STATE O F MAINE DISTRICT COURT

PENOBSCOT, SS. BANGOR

CIVIL ACTION

Docket No. CV-03-402

Darren J. Vittum et al.,

Plaintiffs

Oak Ridge Builders, Inc.,

Defendant

Hearing on the complaint and counterclaim was held on July 5-9,2005. Plaintiff

Darren j.Vitrum, Frank Fawlendzio (the principal of defendant Oak Ridge Builders, 1nc.j

was present for portions of the hearing.

This action arises out of the construction of the Vittum residence in the Cedar

Grove Subdivision, a development that is iocaieb in Eddingion and that is a creation of

- . Oak Ridge and Pawlendzio. Oak Ridge was the general contractor for the 'Jittum house

In their complaint, the Vittums seek construction and application of a restrictive

covenant, which is included in their deed from Oak Ridge, governing the construction of

a detached garage that they wish to build on their lot. The Vittums also seek relief for

aspects of the house construction that they contend are defective. In its counterclaim,

Oak Ridge seeks its own declaratory judgment relating to restrictive covenants that

restrict landscaping activities conducted on lots within the subdivision and that require

homeowners to construct an asphalt apron that would connect a driveway to the way

located in the subdivision. Oak Ridge also alleges that Darren Vittum converted some

building materials.'

I

In count 4 of their complaint, the Vittums also seeks to reform the deed, and in its

counterclaim, Oak Ridge has asserted a claim for nuisance. T h e parties have represented

I. Vittums' complaint

A. Detached garage (count 1)

The warranty deed conveying title of lot 6 in the Cedar Grove subdivision from

Oak Ridge to the Vittums includes the following restrictive covenant: "The design of all

single family residences, attached garages, and associated buildings is subject to the

written approvz! cf :he subdivision developer or their [sic: designee. Such apprcval shall

not be unreasonably withheld." See plaintiffs' exhibit 21, paragraph 7. Here, the Vittums

seek a declaratory judgment that under this provision, they are entitled to construct a

detached garage in a particular location on their lot.2 Oak Ridge has objected to that

planned construction. The Vittums contend here that Oak Ridge already agreed to allow

them to build the structure and that its denial of approval now is unreasonable. The

Vittums have not established either claim.

The Vittums first allege that during a chance encounter in the subdivision in

August 2002, Darren Vittum told Pawlendzio that he pianned to build the garage and that

?a::{!er,&io 3: !ezs: ir;.,p!icit!y zg:ee:! that project. The r,opJf!icting testim=fiis! evider,ce

regarding that conversation does not provide an adequate basis for the court to reach that

conclusion. Although during the conversation there was some reference to Vittum's

storage of one of his vehicles, that does not establish that he informed Pawleiidzio that he

intended to build a structure for that purpose. It turns out that Vitt~imsurreptitiously

tape-recorded a conversation he had with Pawlendzio a short time after than initial

encounter. See plaintiffs' exhibits 51, 51A. Although during the taped conversation

Vittum and Pawlendzio made reference to the earlier discussion, nothing in the recording

establishes that Pawlendzio had been told previously about the garage.

on the record that they are not pursuing these claims for relief, thus leaving the claims

outlined in the text.

2

Another restrictive covenant in the deed also prohibits the construction of anything

other than single-family dwellings, attached garages and associated buildings. Oak

Ridge's objection to the proposed construction of the detached garage here is not based

on this provision, but rather it is grounded on the covenant number 7, which is set out in

the text. It thus appears that Oak Ridge acknowledges that a detached garage is an

"associated building," thus leaving in issue only the other requirements set out in

covenant 7.

The evidence is at least as likely as not that Pawlendzio was unaware that the

Vittums planned to build the garage until Pawlendzio saw that a concrete pad had been

poured onto a location adjacent to the Vittums' driveway. Up to that point, there had

been a graveled surface, and in fact during the initial conversation about the Vittums'

vehicle, Pawlendzio told Vittum that he could take some gravel. However, it appears that

v~heilPawlendzio saw the pad, he advised municipa: officials who then contacted Darren

Vittum, because Vittum had not obtained a building permit.3 The court finds that the best

explanation for Pawlendzio's recourse to the town's representative was that he had just

realized what the Vittums planned to do and that, for the reasons discussed below, he - as

Oak Ridge's agent - opposed the construction of the building in the intended location.

