Opinion

Mohamed v. Freddie Mac

Court
District Court, E.D. New York
Filed
Aug 24, 2024
Cited by
0 cases
Authority
More cited than 31.6%

affirming summary judgment where defendants established plaintiff’s injury was caused by the actual performance of the demolition work

How later courts described this case

  • affirming summary judgment where defendants established plaintiff’s injury was caused by the actual performance of the demolition work
  • plaintiff engaged in “demolition work” where plaintiff was employed to “clean out, remove machines, break down structures . . . and ship them out” and was injured in a fall from an unsecured ladder
  • “Put simply, it would be illogical to require an owner or general contractor to place a protective cover over, or otherwise barricade, a three- or four-foot-deep hole when the very goal of the work is to fill that hole with concrete.”
  • triable issues of fact precluding summary judgment existed where evidence indicated defendants played a role in the choice of equipment and safety procedures

Written by the judges who cited it.

The opinion

UNITED STATES DISTRICT COURT

EASTERN DISTRICT OF NEW YORK

RAFEEK MOHAMED,

Plaintiff,

v. MEMORANDUM & ORDER

22-CV-01243 (HG)

FEDERAL HOME LOAN MORTGAGE

CORP. (FREDDIE MAC), RADIAN REAL

ESTATE MANAGEMENT, LLC, THE

RADIAN GROUP, INC., and MILES

PRESERVATION, LLC,

Defendants.

HECTOR GONZALEZ, United States District Judge:

Plaintiff Rafeek Mohamed brought this action in Kings County Supreme Court on

January 28, 2022, alleging claims under Sections 200, 240(1) and 241(6) of the New York Labor

Law (“NYLL”) against Defendants Federal Home Loan Mortgage Corp. (“Freddie Mac”),

Radian Real Estate Management, LLC, The Radian Group, Inc. (collectively “Radian”), and

Miles Preservation, LLC (“Miles”). ECF No. 1-2 (Compl.). The case was removed to this Court

on March 7, 2022. ECF No. 1 (Notice of Removal). Currently pending before me are the

parties’ motions for summary judgment. Plaintiff moves for summary judgment against all

Defendants on his Section 240(1) claim. ECF No. 44 (Plaintiff Mot.). Freddie Mac moves for

summary judgment against Radian on claims for contractual indemnification and breach of

contract. ECF No. 45 (Freddie Mac Mot.). Radian moves for summary judgment against Miles

for contractual indemnification. ECF No. 46 (Radian Mot.). Miles moves for summary

judgment against Plaintiff on his Section 241(6) claim. ECF No. 47 (Miles Mot.). And all

Defendants move against Plaintiff on his Section 200 claim. ECF No 45; ECF No. 46; ECF No.

47.

For the reasons set forth below, the Court: (1) denies Plaintiff’s motion for summary

judgment on his Section 240(1) claim; (2) grants Freddie Mac’s motion for summary judgment

on Plaintiff’s Section 200 claim and denies Freddie Mac’s motion for summary judgment on its

contractual claims; (3) grants Radian’s motion for summary judgment on Plaintiff’s Section 200

claim and denies Radian’s motion for summary judgment on its contractual claims; and

(4) grants Miles’s motion for summary judgment on Plaintiff’s Section 200 claim and partially

grants and partially denies Miles’s motion for summary judgment on Plaintiff’s Section 241(6)

claim.

BACKGROUND

Unless otherwise indicated, the following facts are undisputed. On July 30, 2020,

Plaintiff was working on a repair project at 778 Madison Street, Brooklyn, New York (the

“Property”), which involved removing and replacing at least a portion of the flooring and

subflooring of the fourth floor of the Property. ECF No. 32 ¶¶ 1, 8, 15 (Freddie Mac Resp. to

Plaintiff 56.1 Statement); ECF No. 33 ¶¶ 1, 8, 15 (Radian Resp. to Plaintiff 56.1 Statement);

ECF No. 39 ¶¶ 1, 8, 15 (Miles Resp. to Plaintiff 56.1 Statement). At all times relevant to this

action, Freddie Mac was the owner of the Property, which it acquired following a foreclosure

proceeding. ECF No. 32 ¶ 2; ECF No. 33 ¶ 2; ECF No. 39 ¶ 2. Radian managed the Property,

and in this role, Radian had authority to hire companies to perform work at the Property and to

manage the “vendor network” as defined in the agreement between Freddie Mac and Radian.1

ECF No. 32 ¶ 4; ECF No. 33 ¶ 4; ECF No. 39 ¶ 4; ECF No. 45-2 at 29 (Freddie Mac-Radian

1 Freddie Mac originally entered into a services agreement with Green River Capital, LLC

on January 1, 2018. ECF No. 45-2. Green River Capital, LLC eventually changed its named to

Radian Real Estate Management, LLC. The services agreement for property management

remained the same in all other respects. ECF No. 54-1 ¶ 4 (Plaintiff Resp. to Miles 56.1

Statement).

Agreement).2 The agreement also contained an indemnification clause, whereby Radian agreed

to, in relevant part:

defend, indemnify and hold harmless Freddie Mac and its Affiliates . . . from and

against any and all claims brought by third parties and related injuries, damages,

liabilities, judgments and settlements . . . arising out of or related to: (A) any

negligence or willful misconduct by [Radian], its subcontractors or their

respective directors, officers, partners, employees or agents[.]

