“Where a contract provision is ‘clear and unambiguous,’ it 4 is not subject to questions of construction or interpretation.’”

How later courts described this case

  • “Where a contract provision is ‘clear and unambiguous,’ it 4 is not subject to questions of construction or interpretation.’”

Written by the judges who cited it.

The opinion

1

2

3

4 UNITED STATES DISTRICT COURT

5 NORTHERN DISTRICT OF CALIFORNIA

6

7 ORACLE AMERICA, INC., et al., Case No. 24-cv-07457-JST

8 Plaintiffs,

ORDER DENYING MOTIONS TO

9 v. COMPEL ARBITRATION, TO STAY,

AND TO DISMISS

10 PROCORE TECHNOLOGIES, INC., et al.,

Re: ECF Nos. 38, 40

Defendants.

11

12

13 Before the Court is Defendant Mark Mariano’s motion to compel arbitration and to stay

14 proceedings or, in the alternative, to dismiss, ECF No. 38, and Defendants Procore Technologies,

15 Inc. and Procore Payment Services, Inc.’s motion to stay or, in the alternative, to dismiss, ECF No.

16 40. The Court will deny the motions.

17 I. FACTUAL BACKGROUND

18 A. Oracle’s Allegations1

19 Plaintiff Oracle hired Defendant Mariano when Oracle acquired his previous employer in

20 2016. ECF No. 1 ¶ 49. Mariano worked for Oracle until October 29, 2021, and during that time

21 he “had a front row seat to . . . Oracle’s technical development of” its Textura Payment

22 Management (“TPM”) solution and related enterprise resource planning (“ERP”) integrations. Id.

23 “Unbeknownst to Oracle, long after he left Oracle, Mariano improperly possessed thousands of

24 Oracle’s confidential, proprietary materials on his personal cloud accounts . . . , in addition to on

25 two Oracle computers . . . that he kept long after leaving Oracle.” Id. ¶ 51. Oracle discovered this

26

27

1 For the purpose of resolving Defendants’ motions to dismiss, the Court accepts as true the

1 fact “only after learning of Procore’s rapid launch of competing technology after hiring Mariano.”

2 Id. At that point, Oracle requested that Mariano return his Oracle devices and conducted a

3 forensic inspection, which revealed that they contained “Oracle trade secret files such as

4 confidential Oracle source code.” Id. ¶ 52. Oracle initiated conversations with Procore and

5 learned from those conversations that some of Oracle files “were copied over to Mariano’s

6 Procore-issued laptop.” Id.

7 Oracle filed this lawsuit against Mariano and Procore on October 25, 2024, asserting

8 claims for trade secret misappropriation under the Defend Trade Secrets Act, 18 U.S.C.

9 §§ 1836(b), 1839 et seq.; breach of contract; and unjust enrichment.

10 B. Employment Agreement and Proprietary Information Agreement

11 When Oracle offered Mariano a job, it required as a condition of his employment that he

12 sign an “Employment Agreement,” ECF No. 39-3 at 13–15, and a “Proprietary Information

13 Agreement,” ECF No. 39-3 at 9–12. Mariano signed both. ECF No. 38 at 11–12.

14 The Employment Agreement contains an arbitration provision, which states in relevant

15 part:

16 You and Oracle understand and agree that any existing or future

dispute or claim arising out of or related to your Oracle employment,

17 or the termination of that employment, will be resolved by final and

binding arbitration and that no other forum for dispute resolution will

18 be available to either party. . . . The arbitration proceedings shall be

conducted pursuant to the Federal Arbitration Act, and in accordance

19 with the National Rules for the Resolution of Employment Disputes

of the American Arbitration Association of the Employment

20 Arbitration Rules and Procedures adopted by Judicial Arbitration &

Mediation Services (“JAMS”).