The court doubts that Pawlendzio indicated knowing consent to Vittum during the first

conversation and then retracted that approval after the Vittums had arranged for the

concrete work. Instead, it is more reasonable to conclude that if Pawlendzio knew about

the plans for the garage during the first conversation, as the Vittums contend here, he

..,,..lA L,.,, -,-,,,,,A L:,

Y Y V U I U I l U V L LApl1;33LU 1113 U U J G L L I U I I

+LA,

LIIGll.

TL, ,h,,,,, -C ,.

L 11G U U 3 L I I L C ; Ul ally

,h;,,+;,-

V U J L L L I V I I

:,,,,--+,,

13 3 L l V l l i ; L L

evidence that Pawlendzio was unaware of the Vittums' plans than evidence of a change

of heart.

Thus, the court concludes that Oak Ridge: through Pawiendzio, communicated its

objection .to the proposed detached garage reasonably close in time to when it became

aware of those plans. This leads to the second question, namely, whether Oak Ridge has

unreasonably withheld its approval from the Vittums. In this context, it is important to

note the nature of the basis for Oak Ridge to withhold its consent. T h e restrictive

covenant requires only that Oak Ridge shall not unreasonably withhold any such

approval. This provision does not require that Oak Ridge's position must be the only

reasonable assessment of the circumstances or even the most reasonable of several

reasonable positions that might he available to it. Thus, so long as the hasis for Oak

Ridge's refusal to grant such approval is not unreasonable, then Oak Ridge's position will

be deemed sufficient to bar the proposed construction. T o this extent, the court's scrutiny

of the basis for its objection is deferential.

3

In August, when the issue first arose, Vittum applied for a building permit. The town

denied the permit application but eventually issued a permit i n October.

From portions of the subdivision, including the vantage point from Grandview

Drive, which is one of the two ways in the subdivision, the view over the Vittums'

property is sweeping. The grade of the Vittums' property falls away from the road and

from other nearby lots, see defendant's exhibit 7 (subdivision survey with contour

information), and this opens up the vista beyond the Vittums' house. The Vittums'

house, which has an attached garage, is within that field of vision. The proposed

detached garage would interfere with the remaining view. See, e.g., plaintiffs' exhibits

82A, 86A (photographs showing slab, where detached garage would be built), 113B.

Oak Ridge's concerns about the effect of the additional structure on the vista are not

unreasonable.

The Vittums argue that Oak h d g e has opposed the construction of the building

not because of its design but because of its proposed location, which is not a criterion

established in the restrictive covenant. This contention, however, is abstract and ignores

the integral relationship between the building as the Vittums have designed it and the

+LO L . . : I A : - ~ ..,;I] LA.,,

b l I L C L L L L L UCLIIUIIla

,

,; t o n . r r r n , . n ~ ; , 3 0

VV111 1 1 U V L UI1 1 L 3 3 U 1 1 V U l l U l l l b 3 .

nnlrD : A , -

W U I \ I\IU5L

.-lurSr

11U3 LllUUb L l L U I

thnt it i t c

LIlUI) 1 L lCLl

view, the garage would be unobjectionable if located elsewhere on the Vittums' lot, but

that the nature and design of the building would unduly interfere with aesthetic aspects of

the land if locaied where the Vittuiiis propose. See plaintiffs' exhibit 54. A structure is

not built in isoiation. Rather, ir must be assessed in the context of its environment. T h ~ s

implicates inherent design considerations, and thus the nature of Oak Ridge's concerns

fell within the scope of the covenant.

It bears note that Oak Ridge agreed to grant the consent required under the deed if

the Vittums placed their power and other utility lines underground rather than running

them on poles (an option that Oak Ridge made available to the Vittums through a

proposed easement). This proposal does not undermine Oak Ridge's refusal to grant

consent for the detached garage. When viewed from within the subdivision, the existing

power poles are in the same vista as the proposed site of the detached garage. If the poles

were removed (requiring the cables to run underground), then a material source of

interference with the view would be gone, and the construction of the garage would not

have the cumulative impact that it would if the poles were to remaln.

