STATE OF MAINE SUPERIOR COURT

CIVIL ACTION

KENNEBEC, ss. DOCKET NO. AP-06-72

T)l~ ,/v\-)~ L /), 0 ; ';'/':J.:

ROBERT and PATRICIA NELSON,

Petitioners

v. DECISION AND ORDER

MAINE LAND USE REGULATION

COMMISSION,

Respondent

Robert and Patricia Nelson ("Petitioners"), pursuant to M.R. Civ. P. 80C and 5

M.R.S.A. § 11001, ask this court to review the September 6, 2006 decision of the Maine

Land Use Regulation Commission ("LURC") approving Bayroot, LLC's Application to

Amend Subdivision Plan for LURC Project No.5 ("SP 5").

In 1972, LURC approved Brown Company's subdivision application, SP 5, with

conditions, for an area around Parmachenee Lake. The 19-1ot subdivision was

approved as a camp lot lease program. The lease lots were dispersed throughout the

31,OOO-acre subdivision and provided outdoor enthusiasts with the opportunity to lease

lots in a remote wilderness area. In its 1972 decision, LURC disapproved Brown

Company's proposed location of four sites for the reason that the soil at those locations

was unsuitable for development,l LURC imposed, in Condition 2 of its decision, a duty

on the applicant to return to the Commission to obtain approval for new locations for

1 "Soil types on sites 1, 3, 9, 13 and 14 are rated with severe to very severe limitations for the uses

proposed." R. at 20, <j[ 10 Finding of Fact. "Certain sites have unsuitable soil types, and should be re­

located, except possibly site 1." R. at 20, <j[ 15 Finding of Fact. Site 1 already had an existing camp on it

and LURC allowed it to remain on the condition that it obtain a plumbing permit and certificate of

inspection. R. at 20, Condition 3.

2

those sites. "The applicant shall relocate, with Commission approval, sites 3, 9, 13, and

14 to suitable soils." R. at 20, <JI 2 Terms and Conditions. Subsequent to LURe's

approval of SP 5, Brown Company leased ten of the nineteen sites. During the next 31

years, until Bayroot purchased SP 5, none of the remaining nine sites was improved,

developed, or leased.

Since 1972, LURC has adopted further regulations that apply to the subdivision.

LURC rezoned the shorefront (within 250 feet of the water) to a specially protected zone

called the Great Pond Protection Sub-District (P-GP zone). Residential development

without a special permit from LURC is prohibited in this zone. LURC has also adopted

a provision that prohibits shorefront lots, regardless of the zone, from forming a

contiguous strip longer than 1320 linear feet. Finally, LURC adopted a sunset provision

providing for the expiration of permits for lots that had been neither "substantially

started" nor "substantially completed" by October 1, 2004. 2

In 2004, Bayroot, as landowner and successor to SP 5, sought an advisory ruling

from the Commission asking certain questions regarding its rights and duties regarding

the nine lots that were undeveloped and that they proposed to relocate. In response,

the Commission's staff issued Advisory Ruling AR-04-39 ("Advisory Ruling"). Bayroot,

treating the Advisory Ruling as "Commission approval," thereupon relocated and

leased the four lots that Condition 2 of SP 5 mandated, as well as applied for an

amendment to authorize relocating five additional lots (to increase by four the number

of lots on the shorefront of Lake Parmacheenee). On September 7, 2006, LURC

2 Bayroot disputes that Section 10.17 of the Commission's rules applies to subdivision permits. However,

both the staff advisory opinion and the LURC decision "take the more conservative view that it applies to

both [subdivision and development permits], and therefore the conditions and activities authorized by

that permit had to be met by October 1, 2004." R. at 4, fn. 1. The court is satisfied that LURC's

interpretation of this rule is reasonable and within its realm of expertise, therefore the court will defer to

LURe's position.

