The opinion

IN THE COURT OF APPEALS OF TENNESSEE

AT KNOXVILLE

February 4, 2004 Session

FRED M. LEONARD, JR., ET AL. v.

KNOX COUNTY, TENNESSEE, ET AL.

Appeal from the Circuit Court for Knox County

No. 3-792-03 Wheeler A. Rosenbalm, Judge

Filed March 24, 2004

No. E2003-02255-COA-R3-CV

This is an inverse condemnation claim brought by Fred M. Leonard (“Plaintiff”) against the City of

Knoxville (the “City”) and Knox County (the “County”). Plaintiff sought damages to his property

resulting from flooding which occurred during and after construction to Gleason Road in Knoxville.

The Trial Court granted the County’s motion for summary judgment because the County had no

involvement with the road construction and because the construction occurred solely within the

City’s limits on a city street. The Trial Court granted Plaintiff’s motion seeking to prohibit the City

from introducing evidence at trial pertaining to the deed between the City and Plaintiff’s predecessor

in title, which the City claimed estopped Plaintiff from pursuing this litigation. The jury returned

a verdict for Plaintiff for $50,000 and concluded that Plaintiff’s action was not barred by the

applicable one year statute of limitations. We affirm the grant of summary judgment to the County

and the jury’s verdict that this action was filed timely. We conclude, however, that the Trial Court

erred when it prohibited the City from introducing the deed and evidence concerning whether that

deed operated to estop Plaintiff from pursuing this action.

Tenn. R. App. P. 3 Appeal as of Right; Judgment of the Circuit

Court Affirmed in Part and Reversed in Part; Case Remanded

D. MICHAEL SWINEY , J., delivered the opinion of the court, in which HERSCHEL P. FRANKS, J., and

CHARLES D. SUSANO , JR., J., joined.

Sharon E. Boyce, Knoxville, Tennessee, for the Appellant City of Knoxville.

Glenna W. Overton, Knoxville, Tennessee, for the Appellee Fred M. Leonard, Jr.

Robert C. McConkey, III, Knoxville, Tennessee, for the Appellee Knox County, Tennessee.

OPINION

Background

This is an appeal from a jury verdict in an inverse condemnation lawsuit brought by

Plaintiff against Knox County, the City of Knoxville, and Whaley & Sons, Inc.1 Plaintiff owns land

located on Forest Oak Drive in the City. Plaintiff claimed his property was permanently damaged

as a result of construction which occurred on Gleason Road, a city street located in the City. Plaintiff

claimed Gleason Road was raised several feet above its previous elevation. According to Plaintiff,

the flow of runoff water was changed permanently because of this increased elevation, resulting in

the water flowing down his driveway and into the lower level of his house.

The construction on Gleason Road began after a contract was entered into on

December 15, 1993, between the State of Tennessee, Department of Transportation (the “State”) and

the City. Pursuant to this contract the State was responsible for designing the project, purchasing

a right-of-way on behalf of the City, and supervising the construction. The City agreed to make

periodic inspections, to pay a portion of the expenses, and to be responsible for maintenance of the

road once the project was completed.

In February of 1997, Robert and Linda Tipton sold a portion of real estate they owned

to the City for use in the Gleason Road project. The State bought this land on behalf of the City.

The deed from the Tiptons to the City provided, among other things, that:

The consideration mentioned herein includes payment for the

property taken, also payment for any and all incidental damages to the

remainder compensable under eminent domain.

The Tiptons retained a portion of their land, and this remaining land and a house were sold later to

Michael Mills, who then sold the property to Plaintiff in December of 1997. It is this property now

owned by Plaintiff that is the subject of this lawsuit.

Whaley & Sons, Inc., was the winning bidder on the construction project and was

responsible for making the improvements to Gleason Road. Plaintiff voluntarily nonsuited Whaley

& Sons, Inc., without prejudice shortly after the complaint was filed. The County subsequently filed

a motion for summary judgment claiming it should be dismissed because it had absolutely no

involvement with the construction and improvements to Gleason Road. According to the County,

the construction on Gleason Road, a city street, took place entirely within the City’s limits and

“Knox County had nothing to do with the construction of the improvements, contributed no funding

to the improvements, and did not enter into any agreements with the state or the City in connection

1

Andrew D. Flick and M ary Anne Flick also were plaintiffs when this litigation began. However, after the

complaint was filed Mr. Flick passed away and M s. Flick subsequently transferred her interest in the property at issue

to Plaintiff, her son.