It is also not unreasonable that the only design change to the detached garage on

which Oak Ridge insists is a steeper roofline (10112, instead of 5112, as the Vittums have

proposed) to match the rooflines of the house itself. This would have the effect of

making the detached garage higher. However, it appears from the photographs that if the

detached garage is build where the Vittums want it to be located, then the additional

height vvill not create any greater significant intrusion into the view than would a garage

of the same horizontal dimensions but lower height.

In their complaint, the Vittums seek a declaration on the question of whether Oak

Ridge is entitled to exert its approval over the construction of a detached garage, as the

covenant purports to do, and on the question of whether Oak Ridge has unreasonably

withheld its approval to the Vittums' specific plans. The Vittums d o not argue that the

covenant itself is unenforceable or otherwise invalid, and for the reasons noted above, the

court concludes that Oak Ridge did not act unreasonably in withholding its consent here.

B. Construction defects

,,

XXTL,... I I L l l Gf ;hc hoKsz

fhC cons:ri;c:ioi; was tL h o n n v t ; aCall ~ in+-

I l b y U l L 1 b J Ib11 111IV

ongoing disputes regarding several aspects of the project, most notably issues relating to

the third floor. In order to resolve those disputes, the parties executed an addendum to

the originai home constructio~lcontract. See piaiiltiffs' exhibits 28, 40. Iii the addendum,

the Viltnms acknowledged their satisfaction "wiih all aspects of the building construction

to date." However, they also reserved any claims that would arise out of the "standard

builder warranty." The court takes this to mean the warranty of good workmanship that

is implied into any home construction contract of the magnitude present here. See 10

M.R.S.A. 3 1487(7). The Vittums allege that construction work subsequently performed

by Oak Ridge failed to meet this ~ t a n d a r d .The

~ alleged defects are enumerated in

evidence generated by Stacey Goodwin, an estimator for a local contractor. The Vittums

have established that most - bat not a! - of the problems that Goodwin identified are

actionable. In examining the alleged problems, the court gives weight to evidence of the

costs of repairs that she formulated. The base cost to repair each of the problems is

enhanced by surcharges for disposal expenses (5%); for overhead, including insurance

4

Oak Ridge operated as the general contractor but subcontracted virtually all of the work

performed on the house.

(16%); for tax on materials (5%); and for margin (profit) (10%). These surcharges are

standard and reasonable, and the court uses them in calculating damages where the

Vittums have established the underlying loss.

Oak Ridge challenges many aspects of the Vittums' claim for defective

construction work, arguing that they did not provide Oak h d g e with an adequate

opportunity to address and correct the problems. The evidence belies this suggestion. In

May 2003, Pawlendzio met at the Vittum residence with Goodwin and the Vittums

themselves. Goodwin advised Pawlendzio of the work that, in her view, remained

outstanding, and Pawlendzio agreed with much of her assessment. Pawlendzio assured

the Vittums that he would line up Oak Ridge's subcontractors to return to the residence

and correct the problems. (As is noted above, Oak Ridge's practice with Vittum home

was to delegate the construction work to subcontractors; Oak Ridge did little or none of

the work itself.) Only one of those subcontractors - the siding company - actually

showed up. (Unfortunately, after some -- but not all -- of the problems with the siding

..,o..o .-o--;.-oA

V Y ~ I L

Axx.-;-*

I L ~ U I I L U UUIIII~

th-t

i l l a L

..;n;t

VIDIL,

-th--

ULIILI

---hln-n A-..-lA..-A

y ~ u u l ~ ~U lL lV G

aI U ~ U ,

- " A thnnmI - + - -

allu LIILDL

--nLln-,.

1 a i C . l y1uu1~1113UIL

included in the Vittums' claim here.) The problem is best exemplified by the painting

contractor, who stated that he did not make the time to d o his remedial work at the

residence. H e also testified that Oak R ~ d g ehad aiready paid him in full for his work.

