The opinion
Filed 12/4/25 CEMEX v. State Water Resources Control Board CA2/2
NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions
not certified for publication or ordered published, except as specified by rule 8.1115(b). This opinion has
not been certified for publication or ordered published for purposes of rule 8.1115.
IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
SECOND APPELLATE DISTRICT
DIVISION TWO
CEMEX, INC., B339579, B340779
Plaintiff and Appellant, (Los Angeles County
Super. Ct. No. 23STCP03578)
v.
STATE WATER RESOURCES
CONTROL BOARD,
Defendant and Respondent.
APPEALS from a judgment of the Superior Court of Los
Angeles County, Stephen I. Goorvitch, Judge. Affirmed.
Jeffer Mangels Butler & Mitchell, Kerry Shapiro and
Matthew D. Hinks for Plaintiff and Appellant.
Rob Bonta, Attorney General, Evan Eickmeyer, Acting
Assistant Attorney General, Eric M. Katz and Benjamin
Lempert, Deputy Attorneys General, for Defendant and
Respondent.
____________________
CEMEX, Inc., formerly known as Southdown, Inc., appeals
the trial court’s judgment dismissing its petition for a writ of
mandate against the State Water Resources Control Board
(Board). We affirm.
FACTUAL BACKGROUND1
I. The Soledad Canyon Project
CEMEX produces construction and building materials. In
1990, CEMEX entered into two contracts with the United States
to develop a sand and gravel mine in the unincorporated Soledad
Canyon area of Los Angeles County (the Project). Since then, the
Project has been reviewed by various government entities and
has been the subject of litigation in California and federal courts.
In August 2015, the federal government rescinded CEMEX’s
mining material contracts. CEMEX filed suit in May 2019, and in
2022, the United States District Court for the District of
Columbia vacated that rescission.
II. CEMEX Applies for a Permit to Appropriate Water
In connection with the Project, CEMEX filed an application
(No. A029967) in June 1991, for a permit to appropriate water
from the Santa Clara River for mining and industrial uses. The
Board deemed the application complete and issued a public notice
in May 1993. That triggered the public protest period required by
the Water Code, and 10 protests were filed with the Board. (See
Wat. Code, §§ 1302–1303.) The City of Santa Clarita (City) did
not file a protest.
1 In reciting this summary, we assume the truth of the facts
alleged in CEMEX’s petition. (See Committee for Green Foothills
v. Santa Clara County Bd. of Supervisors (2010) 48 Cal.4th 32,
42.)
2
CEMEX’s permit application remained pending while
litigation regarding the broader Project proceeded. During that
time, six of the 10 protests were resolved; four remain pending.
In August 2004, the City requested the Board re-notice
CEMEX’s application. The Board decided not to do so. In June
2016, the City requested the Board cancel CEMEX’s application
or reopen the protest period in light of the federal government’s
rescission of CEMEX’s mining contracts. The Board refused to do
so.
In November 2019, the Board informed CEMEX it would
pause staff processing of the application until the litigation
regarding the Project contracts were resolved.
III. The Board’s Decision to Re-notice the Application
After the federal district court vacated the rescission of
CEMEX’s contracts in connection with the broader Project, the
Board informed CEMEX on June 1, 2023, it was resuming staff
processing of the permit application. It also told CEMEX the
Board’s executive director had “determined the application will
be re-noticed.” The letter explained the application had originally
been noticed nearly 30 years ago, and during that time, “the
circumstances of affected downstream water users or other
interested persons have changed. For example, many of the
entities that have filed protests against the application no longer
exist due to changes in property ownership and other factors. In
addition, multiple entities which did not file protests in response
to the 1993 notice have contacted the Division to request that the
application be re-noticed so that they have an opportunity to file
a protest and participate in the proceedings related to the
application. For these reasons, I have determined that the record
does not reflect up-to-date circumstances and re-noticing of the
3
application is necessary. (Cal. Code Regs., tit. 23, § 684,
subd. (b).)”
