Opinion

Danis Clarkco Landfill Co. v. Clark Cty. Solid Waste Mgt. Dist.

  • 73 Ohio St. 3d 590
  • 1995 Ohio 301
Court
Ohio Supreme Court
Filed
Sep 6, 1995
Status
Published
On the bench
Moyer, C.J.
Cited by
23 cases
Authority
More cited than 81.2%

“The issue whether to grant or deny an injunction is a matter solely within the discretion of the trial court and a reviewing court should not disturb the judgment of the trial court in the absence of a clear abuse of discretion”

How later courts described this case

  • “The issue whether to grant or deny an injunction is a matter solely within the discretion of the trial court and a reviewing court should not disturb the judgment of the trial court in the absence of a clear abuse of discretion”

Written by the judges who cited it.

The opinion

[This opinion has been published in Ohio Official Reports at 73 Ohio St.3d 590.]

DANIS CLARKCO LANDFILL COMPANY, APPELLEE AND CROSS-APPELLANT, v.

CLARK COUNTY SOLID WASTE MANAGEMENT DISTRICT, CROSS-APPELLEE;

OGDEN MARTIN SYSTEMS, INC., APPELLANT AND CROSS-APPELLEE.

[Cite as Danis Clarkco Landfill Co. v. Clark Cty. Solid Waste Mgt. Dist.,

1995-Ohio-301.]

Counties—Solid waste management districts -- Selection of designated providers of

solid waste disposal services not subject to competiitive bid requirements of

R.C. 307.86—Procedure for selecting designated providers of solid waste

disposal services—Issue of whether to grant or deny an injunction is solely

within discretion of trial court.

1. The selection of designated providers of solid waste disposal services by a

county solid waste management district established pursuant to R.C. Chapters

343 and 3734 does not involve the expenditure of public funds falling within

the minimum monetary limits of the county competitive bid statute, R.C.

307.86, and such a selection is not subject to the competitive bid requirements

of that statute.

2. In selecting designated providers of solid waste disposal services,a county

solid waste management district established pursuant to R.C. Chapters 343

and 3734 may adopt a procedure by which it first issues a request for proposals

to be followed by subsequent negotiation with successful respondents.

3. The issue whether to grant or deny an injunction is a matter solely within the

discretion of the trial court and a reviewing court will not disturb the judgment

of the trial court in the absence of a clear abuse of discretion. (Garono v. State

[1988], 37 Ohio St.3d 171, 173, 524 N.E.2d 496, 498, followed.)

(No. 94-1047—Submitted May 23, 1995—Decided September 6, 1995.)

APPEAL and CROSS-APPEAL from the Court of Appeals for Clark County, No. 3048.

SUPREME COURT OF OHIO

__________________

{¶ 1} The Clark County Solid Waste Management District ("District") is a

single county solid waste management district established pursuant to R.C. Chapters

343 and 3734, and is responsible pursuant to R.C. 3734.52 et seq., for preparing,

obtaining Ohio Environmental Protection Agency approval for, and implementing a

ten-year solid waste management plan ("SWM plan" or "plan") for disposal of solid

wastes generated within the District’s boundaries. In February 1992, the District

received approval from the Director of the Ohio Environmental Protection Agency

(“OEPA”) for its SWM plan. The plan contemplated continued use of an existing

landfill (the Tremont City Landfill) for disposal of wastes generated in Clark County

until that landfill reached its capacity, expected to occur in late 1992 to early 1993.

Thereafter the plan contemplated both interim and long-term disposal systems. The

plan called for interim waste disposal needs to be met by transfer of solid waste to an

unspecified transfer station and landfill which the District intended to identify through

a request for proposals ("RFP") process. Pursuant to that process, the District intended

to solicit proposals from private solid waste operators, to select the proposal it deemed

most satisfactory and beneficial to the residents of the District, and to thereafter enter

into negotiations with the successful operator leading to execution of a contract. In

terms of long-term (fifteen-twenty years) solid waste planning, the approved plan

again contemplated use of an RFP-negotiation process to obtain future disposal or

landfill services for the use of both residential and industrial waste generators in the

district.

{¶ 2} The District's OEPA-approved plan defined "secondary processing

facilities" as including composting systems, waste-to-energy facilities, refuse-derived

fuel facilities and other secondary recycling and composting methods. Although the

plan did not schedule development of a waste-to-energy incinerator or other secondary

processing facility, or anticipate implementation of such a facility for eight to ten

years, the plan indicated the District's intent to use the RFP process to "accept

2

January Term, 1995

secondary processing facility alternatives to determine improved cost competitiveness

due to local private sector involvement.”

{¶ 3} Accordingly, in early 1992, the District issued a formal document of

over two hundred pages entitled “Request for Proposal for an Integrated Solid Waste

Management System.” The RFP sought "proposals from qualified bidders to design,

construct and operate solid waste management facilities for the benefit of the District

and its Residents," and indicated the District's willingness to accept proposals as to

the following enumerated types of solid waste facilities: (1) a material processing

facility to provide a drop-off station at which trash could be sorted and directed

towards further disposal, (2) a yard waste composting facility, (3) a solid waste

transfer station, and (4) a newly constructed landfill with minimum eleven-year

disposal capacity. In addition, bidders were invited to suggest in their proposals

options as to “secondary processing technologies to reduce disposal capacity

requirements,” and were advised that “secondary processing alternatives proposed as

part of a total solid waste management solution [would] be considered.” The RFP

further apprised potential respondents that the District did not "currently anticipate

that a secondary processing technology would be cost-effective within the District

within the 11-year planning period," but that it was "possible that one of many

secondary processes will be feasible during the 11-to-21-year term of the proposed

contract."