The unavoidable coriclusior~is that he' had no motivation to follow up w ~ t hthe repair

work, because he had nothing to gain by expending further time and labor for the

Vittums' benefit. The Vittums commenced this action in September 2003, four months

after the meeting with Goodwin. The court is satisfied that Oak Ridge had ample

opportunity to repair the problems that Goodwin had identified to it.

A problem of which Oak Ridge may not have been placed on notice at the May

2003 meeting was an unprotected electrical wire inside a wall in the living room. T h e

electrician drilled a hole though a corner post and ran the wire through the hole. See

plaintiffs' exhibit 73B. Because of the proximity of the wire to the interior wall surface,

code requirements mandate that a strike plate must be placed in a way that would protect

the wire. In light of Oak Ridge's failure to take meaningful steps to ensure that its

contractors return to the house in response to Goodwin's assessment, the court has no

reason to think that even if Oak Ridge had known of the electrical issue, it would have

caused the problem to be corrected in a timely way. The same analysis is true with a

problem affecting the kitchen cabinets. Thus, the court charges Oak Ridge with the costs

of these repairs as well.

Following Goodwin's analysis, see plaintiffs' exhibits 141-142,~

the court

discusses the alleged construction defects seriatim.

1. Sections of the exterior vinyl siding had come loose. As is noted above, the

siding contractor returned to the residence after the May meeting with Goodwin and

reattached the loose sections. Subsequently, however. the siding became loose again.

Although this may be explained by the house's exposure to wind, it remains a problem

and needs repair. Further, Goodwin and the siding contractor appear to disagree about

the best way to secure the top rows of siding to the shell of the house: Goodwin

recommends an undersill, and the contractor relies on a tight fit between the fascia and

the top row of siding to prevent that section from coming loose. (The top of a section of

siding is held in place by the bottom of the section that is immediately above it. This

r-:n-n + L A -..nn+:-, - C LA.., +A n,n..rA +L

., .n,.rmAn+ n,\,.+:n, ;+nnlC \ T h . . " Cnr thn

YU~DLIVII

1 a 1 a ~ aL I ~ L u1 ~ I V V V LV ~ L L U I LL ~ I L U ~ ~ L I I I I V ~ L ~ L L L I V ~ 1

~ ~ a ~ l 1 . I1l l U 3 L U J , L I L ~

contractor's method appears to be unsuccessful in this application. Further, although the

siding contractor testified that he would not need as much time on the job as Goodwin

has forecasted, his iinsuccessful efforts to cure the siding problem weaken his testimony

on this point. Thus, the court accepts Goodwin's anaiysis. The base cost to reattach the-.

loose sections and to install the undersill is approximately $470. The surcharges noted

above result in a total cost of roughly $615.

2. Water leaks into the basement because the seal around the sill is not adequate.

The base cost to repair this problem is roughly $180. The surcharges noted above result

in a total cost of roughly $240.

3. Goodwin testified that a ledger board that is part of the deck system is not

adequately secured to the house. However, the Vitt1.1msand Oak k d g e agreed that Oak

k d g e would not construct the deck and that the Vittums would build it if they chose.

5

The portion of plaintiffs' exhibit 141 consisting of Goodwin's report was ultimately

admitted. The remainder, made up of copies of code provisions, was excluded. Exhibit

142 was admitted as a summary of Goodwin's prospective testimony on her cost

estimate. The court has used these exhibits to the extent allowed by the evidentiary

rulings.

Because of this modification to the construction contract, Oak Ridge no longer became

responsible for the ledger board.

4. The Vittums claim that Oak Ridge is required to provide three deadbolts in

exterior doors. Goodwin herself testified, however, that a deadbolt is an option and is not

a warranty item. The Vittums clearly wanted deadbolts, as shown by their request that

Oak Ridge furnish doors \iv.itS h d e s bored to accept the hardware. However, there is

insufficient evidence that, under this arrangement, the installation of the doors without

the deadbolts is a warranty breach.

5. The trim around the breezeway door was damaged during the construction

process and needs to be repaired. The base cost for this repair is approximately $155.