3

approved Bayroot's application to relocate the five previously approved lots within the

31,000-acre project area subject to a number of conditions. On October 5, 2006, the

petitioners filed a petition for review, asserting, among other arguments, that Bayroot

failed to meet the October 2004 deadline for fulfilling the conditions affecting sites 3, 9,

13, and 14 in SP 5, therefore, the permit expired. Petitioners continue, arguing that

without a valid permit, LURC could not subsequently authorize the relocation of five

other lots within the subdivision pursuant to an amendment to the expired SP 5. 3

When the decision of an administrative agency is appealed pursuant to M.R. Civ.

P. 80C, this Court reviews the agency's decision directly for abuse of discretion, errors

of law, or findings not supported by the evidence. Centamore v. Dep't of Human Services,

664 A.2d 369, 370 (Me. 1995). "An administrative decision will be sustained if, on the

basis of the entire record before it, the agency could have fairly and reasonably found

the facts as it did." Seider v. Board of Exam'r of Psychologists, 2000 ME 206 <JI 9, 762 A.2d

551, 555 (Me. 2000) (citing CWCO, Inc. v. Superintendent of Ins., 1997 ME 226, <JI 6, 703

A.2d 1258, 1261 (Me. 1997)). In reviewing the decisions of an administrative agency, the

Court should "not attempt to second-guess the agency on matters falling within its

3 Bayroot argues that petitioners lack standing due to their failure to show they have suffered a

"particularized injury" from the LURC decision that "adversely and directly affects [their] property,

pecuniary or personal rights." Anderson v. Swanson, 534 A,2d 1286, 1288 (Me. 1987) (internal citations

omitted). The court is satisfied that the petitioners, as leaseholders who own a residence in SP 5, have

standing. Boiled down, this is what the essential dispute is between the parties. The petitioners, and

others who leased property in SP 5, did so for a unique, rugged wilderness area where camps were

spread out so as to keep the area in a more natural state. This is what LURC encouraged in 1972, when it

followed a philosophy encouraging scattered development. Now however, LURC has changed its

approach and believes that the impact on wilderness is better managed if done in a more concentrated

area-more camps closer together puts the impact in just a few areas as opposed to 19 areas each with a

little impact. This is a significant departure from what the agency followed in 1972 and the petitioner's

expectations (and property value) of their wilderness camp are diminished if a large subdivision with a

cluster of camps and its accompanying roads and construction is allowed to be built under a

grandfathered amendment. While the petitioners may not be abutters in the traditional understanding of

the word, the word can sometimes be "loosely used" in circumstances such as this. Sahl v. Town of York,

2000 ME 180, lJI 9, 760 A,2d 266,269. Further, the court believes that the petitioners, as property owners in

the subdivision in question, have standing as abutters to question decisions regarding development of the

subdivision that will impact their property.

4

realm of expertise" and the Court's review is limited to "determining whether the

agency's conclusions are unreasonable, unjust or unlawful in light of the record."

Imagineering v. Superintendent ofIns., 593 A.2d 1050, 1053 (Me. 1991).

The burden of proof rests with the party seeking to overturn the agency's

decision, and that party must prove that no competent evidence supports the Board's

decision. Seider, 762 A.2d 551. "[Petitioner] must prove that no competent evidence

supports the Board's decision and that the record compels a contrary conclusion."

Bischoffv. Board of Trustees, 661 A.2d 167, 170 (Me. 1995).

Petitioners present the following arguments:

(1) The Commission had no authority to review Bayroot's Application to

Amend as Section 1.02(D) of its rules limits LURe's authority to amend subdivisions to

no more than 10% of a subdivision development;

(2) Under Section 10.17, the permits for the nine relocated lots had expired

because they were not lawfully leased prior to 10.17's October I, 2004 decision;

(3) Even if the permits to the lots had not expired, none of the lots could be

relocated to the shores of Lake Parmachenee as they were subdivision lots and thus

prohibited in the P-GP zone;

(4) The placement of the relocated lots on the shoreline, regardless of the

shoreline's zoning classification, would unlawfully extend the subdivision lots in a

contiguous line well beyond the 1320 linear foot limit set forth in Ch. 10.25,Q3,b.