ECF No. 45-2 at 16, ¶ 8(a)(i)(A). The agreement further required Radian to “maintain, at its

expense, complete and comprehensive insurance coverage.” Id. at 17, ¶ 8(c); see also id. at 127–

28 (insurance requirements). As part of that insurance coverage, Radian was required to procure

“[c]ommercial general liability coverage in the minimum amount of $500,000 [sic] each

occurrence and $2,000,000 annual aggregate.” Id. at 127, ¶ 1(a). This insurance would insure

against, among other things, liability arising out of or from bodily injury or personal injury. Id.

Radian was also required to procure “[u]mbrella liability coverage in the minimum amount of

$5,000,000 [sic] each claim and annual aggregate.” Id. ¶ 1(e). And finally, as relevant here,

Radian was required to name Freddie Mac as an additional insured (except for Radian’s

professional liability policy and workers’ compensation policy). Id. at 128, ¶ 2(e).

As manager of the Property, Radian hired Miles to be the “preservation and maintenance”

vendor. ECF No. 47-9 at 23, ¶ 1 (Radian-Miles Agreement). Although the parties disagree as to

whether Miles’s scope of work included Miles performing the work contemplated in the

agreement itself, the agreement requires any of Miles’s “personnel and subcontractors” that

performed work on the Property to be “experienced, properly trained, supervised, appropriately

licensed and otherwise qualified and capable of performing the Services” outlined in the

2 Unless otherwise noted, the Court refers to the pages assigned by the Electronic Case

Files system (“ECF”).

agreement. Id. at 34, ¶ 6. Similar to the agreement between Freddie Mac and Radian, Miles

agreed to:

indemnify and hold harmless [Radian] and its Affiliates . . . from and against any

and all claims brought by third parties and related injuries, damages, liabilities,

judgments and settlements . . . arising out of or related to: (A) any negligence or

willful misconduct by [Miles], its subcontractors or their respective directors,

officers, employees or agents[.]

Id. at 15, ¶ 7(a)(i)(A).

Miles hired non-party R&M Renovations to perform work at the Property. ECF No 41

¶¶ 1, 8 (Miles Resp. to Radian 56.1 Statement). Plaintiff was employed by R&M and his scope

of work on July 30, 2020, involved removing and replacing at least a portion of the flooring and

subflooring of the fourth floor of the Property. ECF No. 32 ¶ 8; ECF No. 33 ¶ 8; ECF No. 39 ¶

8. Prior to that date, Radian and Miles were aware, through correspondence and engineer

reports, that because of a hole in the roof, water leakage had caused structural damage to the

flooring on the fourth floor. ECF No. 32 ¶¶ 12–13; ECF No. 33 ¶¶ 12–13; ECF No. 39 ¶¶ 12–

13. Miles had uploaded a bid for work into the internal report system—which both Radian and

Freddie Mac had access to—indicating that the floor was a “safety issue. The wood is rotted,

and there are holes and someone can fall through.” ECF No. 44-9 at 38–39 (Wooley Dep. Tr.).

Plaintiff testified that when he arrived at the Property on July 30, 2020, he was instructed

to work on the subflooring of the fourth floor, and he and his coworker brought 20 sheets of

plywood up there. ECF No. 32 ¶¶ 15–16; ECF No. 33 ¶¶ 15–16; ECF No. 39 ¶¶ 15–16. Plaintiff

also testified that once he reached the fourth floor, he began removing the loose linoleum floor.

ECF No. 32 ¶ 17; ECF No. 33 ¶ 17; ECF No. 39 ¶ 17. Plaintiff observed that the existing

plywood showed signs of rotting and was severely discolored with mold. ECF No. 32 ¶¶ 17–19;

ECF No. 33 ¶¶ 17–19; ECF No. 39 ¶¶ 17–19. After Plaintiff described the condition of the floor

to his supervisor, Mr. Ramnarine, Mr. Ramnarine instructed Plaintiff to start installing the

plywood sheets on top of the otherwise rotting floor. ECF No. 32 ¶ 20; ECF No. 33 ¶ 20; ECF

No. 39 ¶ 20. As Plaintiff carried the first sheet of plywood across the floor to install it, the floor

collapsed under him, and he fell to the floor below. ECF No. 32 ¶ 22; ECF No. 33 ¶ 22; ECF

No. 39 ¶ 22. Plaintiff testified that he was not provided with any safety equipment to protect him

from the risk of falling. ECF No. 32 ¶ 23; ECF No. 33 ¶ 23; ECF No. 39 ¶ 23. Plaintiff does not

dispute that R&M Renovations provided Plaintiff with all the materials and equipment to

perform this work at the Property and that Plaintiff did not work with anyone at the Property who

was not an R&M employee. ECF No. 54-1 ¶¶ 18–19.

LEGAL STANDARD

Summary judgment is appropriate “if the movant shows that there is no genuine dispute

as to any material fact and the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P.