{¶ 4} The RFP indicated the basic process by which sealed bids for

"Comprehensive Solid Waste Management Services" would be received and opened,

and by which they could be withdrawn, and included the following statement:

"The District shall have the right to reject any or all Bids, waive any and all

informalities or irregularities in any Bid or in the bidding, to accept any Bid which is

deemed most favorable to the District, and to negotiate contract terms with the

successful Bidder."

3

SUPREME COURT OF OHIO

{¶ 5} The RFP set forth the District's criteria to be used in evaluating bids, and

reserved for the District the right to consider qualifications and experience of bidders,

their key personnel and facility supervisors in managing solid waste facilities. The

District informed prospective respondents that it might "schedule interviews with any

or all of the Bidders," and that the results of those interviews would be "incorporated

into the District's qualitative evaluation of the Bidder and its Bid." As to bids

including proposals for secondary processing technologies, the District informed

bidders that it reserved the right to "select any alternate Bid, or part thereof, if the

District believes it is in the best interest of the District and its Residents" and advised

bidders in general of its intent to reserve the right to “accept any component of any

bid.”

{¶ 6} The RFP included sample contractual agreements which represented

"the most likely options of the District," although potential respondents were informed

that "[o]ther eventualities, unique solid waste services, and Bidder requirements may

require separate negotiation between the Bidder and the District." The sample

contract documents contemplated that a successful private operator would site, design,

construct and operate its proposed waste disposal facilities at the operator's sole cost,

all in accordance with the proposal set forth in its bid, subject to modifications

resulting from negotiations due to changes in the law or regulations. Pursuant to the

expected contracts, the selected private operators would accept for processing and

disposal all of the solid wastes (according to enumerated types, e.g., yard waste,

recyclables and mixed waste) generated by residents of the District for a specified

term, and to grant the District, on behalf of its residents (including all residential

households; all commercial, industrial or agricultural enterprises; and all

governmental entities) an irrevocable license to use its private facility for solid waste

disposal purposes. In exchange, the sample contracts called for the District to

"designate the Facility as the facility where all Solid Waste and Recyclable Materials

generated in the District, and over which the District has designation authority, is to

4

January Term, 1995

be delivered and processed," and to refuse to so designate any other facility for those

purposes. In further consideration of receiving such a designation, the successful

bidder would contractually agree to charge depositors a pre-specified price per ton

("tip fee") set by the contract, and would pay the District a royalty fee based on the

tonnage of trash received.

{¶ 7} The District received at least ten proposals in response to the RFP,

including proposals submitted by Danis Clarkco Landfill Company ("Danis") and

Ogden Martin Systems, Inc. ("OM"), parties herein.

{¶ 8} Of the bids received, only OM proposed a secondary processing

technology. OM proposed a joint project with Ohio Edison in which an existing Ohio

Edison facility in Clark County would be converted into a mass-burn incineration

facility producing electricity from the burning of refuse. OM proposed to enter into a

twenty-five-year contract by which the District would designate it to be the disposal

provider of Clark County's solid waste with an expected "tip fee" of $43.60 per ton

upon completion of the facility.

{¶ 9} Danis's bid contemplated the construction of a new landfill adjacent to

the existing Tremont City Landfill, which it owned and operated. Danis sought a

contract by which the District would deem the new Danis facility to be the designated

provider of solid waste disposal services in Clark County for a minimum of thirty

years, and proposed a tip fee of $34.13 per ton for disposal into the newly constructed

landfill once built.

{¶ 10} On September 8, 1992 the District's Board of Directors adopted

separate resolutions giving notice of the District’s intent to award three contracts,

including a contract by which OM and Ohio Edison would be designated to provide

long-term solid waste disposal services by means of their proposed incineration

facility. Each resolution noted that the award was subject to development and

execution of a written contract within ninety days, successful completion of siting as

5

SUPREME COURT OF OHIO

required by the District's approved SWM plan, and issuance of all required OEPA or

other governmental permits.

{¶ 11} On October 30, 1992 Danis filed a complaint in the Court of Common

Pleas of Clark County, naming the District as defendant, in which Danis claimed that

its bid was the only proposed bid which complied with the director-approved District

SWM plan, as only the Danis bid contemplated construction of a new sanitary landfill.

Danis sought a declaratory judgment claiming that the District lacked statutory

authority to enter into a contract with OM, in that the OM bid did not comply with the

plan and thus was not a conforming bid. Danis sought temporary, preliminary and

permanent injunctive relief in the form of an order, inter alia: (1) enjoining the District

from entering into contracts with OM for incineration services, and (2) ordering the

District to execute a contract with Danis for provision of solid waste management

services. Danis further claimed that the District was required to accept its bid,

contending that the Danis bid represented the sole, hence lowest, bid which conformed

to the OEPA-approved plan. The parties thereafter stipulated, with the court's

concurrence, that OM should be permitted to intervene as an additional defendant.

{¶ 12} The trial court held an evidentiary hearing after which it denied Danis

preliminary injunctive relief based on its finding that Danis was not likely to prevail

on the merits under any of its three proffered legal theories. The court held that (1)

determinations of compliance or non-compliance with the District's Plan (such as

whether designation of the OM-Ohio Edison waste-to-energy incinerator violated the

SWM Plan) are properly determined by the Director of Environmental Protection

(“Director”) pursuant to the doctrines of exhaustion of administrative remedies and

primary administrative jurisdiction, (2) Danis had not demonstrated evidence

sufficient to show that the District had abused its discretion by fraudulently conspiring

against Danis to prevent it from being awarded a contract, and (3) Danis had not

demonstrated that the award of a contract to OM would violate R.C. 307.86, Ohio's

competitive bid statute applicable to counties.