LURC asserts that the petitioners' first argument is patently wrong because they

misread Chapter 1 of the Commission's rules. Chapter 1 deals only with the

establishment of a fee schedule for applications and petitions processed by LURe. The

"minor changes" defined in Chapter 1 are defined because under Part C Exceptions (2)

minor changes are not assessed a fee. The petitioners respond that 12 M.R.S.A. § 685-B

5

requires ALL subdivision amendment applications to pay a fee ("fees apply to all

amendments except for minor changes to building permits." (emphasis added). Since

this is not a building permit, petitioners argue that a fee must apply and therefore

Chapter 1 cannot exist to merely distinguish between no fee minor changes to

subdivision permits and fee required major changes (as LURC asserts) because section

685 requires the imposition of a fee for both minor and major amendments.

LURC responds that the petitioner takes section 685 out of context (as they do

Chapter 1) because section 685-B(5) concerns unilateral amendments or modifications of

a Commission permit and states that these unilateral actions without authorization are

violations. Section 685-B does not apply to permit amendments that are voluntarily

sought by the permit holder, as in this case. Further, LURC argues that nothing in the

regulations or statutes cited by the petitioners supports their argument that the

Commission only has authority to authorize amendments to permits affecting less than

10 percent of the original project. LURC asserts that it has, throughout its history,

considered and issued amendments to permits in response to permit holders' requests.

In fact, section 10.11 of LURC's rules contemplates amendments of previously

permitted activities that have become non-conforming or grandfathered, such as the

subdivision in question, which was previously authorized under SP5 but does not

conform to LURC's current zoning scheme.

The court finds that LURC has the authority to promulgate regulations to enact

statutory provisions such as Section 685-B, and even if section 685 can be interpreted as

the petitioners' desire, it is entirely legitimate for an agency to enact a regulation stating

that minor changes to permits other than building permits can also be done without a

fee.

6

The court will next review petitioner's argument that Bayroot failed to meet the

October 2004 deadline imposed under section 10.17 for meeting the conditions affecting

the approved lots under SP 5. LURC notes that there is some doubt as to the

applicability of this section to subdivision permits. All of the terms of section 10.17

apply to construction and related activities. SP 5, being a subdivision permit,

authorizes only the division and conveyance of lots and not any construction activities

upon those lots. Following issuance of SP5, any construction on the authorized lots

required a separate building permit from the Commission. Nevertheless, the

Commission decision and the Advisory Ruling take the view that section 10.17 applies

to both development and subdivision, therefore the conditions and activities authorized

by the permit would, under this interpretation, needed to have been met by October 1,

2004. As noted in footnote two, the court finds LURC's interpretation of the

applicability of this rule reasonable.

Applying section 10.17, the Commission argues that the October 2004 deadline

was met because it upheld its staff's advisory ruling that stated that the approved lots

under SP 5 could be moved to areas having approved soils, provided that this

relocation occurred by the October 2004 deadline. LURC argues that in issuing this

advisory ruling, its staff relied upon evidence provided by Bayroot of satisfactory soils

at the new site locations, and the Commission found that these sites were in fact

relocated by the deadline.

Petitioners argue that the Commission's attempt at recharacterizing an advisory

opinion as a staff decision is fatally flawed because (1) if the advisory ruling is

construed as a "staff decision," then aggrieved parties have been denied their statutory

right to appeal the staff decision to the Commission within 30 days, as that deadline

passed in 2004 with no actual or constructive notice to the public; and (2) the advisory

7

ruling cannot, as a matter of fact, constitute "Commission approval" of the proposed

sites because it recites future actions Bayroot must take before approval can be given.

These stated future actions presume a second review to determine if those conditions

were met ("Provided Bayroot completes and complies," "Provided all terms and

conditions . . . are complied with"). In further support of their position that the

Advisory Ruling was not a final determination, the petitioners note that the Advisory

Ruling actually states that it "is an informal response and not a legal determination,"

clearly demonstrating to any reasonable person that the ruling was, as its name implies,

advisory.