56(a). In other words, a court should grant summary judgment “if the pleadings, depositions,

answers to interrogatories, and admissions on file, together with the affidavits, if any, show that

there is no genuine issue as to any material fact and that the moving party is entitled to a

judgment as a matter of law.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 247 (1986).3 The

moving party has the burden of demonstrating that there is no genuine issue of material fact.

Celotex Corp. v. Catrett, 477 U.S. 317, 323 (1986). “Where the moving party demonstrates the

absence of a genuine issue of material fact, the opposing party must come forward with specific

evidence demonstrating the existence of a genuine dispute of material fact.” Brown v. Eli Lilly &

Co., 654 F.3d 347, 358 (2d Cir. 2011). “The mere existence of a scintilla of evidence” in support

3 Unless noted, case law quotations in this Order accept all alterations and omit internal

quotation marks, citations, and footnotes.

of the non-movant will not alone defeat a summary judgment motion. Anderson, 477 U.S. at

252.

In deciding a summary judgment motion, any ambiguities and inferences drawn from the

facts must be viewed in the light most favorable to the non-moving party. LaFond v. Gen.

Physics Servs. Corp., 50 F.3d 165, 171 (2d Cir. 1995). Although “courts must refrain from

assessing competing evidence in the summary judgment record and avoid making credibility

judgments,” the non-moving party must defeat summary judgment by putting forth “evidence on

which the jury could reasonably find for the non-moving party.” Saeli v. Chautauqua Cnty., 36

F.4th 445, 456 (2d Cir. 2022) (emphasis in original). “[R]eliance upon conclusory statements or

mere allegations is not sufficient to defeat a summary judgment motion”; rather, the nonmoving

party must “go beyond the pleadings and by his or her own affidavits, or by the depositions,

answers to interrogatories, and admissions on file, designate specific facts showing that there is a

genuine issue for trial.” Davis v. New York, 316 F.3d 93, 100 (2d Cir. 2002).

DISCUSSION

I. Plaintiff’s Section 240(1) Claim

Plaintiff moves for summary judgment on his Section 240(1) claim against all

Defendants. ECF No. 44-1. Plaintiff argues that Freddie Mac, as the owner of the Property, is

strictly liable under Section 240(1), see id. at 7, and that Radian and Miles, as the manager of and

contractor for the Property, respectively, are subject to Section 240(1) liability, see id. at 8–9.

Defendants respond that Plaintiff is not entitled to summary judgment on his Section 240(1)

claim because Plaintiff was the sole proximate cause of the accident. ECF No. 51 at 4–6

(Freddie Mac Opp. to Plaintiff Mot.); ECF No. 55 at 3–4 (Radian Opp. to Plaintiff Mot.); ECF

No. 58 at 10–12 (Miles Opp. to Plaintiff Mot.).4

Section 240(1) of the New York Labor Law requires building owners and contractors:

in the erection, demolition, repairing, altering, painting, cleaning or pointing of a

building or structure [to] furnish or erect, or cause to be furnished or erected for

the performance of such labor, scaffolding, hoists, stays, ladders, slings, hangers,

blocks, pulleys, braces, irons, ropes, and other devices which shall be so

constructed, placed and operated as to give proper protection to a person so

employed.

N.Y. Lab. Law § 240(1). Pursuant to the statute, owners and contractors who fail to “provide

proper protection to workers employed on a construction site” which then “proximately causes

injury to a worker” are absolutely liable for that injury. Wilinski v. 334 E. 92nd Hous. Dev. Fund

Corp., 959 N.E.2d 488, 491 (N.Y. 2011). Although Plaintiff contends that Freddie Mac, as the

owner of the Property, is subject to “strict liability” for his injuries, see ECF No. 44-1 at 7,

“[v]iolation of the statute alone is not enough” to impose liability. Wojcik v. 42nd St. Dev.

Project, 386 F. Supp. 2d 442, 451 (S.D.N.Y. 2005). Indeed, “[n]ot every worker who falls at a

4 Radian and Miles further argue that they are generally not proper labor law Defendants

because they did not supervise Plaintiff’s work. ECF No. 55 at 2; ECF No. 58 at 6–8. The Court

disagrees. “A party is deemed to be an agent of an owner or general contractor under [Sections

240(1) and 241(6) of] the Labor Law when it has supervisory control and authority over the work

being done where a plaintiff is injured.” Diaz v. Trevisani, 82 N.Y.S.3d 549, 554 (N.Y. App.

Div. 2018) (affirming denial of motion for summary judgment on Section 240(1) and Section

241(6) claims). “[T]he test of whether a defendant is a statutory agent subject to liability under

those sections is not whether it actually supervised the work, but whether it had the authority to

do so.” Merino v. Cont’l Towers Condo., 72 N.Y.S.3d 59, 61 (N.Y. App. Div. 2018) (finding

motion court erred in determining defendant was not liable under Sections 240(1) and 241(6)

where defendant had authority to supervise the work at issue). Here, although Radian and Miles

may not have directly supervised and directed Plaintiff’s work at the Property, see ECF No. 52-1

¶ 10 (Plaintiff Resp. to Radian 56.1 Statement); ECF No. 54-1 ¶¶ 17–23, they were granted

authority to supervise Plaintiff under their relative contracts associated with the Property. ECF

No. 45-2 at 30, 40, 113; ECF No. 47-9 at 23, 34. They are therefore proper labor law Defendants

under Sections 240(1) and 241(6). However, as discussed infra § II, the Court agrees that

whether Defendants actually exercised control over the method or manner of the work giving

rise to Plaintiff’s injuries is determinative for liability as to Plaintiff’s Section 200 claim.

construction site, and not every object that falls on a worker, gives rise to the extraordinary

protections of Labor Law § 240(1). Rather, liability is contingent upon the existence of a hazard

contemplated in section 240(1) and the failure to use, or the inadequacy of, a safety device of the

kind enumerated therein.” Narducci v. Manhasset Bay Assocs., 750 N.E.2d 1085, 1089 (N.Y.