The surcharges noted above result in a total cost of roughly $205.

6. Oak Ridge did not construct steps that are needed to use the breezeway door,

due to the height of the door. The construction code requires that the stair system include

a landing and a raii. Oak Ridge contends that the Vittums agreed to assume

respoiisibllity for the stcps iii exchaiige for a reductlsn of thc coiitract price. Because this

claim amounts to an accord and satisfaction, Oak Ridge bears the burden of proving it. It

has not done so. Oak Ridge tendered the Vittums a check that included the putative $100

refund for the steps. tiowever, Oak Ridge conditio~ledacceptance of the check as

"FINAL SETTLEMENT O F CONTRACT," see defendant's exhibit 2, which did not

reflect any such agreement by the parties and which was clearly unrealistic when seen in

light of the parties' ongoing disputes. Not surprisingly, the Vittums did not negotiate the

check, and so there has not been an agreement on this point. Thus, the court holds Oak

Ridge liable for this construction shortcoming. The base cost for this additional

construction work is approximately $360. The surcharges noted above result in a total

cost of roughly $480.

7. The sliding exterior door jams and cannot be opened properly. A

representative of the manufacturer inspected the door and made an adjustment, after

which the door worked properly for several days. The original problem then

redeveloped. By itself, this might suggest a defect in the product. However, during an

unrelated attempt to fix the problem, Oak Ridge or one of its subcontractors put a screw

into the upper track for the slider. (It appears that the problem was with the upper part of

the door system causing the track to be too tight and the door to jam. The repair effort

thus might have been an attempt to raise the upper track and allow additional clearance

for the door. The actual source of the problem, however, may well be in the wall system

above the slider.) This unsuccessful effort voided the warranty. And in any event, the

use of a screw in the slider track is not a proper remedy because it may lead to other

probleims, such as thermal bridging. Therefore, the respoiisibility to ciiie thc problem is

now Oak Ridge's. The best evidence indicates that replacement of the slider unit will be

necessary. The base cost to do so is approximately $1,450. The surcharges noted above

result in a total cost of roughly $1,540.

8. Weatherstripping and the aluminum claddifig on one side of a garage door

require replacement attributable to Oak h d g e . (Damage to the cladding on the other side

of the door is Darren Vittum's responsibility, and the Vittums do not seek recovery for

that problem.) The base cost for this work is approximately $155. The surcharges noted

above result in a totai cost of roughiy $205.

. .

3, Eespite cGiistruc:ioi; codc icquircmcn:s arising f -ln

l U- 6;-0

l l l 1 nLv

1 1 b p U-Lt

bnb L~L tV;In n tho

I , P--00

Lllb O p L L U U

between the garage and the breezeway has not been separate by sheetrock. The base cost

for the sheetrock barrier is approximately $680. The surcharges noted above result in a

total cost of roughly $500.

'

. 10. The weatherstripping at the bottom of the breezeway door was darnagrd. , *

probably when someone tried to close the door while an extension cord was in the

doorway. The total cost for this work is approximately $15.

11. At some point during the construction process, Darren Vittum created an ink

mark on the dining room wall. The painting subcontractor later painted the walls in the

room but did not seal the ink mark, which therefore bled through the finish coat and is

now visible. Any dispute about responsibility for this problem is resolved by the

painter's agreement to fix the problem. The base cost for this painting job is

approximately $130. The surcharges noted above result in a total cost of roughly $170.

12. As is typical in new construction, some follow-up work is needed to patch

cracks in sheetrock that are created as the house settles and dries. This will also require

some painting. The base cost for this work is approximately $965. The surcharges noted

above result in a total cost of roughly $1270.~

13. The kitchen pantry door is defective and needs replacement. Because the

product is under warranty, Oak Ridge's liability is limited to the cost of labor, which is

$65. The surcharges bring this cost to $85.

14. The bedroom floor is excessively- squeaky. Repair work will reyilire the

removal and reinstallation of furniture and carpeting in the room. The base cost to fix the

floor is approximately $230. The surcharges noted above result in a total cost of roughly

$300.

