Sosa v 310 Group LLC

2024 NY Slip Op 32425(U)

July 12, 2024

Supreme Court, New York County

Docket Number: Index No. 157148/2017

Judge: Alexander M. Tisch

Cases posted with a "30000" identifier, i.e., 2013 NY Slip

Op 30001(U), are republished from various New York

State and local government sources, including the New

York State Unified Court System's eCourts Service.

This opinion is uncorrected and not selected for official

publication.

· ~ " , : ~ ~ • ~ INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

SUPREME COURT OF THE STATE OF NEW YORK NEW

YORK COUNTY

PRESENT: HON. ALEXANDER M. TISCH PART 18

Justice

------------------------------------------------------------------X INDEX NO. 157148/2017

GENARO SOSA,

MOTION DATE 11/17/2022

Plaintiff,

MOTION SEQ. NO. 006,007

- V -

310 GROUP LLC, METRO NYC SERVICES INC.,

STRUCTURETECH NEW YORK INC.,

DECISION + ORDER ON MOTION

PRESS BUILDERS, INC.,

Defendant.

------------------------------------------------------------------X

310 GROUP LLC, METRO NYC SERVICES INC. Third-Party

Index No. 595066/2019

Plaintiff,

-against-

PRESS BUILDERS, INC.

Defendant.

------------------------------------------------------------------X

STRUCTURETECH NEW YORK INC. Second Third-Party

Index No. 595115/2019

Plaintiff,

-against-

PRESS BUILDERS, INC.

Defendant.

------------------------------------------------------------------X

PRESS BUILDERS, INC. Third Third-Party

Index No. 595115/2020

Plaintiff,

-against-

CENTRIFUGAL ELECTRIC, LLC

Defendant.

------------------------------------------------------------------X

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 1 of 23

Motion l\o. 006, 007

1 of 23

[* 1]

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

The following e-filed documents, listed by NYSCEF document number (Motion 006) 195, 196, 197, 198, 199, 200,

201,202,203,204,205,206,207,208,209,210,211,212,213,214,215,216,217,218,219,220,221,222,223,

224,225,226,227,228,229,230,231,232,233,269,270,271,272,273,274,275,276,277,286,287,292,293,

294,298,299,301,303,304

were read on this motion to/for JUDGMENT- SUMMARY

The following e-filed documents, listed by NYSCEF document number (Motion 007) 157, 158, 159, 160, 161, 162,

163,164,165,166,167,168,169, 170,171,172,173,174,175,176, 177, 178, 179,180,181, 182, 183,184,185,

186,187,188,189,190,191,192,193,194,234,235,236,237,238,239,240,241,242,243,244,245,246,247,

248,249,250,251,252,253,254,255,256,257,258,259,260,261,262,263,264,265,266,267,268,289,290,

291,295,296,297,300,302,305

were read on this motion to/for JUDGMENT- SUMMARY

I. BACKGROUND

This action was brought by plaintiff Genaro Sosa, a construction worker who tripped over

an electrical cord which had been left out and sustained an injury while he worked on site on a

construction project at 310 West 40 th Street, New York, New York (the Premises). Defendant

310 Group LLC (310) states it was the developer of the project. Defendant Metro NYC

Services, Inc. (Metro) states it was the general contractor on the project. Plaintiff alleges

defendant 310 hired defendants Metro, Structuretech New York (Structuretech), Press Builders,

Inc., (Press), and Centrifugal Associates Group LLC (Centrifugal), to work on the project.

Plaintiff worked for Centrifugal as a foreman.

In the Second Amended Verified Complaint (NYSCEF Doc. No. 98), plaintiff asserts

claims against 310, Metro, Structuretech, and Press sounding in negligence (Claims 1-3), New

York Labor Law§ 200 and 241(6) and Rule 23 of the Industrial Code of the State of New York

(Claim 4). 310 Group and Metro (the Third Party Plaintiffs) filed a Third Party Verified

Complaint (NYSCEF Doc. No. 71) against Press in which the Third Party Plaintiffs allege Press

was required to indemnify the Third Party Plaintiffs for claims arising out of Press' s work or the

project, in general, pursuant to its contract with Metro. Third Party Plaintiffs assert claims

against Press seeking declaratory judgment that Press must indemnify Third Party Plaintiffs, and

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 2 of23

Motion No. 006, 007

[* 2] 2 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

for contribution or indemnification, and for breach of contract for failing to obtain insurance.