2001). Accordingly, “the statutory protection does not extend to workers who have adequate and

safe equipment available to them but refuse to use it.” Wojcik, 386 F. Supp. 2d at 452.

Defendants argue that they are not liable under Section 240(1) because Plaintiff’s actions

were the proximate cause of his injuries. ECF No. 51 at 5–6; ECF No 55 at 3–4; ECF No. 58 at

10–12. Namely, Defendants argue that (1) Plaintiff was injured by the hazard he was there to

remedy, see ECF No 55 at 3, and (2) Plaintiff was aware that the floor was deteriorating,

reported it to his supervisor, but then nonetheless walked over the floor, see ECF No. 51 at 5–6;

ECF No 55 at 3–4; ECF No. 58 at 10–12. Both arguments have merit and, at a minimum,

present issues of fact precluding summary judgment. The New York Court of Appeals has

distinguished between cases where a plaintiff is injured from the defect he was set to remedy and

where a plaintiff is injured from objects unrelated to his scope of work. See, e.g., Wilinski, 959

N.E.2d at 495 (“This [case] stands in contrast to cases where the objects that injured the

plaintiff’s [sic] were themselves the target of demolition when they fell. . . . In those instances,

imposing liability for failure to provide protective devices to prevent the walls or objects from

falling, when their fall was the goal of the work, would be illogical.”); Salazar v. Novalex

Contracting Corp., 960 N.E.2d 393, 396 (N.Y. 2011) (“Put simply, it would be illogical to

require an owner or general contractor to place a protective cover over, or otherwise barricade, a

three- or four-foot-deep hole when the very goal of the work is to fill that hole with concrete.”).

In the case where a plaintiff is injured from the defect he was hired to remedy “neither party is

entitled to summary judgment on plaintiff’s Labor Law § 240(1) claim.” Wilinski, 959 N.E.2d at

495. Rather, “[w]hether plaintiff's injuries were proximately caused by the lack of a safety

device of the kind required by the statute is an issue for a trier of fact to determine.” Id. Such is

the case here, where Plaintiff was injured by the structurally compromised floor he was tasked

with fixing. ECF No. 32 ¶¶ 12–13, 15–16; ECF No. 33 ¶¶ 12–13, 15–16; ECF No. 39 ¶¶ 12–13,

15–16; ECF No. 44-9 at 38–39.

Furthermore, the parties have presented issues of fact regarding whether Plaintiff’s

actions were the proximate cause of his injuries. Plaintiff argues that Defendants should have

provided him with specific safety devices to assist in his repair of the floor. See ECF No. 44-1 at

18. Miles argues that there are issues of fact regarding whether Plaintiff was provided with, and

used, safety measures at the time of the incident. ECF No. 58 at 8. The Court agrees. Plaintiff

testified that his employer, R&M, generally did not provide him with safety equipment. ECF

No. 47-5 at 58–59 (Plaintiff Dep. Tr.). However, Plaintiff’s supervisor, Mr. Ramnarine, testified

that he kept safety equipment, such as hard hats and harnesses, in the company’s trucks and that

he discussed safety measures with his team. ECF No. 51-2 at 107–10 (Ramnarine Dep. Tr.).

Mr. Ramnarine nevertheless did not instruct Plaintiff to use the safety equipment. ECF No. 58-1

at 44–47 (Ramnarine Dep. Tr.). All Defendants also contend that it was Plaintiff’s own

actions—i.e., walking over the rotted floor, knowing it was structurally compromised—that

proximately caused his injuries. ECF No. 51 at 5–6; ECF No. 55 at 3–4; ECF No. 58 at 10–12.

Indeed, Plaintiff testified that he knew and had previously discussed the condition of the floor

with Mr. Ramnarine prior to walking over it. ECF No. 47-5 at 112–13, 133–34. Because the

record is replete with conflicting testimony, “[t]he proximate cause of [P]laintiff’s injuries is . . .

a factual issue improper for summary judgment.” Pollack v. Safeway Steel Prod., Inc., 457 F.

Supp. 2d 444, 449 (S.D.N.Y. 2006). Accordingly, the Court denies Plaintiff’s motion for

summary judgment on his Section 240(1) claim.

II. Plaintiff’s Section 200 Claim

All Defendants have moved for summary judgment on Plaintiff’s Section 200 claim.