6

January Term, 1995

{¶ 13} The parties stipulated, with the concurrence of the trial court, that the

preliminary injunction hearing should be deemed consolidated with trial on the merits.

{¶ 14} The court of appeals reversed in part, and ordered that injunctive relief

be granted by the trial court to prevent the District from awarding a contract to OM.

The court of appeals agreed that claims of plan violations should be brought first to

the Director, but held that the Director had no authority nor primary jurisdiction to

adjudicate Danis's claims that Ohio competitive bid statutes were violated. The

appellate court held R.C. 307.86 to be inapplicable according to its terms, but held

that the District had nevertheless voluntarily committed itself to a competitive bidding

process, had thereby become subject to statutory competitive bid principles, and was

thus required to make its award to the "lowest and best" bidder. It held that Danis was

entitled to relief, in that the District had violated its own rules of bidding, and had

failed to consider Danis's bid in good faith. It remanded the cause to the court of

common pleas, which granted injunctive relief in accordance with the opinion of the

court of appeals.

{¶ 15} The cause is now before this court pursuant to the allowance of a

discretionary appeal and cross-appeal.

__________________

Faruki, Gilliam & Ireland, Charles J. Faruki and Jeffrey T. Cox, for appellee

and cross-appellant.

Eastman & Smith, John D. Willey, Jr., and Kenneth C. Baker; Stephen A.

Schumaker, Clark County Prosecuting Attorney, and Thomas E. Trempe, Assistant

Prosecuting Attorney, for cross-appellee Clark County Solid Waste Management

District.

Benesch, Friedlander, Coplan & Aronoff, N. Victor Goodman, James F.

DeLeone, Terrence M. Fay and Mark D. Tucker, for appellant and cross-appellee,

Ogden Martin Systems, Inc.

7

SUPREME COURT OF OHIO

Smith & West and William D. West, urging reversal on appeal for amicus

curiae, CF/Water.

David L. Feltner and Linda R. Evers, urging reversal on appeal for amicus

curiae, Ohio Edison Co.

Gallon & Takacs and Jeffrey Julius, urging reversal on appeal for amici

curiae, Ohio State Building and Construction Trades Council and Dayton Building

and Construction Trades Council.

__________________

MOYER, C.J.

{¶ 16} In this case a county solid waste management district solicited

proposals for construction of a solid waste disposal facility from private enterprises,

in contemplation of thereafter negotiating and entering into a contract pursuant to

which the successful bidders would agree to implement their proposals in

consideration of the district designating them to be the sole legal recipients of all solid

waste of enumerated types generated within the District. The primary legal issue we

are called upon to resolve is whether Ohio’s competitive bidding law applicable to

counties, as set forth in R.C. 307.86 et seq., bars a county solid waste management

district from selecting providers of solid waste disposal through the use of an RFP-

negotiation process.

{¶ 17} We resolve this inquiry in the negative, as did the court of appeals. We

further agree with the court of appeals that the District is under a legal obligation to

deal in good faith with bidders participating in its RFP process and must comply with

the terms and obligations it set forth in its RFP document. The court of appeals erred,

however, in holding that the District had voluntarily committed itself to strictly follow

all provisions of Ohio’s competitive bid statutes as interpreted by case law, and further

erred in reversing the trial court’s holding that Danis had failed to prove fraud or bad

faith on the part of the District. We therefore remand this cause with instructions that

8

January Term, 1995

the injunction entered in compliance with the judgment of the court of appeals be

vacated.

Solid Waste Disposal Statutory Framework

{¶ 18} Effective June 24, 1988, the General Assembly enacted

Am.Sub.H.B.No. 592 ("H.B. 592") (142 Ohio Laws, Part III, 4418), thereafter

codified in, inter alia, R.C. Chapters 343 and 3734. H.B. 592 constituted

comprehensive legislation establishing statewide solid and hazardous waste

management policies and programs. It vested the Director of Environmental

Protection with wide ranging authority to adopt rules governing solid waste facilities

and mandated each county to either create a county solid waste management district

("SWM district") or participate in a joint county solid waste management district.

Where a county SWM district is created, as in the case sub judice, the members of the

county board of commissioners also serve as members of the board of directors of the

SWM district. R.C. 3734.52(A). Each county SWM district is required to prepare

and implement a ten-year county solid waste management plan which must be

submitted to and approved by the Director. R.C. 3734.54(A). Thereafter, each district

is responsible for implementing the plan in compliance with schedules contained in

the approved plan. R.C. 3734.55(C)(4). In the event that a SWM district materially

fails to implement its approved plan, the Director must issue an enforcement order

directing the district to comply with the implementation schedule in the plan within a

specified reasonable time. R.C. 3734.13(A) and 3734.55(E). Where such an order is

disregarded, the Director may request the Attorney General to bring a civil action for

appropriate relief, including a temporary restraining order, preliminary or permanent

injunction and civil penalties. R.C. 3734.13(C).