Later that month, CEMEX petitioned the Board to
reconsider the June 1, 2023, decision to re-notice its permit
application. (See Wat. Code, § 1122; Cal. Code Regs., tit. 23,
§ 768.) It argued re-noticing was unwarranted because “(1) there
have been no changes in CEMEX’s Application or project, and
(2) there are no changes, related to this Application, in the
circumstances of any affected downstream water users or other
interested persons.”
On August 30, 2023, the Board dismissed CEMEX’s
petition for reconsideration. It determined the June 1, 2023,
letter “[did] not constitute a final water right decision or order”
and thus was “not subject to reconsideration.” The Board noted
“CEMEX’s application is still being processed, and the Board has
not reached a final decision or adopted an order on application
A029967.” Thus, the Board concluded the petition for
reconsideration was premature.
PROCEDURAL HISTORY
CEMEX filed a petition for a writ of mandate in the trial
court on September 29, 2023. Its first cause of action sought a
writ to overturn the Board’s June 1, 2023, decision to re-notice its
application. Its second cause of action sought a writ to overturn
the Board’s August 30, 2023, dismissal of its petition for
reconsideration. Both causes of action were styled as arising
under Code of Civil Procedure section 1094.52 “and/or”
section 1085. CEMEX also alleged it had exhausted
2 Undesignated statutory references are to the Code of Civil
Procedure.
4
administrative remedies by filing a petition for reconsideration
with the Board, and that “[n]o further administrative remedies
exist.”
The Board demurred to the petition on several grounds,
including that review was not available under section 1085, the
re-noticing decision was not a final decision ripe for review, and
the Board had no obligation to entertain the petition for
reconsideration.
The trial court sustained the demurrer without leave to
amend. It first concluded the Water Code required CEMEX to
seek a writ under section 1094.5, not section 1085. Next, the trial
court determined CEMEX could not obtain a writ under
section 1094.5 because that was available “only for ‘final
administrative order[s] or decision[s],’ ” and the re-noticing
decision was not sufficiently final. The trial court reviewed the
requirement of exhaustion of administrative remedies, and
concluded CEMEX had not shown it was entitled to any exception
to that doctrine. Finally, the trial court concluded “there is no
meaningful distinction between this interim procedural decision
and others made by [the] Board,” and CEMEX had to wait “until
there has been a ‘final action’ by the Board on the application.” It
therefore determined the Board properly denied CEMEX’s
petition for reconsideration, and it sustained the demurrer
without leave to amend.
An order dismissing the action with prejudice was entered
on May 9, 2024. CEMEX filed a notice of appeal from that order
on July 3, 2024 (No. B339579). Judgment was entered on July 5,
2024. CEMEX filed a notice of appeal from the judgment on
August 22, 2024 (No. B340779). The appeals are timely. (See
Cal. Rules of Court, rule 8.104(a)(1)(A), (d).)
5
On December 2, 2024, we granted the parties’ joint motion
to consolidate those appeals. On October 22, 2025, we invited the
parties to present their views regarding the application of the
doctrine of exhaustion of administrative remedies. (See Gov.
Code, § 68081.) Both parties did so.
DISCUSSION
We review de novo the trial court’s order dismissing a
petition for writ of mandate without leave to amend. (Committee
for Sound Water & Land Development v. City of Seaside (2022)
79 Cal.App.5th 389, 399.) “ ‘[W]e may affirm on any ground
supported by the record.’ ” (Beverage v. Apple, Inc. (2024)
101 Cal.App.5th 736, 747.)
“ ‘A traditional writ of mandate under . . . section 1085 is a
method for compelling a public entity to perform a legal and
usually ministerial duty.’ [Citation.] By contrast, ‘the purpose of
an administrative mandamus proceeding, under . . . section
1094.5, is to review the final adjudicative action of an
administrative body.’ ” (Westsiders Opposed to Overdevelopment
v. City of Los Angeles (2018) 27 Cal.App.5th 1079, 1085.)