-2-

with the improvements.” Neither Plaintiff nor the City disputed the County’s lack of involvement

with the construction project, but maintained the County nevertheless could be held liable for

damages pursuant to Tenn. Code Ann. § 54-5-106. The Trial Court disagreed and granted the

County’s motion for summary judgment.

The City filed a motion for summary judgment claiming Plaintiff’s lawsuit was barred

by the applicable statute of limitations and by the doctrine of estoppel by deed. The Trial Court

denied the City’s motion for summary judgment and the case proceeded to trial with the City being

the only remaining defendant. After opening arguments were completed, Plaintiff’s counsel moved

to prohibit the City from introducing evidence of the purchase of the subject property from the

Tiptons as well as the terms and conditions of the deed. The Trial Court granted this motion, thereby

effectively precluding the City from raising its defense of estoppel by deed. The City made an offer

of proof with regard to its defense of estoppel by deed.

The jury was given a Special Verdict Form containing three questions. These

questions and the jury’s answers are as follows:

1 Did the improvements to Gleason Road cause flooding

of plaintiff’s property so as to amount to a taking of the property by

the defendant?

ANSWER: Yes (Yes or No)

2. (Answer this question only if you answered Question

1 “Yes”.)

What sum of money is necessary to compensate

plaintiff for the taking?

AMOUNT: $ 50,000 (In Dollars)

3. (Answer this question only if you answered Question

1 “Yes”.)

Is the plaintiff’s action for inverse condemnation

barred by the one-year Statute of Limitations?

ANSWER: No (Yes or No)

The Trial Court entered a judgment in accordance with the jury’s verdict. The City

appeals raising three issues. The City claims the County is liable for the judgment pursuant to Tenn.

Code Ann. § 54-5-106 and, therefore, the Trial Court erred when it granted the County’s motion for

summary judgment. The City also argues there is no material evidence to support the jury’s verdict

-3-

that Plaintiff’s claim was not barred by the applicable one year statute of limitations. The City’s

final argument is that the Trial Court erred when it precluded the City from presenting any proof on

its defense of estoppel by deed. The City does not challenge the amount of damages awarded or

whether there was a compensable taking of Plaintiff’s property under applicable law. We will,

therefore, limit any further discussion of the facts to those which pertain to the three specific issues

presented for review.

Discussion

We first will address whether the Trial Court correctly granted the County’s motion

for summary judgment. The standard for review of a motion for summary judgment is set forth in

Staples v. CBL & Associates, Inc., 15 S.W.3d 83 (Tenn. 2000):

The standards governing an appellate court’s review of a

motion for summary judgment are well settled. Since our inquiry

involves purely a question of law, no presumption of correctness

attaches to the lower court’s judgment, and our task is confined to

reviewing the record to determine whether the requirements of Tenn.

R. Civ. P. 56 have been met. See Hunter v. Brown, 955 S.W.2d 49,

50-51 (Tenn. 1997); Cowden v. Sovran Bank/Central South, 816

S.W.2d 741, 744 (Tenn. 1991). Tennessee Rule of Civil Procedure

56.04 provides that summary judgment is appropriate where: (1) there

is no genuine issue with regard to the material facts relevant to the

claim or defense contained in the motion, see Byrd v. Hall, 847

S.W.2d 208, 210 (Tenn. 1993); and (2) the moving party is entitled

to a judgment as a matter of law on the undisputed facts. See

Anderson v. Standard Register Co., 857 S.W.2d 555, 559 (Tenn.

1993). The moving party has the burden of proving that its motion

satisfies these requirements. See Downen v. Allstate Ins. Co., 811

S.W.2d 523, 524 (Tenn. 1991). When the party seeking summary

judgment makes a properly supported motion, the burden shifts to the

nonmoving party to set forth specific facts establishing the existence

of disputed, material facts which must be resolved by the trier of fact.

See Byrd v. Hall, 847 S.W.2d at 215.