ECF No. 45; ECF No. 46; ECF No. 47. Plaintiff does not oppose Freddie Mac’s motion for

summary judgment on this claim. ECF No. 53 (Plaintiff’s Opp. to Freddie Mac’s Mot.). And

Plaintiff does not oppose Radian’s and Miles’s motions to the extent that they are based on the

“dangerous condition theory.” ECF No. 52 at 1 (Plaintiff Opp. to Radian Mot.); ECF No. 54 at 2

(Plaintiff Opp. to Miles Mot.). However, Plaintiff opposes Radian’s and Miles’s motions

regarding this claim under the “means and methods” theory. ECF No. 52 at 1–3; ECF No. 54 at

3–4. In other words, Plaintiff does not refute “[t]o the extent the accident was caused by the

dangerous, ‘structurally compromised’ condition of the floor,” that “no responsibility rests upon

an owner of real property to one hurt through a dangerous condition which he has undertaken to

fix.” ECF No. 52 at 1 (citations omitted); accord ECF No. 54 at 2. Nevertheless, Plaintiff

argues that “to the extent the accident was caused by the dangerous means and methods of the

work, i.e.[,] the failure to put fall protection in place and and/or the failure to otherwise

brace/support the area in order for Plaintiff and other workers to be able to perform the work

safely,” there are material issues of fact precluding granting Radian and Miles summary

judgment on the Section 200 claim. ECF No. 52 at 1–3; accord ECF No. 54 at 3–4. Radian and

Miles respond that they are not liable under Section 200 because they did not direct or control

Plaintiff’s work. ECF No. 63 at 4–5 (Radian Reply); ECF No. 64 at 6–10 (Miles Reply). The

Court agrees with Defendants.

Section 200 of the New York Labor Law provides:

All places to which this chapter applies shall be so constructed, equipped,

arranged, operated and conducted as to provide reasonable and adequate

protection to the lives, health and safety of all persons employed therein or

lawfully frequenting such places. All machinery, equipment, and devices in such

places shall be so placed, operated, guarded, and lighted as to provide reasonable

and adequate protection to all such persons.

N.Y. Lab. Law § 200. Where it is alleged that plaintiff’s injuries resulted from the “methods or

materials of the work,” a party may be liable under Section 200 if it had “the authority to

supervise and control the work actually being performed.” Quilambaqui v. Men at Work Constr.

Corp., No. 18-cv-4824, 2021 WL 11690892, at *5 (E.D.N.Y. Aug. 25, 2021) (citing cases).

Unlike the question of whether a party is liable under Sections 240(1) and 241(6), see supra

note 4, “which only requires the authority to control the condition giving rise to the injury—

liability for a defect in the ‘means or method’ of the work requires actual exercise of control

over the method or manner of working giving rise to a plaintiff’s injury.” In re World Trade Ctr.

Lower Manhattan Disaster Site Litig., 44 F. Supp. 3d 409, 432 (S.D.N.Y. 2014) (emphasis in

original); see also Quilambaqui, 2021 WL 11690892, at *5 (“[B]uilding owners and general

contractors may be liable only if they had the authority to supervise and control the work actually

being performed. . . . Retention of general supervisory control, by contrast, is insufficient to

establish the necessary authority for liability to attach under § 200.”).

Here, although Radian and Miles had “general supervisory control” over the work being

performed at the Property, see supra note 4, the undisputed evidence shows that neither

Defendant actually exercised control over the method or manner of work giving rise to Plaintiff’s

injuries. Indeed, Plaintiff does not dispute that R&M provided him with all the materials and

equipment to perform the work at the Property and that Plaintiff did not work with anyone at the

Property who was not an R&M employee. ECF No. 54-1 ¶¶ 17–19. Plaintiff also does not

dispute that Radian and Miles did not give any instructions to Plaintiff about how the work at the

Property should be performed. ECF No. 52-1 ¶¶ 10–11; ECF No. 54-1 ¶¶ 20–23. This case is

therefore distinguishable from others where the evidence showed defendants were present on the

worksite and provided equipment for the workers. See, e.g., In re World Trade Ctr. Lower

Manhattan Disaster Site Litig., 54 F. Supp. 3d 301, 315–16 (S.D.N.Y. 2014) (denying summary

judgment); In re World Trade Ctr. Lower Manhattan Disaster Site Litig., 57 F. Supp. 3d 328,

341 (S.D.N.Y. 2014) (triable issues of fact precluding summary judgment existed where

evidence indicated defendants played a role in the choice of equipment and safety procedures).

Because the undisputed evidence in this case shows that Radian and Miles did not exercise any

supervisory control over the work giving rise to Plaintiff’s injuries, they are entitled to summary

judgment on Plaintiff’s Section 200 claim. Plaintiff’s Section 200 claim is therefore dismissed

as to all Defendants.

III. Plaintiff’s Section 241(6) Claim

Miles moves for summary judgment on Plaintiff’s Section 241(6) claim on the basis that

the Industrial Code provisions Plaintiff alleges were violated cannot form the basis of a Section

241(6) claim. ECF No. 47-3 at 17. Specifically, Miles argues that Industrial Code Sections 23-

1.16, 23-2.4, and 23-3.3 are “irrelevant/inapplicable to the facts of this case or they do not set

forth concrete safety requirements and specifications” that were violated. Id.5 Plaintiff concedes

that Section 23-1.16 is inapplicable to this case because he was not provided with any safety

belts or items referenced in the regulation. ECF No. 54 at 4. Plaintiff also concedes that

5 Miles does not move for summary judgment on all of the Industrial Code Sections that

Plaintiff alleges were violated. Compare ECF No. 1-2 at 12, ¶ 72, with ECF No. 47-3 at 17.

