Opinion

Opinion

Court
District Court, N.D. Oklahoma
Filed
Oct 23, 2025
Cited by
0 cases
Authority
More cited than 35.9%

which itself relies on Wilder

How later courts described this case

  • which itself relies on Wilder
  • upholding dismissal of equal protection claim where plaintiff, inter alia, “failed to allege any unequal treatment due to his membership in a protected class or group” and where the court would not “read a class-of-one claim into the bare allegations” of the complaint
  • “the county is not a competitor in the health care provision market and cannot be charged with having used market position to exclude competition”
  • applying federal “attempted monopolization” factors to section 203(B) claim

Written by the judges who cited it.

The opinion

IN THE UNITED STATES DISTRICT COURT

FOR THE NORTHERN DISTRICT OF OKLAHOMA

EMRICH AERIAL SPRAYING LLC, )

)

Plaintiff, )

)

v. )

)

Case No. 25-cv-00115-SH

THE CITY OF PAWHUSKA, PAWHUSKA )

MUNICIPAL AIRPORT AUTHORITY, )

and PAWHUSKA MUNICIPAL AIRPORT )

ADVISORY COMMITTEE, )

)

Defendants. )

OPINION AND ORDER

Before the Court are Defendants’ motions to dismiss Plaintiff’s claims.1 The

motions are granted in part and denied in part.

Plaintiff has failed to allege any facts regarding the Pawhuska Municipal Airport

Advisory Committee, and all claims against that defendant are dismissed. As for the

remaining defendants, Plaintiff has failed to plead that they are competitors subject to an

antitrust claim and has otherwise failed to plead a federal right protected under 42 U.S.C.

§ 1983. The Court further finds that, as pled, the contract claims based on the Airport

Hangar Lease are premature. Plaintiff has sufficiently pled a claim under the original

Aerial Applicator Agreement, but against the City of Pawhuska only. Defendants have

failed to show that Plaintiff’s claims for promissory estoppel are barred by the statute of

limitations. Plaintiff may file a motion for leave to amend its complaint. If no amendment

is granted, the Court will consider whether to decline supplemental jurisdiction over the

remaining state-law claims.

1 The parties have consented to the jurisdiction of a U.S. Magistrate Judge for all purposes

under 28 U.S.C. § 636(c)(1) and Fed. R. Civ. P. 73(a). (ECF No. 19.)

Factual Background

Taking the factual allegations in the complaint as true, and viewing them in the

light most favorable to the nonmoving party, Plaintiff alleges as follows:

Emrich Aerial Spraying LLC (“Emrich”) is a Nebraska company seeking to provide

agricultural spraying services in the area surrounding the Pawhuska Airport in Osage

County, Oklahoma (the “airport”). (Id. ¶¶ 1, 16–18.) Emrich contracts with farmers and

ranchers to sell and apply fertilizers and pesticides during the agricultural spraying

season.2 (Id. ¶¶ 9, 17.)

In April 2019, Emrich began negotiating an agreement with the City of Pawhuska

(the “City”) and the Pawhuska Municipal Airport Authority (the “Airport Authority”) to

utilize the airport to expand Emrich’s commercial operations in the area. (Id. ¶¶ 16, 18.)

The airport is owned by the City and operated by the Airport Authority. (Id. ¶¶ 3, 5.)

Members of City Council serve as members of the Airport Authority (id. ¶ 5), but the

complaint does not allege that the Airport Authority’s board consists solely of council

members. The Pawhuska Municipal Airport Advisory Committee (the “Advisory

Committee”), meanwhile, provides recommendations on management of the airport. (Id.

¶ 4.)

On April 26, 2019, Emrich and the City entered into an Aerial Applicator

Agreement (the “agreement”), which provided that Emrich could use the airport in

connection with its aerial application and crop-dusting business. (Id. ¶¶ 19–21; ECF No.

1-1 (copy of the agreement).3) Under the agreement, the City permitted Emrich to use

2 In Osage County, the spraying season runs from around May 1 to July 4. (Id. ¶ 17.)

3 As discussed infra, exhibits attached to a complaint are treated as a part of the pleading.

See Tal v. Hogan, 453 F.3d 1244, 1264 n.24 (10th Cir. 2006).

and access certain areas of the airport, as well as to use and pay for water associated with

the City’s water account until Emrich installed its own connection to the rural water

supplier. (ECF No. 1 ¶ 22; ECF No. 1-1 ¶¶ 1–2.) The agreement was for the calendar year

of 2019 and renewed automatically for two consecutive one-year terms unless a party gave

written notice of its intent not to renew. (ECF No. 1 ¶ 24; ECF No. 1-1 ¶ 1.) Such notice

was to be given 60 days prior to the April 26th contract anniversary date. (ECF No. 1

¶¶ 23–24; ECF No. 1-1 ¶ 1.)

Beginning in or about April 2019, the City continuously denied Emrich access to

facilities at the airport. (ECF No. 1 ¶ 26.) Around that same time, the City informed

Emrich that if it wished to operate at the airport, it would need to construct a building on

the property at its own expense, which the parties agreed to discuss after the end of the

2019 spraying season. (Id. ¶ 28.)

The next month, in May 2019, the City placed a new keypad on its airport office

building and instructed Emrich to use the keypad for access. (Id. ¶ 29.) The City also told

Emrich that it was no longer permitted to use the water hydrants associated with the City’s

water accounts at the airport. (Id.) The restriction on water was limited to Emrich and

did not extend to Emrich’s two competitors. (Id. ¶¶ 30–31.)

A year later, in May 2020, the City had removed its locks from the water hydrants,

and Emrich resumed using the City’s water. (Id. ¶ 35.) That same month, Emrich

received notice that the City had previously sent a letter attempting to terminate the

agreement. (Id. ¶ 37.) The letter was dated February 18, 2020, but it was postmarked

March 10, 2020. (Id. ¶ 37; ECF No. 1-2 at 1, 3 (the termination letter).4)

4 References to page numbers refer to the ECF header.

On May 21, 2020, however, the City’s attorney confirmed that Emrich would be

allowed to use the airport, but gave notice that the agreement was not going to be renewed

for a third year. (ECF No. 1 ¶¶ 40–41; ECF No. 1-3 at 1–2 (the attorney’s letter).) The City

also listed requirements for Emrich to adhere to while using the airport that season, else

the agreement would be considered in default. (ECF No. 1-3 at 1–2.) These included no

further use of the water hydrants or water systems at the airport by Emrich. (ECF No. 1

¶ 40; ECF No. 1-3 at 1.)

In fall 2021, Emrich and the City began discussions about Emrich building a

hangar at the airport, and the City promised to move forward with an agreement. (ECF

No. 1 ¶ 45.) In November 2021, Emrich submitted a formal proposal, and the Airport

Authority approved it on December 13, 2021. (Id. ¶¶ 46–47.) Airport Authority member

Hank Benson told Emrich he would submit the recommendation to the City Council the

next day, but he did not appear at that meeting in what Emrich believes was an attempt

to avoid presenting the proposal.5 (Id. ¶ 48.) Instead, Emrich presented the proposal;

two other Airport Authority members reported the Authority’s approval; and the City

selected a designee to work with Emrich on the final terms of a lease agreement. (Id.)

Subsequently, in February 2022, the City offered a site plan to Emrich that contained less

acreage than had been allowed to Emrich’s competitors and was not feasible for

operations. (Id. ¶ 50; ECF No. 1-4 (the site plan).)