21

22 The Proprietary Information Agreement lays out Mariano’s obligations with respect to

23 “confidential, proprietary, or trade secret information” he “develop[ed], receive[d], or otherwise

24 ha[d] access to” while employed by Oracle. ECF No. 39-3 at 9. It contains a venue provision,

25 which provides:

26 I agree that any legal action or proceeding involving Oracle which is

in any way connected with this agreement may be instituted in federal

27 court in San Francisco or San Jose, California or state court in San

courts in any such legal action or proceeding.

1

Id. at 12.

2

3 C. Procedural Background

4 Mariano moved to compel arbitration of Oracle’s claims against him and moved, in the

5 alternative, to dismiss Oracle’s DTSA claim under Rule 12(b). ECF No. 38. Oracle opposed the

6 motion, ECF No. 53, and Mariano replied, ECF No. 54. Separately, Procore moved to stay the

7 action pending resolution of Mariano’s and Oracle’s arbitration and moved, in the alternative, to

8 dismiss Oracle’s DTSA claim under Rule 12(b). ECF No. 40. Oracle opposed the motion, ECF

9 No. 51, and Procore replied, ECF No. 55.

10 II. JURISDICTION

11 The Court has jurisdiction under 28 U.S.C. §§ 1331, 1367.

12 III. LEGAL STANDARD

13 A. Motion to Compel Arbitration

14 The Federal Arbitration Act (“FAA”) applies to written contracts “evidencing a transaction

15 involving commerce.” 9 U.S.C. § 2. Under the FAA, arbitration agreements “shall be valid,

16 irrevocable, and enforceable, save upon such grounds as exist at law or in equity for the revocation

17 of any contract.” 9 U.S.C. § 2. This provision reflects “both a liberal federal policy favoring

18 arbitration, and the fundamental principle that arbitration is a matter of contract.” AT&T Mobility

19 LLC v. Concepcion, 563 U.S. 333, 339 (2011) (quotation marks and citations omitted).

20 On a motion to compel arbitration, the Court’s role under the FAA is “limited to

21 determining (1) whether a valid agreement to arbitrate exists and, if it does, (2) whether the

22 agreement encompasses the dispute at issue.” Chiron Corp. v. Ortho Diagnostic Sys., Inc., 207

23 F.3d 1126, 1130 (9th Cir. 2000). If the court is “satisfied that the making of the agreement for

24 arbitration or the failure to comply therewith is not in issue, the court shall make an order directing

25 the parties to proceed to arbitration in accordance with the terms of the agreement.” 9 U.S.C. § 4.

26 On a motion to compel arbitration, “courts rely on the summary judgment standard of Rule

27 56 of the Federal Rules of Civil Procedure.” Hansen v. LMB Mortg. Servs., Inc., 1 F.4th 667, 670

1 other documents filed with the court.” Burger v. Northrop Grumman Sys. Corp., No. 21-cv-

2 06761-ABM-RWX, 2021 WL 8322270, at *4 (C.D. Cal. Oct. 27, 2021). Under Rule 56, “[a]n

3 affidavit or declaration used to support or oppose a motion must be made on personal knowledge,

4 set out facts that would be admissible in evidence, and how that the affiant or declarant is

5 competent to testify on the matters stated.” Fed. R. Civ. P. 56(c)(4).

6 When deciding whether a valid arbitration agreement exists, federal courts generally

7 should “apply ordinary state-law principles that govern the formation of contracts.” First Options

8 of Chi., Inc. v. Kaplan, 514 U.S. 938, 944 (1995). “Issues of contract formation may not be

9 delegated to an arbitrator” and must be decided by the court. Suski v. Coinbase, Inc., 55 F.4th

10 1227, 1229 (9th Cir. 2022). “[T]he party resisting arbitration bears the burden of proving that the

11 claims at issue are unsuitable for arbitration.” Green Tree Fin. Corp. Ala. v. Randolph, 531 U.S.

12 79, 91 (2000).