{¶ 19} In addition, the statutory framework provides a method of private

enforcement by which any person aggrieved or adversely affected by an alleged

violation of R.C. Chapter 3734, including violations of approved SWM plans, may

commence a legal action in the court of common pleas in the county where the alleged

9

SUPREME COURT OF OHIO

violation occurred. R.C. 3734.101(A) and (E). Such an action is contingent, however,

upon the potential plaintiff first giving the Director one hundred fifty days’ written

notice of the alleged violation, during which time the Director is authorized to issue

an enforcement order. In the event the Director issues an enforcement order within

the one-hundred-fifty-day period, the contemplated private action is barred. R.C.

3734.101(B) and (C)(1).

{¶ 20} H.B. 592 contemplated the inclusion of “flow-control provisions” in

district SWM plans by which each district must "designate" the facility or facilities to

which wastes generated within its boundaries must be taken. Such a designation is

of value to solid waste disposal providers in that it ensures the receipt of a steady

stream of solid waste, and thus guarantees the designated provider a stable revenue

source. The legislation expressly prohibited the delivery of any solid wastes generated

within a county to any facility other than those designated in the county's SWM plan,

providing, "[n]o person, municipal corporation, township, or other political

subdivision shall deliver, or cause the delivery of, any solid wastes generated within

a county or joint district to any solid waste transfer, disposal, recycling, or resource

recovery facility other than the facility designated in the solid waste management plan

or amended plan of the district approved under section 3734.55 or 3734.56 of the

Revised Code.” Former R.C. 343.01(H)(2).1 In addition, a SWM district is statutorily

authorized to enter into contracts with private waste disposal service providers "for

the furnishing to the district *** of solid waste collection, storage, transfer, disposal,

recycling, processing, or resource recovery services." R.C. 343.02. The relevant

1. In 1993, R.C. 343.01(H)(2) was renumbered (I)(2) (144 Ohio Laws, Part IV, 6259-6260), and later

that year amended to state that, where a facility designation has been made by an SWM district in

accordance with an approved plan, "no person *** shall deliver *** solid wastes generated within a

county or joint district to any solid waste *** facility other than the facility [so] designated in [newly

enacted] section 343.013, 343.014 or 343.015 of the Revised Code, or in the initial or amended plan of

the district prepared and ordered to be implemented under section 3734.521, 3734.55 or 3734.56 of the

Revised Code, as applicable." (Emphasis added.) Am. Sub. S.B. No. 153, 145 Ohio Laws ___.

10

January Term, 1995

statutes in R.C. Chapter 343 are silent regarding the issue of whether such contracts

and designations are subject to statutory competitive bidding requirements.

Alleged Mootness

{¶ 21} Danis contends that this action should be dismissed as moot in light of

the decision of the Supreme Court of the United States in C & A Carbone, Inc. v.

Clarkstown (1994), 511 U.S. ___, 114 S. Ct. 1677, 128 L.Ed.2d 399. In Carbone the

court invalidated a flow-control ordinance enacted by the town of Clarkstown, New

York, as violative of the Commerce Clause of Section 8, Article I of the United States

Constitution. Danis argues that R.C. 343.01(I)(2), formerly (H)(2), which authorizes

SWM districts to adopt exclusive flow-control designations, is similarly

unconstitutional. In effect, Danis argues that the appeal is moot in that, in light of

Carbone, the District will be unable to legally comply with future contractual

obligations to enforce a designation of the proposed OM-Ohio Edison incinerator as

the sole repository of non-compostable, non-recyclable solid wastes generated within

the District.

{¶ 22} Initially, it may be noted that an injunction precluding execution of any

contract between the District and OM has been issued by the common pleas court. So

long as that injunction remains in effect, a real, justiciable controversy exists between

the parties which is neither merely academic nor abstract. See State ex rel. Eliza

Jennings, Inc. v. Noble (1990), 49 Ohio St.3d 71, 74, 551 N.E.2d 128, 131, citing

Miner v. Witt (1910), 82 Ohio St. 237, 238-239, 92 N.E. 21, 22.

{¶ 23} Secondly, we note that Danis did not raise constitutional issues

concerning the District's actions in the courts below, and we therefore deem any

constitutional objections it might have raised based on the Commerce Clause of the

United States Constitution to have been waived.

{¶ 24} Thirdly, acceptance of Danis's argument would result in an implicit

finding by this court that the Clark County Solid Waste Management District could

adopt no designation or flow-control resolution consistent with the Commerce Clause.

11

SUPREME COURT OF OHIO

It would be inappropriate for this court to make such an anticipatory ruling,

particularly in light of long-established precedent that counties and municipalities

may, within the exercise of their police power, designate approved facilities for

disposal of solid waste to ensure the public health, cf. Peninsula Sanitation, Inc. v.

Manistique (1994), 208 Mich. App. 34, 526 N.W.2d 607, and in light of the possibility

that at some future time Carbone may be legislatively overruled by Congressional

action. See Carbone, 511 U.S. ____, 114 S.Ct. at 1692, 128 L.Ed.2d at 420

(O’Connor, J., Concurring).

{¶ 25} Finally, even where appeals to this court might be deemed technically

moot, this court may nevertheless hear them where, as here, the appeal contains issues

of great public or general interest. Franchise Developers, Inc. v. Cincinnati (1987),

30 Ohio St.3d 28, 30 OBR 33, 505 N.E.2d 966.

{¶ 26} For all the foregoing reasons we do not deem this appeal to be moot.

{¶ 27} We further reject the argument that R.C. 343.014(J) effective October

29, 1993 (145 Ohio Laws ___), precludes review of this case.

