The opinion
792
S069919 and S069920 argued and submitted January 18, S069924 submitted
on the briefs January 18; final order of Energy Facility Siting Council affirmed
March 9, 2023
In the Matter of the Application for Site Certificate
for the Boardman to Hemingway Transmission Line.
STOP B2H COALITION,
Petitioner,
v.
OREGON DEPARTMENT OF ENERGY,
Oregon Energy Facility Siting Council,
and Idaho Power Company,
Respondents.
(SC S069919)
In the Matter of the Application for Site Certificate
for the Boardman to Hemingway Transmission Line.
Michael McALLISTER,
Petitioner,
v.
OREGON DEPARTMENT OF ENERGY,
Oregon Energy Facility Siting Council,
and Idaho Power Company,
Respondents.
(SC S069920)
In the Matter of the Application for Site Certificate
for the Boardman to Hemingway Transmission Line.
Irene GILBERT,
Petitioner,
v.
OREGON DEPARTMENT OF ENERGY,
Oregon Energy Facility Siting Council,
and Idaho Power Company,
Respondents.
(SC S069924)
525 P3d 864
Cite as 370 Or 792 (2023) 793
Petitioners sought review of an order of the Energy Facility Siting Council
(EFSC) approving an Idaho Power Company (Idaho Power) application for a site
certificate to construct a high-voltage electrical transmission line. Following a
multi-year process that included a public comment period and a contested case
proceeding on the site certificate application, EFSC members voted unanimously
to approve Idaho Power’s application; EFSC then issued a final order detailing
its findings and conclusions. Pursuant to ORS 469.403(3), petitioners filed timely
petitions for judicial review of EFSC’s order, raising several assignments of error.
Held: (1) EFSC did not err in giving petitioners only limited party status rather
than full party status; (2) EFSC had authority to grant an exception to the noise
standards under OAR 340-035-0035, as well as a variance under OAR 340-035-
0100 and ORS 467.060, and substantial evidence supported EFSC’s granting
of an exception and a variance; (3) the Oregon Department of Energy’s modi-
fication of one requirement of former OAR 345-021-0010(1)(x)(E) (Jan 1, 2019)
was authorized by that rule and did not involve the sort of change that required
rulemaking; (4) EFSC did not err in using Idaho Power’s methodology to deter-
mine whether the transmission line would be likely to result in “significant
adverse visual impacts” to scenic resources under OAR 345-022-0080; (5) Idaho
Power was not required to include in its application an alternative route that
the Bureau of Land Management had concluded was environmentally preferable,
and ORS 469.370(13) did not require EFSC to order Idaho Power to amend its
application to include that alternative; (6) EFSC did not err in assessing impacts
on historic sites and mitigation requirements; and (7) EFSC’s General Standard
of Review Condition 7 in its final order was not substantively different from OAR
345-025-0006(5).
The final order of the Energy Facility Siting Council is affirmed.
On judicial review from the Energy Facility Siting
Council.*
Karl G. Anuta, Law Office of Karl G. Anuta, PC, Portland,
argued the cause and filed the brief for petitioner STOP B2H
Coalition. Also on the briefs was Mike J. Sargetakis, Crag
Law Center, Portland.
Hailey R. McAllister, Oakland, California, argued the
cause for petitioner Michael McAllister. Jesse A. Buss,
Willamette Law Group, PC, Oregon City, filed the brief
for petitioner on review. Also on the brief was Hailey R.
McAllister, Oakland, California.
Irene Gilbert, La Grande, filed the brief pro se.
Patricia G. Rincon, Assistant Attorney General, Salem,
argued the cause and filed the briefs for respondents Oregon
Department of Energy and Oregon Energy Facility Siting
______________
* Judicial review of a Final Order of the Energy Facility Siting Counsel
dated September 27, 2022, Kent Howe, Vice Chair.
794 Stop B2H Coalition v. Dept. of Energy
Council. Patricia G. Rincon, Assistant Attorney General,
Salem, filed the briefs for those respondents in S069919
and S069920. Denise G. Fjordbeck filed the brief for those
respondents in S069924. Also on the briefs were Ellen F.
Rosenblum, Attorney General, and Benjamin Gutman,
Solicitor General.
Sara Kobak, Schwabe Williamson & Wyatt, PC, Portland,
argued the cause and filed the briefs for respondent Idaho
Power Company. Also on the briefs were Andrew J. Lee,
Portland, and Lisa Rackner and Jocelyn C. Pease, McDowell
Rackner & Gibson, PC, Portland.
Anne Morrison, La Grande, filed the brief for amicus
curiae Anne Morrison, Attorney.
Before Flynn, Chief Justice, and Duncan, Garrett, DeHoog,
Bushong, and James, Justices.**
BUSHONG, J.
The final order of the Energy Facility Siting Council is
affirmed.
______________
** Nelson, J., resigned February 25, 2023, and did not participate in the
decision of this case.
Cite as 370 Or 792 (2023) 795
BUSHONG, J.
Petitioners seek review of an order of the Energy
Facility Siting Council (EFSC) approving an Idaho Power
Company (Idaho Power) application for a site certificate to
construct a high-voltage electrical transmission line from
Boardman, Oregon, to Hemingway, Idaho. Petitioner STOP
B2H Coalition (Stop B2H) contends that EFSC erred in the
following ways: (1) denying Stop B2H’s request for full party
status in the contested case proceedings; (2) granting an
exception or variance to noise level requirements; (3) mod-
ifying the governing rule to limit the noise assessment to
landowners within one-half mile of the transmission line;
and (4) misapplying EFSC’s rules on the visual impacts
from the transmission line.
Petitioner Michael McAllister (McAllister) contends
that EFSC erred by failing to require Idaho Power to include
in its application an “environmentally preferable” location
for a segment of the transmission line in Union County.
Petitioner Irene Gilbert (Gilbert) contends that
EFSC erred by (1) denying Gilbert’s request for full party
status; (2) failing to document the impacts on historic
properties and mitigation measures; (3) delegating future
approval of mitigation plans to the Oregon Department of
Energy (ODOE); (4) relying on federal standards to deter-
mine mitigation requirements for historic properties; and
(5) modifying a mandatory site certificate condition without
rulemaking.
Applying the governing standard of review, we affirm
EFSC’s final order approving the site certificate for this
transmission line for the reasons stated below.1
I. BACKGROUND
A. Statutory Framework
A high-voltage transmission line is an “energy facil-
ity” that cannot be constructed or operated in Oregon with-
out a site certificate from EFSC.2 ORS 469.300(11) (defining
1
We consolidate the three petitions for purposes of this opinion only.
2
EFSC consists of seven public members appointed by the Governor, subject
to confirmation by the Senate. ORS 469.450(1). ODOE is responsible for provid-
ing staff support and funding for EFSC. ORS 469.450(6).
796 Stop B2H Coalition v. Dept. of Energy
“energy facility”); ORS 469.320 (site certificate require-
ment). The process starts when the applicant submits a
notice of intent to apply for a site certificate. ORS 469.330(1).
ODOE then issues a project order that identifies all stat-
utes, administrative regulations, and other requirements
that the applicant must satisfy to obtain the site certificate.
ORS 469.330(3). The applicant must submit evidence of com-
pliance with all project order requirements in its site certif-
icate application. ORS 469.350.
If ODOE determines that an application is com-
plete, it issues a draft proposed order and gives the public
an opportunity to comment. ORS 469.350(4); ORS 469.370.