5 The City argues there is insufficient factual basis for the conclusion that Benson acted

with this intent (ECF No. 14 at 12), but Emrich has alleged sufficient additional facts—

including the short time frame between Benson’s representation that he would submit the

proposal and his non-appearance, and the contradictory statements made by Benson as

to whether the approval had occurred (ECF No. 1 ¶¶ 47–49).

Nevertheless, on March 31, 2023, the City and Emrich entered into an Airport

Hangar Lease (“the lease”). (ECF No. 1 ¶ 51; ECF No. 1-5 (the lease).) Under the lease,

Emrich agreed to build a hangar and chemical storage shed at the airport. (ECF No. 1

¶ 51; ECF No. 1-5 ¶ 4.) Plans for the buildings were to be approved by the Airport

Authority before commencement of construction. (ECF No. 1-5 ¶ 4.) Emrich agreed to

begin construction within three years of execution of the lease—or by the end of March

2026—and to complete that construction within another year. (Id. ¶ 6.)

The lease did not define the premises to be leased. (Id. ¶ 1.) Instead, the lease

provided that Emrich would submit a site plan to the City; then, the city manager would

work with the airport engineer to develop and describe the boundaries for the site, along

with provisions for proper access; and, lastly, the City would make a final determination

from the recommendations given by the airport engineer. (Id. Ex. A.) In the two years

between execution of the lease and the filing of this lawsuit, the City has not met its

obligation to develop and describe the boundaries of the site to be leased. (ECF No. 1

¶ 53.)

Instead, on April 11, 2024, Benson sent a letter to Emrich asserting that Emrich

was in violation of the lease term requiring it to start construction of the buildings. (ECF

No. 1 ¶ 55; ECF No. 1-6 (Benson letter); ECF No. 1-5 ¶ 6.) Benson also stated a preference

for a different form of lease, which he offered for review. (ECF No. 1-6.) The City’s

attorney subsequently stated Emrich was not in breach of the lease. (ECF No. 1 ¶ 56.) On

May 7, 2024, Benson again orally asserted Emrich was in breach of the lease. (Id. ¶ 57.)

The City’s attorney again confirmed in writing that Emrich was not considered in breach

of the lease. (ECF No. 1 ¶ 58; ECF No. 1-7 (attorney confirmation e-mail).)

As of the filing of the lawsuit, Emrich was still waiting on the City to identify the

site of the lease, so that it could construct the required buildings. (ECF No. 1 ¶ 59.)

Procedural Background

Emrich filed suit on March 10, 2025. (ECF No. 1.) Emrich asserts claims against

all defendants for violations of section 2 of the Sherman Act, 15 U.S.C. § 2 (id. ¶¶ 76–80);

the Oklahoma Antitrust Reform Act, Okla. Stat. tit. 79, § 203 (id. ¶¶ 81–83); and 42 U.S.C.

§ 1983 (id. ¶¶ 84–90). Emrich also asserts state-law claims for breach of the original

agreement (id. ¶¶ 91–95); breach of the lease (id. ¶¶ 96–100); and promissory estoppel

(id. ¶¶ 101–107).

Defendants move to dismiss, arguing that (1) each cause of action is either time-

barred or premature (ECF No. 146 at 3–6); (2) Emrich failed to allege an antitrust injury

under the Sherman Act and the Oklahoma Antitrust Reform Act (id. at 6–8); (3) Emrich

failed to exhaust its administrative remedies and cannot bring a private cause of action

under 42 U.S.C. § 1983 (id. at 9–10); (4) the Airport Authority and Advisory Committee

are not capable of being sued (ECF No. 15 at 3–4; ECF No. 16 at 3–4); and (5) the Airport

Authority and Advisory Committee were not parties to the contracts or promises at issue

(ECF No. 15 at 10–11; ECF No. 16 at 11–12).

Analysis

I. Standard of Review

Defendants move to dismiss Emrich’s action for failure to state a claim upon which

relief can be granted. See Fed. R. Civ. P. 12(b)(6). “[A] plaintiff must plead sufficient

6 The motions to dismiss submitted by Defendants are substantially similar. (Compare

ECF No. 14 with ECF Nos. 15 & 16.) As such, the Court will primarily reference the City’s

brief and cite the remaining motions only when they raise a separate argument.

factual allegations ‘to state a claim to relief that is plausible on its face.’” Brokers’ Choice

of Am., Inc. v. NBC Universal, Inc., 861 F.3d 1081, 1104 (10th Cir. 2017) (quoting Bell Atl.

Corp. v. Twombly, 550 U.S. 544, 570 (2007)). “A claim is facially plausible ‘when the

plaintiff pleads factual content that allows the court to draw the reasonable inference that

the defendant is liable for the misconduct alleged.’” Id. (quoting Ashcroft v. Iqbal, 556

U.S. 662, 678 (2009)). All such reasonable inferences are resolved in the plaintiff’s favor.

Diversey v. Schmidly, 738 F.3d 1196, 1199 (10th Cir. 2013). “Factual allegations must be

enough to raise a right to relief above the speculative level on the assumption that all the

allegations in the complaint are true (even if doubtful in fact).” Twombly, 550 U.S. at

555–56 (citation modified).

A statute of limitations argument, meanwhile, is an affirmative defense that must

be raised by the defendant and often requires a resolution of factual disputes that cannot

occur at the Rule 12 stage. Herrera v. City of Espanola, 32 F.4th 980, 991 (10th Cir.

2022). Instead, such a defense may be resolved on a Rule 12(b) motion only “when the

dates given in the complaint make clear that the right sued upon has been extinguished.”

Sierra Club v. Okla. Gas & Elec. Co., 816 F.3d 666, 671 (10th Cir. 2016) (internal

quotations omitted).

In addition to the complaint itself, on a motion to dismiss “the district court may

consider documents referred to in the complaint if the documents are central to the

plaintiff’s claim and the parties do not dispute the documents’ authenticity.” Jacobsen v.

Deseret Book Co., 287 F.3d 936, 941 (10th Cir. 2002). Here, the Court considers the

contracts, communications, and documents attached to Plaintiff’s complaint. (ECF Nos.

1-1–1-7.) The Court also considers the Pawhuska Code of Ordinances. See Zimomra v.

Alamo Rent-A-Car, Inc., 111 F.3d 1495, 1504 (10th Cir. 1997) (finding it appropriate for

the district court to take judicial notice of municipal ordinances when considering a

motion to dismiss).

II. Capacity of the Airport Authority and the Advisory Committee to be

Sued

As a preliminary matter, the Court considers whether the Airport Authority and

the Advisory Committee may be sued under Oklahoma law. Having raised the defense

based on the face of the complaint, the Court finds that the Airport Authority has failed

to demonstrate its availability. The Court does not reach the issue as to the Advisory

Committee, because the complaint fails to state any claims against it.

A. Capacity to Be Sued—Generally

Under the federal rules, a pleading generally need not allege a party’s capacity to

be sued. Fed. R. Civ. P. 9(a)(1)(A). A defendant, instead, raises the issue “by a specific

denial, which must state any supporting facts that are peculiarly within the party’s

knowledge.” Fed. R. Civ. P. 9(a)(2). While Rule 12(b) “does not specifically authorize a

motion to dismiss based on a lack of capacity to be sued . . ., where the issue appears on

the face of the complaint, [it] may be raised by a motion for failure to state a claim under

Rule 12(b)(6).” Currin v. Okla. Cnty. Crim. Just. Auth., No. CIV-23-22-F, 2023 WL

3310173, at *1 (W.D. Okla. May 8, 2023) (citing 5A Wright & Miller’s Federal Practice &

Procedure § 1294 (4th ed.) (collecting cases)).