To properly support its motion, the moving party must either

affirmatively negate an essential element of the non-moving party’s

claim or conclusively establish an affirmative defense. See McCarley

v. West Quality Food Serv., 960 S.W.2d 585, 588 (Tenn. 1998);

Robinson v. Omer, 952 S.W.2d 423, 426 (Tenn. 1997). If the moving

party fails to negate a claimed basis for the suit, the non-moving

party’s burden to produce evidence establishing the existence of a

genuine issue for trial is not triggered and the motion for summary

-4-

judgment must fail. See McCarley v. West Quality Food Serv., 960

S.W.2d at 588; Robinson v. Omer, 952 S.W.2d at 426. If the moving

party successfully negates a claimed basis for the action, the non-

moving party may not simply rest upon the pleadings, but must offer

proof to establish the existence of the essential elements of the claim.

The standards governing the assessment of evidence in the

summary judgment context are also well established. Courts must

view the evidence in the light most favorable to the nonmoving party

and must also draw all reasonable inferences in the nonmoving

party’s favor. See Robinson v. Omer, 952 S.W.2d at 426; Byrd v.

Hall, 847 S.W.2d at 210-11. Courts should grant a summary

judgment only when both the facts and the inferences to be drawn

from the facts permit a reasonable person to reach only one

conclusion. See McCall v. Wilder, 913 S.W.2d 150, 153 (Tenn.

1995); Carvell v. Bottoms, 900 S.W.2d 23, 26 (Tenn. 1995).

Staples, 15 S.W.3d at 88-89 (footnote omitted).

As stated previously, the City argues that pursuant to Tenn. Code Ann. § 54-5-106,

it is the County and not the City which ultimately is liable for Plaintiff’s damages. The relevant

statutes are Tenn. Code Ann. §§ 54-5-106 and 54-5-111 which provide:

54-5-106. Judgments and expenses in condemnation cases paid

out of county general funds. All judgments rendered and other

expenses necessarily incurred in such condemnation proceedings shall

be paid out of the general funds of the county, in which the expenses

are incurred and standing to the credit of the trustee, on the warrant

or voucher of the county executive drawn under the direction of the

commissioner.

****

54-5-111. Rights-of-way for state highways – Liability for cost.

– (a) The state of Tennessee is liable for and shall be held to pay,

through its department of transportation and as other highway

expenses are paid, for all rights-of-way and damages and costs

incident to the acquisition and use of same, whether by condemnation

suits or otherwise as provided by existing laws, necessary to the

construction of any highway, or parts thereof, designated and adopted

by the department as and for a state or state and federal aid highway

in the state's system of highways.

-5-

(b) No county affected by such highways will be liable

therefor, nor shall any county pay or enter into an agreement to pay

any part of such costs.

The City correctly points out that a landowner cannot file a direct action for inverse

condemnation against the State. See Hise v. State, 968 S.W.2d 852 (Tenn. Ct. App. 1997). If there

was a taking of Plaintiff’s property and he is entitled to compensation, the City claims Tenn. Code

Ann. § 54-5-106 requires Plaintiff be compensated by the County which, in turn, may seek

reimbursement from the State pursuant to Tenn. Code Ann. § 54-5-111. In making this argument,

the City relies in part on Marion County v. Tydings, 169 Tenn. 286, 86 S.W.2d 565 (1935). In

Tydings, the plaintiffs sued Marion County for the value of land taken by the commissioner of

highways and public works. It was agreed that Marion County had nothing to do with the taking of

the land and had not entered into any agreements with the State. The trial court nevertheless held

Marion County was statutorily liable for the takings. Our Supreme Court affirmed, stating as

follows:

In no case has this court awarded an execution against the

state, or the commissioner of highways and public works, for lands

taken in the construction of highways, and this court has given no

construction to the 1931 act tending to exempt the county from

liability to the landowner for lands taken for highway uses, even

though such lands be taken by the state. We are not willing now to

so construe the act. To do so would be to read into the act a purpose

and exemption not found expressed in the language of the act, nor

reasonably implied therefrom. Indeed, such construction would seem

to deprive the landowner of a remedy, since it has been held that the

act gives the landowner no right of action against the department of

highways and public works (Phillips v. Marion County, supra), and

the state cannot be sued. The uniform construction heretofore given

the act is such as to indicate that this court considers the county to be

liable for lands taken for highway purposes, just as it was prior to the

passage of the act; and the cases here under consideration well

illustrate the wisdom and justice of such construction.