EFSC then conducts a contested case on issues raised during
the public comment period in accordance with ORS chapter
183 and any procedures adopted by EFSC. ORS 469.370(5).3
Only issues raised with sufficient specificity during the pub-
lic comment period may be raised in the contested case pro-
ceeding. ORS 469.370(3), (4). EFSC then issues a final order
“either approving or rejecting the application based upon the
standards adopted under ORS 469.501 and any additional
statutes, rules or local ordinances determined to be appli-
cable to the facility by the project order[.]” ORS 469.370(7).
Any party to the contested case can seek review of EFSC’s
final order in this court. ORS 469.403(2), (3).
ORS 469.501(1) authorizes EFSC to adopt standards
for the siting, construction, and operation of an energy facil-
ity. The standards may address a wide variety of subjects,
including seismic hazards; protection of wilderness areas,
wildlife refuges, and scenic waterways; effects on fish and
wildlife; impacts on historic, cultural, and archaeological
resources; protection of public health and safety; impacts
on recreation, scenic, and aesthetic values; consistency with
the state energy policy; compliance with statewide plan-
ning goals; soil protection; and other subjects. ORS 469.501
(1)(a) - (o).
To issue a site certificate, EFSC must find by a pre-
ponderance of the evidence that the facility complies with
(1) the standards adopted by EFSC and (2) “all other Oregon
3
By rule, EFSC appoints a hearing officer “to conduct a contested case pro-
ceeding on behalf of the Council.” OAR 345-015-0023(1).
Cite as 370 Or 792 (2023) 797
statutes and administrative rules” that apply to the pro-
posed facility, unless EFSC finds that full compliance is not
required. ORS 469.503(1), (3). If the facility does not fully
comply with all applicable standards, EFSC may still issue
the site certificate if it finds that “the overall public benefits
of the facility outweigh any adverse effects on a resource or
interest protected by the applicable standards the facility
does not meet.” ORS 469.501(3)(a); ORS 469.503(1).
The stated purpose of this statutory scheme is to
establish “a comprehensive system for the siting, monitoring
and regulating of the location, construction and operation of
all energy facilities in this state.” ORS 469.310. As part of
this “comprehensive system,” the statute provides that a site
certificate “shall bind the state and all counties and cities
and political subdivisions in this state as to the approval
of the site and the construction and operation of the facil-
ity.” ORS 469.401(3). State agencies and local political sub-
divisions must issue any permits, licenses, and certificates
required by the site certificate. Id. On administrative or
judicial review of any permitting decision, the only issue is
whether the permit is consistent with the site certificate. Id.
We examined this statutory scheme in Marbet v.
Portland Gen. Elect., 277 Or 447, 449, 561 P2d 154 (1977),
“the first contested proceeding under the energy facility sit-
ing act” after its enactment in 1971. There, we pointed out
that the statute “assigns the council a wide range of duties
relating to power facilities in this state.” Id. at 450. The stat-
ute “reflects a legislative policy to centralize these respon-
sibilities in the council.” Id. Regulatory concerns “previ-
ously pursued through * * * separate agencies are now to
find expression through special advisory groups, * * * inter-
agency coordination, * * * and in the council’s procedures.”
Id.
B. Proceedings Below
The following overview—summarized from EFSC’s
final order and not disputed by the parties—provides con-
text for the issues raised in this case.
Idaho Power submitted its notice of intent to apply
for a site certificate for the transmission line at issue in
798 Stop B2H Coalition v. Dept. of Energy
August 2008. Over the course of the next 10 years, Idaho
Power engaged in community outreach and a series of pub-
lic meetings to obtain input and refine the proposed proj-
ect. Seventeen different agencies, including the Oregon
Department of Fish and Wildlife and the United States
Department of the Interior Bureau of Land Management
(BLM),4 participated and offered comment.
ODOE issued its first project order in March 2012,
and Idaho Power submitted its preliminary application for a
Site Certificate in February 2013. Over the next five years,
ODOE amended the project order twice, while Idaho Power
amended its preliminary application, partly in response to
input from the public and other agencies.
One such agency was BLM. The National Environ-
mental Policy Act (NEPA) had required BLM to prepare
an Environmental Impact Statement (EIS) for the project.
42 USC §§ 4321 - 4370. BLM had issued its final EIS in
November 2016 and issued its Record of Decision (ROD) a
year later. In its EIS and ROD, BLM had listed an alterna-
tive route for one segment of the transmission line in Union
County—known as the Glass Hill route—as “environmen-
tally preferable.”
Idaho Power had included that route—along with
other alternatives—in its preliminary application, but it did
not include the Glass Hill route in its amended application.
In written testimony, Idaho Power explained why it decided
not to include the Glass Hill route:
“* * * Idaho Power has worked to develop an acceptable route
through Union County for over a decade. Early on, Idaho
Power considered the Glass Hill Route, along with at least
one other route in the vicinity of Morgan Lake. However,
the Glass Hill Route was confronted with substantial back-
lash from the affected landowners and other interested
parties, some of which formed the Glass Hill Coalition spe-
cifically to challenge that route. The Confederated Tribes
of the Umatilla Indian Reservation also expressed dis-
favor for the Glass Hill Route due to impacts to cultural
resources. The Morgan Lake Alternative was developed
4
BLM was involved because some segments of the proposed transmission
line would cross federal lands managed by BLM.
Cite as 370 Or 792 (2023) 799
in response to those concerns, as well as in response to a
request made by one of the affected landowners during the
federal National Environmental Policy Act (‘NEPA’) pro-
cess to locate the route close to the border of their prop-
erty rather than bisecting it. The Mill Creek Route was
also developed during the NEPA process, in response to
the County’s request to site the Project in parallel with the
existing 230-kv line.”
In September 2018, Idaho Power finalized its appli-
cation. ODOE issued a draft proposed order recommending
approval of the application, and EFSC appointed a hearing
officer; public notice was given, and a public comment period
was opened. Petitioners Stop B2H, McAllister, and Gilbert
submitted comments during that public comment period. In
July 2020, ODOE issued a proposed order and set a dead-
line for interested parties to request party status in the con-
tested case proceedings. Over 50 petitioners—including, as
relevant here, Stop B2H and Gilbert—asked to participate
as full parties.
In late 2020, the hearing officer issued an order on
the petitions for party status, granting only limited party
status to Stop B2H and Gilbert, among others. Stop B2H
and Gilbert appealed that ruling to EFSC. EFSC conducted
a hearing and ultimately agreed with the hearing officer
that Stop B2H and Gilbert would only be allowed to partici-
pate in the contested case proceeding as limited parties.
The hearing officer issued the first case manage-
ment order for the contested case proceedings in January
2021 and began receiving witness testimony and other evi-
dence. The evidentiary record for the contested case closed
on January 31, 2022. The hearing officer issued a proposed
contested case order on May 31, 2022. EFSC conducted a
hearing on the hearing officer’s proposed contested case
order in August 2022. EFSC then issued a draft final order
and held its final hearing on September 27, 2022. After that
hearing, the EFSC members voted unanimously to approve
Idaho Power’s application.
EFSC’s final order, dated September 27, 2022, is 729
pages long (excluding attachments). The order describes the
procedural history, opportunities for public input, and the
800 Stop B2H Coalition v. Dept. of Energy
proposed facility—including the corridor assessment estab-
lishing the locations for this 300-mile transmission line—in
detail. The order also includes detailed findings and conclu-
sions regarding compliance with the standards established
by EFSC and other applicable statutes and regulations,
including the standards for noise, visual impacts, effects on
historic properties, and mitigation that had been raised in
this case. Stop B2H, McAllister, and Gilbert filed timely peti-
tions for review of that order pursuant to ORS 469.403(3).