Structuretech filed the Verified Second Third-Party Complaint against Press (NYSCEF Doc. No.

86) for claims sounding in common law indemnity, contribution, contractual indemnification,

and breach of contract for Press's failure to obtain liability insurance. Press then filed the Third

Third Party Complaint (NYSCEF Doc. No. 116) asserting claims against Centrifugal for

contractual indemnification, common law indemnification or contribution, breach of contract for

Centrifugal' s failure to obtain insurance, and breach of Centrifugal' s agreement with the general

contractor on the project for Centrifugal's failure to obtain required insurance. Press also

asserted cross claims (NYSCEF Doc. No. 107) against 310 Group, Metro, Structuretech, and

ZDG, LLC (the former construction manager), sounding in common law indemnification and or

contribution, comparative negligence, contractual indemnification, and breach of contract for

failure to obtain required insurance. ZDG has been dismissed from this action (NYSCEF Doc.

No. 92).

II. STANDARD

The standards for summary judgment are well settled. Summary judgment is a drastic

remedy which will be granted only when the party seeking summary judgment has established

that there are no triable issues of fact (see CPLR 3212 [b ]; Alvarez v Prospect Hosp., 68 NY2d

329 [1986]; Sillman v Twentieth Century-Fox Film Corporation, 3 NY2d 395 [1957]). To

prevail, the party seeking summary judgment must make a prima facie showing of entitlement to

judgment as a matter of law tendering evidentiary proof in admissible form, which may include

deposition transcripts and other proof annexed to an attorney's affirmation (see Alvarez v

Prospect Hosp., supra; Olan v Farrell Lines, 64 NY2d 1092, 1093 [1985]; Zuckerman v City of

New York, 49 NY2d 557, 562 [1980]). Absent a sufficient showing, the court should deny the

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 3 of23

Motion No. 006, 007

[* 3] 3 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

motion without regard to the strength of the opposing papers (see Winegradv New York Univ.

Med. Ctr., 64 NY2d 851,853 [1985]).

Once the initial showing has been made, the burden shifts to the party opposing the

motion for summary judgment to rebut the prima facie showing by producing evidentiary proof

in admissible form sufficient to require a trial of material issues of fact (see Kaufman v Silver, 90

NY2d 204, 208 [1997]). Although the court must carefully scrutinize the motion papers in a

light most favorable to the party opposing the motion and must give that party the benefit of

every favorable inference (see Negri v Stop & Shop, 65 NY2d 625,626 [1985]) and summary

judgment should be denied where there is any doubt as to the existence of a triable issue of fact

(see Rotuba Extruders, v Ceppos, 46 NY2d 223, 231 [1978]), bald, conclusory assertions or

speculation and "[a] shadowy semblance of an issue" are insufficient to defeat a summary

judgment motion (S.J Capalin Assoc. v Globe Mfg. Corp., 34 NY2d 338,341 [1974]; see

Zuckerman v City of New York, supra; Ehrlich v American Moninger Greenhouse Mfg. Corp., 26

NY2d 255, 259 [1970]).

Lastly, "[a] motion for summary judgment should not be granted where the facts are in

dispute, where conflicting inferences may be drawn from the evidence, or where there are issues

of credibility" (Ruiz v Griffin, 71 AD3d 1112, 1115 [2d Dept 2010], quoting Scott v Long Is.

Power Auth., 294 AD2d 348, 348 [2d Dept 2002]).

III. MOTION SEQUENCE 006

In Motion Sequence 006, Press moves for summary judgment dismissing all claims and

cross-claims against it and granting summary judgment on its claim for indemnification against

Centrifugal. Plaintiff Sosa cross-moves seeking partial summary judgment in plaintiffs favor

on the Labor Law § 241 (6) claim. Preliminarily, plaintiff argues the motion is defective for its

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 4 of23

Motion No. 006, 007

[* 4] 4 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

failure to attach the Second Amended Complaint, as required by CPLR section 3212(b) ("A

motion for summary judgment shall be supported by affidavit, by a copy of the pleadings and by

other available proof''). Press cured this defect by attaching the required pleadings to its reply

papers, allowing the court to overlook the procedural defect (see Welch v Hauck, 18 AD3d 1096,