Exhaustion of Administrative Remedies

{¶ 28} The trial court refrained from adjudicating Danis’s contentions that the

District‘s actions violated the technical requirements of R.C. Chapter 3734 based on

its finding that Danis failed to exhaust administrative remedies available to it under

R.C. Chapters 3734 and 3745.2 The court of appeals affirmed, and Danis has in this

court expressly disclaimed any challenge to these lower court findings.

2. R.C. 3734.101 at the time this action was commenced, provided in relevant part:

"(A) Except as provided in division (C) of this section, any person aggrieved or adversely

affected by an alleged violation of this chapter or a rule, permit, license, variance, or order issued or

adopted under it may commence a civil action on his own behalf against any person, the state, or a

political subdivision that is alleged to be in violation of this chapter or a rule, permit, license, variance,

or order issued or adopted under them. ***

"(B) An action under division (A) of this section may be commenced no sooner than one

hundred fifty days after the aggrieved or adversely affected person has given notice of the alleged

violation to the director of environmental protection, the attorney general, and the alleged violator.

Notice required under this division shall be delivered by certified mail and shall describe in detail the

alleged violation for which the action may be commenced.

12

January Term, 1995

{¶ 29} We concur, and hold that Danis’s failure to exhaust administrative

remedies and failure to serve a one-hundred-fifty-day notice on the Director as

required by R.C. 3734.101 barred it from commencing suit in the common pleas court

alleging failure of the District to comply with the requirements of its approved plan.

See State ex rel. Brown v. Rockside Reclamation, Inc. (1976), 47 Ohio St.2d 76, 84, 1

O.O. 3d 46, 50, 351 N.E.2d 448, 453-454. Accord Empire Sanitary Landfill v.

Pennsylvania Dept. of Environmental Resources (1994), 165 Pa. Commw. 442, 447-

448, 645 A.2d 413, 415.

{¶ 30} We therefore refuse to consider on this review any allegations of

illegality based on the District’s alleged failure to act in accordance with its own ten-

year OEPA-approved plan.

"(C)(1) No action may be commenced under division (A) of this section if, within one hundred

fifty days after the aggrieved or adversely affected person has given notice under division (B) of this

section:

"(a) The director, with the written concurrence of the attorney general, has issued an

administrative enforcement order requiring compliance by the alleged violator with the particular

provision of this chapter, rule, permit, license, variance, or order in question; or

"(b) The attorney general, prosecuting attorney of a county, or city director of law is

prosecuting a civil or criminal action in any court to require compliance by the alleged violator with the

particular provision of this chapter, rule, permit, license, variance, or order in question." (142 Ohio

Laws, Part III, 4495-4496.) (Amended effective October 29, 1993 in 145 Ohio Laws ___.)

R.C. 3745.08 as in effect when this action was commenced, provided, in part:

"(A) *** [A]ny person who is or will be aggrieved or adversely affected by a violation which

has occurred, is occurring, or will occur may file a [verified] complaint, *** with the director of

environmental protection, in accordance with the rules of the director adopted pursuant to Chapter 119.

of the Revised Code, alleging that another person has violated, is violating, or will violate any law, rule,

standard, or order relating to *** solid waste, *** or, if the person is in possession of a valid *** plan

approval relating to *** solid waste, that the person has violated, is violating, or will violate the

conditions of the *** plan approval. ***

"(B) Upon receipt of a complaint authorized by this section, the director shall cause a prompt

investigation to be conducted such as is reasonably necessary to determine whether a violation, as

alleged, has occurred, is occurring, or will occur. The investigation shall include a discussion of the

complaint with the alleged violator. If, upon completion of the investigation, the director determines

that a violation, as alleged, has occurred, is occurring, or will occur, he may enter such order as may be

necessary, request the attorney general to commence appropriate legal proceedings, or, where he

determines that prior violations have been terminated and that future violations of the same kind are

unlikely to occur, he may dismiss the complaint. *** " (143 Ohio Laws, Part III, 4684-4685.) (Amended

effective July 1, 1995, in 145 Ohio Laws ___.)

13

SUPREME COURT OF OHIO

{¶ 31} We similarly reject OM’s contention that the doctrine of primary

administrative jurisdiction precludes this court from resolving the competitive bid

issues Danis has presented pending final resolution of administrative appeals. In this

case, although Danis did not pursue administrative remedies, the parties and the court

of appeals all have acknowledged that persons not parties to the instant cause did

pursue administrative challenges with the Director of Environmental Protection

concerning the District’s proposed selection of the OM incinerator proposal, and that

litigation resulting from that challenge continues at the time of the issuance of this

opinion. We confine our review to substantive legal issues not falling within the

administrative purview of the OEPA.

Purported Applicability of Competitive Bidding Statute

{¶ 32} The court of appeals in this case recognized that “[n]egotiating material

aspects of contracts after the bid opening is violative of the sanctity and integrity of

competitive bidding.” Review of the District’s RFP makes it clear that the District

chose a process which can only in the most general sense be deemed to be

“competitive bidding.” See Yellow Cab of Cleveland, Inc. v. Greater Cleveland

Regional Transit Auth. (1991), 72 Ohio App.3d 558, 561, 595 N.E.2d 508, 509

(“‘[T]he RFP method of procurement is not competitive bidding.’”) Certainly, the

RFP process did not contemplate the execution of a contract based upon a simple

acceptance by the District of the successful bidder’s original proposal. Rather, the

RFP contemplated an award solely of the opportunity to further negotiate to reach a

possible contract with the District. The RFP did not include architectural or

engineering plans or “specifications” as that term is generally used in competitive bid

law in the sense of reasonably definite required elements. See Black's Law Dictionary