The Court looks to the law of the State of Oklahoma to determine the Airport

Authority and Advisory Committee’s capacity to be sued.7 See Fed. R. Civ. P. 17(b)(3).

7 Neither entity is an individual or corporation, so its capacity to be sued is determined

“by the law of the state where the court is located . . . .” Fed. R. Civ. P. 17(b)(3). Notably,

even if capacity is lacking, an unincorporated association can be sued in its common name

to enforce a substantive federal right. Fed. R. Civ. P. 17(b)(3)(A).

B. The Airport Authority

The Airport Authority, citing a single Oklahoma statute stating that persons and

certain entities can be sued, argues that because the Airport Authority is not one of those

listed entities, it cannot be sued. (ECF No. 15 at 3 (citing Okla. Stat. tit. 12, § 2017(B)).)

The Airport Authority’s conclusion is not supported by the limited citations it provides.

The Airport Authority is correct that, in Oklahoma, “any person, corporation,

partnership, or unincorporated association[8] shall have capacity to sue or be sued . . . .”

Okla. Stat. tit. 12, § 2017(B). But this statute does not mean that other sorts of entities

lack such a capacity. See, e.g., Bond v. Okla. Cnty. Crim. Just. Auth., No. CIV-23-05-D,

2023 WL 2878772, at *2 (W.D. Okla. Apr. 10, 2023) (rejecting argument that section 2017

is “conclusive authority establishing that a public trust does not also have the capacity to

be sued”).

In fact, Oklahoma law contains many sources for the authority to sue or be sued

beyond just section 2017, particularly for governmentally created entities. See, e.g., Okla.

Stat. tit. 11, § 22-101(1) (“All incorporated municipalities . . . shall have the powers to . . .

[s]ue and be sued”); Okla. Stat. tit. 11, § 24-107(U) (Oklahoma Municipal Power Authority

may “sue or be sued”); Okla. Stat. tit. 11, § 38-107(A) (same, municipal Urban Renewal

Authorities); Okla. Stat. tit. 19, § 1(1) (same, organized counties within the State); Okla.

Stat. tit. 85A, § 100(B)(2) (same, Self-Insurance Guaranty Fund Board); Okla. Stat. tit.

36, § 2007(B)(3) (same, Oklahoma Property and Casualty Insurance Guaranty

Association); Okla. Stat. tit. 36, § 2028(L)(2) (same, Oklahoma Life and Health Insurance

8 Oklahoma law appears to recognize an unincorporated association when “any two or

more persons associate themselves together and transact business for gain or

speculation” under a particular name. Okla. Stat. tit. 12, § 182.

Guaranty Association); Okla. Stat. tit. 36, § 6530.6(2) (same, Board of Directors

established by the Oklahoma Insurance Commissioner under the Oklahoma Individual

Health Insurance Market Stabilization Act); Okla. Stat. tit. 63, § 485.3(B) (same,

Oklahoma Cerebral Palsy Commission).

Relevant here, in 1947, Oklahoma enacted the Municipal Airports Act, Okla. Stat.

tit. 3, §§ 65.1–65.22. The Act authorizes every municipality to establish, construct,

maintain, and operate airports. Id. § 65.2(A);9 see also Fine Airport Parking, Inc. v. City

of Tulsa, 2003 OK 27, ¶ 21, 71 P.3d 5, 12 (noting that powers exercised under the act are

for a public purpose). The Act provides that a municipality may grant the privileges of

using the airport for commercial purposes or supplying goods or services at the airport.

Okla. Stat. tit. 3, § 65.5(A)(1)–(2). In each case, the municipality may “establish the terms

and conditions and fix the charges, rentals or fees for the privileges,” which themselves

“shall be reasonable and uniform for the same class of privilege . . . and shall be

established with due regard to the property and improvements used and the expenses of

operation to the municipality.” Okla. Stat. tit. 3, § 65.5(A). Oklahoma law allows a

municipality to vest its authority under the Municipal Airports Act “in an officer or board

or other municipal agency whose powers and duties shall be prescribed in the resolution

. . . .” Okla. Stat. tit. 3, § 65.7. This includes a municipal airport authority. See City of

Tulsa ex rel. Tulsa Airport Auth. v. Air Tulsa, Inc., 1992 OK 146, ¶ 18, 851 P.2d 519, 522

(finding City of Tulsa properly delegated its authority to the Tulsa Airport Authority).

9 In 2024, two different versions of various amendments to the Municipal Airports Act

were signed into law. See 2024 Okla. Sess. Law Serv. Ch. 18 (H.B. 3672) (approved April

18, 2024); 2024 Okla. Sess. Law Serv. Ch. 135 (S.B. 1912) (approved Apr. 23, 2024). As

each enactment amends and restates the affected sections in their entirety, the Court cites

the later-approved version—S.B. 1912.

In accordance with the Municipal Airports Act, the Pawhuska Code of Ordinances

has created the Airport Authority and given it certain powers. See Pawhuska Code of

Ordinances tit. IX, §§ 98.01, 98.06(A).10 These powers include full and complete

authority to manage, operate, improve, extend, and maintain the Pawhuska Municipal

Airport—including entering into agreements, leases, and contracts with private

individuals for the privilege of using or improving the airport. Id. § 98.06(A) & (A)(4).

The Airport Authority also has “the other and further powers as are now given to any

charter municipality under the laws of the State” of Oklahoma except where those may

conflict with the City’s charter or other ordinances. Id. § 98.06(A)(7). Such

municipalities, including the City of Pawhuska, have the power to sue or be sued. See

Okla. Stat. tit. 11, § 22-101(1) (“All incorporated municipalities . . . shall have the powers

to . . . [s]ue and be sued . . . .”);11 see also Pawhuska Charter, § 3 (“The City shall have

power . . . to sue and to be sued . . . .”).12 And the Airport Authority has provided no

authority for the proposition that it would otherwise conflict with the City’s charter or

other ordinances for the Authority to sue or be sued.

As such, at this motion to dismiss stage, the Airport Authority has failed to meet

its burden of showing it lacks capacity.

10 Title IX of the City’s Code of Ordinances is available at

https://www.pawhuska.org/sites/g/files/vyhlif8551/f/uploads/paw_09.pdf

[https://perma.cc/B5K2-SJTG].

11 The Oklahoma Municipal Code defines a “charter municipality” as “any municipality

which has adopted a charter . . . .” Okla. Stat. tit. 11, § 1-102(1). Meanwhile, the term

“municipality” means “any incorporated city or town.” Id. § 1-102(5).

12 The Pawhuska Charter is available at

https://www.pawhuska.org/sites/g/files/vyhlif8551/f/uploads/00paw_charter.pdf

[https://perma.cc/5MMM-CKKN].

C. The Advisory Committee

The Court need not decide whether the Advisory Committee may sue or be sued,

because the complaint contains no factual allegations regarding the Advisory

Committee.13 The entirety of the allegations regarding the Advisory Committee are as

follows: “The Pawhuska Municipal Airport Advisory Committee is a citizen of Oklahoma

providing recommendations on the management of the Pawhuska Airport.” (ECF No. 1

¶ 4.) This falls far short of stating a plausible claim for relief under any law.14 Plaintiff’s

claims against the Advisory Committee will, therefore, be dismissed without prejudice for

failure to state a claim upon which relief may be granted.