1098 [3d Dept 2005], lv. denied 5 NY3d 708 [2005]; see Ayer v Sky Club, Inc., 70 AD2d 863,

864 [1st Dept. 1979] [parties permitted to supplement the record by submitting a copy of the

pleadings], appeal dismissed 48 NY2d 705 [1979]). The record is sufficiently complete, despite

movant's failure to attach all of the pleadings, as they are available from the materials submitted

(see e.g. Studio A Showroom, LLC v Yoon, 99 AD3d 632 [1st Dept 2012] [pleadings filed

electronically were available for the court's consideration], Pandian v New York Health and

Hospitals Corp., 54 AD3d 590, 591 [1st Dept. 2008] [pleadings were attached to reply papers];

Welch, 18 AD3d at 1098 [cross motion not fatally defective where pleadings were attached to

primary motion]) and available on NYSCEF.

A. Plaintiff's Claims Against Press

1. Negligence and Labor Law§ 200 claims

Labor Law§ 200 is a "'codification of the common-law duty imposed upon an owner or

general contractor to provide construction site workers with a safe place to work"' (Cruz v

Toscano, 269 AD2d 122, 122 [1 st Dept 2000] [citation omitted]). Labor Law § 200 ( 1) states:

"All places to which this chapter applies shall be so constructed,

equipped, arranged, operated and conducted as to provide

reasonable and adequate protection to the lives, health and safety of

all persons employed therein or lawfully frequenting such places.

All machinery, equipment, and devices in such places shall be so

placed, operated, guarded, and lighted as to provide reasonable and

adequate protection to all such persons."

157148/2017 SOSA, GENARO vs. 310 GROUP LLC

Motion No. 006, 007 Page 5 of23

[* 5] 5 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

As an initial matter, Press contends it lacked the authority to supervise and control the

work, so it is not a proper Labor Law or negligence defendant and Labor Law liability does not

apply to it.

"When the work giving rise to these [Labor Law] duties has been

delegated to a third party, that third party then obtains the

concomitant authority to supervise and control that work and

becomes a statutory 'agent' of the owner or general

contractor. Only upon obtaining the authority to supervise and

control does the third party fall within the class of those having

nondelegable liability as an 'agent' under sections 240 and 241."

(Russin v Louis N. Picciano & Son, 54 NY2d 311, 318 [1981 ]; see also Nascimento v

Bridgehampton Constr. Corp, 86 AD3d 189, 193 [1st Dept 2011] [an entity becomes a statutory

agent under the Labor Law when it has been "delegated the supervision and control either over

the specific work area involved or the work which [gave] rise] to the injury"] internal quotation

marks and citation omitted]). Press is not an owner or a general contractor. Press contends that,

as a construction manager, it has only general supervisory powers and no control over how the

laborers perform their work (Hughes v Tishman Const. Corp., 40 AD3d 305,306 [1st Dept 2007]

["liability cannot be imposed on an owner or general contractor unless it is shown that it

exercised some supervisory control over the work"). "It is well settled that an implicit

precondition to th[e] duty [to maintain a safe construction site] is that the party to be charged

with that obligation 'have the authority to control the activity bringing about the injury to enable

it to avoid or correct an unsafe condition' "(Rizzuto v L.A. Wenger Contr. Co., 91 NY2d 343,

3 52 [ 1998], quoting Russin v Louis N. Picciano & Son, 54 NY2d 311, 317 [ 1981 ]). General

supervisory authority is insufficient to constitute supervisory control; it must be demonstrated

that the contractor controlled the manner in which the plaintiffperformed his or her work, i.e.,

157148/2017 SOSA, GENARO vs. 310 GROUP LLC

Motion No. 006, 007 Page 6 of23

6 of 23

[* 6]

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

how the injury-producing work was performed" (Hughes v Tishman Const. Corp., 40 AD3d 305,

306 [1st Dept 2007]).

While Press admits to having "supervisory authority," it denies having "supervisory

control" and points to the Construction Management Agreement between Press and Metro

(Exhibit Y to Affirmation of Megan E. Yllanes filed in Motion Sequence 007, NYSCEF Doc.

No. 186). According to the CMA, Press was contracted to provide project management and

construction consulting services as Construction Manager, to Metro's General Contractor.

Plaintiff does not argue against the dismissal of this claim in its opposition to Press's

motion. Therefore, the portion of the motion seeking summary judgment dismissing plaintiffs

claim against Press brought pursuant to common law negligence and Labor Law § 200 is

granted.