(6 Ed.1990) 1399 ("specification," as used in the law relating to construction contracts,

defined as "a particular or detailed statement *** of the various elements, materials,

dimensions, etc. involved"). (Emphasis added.) Accord Thelander v. Cleveland

(1981), 3 Ohio App.3d 86, 99, 3 OBR 100, 114, 444 N.E.2d 414, 427 (where

14

January Term, 1995

competitive bidding required, alteration of specifications without readvertisement and

recommencement of the bidding process constitutes abuse of discretion by public

officials). See, also, R.C. 307.02(D), requiring counties to devise "[d]efinite and

complete specifications of the work to be performed, together with such directions as

will enable a competent mechanic or other builder to carry them out" in procuring

leased building spaces. (Emphasis added.) Competitive bidding is based on the

premise that submitted proposals will be susceptible to being judged as “apples against

apples.”

{¶ 33} However, the RFP proposal used in this case, in soliciting proposals

for a wide range of innovative waste disposal methodologies and technologies,

resulted in the District receiving proposals for entirely different kinds of solid waste

disposal facilities at entirely different locations, necessarily requiring the District to

judge the proposals by a nonexistent standard.

{¶ 34} The issue, then, is whether the District could legally choose this

method to meet its statutory duty to designate waste disposal facilities. We start with

the premise that a public entity is not required to engage in competitive bidding in the

absence of legislation requiring it. Shafer v. Streicher (1922), 105 Ohio St. 528, 534,

138 N.E. 65, 67. Danis has contended throughout the course of this litigation that the

District falls within the scope of R.C. 307.86, which provided at the time this action

was commenced:

"Anything to be purchased, leased, leased with an option or agreement to

purchase, or constructed, including, but not limited to, any product, structure,

construction, reconstruction, improvement, maintenance, repair, or service, except the

services of an accountant, architect, attorney at law, physician, professional engineer,

construction project manager, consultant, surveyor, or appraiser by or on behalf of the

county or contracting authority, as defined in section 307.92 of the Revised Code, at

a cost in excess of ten thousand dollars, except as otherwise provided ***, shall be

15

SUPREME COURT OF OHIO

obtained through competitive bidding. ***” (Emphasis added.) (144 Ohio Laws,

Part II, 3261.)3

{¶ 35} In this case, a bidder responding to the District’s RFP sought to enter

into a contract by which it would receive a “designation” in exchange for its agreement

to build and operate a waste disposal facility for the use of residents of the District.

The anticipated contract quite simply did not involve any monetary cost to the public

or expenditure of public funds by the District. As then in effect, R.C. 307.92 applied

only to contracts “at a cost in excess of ten thousand dollars,” and the court of appeals

correctly held that the proposed contracts contemplated by the RFP process did not

fall within the scope of the statute.

{¶ 36} Danis urges this court to look to the value of the contemplated facility

in determining whether the proposed contract meets the statutory monetary minimums

of R.C. 307.86. The contemplated OM-Ohio Edison incinerator facility here at issue

was estimated to be a $150 million construction project with an ultimate projected

economic benefit to the community as high as $450 million. We acknowledge that

among the purposes of competitive bidding legislation are the protection of the

taxpayer; prevention of excessive costs and corrupt practices; and the assurance of

open and honest competition in bidding for public contracts so as to save the public

harmless, as well as bidders themselves, from any kind of favoritism, fraud or

collusion. Cedar Bay Constr., Inc. v. Fremont (1990), 50 Ohio St.3d 19, 21, 552

N.E.2d 204; Boger Contracting Corp. v. Bd. of Commrs. of Stark Cty. (1978), 60 Ohio

App.2d 195, 14 O.O. 3d 176, 396 N.E.2d 1059; United States Constructors &

Consultants, Inc. v. Cuyahoga Metro. Hous. Auth. (1973), 35 Ohio App.2d 159, 163,

64 O.O.2d 267, 269, 300 N.E.2d 452, 454. We further acknowledge that the power

entrusted to SWM districts to designate exclusive of solid waste disposal providers

3. R.C. 307.86 contains numerous exceptions to the general requirement of county competitive bidding

of contracts in excess of the monetary minimums. None of those exceptions has, however, been asserted

to be applicable to the cause sub judice.)

16

January Term, 1995

vests those districts with the power to "award" projects potentially worth millions to

the parties they select. Danis argues that a contract for exclusive services awarded by

a public entity should be subject to the checks and balances afforded by competitive

bidding.

{¶ 37} While this argument is not without some appeal, we conclude that the

General Assembly has not enacted a competitive bidding requirement that reaches

designations of privately owned and operated solid waste disposal facilities. It has

instead chosen alternative methods by which to protect the public interest, i.e., by

vesting the Ohio Environmental Protection Agency with extensive supervisory

authority over both solid waste providers and solid waste management districts, and

by including assurances in the statutory scheme that the public will have ample

opportunity to become involved in the process by which districts make solid waste

disposal decisions, including facility designations. See, e.g., R.C. 343.014, which

statutorily requires SWM districts to provide opportunity for public input as to facility

designations. Although that statute had not yet been enacted at the time of the events

sub judice, the District nevertheless held public hearings following the opening of the

bids submitted in response to the RFP at which members of the public had the

opportunity to respond, comment and ask questions concerning the various proposals.

One of the advertised public hearings attracted between seventy-five and one hundred

citizens.