C. Standard of Review
“We review final orders of the council for errors of
law, abuse of agency discretion, and lack of substantial evi-
dence in the record to support the challenged findings of
fact.” Save Our Rural Oregon v. Energy Facility Siting, 339
Or 353, 356, 121 P3d 1141 (2005); see ORS 469.403(6); ORS
183.482(7), (8).
Many of the parties’ assignments of error require
us to construe and apply various provisions of the energy
facility siting act. In construing the statute, we attempt to
discern the intent of the legislature that enacted it. ORS
174.020; State v. McDowell, 352 Or 27, 30, 279 P3d 198 (2012)
(“[o]ur task is to discern what the legislature contemplated
in enacting” the statute at issue). To discern that intent, we
give primary weight to the statutory text in context, with
appropriate additional weight accorded to any relevant leg-
islative history. City of Portland v. Bartlett, 369 Or 606, 610,
509 P3d 99 (2022); State v. Gaines, 346 Or 160, 171-72, 206
P3d 1042 (2009). Context “includes other provisions of the
same statute and other related statutes,” PGE v. Bureau of
Labor and Industries, 317 Or 606, 611, 859 P2d 1143 (1993),
and “case law interpreting the statute at issue and related
statutes, including earlier versions of those statutes,” SAIF
v. Walker, 330 Or 102, 109, 996 P2d 979 (2000).
Some assignments of error require us to apply
agency rules and review EFSC’s interpretation of those
rules. We review an agency’s interpretation of a rule to see if
the agency has “erroneously interpreted a provision of law.”
ORS 183.482(8)(a). Where “the provision of law” at issue is
the rule itself, and the agency offers a “plausible interpreta-
tion” of that rule, then “there is no basis on which this court
Cite as 370 Or 792 (2023) 801
can assert that the rule has been interpreted ‘erroneously’ ”
unless the interpretation is “shown either to be inconsistent
with the wording of the rule itself, or with the rule’s context,
or with any other source of law.” Don’t Waste Oregon Com. v.
Energy Facility Siting, 320 Or 132, 142, 881 P2d 119 (1994).
II. DISCUSSION
A. Stop B2H’s Assignments of Error
1. First Assignment: Denial of Full Party Status
Stop B2H applied to be a full party in the contested
case proceedings but was only allowed to participate as a
limited party. Stop B2H contends that EFSC has no author-
ity to override its choice to participate as a full party.
The Oregon Administrative Procedures Act (APA)
defines “party” to include any person or entity “requesting to
participate before the agency as a party or in a limited party
status which the agency determines either has an interest
in the outcome of the agency’s proceeding or represents a
public interest in such result.” ORS 183.310(7)(c). The model
rules promulgated by the Attorney General for contested
case proceedings—adopted by EFSC, OAR 345-001-0005—
further address party status: “Persons who have an interest
in the outcome of the agency’s contested case proceeding or
who represent a public interest in such result may request
to participate as parties or limited parties.” OAR 137-003-
0005(1). The rule goes on to state, “A petition to participate
as a party may be treated as a petition to participate as a
limited party.” OAR 137-003-0005(8). If the agency grants
a petition to participate, “the agency shall specify areas of
participation and procedural limitations as it deems appro-
priate.” OAR 137-003-0005(9).
Under the model rules, an agency is not bound by
the party’s “request” and is authorized to treat a party’s
petition to participate as a party “as a petition to partici-
pate as a limited party.”5 That conclusion is supported by
our recent decision in Friends of Columbia Gorge v. Energy
5
OAR 137-003-0005(8) uses the passive voice: A petition to participate “may
be treated” as a petition to participate as a limited party. In context, the only log-
ical reading is that the agency is the actor with the authority to treat a petition
to participate as a party as a petition to participate as a limited party.
802 Stop B2H Coalition v. Dept. of Energy
Fac. Siting Coun., 368 Or 123, 486 P3d 787 (2021). There, we
held that certain procedural rules adopted by EFSC were
invalid because they restricted “the participatory rights of
all parties, in a manner not allowed by the APA.” Id. at 133.
In reaching that conclusion, we discussed the
legislative history of the APA provisions on “parties” and
“limited parties” in a contested case proceeding. The stat-
ute originally distinguished between parties “entitled as of
right” to participate and parties “permitted to intervene by
the agency.” Id. at 129. Parties entitled “as of right” could
fully participate in the proceeding, but “the APA allowed
agencies to limit the participation of intervening parties.”
Id.
A 1979 amendment to the APA “inserted the concept
of limited parties into the definition of ‘party’ that exists
today.” Id. at 131. As a result, “a person requesting to par-
ticipate before the agency—in the nature of an intervenor—
might be either a full party or a limited party in a particular
contested case proceeding[.]” Id. at 132. An agency “may * * *
restrict rights of participation for limited parties in a man-
ner that it cannot for full parties.” Id.; see ORS 183.450(3)
(“Persons appearing in a limited party status shall partic-
ipate in the manner and to the extent prescribed by rule of
the agency.”).
ORS 469.370(5) provides that the applicant (Idaho
Power in this case) “shall be a party to the contested case.” In
other words, the applicant is entitled to fully participate “as
of right.” EFSC “may permit any other person” who partici-
pated during the public comment period to become a party
to the contested case. Id. The APA has always “allowed agen-
cies to limit the participation” of parties who are “permitted
to intervene by the agency.” Friends of Columbia Gorge, 368
Or at 129.
Applying those principles here, under the energy
facility siting act, EFSC “may permit” Stop B2H to partici-
pate in the contested case, just as an agency could “permit”
an interested party to intervene under earlier versions of
the APA. Under the model rules, EFSC could treat a petition
to participate as a full party “as a petition to participate
as a limited party” under OAR 137-003-0005(8), just as an
Cite as 370 Or 792 (2023) 803
agency could limit the participation of an intervenor under
earlier versions of the APA. And under the current version
of the APA and the model rules, EFSC is expressly autho-
rized to limit the participation of a party that it permitted
to participate as a limited party. ORS 183.450(3); OAR 137-
003-0005(9). The terminology has changed, but the agency’s
authority has not. We conclude that EFSC was authorized to
treat Stop B2H as a limited party.
Stop B2H also argues that EFSC did not apply the
factors in OAR 137-003-0005(7) in evaluating its application
to be a full party. That rule provides:
“(7) In ruling on petitions to participate as a party or
a limited party, the agency shall consider:
“(a) Whether the petitioner has demonstrated a per-
sonal or public interest that could reasonably be affected by
the outcome of the proceeding;
“(b) Whether any such affected interest is within the
scope of the agency’s jurisdiction and within the scope of
the notice of contested case hearing;
“(c) When a public interest is alleged, the qualifica-
tions of the petitioner to represent that interest;
“(d) The extent to which the petitioner’s interest will
be represented by existing parties.”
Here, EFSC’s hearing officer addressed over 50 dif-
ferent petitions to appear, most of them asking for full party
status. The hearing officer’s order cited the governing rule,
OAR 137-003-0005(7), and expressly discussed the public
interest factor of those petitioners seeking to appear as par-
ties, which covers factors (a) and (c) of the rule.6 The hearing
officer also stated that petitioners had shown either a per-
sonal or public interest in the outcome:
“[L]imited party status is appropriate where, as in this
case, a petitioner satisfies the eligibility requirements
for participation and has established a personal or public
interest in the outcome of the proceeding, but is only quali-
fied to respond to some, but not all, issues to be considered
in the contested case.”