2. Plaintifrs Claim Pursuant to Labor Law§ 240 (1)

Labor Law § 240 (1 ), known as the Scaffold Law, provides:

"All contractors and owners and their agents ... in the erection,

demolition, repairing, altering, painting, cleaning or pointing of a

building or structure shall furnish or erect, or cause to be furnished

or erected for the performance of such labor, scaffolding, hoists,

stays, ladders, slings, hangers, blocks, pulleys, braces, irons, ropes,

and other devices which shall be so constructed, placed and operated

as to give proper protection to a person so employed."

Labor Law § 240 ( 1) "imposes a nondelegable duty on owners and contractors to provide

devices which shall be so constructed, placed and operated as to give proper protection to those

individuals performing the work" (Quiroz v Memorial Hosp. for Cancer & Allied Diseases, 202

AD3d 601, 604 [1st Dept 2022] [internal quotation marks and citations omitted]). It "was

designed to prevent those types of accidents in which the scaffold ... or other protective device

proved inadequate to shield the injured worker from harm directly flowing from the application

157148/2017 SOSA, GENARO vs. 3IO GROlJP LLC

Page 7 of23

Motion No. 006, 007

[* 7] 7 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

of the force of gravity to an object or person"' (John v Baharestani, 281 AD2d 114, 118 [1st

Dept 2001], quoting Ross v Curtis-Palmer Hydro-Elec. Co., 81 NY2d 494, 501 [1993]).

The absolute liability found within section 240 "is contingent upon the existence of a

hazard contemplated in section 240(1) and the failure to use, or the inadequacy of, a safety

device of the kind enumerated therein" (O'Brien v. Port Auth. of NY & NJ, 29 NY3d 27, 33

[2017] [internal quotation marks and citation omitted]). In addition, Labor Law§ 240 (1) "must

be liberally construed to accomplish the purpose for which it was framed" (Valensisi v Greens at

Half Hollow, LLC, 33 AD3d 693, 695 [2d Dept 2006] [internal citations omitted]).

That said, not every worker who is injured at a construction site is afforded the

protections of Labor Law § 240 ( 1), and "a distinction must be made between those accidents

caused by the failure to provide a safety device ... and those caused by general hazards specific

to a workplace" (Makarius v Port Auth. of NY & NJ, 76 AD3d 805,807 [1st Dept 2010];

Buckley v Columbia Grammar & Preparatory, 44 AD3d 263,267 [1st Dept 2007] [section 240

(1) "does not cover the type of ordinary and usual peril to which a worker is commonly exposed

at a construction site"). Instead, liability "is contingent upon the existence of a hazard

contemplated in section 240 (1) and the failure to use, or the inadequacy of, a safety device of the

kind enumerated therein" (Narducci v Manhasset Bay Assoc., 96 NY2d 259, 267 [2001]).

To prevail on a Labor Law§ 240 (1) claim, a plaintiff must establish that the statute was

violated, and that this violation was a proximate cause of the plaintiff's injuries (Barreto v

Metropolitan Transp. Auth., 25 NY3d 426,433 [2015]). Neither the Second Amended Verified

Complaint (NYSCEF Doc. No. 98) nor the plaintiff's submissions in opposition to this motion

make any allegations about a failure to provide sufficient "scaffolding, hoists, stays, ladders,

slings, hangers, blocks, pulleys, braces, irons, ropes, or other devices" for the protection of the

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page8 of23

Motion No. 006, 007

8 of 23

[* 8]

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

plaintiff, resulting in the injury at issue (Labor Law§ 240[1]). Nor are there any allegations or

issues of material fact that the plaintiff's alleged injury resulted from an elevation related risk

(Toefer v Long Is. R.R., 4 NY3d 399,405 [2005]). This statute does not allow recovery for the

"usual and ordinary dangers of a construction site," such as those alleged here (Rodriguez v

Margaret Tietz Ctr. for Nursing Care, Inc., 84 NY2d 841, 843 [1994 ]). Therefore, the portion of

Press's motion seeking summary judgment dismissing the plaintiff's claim brought pursuant to

Labor Law § 240 (1) is granted and that claim is dismissed as against Press.