15. Finally, as is discussed above, electrical and associated cosmetic work will be

needed to install a strike plate over an area where an electrical wire located inside a wall

is not protected pursuant to code requirements. The base cost for this work is

approximately $265. The surcharges noted above result in a total cost of roughly $350.

The total costs to repair these warranty defects is $6,775.

-1- - T r:AL I. - - - - .---..-..-

.

I- I - - - -

I I I ~ :v I L L U I I I ~l l a v t : p u ~ x x u

----A

~ l l c L

A:

x ulLauuLcluu

-- uelcct

2 r- -I,,:--

L l a l l l l a zs cjaiiiis f ~ brcach

r of

warranty. This is the theory that is allowed by the terms of the parties' modified

construction contract, and Goodwin, who is the plaintiff's liability expert on this part of

the case, expressly framed her analysis on this basis. Thus, judgment wili be entered for

the Vittums on count 2, which alleges breach of contracr. Tile Vitturns have not

meaningfully pressed a theory of negligence in their argument: and so the court enters

judgment for Oak Ridge on count 3.

In addition to the construction defect claims, the Vittums seek recovery of an

amount equivalent to expenses they paid for extra rent and interest payments because

Oak Ridge did not complete construction of the house within the time allowed by

contract, which would have been in late 2001. (Under the contract, the house was to be

substantially completed 120 days after construction commenced, which was late August

6

This includes the charges described in the "stairwel!" section of plaintiffs' exhibit 142

and the "misc. drywall repairs and touchups" line, which is the last item in the "living

room-electrical" section of the same exhibit.

7

Indeed, even in the section of their argument that purports to address their negligence

claim, the plaintiffs attribute the construction defects to breaches of the construction

contract.

or early September 2001). See plaintiffs' exhibit 28. In January 2002, however, the

parties entered into a modified construction contract, which granted Oak Ridge until

February 21 (30 days from the contract date) to substantially complete the construction

project. See plaintiffs' exhibit 40. In that modified agreement, the Vittums waived any

claim that might include later performance. In fact, the Vittums moved into the house in

the middie of February. Thus, they have not established here that any material delay in

the substantial completion of the house (that is, any delay past February 21) caused them

any loss.

I!. Oak Rid~e'scounterclaim

A. Conversion

In count 1 of its counterclaim, Oak Ridge alleges that Darren Vittum committed

the tort of conversion by taking several pieces of dimensional lumber (2x4s) without

permission. Vittum took the framing lumber from the construction site of another home

"ii lot g iii

deVejopiiieiii. "I-I IIG- ULIIGI

-'I- --- " -----

~~V~IICV

" "-" - - : " n - 1 - n : " - -

'

1 1W~ 1 ,IIVWG V G I , llau palu v a n I U U ~ G i i i

advance for these materials. Therefore, Oak Ridge did not have an ownership interest in

the property. Nonetheless, even if Oak Ridge has standing to pursue a claim for

(SECOND)OFTORTS8 225 (i965), Oak Ridge has faiied to

conversion, see WSTXI'EMENT

prove that Vittu~nwas without authority to take the property under the circurnstance

involved here. The owner of lot 8 testified that he had told Vittum that he (Vittum) could

use construction materials if he replaced them. This is the nature of the event underlying

the conversion claim: Vittum took the lumber because he ran short of his own materials

when he was doing some work on the third floor of his new house, and he then promptly

bought new lumber to replace the ones he had taken. As applied to the Restatement

formulation, it means that Oak Ridge has not established that it was entitled to immediate

possessior! of the property, becawe the property owner had a!so entit!ed Vittum to take

possession of the property. Further, Oak h d g e has not demonstrated that anyone (either

it or the owner of lot 8) was damaged. Thus, Oak Ridge has not proven conversion.