Petitioners' arguments on this point are compelling. The Commission has

delegated to staff the authority to approve, approve with conditions, or disapprove all

applications submitted pursuant to section 685-B that are routine in nature and do not

raise significant policy issues. LURC's regulations state that staff can be delegated the

authority to approve or disapprove applications only upon finding that the applications

are of a routine nature, that its handling by the staff will eliminate a waiting period

between completion of the staff work and the next Commission meeting, and that the

nature of the application is such that it can be made by the staff by following the strict

basis of the statutory criteria in section 685-B and the policies, standards and rules

adopted by the Commission. LURC Reg., Ch. 3.02(A).

This presumes that the only decision LURC staff is authorized to make is one

that any reasonable, disinterested person, reviewing the same laws and regulations,

would be compelled to make. In other words, LURC staff can make decisions regarding

applications only if the applications are routine in nature and can be disposed of by

simply following the applicable laws and regulations. This case clearly does not

involve a "routine" application that is without significant policy issues.

8

In addition, chapter 3.02(B) of LURC's regulations states that "[a]ny person

aggrieved by a decision of the staff ... has the right to review of that decision by the

Commission. A request for such review must be made in writing within 30 days of the

staff decision." However, reading the advisory opinion in the way LURC wishes

completely divests the petitioners of their right to appeal to the full Commission. The

court simply cannot accept an argument that an advisory ruling can constitute

"Commission approval" due to the lack of adequate notice provided in the advisory

ruling to potentially aggrieved parties who wish to have the Commission review the

decision.

The nature of advisory opinions is to inform people the steps that need to be

taken so that the correct regulatory process is understood and followed, resulting in less

burdensome and more efficient work done so as to make the more formal, future

decision-making process go smoother. Petitioners have convinced the court that

LURC's decision to treat a staff advisory ruling as "Commission approval" is

unreasonable. Likewise, Bayroot and LURC have failed to convince the court that an

advisory opinion is anything other than what its name proclaims it to be. Bayroot and

LURC's reasoning is further undermined by the clear language of the advisory

opinion's first paragraph, which also demonstrates that no independent analysis was

conducted by LURC: "[I]n providing our views on these matters, we have relied entirely

upon the facts as you have presented them to us." Even more convincing is the scope of

advisory rulings as defined in LURC's regulations. According to LURC regulations

chapter 4.02, staff may issue an advisory ruling with respect to the applicability of any

statute, standard or rule administered by the Commission. Further, 4.02(2) states that

an advisory ruling shall not be binding on the Commission. The court notes the lack of

9

any language indicating that an advisory ruling otherwise constitutes "Commission

approval."4

LURC, as a regulatory body, is charged with overseeing the granting of permits,

and it is not reasonable to believe that the Commission grants approval to applicants

based on an advisory ruling with no requirement that evidence supporting the

application be submitted and reviewed to demonstrate that in fact the advisory ruling

was complied with. Advisory rulings are a blueprint for a person to follow if they wish

to have a smooth application process, and the person can choose to follow the advice or

not, with the understanding that if the advice is not followed, they will have to convince

the agency their decision was appropriate. It is LURC's job to oversee and ensure

compliance, and allowing applicants to self-police themselves is contrary to LURC's

purpose.

An argument could be made that there was no permit or amendment for LURC

to approve because SP 5 was already issued; all that needed to be done was to get soil

approval for the new locations, which staff is competent to do without full Commission

oversight. The court notes that Bayroot did submit soil data to LURC for the proposed

new locations prior to the October deadline, and Bayroot asserted that the soil, under its

analysis, was suitable. However there is no determination or analysis in the record by

LURC (or its staff) confirming that the soil was indeed acceptable, or any finding that

the new locations would not increase the extent of nonconformity, as section 10.11

requires. The LURC decision also states in paragraph 12, "In September of 2004,

4 5 M.R.S.A. § 9001 grants the authority to agencies to, upon request, make advisory rulings. It further

states that an advisory ruling shall not be binding on the agency, except in one instance: provided that in

any subsequent enforcement action initiated by the agency, justifiable reliance on the ruling shall be

considered in mitigation of any penalty sought to be assessed. This action was not initiated by the

agency, further supporting the proposition that the advisory ruling at issue in this case cannot reasonably

be viewed as "Commission approval."