13 Where the claims alleged in a complaint are subject to arbitration, the Court may stay the

14 action pending arbitration. 9 U.S.C. § 3.

15 B. Rule 12(b)(6) Motion to Dismiss

16 Dismissal under [Federal Rule of Civil Procedure] 12(b)(6) is appropriate only where the

17 complaint lacks a cognizable legal theory or sufficient facts to support a cognizable legal theory.”

18 Mendiondo v. Centinela Hosp. Med. Ctr., 521 F.3d 1097, 1104 (9th Cir. 2008). A complaint must

19 contain “a short and plain statement of the claim showing that the pleader is entitled to relief.”

20 Fed. R. Civ. P. 8(a)(2). Facts pleaded by a plaintiff “must be enough to raise a right to relief

21 above the speculative level.” Bell Atl. Corp. v. Twombly, 558 U.S. 544, 555 (2007). “To survive a

22 motion to dismiss, a complaint must contain sufficient factual matter, accepted as true, to ‘state a

23 claim to relief that is plausible on its face.’” Ashcroft v. Iqbal, 556 U.S. 662, 678 (2009) (quoting

24 Twombly, 550 U.S. at 570)). “A claim has facial plausibility when the plaintiff pleads factual

25 content that allows the court to draw the reasonable inference that the defendant is liable for the

26 misconduct alleged.” Id. In determining whether a plaintiff has met this plausibility standard, the

27 Court must “accept all factual allegations in the complaint as true and construe the pleadings in the

1 2005).

2 IV. DISCUSSION

3 A. Mariano’s Motion to Compel Arbitration

4 Mariano moves to compel arbitration. He argues that the parties delegated issues of

5 arbitrability to the arbitrator, and that even if the Court finds that it must decide arbitrability, the

6 Employment Agreement requires arbitration of Oracle’s claims.

7 1. Delegation of Arbitrability

8 The parties agree that the Employment Agreement incorporates the rules of the Judicial

9 Arbitration & Mediation Services (“JAMS”) and American Arbitration Association (“AAA”),

10 both of which delegate questions of arbitrability to the arbitrator. ECF No. 38 at 13–14; ECF No.

11 53 a 53. But Oracle contends that the claims at issue are governed not by the Employment

12 Agreement’s arbitration provision but rather by the Proprietary Information Agreement’s venue

13 provision. ECF No. 53 at 18–26. Mariano responds that the Employment Agreement and the

14 Proprietary Information Agreement ought to be read as “one contract” because they are “part of

15 the same employment package.” ECF No. 54.

16 California contract law principles do not support Mariano’s argument. It is true that

17 “[s]everal contracts relating to the same matters, between the same parties, and made as parts of

18 substantially one transaction, are to be taken together.” Cal. Civ. Code § 1642. But courts draw a

19 line between interpreting multiple contracts as one transaction and merging them together as one

20 contract. See, e.g., Alberto v. Cambrian Homecare, 91 Cal. App. 5th 482, 491 (2023)

21 (“Construing different instruments together pursuant to Civil Code section 1642 is not the same

22 thing as incorporating them into one instrument”); Tulare Golf Course, LLC v. Vantage Tag, Inc.,

23 No. 1:21-cv-00505-JLT-SKO, 2023 WL 2587994, at *6 (E.D. Cal. Mar. 21, 2023) (“construing

24 two agreements ‘in light of one another’ does not “merge them into a single written contract”)

25 (quoting Mountain Air Enters., LLC, v. Sundowner Towers, LLC, 3 Cal. 5th 744, 760 (2017)).

26 Mariano cites no authority holding that several written agreements presented as “part of the same

27 employment package” merge together to form “one contract.”