6
EFSC’s order affirming the hearing officer’s designation of limited party
status for Stop B2H and Gilbert also stated that it was relying on the Attorney
General’s model rules for contested cases, OAR 137-003-0000 to 137-003-0092.
804 Stop B2H Coalition v. Dept. of Energy
The hearing officer articulated its reasons for giv-
ing limited party status to most petitioners:
“Mindful of the following considerations—the strict
eligibility requirements for participation set out in ORS
469.370, OAR 345-015-0016(3), and OAR 137-003-0005;
the number of petitioners with an interest in the out-
come of this contested case requesting to participate as a
party; the number and nature of properly raised contested
case issues in this matter; and the ALJ’s duties under
OAR 345-015-0023(2) to, among other things, ensure a
full, fair and impartial hearing, facilitate the presenta-
tion of evidence, maintain order, comply with time lim-
its, and assist the Council in making its decision—I find
it appropriate under OAR 137-003-0005(8) and (9), OAR
137-003-0040, and OAR 345-015-0083, to limit success-
ful petitioners’ participation in this contested case to the
issues properly raised in their respective petitions for party
status.”
(Footnote omitted.)
Although the hearing officer did not expressly
address factor (d)—the extent to which Stop B2H’s interest
would be represented by existing parties—the hearing offi-
cer allowed all limited parties to participate with respect
to the issues raised in their petitions. Given the number
of parties and the breadth of the issues raised, there may
have been some duplication of interests represented by mul-
tiple parties, but the hearing officer’s order ensured that
all issues raised by any party would be considered during
this process. Thus, the failure to expressly address factor
(d) did not preclude Stop B2H from presenting all the issues
it wanted to present during the contested case process.
Nothing in the rule precluded the hearing officer from also
considering the need to limit party status to keep the pro-
ceedings manageable.
Stop B2H does not contend that EFSC abused its
discretion in granting it limited party status under that rule
or challenge the evidentiary support for any factual find-
ings. We conclude that EFSC (1) had authority to grant lim-
ited party status to Stop B2H and (2) considered the factors
it was required to consider in making that determination.
Cite as 370 Or 792 (2023) 805
2. Second Assignment: Noise Level Limits
It is undisputed that, on occasion, the “corona noise”
from the transmission line will exceed the noise limits speci-
fied in OAR 340-035-0035(1)(b)(B)(i).7 EFSC concluded that,
under the circumstances, it could grant an exception to the
noise standards under OAR 340-035-0035(6)(a) and a vari-
ance under ORS 467.060 and OAR 340-035-0100.8
Stop B2H contends that EFSC lacks authority to
grant either an exception or a variance. According to Stop
B2H, only the Department of Environmental Quality (DEQ)
has authority to grant exceptions to the noise standards
under OAR 340-035-0035(6), and only the Environmental
Quality Commission (EQC) has authority to grant variances
under ORS 467.060. In Stop B2H’s view, if the legislature
had intended to give EFSC the authority to grant excep-
tions and variances from noise regulations, it would have
stated that expressly, as it did in ORS 469.504(2) (authoriz-
ing EFSC to grant exceptions to statewide planning goals).9
EFSC explained in its final order why it addressed
Idaho Power’s requests for an exception and variance instead
of referring Idaho Power to EQC and DEQ. EFSC stated that
it “assumes the authority as the decision maker to interpret
and implement” the noise rules because (1) “the Legislative
Assembly withdrew all funding for implementing and
7
As described in EFSC’s final order, corona noise “is characterized by a low
hum, hissing, frying, or crackling sound” that results from “small local pressure
changes” causing energy dissipation “near the surface of * * * conductors.” Corona
noise may be perceptible at some locations “during occasional foul weather
events.”
8
The statute and rules do not define “exception” and “variance” for purposes
of the noise standards statute. Those terms are commonly used in zoning laws,
however. In that context, an “exception” generally means a predefined circum-
stance to which a general regulation would not apply; a “variance” is a decision
to not apply a regulatory requirement so as to avoid undue hardship to the appli-
cant. See Application of Devereux Found., 351 Pa 478, 483, 41 A2d 744, 746, appeal
dismissed, 326 US 686, 66 S Ct 89, 90 L Ed 403 (1945); Mitchell Land Co. v.
Planning & Zoning Board Of Appeals, 140 Conn 527, 531-33, 102 A2d 316, 318-19
(1953); see generally Sara C. Bronin and Dwight H. Merriam, 3 Rathkopf’s Law of
Zoning and Planning § 58.3, 58-10-11 (4th ed 2018). Those definitions are consis-
tent with how those terms are used here.
9
ORS 469.504(2) states that EFSC “may take an exception” to a statewide
planning goal under certain circumstances. Similarly, ORS 469.501(2) states
that EFSC “may adopt exemptions from any need standard” adopted under the
state energy policy.
806 Stop B2H Coalition v. Dept. of Energy
administering” the noise program as stated in OAR 340-
035-0110; and (2) it had received a management directive
from DEQ as part of the contested case authorizing EFSC
to “review applications to ensure that proposed facilities
meet the State noise regulations.” The rule cited by EFSC
states that EQC and DEQ have “suspended administration
of the noise program, including but not limited to processing
requests for exceptions and variances[.]” OAR 340-035-0110.
Thus, EFSC addressed Idaho Power’s requests for
an exception or variance only because EQC and DEQ had
made it clear by rule—and confirmed in the directive
to EFSC—that EQC and DEQ would not address those
requests.10 Under those circumstances, it would have been
futile for EFSC to refer Idaho Power’s exception/variance
requests to EQC and DEQ.
The question, though, is whether EFSC’s practical
solution to this problem exceeded its authority under those
circumstances. We conclude that it did not. The energy
facility siting act (1) grants EFSC authority to adopt stan-
dards for a particular facility in a wide variety of areas that
otherwise would be governed by other state agencies (ORS
469.501(1)); (2) authorizes EFSC to approve a site certifi-
cate based on those standards “and any additional statutes,
rules or local ordinances” that may apply (ORS 469.370(7));
(3) makes EFSC’s decision to issue a site certificate binding
on all state agencies and local governments and requires
them to “promptly issue” any permits, licenses, and cer-
tificates required by the site certificate11 (ORS 469.401(3));
and (4) authorizes EFSC to issue a site certificate even if
10
Compare EFSC’s decision to grant Idaho Power’s requests for an exception
to and variance from the noise standards with EFSC’s response to Idaho Power’s
request for an exemption from the reforestation requirements of the Oregon
Forest Practices Act (FPA), ORS 527.610 to 527.770. EFSC stated in that context
that it “does not assert jurisdiction of the FPA” and directed Idaho Power “to
submit its request for exemption directly to the Oregon Department of Forestry.”
That statement supports the conclusion that EFSC addressed the requests for an
exception to and variance from the noise standards only because EQC and DEQ
had suspended processing those requests.
11
An example of EFSC’s authority to direct other agencies to issue permits
otherwise required by state law, subject only to the conditions in the site certif-
icate, is found in EFSC’s direction to the Department of State Lands to issue a
removal-fill permit for wetlands affected by the project, subject only to the condi-
tions specified in the site certificate.
Cite as 370 Or 792 (2023) 807
the facility does not meet all applicable standards if EFSC
determines that “the overall public benefits of the facil-
ity outweigh any adverse effects on a resource or interest
protected by the applicable standards the facility does not
meet” (ORS 469.501(3)(a) and ORS 469.503(1)).