Consequently, the Court does not analyze Plaintiff’s Section 241(6) claim brought pursuant to

Industrial Code Sections 23-1.7(b), 23-1.8, 23-1.11, and 23-1.17, and those claims therefore

survive for trial.

Sections 23-2.4, 23-3.3(b)(3) and 23-3.3(b)(4) are inapplicable to this case. Id. at 4–5.

However, Plaintiff opposes dismissal of his Section 241(b) claim as it relates to Sections 23-

3.3(c) and 23-3.3(l). Id. at 6.

Section 241(6) of the New York Labor Law requires all contractors, owners, and their

agents to provide “reasonable and adequate protection and safety in areas in which construction,

excavation or demolition work is being performed.” Laverty v. Dobco, Inc., No. 21-cv-2592,

2024 WL 966013, at *8 (S.D.N.Y. Mar. 6, 2024). To succeed on a Section 241(6) claim,

Plaintiff must demonstrate that his injuries were proximately caused by the violation of a

regulation issued by the Commissioner of the Department of Labor. Id.; see also Flores v.

Crescent Beach Club, LLC, 173 N.Y.S.3d 574, 578 (N.Y. App. Div. 2022) (“To succeed on a

cause of action alleging a violation of Labor Law § 241(6), a plaintiff must demonstrate that his

or her injuries were proximately caused by a violation of an Industrial Code provision that is

applicable under the circumstances of the accident.”). At issue here is Plaintiff’s Section 241(6)

claim predicated on Industrial Code Sections 23-3.3(c) and 23-3.3(l). N.Y. Comp. Codes R. &

Regs. tit.12 §§ 23-3.3(c), 23-3.3(l); ECF No. 54 at 6. Section 23-3.3(c) requires continuing

inspections during demolition operations “as the work progresses to detect any hazards to any

person resulting from weakened or deteriorated floors or walls or from loosened material.”

Section 23-3.3(l) requires workers “working above the first floor or ground level in the

demolition of any building or other structure” to “be provided with safe footing consisting of

sound flooring, planking not less than two inches thick full size, adequately supported exterior

grade plywood at least three-quarters inch think or other material of equivalent strength.”

As an initial matter, Miles argues that these regulations do not apply because Plaintiff

was not engaging in demolition work. ECF No. 47-3 at 19. The Industrial Code defines

demolition as “[t]he work incidental to or associated with the total or partial dismantling or

razing of a building or other structure including the removing or dismantling of machinery or

other equipment.” N.Y. Comp. Codes R. & Regs. tit.12 § 23-1.4 (emphasis added). The

undisputed evidence indicates that Plaintiff was tasked with removing and replacing the flooring

and subflooring of at least a portion of the flooring on the fourth floor of the Property, and that

Plaintiff’s injuries occurred while he was in the process of removing and replacing the flooring.

See ECF No. 32 ¶¶ 8, 17–22; ECF No. 33 ¶¶ 8, 17–22; ECF No. 39 ¶¶ 8, 17–22. Based on these

undisputed facts, it’s clear that Plaintiff engaged in “demolition” work as defined by the

Industrial Code. See Quizhpi v. S. Queens Boys & Girls Club, Inc., 87 N.Y.S.3d 187, 188–89

(N.Y. App. Div. 2018) (plaintiff engaged in “demolition work” where plaintiff was employed for

an asbestos abatement project and was injured when a portion of the roof he walked over

collapsed underneath him); Phillips v. Powercrat Corp., 6 N.Y.S.3d 50, 51 (N.Y. App. Div.

2015) (plaintiff engaged in “demolition work” where plaintiff was employed to “clean out,

remove machines, break down structures . . . and ship them out” and was injured in a fall from an

unsecured ladder).

With respect to Section 23-3.3(c), Miles argues that the regulation does not apply to this

case because the evidence indicates that the floor had been inspected and there was no concern

that it would collapse. ECF No. 64 at 13.6 Miles further argues that Plaintiff was injured by his

actual performance of the work, rendering the regulation inapplicable to this case. Id. at 14; see

also Flores, 173 N.Y.S.3d at 578 (party established “prima facie, the inapplicability of [Section

6 Although this portion of Miles’s argument is not material to the Court’s analysis

regarding Section 23-3.3(c), the Court finds this argument to be contradicted by Miles’s own bid

request for this repair work, which was uploaded into the internal report system and indicated

that the floor was a “safety issue. The wood is rotted, and there are holes and someone can fall

through.” ECF No. 44-9 at 38–39.

23-3.3(c)] by demonstrating that the hazard arose from the plaintiff's actual performance of the

demolition work itself, and not structural instability caused by the progress of the demolition”).