1 602 U.S. 143 (2024) controls here. See ECF No. 53 at 17. In Coinbase, the United States

2 Supreme Court held that “where parties have agreed to two contracts—one sending arbitrability

3 disputes to arbitration, and the other explicitly or implicitly sending arbitrability disputes to the

4 courts—a court must decide which contract governs.” Coinbase, 602 U.S. at 152. That is the

5 situation presented here, where the Employment Agreement delegates arbitrability questions to an

6 arbitrator but the Proprietary Information Agreement provides that “any legal action or proceeding

7 . . . may be instituted in federal court.” ECF No. 39-3 at 12.

8 Mariano points to several cases in which courts have found that “similar Oracle arbitration

9 agreements” delegated questions of arbitrability to an arbitrator, ECF No. 38 at 19–20, but none of

10 these cases held that Oracle’s arbitration agreement delegated questions of arbitrability of another,

11 separate agreement—in this case, the Proprietary Information Agreement—to an arbitrator.

12 Oracle Am., Inc. v. Myriad Grp. A.G., 724 F.3d 1069, 1074–75 (9th Cir. 2013) (incorporation of

13 United Nations Commission on International Trade Law rules evinced delegation of arbitrability

14 with respect to the same contract); Lopes v. Oracle Am., Inc., No. 22-cv-01815-BLF, 2022 WL

15 4281354, at *1, at *5 n.1 (N.D. Cal. Sept. 15, 2022) (same regarding American Arbitration

16 Association rules).2 Thus, these authorities provide no reason to deviate from Coinbase.

17 In short, the Court cannot conclude that the Employment Agreement’s delegation of

18 arbitrability operates to delegate to arbitration questions regarding the separate Proprietary

19 Information Agreement. Accordingly, the Court must decide the arbitrability of Oracle’s claims.

20 2. Scope of Arbitration Provision

21 Mariano contends that, if the Court reaches the issue of arbitrability, it should find that

22 Oracle’s claims fall within the scope of the Employment Agreement’s arbitration provision. ECF

23 No. 38 at 20–25. Oracle responds that, as a matter of contract interpretation, Mariano’s proposed

24 reading would vitiate the Proprietary Information Agreement’s venue provision. ECF No. 53 at

25

26

2 On reply, Mariano argues that “California law on incorporation also supports treating the

agreements as one.” ECF No. 54 at 10 (citing Shaw v. Regents of Univ. of Cal., 58 Cal. App. 4th

27

44, 54 (1997)). Because a “district court need not consider arguments raised for the first time in a

1 20–26.

2 The Court begins by finding that the Employment Agreement and the Proprietary

3 Information Agreement are “interdependent instruments, together designed to attain one

4 preconceived objective, and should be construed together.” 3 Tulare Golf Course, 2023 WL

5 257994, at *7; see also Goodman v. Severin, 274 Cal. App. 2d 885, 895 (1969). But “construing

6 two agreements together pursuant to § 1642 functions as an interpretive aide, and the Court must

7 nonetheless consider traditional principles of contract interpretation to determine whether the

8 terms of one agreement apply to the other.” Tulare Golf Course, 2023 WL 257994, at *6.

9 “It is a standard rule of contract interpretation that specific terms control over general

10 ones.” Shivkov v. Artex Risk Sols., Inc., 974 F.3d 1051, 1063 (9th Cir. 2020) (internal quotations

11 omitted). Mariano signed an Employment Agreement that governed the rights and obligations of

12 the parties with respect to Mariano’s employment. ECF No. 39-2 at 13. That Employment

13 Agreement directed that Mariano “also must sign the Proprietary Information Agreement,” ECF

14 No. 39-3 at 13, which Mariano did. The Proprietary Information Agreement sets forth the rights

15 and obligations of the parties with respect to confidential, proprietary, or trade secret

16 information—which is the subject of the claims in this action. The Proprietary Information

17 Agreement does not provide for arbitration of claims arising from or related to proprietary

18 information; to the contrary, it provides that “legal action[s] or proceeding[s] . . . in any way

19 connected with this agreement may be instituted in federal court.” ECF No. 39-3 at 12. Taking

20 these agreements together, see Cal. Civ. Code § 1642, the most natural reading is that claims that

21 arise under the more specific terms of the Proprietary Information Agreement are subject to that

22 agreement’s venue provision rather than the more general Employment Agreement’s arbitration

23 provision.