III. Antitrust Claims

The Court next considers whether Emrich has sufficiently pled antirust claims

against the City and the Airport Authority under federal and state law. Federally,

Defendants assert that Emirch’s claims are untimely and that it has failed to allege an

antitrust injury or to plead a claim under section 2 of the Sherman Act.15 (ECF No. 14 at

13 The Advisory Committee is another creature of the City’s ordinances. See Pawhuska

Code of Ordinances, § 98.35. It is formed of local citizens to provide recommendations

to the City regarding the resolution of certain issues related to the airport. Id. § 98.35(A)–

(B).

14 The first page of the complaint alternatively uses the term “City” to refer to the City of

Pawhuska and, also, to all defendants collectively. (See ECF No. 1 at 1 & ¶ 2.) Reviewing

the remainder of the complaint, however, it appears that the “City” refers only to the City

of Pawhuska—e.g., “Pawhuska Airport is owned by the City” (id. ¶ 5); “EAS and the City

entered into an Aerial Applicator Agreement” (id. ¶ 19); “the City informed EAS at a City

Council meeting . . .” (id. ¶ 28). The undersigned interprets the complaint as referring to

the City of Pawhuska, specifically, in allegations referencing the “City.”

15 Defendants do not raise, and the Court does the address, the City and Airport

Authority’s potential exemption from liability under the doctrine established in Parker v.

Brown, 317 U.S. 341 (1943), or from damages under the Local Government Antitrust Act

of 1984, 15 U.S.C. § 34–36. “[T]he Parker doctrine exempts . . . anticompetitive conduct

engaged in as an act of government by the State as sovereign, or, by its subdivisions,

(cont. on next page)

4–7.) Defendants make similar arguments under state law.16 (Id. at 5, 8.) The Court

finds that Emrich has failed to state a claim and does not address Defendants’ other

arguments.

A. Section 2 of the Sherman Act

1. Generally

Emrich brings its antitrust claims under section 2 of the Sherman Act, 15 U.S.C.

§ 2, which makes it unlawful for a person to “monopolize, or attempt to monopolize, or

combine or conspire with any other person or persons, to monopolize any part of the trade

or commerce among the several States . . . .” 15 U.S.C. § 2. Section 4 of the Clayton Act,

15 U.S.C. § 15, “creates a private cause of action for any person who has been ‘injured in

his business or property by reason of anything forbidden in the antitrust laws,’ and

provides for treble damages.” Full Draw Prods. v. Easton Sports, Inc., 182 F.3d 745, 750

(10th Cir. 1999) (quoting 15 U.S.C. § 15(a)).

Section 2 of the Sherman Act applies to three distinct kinds of claims—

monopolization, attempted monopolization, and combinations or conspiracies to

pursuant to state policy to displace competition with regulation or monopoly public

service.” City of Lafayette v. La. Power & Light Co., 435 U.S. 389, 413 (1978).

“Municipalities, on the other hand, are not beyond the reach of the antitrust laws by virtue

of their status because they are not themselves sovereign.” Town of Hallie v. City of Eau

Claire, 471 U.S. 34, 38 (1985). “Rather, to obtain exemption, municipalities must

demonstrate that their anticompetitive activities were authorized by the State ‘pursuant

to state policy . . . .’” Id. at 38–39 (quoting Lafayette, 435 U.S. at 413).

16 Defendants do not raise, and the Court does not address, whether the City and Airport

Authority may be sued under the Oklahoma Antitrust Reform Act for the anti-competitive

effects of actions taken by a municipal airport. See Fine Airport Parking, 2003 OK 27,

¶ 29, 71 P.3d 5, 14 (holding municipality may fix the rate for an airport parking service

even though it may have anti-competitive effects).

monopolize. Emrich does not assert a combination or conspiracy claim.17 To state a

monopolization claim for damages, the plaintiff must plead (1) the defendant’s possession

of monopoly power in the relevant market;[18] (2) the defendant’s willful acquisition or

maintenance of that power as distinguished from growth or development as a

consequence of a superior product, business acumen, or historic accident; and (3) that

plaintiff’s injuries were caused by the defendant’s anticompetitive conduct. Chase Mfg.,

Inc. v. Johns Manville Corp., 84 F.4th 1157, 1168 (10th Cir. 2023); see also id. at 1168–69

(noting these are often shortened to (1) monopoly power, (2) exclusionary conduct, and

(3) antitrust injury). To state an attempted monopolization claim, the plaintiff must plead

“(1) relevant market (including geographic market and relevant product market);

(2) dangerous probability of success in monopolizing the relevant market; (3) specific

intent to monopolize; and (4) conduct in furtherance of such an attempt.” TV Commc’ns

Network, Inc. v. Turner Network Television, Inc., 964 F.2d 1022, 1025 (10th Cir. 1992)

(internal quotations omitted). Again, to recover damages, “a private plaintiff . . . ‘must

17 The complaint mentions that Emrich originally negotiated with Kevin Brown about

partnering with his company, Bluestem Aerial, to expand into Oklahoma, but Brown later

sold Bluestem and kept a percentage of profits for himself. (ECF No. 1 ¶¶ 11, 14–15.) The

complaint further alleges that Defendants provided favorable treatment to Bluestem and

Deterding Aerial, who are Emrich’s competitors. (Id. ¶¶ 31, 42, 67.) But Emrich does not

allege that Defendants conspired or combined with these companies.

18 For each cause of action under section 2 of the Sherman Act, “plaintiffs must define the

relevant market . . . .” Auraria Student Hous. at the Regency, LLC v. Campus Vill.

Apartments, LLC, 843 F.3d 1225, 1239 (10th Cir. 2016). “The relevant product market in

any given case ‘is composed of products that have reasonable interchangeability for the

purposes for which they are produced—price, use and qualities considered.’” Id. at 1244–

45 (quoting SCFC ILC, Inc. v. Visa USA, Inc., 36 F.3d 958, 966 (10th Cir. 1994)). The

“geographic market is the narrowest market which is wide enough so that products from

adjacent areas cannot compete on substantial parity with those included in the market.’”

Id. at 1245 (quoting Westman Comm’n Co. v. Hobart Int’l, Inc., 796 F.2d 1216, 1222 (10th

Cir. 1986)). “Together these factors define a real economic market for purposes of

antitrust analysis.” Id.

prove antitrust injury, which is to say injury of the type the antitrust laws were intended

to prevent and that flows from that which makes defendants’ acts unlawful.’” Full Draw,

182 F.3d at 750 (quoting Brunswick Corp. v. Pueblo Bowl-O-Mat, Inc., 429 U.S. 477, 489

(1977)). “The injury should reflect the anticompetitive effect either of the violation or of

anticompetitive acts made possible by the violation.” Brunswick, 429 U.S. at 489.

2. Emrich Has Failed to Plead a Claim under Section 2 of the

Sherman Act

As noted above, Emrich’s section 2 claims require that a defendant either possesses

monopoly power in the relevant market or has a dangerous probability of success in

monopolizing the relevant market. It its complaint, Emrich claims that “the relevant

product market[]” is “aeronautical spraying services in the relevant geographic market.”

(ECF No. 1 ¶ 77.) Likewise, the alleged relevant geographic market appears to be the area

accessible for spraying services via the Pawhuska Municipal Airport. (See id. ¶¶ 16, 64,

71.)