It is immaterial that the county has or has not entered into a

contract to co-operate with the department of highways and public

works; and whether the obligation of the county be regarded as

primary or secondary, as between the state and itself, as to the

landowner, the county's liability is direct, and may be enforced.

Tydings, 169 Tenn. at 289-90, 86 S.W.2d at 566.

-6-

In our opinion, cases such as Tydings are not controlling in the present case.

Admittedly, Tydings and the present case both involve a county which had nothing to do with the

improvements to the road. However, unlike Tydings, the present case involves road construction

undertaken entirely within the limits of a municipality. Tydings would be on point here if the

construction in this matter had been undertaken within the limits of Knox County but not within the

City on a city street. However, it was on a city street in the City.2

The City quite correctly argues that even though the State cannot be sued directly by

a landowner, the landowner is constitutionally entitled to just compensation for a governmental

taking of his or her property. Nevertheless, we do not believe the above statutes are applicable to

the present case because: (1) the County had no involvement whatsoever with the construction

project which took place entirely within the corporate limits of the City on a city street; and (2) the

City was actively involved in the construction project and entered into a contract with the State

wherein it agreed to make periodic inspections, to pay a portion of the expenses, and to be

responsible for maintenance once the project was completed. We believe Plaintiff’s right to

compensation is found at Tenn. Code Ann. § 7-31-112 which provides:

Damage from change of grade or repair– When any owner of real

estate in any municipality sustains any damage to such owner's

property by reason of any change made in the natural or established

grade of any highway, street or alley, or by reason of the raising or

lowering of such grades, or other acts done for the purpose of

improving or repairing such ways, the owner shall be paid all

damages therefor by such municipality, which damages may be

recovered by suit brought at any time in one (1) year from the

completion of or the cessation of such works, acts, or improvements;

but all benefits accruing by reason of such improvements, acts, or

works shall be allowed to affect, reduce, and offset the damages

hereinbefore provided.

In light of the foregoing, we conclude the Trial Court correctly granted the County’s

motion for summary judgment. In reaching this conclusion, we express no opinion on the

applicability of Tenn. Code Ann. § 7-31-112 when a city has no involvement in road construction

taking place within its corporate limits. We further express no opinion on the respective rights and

liabilities that may exist between the City and the State with regard to damages, if any, ultimately

awarded to Plaintiff.

The next issue is whether there is material evidence to support the jury’s verdict that

Plaintiff’s claim is not barred by the one year statute of limitations. The jury’s verdict on this issue

2

The present case likewise does not involve road construction which takes place partially within the limits of

a city and partially within the limits of a county, as was the case in Charleston v. Ailey, 210 Tenn. 211, 357 S.W .2d 339

(1962). W e express no opinion on how the result in this case would differ, if at all, under these circumstances.

-7-

can be set aside only if there is no material evidence to support it. Tenn. R. App. P. 13(d); Forrester

v. Stockstill, 869 S.W.2d 328, 329 (Tenn. 1994). A verdict cannot, however, be based upon a “mere

spark, glimmer or scintilla of evidence.” See Sadek v. Nashville Recycling Co., 751 S.W.2d 428, 431

(Tenn. Ct. App. 1988). In resolving this issue, we are guided by our Supreme Court’s decision in

Knox County v. Moncier, 224 Tenn. 361, 455 S.W.2d 153 (1970), wherein the Court stated:

In determining what amounts to a "taking" in a case and when

the "taking" is complete so as to give the landowner a cause of action

and begin the running of the statute of limitations, the Court must

look to the facts in the particular case under consideration. Davidson

County v. Beauchesne (1955), 39 Tenn. App. 90, 281 S.W.2d 266.

****

The statute of limitations should be applied in such a manner

that the landowner will have the one year period within which to

bring his suit "after injury or after reasonable notice or knowledge of

such injury and damage." Morgan County v. Neff (1953), 36 Tenn.