24 Mariano argues that the Employment Agreement’s arbitration provision “supersedes” and

25 “governs over” the Proprietary Information Agreement’s venue provision.4 ECF No. 38 at 13.

26

3 The parties appear to agree on this. ECF No. 38 at 17; ECF No. 53 at 15.

27

4 Mariano argues that the Employment Agreement “supersedes” the Proprietary Information

1 But a “basic rule of statutory construction is that one provision should not be interpreted in a way

2 which is internally contradictory or that renders other provisions of the same statute inconsistent

3 or meaningless.” Hughes Air Corp. v. Pub. Utils. Comm’n, 644 F.2d 1334, 1338 (9th Cir. 1981);

4 see also Cal. Civ. Code § 1641 (“The whole of a contract is to be taken together, so as to give

5 effect to every part, if reasonably practicable, each clause helping to interpret the other.”).

6 Mariano argues that the arbitration provision and the venue provision can be “harmonized”

7 because the arbitration provision uses broader language (“dispute or claim”) than the venue

8 provision (“legal action or proceeding”). ECF No. 38 at 22. It is true that other courts have

9 “harmonized” similar provisions this way. See id. (citing Roma Mikha, Inc. v. S. Glazer’s Wine &

10 Spirits, LLC, 2023 WL 3150076, at *6 (C.D. Cal. Mar. 30, 2023); Mohamed v. Uber Techs., Inc.,

11 848 F.3d 1201 (9th Cir. 2016)). But those cases concerned the interpretation of one contract rather

12 than two taken together. In Suski v. Coinbase, Inc., when the Ninth Circuit was presented with

13 two contracts in which one contained an arbitration provision and the other a forum selection

14 clause sending disputes to the courts, the Ninth Circuit distinguished its earlier decision in

15 Mohamed precisely because “there, the arbitration clause and the forum selection clause were

16 included in the same contract.” 55 F.4th 1227, 1231 (9th Cir. 2022).

17 Finally, Mariano argues that “any ambiguities in or questions about the agreements and

18 whether arbitration is required here must be interpreted against Plaintiffs.” ECF No. 38 at 25; see

19 Cal. Civ. Code § 1654 (“In cases of uncertainty not removed by the preceding rules, the language

20 of a contract should be interpreted most strongly against the party who caused the uncertainty to

21 exist.”) But a contract provision is only “ambiguous when it is capable of two or more

22 constructions, both of which are reasonable.” Daniel v. Ford Motor Co., 806 F.3d 1217, 1224 (9th

23 Cir. 2015) (quoting Producers Dairy Delivery Co. v. Sentry Inc. Co., 41 Cal. 3d 903, 912 (1986)).

24 In this case, neither provision is ambiguous. Mariano’s proposed construction would render one

25

26

Information Agreement is “7/5/16.” Id. at 12. Oracle contends that this discrepancy was a

mistake because Oracle’s records show Mariano returned both agreements on July 5, 2016. ECF

27

No. 53 at 24. In any event, the Court does not read the Employment Agreement to “supersede”

1 of the contract’s provisions superfluous, and such an approach violates basic principles of contract

2 interpretation. Accordingly, there are no ambiguities to interpret in Mariano’s favor. See Daniel

3 v. Ford Motor Co., 806 F.3d at 1224 (“Where a contract provision is ‘clear and unambiguous,’ it

4 is not subject to questions of construction or interpretation.’”) (quoting Neal v. State Farm Ins.