In a usual monopoly, “suppliers utilize market power to restrict output and thereby

raise prices.” Campfield v. State Farm Mut. Auto. Ins. Co., 532 F.3d 1111, 1118 (10th Cir.

2008). Monopoly power under section 2 “is conventionally understood to mean

‘substantial’ market power.” Phillip E. Areeda & Herbert Hovenkamp, Antitrust Law: An

Analysis of Antitrust Principles and Their Application (CCH) ¶ 801; id. ¶ 801a (noting

most recent cases dismiss claims where the defendant’s market share is less than 50%).

Here, however, there is no allegation that the City or the Airport Authority has any market

share in the relevant market of aeronautical spraying services, or that either governmental

entity was attempting to obtain any.

Stated more simply, if an entity acts alone and is “not a competitor” in the relevant

market, they cannot be a defendant in a section 2 monopoly claim.19 See, e.g., Mercy-

Peninsula Ambulance, Inc. v. San Mateo Cnty., 791 F.2d 755, 759 (9th Cir. 1986) (“the

county is not a competitor in the health care provision market and cannot be charged with

having used market position to exclude competition”); Name.Space, Inc. v. Internet

Corp. for Assigned Names & Numbers, 795 F.3d 1124, 1131 (9th Cir. 2015) (“Because

ICANN is not a competitor in any of the three [relevant] markets, they cannot serve as the

basis for a § 2 monopoly claim.”); Abraham & Veneklasen Joint Venture v. Am. Quarter

Horse Ass’n, 776 F.3d 321, 334–35 (5th Cir. 2015) (finding defendant AQHA entitled to

judgment where nothing “shows that AQHA competes in the elite Quarter Horse

Market”); Spanish Broad. Sys. of Fla., Inc. v. Clear Channel Commc’ns, Inc., 376 F.3d

1065, 1075 (11th Cir. 2004) (“There is no question that CC does not participate in the

Spanish-language radio market. Thus, CC cannot attempt to monopolize that market.”);

Beard v. Parkview Hosp., 912 F.2d 138, 144 (6th Cir. 1990) (finding judgment

appropriate for defendant who “does not compete . . . as a provider of osteopathic

radiological services in” the geographic market).

19 There is no allegation that the City/Airport Authority acted in concert with others who

are competitors in an attempt to monopolize—or in monopolizing—the relevant market.

For example, in Full Draw, the defendants included the plaintiff’s sole competitor,

AMMO, and other defendants who “controlled or influenced AMMO.” Full Draw, 182

F.3d at 751. The Tenth Circuit found the complaint adequately alleged attempted

monopolization where the defendants’ boycott “eliminated the only competitor to

defendant AMMO’s trade show,” which was done with the intent “to monopolize the

relevant market [of archery trade shows in the United States], in order to destroy the

[plaintiff’s competing trade show] and create a monopoly for AMMO.” Id. at 756. The

plaintiff also stated a monopolization claim where “defendants obtained monopoly

power,” as “AMMO is now the sole producer of archery trade shows, [meaning] AMMO

and its members have the power to control prices in the market.” Id. at 756–57.

Because neither defendant here is alleged to have been competing with Emrich for

market power in the relevant market, the Court finds Emrich has failed to state a claim

under section 2 of the Sherman Act and does not reach Defendants’ other arguments.20

B. Oklahoma Antitrust Reform Act

1. Generally

Like section 2 of the Sherman Act, the Oklahoma Antitrust Reform Act makes it

“unlawful for any person to monopolize, attempt to monopolize, or conspire to

monopolize any part of trade or commerce in a relevant market within this state.” Okla.

Stat. tit. 79, § 203(B). Provisions of the Oklahoma Antitrust Reform Act are interpreted

in a manner consistent with federal antitrust law. See Okla. Stat. tit. 79, § 212; see also

Green Country Food Mkt., Inc. v. Bottling Grp., LLC, 371 F.3d 1275, 1281 (10th Cir. 2004)

(applying law under section 2 of the Sherman Act to a claim under section 203(B));

Bristow Endeavor Healthcare, LLC v. Blue Cross & Blue Shield Ass’n, 691 F. App’x 515,

520 (10th Cir. 2017) (applying federal “attempted monopolization” factors to

section 203(B) claim).21

20 Emrich also pleads that the City acted with the intent to use its control of an essential

facility (the airport) to limit competition within the relevant market of agricultural

spraying services. (ECF No. 1 ¶ 78.) The Tenth Circuit has recognized the “essential

facilities” doctrine as a way of showing monopolization. See Aspen Highlands Skiing

Corp. v. Aspen Skiing Co., 738 F.2d 1509, 1520–21 (10th Cir. 1984), aff’d on other

grounds, 472 U.S. 585 (1985). The elements to establish liability under this doctrine are

“(1) control of the essential facility by a monopolist; (2) a competitor’s inability to

duplicate the facility; (3) denial of the use of the facility to a competitor; and (4) the

feasibility of providing the facility.” Id. at 1520. Again, Emrich has not pled these

elements, as it has not alleged it is a competitor of the City or Airport Authority in the

provision of agricultural spraying services.

21 Unpublished decisions are not precedential, but they may be cited for their persuasive

value. 10th Cir. R. 32.1(A).

2. Emrich Has Failed to Plead a Claim under the Oklahoma

Antitrust Reform Act

Emrich’s claims under section 203(B) of the Oklahoma Antitrust Reform Act fail

for the same reasons as those under section 2 of the Sherman Act. As such, the Court does

not reach Defendants’ other arguments.

IV. Section 1983 Claims

In its complaint, Emrich also asserts claims under 42 U.S.C. § 1983, contending

Defendants violated its “guaranteed rights” under 49 U.S.C. § 47107.22 (ECF No. 1 ¶¶ 84–

90.) Defendants argue that any § 1983 action is time-barred and that Emrich has failed

to state a cognizable claim under the statute. (ECF No. 14 at 4, 9–10.)

Having considered the parties’ arguments, the Court finds that section 47107 does

not create statutory rights protected by § 1983. The Court further finds that Emrich has

not pled a § 1983 claim based on the Fourteenth Amendment. The Court does not reach

Defendants’ other arguments.

A. 42 U.S.C. § 1983—Generally

Section 1983 assigns liability to every person who, under color of State law,

deprives someone of “any rights, privileges, or immunities secured by the Constitution

and laws . . . .” 42 U.S.C. § 1983. “Historically, individuals brought § 1983 suits to

vindicate rights protected by the Constitution,” but the Supreme Court “recognized that

§ 1983 also authorizes private parties to pursue violations of their federal statutory

22 Emrich also alleges Defendants failed to comply with the Oklahoma Open Meetings Act,

presumably as support for its allegations that they violated its rights under § 47107. (ECF

No. 1 ¶ 86.) To the extent this allegation is intended as an independent basis for the

§ 1983 claim, it would fail. See Gaines v. Stenseng, 292 F.3d 1222, 1225 (10th Cir. 2002)

(noting there is “no cognizable claim under § 1983” for the alleged violation of state

statutes).

rights.” Medina v. Planned Parenthood S. Atl., 606 U.S. ---, 145 S. Ct. 2219, 2229 (2025).

Statutes, however, “create individual rights only in atypical cases.” Id. (citation modified).

For a statute to create an enforceable right, privilege, or immunity, it must clearly and

unambiguously use “rights-creating terms” and “display an unmistakable focus on

individuals like the plaintiff.” Id. (citation modified). Even for the “rare statute” that

satisfies this stringent and demanding test, “a § 1983 action still may not be available if

Congress has displaced § 1983’s general cause of action with a more specific remedy.” Id.