The trial court correctly dismissed CEMEX’s section 1094.5
petition on the ground the Board’s proceeding on CEMEX’s
permit application is ongoing and no final order or decision has
been rendered. Likewise, dismissal of the section 1085 petition
was appropriate because the Board’s proceeding on the permit
application is ongoing, and CEMEX has not exhausted
administrative remedies.
I. The Petition Arising Under Section 1094.5 Was
Properly Dismissed
CEMEX does not dispute that section 1094.5 requires a
final decision by the Board. Rather, it argues the decisions it
6
challenges—the letter informing it the application would be re-
noticed and the Board’s refusal to reconsider that decision—are
final. We disagree.
A. It Is Undisputed the Board’s Proceeding on
CEMEX’s Permit Application Is Ongoing
The Board’s decision to re-notice CEMEX’s application for a
permit to appropriate water did not arise sua sponte; instead, it
arose in the context of the Board’s processing of CEMEX’s permit
application. (See Cal. Code Regs., tit. 23, § 684, subd. (b).) Our
Legislature tasked the Board with “consider[ing] and act[ing]
upon all applications for permits to appropriate water” (Wat.
Code, § 1250) and enacted a detailed statutory scheme governing
those applications (see, e.g., Wat. Code, §§ 1200–1415). To fulfill
its statutorily prescribed duties, the Board has duly adopted
extensive regulations further delineating its consideration and
processing of applications. (See, e.g., Cal. Code Regs., tit. 23,
§§ 678–679, 681, 683–684, 751, 768, 770.)
The Water Code and the accompanying regulations
“contain[] a complete administrative procedure” governing
CEMEX’s permit application, a procedure currently ongoing.
(Abelleira v. District Court of Appeal, Third Dist. (1941) 17 Cal.2d
280, 291 (Abelleira) [discussing doctrine of exhaustion of
administrative remedies].) It is undisputed the Board continues
to process CEMEX’s permit application No. A029967.
B. The Board Has Not Rendered a Final Decision
or Order
Because CEMEX’s permit application remains pending
before the Board, no final decision has been reached in the
proceeding. “ ‘Until a public agency makes a final decision, the
matter is not ripe for judicial review.’ ” (AIDS Healthcare
7
Foundation v. State Dept. of Health Care Services (2015)
241 Cal.App.4th 1327, 1338 (AIDS Healthcare).) “ ‘ “A decision
attains the requisite administrative finality when the agency has
exhausted its jurisdiction and possesses ‘no further power to
reconsider or rehear the claim.’ ” ’ ” (Id. at pp. 1337–1338;
California Water Impact Network v. Newhall County Water Dist.
(2008) 161 Cal.App.4th 1464, 1485 (California Water) [same].)
The Board is still considering CEMEX’s permit application,
and CEMEX does not contend the Board has exhausted its
jurisdiction over that application. Rather, CEMEX argues the re-
noticing decision and the order refusing to reconsider it are
sufficiently final for purposes of section 1094.5. We disagree.
First, CEMEX argues we must accept as true the petition’s
allegation “ ‘[t]he Board’s Decision to Re-Notice is a final
decision.’ ” Not so. Upon review of a demurrer, “courts must
assume the truth of the . . . properly pleaded or implied factual
allegations.” (Schifando v. City of Los Angeles (2003) 31 Cal.4th
1074, 1081.) But “ ‘we do not assume the truth of “contentions,
deductions, or conclusions of law.” ’ ” (Beverage v. Apple, Inc.,
supra, 101 Cal.App.5th at p. 746.) CEMEX’s argument the re-
noticing decision is final is a contention we are not required to
adopt.3
Second, CEMEX argues the re-noticing decision is the final
action by the Board with regard to re-noticing specifically, and
thus, it need not await a final decision on its broader application.
CEMEX cites no authority for that position, and we are not
persuaded. That the June 1, 2023, letter (or the Aug. 30, 2023,
3 For the same reason, we do not adopt CEMEX’s allegation
the Board’s refusal to reconsider the re-noticing decision was
final.
