stating that APA standard of review is applicable in bid protest context
How later courts described this case
- stating that APA standard of review is applicable in bid protest context
- “We see nothing in Lexmark that suggests … the Claims Court may not initially determine whether a plaintiff is an ‘interested party,’ though such an initial determination is not required before addressing the merits, because statutory standing is not jurisdictional.”
Written by the judges who cited it.
The opinion
In the United States Court of Federal Claims
ACTIVE DEPLOYMENT SYSTEMS, LLC,
Plaintiff, No. 25-968
v. (Originally Filed: October 7, 2025)
(Reissued: October 30, 2025)
THE UNITED STATES,
Defendant.
Matthew P. Moriarty, Ian P. Patterson, Timothy J. Laughlin, and Haley M. Sirokman,
Schoonover & Moriarty LLC, Olathe, Kansas, for Plaintiff.
Elizabeth M.D. Pullin, Trial Attorney, Douglas K. Mickle, Acting Deputy Director,
Patricia M. McCarthy, Director, Commercial Litigation Branch, Brett A. Shumate,
Assistant Attorney General, Civil Division, United States Department of Justice,
Washington, D.C., for Defendant. Patrick J. Madigan and Joshua K. Adams, Associate
Legal Advisors, Commercial and Administrative Law Division Office of the Principal
Legal Advisor, United States Immigration and Customs Enforcement, Washington, D.C.,
of counsel.
OPINION AND ORDER
HADJI, Judge.
This is a procurement protest involving the Department of Homeland Security
(DHS), Immigration and Customs Enforcement’s (ICE) award of 42 indefinite delivery /
indefinite quantity (IDIQ) contracts for detention related services.1 Plaintiff, Active
Deployment Systems (ADS), alleges: (1) the Government’s decision to award 42 contracts
was improper because the solicitation stated the Government’s intention was to award “five
(5) or more” contracts; and (2) the solicitation’s pricing structure and evaluation were
arbitrary, making the awarded contracts unworkable. In its prayer for relief, inter alia, ADS
requests a temporary restraining order preventing ICE from awarding task orders. ECF 25
at 18. Before the Court are Plaintiff’s Motion for Judgment on the Administrative Record
(ECF 40), as well as the Government’s Motion to Dismiss pursuant to Rule 12(b)(6) (ECF
18) and Cross-Motion for Judgment on the Administrative Record (ECF 45).
1
This Opinion was issued under seal on October 7, 2025. The parties were directed to propose redactions
within 14 days of issuance of the Opinion. No proposed redactions were received. The Court hereby
publicly releases the Opinion in full.
BACKGROUND
In April 2025, ICE issued Solicitation number 70CDCR25R00000005 (the
Solicitation), as an emergency acquisition aligned to Executive Orders that directed DHS
to “take all appropriate actions to detain, to the fullest extent permitted by law, aliens
apprehended for violations of immigration law until their removal from the United States.”2
AR 371, 375. To fulfill these Executive Orders, the Solicitation sought extensive detention
services including physical detention facilities/plants, medical services for detainees,
resources and activities for detainees, legal resources, recordkeeping services, and support
staff. AR 372-74. The Solicitation was structured as an IDIQ procurement, where awardees
could compete for specific task order awards during the ordering period. AR 375, 382. The
Solicitation anticipated making an award “to five (5) or more qualifying offerors” on a best
value tradeoff basis pursuant to Federal Acquisition Regulation (FAR) 15.101-1. AR 1727.
There were two evaluation factors outlined in the Solicitation—Factor 1: Corporate
Experience and Factor 2: Price. AR 1727. Corporate Experience was significantly more
important than Price. Id.
The Solicitation outlined eight objectives “necessary to deliver comprehensive and
effective detention operations to support the federal government’s immigration
enforcement activities,” of which offerors could “elect to support some, or all.” AR 439.