Stop B2H’s contention that the legislature intended
to give EFSC authority to grant exceptions only where the
statute stated that authority expressly—as in ORS 469.501(2)
and ORS 469.504(2)—is inconsistent with the legislature’s
broad grant of statutory authority to EFSC throughout the
energy facility siting act as summarized above. We con-
clude that EFSC had the authority to grant (1) an excep-
tion to the noise standards under OAR 340-035-0035(6)(a),
and (2) a variance under OAR 340-035-0100 and ORS
467.060.12
Stop B2H also contends that, even if EFSC had the
authority to grant a variance or an exception, it erred in
doing so because the criteria for granting an exception or a
variance were not met. Stop B2H primarily contends that
noise violations are not “unusual or infrequent” as required
for an exception under OAR 340-035-0035(6)(a).13 Stop B2H
contends that the evidence in the record established that
weather would cause noise violations 48 days a year, which
(it argues) is more than “unusual or infrequent.”
EFSC determined that noise exceedances would
be unusual or infrequent based on the evidence showing
that exceedances may occur only in less than two percent of
the total hours in a year. To the extent Stop B2H contends
that EFSC committed a legal error in interpreting what is
meant by “unusual or infrequent” under the rule, we see
no error. Nothing in the rule or statute required EFSC to
use the number of days instead of the percentage of hours
in assessing whether noise exceedances would be unusual
12
We need not decide whether EFSC could exercise this broad statutory
authority absent the unusual circumstances presented here given EQC and
DEQ’s decision to suspend processing requests for exceptions and variances.
13
Stop B2H also contends in its brief that the requirements for a variance in
paragraphs (1)(b) through (d) of ORS 467.060 are not met, but it does not address
a variance under paragraph (1)(a) of ORS 467.060 for noise exceedances resulting
from conditions “that are beyond the control” of Idaho Power.
808 Stop B2H Coalition v. Dept. of Energy
or infrequent.14 To the extent Stop B2H is challenging the
evidentiary support for the factual findings underlying the
exception and variance granted by EFSC, we review that
issue for substantial evidence in the record.
First, we conclude that there was substantial evi-
dence supporting the grant of an exception. EFSC explained
in its final order its reason for granting an exception for
unusual or infrequent events:
“* * * Council finds that exceedances along the transmission
line would be an infrequent event because exceedances are
expected to occur less than two percent of the total hours
in a given year (because they are projected to occur during
foul weather, and foul weather events are infrequent in the
project area, and other circumstances need to occur simul-
taneously to result in an exceedance, i.e., low ambient noise
environment and transmission line operating at full capac-
ity). Therefore, under OAR 340-035-0035(6)(a)[,] Council
grants an exception to the facility, subject to the noise con-
trol conditions described in this Order.”
That conclusion was based on weather data evaluated by
a meteorologist and detailed sound measurement studies
summarized in the final order. That evidence constitutes
substantial evidence supporting EFSC’s conclusion that
noise exceedances would be “unusual or infrequent,” thereby
justifying an exception under OAR 340-035-0035(6)(a).
Second, we also conclude that there was substantial
evidence to support granting a variance. Idaho Power had
requested a variance from the “ambient antidegradation
standard” in OAR 340-035-0100.15 Based on the noise analy-
sis studies and weather data summarized in the final order,
EFSC granted a variance to the ambient antidegradation
14
Stop B2H does dispute EFSC’s finding that noise exceedances will occur in
less than two percent of the total hours per year.
15
“Ambient [n]oise” is defined in the regulations as “the all-encompassing
noise associated with a given environment, being usually a composite of sounds
from many sources near and far.” OAR 340-035-0015(5). The “ambient antideg-
radation standard” established in the rule means that a noise source may not
“cause or permit” an increase of ambient noise levels by more than 10 dBA (deci-
bels adjusted to human hearing using the A-weighting scale (soft)) in any one
hour or exceed the levels specified by the rules at an appropriate measurement
point. OAR 340-035-0035(1)(b)(B)(i).
Cite as 370 Or 792 (2023) 809
standard for the transmission line “at any time of day or
night during foul weather events (defined as a rain rate
of 0.8 to 5 millimeters per hour).” EFSC’s final order first
explains that “ambient antidegradation standard exceed-
ance[s] are predicted during foul weather conditions” and
Idaho Power “cannot be accountable for weather conditions
that may cause audible corona noise, as the weather is a con-
dition beyond its control.” EFSC also found that “strict com-
pliance with the ambient antidegradation standard in DEQ
rule is inappropriate, unreasonable, or impractical because
of special physical conditions and special circumstances con-
tributed to the applicant’s proposed transmission line loca-
tion relating to NSRs [noise-sensitive receptors] that may
experience noise exceedances.” Finally, EFSC found that
strict compliance with the rule “would result in substantial
curtailment or closing down (never building) the proposed
transmission line and that * * * there is not another alterna-
tive facility available.”
Stop B2H disagrees with EFSC’s findings and con-
clusions, but it has not demonstrated that the findings are
unsupported by substantial evidence given the studies and
analyses summarized in the final order, and it has not per-
suaded us that EFSC’s conclusions are legally erroneous in
any respect.
3. Third Assignment: Modifying Rule to Limit Noise
Assessment to Landowners Within One-Half Mile of
the Transmission Line
Former OAR 345-021-0010(1)(x)(E) (Jan 1, 2019)
generally requires applicants to submit a list of noise-
sensitive landowners within one mile of the proposed facil-
ity.16 Here, ODOE’s project order only required Idaho Power
to list landowners within a half mile of the transmission
line “because of the linear nature of the proposed facil-
ity.” Stop B2H contends that ODOE could not change the
one-mile requirement by project order without engaging in
rulemaking.
16
At the time of the agency proceedings, that regulation was numbered OAR
345-021-0010(1)(x). Rule amendments have shifted those provisions to OAR 345-
021-0010(1)(y). We refer to the former version of the rule, subsection (1)(x), for
consistency with citations in the agency record.
810 Stop B2H Coalition v. Dept. of Energy
However, the existing rule states that ODOE “may
waive or modify those requirements that [ODOE] deter-
mines are not applicable to the proposed facility.” OAR 345-
021-0000(4). The rule further provides that the project order
may identify “any appropriate modifications to applicable
provisions of this rule.” OAR 345-021-0010(1).
Here, ODOE in effect modified the one-mile
requirement—or determined that the one-mile requirement
was “not applicable” to this transmission line—in a way that
was authorized by the rule. When a rule expressly autho-
rizes an agency to modify a condition to address a specific
case, the modification is not an amendment of the rule. A
rule is an agency directive “of general applicability.” ORS
183.310(9). An agency action “directed to a specific person
or entity” is not a generally applicable rule. Pen-Nor, Inc. v.
Oregon Dept. Higher Ed., 84 Or App 502, 507-08, 734 P2d 395
(1987). Here, ODOE’s modification of the one-mile require-
ment applied only to the site certificate for this specific pro-
posed transmission line. That modification is not a rule of
general applicability that would apply to other projects.