The Court agrees. While questions of fact exist as to whether Plaintiff’s actions were the

proximate cause of his injuries as it relates to Section 240(1), here it is undisputed that Plaintiff

was injured during the course of the demolition work itself. Indeed, Plaintiff admits that he was

injured once he began carrying the first sheet of plywood across the deteriorated floor after he

removed the linoleum flooring. ECF No. 32 ¶¶ 17–22; ECF No. 33 ¶¶ 17–22; ECF No. 39

¶¶ 17–22. Because Plaintiff was injured in the initial phase of the project, he has failed to

establish that there are triable issues of fact that his injuries were the result of a “structural

instability caused by the progress of demolition rather than from the actual performance of

work.” Lemache v. 600 W 144th St., LLC, 212 N.Y.S.3d 914, at *6 (N.Y. Sup. Ct. 2024); see

also Reyes v. Sligo Constr. Corp., 186 N.Y.S.3d 321, 325 (N.Y. App. Div. 2023) (affirming

summary judgment where defendants established plaintiff’s injury was caused by the actual

performance of the demolition work). The Court therefore grants Miles summary judgment on

Plaintiff’s Section 241(6) claim as it relates to Section 23-3.3(c), and Plaintiff may not proceed

with his Section 241(6) claim on the basis of that regulation.

Plaintiff, however, has established that Section 23-3.3(l) applies to this case. Although

Miles argues that “Plaintiff was not using accumulated debris or piled materials as a footing to

perform his work,” see ECF No. 64 at 14, Plaintiff has “submitted evidence that he was

performing demolition work above ground level, and that the [floor] on which he was standing

collapsed.” Cueva v. 373 Wythe Realty, Inc., 976 N.Y.S.2d 516, 517 (N.Y. App. Div. 2013); see

ECF No. 32 ¶ 22; ECF No. 33 ¶ 22; ECF No. 39 ¶ 22. Consequently, Plaintiff has

“demonstrated prima facie that he was not provided with sound flooring in violation of this

regulation.” Cueva, 976 N.Y.S.2d at 517; see also Lemache, 212 N.Y.S.3d 914, at *7 (“As it is

undisputed that the Plaintiff was standing on dismantled scaffolding racks when he was loading

more dismantled scaffold materials into the truck at the time of his fall, and was not provided

sound flooring, 12 NYCRR § 23-3.3(l) applies.”). Because there are triable issues of fact as to

whether Defendants provided, or were obligated to provide, reasonable and adequate protection

for the worksite as defined in Section 23-3.3(l), Plaintiff may proceed with his Section 241(6)

claim pursuant to that regulation.

To summarize, for the reasons set forth above, Plaintiff’s Section 241(6) claim may

proceed pursuant to Industrial Code Sections 23-1.7(b), 23-1.8, 23-1.11, 23-1.17, and 23-3.3(l).

The case will not proceed with Plaintiff’s Section 241(6) claim as it relates to Industrial Code

Sections 23-1.16, 23-2.4, 23-3.3(b)(3), 23-3.3(b)(4) and 23-3.3(c).7

IV. Defendants’ Contract Claims

A. Indemnification

Freddie Mac moves for summary judgment against Radian, arguing that Plaintiff’s claims

“trigger Radian’s obligation to defend and indemnify Freddie Mac.” ECF No. 45 at 26.

Similarly, Radian moves for summary judgment against Miles because “R&M is a subcontractor

of Miles and [P]laintiff’s injuries arose from R&M’s negligence,” thereby triggering the

indemnification provision. ECF No. 46 at 15. Both indemnification provisions in the Freddie

Mac-Radian Agreement and Radian-Miles Agreement require the respective indemnitor to

indemnify and hold harmless against any “negligence or willful misconduct” by the indemnitor,

7 Although Miles was the only Defendant to move on this claim, the Court finds the basis

for which the Court granted Miles summary judgment on the Section 241(6) claim brought

pursuant to Industrial Code Section 23-3.3(c) to apply to all Defendants, see supra § III, and

separately finds that Plaintiff has abandoned his Section 241(6) claim brought pursuant to

Industrial Codes Sections 23-1.16, 23-2.4, 23-3.3(b)(3), and 23-3.3(b)(4) against all Defendants

as Plaintiff concedes those regulations are inapplicable to this case, see ECF No. 54 at 4–5.

its subcontractors, or their respective agents. ECF No. 45-2 at 16, ¶ 8(a)(i); ECF No. 47-9 at 15,

¶ 8(a)(i)(A).

Radian argues that it is not obligated to indemnify Freddie Mac because there is no

evidence that Radian was negligent with respect to the incident and because R&M was not

Radian’s subcontractor, but rather was Miles’s subcontractor. ECF No. 56 at 3–6 (Radian Opp.

to Freddie Mac Mot.). Similarly, Miles argues that it is not obligated to indemnify Radian

because there is no evidence that Miles was negligent with respect to the incident and because

issues of fact exist as to whether Plaintiff was the sole proximate cause of the accident and

injuries. ECF No. 57 at 5–7 (Miles Opp. to Radian Mot.). As discussed supra, factual issues

exist as to whether the actions of Plaintiff or one of the Defendants was the sole proximate cause

of Plaintiff’s injuries. See supra § I. Because there has been no finding of negligence or

misconduct “summary judgment on [a] contractual indemnification claim would be premature.”