These objectives included: Objective I: provide a detention facility/plant; Objective II:
provide safe and secure detention operations; Objective III: provide safe and secure ground
transportation services; Objective IV: provide adequate medical care to detained aliens;
Objective V: provide resources and activities to manage detained aliens; Objective VI:
provide access to required legal resources; Objective VII: effectively administer and
manage detainee records; and Objective VIII: provide contract detention processing
support for ERO officers. AR 438-39. Offerors were informed that they “need not have the
capability to provide each and every service detailed under the objectives…. The
government encourages vendors to propose against any part of [the Solicitation] but must
clearly elect which objective(s) (I-VIII) and which services it is proposing in its
submissions.” AR 428. To make this election, the Solicitation included a “Table of Elected
Objectives” upon which offerors could indicate their selected objectives. AR 1560.
On the next page, the Solicitation included a chart titled “Contract Line Item (CLIN)
and Objective Alignments,” which aligned the contract objectives to CLINs; offerors were
to complete the chart based on their pricing proposals. AR 1561, 1720. Based on the
structure of the Solicitation, some CLINs supported multiple objectives at once. See AR
1561-66.
In addition, offerors were directed to fill out the chart in Attachment 15 (the Pricing
Schedule), to align with their proposal. AR 1721; See AR 1810. Offerors were also
instructed to submit a pricing narrative with their proposal to include the basis of proposed
2
The Solicitation was amended four times on April 3, 2025, then on April 4, 2025, then again on April 7,
2025, and finally on May 5, 2025. AR 1364, 1435, 1556, 1661.
2
pricing and other relevant information. AR 1722. The Pricing Schedule included pre-filled
“fair and reasonable” prices as determined by ICE. AR 1798-99. Relevant here, bed rates
were capped on a “Per Detainee/Per Day” basis, a rate which if exceeded, would result in
unreasonable pricing and the offeror’s proposal being rendered ineligible for award. AR
1722. These price ceilings were based on a market research report and an independent
government cost estimate (IGCE). See AR 340-43, 348-49. Price ceilings for bed day rates
were calculated in the IGCE based on pricing estimates for a procurement of 10,200 beds
and 15,000 beds. AR 340-43. The Pricing Schedule included 10 CLINs for bed rates
prompting offerors to propose rates for different capacities of detainees ranging from 100
to 1,001 or more persons. AR 1810.
On April 7, 2025, the Solicitation closed, and ICE received 54 proposals.3 AR 1366,
5202. From that pool of offerors, the Government eliminated 11 offerors during
compliance review. AR 5204. One other offeror was eliminated due to a low confidence
rating in Factor 1: Corporate Experience. AR 5207. The remaining 42 offerors received
Some or High Confidence for Factor 1 and were selected for award. AR 5207-08. ADS bid
on, and was awarded, Objectives I, II, V, VI, and VII. AR 5214.
On June 9, 2025, Plaintiff filed the instant procurement protest action. ECF 1. The
Government moved to dismiss. ECF 18. Thereafter, Plaintiff filed a Motion for Judgment
on the Administrative Record (ECF 40). In response, the Government filed a Cross-Motion
for Judgment on the Administrative Record (ECF 45).
LEGAL STANDARDS
I. Procurement Protest Jurisdiction and the Standard of Review
Plaintiff alleges jurisdiction under the Tucker Act. ECF 1 ¶ 4. The Tucker Act, as
amended by the Administrative Dispute Resolution Act of 1996, 28 U.S.C. § 1491(b),
confers jurisdiction on this Court to render judgment on “an action by an interested party
objecting to … the award of a contract or any alleged violation of statute or regulation in
connection with a procurement or a proposed procurement.” 28 U.S.C. § 1491(b)(1).
The Court reviews a procurement protest action under the standards set forth in
Section 706 of the Administrative Procedure Act (APA), 5 U.S.C. § 706. 28 U.S.C.
