post-hoc rationalization of the policy change and as

such, cannot justify the changes here.

“It is a ‘foundational principle of administrative law’ that judicial review of agency

action is limited to ‘the grounds that the agency invoked when it took the action.’” Regents, 591

U.S. at 20. In explaining its decisions, the agency may elaborate on the reasons but cannot

provide new reasons. Id. at 21. Defendants maintain that the Arnold Declaration “is a rationale

offered by ‘proper’ agency officials in a position to speak to FEMA’s considerations at the time

of FEMA’s decisions to include the contested terms.” Defs.’ Cross-Mot. 24. Even giving

Defendants the benefit of the doubt here, the Court finds the reasoning for each change to be

lacking.

a. The PCH

According to Defendants, “FEMA chose to implement the population verification

requirement to confirm FEMA’s calculations of state populations and ensure the accuracy of the

final allocation of the EMPG funding, taking into account the number of illegal aliens who have

been removed from the country since the collection of the most recent federal census data.”

Arnold Decl. ¶ 6. This bare-bones explanation fails to “articulate a satisfactory explanation for its

action including a ‘rational connection between the facts found and the choice made.’” Motor

Vehicle Manufacturers Ass’n, 463 U.S. at 43 (quoting Burlington Truck Lines, Inc. v. United

States, 371 U.S. 156, 168 (1962)). Defendant fails to explain why confirmation of population

would be necessary or why accounting solely for those who have been removed—and not those,

for example, who have moved between states—would lead to a more accurate apportionment

than the use of data from the census bureau as required by law. Burlington Truck Lines, Inc., 371

U.S. at 167 (“There are no findings and no analysis here to justify the choice made.”).

Plaintiffs also argue that in seeking the population data, FEMA is “rel[ying] on factors

which Congress has not intended it to consider.” Motor Vehicle Manufacturers Ass'n, 463 U.S. at

43 (1983). Congress clearly intended for agencies to rely on the most recent data from the

Census Bureau in allocating these grants. See 13 U.S.C. § 183(a). By asking for additional data

to “confirm” these populations, FEMA appears to intend to rely on additional data. And if

Defendants do not intend to rely on this data, then the decision to condition grants on providing it

seems even more poorly reasoned.

b. The PPC

With respect to the Performance Period Change, Defendants provide the following

reasoning:

On September 17, 2025, DHS and FEMA decided to change the period of

performance from three years to one year for HSGP and EMPG grants. FEMA

decided to make the change for several reasons to align with the President’s

vision of shifting responsibility and authority for preparedness back to the states.

This change allows for:

 Improved Accountability and Oversight: A shorter period of performance allows

FEMA to more closely monitor grant recipients and ensure funds are being used

effectively and in alignment with program goals;

 Accelerated Project Completion: A one-year period encourages grant recipients to

expedite their projects and deliver results more quickly, which is particularly

important for emergency management initiatives that address urgent needs;

 Alignment with Annual Budget Cycles: A one-year performance period aligns

with annual federal budget cycles, simplifying financial planning and reporting

for both FEMA and grant recipients;

 Flexibility in Funding Allocation: Shorter performance periods enable FEMA to

reassess priorities and reallocate funds more frequently to address emerging

threats or changing circumstances;

 Streamlined Grant Management: Managing grants on a yearly basis can reduce

administrative complexity and allow FEMA to adapt program requirements or

priorities more dynamically.

Arnold Decl. ¶ 12.

While the Court cannot substitute its judgment for that of the agency, the change in

performance period, especially without backdating, makes it functionally impossible for Plaintiff

States to use the funding that is allocated by statute. According to Plaintiffs, “Defendants’

decision to reduce the period of performance for both the 2025 EMPG and 2025 HSGP awards

makes the grant awards largely unusable in Plaintiff States and frustrates Plaintiff States’ ability

to achieve the purposes of the EMPG and HSGP grants.” Compl. ¶ 114. “States and local law

enforcement agencies structured their budgets for the 2025 EMPG award and the 2025 HSGP

award around anticipated three-year funding streams. Without the three-year period to expend

grant funding, portions of Plaintiff States’ 2025 EMPG and HSGP awards will go unused,

reducing emergency preparedness and law enforcement efficacy.” Compl. ¶ 117. Additionally,

because the EMPG award is no longer backdated, “[s]everal Plaintiff States and local

subgrantees will be unable to seek reimbursement for expenses already incurred—despite

operating under the reasonable belief that the expenses could be reimbursed with the 2025

EMPG funds.” Compl. ¶ 118. Defendants’ counter that they want more oversight as the States

use the money. That already exists because FEMA must approve the projects. This is not

reasoned decision-making.