B. Declaratory judgment: landscaping restriction

The deed executed by Oak Ridge to the Vittums includes a restrictive covenant

that provides, "Once construction is started on the within described lot, . . .all landscaping

shall be completed within two years from commencement of construction." See

plaintiffs' exhibit 21. Oak Ridge began construction on the Vittums' house in late

August or early September 2001. This would result in a late-summer 2003 deadline for

the Vittums to complete "all landscaping" on their lot. In 2003, Darren Vittum hired a

contractor to scrape off a layer of loam from a portion of the houselot and put the loam

into piles. The contractor aoved and screened roiighly 503 crrbic yards of the topsoil. Cf

this, Vittum sold approximately 500 yards. He has retained the balance, see, e.g.,

plaintiffs' exhibits 83B, 91B, with which he intends to improve the grade of part of his

property. Much of this area would be lawn, with some flowerbeds. Oak Ridge contends

that this ongoing process violates the restrictive covenant and seeks enforcement of the

provision that it contends bars this use of the property.

Pawlendzio's own testimony, however, demonstrates that the covenant at issue is

virtually meaningless because the term "landscaping" does not have a definition that

comports with his own understanding. For exampie, he testified that in his view, the

n-rl

r o m n x r n l

I b 1 1 1 U V U L

-4 Inn- -A+ 4-rm -4 In-

nnln

U L l U 3 U L b UI I U U l l l

Thnt - . . nnnml-rr

l l U L U l U 1 1 1 1 U L LUlld3bUY;I15.

n n t - x n t x r

I LLUL U b L I VILJ,

h n . x , n x r n r

1 1 U I I b V b1,

nnn

b U 1 1

amount to a material and even radical reformation of the land on a lot. Further, he

testified that he would not consider the importation of small amounts of loam onto a lot

as something that rises to the level of "iandscaping," and he also does not believe it

would be reasonable to consider thz creation of a new garden to amount to "landscaping."

Indeed, Pawlendzio lives in a house on one of the subdivision lots, and even though the

ostensible landscaping deadline applicable to him expired during the summer of 2004

(two years after he began the construction of his own house in June 2002)' he has a pile

of loam on his own lot. Further, Pawlendzio acknowledges that he landscapes his own

lot a bit at a time. The record clearly demonstrates that a number of other homeowners in

the subdivision are similarly situated.

When the issue is framed in the conventional terms of deed construction, it is

plain that the term "landscaping" is ambiguous because it is vague. Accordingly. one

must look to the intention of the parties to determine its meaning. Dillingham v. Ryan,

651 A.2d 833, 836 (Me. 1994). Further, when an ambiguity arises, it is construed more

favorably to the grantee. Rusha v. Little, 309 A.2d 867, 870 (Me. 1973). Here,

Pawlendzio has both engaged in on-site activities, and he has tolerated that of other local

homeowners, that are both at least as substantial (i.e., removing and selling 500 yards of

topsoii) and also less substantial (flower gardening) as the conduct that the Vittums

propose to pursue. From the way Oak Ridge itself has viewed the substance of the

66

landscaping" restriction in the Vittums' deed, it is wholly unclear what the provision

allows and what it precludes. Oak Ridge's principal complaint about the earthmoving

operation 92 the Vittums' !ct is that the screenicg prscess created a 1st of noise.

However, because Pawlendzio conceded that the covenant would not prohibit a lot-owner

from removing and selling topsoil, it would not prevent the noise problem.

Because of the fundamental lack of clarity and guidance provided in the covenant,

both as it appears on the face of the deed and in the way that Oak Ridge proposes to

apply it, the court declines to hold that the Vittums have violated the provision.

C. Declaratory judgment: driveway apron

The Vittums' deed includes the following restrictive covenant: "Paved apron 15

feet from road to be compieted by iot purchaser within 90 days of occupancy permit

icn~gnre

IVVUUIIVV.

" C o o n l 3 ; n t ; f f S ' exhibit 2:. The Vitt,uACs yere issued their certificIte cf

U V V

t"-"'L'

occupancy on February 8, 2002. See plaintiffs' exhibit 47. Under the terms of the

covenant, the Vittums had until May 2002 to construct the apron. They have not done so,

aiid Oak Kidge seeks a declaration that they are in violation of the covenant and an order

of compliance.