3. Plaintiff's Claim Pursuant to Labor Law§ 241(6)

Labor Law§ 241 (6) provides:

"All contractors and owners and their agents, ... when constructing

or demolishing buildings or doing any excavating in connection

therewith, shall comply with the following requirements:

***

(6) All areas in which construction, excavation or demolition

work is being performed shall be so constructed, shored,

[and] equipped ... as to provide reasonable and adequate

protection and safety to the persons employed therein or

lawfully frequenting such places."

Labor Law § 241 (6) imposes a nondelegable duty of reasonable care upon owners and

contractors "'to provide reasonable and adequate protection and safety' to persons employed in,

or lawfully frequenting, all areas in which construction, excavation or demolition work is being

performed" (Rizzuto v L.A. Wenger Contr. Co., 91 NY2d 343,348 [1998]; see also Ross v

Curtis-Palmer Hydro-Electric Co., 81 NY2d at 501-502).

To sustain a Labor Law§ 241 (6) claim, it must be established that the defendant violated

a specific, "concrete" implementing regulation of the Industrial Code, rather than a provision

containing only generalized requirements for worker safety (Ross, 81 NY2d at 505). violation

must be a proximate cause of the plaintiff's injuries (Yaucan v Hawthorne Vil., LLC, 155 AD3d

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 9 of23

Motion No. 006, 007

[* 9] 9 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

924, 926 [2d Dept 2017] ["a plaintiff must demonstrate that his or her injuries were

proximately caused by a violation of an Industrial Code regulation that is applicable to the

circumstances of the accident"]; see also Sutherlandv Tutor Perini Bldg. Corp., 207 AD3d 159,

161 [1st Dept 2022]). "Whether a regulation applies to a particular condition or circumstance is

a question of law for the court" (Harrison v State of New York, 88 AD3d 951, 953 [2d Dept

2011]).

Press argues the Labor Law 241 (6) claim should be dismissed because plaintiff has failed

to allege a specific violation of the Industrial Code required for this statute to apply and OSHA

violations do not create liability pursuant to Labor Law § 241 (6). In its opposition to the motion,

plaintiff Sosa clarifies that there was a violation oflCR § 23-1. 7( e)(1) and (2), in that Press had

the responsibility to keep the area clear of tripping hazards but failed to do so, creating liability

pursuant to Labor Law § 241 ( 6). Press concedes that this claim survives its motion for summary

judgment as it pertains to violations of ICR § 23-1. 7(e )( 1) and (2).

B. Cross-Claims against Press

310 Group and Metro asserted cross-claims against Press for: ( 1) indemnification

pursuant to the contract between Press and Metro; (2) contribution and common-law

indemnification; and (3) breach of contract, for failure to procure the insurance required by the

contract between Press and Metro.

1. 310/Metro claims for contribution, common law indemnification

Press moves for summary judgment dismissing the cross claim for contribution and

common law indemnification. "To establish a claim for common-law indemnification, 'the one

seeking indemnity must prove not only that it was not guilty of any negligence beyond the

statutory liability but must also prove that the proposed indemnitor was guilty of some

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page IO of23

Motion No. 006, 007

[* 10] 10 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

negligence that contributed to the causation of the accident"' (Perri v Gilbert Johnson Enters.,

Ltd., 14 AD3d 681, 684-685 [2d Dept 2005], quoting Correia, 259 AD2d at 65). "Contribution

is available where two or more tortfeasors combine to cause an injury and is determined in

accordance with the relative culpability of each such person" (Godoy v Abamaster of Miami, 302

AD2d 57, 61 [2d Dept 2003] [internal quotation marks and citations omitted]).

Press argues that since a Centrifugal employee, Terry Hall, left the electrical cord out and

Press had no obligation to inspect the property pursuant to its agreement with Metro (the CMA),

Press is not liable for any negligence, and so has no obligation for contribution. Similarly, Press

claims not to be liable for common law indemnification because Centrifugal has direct liability

for the injury and Press did not supervise or control Centrifugal employees (Deposition

Testimony of Genaro Sosa, attached as Ex P to motion, NYSCEF Doc. No. 213, p 132;

Deposition Testimony of Abe Noy, Ex S to motion, NYSCEF Doc. No. 216, pp 79-80). In fact,

Press contends it was prohibited by the CMA from controlling the actions of Metro's

subcontractors. Press provides evidence Centrifugal was aware of Hall's safety violations and

failed to take action until after plaintiff was injured (Daily Log, attached as Ex CC to Motion ,

NYSCEF Doc. No. 226). Press states it was barred from supervising the contractors and 310

Group failed to do so.