8
letter refusing to reconsider) may be the final decision of the
Board with regard to the re-noticing issue does not mean that
decision is imbued with the requisite finality for purposes of
judicial intervention by means of mandamus. (See California
Water, supra, 161 Cal.App.4th at p. 1487 [approval of water
supply assessment was not final decision because lead agency
still had to evaluate it and make findings].) As we explained
above, the Board plainly retains jurisdiction over CEMEX’s
permit application. (See AIDS Healthcare, supra,
241 Cal.App.4th at pp. 1337–1338.) The Board’s decision to re-
notice the permit application is simply one interlocutory step in
the Board’s statutory and regulatory process to evaluate
CEMEX’s application for a permit to appropriate water from the
Santa Clara River. Mandamus review is not available for an
interlocutory step in that process. (See California Water, at
p. 1489 [“The [water supply assessment] is but an interlocutory
and preliminary step . . . , and . . . interim decisions are not
subject to mandamus review.”].)
In essence, CEMEX is asking us “to interfere in the middle”
of an administrative proceeding before it becomes final.
(Abelleira, supra, 17 Cal.2d at p. 305.) That “challenges judicial
practices of long standing.” (Id. at p. 306.) The trial court
properly refused to intervene prematurely, before a final decision
had been rendered. It correctly dismissed CEMEX’s petition
arising under section 1094.5.
C. CEMEX’s Policy Arguments Are Not Persuasive
In its opening brief, CEMEX argues “[p]recluding any
judicial challenges to Board actions before a final action on an
application” would be unwise as a matter of policy. But
regardless of CEMEX’s policy preferences, it is undisputed the
9
Legislature made section 1094.5 applicable to “final
administrative order[s] or decision[s].” (§ 1094.5, subd. (a).) We
will not second guess the Legislature’s wisdom in that regard.
(See Los Angeles County Metropolitan Transportation Authority
v. Alameda Produce Market, LLC (2011) 52 Cal.4th 1100, 1113–
1114 [we do “not . . . ‘ “sit in judgment of the Legislature’s wisdom
in balancing . . . competing public policies” ’ ”]; see also Plantier v.
Ramona Municipal Water Dist. (2019) 7 Cal.5th 372, 383
(Plantier) [“creating an agency with particular expertise . . .
would be frustrated if a litigant could bypass the agency in the
hope of seeking a different decision in court”].)4
II. The Petition Arising Under Section 1085 Was
Properly Dismissed
The trial court also dismissed CEMEX’s petition arising
under Code of Civil Procedure section 1085 on the ground the
Legislature intended Code of Civil Procedure section 1094.5 to
“govern judicial review of all cases relating to state water.”
(Phelps v. State Water Resources Control Board (2007)
157 Cal.App.4th 89, 105; see also Wat. Code, § 1126, subd. (c).)
CEMEX and the Board dispute whether a section 1085 writ
petition is cognizable in a Water Code proceeding, and whether
this petition fails on its merits. We need not resolve those
disputes because even assuming Board action can be challenged
4 In its opening brief, CEMEX raised (without citation)
various policy arguments that seem related to exceptions to the
doctrine of exhaustion of administrative remedies. As we explain
in Discussion, part II.B., post, we are not persuaded any of those
exceptions apply.
10
via a section 1085 petition, CEMEX’s fails for essentially the
same reason as does its section 1094.5 petition.5
A. The Doctrine of Exhaustion of Administrative
Remedies Applies to Section 1085 Writ Petitions
CEMEX argues it may bring a section 1085 petition,
notwithstanding the lack of a final order, because section 1085 is
not limited to final orders. (Compare § 1085 with § 1094.5,
subd. (a).) That argument fails to account for the doctrine of
exhaustion of administrative remedies.
“ ‘[E]xhaustion of . . . administrative remedies’ . . . refers to
the requirement that administrative remedies be pursued as a
jurisdictional prerequisite to seeking judicial relief from an
administrative action.” (California Correctional Peace Officers
Assn. v. State Personnel Bd. (1995) 10 Cal.4th 1133, 1148, second
ellipsis added.) It “is a closely related concept to finality.”