Spending-power statutes are “especially unlikely” to satisfy this test. Id. at 2230;

see also id. at 2231 (noting, in the context of federal grants, Congress alone has historically

had the power to enforce grant conditions). Recipients of federal grants must “voluntarily

and knowingly” consent to answer private § 1983 enforcement suits before such suits may

proceed, and this “consent cannot be fairly inferred if the federal spending-power statute

fails to provide ‘clear and unambiguous’ notice that it creates a personally enforceable

right.” Id. at 2234.

B. 49 U.S.C. § 47107 and FAA “Grant Assurances”

Here, Emrich asserts that it is “guaranteed the right to equal and fair opportunity

to use the Pawhuska Airport and its resources” pursuant to 49 U.S.C. § 47107 and certain

provisions in the “Grant Assurances.” (ECF No. 1 ¶ 85.)

1. 49 U.S.C. § 47107—Generally

“The federal government, through the Federal Aviation Administration (‘FAA’),

has been given authority by Congress to provide airport improvement grants to state and

local governments.” Mineta v. Bd. of Cnty. Comm’rs, No. 05-CV-0297-CVE-PJC, 2006

WL 2711559, at *1 (N.D. Okla. Sept. 19, 2006). Such grants “fall within congressional

authority to spend for the general welfare.” Id. at *6.

“Congress has required that [these] grant applications contain certain written

assurances that an airport sponsor . . . will abide by a variety of requirements.” 41 N. 73

W., Inc. v. U.S. D.O.T., 408 F. App’x 393, 395 (2d Cir. 2010) (citing 49 U.S.C. § 47107(a)).

The “Secretary of Transportation is responsible for ensuring compliance with these

assurances . . ., and is authorized to approve grant applications only if the airport

sponsor’s assurances are ‘satisfactory to the Secretary.’” Id. (citing 49 U.S.C. § 47107(g)

and quoting 49 U.S.C. § 47107(a)). To facilitate compliance, the Secretary of

Transportation has promulgated the set of standardized “grant assurances” that Emrich

references in its complaint. See FAA, Airport Sponsor Assurances (Apr. 2025).23 Emrich

asserts Defendants violated assurances regarding economic nondiscrimination (§ 22), no

exclusive right of use (§ 23), and hangar construction (§ 38). (ECF No. 1 ¶ 85.)

Any individual that is “directly and substantially affected” by an “airport sponsor’s

alleged noncompliance with a Grant Assurance [may] file a formal complaint with the

FAA.” 41 N. 73 W., Inc., 408 F. App’x at 396 (quoting 14 C.F.R. § 16.23(a)). “If the [FAA]

pleadings reveal a ‘reasonable basis for further investigation,’ the FAA investigates” and

“issues an ‘initial determination.’” Id. (quoting 14 C.F.R. §§ 16.29 & 16.31). If the

complaining party’s case is dismissed by the FAA, the party can “file an administrative

appeal to the Associate Administrator for Airports,” who then issues a final decision that

is “reviewable by a federal appellate court via petition.” Id. (citing 14 C.F.R. §§ 16.31,

16.33, 16.247, and 49 U.S.C. § 46110).

23 This document is available at

https://www.faa.gov/airports/aip/grant_assurances/assurances-airport-sponsors-2025

[https://perma.cc/ME4E-XTAR].

2. No Enforceable Right, Privilege, or Immunity under

§ 47107

The question before the Court, then, is whether these “grant assurances” given by

state and local governments receiving federal funding for airport improvements explicitly

contemplate private causes of action under § 1983, in addition to an administrative

enforcement scheme. The Court finds they do not.

Overwhelmingly, courts have found that § 47107 creates no right of action under

§ 1983 for parties harmed by an alleged violation of the “grant assurances” given to the

Secretary of Transportation. See, e.g., Carey v. Afton-Lincoln Cnty. Mun. Airport Joint

Powers Bd., No. 07-CV-286-D, 2008 WL 11411455, at *3–5 (D. Wyo. June 4, 2008)

(finding no § 1983 claim for violation of § 47107 and noting this is consistent with the

“overwhelming majority of cases interpreting the [Airport and Airway Improvement Act]”

(collecting cases)); Four T’s, Inc. v. Little Rock Mun. Airport Comm’n, 108 F.3d 909, 916

(8th Cir. 1997) (finding § 47107 indicates Congress’s intent to establish an administrative

enforcement scheme “rather than a private right of action” or an action under § 1983);

Ricks v. City of Winona, 858 F. Supp. 2d 682, 687–88 (N.D. Miss. 2012) (finding no right

of action under § 1983 (collecting cases)); see also Mid-Atl. Soaring Ass’n, Inc. v. F.A.A.,

No. RDB 05-2110, 2006 WL 1892412, at *6 & n.5 (D. Md. June 29, 2006) (finding that

while a § 1983 claim was not available, this did not preclude plaintiff “from filing a

complaint with the FAA”). The one case Emrich cites that found an enforceable right

under § 1983 relies on cases that are no longer good law after Medina. See Cedarhurst

Air Charter, Inc. v. Waukesha Cnty., 110 F. Supp. 2d 891, 898–99 (E.D. Wis. 2000)

(relying on Wilder v. Va. Hosp. Ass’n, 496 U.S. 498, 503 & 509 (1990)24 and Mallett v.

Wis. Div. of Vocational Rehab., 130 F.3d 1245, 1253 (7th Cir. 1997) (which itself relies on

Wilder) as examples of cases permitting such § 1983 actions). Therefore, the Court finds

that Emrich has failed to state a claim for violation of 42 U.S.C. § 1983 based on the

defendants’ alleged violations of 49 U.S.C. § 47107.

C. Equal Protection under the Fourteenth Amendment

In its response brief, Emrich separately—and very briefly—argues that it has pled

that Defendants violated the Equal Protection Clause of the Fourteenth Amendment.

(ECF No. 21 at 10–11.) To the extent Emrich intended to assert an equal protection claim

in its complaint, the undersigned cannot discern it. See Watson v. Williams, 329 F. App’x

193, 196 & n.5 (10th Cir. 2009) (upholding dismissal of equal protection claim where

plaintiff, inter alia, “failed to allege any unequal treatment due to his membership in a

protected class or group” and where the court would not “read a class-of-one claim into

the bare allegations” of the complaint). The Court will grant Defendants’ motion to

dismiss Emrich’s § 1983 claims.

V. Contract Claims

Regarding Emrich’s contract claims, the City argues that Emrich’s claim for breach

of the original agreement is barred by the statute of limitations, while its claim based on

the lease is premature.25 (ECF No. 14 at 5–6.) The Airport Authority adds that it is not a

party to either contract. (ECF No. 15 at 10–11.)

24 “Some lower court judges, including in this case, still consult Wilder . . . when asking

whether a spending-power statute creates an enforceable individual right. They should

not.” Medina, 145 S. Ct. at 2234 (citation omitted).

25 Defendants ask that—if the Court dismisses the federal claims—it decline to exercise

supplemental jurisdiction over the remaining state-law claims. (E.g., ECF No. 14 at 5 n.5.)

(cont. on next page)

A. Emrich Has Failed to State a Breach of Contract Claim against

the Airport Authority

In its complaint, Emrich has failed to allege that the Airport Authority is a party to

either the original agreement or the lease. Its contract claims against the Airport

Authority will be dismissed.