Thus, rulemaking was not required. There was no
legal error in modifying the one-mile requirement specified
in former OAR 345-021-0010(1)(x)(E) (Jan 1, 2019) for this
transmission line. Stop B2H does not contend that ODOE
abused its discretion in making that modification or chal-
lenge the evidentiary support for any factual findings.17
4. Fourth Assignment: Assessing Visual Impacts
Under OAR 345-022-0080(1), EFSC can issue a site
certificate only if “the design, construction and operation of
the facility, taking into account mitigation, are not likely to
result in significant adverse visual impacts to significant or
important scenic resources.” “Significant” is defined in part
to mean “having an important consequence * * * based upon
the magnitude and likelihood of the impact on the affected
human population[.]” OAR 345-001-0010(29).
17
EFSC’s final order required Idaho Power to address noise impacts on land-
owners of noise-sensitive properties within one mile of the facility for any land-
owner “who nevertheless believes that exceedances above the ambient degrada-
tion standard have occurred at their NSR property.”
Cite as 370 Or 792 (2023) 811
Stop B2H contends that Idaho Power’s methodology
for assessing the visual impacts of the transmission line
was flawed because it failed to account for viewers’ subjec-
tive perceptions and reactions when determining whether
a potential impact was going to be “significant.” However,
nothing in the rule required Idaho Power to utilize a par-
ticular methodology or specifically account for subjective
perceptions and reactions in assessing whether the trans-
mission line would be likely to result in “significant adverse
visual impacts” to scenic resources.
Moreover, as explained in the final order, the meth-
odology used to assess the visual impacts of the transmission
line did take viewers’ subjective perceptions into account.
Idaho Power developed a detailed visual-impact assessment
methodology and prepared a comprehensive visual impact
study. The assessment “incorporated the BLM visual ‘sen-
sitivity level’ criterion and the [US Forest Service] visual
‘concern’ criterion into its methodology, both of which mea-
sure the degree to which viewers subjectively value a visual
resource.”18 Stop B2H disagrees with how the methodol-
ogy took subjective perceptions into account and the con-
clusions EFSC reached in assessing the visual impacts of
the facility, but Stop B2H has not identified a legal error in
EFSC’s use of Idaho Power’s methodology to assess whether
the transmission line would result in significant adverse
visual impacts to scenic resources. Stop B2H does not chal-
lenge the evidentiary support for any factual findings or
contend that EFSC abused its discretion in assessing the
visual impacts of the transmission line.
B. McAllister’s Assignment of Error
As noted above, for a portion of the transmission
line running through Union County, Idaho Power’s prelimi-
nary application included an alternative known as the Glass
Hill route, but the final application did not include the Glass
Hill route, proposing instead two other alternative routes
18
The study concluded that, without mitigation, the facility might cause sig-
nificant visual impacts at certain points—including near the National Historic
Oregon Trail Interpretive Center outside of Baker City—but EFSC required
mitigation (including, among other things, modified H-frame tower structures)
to lessen the visual impacts at those locations, consistent with EFSC’s siting
standards.
812 Stop B2H Coalition v. Dept. of Energy
for that segment of the line. During the public comment
period and contested case proceedings, McAllister argued
that the Glass Hill route should be chosen because BLM had
identified that route during the NEPA process as the “envi-
ronmentally preferable” alternative. EFSC concluded that
McAllister’s argument that EFSC must consider the Glass
Hill alternative route under ORS 469.370(13) was outside
the scope of its jurisdiction.
McAllister contends here that ORS 469.370(13)
required Idaho Power to include that “environmentally pref-
erable” alternative in its application for EFSC’s full con-
sideration. In response, Idaho Power and the state contend
that (1) McAllister did not preserve that argument for judi-
cial review, because he did not cite ORS 469.370(13) during
the public comment period; (2) EFSC correctly rejected the
argument as outside the scope of its jurisdiction; and (3) the
argument fails on its merits.
We need not decide the preservation issue, because
we agree with Idaho Power and the state that the argument
fails on its merits.19 Before addressing the merits, however,
we first address the jurisdictional argument.
ORS 469.370(7) authorizes EFSC to review “the
application” for compliance with EFSC conditions and other
legal standards. According to Idaho Power and the state,
Idaho Power’s decision to delete the Glass Hill route from
its application removed that alternative from EFSC’s juris-
diction, under Teledyne Wah Chang v. Energy Fac. Siting
Council, 298 Or 240, 692 P2d 86 (1984). We disagree in part.
In Teledyne Wah Chang, EFSC had approved a site
certificate for a waste disposal facility at a location different
from the location specified in the application. We reversed,
noting that the statutory standard governing this type of
facility required EFSC to determine whether “the site”
specified in the application “is suitable for disposal of such
wastes.” Id. at 258 (citing ORS 469.375). We explained that
“[t]his [statutory] standard does not permit the Council to
reject a proposed site because it believes another location is
19
McAllister cited ORS 469.370(13) in the contested case proceedings but
did not cite the statute in advocating for the Glass Hill route during the public
comment period.
Cite as 370 Or 792 (2023) 813
better. EFSC was obligated to accept or reject the [site] on
its own merits, rather than engaging in a comparison.” Id.
The statutory standard at issue here is different.
This transmission line traverses a 300-mile “corridor.” It is
not placed on a single “site” that is subject to EFSC review
to determine whether that site is “suitable” for the proposed
facility. The statute governing EFSC’s review of a transmis-
sion line application broadly requires EFSC to review “the
application” for compliance with legal standards and issue a
final order “either approving or rejecting” that application.
ORS 469.370(7). Unlike an application for a waste disposal
facility, an application for a transmission line must include
a “corridor selection assessment explaining how the appli-
cant selected the corridors for analysis in the application.”
OAR 345-021-0010(1)(b)(D).20
Thus, Idaho Power and the state are correct that
EFSC is limited to reviewing the application, but review-
ing the application did not necessarily remove from EFSC’s
jurisdiction an alternative route that Idaho Power addressed
during the corridor selection assessment process. Because
McAllister has not challenged the corridor selection assess-
ment process, we decline to further address EFSC’s review
of that process. We turn to the merits of McAllister’s argu-
ment that ORS 469.370(13) required EFSC to approve the
Glass Hill route.
ORS 469.370(13) states:
“For a facility that is subject to and has been or will
be reviewed by a federal agency under the National
Environmental Policy Act, 42 U.S.C. Section 4321, et seq.,
the council shall conduct its site certificate review, to the
maximum extent feasible, in a manner that is consistent
with and does not duplicate the federal agency review. Such
coordination shall include, but need not be limited to:
“(a) Elimination of duplicative application, study and
reporting requirements;
20
The rule requires the applicant to “discuss the reasons for selecting the
corridors, based upon the evaluation” of the factors listed in the rule. OAR 345-
021-0010(1)(b)(D). The factors include “[l]east disturbance to streams, rivers and
wetlands” and “[l]east disturbance to areas where historical, cultural or archae-
ological resources are likely to exist.” Id.
814 Stop B2H Coalition v. Dept. of Energy
“(b) Council use of information generated and docu-
ments prepared for the federal agency review;
“(c) Development with the federal agency and reliance
on a joint record to address applicable council standards;
“(d) Whenever feasible, joint hearings and issuance of
a site certificate decision in a time frame consistent with
the federal agency review; and
“(e) To the extent consistent with applicable state
standards, establishment of conditions in and site certifi-
cate that are consistent with the conditions established by
the federal agency.”
Thus, the text of the statute only required EFSC’s “coordi-
nation” with BLM and required it to conduct its site review,
“to the maximum extent feasible,” in a manner that was
“consistent with and d[id] not duplicate” the BLM review. It
also required EFSC to establish conditions in the site certif-
icate “that [were] consistent with the conditions established
by the federal agency.” ORS 469.370(13)(e).