(California Water, supra, 161 Cal.App.4th at p. 1489.) Moreover,
the doctrine applies to petitions for writs of mandate arising
under both sections 1085 and 1094.5. (See FlightSafety Internat.,
Inc. v. Los Angeles County Assessment Appeals Board (2023)
96 Cal.App.5th 712, 718; see also Lopez v. Civil Service Com.
(1991) 232 Cal.App.3d 307, 314–315 [“The exhaustion doctrine
applies generally whenever judicial relief is sought where a
remedy is available at the administrative level.”].) When CEMEX
responded to our request for its views on the application of the
doctrine here, it acknowledged “the exhaustion doctrine is always
potentially applicable when challenging agency action.”
5 CEMEX’s briefing focuses on its first cause of action, but
the ongoing administrative proceedings and lack of a final order
are fatal to its second cause of action for the same reasons.
11
Exhaustion requires “the administrative agency [to]
initially decide the ‘entire controversy’ ” before it. (Jonathan Neil
& Assoc., Inc. v. Jones (2004) 33 Cal.4th 917, 933 (Jonathan
Neil); see Plantier, supra, 7 Cal.5th at p. 383 [courts should
generally not “intervene before an agency has fully resolved the
matter”].) It thus requires a party to “proceed through the full
administrative process ‘to a final decision on the merits,’ ” and
those “[a]dministrative proceedings should be completed before
the issuance of a judicial writ.” (California Water, supra,
161 Cal.App.4th at p. 1489.) “ ‘The . . . doctrine is principally
grounded on concerns favoring administrative autonomy (i.e.,
courts should not interfere with an agency determination until
the agency has reached a final decision) and judicial efficiency
(i.e., overworked courts should decline to intervene in an
administrative dispute unless absolutely necessary).’ ” (Coachella
Valley Mosquito & Vector Control Dist. v. California Public
Employment Relations Board (2005) 35 Cal.4th 1072, 1080
(Coachella Valley).)
As we have already explained in Discussion, parts I.A.–B.,
ante, it is undisputed the Board retains jurisdiction over
CEMEX’s permit application, which remains pending before it.
Plainly, the Board has not yet resolved or decided that “ ‘entire
controversy.’ ” (Jonathan Neil, supra, 33 Cal.4th at p. 933.)
“ ‘[T]he administrative process has [not yet] run its course.’ ”
(California Water, supra, 161 Cal.App.4th at p. 1489.) Thus,
CEMEX has not exhausted its administrative remedies before the
Board. We decline CEMEX’s invitation “to interfere in the
middle” of that ongoing administrative proceeding. (Abelleira,
supra, 17 Cal.2d at p. 305.)
12
B. No Exception Applies
In its response to our Government Code section 68081
letter, CEMEX argued three exceptions to the exhaustion
doctrine should apply here: “the administrative remedy is
‘inadequate’ or ‘unavailable,’ or . . . it would be ‘futile’ to pursue
it.”6 We disagree any exception applies.
First, CEMEX argues it has no available remedy because
“the Board will never reconsider an interim, procedural decision.”
But that only underscores that CEMEX’s real disagreement is
with the doctrine of administrative exhaustion itself. That is,
CEMEX argues in favor of having a court hear its challenge
immediately, without waiting for the Board’s administrative
proceeding to run its course. Were we to hold administrative
remedies unavailable merely because a party must submit to the
administrative procedures prescribed by statute and regulation,
the unavailability exception would swallow the exhaustion
doctrine entirely. (See Abelleira, supra, 17 Cal.2d at p. 293 [“the
rule will disappear unless this court is prepared to enforce it”];
California Water, supra, 161 Cal.App.4th at p. 1489 [“Each step
in the administrative proceeding cannot be reviewed separately,
any more than each ruling in the trial of a civil action may be
separately reviewed by a separate appeal.”].) CEMEX cites no
6 In its opening and reply briefs, CEMEX speculated that
requiring a final administrative order could allow the Board to
refuse to consider a timely filed protest. But one of the recognized
exceptions to exhaustion of administrative remedies is a
“ ‘situation[] where the agency indulges in unreasonable delay.’ ”
(Public Employment Relations Bd. v. Superior Court (1993)
13 Cal.App.4th 1816, 1827.) CEMEX does not argue (and this
record does not suggest) the Board has engaged in unreasonable
delay.