10

Bayroot LLC informed the Commission that it had complied with the terms and

conditions of SP5, as clarified through" the Advisory Ruling. Further, "According to

the applicant, as of September of 2004 all of the 19 approved sites ... had been leased

and remained currently under lease." Nothing, however, indicates that LURC

performed its oversight role to confirm that the terms and conditions were complied

with. 5

This approach is in contrast to the analysis LURC conducted in the Commission

decision to grant Bayroot's application to relocate five lots. As to that application,

paragraph 30 under Review Comments details the extensive comments from a Maine

State Soil Scientist regarding the soils in the areas proposed for development. However,

as to the relocation of the four sites necessary to maintain SP 5, the Commission simply

states in paragraph 1 of its conclusions that the applicant sought and obtained

Commission approval for the relocation of the four sites to sites with suitable soils for

development. The only Commission approval it points to is its staff advisory ruling.

Even if the court were to credit the argument asserting that LURC staff had the

authority to declare that the soil samples were suitable, and even if the court were to

accept an argument that there was no application or permit being approved (just a

condition of an already existing permit), the fact remains that based upon the record

before the court, no soil was ever "approved" by LURC or its staff. The Advisory

Ruling states that it was written merely to provide its views on the matter, based upon

evidence submitted to it by the applicant, and LURC cannot point to any evidence in

the record confirming that it performed its oversight duties to ensure that the soil

samples were indeed "suitable," and as a result, issued its "approval."

5 While the court does not have any reason to doubt the analysis of the soil samples submitted by

Bayroot, it also does not have the expertise to make that determination. The court merely finds that

LURe failed to make its own separate determination.

11

Finally, because the Court finds that these 4 lots were not properly relocated

prior to October 2004, Bayroot's subsequent application to relocate 5 other lots6 is

vacated because Bayroot was only able to request that these sites be relocated on the

condition that it was found to have possessed a valid permit. A valid permit only

existed to the extent that all of the terms and conditions of the SP5 were complied with.

This could only have been accomplished by first having properly relocated (as required

by the original permit) the 4 sites discussed earlier. By the terms of the permit, the 4

lots had to be relocated to a site with suitable soil in order for the permit to remain

valid, and LURC failed to fulfill its regulatory role and make the affirmative

determination that the soils were indeed suitable.

In addition, the Advisory Ruling also stated that it recommended that Bayroot

submit an application to amend SP 5 prior to October I, 2004, to relocate the five other

sites, which it did not do until seven months after the October deadline. Further, the

use of the nine undeveloped lots needed to be "substantially started", defined by LURC

staff as approved at their new locations and leased. It was only after Bayroot deemed

itself to have been in compliance and moved the 4 lots by October 2004 that it could be

seen as having substantially started and was then able to make a subsequent request

that it be allowed to move the other 5 lots. Because the 4 lots were not "authorized by

the Commission," the SP5 permit lapsed and Bayroot, should it wish, if it wishes to

continue, must submit a petition to rezone the lakefront subject to the more stringent

permitting requirements in effect today.

6 The lots proposed to be relocated are Brown Company sites 10/ 11/ 17, 18/ and 19.

12

As to the 5 other lots (relocation of which was not authorized by SP5), the

Commission evaluated Bayroot's requested relocation of the Amendment Lots pursuant

to section 10.11 of its rules. Commission rules allow a permit to be issued for

relocations of nonconforming lots if the Commission finds compliance with its permit

authorizing statute and the project will not adversely affect surrounding uses and

resources and that there is no increase in the extent of nonconformity. The majority of

the LURC decision deals directly with this request.