B. The PCH Also Exceeds Statutory Authority and Is Contrary to Law

Additionally, Plaintiff States argue that the Population Certification Hold violates the

APA because it exceeds statutory authority, is contrary to law, and is implemented without

observance of procedure required by law. Pl.’s Mot. 16-28.

Agency decisions also violate the APA when they exceed statutory authority or are

contrary to law. 5 U.S.C. § 706(2). The PCH does both.

The authorizing statute for the EMPG requires that FEMA “make grants to States to

assist State, local, and tribal governments in preparing for all hazards.” 6 U.S.C. § 762(b). The

amount of the grants is statutorily apportioned among the states and territories of the United

States. 6 U.S.C. § 762(d). There is nothing in the EMPG statute, or any other statute, that

authorizes Defendants to condition these statutory grants upon providing population information.

That is because for benefits that are appropriated by population, agencies must use the most

recent population data provided by the U.S. Census Bureau. 13 U.S.C. § 183(a).

Defendants argue that “State population verifications will simply be used to supplement

the census data that FEMA considered.” Defs.’ Cross-Mot. 16. Defendants argue that 183(a)

should be read as permissive, to give FEMA “discretion to consider additional sources of

information to assess state populations.” Id. This is nonsensical. Defendants are asking the

Plaintiff States to certify a population number that is not based on census data; subtracting the

number of people removed from the state does not supplement the census numbers, it changes it.

The statute in no way authorizes FEMA to consider additional sources of population data. And if

the agency uses the “population certification” data to calculate the apportionment of grant funds,

they are then not using the most recent census bureau data, as required by law. 7

III. THE REMEDY

Plaintiffs ask the Court to hold unlawful and vacate the Population Certification Hold and

the Performance Period Change. Compl. 32.

Defendants argue that vacatur is not appropriate under the APA. Defs.’ Cross-Mot. 27

(citing United States v. Texas, 599 U.S. 670, 695 (2023) (Gorsuch, J., concurring)). However, as

Defendants acknowledge, the Ninth Circuit continues to hold that “[w]here a court holds an

7 Plaintiffs also argue that that the PCH violates the Paperwork Reduction Act. 44 U.S.C. § 3501

et seq. “By conditioning the release of EMPG funds on Plaintiff States’ reporting and

certification of their populations on September 30, 2025, Defendants are engaging in a

‘collection of information.’” Compl. ¶ 144. Before engaging in a collection of information, an

agency must follow certain procedures. See 44 U.S.C. § 3506(c). Plaintiffs argue that Defendants

did not. Pls.’ Mot. 24-26. Defendants argue that the population verification is permitted under the

Paperwork Reduction Act. Defs.’ Cross-Mot. 17-18. Defendants obtained OMB approval of a

“Generic Information Collection Request,” which “explicitly authorizes collection of

demographic information from preparedness grant applicants in order to ‘comply with Federal

laws and regulations.’” Defs.’ Cross-Mot. 17-18. Defendants also maintain that the information

sought is not duplicative as “a calculation of the state’s population as of September 30, 2025 . . .

is not information already in the possession of the federal government.” Defs.’ Cross-Mot. 18.

Given that there seems to be some dispute on this issue and the Court has already concluded the

PCH violates the APA, the Court declines to rule on this issue.

agency action unlawful, vacatur and remand is the default remedy under the APA.” Montana

Wildlife Fed’n v. Haaland, 127 F.4th 1, 50 (9th Cir. 2025).

The Court holds that the Population Certification Hold is unlawful under 5 U.S.C. §

706(2) because it exceeds Defendants’ statutory authority, is contrary to law, and is arbitrary and

capricious. The Court also holds that the Performance Period Change for the 2025 EMPG and

HSGP grant awards is unlawful under 5 U.S.C. § 706(2) because it is arbitrary and capricious.

These terms are vacated from Plaintiff States’ 2025 EMPG and HSGP award notices.

Plaintiffs also ask that the Court grant permanent injunctive relief. Compl. 32.