310 Group, Metro, and Centrifugal (the Opposing Parties) argue Press's motion must fail

because Press has failed to make a prima facie case it was not negligent and Opposing Parties

were. Opposing Parties also argue Press was effectively the general contractor. Mr. Noy, owner

of Metro and a member of 310, states that he was the only person from either of those companies

onsite and he did not monitor or control the work (Aff of Abe Noy, filed in Motion Seq. No. 007,

NYSCEF Doc. NO. 194). the evidence cited by Sosa from the testimony of Mr. Noy, Opposing

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 11 of23

Motion No. 006, 007

[* 11] 11 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

Parties cite to the affidavit of Mr. Thomas Socha, Press's Construction Superintendent, who

testified that Press supervised the subcontractors, was responsible for safety on the jobsite, and

had the authority to stop work if its employees observed unsafe work (Attached as Exhibit T to

Affirmation of Adam J. Kipnis, NYSCEF Doc. No. 217 at 13, 15-16, 31 ).

As there is a disputed issue of material fact as to Press' s role at the job site, and what

Press's obligations were regarding supervising workers and workplace safety, Press's motion for

summary judgment on the cross-claims against it by 310 Group and Metro for contribution and

common law indemnification fail.

2. 310 Group/Metro claims for contractual indemnification

"A party is entitled to full contractual indemnification provided that the 'intention to

indemnify can be clearly implied from the language and purposes of the entire agreement and the

surrounding facts and circumstances"' (Karwowski v 1407 Broadway Real Estate, LLC, 160

AD3d 82, 87-88 [1st Dept 2018], quoting Drzewinski v Atlantic Scaffold & Ladder Co., 70 NY2d

774, 777 [1987]). "In contractual indemnification, the one seeking indemnity need only establish

that it was free from any negligence and was held liable solely by virtue of the statutory liability"

(Correia v Professional Data Mgt., 259 AD2d 60, 65 [1st Dept 1999]; see also Lexington Ins. Co.

v Kiska Dev. Group LLC, 182 AD3d 462,464 [1st Dept 2020][denying summary judgment

where indemnitee "has not established that it was free from negligence"]). Further, unless the

indemnification clause explicitly requires a finding of negligence on behalf of the indemnitor,

"[w]hether or not the proposed indemnitor was negligent is a non-issue and irrelevant"

(Correia, 259 AD2d at 65).

Press explains the only indemnification agreement it signed was in the CMA with Metro

and Centrifugal is not entitled to indemnification based on that agreement. Press also argues the

157148/2017 SOSA, GENARO vs. 3IO GROUP LLC Page 12 of23

Motion No. 006, 007

[* 12] 12 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

indemnification clause in the CMA is unenforceable because it violates General Obligations Law

§ 5-322.1, which states an agreement exempting owners and contractors for liability for their

own negligence is unenforceable, citing Brooks v Jud/au Contr., Inc. (11 NY3d 204, 207

[2008]). Further, Press contends, the clause in the CMA contract is fatally flawed because it

indemnifies Metro of its own ordinary negligence and lacks the saving language identified by

Brooks.

Opposing Defendants argue the clause is not rendered unenforceable by General

Obligations Law§ 5-322.1 when there is no evidence in this instance that the parties seeking to

enforce the clause were at fault. (Brown v Two Exch. Plaza Partners, 76 NY2d 172, 180

[ 1990]). As Press has not brought evidence to establish a prima facie case for 310 or Metro's

fault, they argue the contractual indemnity claim should survive summary judgment.

Third party defendants are correct that the First Department has held an indemnification

clause without the limitation language is still valid, even though it violates the rule in General

Obligations Law § 5-322.1, if the indemnitee is not negligent (Sande v Trinity Ctr. LLC, 206

AD3d 441,442 [1st Dept 2022]; Higgins v TST 375 Hudson. L.L.C., 179 AD3d 508, 511 [1st

Dept 2020]). There are issues of fact about which entity had responsibility for overseeing

worksite safety and which entities may have been negligent. Therefore, Press' motion for

summary judgment on the contractual indemnification claim fails.