The Commission reviewed the permit application, received comments from

other agencies, as well as comments from opponents of the application, and determined

that Bayroot had demonstrated that the relocation of the 5 lots complied with its rules

and other permitting requirements. The Commission found: (1) that the proposed

relocation would concentrate the previously approved scattered development onto two

shoreline areas in keeping with the Commission's current Comprehensive Land Use

Plan7; (2) that the relocated lots would comply with the Commission's dimensional

requirements; (3) that the relocated lots would have suitable soils; (4) that the relocated

lots would be accessible by an existing road while the unrelocated lots would require

construction of a new road; (5) that the proposed right-of-way to the relocated lots

would provide adequate access; (6) that the relocated lots would have no adverse effect

on water quality or fish and wildlife resources; (7) and that the proposal would

otherwise comply with section 685-B(4). The Commission followed these conclusions

7 Boiled down, this is what the essential dispute is between the parties. The petitioners, and other who

leased camp-sites on this property did so for a unique, rugged wilderness area where camps were spread

out so as to keep the area in a more natural state. This is what LURC encouraged in 1972, when it

followed a philosophy encouraging scattered development. Now however, LURC has changed its

approach and believes that the impact on wilderness is better managed if done in a more concentrated

area-more camps closer together puts the impact in just a few areas as opposed to 19 areas each with a

little impact. This is a significant departure from what the agency followed in 1972 and the petitioners'

expectations (and property value) for a wilderness camp are diminished if, as they believe, a large

subdivision with a cluster of camps is allowed to be built.

13

with 15 conditions to the permit amendment, designed to assure that the relocated lots

would conform with the Commission's findings and requirements. LURC argues that

this comprehensive analysis and decision approving the application should be given

deference.

The petitioners main arguments are (1) that LURC could not relocate these lots

into the prohibited shore zone and (2) that the lots as approved would extend along a

contiguous line further than allowed. 8 LURC does not appear to argue these two

specific points, instead relying on the thoroughness of the Commission's decision. An

evaluation of the Commission decision shows that the decision specifically states under

the review criteria that a subdivision is not allowed within the Great Pond Protection

Sub-Distriet9 ("P-GP zone") and that there can be no increase in nonconformance. The

decision's specific response to these criteria states the reasons (numbered 1-7 above)

why it believes relocation is appropriate. The court notes, however, that as to relocating

more sites into a P-GP zone, the Commission's reasoning is that relocation "will

concentrate the previously approved development, scattered on the shoreline and to the

south and north of Parmachenee Lake, onto two shoreline area of the lake in keeping

with the Commission's development goals . . . which states that the Commission

discourages growth that results in scattered and sprawling development patterns."

Concerning the physical location of the 5 lots prior to relocation. According to <JI

9 of the decision, "[o]f the 19 sites approved by SP 5, 13 were proposed to have frontage

on Parmachenee Lake, 2 had frontage on Rump Pond, and the remaining 4 were

8 LURC and Bayroot argue that petitioners' argument concerning the lots extending in a contiguous line

further than allowed was not argued below and cannot be raised here. Petitioners argue that they

specifically argued to the Commission that the lots had to meet all of section la's impact standards, which

include the contiguous line requirement. The court finds that the petitioners sufficiently raised the issue

of the lots having to comply with section la's impact standards such that the issue could be raised on

appeal.

9 A Great Pond Zone applies to all areas within 250 feet of the normal high water mark around all lakes

and ponds greater than 10 acres in size.

14

proposed to be located on the Magalloway River." Paragraph 6 clarifies the proposed

relocation. "The applicant seeks to amend ... SP 5 ... to allow for the relocation of 5

previously approved, but as yet undeveloped lots for seasonal camp development. ...

The original proposal for SP 5 included 13 shorefront lots on Parmachenee Lake. The

applicant's proposed relocation of 5 lots does not increase the total number of

previously approved lots, but does increase the number of shorefront lots on

Parmachenee lake by 4, eliminates 2 previously approved lots located at sensitive"

locations on the Magalloway River, and reduces the amount of road construction

required to access the lots."