§ 1491(b)(4). See NVT Techs., Inc. v. United States, 370 F.3d 1153, 1159 (Fed. Cir. 2004)
(stating that APA standard of review is applicable in bid protest context). The APA
provides that an agency’s decision is to be set aside only if it is “arbitrary, capricious, an
abuse of discretion, or otherwise not in accordance with law.” 5 U.S.C. § 706(2)(A); Nat’l
Gov’t Servs., Inc. v. United States, 923 F.3d 977, 981 (Fed. Cir. 2019). “The arbitrary and
capricious standard applicable here is highly deferential,” and “requires a reviewing court
3
Shortly before the Solicitation closed, ADS submitted an agency-level protest, alleging that the terms of
the Solicitation were ambiguous and unreasonable. AR 8836-8842. Subsequently, ADS also filed an
agency-level protest challenging the reasonableness of the price ceilings included in the Solicitation. AR
8883-86. Both protests were denied. AR 8953-55.
3
to sustain an agency action evincing rational reasoning and consideration of relevant
factors.” Advanced Data Concepts, Inc. v. United States, 216 F.3d 1054, 1058 (Fed. Cir.
2000) (citing Bowman Transp., Inc. v. Arkansas-Best Freight Sys., Inc., 419 U.S. 281, 285
(1974)). In reviewing procurement decisions, the Court should not substitute its judgment
for the agency’s. See R & W Flammann GmbH v. United States, 339 F.3d 1320, 1322 (Fed.
Cir. 2003).
II. Judgment on the Administrative Record in a Procurement Protest
Court of Federal Claims Rule 52.1(c) provides for judgment on the administrative
record. Rule 52.1(c) was “designed to provide for trial on a paper record, allowing fact-
finding by the trial court.” Bannum, Inc. v. United States, 404 F.3d 1346, 1356 (Fed. Cir.
2005).
To prevail on a procurement protest, a plaintiff must demonstrate: “(1) that the
procurement official’s decision lacked a rational basis; or (2) the procurement procedure
involved a violation of regulation or procedure.” Impresa Construzioni Geom. Domenico
Garufi v. United States, 238 F.3d 1324, 1332 (Fed. Cir. 2001) (citation omitted). “When a
challenge is brought on the second ground, the disappointed bidder must show a clear and
prejudicial violation of applicable statutes or regulations.” Id. at 1333 (internal quotation
marks omitted). If a protester meets its burden to prove that an agency’s conduct lacked a
rational basis or was contrary to law, the Court determines, “as a factual matter, if the bid
protester was prejudiced by that conduct.” Bannum, 404 F.3d at 1351. For a post-award
protest, a protester must establish that it was “significantly prejudiced” by the error. Id. at
1353; see also 5 U.S.C. § 706 (“[D]ue account shall be taken of the rule of prejudicial
error.”). “To establish ‘significant prejudice,’ [the protester] must show that there was a
‘substantial chance’ it would have received the contract award but for the errors ….”
Bannum, 404 F.3d at 1353. Although the “substantial chance” test is sometimes applied in
pre-award bid protests, see, e.g., Orion Tech., Inc. v. United States, 704 F.3d 1344, 1348-
49 (Fed. Cir. 2013), courts have also used a more lenient test “[i]n some pre-award cases
… [where] there is an inadequate factual foundation for performing a ‘substantial chance’
test,” Oracle America, Inc. v. United States, 975 F.3d 1279, 1291 n.3 (Fed. Cir. 2020); see
also Weeks Marine, Inc. v. United States, 575 F.3d 1352, 1363 (Fed. Cir. 2009). In such
cases, the protester must show it suffered “a non-trivial competitive injury which can be
addressed by judicial relief.”4 Weeks Marine, 575 F.3d at 1363 (internal quotation marks
omitted).
4
While this protest was filed post-award, ADS argues that because it challenges the terms of the
Solicitation, the more lenient “non-trivial competitive injury” test should apply. See, e.g., ECF 27, 9-10.
Because Plaintiff fails to satisfy even the more lenient test, as addressed below, the Court need not reach
the issue of which test applies.
4
DISCUSSION
ADS’s protest raises two principal complaints.5 First, it argues that the
Government’s decision to award 42 contracts was improper because the Solicitation stated
the Government’s intention was to award to “five (5) or more” offerors. Second, ADS
contends the Solicitation’s pricing structure and evaluation was arbitrary and confusing,
making the entire awarded contract unworkable.