{¶ 38} It is also true that the county itself may be presumed to be a future waste

generator which will ultimately be required, as all residents of the District will be, to

deposit future wastes at the designated facilities selected by the District, and to pay

associated tip fees at that time. This fact does not, however, bring the designation

selection process within the monetary minimums of R.C. 307.86. Any future tip fees

to be paid by the county will be payments made in consideration of OM's receipt of

wastes at that future time, and not in consideration of the District's designation of the

OM-Ohio Edison facility as the sole repository of the identified types of solid wastes.

17

SUPREME COURT OF OHIO

{¶ 39} Since we hold that the statutory minimum monetary expenditure

requirement of R.C. 307.86 is not met by a county solid waste management district's

designation process, we need not determine whether such a district constitutes a

county "contracting authority" as defined in R.C. 307.92. Cf. 1992 Ohio Atty. Gen.

Op. No. 92-060, at 2-246 to 2-247.

{¶ 40} We thus hold that the selection of designated providers of solid waste

disposal services by a county solid waste management district established pursuant to

R.C. Chapters 343 and 3734 does not involve the expenditure of public funds falling

within the minimum monetary limits of the county competitive bid statute, R.C.

307.86, and such a selection is not subject to the competitive bid requirements of that

statute. We further hold that, in selecting designated providers of solid waste disposal

services, a county solid waste management district established pursuant to R.C.

Chapters 343 and 3734 may adopt a procedure by which it first issues a request for

proposals to be followed by subsequent negotiation with successful respondents.

Limitation on Exercise of District Discretion

{¶ 41} The District here chose to incorporate into its RFP negotiation process

several components also required by statutory competitive bidding, e.g., sealed bids,

bid bonds, performance bonds, public opening of bids. The court of appeals correctly

recognized that the District was bound to adhere to these provisions, as well as other

conditions and provisions it had itself set forth in the RFP, as a public authority or

administrative agency may by its actions commit itself to follow rules it has itself

established, including rules governing the evaluation of proposals where statutory

competitive bidding is not required. Accord Waste Mgt., Inc. v. Wisconsin Solid

Waste Recycling Auth. (1978), 84 Wis.2d 462, 477, 267 N.W.2d 659, 667, at fn. 4

(although not subject to competitive bid statutes, award of contract for design,

construction and operation of a solid waste recycling facility was governed by

proposal-negotiation rules set forth in RFP).

18

January Term, 1995

{¶ 42} The court erred, however, in extrapolating from that premise the

conclusion that the District was bound to the full panoply of statutory competitive bid

requirements set forth in R.C. Chapter 307. To the contrary, the District was bound

only by the provisions contained within the RFP itself, and in its RFP the District

reserved for itself the right to “waive any and all informalities or irregularities in any

Bid ***.” The District did not commit itself to accept the "lowest and best" proposal

but, rather, informed bidders that it would accept the proposal, "or part thereof," it

deemed to be "in the best interest of the District and its Residents."

{¶ 43} Whether or not these reservations of rights are consistent with the

statutory competitive bidding requirements of R.C. 307.86 is irrelevant. Cf. State ex

rel. Coleman v. Munger (1948), 84 Ohio App. 148, 152-153, 39 O.O. 170, 172, 83

N.E.2d 809, 811. Quite simply, the District was bound to follow the conditions it had

set for itself in the RFP document, but was not required to follow the requirements of

R.C. Chapter 307. The court of appeals thus erred in finding it impermissible for the

District to, e.g., allow OM to “waive” a “put-or-pay” provision in its bid based on its

finding that the waiver constituted a “material” or “substantial" variation from the

original OM proposal.4

Propriety of Granting Injunctive Relief

{¶ 44} Courts should take “particular caution *** in granting injunctions,

especially in cases affecting a public interest where the court is asked to interfere with

or suspend the operation of important works or control the action of another

department of government.” Leaseway Distrib. Centers, Inc. v. Dept. of Adm. Serv.

(1988), 49 Ohio App.3d 99, 106, 550 N.E.2d 955, 962; Dandino v. Hoover (1994), 70

Ohio St.3d 506, 639 N.E.2d 767. The issue whether to grant or deny an injunction is

4. A “put or pay” provision may be described as a provision by which an SWM district agrees to

compensate a solid waste disposal provider in the event that prescribed levels of anticipated waste

do not eventuate, thereby reducing the provider’s expected revenues. An example of such a

provision is described in Carbone, supra, 511 U.S. at --, 114 S.Ct. at1693, 128 L.Ed.2d at 421.

19

SUPREME COURT OF OHIO

a matter solely within the discretion of the trial court and a reviewing court should not

disturb the judgment of the trial court in the absence of a clear abuse of discretion.

Garono v. State (1988), 37 Ohio St.3d 171, 173, 524 N.E.2d 496, 498.

{¶ 45} The court of appeals found that Danis was entitled to injunctive relief

in that it had submitted evidence sufficient to prove bad faith on the part of the District

and in that the District had “conducted a fraudulent bidding procedure by having

implicitly represented that it would consider all responsive bids in good faith when it

had no intention of considering Danis’s bid in good faith.” We reverse this holding.

We find instead, that the record before the trial court justified a finding that the District

substantially complied with the procedures it had announced in its RFP. When an

award decision is based upon criteria expressly set forth in a bidding proposal, no

abuse of discretion occurs. Kokosing Constr. Co. v. Dixon (1991), 72 Ohio App.3d

320, 325, 594 N.E.2d 675, 678.