To recover for breach of contract, Plaintiff must show (1) formation of a contract;

(2) breach of that contract; and (3) damages as a direct result of that breach.26 Digital

Design Grp., Inc. v. Info. Builders, Inc., 2001 OK 21, ¶ 33, 24 P.3d 834, 843. Formation

of a contract requires (1) parties capable of contracting; (2) their consent; (3) a lawful

object; and (4) sufficient cause or consideration. Okla. Stat. tit. 15, § 2. Generally,

“contracts are binding only upon those who are parties thereto.” Drummond v. Johnson,

1982 OK 37, ¶ 25, 643 P.2d 634, 639. There are no allegations that the Airport Authority

is a party to either the original agreement or the lease, much less that it breached either.

(See, e.g., ECF No. 1 ¶ 92 (“EAS and the City entered in the First Agreement”); id. ¶ 94

(the “City breached material terms of the First Agreement”); id. ¶ 97 (“EAS and the City

entered in the Second Agreement”); id. ¶ 99 (the “City has breached material terms of the

Second Agreement”); ECF No. 1-1 (showing only Emrich and the City as parties to the

original agreement); ECF No. 1-5 (showing only Emrich and the City as parties to the

lease).) Thus, Emrich has failed to state a claim against the Airport Authority for breach

of contract.

As noted below, while the Court has dismissed the federal claims, it is allowing Emrich to

file a motion to amend. The Court, therefore, addresses Defendants’ arguments regarding

the remaining state-law claims.

26 The parties assume that Oklahoma law governs the substance of, and limitations to,

Emrich’s state-law claims, and the Court does the same.

In its response brief, Emrich argues that the Airport Authority “is an alter-ego of

the City.” (ECF No. 22 at 12–13.) Emrich appears to be referring to a theory for piercing

the corporate veil, under which courts may “disregard the corporation as a separate

entity,” namely “where a business association becomes the ‘alter ego’ of one or more

stakeholders, such that a court will consider the stakeholder(s) and business association

to be synonymous.” Mattingly L. Firm, P.C. v. Henson, 2020 OK CIV APP 19, ¶ 17, 466

P.3d 590, 595 (listing factors considered). Emrich pleads no facts indicating that the City

and the Airport Authority are mere alter egos of each other, such that they should be

treated as a single entity. Additionally, there is no law provided in Emrich’s brief

indicating that the alter-ego theory applies to municipalities and their subordinate

entities.27

B. Emrich Has Stated a Breach of Contract Claim against the City

under the Original Contract, But Does Not (Currently) State a

Claim under the Lease

1. The Original Contract

The City has failed to clearly show, based on the allegations in the complaint, that

Emrich’s right to sue under the original contract has been extinguished. See Sierra Club,

816 F.3d at 671. Under Oklahoma law, an action on a written contract must be brought

within five years. Okla. Stat. tit. 12, § 95(A)(1). The action accrues when the contract is

breached (and not when damages result). Morgan v. State Farm Mut. Auto. Ins. Co.,

2021 OK 27, ¶ 25, 488 P.3d 743, 750. “When performance of a duty under a contract is

27 The one case cited by Emrich is not on point. (See ECF No. 22 at 12–13 (citing Advanced

Techs. v. Inverness Vill., Inc., No. 05-CV-254-TCK-SAJ, 2006 WL 8458164, at *2 (N.D.

Okla. Feb. 23, 2006)).) Advanced Technologies involved corporate entities, and the court

there found sufficient allegations—either alleged in the complaint or in a subsequent

amended complaint allowed “so long as the defect could be remedied”—that the two

companies functioned as a single entity. 2006 8458164, at *2.

due[,] any non-performance is a breach.” Restatement (Second) of Contracts § 235

(1981).

Citing no authority, the City argues its alleged breach of the original agreement in

April 2019 insulates it from suit for any subsequent breaches, unless Emrich brought suit

within five years of the first breach. (ECF No. 14 at 5.) The City’s argument is divorced

from the facts alleged in the complaint and unsupported by basic principles of contract

law.

As noted above, Emrich alleges it entered into the first, year-long agreement in

April of 2019, but the City almost immediately began denying Emrich access to facilities

at the airport in breach of the terms of the agreement. Then, in May 2019, the City also

stopped letting Emrich use the water hydrants at the airport. According to Emrich, the

agreement automatically renewed for another one-year term in April of 2020, and, in May

2020, the City restored access to the water hydrants. Later that month, on May 21, 2020,

the City again threatened Emrich with a loss of access to the water, stating that if Emrich

exercised this alleged contractual right, the City would consider it in default of the

agreement. The May 2020 letter also imposed additional requirements on Emrich, which

Emrich asserts were a breach of the parties’ agreement. Emrich brought this suit on

March 10, 2025, more than five years after the alleged breaches during 2019 (the first

term of the agreement), but less than five years after the alleged breaches during 2020

(the second term of the agreement).

The Tenth Circuit has determined that Oklahoma would find—in the case of a

continuing contract—that the plaintiff can sue for any failure to comply with the contract

that occurs within the five years preceding the lawsuit. See Paul Holt Drilling, Inc. v.

Liberty Mut. Ins. Co., 664 F.2d 252, 255–56 (10th Cir. 1981) (citing, among other things,

4A Corbin on Contracts § 956 (1951) 28). As Corbin states,29

There are contracts . . . that have been said to require continuing (or

continuous) performance for some specified period of time, a period that

may be definite or indefinite when the contract is made. These contracts,

too, are capable of a series of “partial” breaches, as well as of a single total

breach by repudiation or by such a material failure of performance . . . as to

go “to the essence” and to frustrate substantially the purpose for which the

contract was agreed to by the injured party. For each “partial” breach a

separate action is maintainable, just as in the case of an “installment”

contract; and for a series of “partial” breaches occurring before any action

is brought only one action is maintainable.

10 Corbin on Contracts § 53.14 (2025); see also W. Nat. Gas Co. v. Cities Serv. Gas Co.,

1972 OK 76, ¶ 19, 507 P.2d 1236, 1242 (action not barred by statute of limitations where

defendant had a continuing obligation to disclose information).

As pled in the complaint, the City’s obligations under the original agreement were

of a continuing nature. Emrich was to, inter alia, have the continuous non-exclusive right

to use the blue office building and to pay for water usage associated with the City’s water

accounts until it had its own connection to the rural water supplier. The complaint also

appears to allege that the City allowed the contract to renew for a second one-year term

(i.e., it failed to terminate the agreement in a timely manner) and that it removed the

blockade of the water hydrants by May 2020, before again attempting to withdraw access

later that month. Drawing all inferences in Emrich’s favor, there was a contract with the

28 Now 10 Corbin on Contracts § 53.14 (2025).

29 The Oklahoma Supreme Court has frequently cited to Corbin on Contracts. See, e.g.,

Max True Plastering Co. v. U.S. Fid. & Guar. Co., 1996 OK 28, n.34, 912 P.2d 861, 868

n.34 (citing 1 Corbin on Contracts § 1 (1963)); Thompson v. Est. of Coffield, 1995 OK 16,

894 P.2d 1065, 1067–68 (citing Corbin on Contracts §§ 580, 614 (1960)); Crockett v.

McKenzie, 1994 OK 3, n.8, 867 P.2d 463, 467 n.8 (citing 3A Corbin on Contracts § 546

(1960)); Bonner v. Okla. Rock Corp., 1993 OK 131, n.44, 863 P.2d 1176, 1184 n.44 (citing

3 Corbin on Contracts § 562 (1960)).

City that required continued performance; the City did not fully repudiate the contract,

or otherwise commit a total breach of the contract, before March of 2020; 30 and the City

committed a subsequent breach of the contract after March of 2020.