The APA expressly authorizes prohibitive and mandatory injunctive relief. 5 U.S.C. §

703. Injunctive relief is appropriate when a plaintiff has demonstrated (1) “actual success on the

merits”; (2) irreparable injury; (3) “remedies available at law are inadequate”; (4) the balance of

hardships justifies equitable relief; and (5) “the public interest would not be disserved by a

permanent injunction.” Indep. Training & Apprenticeship Program v. California Dep’t of Indus.

Rels., 730 F.3d 1024, 1032 (9th Cir. 2013).

Plaintiffs have demonstrated success on the merits. Because the Court holds that the

Population Certification Hold and the Performance Period Change are unlawful, Plaintiffs have

also shown irreparable injury and that remedies at law are inadequate. Nat’l Min. Ass’n v. U.S.

Army Corps of Eng’rs, 145 F.3d 1399, 1409 (D.C. Cir. 1998) (“once the court reached the

conclusion that the rule was indeed illegal (i.e., not merely that the plaintiffs had a reasonable

probability of success on the merits, as would be necessary for a preliminary injunction), there

was no separate need to show irreparable injury, as that is merely one possible ‘basis for showing

the inadequacy of the legal remedy.’”) (quoting 11A Charles Alan Wright, Arthur R. Miller &

Mary Kay Kane, Federal Practice and Procedure § 2944, at 94 (2d ed.1995)).

The balance of equities also favors injunctive relief. Because Plaintiffs have no way of

complying with the Population Certification Hold, Plaintiff States’ EMPG funds are frozen,

forcing states to reduce state and local emergency management capacity. Because the

Performance Period Change leaves states mere months to spend EMPG and HSGP funds—only

after FEMA approves states’ programs or projects—Plaintiff States face lapses in funding,

risking emergency management and homeland security capacities. Further, the decision to not

backdate EMPG awards means that many states and localities would not be reimbursed for

emergency management expenses already incurred. None of this appears consistent with

Congressional intent or FEMA’s mission. By contrast, the government “cannot suffer harm from

an injunction that merely ends an unlawful practice.” Rodriguez v. Robbins, 715 F.3d 1127, 1145

(9th Cir. 2013).

Finally, an injunction is also in the public interest. As discussed in detail above, EMPG

and HSGP funds are critical to ensure that states can prepare for and respond to emergencies and

threats of terrorism. The public interest weighs against “jeopardizing national security.” Winter

v. Nat. Res. Def. Council, Inc., 555 U.S. 7, 33 (2008).

Defendants are enjoined from implementing the Population Certification Hold in the

2025 EMPG awards for Plaintiff States. Defendants are enjoined from rejecting Plaintiff States’

drawdown requests for funds from their 2025 EMPG awards for expenses incurred between

October 1, 2024, and September 30, 2027, by the Plaintiff State grantee or a subgrantee.

Defendants are also enjoined from rejecting Plaintiff States’ drawdown requests for funds from

their 2025 HSGP awards for expenses incurred between October 1, 2025, and September 30,

2028, by the Plaintiff State grantee or a subgrantee.

IV. REQUEST FOR A STAY

Defendants requested a stay if the Court ruled in Plaintiffs’ favor. A stay pending appeal

“is not a matter of right” but “instead ‘an exercise of judicial discretion.’” Nken v. Holder, 556

U.S. 418, 433 (2009) (quoting Virginian Ry. Co. v. United States, 272 U.S. 658, 672 (1926).

Courts consider (1) whether the stay applicant has made a strong showing that he is likely to

succeed on the merits; (2) whether the applicant will be irreparably injured absent a stay; (3)

whether issuance of the stay will substantially injure the other parties interested in the

proceeding; and (4) where the public interest lies.” Id. at 434.

For the same reasons that injunctive relief is appropriate in this case, a stay is not

appropriate. Where Defendants have repeatedly stated their intention to provide the grant funds

to Plaintiffs, a stay would only serve to delay the flow of much needed funds to states that need

to prepare for emergencies. Given that no one disputes that the Plaintiff States are entitled to the

grant funds, further delaying the ability of the Plaintiff States to draw on those funds would only

place core emergency services in this country at risk.

CONCLUSION

For these reasons, Plaintiffs’ Motion for Summary Judgment (ECF No. 30) is GRANTED

and Defendants’ Cross-Motion for Summary Judgment (ECF No. 49) is DENIED.

IT IS SO ORDERED.

DATED this 23rd Day of December, 2025.

_/_s_/A__m_y_ _E_._ P_o_t_te_r_____________

AMY E. POTTER

United States Magistrate Judge