In testimony, Darren Vittum explained that he has deferred construction of the

apron because of the pendency of this litigation and because he has not finished putting in

his lawn. The fact of litigation, in which the Vittums' compliance with the covenant is

placed in issue, cannot be seen as an event that stays their obligation to comply with the

covenant. Further, the evidence does not reveal a logically necessary sequence in which

the lawn must be planted before the apron is constructed. (In fact, because the asphalt

work will involve heavy equipment, it seems sensible for that work to precede grading

and planting the lawn, because the latter is a more delicate operation.) The evidence

indicates that the drainage in front of the house needs to be improved, and this may work

may need to be done before the apron is built. However, such a sequence still does not

justify the delay.

The Vittums' lot is not the only one where an apron has not been built within the

time prescribed by the restrictive covenant. However, the court does not view that

circumstance as one that amounts to a waiver by Oak Ridge of any rights it might assert

here. The evidence does not suggest that compliance with the covenant is particularly

burdensome to an extent that enforcement would be inequitable.

Finaiiy , the restrictive covenant ar issue here does not suffer from the same

problem that renders the landscaping provision unenforceabie in the context of this case.

Unlike the latter, the covenant requiring the apron is clear and unambiguous.

For these reasons, the court finds that the Vittums have failed to comply with the

..

covenant reqmr;;lg construction of :he aprcn. As s o ~ ras

i the :.;eather alloivs Chat

construction, they shali build the apron in compliance with the restrictive covenant

forthwith.

The claims of the parties have met with mixed success. When viewed from a

1 4 M.R.S.A. $ 1501. Consequently, the parties shall bear their own costs.

The entry shall be:

For the foregoing reasons, on count 2 of the complaint, judgment is entered for

the plaintiffs in the amount of $6,775. plus pre-judgment interest at the annual rate of 8%

and post-judgment interest at the annual rate of 10.3670. Judgment is entered for the

defendant on counts 1 and 3. Count 4 of the complaint is dismissed on the plaintiffs'

motion.

On the counterclaim, judgment is entered for the defendant (the counterclaim

piaintiff) on that part of count 2 relating to the driveway apron. As soon as the weather

allows such construction, the plaintiffs (the counterclaim defendants) shall build the

apron in compliance with the restrictive covenant forthwith. On that part of count 2

relating to the landscaping provision of the deed and on count 1, judgment is entered for

the plaintiffs (the counterclaim defendants). Count 3 of the counterclaim is dismissed on

the defendant' motion.

No costs are awarded to any party.

..-,

Dated: February 17,2006

.

s !!

17

il!

,? /, ,

I /

~ustic; $ine Superior Court sitting

in Maine District Court

02/'21/2006 MAINE J U D I C I A L INFORMATION SYSTEM k s m ith

BANGOR D I S T R I C T COURT mjxxi048

CASE PARTY ADDRESS BOOK

DARREN J VITTUM & DENISE L VITTUM VS OAK RIDGE BUILDERS I N C

UTN:AOCSsr - 2 0 0 3 - 0 0 9 1 2 1 2 CASE #:BANDC-CV-2003-00402

DAR.REN J . VITTUM PL

ATT'Y DEARBORN, JOEL T e l # (207) 9 8 9 - 8 5 0 1

ATT'Y ADDR:120 NORTH M A I N STREET BREWER ME 0 4 4 1 2

DENISE L . VITTUM

ATTY DEARBORN, JOEL T e l # (207) 9 8 9 - 8 5 0 1

ATTY ADDR:120 NORTH M A I N STREET BREWER ME 0 4 4 1 2

OAK RIDGE BUILDERS I N C DEF

ATTY RELLA, CARL T e l # (207) 9 4 5 - 4 7 2 2

ATTY ADDR:ONE CUMBERLAND PLACE, STE 3 1 4 PO BOX 2 7 0 8 BANGOR ME 0 4 4 0 2 - 2 7 0 0

ATT'Y K L E I N , PETER T e l # (207) 947-0111

ATT'Y ADDR:80 EXCHANGE ST PO BOX 1 2 1 0 BANGOR ME 0 4 4 0 2 - 1 2 1 0

M=More, Space = E x i t : M

S e l e c t t h e E X I T KEY f o r p a g e s e l e c t i o n l i n e .

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.