{¶ 46} It is true that Danis presented evidence that one District board member

had indicated he would “help lead the fight against Danis,” and that prior to the date

set for submission of proposals another board member had written a handwritten note

indicating that the District “must follow the procedures & preserve [the District’s]

ability to oppose Danis in the future.” The record shows that public opposition to

Danis existed within Clark County based on its record of performance in operating

the Tremont City Landfill, although the parties disagree as to the extent of that

opposition. It is clear that the members of the District’s board may have been

influenced by citizens opposed to the selection of Danis’s proposal, and may well have

held a predisposition against accepting its proposal. However, such a reluctance under

the circumstances of this case does not necessarily demonstrate bad faith or abuse of

discretion.

{¶ 47} The District argued in the court below that its selection of the OM-Ohio

Edison proposal was based on its determination that the proposal would meet

ecological and economic needs not addressed by the Danis proposal, which

20

January Term, 1995

contemplated reliance on landfilling only. Testimony at the hearing established that

the OM proposal was favored by one District board member based on his conclusion

that (1) it was price competitive, (2) the technology "would serve the community

well," (3) the proposal resulted in waste reduction, and (4) the District would be

benefited by the generation of electricity by the facility. The vote of the District board

was unanimous in favor of the OM-Ohio Edison proposal. The trial court correctly

refrained from substituting its discretion for that of the District as to which submitted

proposals would be "in the best interest of the District," a primary selection criterion

established in the RFP.

{¶ 48} We further acknowledge that the District failed to interview Danis

concerning its proposal, while choosing to interview several other respondents,

including OM. Danis had, however, been interviewed previously by District

representatives in connection with a similar proposal it had submitted in response to

an earlier RFP, and the District was aware of the quality of Danis's operation of the

contemporaneously operating Tremont City Landfill. The RFP clearly authorized the

consideration of a bidder’s past record of performance in evaluation of its bid. In

addition, all submitted proposals, including that submitted by Danis, were evaluated

by the primary review committee, and its summary of the Danis proposal was included

in the Committee report to the District board. Danis was fully advised by the RFP

regarding the procedures the District would follow in making its designation selection.

{¶ 49} To establish fraud or abuse of discretion Danis was required to prove

that the District acted in bad faith or with an unreasonable, arbitrary or unconscionable

attitude. Cedar Bay Constr., supra, 50 Ohio St.3d 21-22, 552 N.E.2d at 205. The

trial court's finding that Danis failed to meet that burden of proof is not against the

manifest weight of the evidence.

{¶ 50} In sum, we conclude that the court of appeals erred in holding that the

District failed to adhere to any duty required of it, or otherwise abused its discretion.

In the absence of such a finding, Danis was not entitled to injunctive relief. We

21

SUPREME COURT OF OHIO

therefore reverse the judgment of the court of appeals, and reinstate the original

judgment of the trial court.

Judgment reversed

and original judgment

of the trial court reinstated.

DOUGLAS, WALSH, RESNICK, F.E. SWEENEY and COOK, JJ., concur.

PFEIFER, J., dissents.

JAMES E. WALSH, J., of the Twelfth Appellate District, sitting for WRIGHT, J.

__________________

PFEIFER, J., dissenting.

The math in this case adds up. The construction of this facility will cost

over $150 million; there are approximately 148,000 citizens in Clark County. As I

calculate it, this disposal plant will cost over $1,000 for every man, woman and

child in the county, yet the majority holds that the awarding of this lucrative

contract is exempt from competitive bidding.

The public’s funds are public funds. Whether they are spent directly or

indirectly by elected officials is of no consequence for purposes of Ohio’s county

competitive bidding statute, R.C. 307.86. The majority curiously labels the contract

between the Clark County Solid Waste Management District (“District”) and

Ogden Martin Systems, Inc. (“OM”) as a “designation,” rather than an expenditure,

in order to circumvent the requirements of R.C. 307.86. The majority contends that

the “anticipated contract quite simply did not involve any monetary cost to, or

expenditure of, public funds by the District.” (Emphasis sic.) If there is any

purpose to a public bidding statute, the logical and inescapable conclusion must be

that when a solid waste management district obligates the citizens it represents to

expend $150 million, the transaction is subject to the requirements of R.C. 307.86.

The “designation” of funds by the District falls within the purview of R.C.

307.86. R.C. 307.86 requires services purchased on behalf of a county or

22

January Term, 1995

contracting authority in excess of $10,000 to be obtained through competitive

bidding. The contract between the District and OM “designated” OM as the

exclusive provider of solid waste disposal for a period of twenty-five years, during

which time OM was to charge a pre-specified “tip fee” of $43.60 per ton. Waste

estimates for Clark County indicate that the residential, industrial, and commercial

sectors generate tens of thousands of tons of solid waste requiring disposal each

year. Thus, although the District did not directly convey any public funds, the

District arranged for OM to receive the benefit of millions of dollars of the public’s

funds. Funds need not first be taken into the public treasury before they are

regulated by R.C. 307.86.

Excluding county commissioners from state supervision of their fiscal

decisions when they put on the hat of solid waste management district

commissioners is contrary to the purpose of competitive bidding. The recognized

purpose of the county competitive bidding statute is the protection of the taxpayers

from a bad deal. Competitive bidding protects the taxpayers from fraud and the

temptations of lucrative collusion between public officials and private contractors.

Cedar Bay Constr., Inc. v. Fremont (1990), 50 Ohio St.3d 19, 21, 552 N.E.2d 202,

204.

To hold this transaction to be beyond the scope of R.C. 307.86 permits the

public trust to be displaced by public deal making. I accordingly dissent.

__________________

23