App. 407, 256 S.W.2d 61. We would add to this that the landowner

should have one year to commence his action after an injury to his

property which reasonably appears to him to be a permanent injury

rather than a temporary one. Only when the injury is permanent in

nature can there be a "taking" within the contemplation of the statute;

and until there is a "taking" the statute of limitations does not begin

to run.

Moncier, 224 Tenn. at 366-67, 455 S.W.2d at 156.

The complaint in the present case was filed on December 30, 1999. The City argues

that by December 14, 1998, Plaintiff’s house already had been flooded nine times. Thus, the City

argues that Plaintiff either was aware or should have been aware no later than December 14, 1998,

that “the damage appear[ed] to be permanent” and he needed to take appropriate legal action to

preserve his rights.

Plaintiff testified that after the flooding to his house began in August of 1998, he

complained to the State, the City, as well as State Senator Tim Burchett. According to Plaintiff, he

was told the flooding would go away once the road construction was completed. Plaintiff’s former

girlfriend, Ms. Shelley Dane (“Dane”), also testified on Plaintiff’s behalf. Dane began residing with

Plaintiff in June or July of 1998. Dane testified that contractors with Whaley & Sons, Inc., told her

that they were aware of the flooding in Plaintiff’s house, and “as soon as the project was done and

they put in, you know, the permanent road and permanent driveway and the culverts and everything

else that the water [problem] would be fixed.” Dane stated this conversation occurred on May 6,

1999.

-8-

In Moncier, as in the present case, the plaintiff was assured that the flooding would

be remedied. According to the Moncier Court:

Plaintiff was justified in believing that no "taking" had

occurred until after January 1965. From 1963 until 1965, Moncier

discussed the flooding with the State engineers, and he was assured

that the problem would be alleviated. In fact, after the March 1963

flooding the State reconstructed the catch basin on Moncier's

property. Thus, during this time period, 1963 to 1965, Moncier

reasonably assumed that any injury to his land was of a temporary

nature. However, after a substantial part of the construction was

completed in September 1964, and subsequent flooding occurred in

January 1965, plaintiff was then justified in assuming that such

flooding constituted a permanent situation and not merely a

temporary inconvenience. This was the first time that Moncier could

be charged with knowledge that the injury to his property was

permanent, thus constituting a "taking."

Moncier, 224 Tenn. at 368, 455 S.W.2d at 156. We believe the testimony of Plaintiff and Dane to

the effect that they were told as late as May of 1999 that the flooding would be remedied once the

project was completed constitutes material evidence to support the jury’s verdict that the one year

statute of limitations had not expired when the complaint was filed on December 30, 1999. We

affirm the Trial Court’s judgment on this issue.

The final issue is the City’s claim that the Trial Court committed reversible error

when it precluded the City from pursuing its affirmative defense of estoppel by deed. When arriving

at a determination to admit or exclude evidence, a trial court generally is accorded a wide degree of

latitude and will be overturned on appeal only where there is a showing of abuse of discretion. Otis

v. Cambridge Mutual Fire Ins. Co., 850 S.W.2d 439, 442 (Tenn. 1992). According to the City, the

language in the deed between the Tiptons and the City estops Plaintiff from pursuing his inverse

condemnation claim. As noted above, the deed provides that the compensation paid includes

payment for the property taken as well as “payment for any and all incidental damages to the

remainder compensable under eminent domain.” The City argues that the damages sought by

Plaintiff are “incidental damages to the remainder.” Although not entirely clear from the record, the

Trial Court apparently concluded that the “incidental damages” language in the deed could not refer

to potential future flooding. According to the Trial Court, “I don’t think that is what incidental

damages means.” In effect, the Trial Court held that, as a matter of law, “incidental damages” could

not encompass flooding to the remainder property.

Tenn. Code Ann. § 29-17-801 gives the State, counties, and municipalities the power

to acquire through eminent domain “such right-of-way, land, material, easements and rights as may

be deemed necessary, suitable or desirable for the construction, reconstruction, maintenance, repair,

drainage or protection of any street, road, highway, freeway or parkway ….” When such a taking

-9-

occurs, the landowner is entitled to be compensated for the “fair cash market value of the property

or property rights taken and adding to the same the amount of incidental damages done to the residue

of the owner’s property, if any, after deducting from the incidental damages to the residue the value

of all special benefits, if any, occasioned such residue by the construction of such street ….” Tenn.