5 Cos., 188 Cal. App. 2d 690, 693–94 (1961) (internal quotation marks omitted)).

6 Accordingly, the Court holds that the Proprietary Information Agreement’s venue

7 provision authorizes Oracle to bring claims related to misappropriation of its proprietary

8 information in this Court rather than arbitration. The Court will deny Mariano’s motion to compel

9 arbitration.

10 B. Procore’s Motion to Stay

11 Procore moves to stay the entire action pending resolution of arbitration between Oracle

12 and Mariano. Because the Court denies Mariano’s motion to compel arbitration, it also denies

13 Procore’s motion to stay.

14 C. Mariano’s and Procore’s Motions to Dismiss DTSA Claim

15 Finally, Mariano and Procore argue that Oracle fails to state a DTSA claim. ECF No. 38 at

16 25–33; ECF No. 40 at 17–26. Under the DTSA, trade secrets are defined as information which

17 must (1) derive independent economic value, actual or potential, from not being generally known

18 in the public or to other persons who can obtain economic value from its disclosure or use; and (2)

19 is the subject of efforts that are reasonable under the circumstances to maintain its secrecy. 18

20 U.S.C. § 1839(3). To prevail on a claim under the DTSA, “a plaintiff must prove: (1) that the

21 plaintiff possessed a trade secret[;] (2) that the defendant misappropriated the trade secret; and (3)

22 that the misappropriation caused or threatened damage to the plaintiff.” InteliClear, LLC v. ETC

23 Glob. Holdings, Inc., 978 F.3d at 657–58 (citing 18 U.S.C. § 1839(5)).

24 Both Mariano and Procore argue that Oracle fails to plead sufficient particularity of the

25 trade secrets. Moreover, Mariano argues that Oracle fails to plead misappropriation as to him, and

26 Procore argues that Oracle fails to plead misappropriation as to it.

27 1. Particularity of Trade Secrets

1 with sufficient particularity to give defendants reasonable notice of the issues which must be met

2 at the time of trial and to provide reasonable guidance in ascertaining the scope of appropriate

3 discovery.” MedioStream, Inc. v. Microsoft Corp., 869 F. Supp. 2d 1095, 1113 (N.D. Cal. 2012).

4 “Plaintiffs must clearly refer to tangible trade secret material instead of referring to a system

5 which potentially qualifies for trade secret protection. Plaintiffs may not simply reply upon

6 ‘catchall’ phrases or identify categories of trade secrets.” Nat’l Specialty Pharmacy, LLC v.

7 Padhye, 734 F. Supp. 3d 922, 930 (N.D. Cal. 2024) (quoting InteliClear, 978 F.3d at 657–58).

8 “[T]he basic test is (1) whether something beyond general knowledge is being claimed and (2)

9 whether there is enough specificity to put the defendant on notice of what the theft is about.”

10 Arthur J. Gallagher & Co. v. Tarantino, 498 F. Supp. 3d 1155, 1172 (N. D. Cal. 2020).

11 Defendants argue that Oracle alleges only “broad categories and vague descriptions” of the

12 trade secrets at issue, that Oracle does not distinguish its claimed trade secrets from “matters of

13 general knowledge,” and that Oracle fails to plead the economic value of the trade secrets. ECF

14 No. 38 at 27–31; ECF No. 40 at 18–22. Oracle responds that it identified its trade secrets not as

15 “broad catchall categories” but “as particular files,” that it sufficiently pleads that the alleged trade

16 secrets are not “generally known,” and that its allegations regarding its investments in the alleged

17 trade secret materials and their impact on Oracle’s success in the market are sufficient to plead

18 economic value. ECF No. 53 at 28–31; ECF No. 51 at 20–29.