I. Awarding 42 Contracts Was Explicitly Permitted by the Solicitation
ADS alleges that ICE’s decision to award contracts to 42 contractors was in excess
of the “five (5) or more” offerors the Solicitation stated would receive contract awards,
making the award decision unlawful and prejudicial because ADS now has to compete for
task orders with more companies than the Solicitation contemplated. ECF 40-1 at 24-28.
“Interpretation of a government solicitation, as with a contract, begins with the
solicitation’s plain language.” CliniComp Int’l, Inc. v. United States, 117 Fed. Cl. 722, 736
(2014) (citing Banknote Corp. of Am., Inc. v. United States, 365 F.3d 1345, 1353 (Fed. Cir.
2004)).
The Solicitation stated that ICE planned to award contracts “to five (5) or more
qualifying offerors whose proposals represent the best overall value to the government.”
AR 1727. “If the provisions of the solicitation are clean and unambiguous, they must be
given their plain and ordinary meaning ….” Banknote, 365 F.3d. at 1353. Looking to the
plain language of the Solicitation, the language “five (5) or more” can only mean one
thing—five or more than five. It does not mean “approximately five” as ADS contends. In
the context of the number of contracts the Government was permitted to award based on
the Solicitation, the plain meaning of “five (5) or more” is that the Government could award
five contracts or any number above five. By awarding 42 contracts when the Solicitation
stated it could award 5 or more, the Government complied with the unambiguous, plain
language of the Solicitation.
II. The Pricing Structure of the Solicitation Was Not Prejudicial
The crux of ADS’s pricing allegations is: (1) the Solicitation had an arbitrary CLIN
structure and (2) the pricing caps were irrational because they were based on a flawed
IGCE. ECF 40-1 at 11. Regarding the structure of CLINs, ADS alleges that because CLINs
were structured to encompass several objectives, offerors were compelled to bid on CLINs
5
The Government moves for dismissal on the basis that ADS is not an interested party and thus lacks
statutory standing. ECF 18 at 9-13. Whether an individual or entity qualifies as an “interested party” is
narrowly construed. See Percipient.AI, Inc. v. United States, ___ F.4th ___, 2025 WL 2472671, *13 (Fed.
Cir. Aug. 28, 2025). However, the Court need not address ADS’s standing, because ADS loses on the
merits. See CACI, Inc.-Fed. v. United States, 67 F. 4th 1145, 1152 (Fed. Cir. 2023) (“We see nothing in
Lexmark that suggests … the Claims Court may not initially determine whether a plaintiff is an ‘interested
party,’ though such an initial determination is not required before addressing the merits, because statutory
standing is not jurisdictional.”).
5
they did not seek to, despite the Solicitation’s claim that offerors “need not have the
capability to provide each and every service detailed under the objectives.” ECF 40-1 at
10-11; AR 428. ADS claims that this ambiguity meant that offerors were not bidding on
an equal basis and could not know the proper way to structure their pricing for the bed rate
CLINs. ECF 40-1 at 7, 13, 15. Regarding the price caps, ADS argues that they were
arbitrary because they were grounded in a “fundamentally flawed” IGCE and market
research process. ECF 40-1 at 16.
The Court begins its analysis of ADS’s pricing allegations with prejudice because
analyzing the rationality of the CLIN structure and pricing caps is more laborious and
ultimately not necessary if Plaintiff cannot establish prejudice. To prevail in this protest,
ADS must demonstrate prejudice. Impressa, 238 F.3d at 1333. Even under the more lenient
“non-trivial competitive injury” standard for prejudice that Plaintiff alleges should be
applied, ADS still has not sufficiently carried its burden to establish prejudice. ECF 40-1
at 6; Sys. Stud. & Simulation, Inc. v. United States, 22 F.4th 994, 997-98 (Fed. Cir. 2021).
Under this test, the protester must show it suffered “a non-trivial competitive injury which
can be addressed by judicial relief.” Weeks Marine, 575 F.3d at 1363 (internal quotation
marks omitted). Here, ADS has made no such showing.