Code Ann. § 29-17-810. In Dep’t of Trans. v. Wheeler, No. M1999-00088-COA-R3-CV, 2002

Tenn. App. LEXIS 727 (Tenn. Ct. App. Oct. 11, 2002), no appl. per. appeal filed, this Court

affirmed a $200,000 jury verdict for incidental damages to the plaintiff’s remainder property. On

appeal, the State argued there was no material evidence to support the verdict. We rejected that

argument after reviewing the extensive evidence presented at trial regarding the flooding which

occurred on the plaintiff’s property resulting from the construction of a two-lane undivided highway

and a 132-foot bridge. We noted that “[a]ll this evidence regarding the flooding of the Wheelers’

property and the effects of the flooding was relevant to the Wheelers’ claim for incidental damages

and provided the jury with material evidence upon which to base its verdict.” Wheeler, 2002 Tenn.

App. LEXIS 727 at * 17. See also Dept’ of Trans. v. Webb, 1988 Tenn. App. LEXIS 538 (Tenn. Ct.

App. Aug. 19, 1988)(affirming jury verdict for $6,200 in “incidental damages” to the plaintiff’s

remainder property caused by flooding and diminished access to the property). In the present case,

we believe the Trial Court erred when it concluded, as a matter of law, that flooding to Plaintiff’s

property could not be considered incidental damages to the remainder property as set forth in the

deed between the Tiptons and the City.

Assuming the flooding to Plaintiff’s property could be considered incidental damages

to the remainder, the issue becomes whether or not the language in the deed between the Tiptons and

the City operates to estop Plaintiff. In Duke v. Hopper, 486 S.W.2d 744 (Tenn. Ct. App. 1972), this

Court discussed estoppel by deed as follows:

Estoppel by deed has been described as:

“. . . . a bar which precludes one party to a deed and his

privies from asserting as against the other party and his

privies any right or title in derogation of the deed or from

denying the truth of any material facts asserted in it.” Denny

v. Wilson County, [198 Tenn. 677, 281 S.W.2d 671 (1955)],

supra; 31 C.J.S. Estoppel, § 10, page 295; 28 Am.Jur.2d,

Estoppel, Sec. 4, page 602.

Ordinarily, recitals of matters of fact contained in a deed are

binding on both the grantor and the grantee, such as the date of the

instrument, the existence of prior agreements, and the nature or status

of either grantor or grantee. See 31 C.J.S. Estoppel, § 37, page 330

and § 38, pages 333-334. Also, Henderson v. Overton (1830) 10

Tenn. (2 Yerg.) 394-397; Denny v. Wilson, County, supra.

-10-

The privies of a grantor or grantee are estopped to the same

extent as the original parties to the deed and all persons, including

heirs, claiming through the party estopped by deed are bound by the

estoppel. Spicer v. Kimes (1941 M.S.) 25 Tenn. App. 247, 156

S.W.2d 334.

Duke, 486 S.W.2d at 748.

In Blevins v. Johnson County, 746 S.W.2d 678 (Tenn. 1998) a warranty deed by the

Roark family to the State of Tennessee provided that “[t]he consideration mentioned herein includes

payment for any and all incidental damages to the remainder compensable under eminent domain.”

Id. at 680. The Roark family later sold the remainder property to the plaintiff, Richard Blevins, who

eventually brought an inverse condemnation lawsuit claiming the State had reduced the unrestricted

access along the frontage of his property. Id. The defendant argued that the language in the deed

estopped the plaintiff from pursuing his claim. The Supreme Court ultimately concluded that the

plaintiff was estopped by the deed and the type of damages suffered by the plaintiff were withing the

contemplation of the parties to that deed. While making this analysis, the Court also discussed the

circumstances under which an estoppel would or would not arise which requires, among other things,

an analysis of whether the parties to the deed contemplated the type of damages suffered as well as

whether the damages would have been “so speculative and conjectural that a court would have

rejected any proof regarding them in a condemnation action at the time of the taking.” Id at 682.