Quiroz v. New York Presbyterian/Columbia Univ. Med. Ctr., 163 N.Y.S.3d 516, 519 (N.Y. App.

Div. 2022) (summary judgment inappropriate on contractual indemnification claim in labor law

case where issues of fact existed regarding whether defendant was the sole proximate cause of

plaintiff’s injuries); see also In re Bridge Constr. Servs. of Fla., Inc., 140 F. Supp. 3d 324, 331–

32 (S.D.N.Y. 2015) (“Whether this contractual right of indemnification will in fact be triggered

cannot be resolved on this motion for summary judgment because it depends on disputed issues

of fact concerning whether [defendant] was negligent and whether that negligence was a

proximate cause of the accident.”). The Court therefore denies summary judgment on Freddie

Mac’s and Radian’s indemnification claims.

B. Breach of Contract to Procure Insurance

Freddie Mac seeks summary judgment on its breach of contract claim against Radian on

the basis that the insurance policy Radian procured did not adhere to the terms in the Freddie

Mac-Radian Agreement. ECF No. 45 at 27. Freddie Mac points to a letter from the Great

Northern Insurance Company—Radian’s insurer—disavowing coverage. ECF No. 45-19 at 1

(March 2022 Letter). The letter also states that Freddie Mac was not listed as an additional

insured. Id. at 3. According to Freddie Mac, the letter is “irrefutable proof that Radian breached

its contract with Freddie Mac” because the insurance policy “precludes the exact work Radian

contracted with Freddie Mac to perform.” ECF No. 45 at 28. Radian counters that it did procure

the required insurance coverage and that the policy does contain a provision including Freddie

Mac as an additional insured. ECF No. 56 at 6.

This record presents genuine issues of material fact precluding summary judgment on

Freddie Mac’s breach of contract claim. For one, while the insurance letter indicates that

Freddie Mac’s claim was precluded from coverage “by virtue of the Foreclosure, Trust and

Leasing exclusion,” see ECF No. 45-19 at 1, the insurance policy submitted by Radian contains a

contrary “Bodily Injury and Property Damage” provision which provides coverage for “damages

that the insured becomes legally obligated to pay by reason of liability imposed by law or

assumed in an insured contract for bodily injury or property damage.” ECF No. 56-1 at 250

(Insurance Policy). Explicitly included in this provision is “bodily injury or property damage

involving[] . . . foreclosed property.” Id. Additionally, the insurance contract contains an

“additional insured” provision which includes “[p]ersons or organizations that [the insured is]

obligated, pursuant to a contract or agreement, to provide with such insurance as is afforded by

this policy.” Id. at 366. While the provision does not name Freddie Mac specifically, a

reasonable juror could find that, pursuant to the Freddie Mac-Radian Agreement, Freddie Mac

would be covered by that additional insured provision. And a reasonable juror could find that

the “Bodily Injury and Property Damage” provision satisfies the terms of the Freddie Mac-

Radian Agreement. The Court therefore cannot conclude that the insurance policy Radian

procured did not adhere to the terms of the Freddie Mac-Radian Agreement, and summary

judgment is therefore denied on Freddie Mac’s breach of contract claim.

* * *

For the sake of clarity, and to assist the parties as they prepare for trial, the Court

provides a summary of its decision as set forth in more detail herein. The Court grants all

Defendants’ motions as they pertain to Plaintiff’s Section 200 claim, and that claim is therefore

dismissed. Summary judgment is also granted for all Defendants as it relates to Plaintiff’s

Section 241(6) claim brought pursuant to Industrial Code Section 23-3.3(c). As to the Section

241(6) claims brought pursuant to Industrial Code Sections 23-1.16, 23-2.4, 23-3.3(b)(3), and

23-3.3(b)(4), Plaintiff has abandoned those claims and they are therefore dismissed as to all

Defendants. All remaining claims survive for trial.

CONCLUSION

For the reasons set forth above, the Court: (1) denies Plaintiff’s motion for summary

judgment on his Section 240(1) claim, see ECF No. 44; (2) grants Freddie Mac’s motion for

summary judgment on Plaintiff’s Section 200 claim and denies Freddie Mac’s motion for

summary judgment on its contractual claims, see ECF No. 45; (3) grants Radian’s motion for

summary judgment on Plaintiff’s Section 200 claim and denies Radian’s motion for summary

judgment on its contractual claims, see ECF No. 46; and (4) grants Miles’s motion for summary

judgment on Plaintiff’s Section 200 claim and partially grants and partially denies Miles’s

motion for summary judgment on Plaintiff’s Section 241(6) claim, see ECF No. 47.

The Court understands the parties are scheduled for private mediation on September 24,

2024, and have been directed by Magistrate Judge Kuo to submit a joint status report regarding

the result of mediation by September 27, 2024. See ECF No. 68. Should the mediation not

result in settlement, the parties shall submit their joint pre-trial order in accordance with Section

VI.B of the Court’s Individual Practices on or before October 4, 2024.

SO ORDERED.

/s/ Hector Gonzalez

HECTOR GONZALEZ

United States District Judge

Dated: Brooklyn, New York

August 24, 2024