13
authority holding administrative remedies are unavailable
merely because a party prefers not to pursue them.
(Cf. Automotive Management Group, Inc. v. New Motor Vehicle
Bd. (1993) 20 Cal.App.4th 1002, 1015, cited by CEMEX and
analyzing “the futility exception.”)
Second, CEMEX argues awaiting a decision on its water
application is an inadequate remedy “because the harms CEMEX
seeks to avoid would already have been incurred.” In its opening
brief, CEMEX argued the re-noticing “will have massive
consequences on the proceedings . . . that cannot be corrected by
review after the Board’s action on the application,” such as
CEMEX incurring additional costs and delays to respond to new
protests. But that does not demonstrate administrative remedies
are inadequate. On the contrary, administrative remedies are
adequate so long as the agency has authority to hear a party’s
complaint, even if “the administrative procedures arguably limit
the remedy the agency may award.” (Campbell v. Regents of
University of California (2005) 35 Cal.4th 311, 323; cf. Unnamed
Physician v. Board of Trustees of Saint Agnes Medical Center
(2001) 93 Cal.App.4th 607, 621 (Unnamed Physician)
[administrative remedies are inadequate “ ‘where the challenge is
to the constitutionality of the administrative agency itself or the
agency’s procedure’ ” (italics omitted)].)
CEMEX does not argue the Board will be unable to hear its
complaints regarding re-noticing at a later point; rather, it
argues the harms it will suffer cannot be fully remedied at that
time. But a remedy is not “inadequate simply because it is not
the result desired,” (AIDS Healthcare, supra, 241 Cal.App.4th at
p. 1351), or “ ‘because additional time and effort would be
consumed by its being pursued through the ordinary course of the
14
law’ ” (Unnamed Physician, supra, 93 Cal.App.4th at p. 620).
CEMEX has not shown the Board lacks authority to hear its
complaints about the re-noticing decision, even if the Board may
ultimately be unable to grant CEMEX all the relief it desires.
Third, CEMEX argues administrative remedies are futile
for the same reason it believes they are inadequate. But futility
and inadequacy are distinct. “ ‘The futility exception requires
that the party invoking the exception “can positively state that
the [agency] has declared what its ruling will be on a particular
case.” ’ ” (Coachella Valley, supra, 35 Cal.4th at pp. 1080-1081.)
To the extent CEMEX means to argue exhaustion is futile
because the Board has conclusively decided to re-notice its
application, we disagree. “For the futility exception to apply, it is
not sufficient that a party can show what the agency’s ruling
would be on a particular issue . . . . Rather, the party must show
what the agency’s ruling would be ‘ “on a particular case.” ’
[Citation.] This follows from the exhaustion doctrine itself, which
‘precludes review of an intermediate or interlocutory action of an
administrative agency.’ ” (Coachella Valley, supra, 35 Cal.4th at
p. 1081.) That is, CEMEX cannot simply show the Board has
conclusively decided to re-notice its application; rather, it must
show the outcome of the Board’s proceedings on its permit
application is a foregone conclusion. (Ibid. [“Had the
administrative proceeding run its course, [petitioner] might have
prevailed on some [other] procedural ground . . . , or it might have
prevailed on the merits”].) CEMEX has not attempted to make
that showing.
In its letter brief, CEMEX asks for leave to amend “to plead
additional facts supporting the exceptions.” Because CEMEX has
not shown “what facts [it] could plead to cure the existing defects
15
in” its petition, we deny that request. (Total Call Internat. Inc. v.
Peerless Ins. Co. (2010) 181 Cal.App.4th 161, 166.)
DISPOSITION
The judgment is affirmed. The Board is entitled to costs.
(See Cal. Rules of Court, rule 8.278(a)(1)–(2).)
RICHARDSON, J.
WE CONCUR:
LUI, P. J.
CHAVEZ, J.
16