The Court also stated:

In a negotiated taking or in a condemnation suit, the same issue must

be resolved as to whether the subsequent damages to the land from

which a severance was taken were foreseeable and contemplated by

the parties to the deed or to the suit so that the consideration would

encompass payment for the injury suffered.

Incidental damages are sometimes called "severance damages,

i.e., if only a portion of a single tract is taken the owner's

compensation for that taking includes any element of value arising

out of the relationship of the part taken to the entire tract," State ex

rel. Pack v. Walker, 220 Tenn. 661, 662-663, 423 S.W.2d 473, 473

(1968), and "[t]he recital in the deed, that the consideration for it is

in full of all damages that the grantor may suffer, is an estoppel and

a bar against his right later to sue for such damages." Denny v.

Wilson County, 198 Tenn. 677, 685, 281 S.W.2d 671, 674 (1955).

The unanticipated injury exception to the general rule thus depends

on what the parties to a taking knew or should have known at the time

of the execution of the deed and of what a subsequent purchaser can

be said to have adequate notice ….

-11-

Id. at 685.

As noted, the City made an offer of proof after the Trial Court granted Plaintiff’s

motion to exclude any proof regarding the deed between the Tiptons and the City. The offer of proof

included testimony of John McKee (“McKee”), a right of way agent with the Tennessee Department

of Transportation, who negotiated the purchase of the Tiptons’ property. McKee verified the

language in the deed provided that the consideration paid included payment for the property taken

as well as payment for “any and all incidental damages to the remainder compensable under eminent

domain.” On cross-examination, when asked to define “incidental damages,” McKee stated

“[i]ncidental damages is anything, it could pertain to most anything, from what we are talking about

here, from drainage, to proximity to the road, and things of that kind.” A Negotiator’s Report of Call

prepared by McKee was admitted for identification. This document contains, among other things,

a check-list indicating whether certain items were discussed with the property owner during

negotiations. McKee checked “Yes” next to the item which asked if the “effects of construction on

the remainder [were] explained.” In our opinion, this evidence is relevant to the issue of whether

potential flooding to the remainder property was contemplated when the “incidental damages”

language discussed above was included in the deed. Therefore, the Trial Court erred in excluding

this evidence on the basis that “incidental damages” could not encompass flooding to the remainder

of the property. On remand, the City, as the party asserting the defense of estoppel by deed, has the

burden “to show that the parties contemplated that the consideration paid for the damages included

those subsequently suffered by Plaintiff.” Blevins, 746 S.W.2d at 686.

In Blevins, the Court also stated that notice was an element of estoppel by deed.

Notice can be actual or constructive, or may arise from “knowledge of facts and circumstances

sufficiently pertinent in character to enable reasonably cautious and prudent persons to investigate

and ascertain as to the ultimate facts”, sometimes referred to as inquiry notice. Blevins, 746 S.W.2d

at 683. At trial, Plaintiff testified that prior to purchasing the property he was “sure that the title

company did [a title search]; the bank requires it ….” Plaintiff also testified he knew Gleason Road

was being widened and there were temporary construction easements. Plaintiff also was aware that

“they were moving the houses because they were widening the road, so … I guess I knew that they

at some point had taken property through there.” We believe this evidence is relevant to the issue

of whether the notice element of estoppel by deed as required by Blevins has been satisfied, an

inquiry that was foreclosed by the Trial Court’s erroneous evidentiary ruling.

We conclude that the Trial Court erred when it precluded the City from introducing

evidence on its defense of estoppel by deed. This case is remanded to the Trial Court on the sole

issue of whether the deed between the Tiptons and the City operates to estop Plaintiff from pursuing

this inverse condemnation claim. If on remand the City successfully proves this defense, then a

judgment will be entered for the City. On the other hand, if the City is unsuccessful in proving this

defense, then the Trial Court’s previous judgment for Plaintiff will be reinstated in its entirety.

-12-

Conclusion

The judgment of the Trial is affirmed in part and reversed in part, and this cause is

remanded to the Trial Court for further proceedings as are necessary consistent with this Opinion.

The costs on appeal are assessed one-half against the Appellant, the City of Knoxville, and one-half

against the Appellee, Fred M. Leonard.

_____________________________

D. MICHAEL SWINEY, JUDGE

-13-