First, even assuming that the pricing structure of the Solicitation was flawed, ADS
fails to establish prejudice because it was awarded the contract upon which it submitted a
proposal. See AR 5214, 5441-44. In fact, ADS was awarded a contract for all objectives it
proposed against. AR 5214, 5441-44. While ADS alleges that it was prejudiced because all
offerors were not competing on equal footing, ADS fails to articulate how it was harmed
based on this premise. ECF 48 at 11-12. Because ADS was awarded all objectives which
it proposed, it cannot prove an injury, let alone a non-trivial injury, that this Court can
redress. Weeks Marine, 575 F.3 at 1363. ADS, therefore, fails to prove prejudice, as is
necessary to succeed on this claim. Id.
Likewise, ADS cannot demonstrate prejudice stemming from the allegedly arbitrary
price ceilings. ADS alleges that had it “not been subjected to these arbitrary caps, it could
have submitted pricing as it sees fit … [which] could have certainly been more than the set
‘Fair and Reasonable’ price.” ECF 48 at 15. More specifically, ADS contends that because
price ceiling calculations were predicated on procurements smaller than those anticipated
by the Solicitation and because ICE determined the “fair and reasonable” price before it
received any proposals, the price caps are arbitrarily low and thus prejudicial. ECF 40-1 at
16. ADS’s argument is purely speculative. In the context of the IDIQ contract at issue here,
ADS’s alleged harm requires, at a minimum, that (1) the Government will place future task
orders; (2) the future task orders will be in large quantities; and (3) the large quantity of
work will not benefit from economies of scale, but instead be more expensive for ADS to
fulfill on a per unit basis. Because this sequence of events is far from certain to occur, it is
speculative, and therefore not an adequate basis to establish prejudice. See Reema
Consulting Servs., Inc. v. United States, 107 Fed. Cl. 519, 529 (2012) (“[F]or plaintiff to
have an ‘injury which can be addressed by judicial relief,’ that injury must be ‘actual or
6
impending,’ and not one that ‘has not occurred yet, is far from imminent, and indeed, may
never occur.’”) (quoting Weeks Marine, 575 F.3d at 1362).
Similarly, because this is an IDIQ contract, to the extent that some of the
Government’s requests for task order proposals prove to be money losers as Plaintiff fears,
Plaintiff is under no obligation to submit a proposal on that work. In other words, at a later
date, Plaintiff remains free to pick and choose which work it would like to be selected to
perform and can avoid contracting for work that it cannot perform at a profit. The very
nature of the contract effectively provides Plaintiff with an “out” from being trapped in an
unprofitable situation on account of the Government’s alleged arbitrary pricing caps.
Accordingly, the Court cannot see how such a structure prejudices Plaintiff.
Lastly, and more generally, the Court has trouble finding prejudice related to the
pricing in the contract because, despite the alleged prejudice, Plaintiff unequivocally
expressed its willingness and desire to perform the contract. During oral argument, the
Court asked whether the appropriate remedy for the allegedly arbitrary pricing structure of
the contract would be for the Court to award Plaintiff its proposal costs and allow it to walk
away from the contract it voluntarily executed. See Oral Argument at 22:55. Plaintiff stated
that it did not seek to back out of the contract due to the alleged pricing flaws, but instead
expressed its desire to perform the work. See Oral Argument at 24:54. As such, Plaintiff
simultaneously maintains that the contract’s pricing is so arbitrary that it is unworkable,
yet not so arbitrary that Plaintiff is willing to forego the contract. Accordingly, the Court
does not find prejudice when Plaintiff’s own actions—signing the contract and expressing
continued desire to perform—indicate a willingness to perform under the terms of the
contract it alleges are unworkable.
CONCLUSION
For the foregoing reasons, the Government’s Cross-Motion for Judgment on the
Administrative Record (ECF 45) is GRANTED and Plaintiff’s Motion for Judgment on
the Administrative Record (ECF 40) is DENIED. Further, Plaintiff’s Motion for
Temporary Restraining Order and Preliminary Injunction (ECF 3) and the Government’s
Motion to Dismiss (ECF 18) are DENIED as MOOT. The Clerk of Court is DIRECTED
to enter judgment accordingly.
IT IS SO ORDERED.
PHILIP S. HADJI
Judge
7