“Coordination” means the “combination in suitable
relation for most effective or harmonious results.” Webster’s
Third New Int’l Dictionary 502 (unabridged ed 2002).
“Consistent with” generally means “marked by harmony,
regularity, or steady continuity throughout” or “coexisting
and showing no noteworthy opposing, conflicting, inharmo-
nious, or contradictory qualities or trends.” Id. at 484. Those
terms govern EFSC’s process—that is, the “manner” in
which EFSC must “conduct its site certificate review”—but
they do not mandate any particular result, including choos-
ing a route deemed preferable during the NEPA process.
Moreover, NEPA “does not mandate particular
results, but simply provides the necessary process to ensure
that federal agencies take a hard look at the environmental
consequences of their actions.” Muckleshoot Indian Tribe v.
U.S. Forest Service, 177 F3d 800, 814 (9th Cir 1999) (inter-
nal quotation marks omitted); see also Robertson v. Methow
Valley Citizens Council, 490 US 332, 350, 109 S Ct 1835, 104
L Ed 2d 351 (1989) (“If the adverse environmental effects of
the proposed action are adequately identified and evaluated,
the agency is not constrained by NEPA from deciding that
other values outweigh the environmental costs.”).
Cite as 370 Or 792 (2023) 815
Thus, identifying an “environmentally preferable”
alternative under NEPA does not mean that selecting that
alternative is a condition for approval, even for a federal
project. Without that condition, McAllister cannot show that
EFSC’s approval of the two alternative routes proposed by
Idaho Power results in inconsistency between state and fed-
eral regulatory review. It follows that Idaho Power was not
required to include the environmentally preferable alterna-
tive in its application, and ORS 469.370(13) did not require
EFSC to order Idaho Power to amend its application to
include that alternative.
McAllister also contends that EFSC effectively
denied him a fair process to advocate in favor of the Glass
Hill alternative. But as noted above, McAllister was able
to present his arguments in favor of the Glass Hill alter-
native during the public comment period and the contested
case proceedings. Idaho Power explained as part of the cor-
ridor selection assessment why it chose not to include the
Glass Hill alternative in its final application. And we have
addressed the merits of McAllister’s legal argument under
ORS 469.370(13). Under the circumstances, we do not agree
that McAllister has been denied a fair opportunity to pres-
ent his argument.
C. Gilbert’s Assignments of Error
1. First Assignment: Denial of Full Party Status
Gilbert appears to contend that EFSC was legally
required to grant her request for full party status. We
disagree, for the reasons stated above on Stop B2H’s first
assignment of error.
2. Second, Third, and Fourth Assignments: Impacts on
Historic Sites and Mitigation Efforts
These assignments of error all involve EFSC’s
treatment of historic sites. ORS 469.501(1) requires EFSC
to adopt standards addressing:
“Impacts of the facility on historic, cultural or archae-
ological resources listed on, or determined by the State
Historic Preservation Officer to be eligible for listing on,
816 Stop B2H Coalition v. Dept. of Energy
the National Register of Historic Places[21] or the Oregon
State Register of Historic Properties.”
ORS 469.501(1)(f). EFSC adopted those standards in OAR
345-022-0090,22 which includes a requirement that EFSC
“tak[e] into account mitigation” in determining whether the
facility is “likely to result in significant adverse impacts” on
those resources. “Mitigation” is defined in former OAR 345-
001-0010(33) (June 30, 2020).23
Gilbert contends in her second, third, and fourth
assignments of error that Condition 2 in EFSC’s final order
fails to comply with those statutory and regulatory require-
ments. That condition states:
21
The National Historic Preservation Act, 54 USC § 306108, defines “historic
property” as districts, sites, or buildings “included on, or eligible for inclusion
on, the National Register [of Historic Places].” 54 USC § 300308; see 54 USC
§ 300311 (defining “National Register”).
22
OAR 345-022-0090 provides, in pertinent part:
“(1) * * * [T]o issue a site certificate, the Council must find that the con-
struction and operation of the facility, taking into account mitigation, are not
likely to result in significant adverse impacts to:
“(a) Historic, cultural or archaeological resources that have been listed
on, or would likely be listed on the National Register of Historic Places;
“(b) For a facility on private land, archaeological objects, as defined in
ORS 358.905(1)(a), or archaeological sites, as defined in 358.905(1)(c); and
“(c) For a facility on public land, archaeological sites, as defined in ORS
358.905(1)(c).”
23
Former OAR 345-001-0010(33) (June 30, 2020), now OAR 345-001-0010(22),
states:
“ ‘Mitigation’ means taking one or more of the following actions listed in
order of priority:
“(a) Avoiding the impact altogether by not taking a certain action or
parts of an action;
“(b) Minimizing impacts by limiting the degree or magnitude of the
action and its implementation;
“(c) Partially or completely rectifying the impact by repairing, rehabili-
tating or restoring the affected environment;
“(d) Reducing or eliminating the impact over time by preservation and
maintenance operations during the life of the action by monitoring and tak-
ing appropriate corrective measures;
“(e) Partially or completely compensating for the impact by replacing or
providing comparable substitute resources or environments; or
“(f) Implementing other measures approved by the Council.”
Cite as 370 Or 792 (2023) 817
“Historic, Cultural, and Archaeological Resources
Condition 2: Prior to construction of a phase or segment
of the facility, subject to confidential material submission
procedures, and based on 1) new survey data from pre-
viously unsurveyed areas and 2) the final design of the
facility, the certificate holder shall submit to [ODOE], the
State Historic Preservation Office (SHPO), and applica-
ble Tribal Governments, for review and [ODOE] approval
a final Historic Properties Management Plan (HPMP)
Attachment S-9 of the Final Order on [the application for
the site certificate]. [ODOE] may engage its consultant to
assist in review of the HPMP. The certificate holder shall
conduct all construction activities in compliance with the
final [ODOE]-approved HPMP.”
Gilbert contends in her third assignment of error that EFSC
cannot approve a site certificate subject to ODOE’s future
review and approval of the HPMP, reasoning that EFSC
cannot make all the required findings when information is
to be developed in the future outside the record of the site
certificate approval proceedings.
That argument fails because ORS 469.402 expressly
authorizes EFSC to delegate future review and approval to
ODOE:
“If the Energy Facility Siting Council elects to impose
conditions on a site certificate or an amended site certif-
icate, that require subsequent review and approval of a
future action, the council may delegate the future review
and approval to the State Department of Energy if, in the
council’s discretion, the delegation is warranted under the
circumstances of the case.”
If EFSC “elects” to impose conditions that require
future review and approval and determines that delega-
tion of that action to ODOE is “warranted under the cir-
cumstances,” EFSC’s decision would be subject to review
for abuse of discretion. Gilbert’s third assignment of error
appears to suggest that EFSC abused its discretion because
Idaho Power did not survey some private properties that
it could have surveyed for impacts on historic sites.24 In
Gilbert’s view, delegating authority to ODOE to assess
24
Gilbert acknowledges that Idaho Power lacked legal authority to enter and
survey private property without the owner’s consent.
818 Stop B2H Coalition v. Dept. of Energy
the impacts on those properties in the future is an abuse
of discretion because impacts could (and should) have been
reviewed as part of EFSC’s site certificate approval proceed-
ings with full public participation.
Gilbert, however, does not identify any specific pri-
vate properties that Idaho Power failed to review even though
it had the legal authority to enter and survey during the site
certificate approval process. EFSC had statutory authority
to delegate that assessment to ODOE for future review. We
find no abuse of discretion under those circumstances.