19 Oracle’s cited cases are closer to the mark than Defendants’. Arthur J. Gallagher & Co.,

20 498 F. Supp. 3d 1155, is particularly instructive. There, as here, a plaintiff alleged theft of

21 particular categories of documents and then provided “examples of specific documents (which the

22 defendant former employee] emailed to her personal email account).” Id. at 1172. The court held

23 that the plaintiff’s description made it “plausible that something other than general knowledge is at

24 issue,” and the plaintiff’s identification of “nine specific documents that it claimed contained its

25 trade secrets” left “little doubt here that Defendant have been put on adequate notice.” Id. at

26 1172–73. The same is true here. Oracle identifies specific categories of alleged trade secret

27 materials:

documents relating to Oracle’s TPM and ERP integrations (the

1 process of connection to a client’s enterprise resource software), such

as: (1) confidential and proprietary source code computer files,

2 including python source code files and SQL database files related to

specific ERP adapters developed by Oracle engineers; (2)

3 confidential test plans, project plans, and implementation plans

developed by Oracle engineers associated with integrations with

4 various ERPS for specific Oracle client implementations; (3)

confidential files reflection Oracle client information, revenue

5 projections, and other internal strategy documents related to Oracle’s

TPM and ERP integrations; and (4) confidential internal Oracle

6 documents and presentations detailing the design and implementation

of various Oracle ERP integrations.

7

8 ECF No. 1 ¶ 37. The complaint then lists specific documents and describes the alleged trade

9 secret nature of their contents:

10 For example, those files include specific .zip files entitled

‘TexturaCloud.zip’ and ‘TexturaSPs.zip,’ which include over 50

11 proprietary and confidential Oracle SQL source code files (together

with log files) developed by Oracle engineers and related to

12 implementing Oracle’s TPM Viewpoint Adapter. These confidential

Oracle code files are confidentially deployed at a customer-site to

13 enable integration with Oracle TPM, and only pursuant to non-

disclosure agreements with those at the customer to whom disclosure

14 is necessary. These confidential code files, developed through

substantial effort of Oracle engineers, are critical to Oracle’s success

15 in the marketplace, including as a result of their secret and proprietary

nature . . . .

16

17 Id. ¶ 53; see, e.g., id. ¶¶ 54–57.

18 As in Arthur J. Gallagher & Co., Oracle’s allegations leave “little doubt . . . that

19 Defendants have been put on adequate notice” of what it is that Oracle claims is trade secret. 498

20 F. Supp. 3d at 1172; see also TMX Funding, Inc. v. Impero Tech. Inc., No. C 10-00202 JF (PVT),

21 2010 WL 2509979, at *3 (N.D. Cal. June 17, 2010) (trade secret allegations were sufficient where

22 plaintiff alleged nine broad categories of trade secret information, including, among other things,

23 “[i]ts software, source codes, data, formulas, and other technical information developed as

24 proprietary and confidential products and services”). Moreover, Oracle’s allegations that the

25 materials were “confidentially deployed . . . and only pursuant to non-disclosure agreements” are

26 sufficient to plead that they are materials beyond general knowledge. See Salesforce.com, Inc. v.

27 GEA, Inc., No. 19-cv-01710-JST, 2021 WL 9860787, at *6–7 (N.D. Cal. Feb. 2, 2021)

1 are sufficient to raise inference that information is protectable as a trade secret). And its

2 allegations that the materials were “developed through substantial effort of Oracle engineers” and

3 “are critical to Oracle’s success in the marketplace” show independent economic value. See Cisco

4 Sys., Inc. v. Chung, No. 19-cv-07562-PJH, 2020 WL 4505509, at *5 (N.D. Cal. Aug. 5, 2020)

5 (“alleged effort and sales advantage” sufficient to plead independent economic value).

6 Accordingly, the Court finds that Oracle has sufficiently pled the particularity of the trade secrets

7 alleged.

8 2. Misappropriation by Mariano

9 Under the DTSA, “misappropriation” means either the “(1) [a]cquisition of a trade secret

10 by another person who knows or has reason to know that the trade secret was acquired by

11 improper means;” or the “(2) [d]isclosure or use of a trade secret of another without express or

12 implied consent.” 18 U.S.C. § 1839(5).