Moreover, as the quotation from Corbin above indicates, it is not necessary to

specially classify the parties’ contract as one requiring continuing performance for

Emrich’s claims to survive. As Corbin notes,

While in the case of a total breach the injured party can at once get judgment

for his entire injury, it is not always necessary for him to elect this remedy.

In some cases he may elect to regard the breach as partial, proceed with his

own performance, sue for the partial injury, and maintain a second suit in

case a further breach occurs. He generally has no such election, however,

in case the wrongdoer has repudiated the contract, expressing his intention

to perform no further.

10 Corbin on Contracts § 53.4 (2025) (footnote omitted).31

The City has failed to show that the dates given in the complaint make it clear that

Emrich’s right to sue has been extinguished. Therefore, the City’s motion will be denied

as to the original agreement.

2. The Lease

Emrich’s arguments regarding the lease, however, are less successful. As noted

above, the lease gives Emrich the right to lease a portion of the airport. Emrich has agreed

to begin construction of a hangar and storage shed on that parcel by March 31, 2026. The

30 “A claim for damages for total breach is one . . . based on all of the injured party’s

remaining rights to performance.” Restatement (Second) of Contracts § 236(1). “A claim

for damages for partial breach is one . . . based on only part of the injured party’s

remaining rights to performance.” Id. § 236(2).

31 “It is perfectly clear, also, that where a non-performance is so material that the injured

party may treat it as a ‘total’ breach if he wishes but is not accompanied by a repudiation

of the contract, he may sue as for a ‘partial’ breach only and the statute will not begin to

run against an action for a subsequent failure of performance until it in fact occurs.” 10

Corbin on Contracts § 53.9 (2025).

lease also provides that the City will determine the portion to be leased (and on which this

construction may occur). The City has not yet fulfilled its obligation in this regard.

The lease does not provide a timeline for when the City must determine the

relevant site under the lease, although there is a reasonable inference that the City would

need to act in time for Emrich to be able to begin construction by March of 2026. Emrich,

however, has not alleged that the City’s failure to act has been so delayed as to constitute

a breach of the lease.32

In its response brief, Emrich argues that the City has, nevertheless, breached its

implied duty of good faith and fair dealing by twice telling Emrich it is in breach of the

lease and then attempting to alter the terms of the lease. (ECF No. 21 at 6–7.) Emrich

appears to base this argument on two statements by Hank Benson, who is identified in

the complaint only as a member of the Airport Authority and not an agent of the City.

(See ECF No. 1 ¶¶ 47, 55, 57; see also ECF No. 1-6.) The complaint further notes that the

City’s attorney has explicitly contradicted Benson both times. (ECF No. 1 ¶¶ 56, 58; ECF

No. 1-7.) Even if Benson’s actions could constitute a breach of the covenant of good faith

and fair dealing, Emrich has failed to allege those actions are attributable to the City.

Consequently, Emrich has failed to plead facts from which the Court could find a

plausible claim for a current breach of the lease by the City.

VI. Promissory Estoppel

Finally, the City argues Emrich’s claims for promissory estoppel are untimely

whether the Court applies the three-year statute of limitations for implied oral contracts

or the five-year statute of limitations for written promises. (ECF No. 14 at 5–6 & n.6

32 Emrich makes an argument that such a delay has occurred in its briefing (ECF No. 21

at 7), but there are no factual allegations to this effect in the complaint.

(citing Okla. Stat. tit. 12, § 95(A)(1)–(2).) Likewise, the Airport Authority argues Emrich

may not assert a promissory estoppel claim against it because it “was not a party to any

promise or agreement.” (ECF No. 15 at 11.) The Court rejects both arguments.

Under Oklahoma law, promissory estoppel requires “(1) a clear and unambiguous

promise, (2) foreseeability by the promisor that the promisee would rely upon it,

(3) reasonable reliance upon the promise to the promisee’s detriment and (4) hardship or

unfairness can be avoided only by the promise’s enforcement.” Russell v. Bd. of Cnty.

Comm’rs, 1997 OK 80, ¶ 27, 952 P.2d 492, 503. Even within three years prior to Emrich’s

March 2025 filing date, Emrich alleges promises and foreseeable reliance sufficient to

carry their promissory estoppel claim against the City past the pleading stage. (See ECF

No. 1 ¶¶ 51–75, 101–107.) Similarly, Emrich alleges the Airport Authority made promises

that at least arise within the five-year statute of limitations. (Id. ¶¶ 45–49.)

Again, where the defendants bear the burden of proving their affirmative defense,

the Court will not dismiss a complaint unless it is clear from the allegations in the

complaint that the defense applies. There is no such clarity here. Defendants’ arguments

regarding Emrich’s promissory estoppel claims are rejected.

VII. Leave to Amend

In its response brief, Emrich asks for leave to amend should the Court be inclined

to grant any portion of Defendants’ motions to dismiss. (E.g., ECF No. 21 at 2.) The local

rules require a motion to amend to include a statement as to whether another party

objects and a summary of the proposed changes. LCvR 7-1(h). (The undersigned prefers

a copy of the proposed amended pleading be attached to the motion.) The request in

Emrich’s response brief, as raised, is not sufficient. However, no schedule has been set in

this case, and, while the Court has dismissed some claims, it has not always done so for

the reasons Defendants argued. Nor is it clear to the Court that amendment would be

futile. Therefore, Emrich may file a motion to amend within 14 days of this order. If no

amendment is granted, the Court will consider whether to decline to exercise supple-

mental jurisdiction over the remaining state-law claims.

Conclusion

IT IS THEREFORE ORDERED that Defendant City of Pawhuska’s Motion to

Dismiss (ECF No. 14) is GRANTED IN PART AND DENIED IN PART as follows: the

Court DISMISSES WITHOUT PREJUDICE Plaintiff’s claims under Section 2 of the

Sherman Act, the Oklahoma Antirust Reform Act, and 42 U.S.C. § 1983, as well as the

claim for breach of contract under the Airport Hangar Lease. The motion is denied as to

all other claims.

IT IS FURTHER ORDERED that Defendant Pawhuska Municipal Airport

Authority’s Motion to Dismiss (ECF No. 15) is GRANTED IN PART AND DENIED IN

PART as follows: the Court DISMISSES WITHOUT PREJUDICE Plaintiff’s claims under

Section 2 of the Sherman Act, the Oklahoma Antitrust Reform Act, and 42 U.S.C. § 1983,

as well as all claims for breach of contract. The motion is denied as to all other claims.

IT IS FURTHER ORDERED that Defendant Pawhuska Municipal Airport Advisory

Committee’s Motion to Dismiss (ECF No. 16) is GRANTED. All claims against the

Pawhuska Municipal Airport Advisory Committee are DISMISSED WITHOUT

PREJUDICE.

The following claims remain in this case: Count IV (Breach of Contract – First

Agreement) as to Defendant City of Pawhuska only, and Count VI (Promissory Estoppel)

as to Defendant City of Pawhuska and Defendant Pawhuska Municipal Airport Authority.

Plaintiff may file a motion to amend its complaint by November 6, 2025.

ORDERED this 23rd day of October, 2025.

CL Yu Lak JUDGE

UNITED STATES DISTRICT COURT

31

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.