While the 1972 permit imagined that the sites would be waterfront, it authorized

them on three different waterways. As the petitioners state, "[t]here is a substantial

difference in impacts between the original site locations, and the proposed new

locations. Bayroot's Amendment results in 17 sites being located on the direct shore

frontage of the lake." LURe asserts, however, that the relocation of 4 more sites onto

the lakeshore will not have an adverse impact and will otherwise conform with LURC's

regulations. Further, the sites are being moved from one subdistrict with substantial

limitations on development to another, therefore there is no real increase in

nonconformi ty.

The entry will be:

The petition to vacate LURC's September 6, 2006 decision regarding Bayroot's

application to amend SP-5 is GRANTED; this matter is REMANDED to LURe for

further proceedings consistent with this decision and order.

~

Donald H. Marden

Justice, Superior Court

Date Filed _-....].....0'-#-/.....6-1-1.....

°-'-'-6 _ Kennebec P-"'-O.>L6_-_~7"'-2

Docket No. _------6.'A..... ~ _

County

Action ---LP.....e.....t.....i'-lt....Ji.....O.l.Jn""-------fL..>.....o rL..-Ru.e...v-"--'-i~e.lOlw _

80C tLMARDE.N

vs. et al

Plaintiff's Attorney Defendant's Attorney

Peggy L. McGehee. Esq. William V. Ferdinand. Jr •• Esq. (Bayroot)

One Canal Plaza Eaton Peabody

PO Box 426 77 Sewall Street. Suite 3000

Portland. Maine 04112-0426 Augusta. ME 04330

- Dennis J. Harnish. AAG

6 State House Station

Augusta, Maine 04333-0006

Date of

Entry

10/5/06 Petition for Review, filed. s/McGehee, Esq.

10/12/06 Entry of Appearance, filed. s/Ferdinand, Jr., Esq.

11/3/06 Certification of Record. filed. s/Carroll, Dir. LURC (in vault)

11/13/06 Notice of briefing schedule mailed to attys of record.

12/13/06 Plaintiffs' Brief in Support of Petition, filed. s/McGehee, Esq.

12/15/06 Plaintiffs' Amended Brief in Support of Petition, filed. s/McGehee, Esq.

12/20/06 Respondent Maine Land Use Regulation Commission's Motion for Enlargement

of Time in Which to File Brief, filed. s/Harnish, AAG

Proposed Order. filed.

1/5/07 ThirdiParty-in-Interest Bayroot, LLC's Motion for Enlargement of Time in

Which to File Brief, filed. s/Ferdinand, Jr., Esq.

Proposed Order, filed.

1/22/07 ORDER GRANTING ENLARGEMENT, Studstrup, J.

Bayroot LLC may file its brief on or before January 26, 2007.

Copies mailed to attys of record.

1/22/07 ORDER GRANTING ENLARGEMENT OF TIME. Studstrup, J.

Maine Land Use Regulation Commission may file its brief on or before

January 26, 2007.

Copies mailed to attys of record.

1/26/07 Brief of Respondent Maine Lane Use Regulation Commission, filed. s/Pidot,AA

Brief of Bayroot, LLC Third Party in Interest, filed. s/Ferdinand, Jr., Esq

No:;ce 01 sc~;,ng tor__ ~ Iq ) () 1 .

sent to attorneys of record.

Date of

Entry Docket No.

2/12/07 Petitioners' Brief In Reply To Bayroot's Rule BOC Brief, filed.

s/McGehee, Esq.

Petitioners' Reply To Maine Land Use Regulation Commission's Rule 80C

Brief, filed. s/McGehee, Esq.

7/12/07 DECISION AND ORDER, Marden, J. (6/29/07)

the petition to vacate LURC's September 6, 2006 decision regarding

Bayroot's application to amend SP-S is GRANTED;this matter is REMANDED

to LURC for further proceedings consistent with this decision and order.

Copies mailed to attys. of record.

Copies mailed to Donald Goss, Garbrecht Law Library and Deborah Firestone.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.