13 Mariano argues that Oracle fails to plead misappropriation by him. ECF No. 38 at 32–33.

14 Mariano claims that Oracle pleads only “incidental possession” and relies improperly on the

15 inevitable disclosure doctrine. ECF No. 38 at 32–33.

16 But Oracle pleads far more than that Mariano merely “failed to return lawfully required

17 information,” ECF No. 38 at 32, including that Mariano transferred those files from his Oracle

18 laptop to his Procore laptop “nearly two years after Mariano started working on competing

19 products at Procore, in furtherance of his job responsibilities and within the scope of his

20 employment.” ECF No. 1 at ¶ 20. Courts have allowed trade secret misappropriation with similar

21 even fewer indicia of misappropriation. See, e.g., E. & J. Gallo Winery v. Instituut Voor

22 Landbouw—En Viserijonderzoek, No. 1:17-cv-00808-DAD-EPG, 2018 WL 2463869, at *7 (E.D.

23 Cal. June 1, 2018) (allegations of similarity of products accompanied by allegations of exactly

24 how defendants improperly obtained the alleged trade secrets were sufficient to plead

25 misappropriation). Mariano’s citation to cases in which courts dismissed claims alleging solely

26 that an employee immediately began working for a competitor or that a competitor developed a

27 product in “record time” is unavailing, because, as explained above, Oracle pleads more here.

1 3. Misappropriation by Procore

2 Finally, Procore argues that Oracle fails to plead misappropriation as to Procore because

3 Oracle “cannot merely impute [its] allegations against Mr. Mariano to Procore” and Oracle fails to

4 plead Procore’s knowledge that it acquired trade secrets. ECF No. 40 at 24–26.

5 Oracle responds first that it pled that Procore is vicariously liable for Mariano’s conduct.

6 ECF No. 51 at 34. “Whether an employer is vicariously liable for an employee’s misappropriation

7 turns on whether the employee’s trade secret misappropriation ‘was committed within the scope of

8 employment.’” Neutron Holdings, Inc. v. Hertz Corp., No. 23-cv-00934-JSC, 2023 WL 3919465,

9 at *5 (N.D. Cal. June 8, 2023) (quoting Brain Injury Ass’n of Cal. v. Yari, No. 19-CV-5912, 2020

10 WL 3643482, at *6 (C.D. Cal. Apr. 30, 2020)). Procore argues on reply that Oracle does not plead

11 facts sufficient to establish that Mariano’s misappropriation occurred “within the scope.” ECF

12 No. 55 at 21. The Court is not persuaded: Oracle pleads that Mariano’s “misappropriation . . .

13 occurred, and is occurring, during the course and within the scope of his employment at

14 Procore . . . including transferring Oracle’s trade secret information to Procore’s equipment, and

15 using such Oracle information in his competitive role at Procore.” ECF No. 1 ¶ 84. Oracle further

16 pleads that Mariano transferred Oracle files to Procore devices after starting at Procore, and that

17 Procore subsequently released a product similar to the Oracle product to which the transferred files

18 were related. This is sufficient to allege vicarious liability. See Neutron Holdings, Inc., 2023 WL

19 3919465, at *5 (vicarious liability attached where plaintiff’s former employee allegedly took

20 algorithms related to a particular product feature, and defendant then released a product with a

21 similar feature).

22 Accordingly, the Court finds Oracle has sufficiently pled its DTSA claim against Mariano

23 and Procore.

24 / / /

25 / / /

26 / / /

27 / / /

1 CONCLUSION

2 For the foregoing reasons, Defendants’ motions to compel arbitration, to stay, and to

3 || dismiss are denied.

4 IT IS SO ORDERED.

5 Dated: April 9, 2025

6

JON S. TIGA!

7 United States District Judge

8

9

10

11

a 12

15

16

it

4 18

19

20

21

22

23

24

25

26

27

28

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.