In her fourth assignment of error, Gilbert contends
that EFSC erroneously allowed Idaho Power to use federal
standards for mitigating adverse environmental effects on
historic, cultural, and archaeological resources without
requiring it to meet more stringent state standards.25 We
disagree.
As noted above, former OAR 345-001-0010(33)
(June 30, 2020) lists acceptable forms of mitigation. The
final order prescribes in Table HCA-4b the specific types of
mitigation that EFSC required for this project: design mod-
ification (former OAR 345-001-0010(33)(b) (June 30, 2020)),
plus “at least one of the” mitigation methods found in former
OAR 345-001-0010(33)(c) - (e), “with a demonstrated direct
benefit to affected area (county of resource site),” and with
the priority of those additional mitigation methods fur-
ther specified. The final order also requires Idaho Power to
demonstrate that any mitigation efforts required by federal
“section 106 review”26 are sufficient to meet the state law
standards articulated in Table HCA-4b:
“Mitigation established through the federal Section 106
compliance review may be used to satisfy the EFSC miti-
gation requirement * * * if [Idaho Power] can demonstrate
that it addresses both the design modifications and the
25
The state contends that Gilbert failed to preserve her argument here, as
she did not raise it during the contested case proceeding. For purposes of this
opinion, we will assume without deciding that Gilbert sufficiently preserved the
issue.
26
“Section 106” refers to the review required by section 106 of the National
Historic Preservation Act, 54 USC § 306108, which requires agencies to “take
into account the effect of the undertaking on any historic property” for federal or
federally-funded projects.
Cite as 370 Or 792 (2023) 819
restoration; preservation and maintenance; or compensa-
tion mitigation within affected area (county), as included
in the below Table HCA-4b * * *. If not duplicated through
the federal Section 106 process, the applicant shall estab-
lish the scope and scale of Table HCA-4b mitigation, prior
to construction, subject to [ODOE] review and approval, in
consultation with SHPO, its consultants, or other entities
with expertise with historic trails.”
Thus, EFSC required Idaho Power to demonstrate that
the mitigation efforts it adopted to comply with federal law
would also satisfy state law.
Finally, Gilbert contends in her second assignment
of error that EFSC’s final order is insufficiently specific
regarding the impacts on historic sites and the appropriate
mitigation necessary for EFSC to “find that the construction
and operation of the facility, taking into account mitigation,
are not likely to result in significant adverse impacts” to
historic sites, OAR 345-022-0090(1).
EFSC’s final order contains specific information
identifying the resources that will be impacted, the extent
of those impacts, and how those impacts will be mitigated.
Table HCA-2 of the order identifies specific sites and explains
the mitigation measures for those sites. For example, one
site (number 35MW00227), described as an “Archaeological
Site—Road,” is not yet evaluated for eligibility for the
National Register of Historic Places, so the federal “section
106” review is not yet complete. Nevertheless, the table sets
out the following mitigation information:
“Avoid. Subsurface probing needed. If the Section
106 determination is eligible, applicant will avoid Site #
35MW227 as follows: Approved Route: For the structure
work area and pulling & tension site, applicant will relocate
or reduce the size of those areas to avoid Site # 35MW227;
for the existing road, all improvements will be made within
the existing road prism thereby avoiding any new impacts;
applicant will flag any portion of the boundary of Site #
35MW227 that occurs within 100 feet of construction activ-
ity. West of Bombing Range Road Alternatives 1 & 2: No
avoidance measures are necessary as there are no direct
impacts proposed for these alternatives.”
820 Stop B2H Coalition v. Dept. of Energy
Gilbert does not explain why that information would be
inadequate to support the findings required by OAR 345-
022-0090(1). She also does not identify any specific sites that
were omitted from the final order, or for which the proposed
mitigation is insufficient. We see no error in the final order
regarding the specificity of EFSC’s assessment of impacts
on historic sites and mitigation requirements.
3. Fifth Assignment: Whether EFSC Changed a Manda-
tory Site Certificate Condition Without Rulemaking
Gilbert contends in her fifth assignment of error
that EFSC changed a mandatory site certificate condition
without going through the required process to amend the
rule. OAR 345-025-0006 lists certain conditions that EFSC
“must impose * * * in every site certificate.” The mandatory
condition identified by Gilbert provides:
“Except as necessary for the initial survey or as other-
wise allowed for wind energy facilities, transmission lines
or pipelines under this section, the certificate holder may
not begin construction, as defined in OAR 345-001-0010,
or create a clearing on any part of the site until the certif-
icate holder has construction rights on all parts of the site.
For the purpose of this rule, ‘construction rights’ means the
legal right to engage in construction activities. For wind
energy facilities, transmission lines or pipelines, if the cer-
tificate holder does not have construction rights on all parts
of the site, the certificate holder may nevertheless begin
construction, as defined in OAR 345-001-0010, or create a
clearing on a part of the site if the certificate holder has
construction rights on that part of the site and:
“(a) The certificate holder would construct and oper-
ate part of the facility on that part of the site even if a
change in the planned route of a transmission line or pipe-
line occurs during the certificate holder’s negotiations to
acquire construction rights on another part of the site; or
“(b) The certificate holder would construct and operate
part of a wind energy facility on that part of the site even
if other parts of the facility were modified by amendment of
the site certificate or were not built.”
OAR 345-025-0006(5).
Cite as 370 Or 792 (2023) 821
Gilbert suggests that General Standard of Review
Condition 7 in EFSC’s final order is inconsistent with
the mandatory condition in the rule, so rulemaking was
required. Condition 7 provides:
“General Standard of Review Condition 7: The cer-
tificate holder may begin construction, as defined in OAR
345-001-0010(12), or create a clearing on a part of the site
if the certificate holder has construction rights on that part
of the site and the certificate holder would construct and
operate part of the facility on that part of the site even if
a change in the planned route of transmission line occurs
during the certificate holder’s negotiations to acquire con-
struction rights on another part of the site.”
EFSC’s final order explains that it modified the wording of
the rule in drafting General Condition 7 “to remove the lan-
guage of the condition that does not apply to transmission
lines and maintain the portion of the condition that would
apply to the facility.” Gilbert does not identify any substan-
tive difference between General Condition 7 and OAR 345-
025-0006(5), and we see none.27
III. CONCLUSION
Oregon law limits our review of EFSC’s final order
approving Idaho Power’s application for a site certificate for
the Boardman-to-Hemingway high voltage electricity trans-
mission line to errors of law, abuse of discretion, and sub-
stantial evidentiary support for factual findings. Applying
that standard, we conclude that EFSC did not err in any of
the ways contended by petitioners Stop B2H, McAllister, or
Gilbert.
The final order of the Energy Facility Siting Council
is affirmed.
27
Gilbert claims that the text of the mandatory condition was changed in
a footnote. Footnote 77, found on the same page of the final order as General
Condition 7, contains a redline/strikeout version intended to show the changes
between OAR 345-025-0006(5) and General Condition 7. Idaho Power acknowl-
edges that that redline/strikeout version erroneously shows OAR 345-025-
0006(5)(a) as being deleted.
The error was typographical and harmless. EFSC’s stated intent was not to
delete or change any substantive requirement of OAR 345-025-0006(5), and the
text of General Condition 7 does contain the substance of OAR 345-025-0006
(5)(a). Moreover, Idaho Power must comply with the text of General Condition 7
itself, not the explanatory version contained in an erroneous footnote.