3. Breach of Contract for Failure to Obtain Liability Insurance

Press argues that, as far as the insurance requirement is enforceable, Press fulfilled the

terms of its contract regarding insurance, as it was only required to obtain insurance coverage to

protect Metro and 310 Group from claims arising from Press' s work, which it did. There is

evidence in the record that shows Press did obtain insurance, Colony's reservation ofrights

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 13 of23

Motion No. 006, 007

13 of 23

[* 13]

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

letter, filed by 310 Group and Metro (Attachment B to Yllanes Aff., NYSCEF Doc. No. 230).

Press claims Metro and 310 Group misinterpret the language of the agreement to require Press to

provide insurance covering the actions of their own subcontractor. That obligation fell to Metro.

310 Group and Metro contend the indemnification clause in the Press contract is enforceable

because while General Obligations Law§ 5-322.1 does not allow 310 Group and Metro to be

protected from their own negligence, they could not have been negligent here, because it was not

their obligation to oversee the work site.

The reservation of rights letter from Colony shows Press had obtained insurance. It does

not establish, however, whether the insurance purchased fulfils the requirements of the CMA. It

is also, as discussed above, a disputed issue of material fact what Press' s responsibilities were at

the site, whether Press or Metro was responsible for supervising workers and monitoring safety

issues at the site, and who, if anyone, was negligent. Therefore, the portion of the motion

seeking summary judgment dismissing the claim for breach of contract for failure to obtain

insurance is also denied.

C. Press's claim against Centrifugal for indemnification.

Press also moves for summary judgment on its claim for contractual or common-law

indemnification against Centrifugal. Press claims to be a third-party beneficiary of Centrifugal' s

contract with ZDG as that agreement classifies ZDG, the original construction manager, and its

successors as indemnitees. (Subcontractor Agreement, attached as Exhibit BB to the Affidavit of

Adam J. Kipnis, NYSCEF Doc. No. 225). Metro signed an Assumption and Assignment of

Contract with Centrifugal as "Owner's new Contractor/Construction Manager" (see Ex Z). That

contract was assigned to Metro but Press claims to be the new construction manager and

successor to ZDG (Raymond Hanratty Tr. of 7/20/21, attached as Exhibit R to the Affidavit of

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 14 of23

Motion No. 006, 007

14 of 23

[* 14]

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

Adam J. Kipnis, NYSCEF Doc. No. 215, at 19-20). Therefore, Press claims section 22.1 of the

Subcontractor Agreement requires Centrifugal to defend and indemnify Press, as the new

construction manager. Alternatively, Press argues it is a consultant, which Centrifugal was also

obligated to indemnify. Therefore, Press claims it is entitled to contractual indemnification for

Centrifugal's negligence in failing to more closely supervise Terry Hall, who left out

Centrifugal's extension cord, after receiving notice of the risks he created. Alternatively, Press

seeks common law indemnification from Centrifugal, arguing Press did not have supervisory

responsibilities over either Terry Hall who left out the cord or the plaintiff who tripped on it, so

Press is not a wrongdoer here and Centrifugal owes it common law indemnification.

Centrifugal contends Press's common law indemnification claim is barred by New York

Workers' Compensation Law§ 11, which limits Centrifugal's liability to the worker's

compensation insurance benefits it provided Soto and states generally, "[a]n employer shall not

be liable for contribution or indemnity to any third person based upon liability for injuries

sustained by an employee acting within the scope of his or her employment for such employer

unless such third person proves through competent medical evidence that such employee has

sustained a 'grave injury."' As plaintiff only suffered a hip fracture and knee tear, he did not

sustain a grave injury. According to Centrifugal, the Subcontractor Agreement was assumed by

Metro, which was named the "new Contractor/Construction Manager" replacement construction

manager, according to the Assignment, and so Metro would be a beneficiary of its terms, rather

than Press (Assignment to Metro, Ex Z to Kipnis Aff, NYSCEF Doc. No. 223). Centrifugal

argues Press is also neither a third party beneficiary of the Subcontractor Agreement nor ZDG's

successor in interest.

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 15 of 23

Motion No. 006, 007

[* 15] 15 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

Press contends that the agreement between Metro and Press conveyed the role of

construction manager to Press, and the contractual right to indemnification with it. Alternatively,

Press points out it is a consultant, which is another category of contractor entitled to

indemnification under the Subcontractor Agreement.

As there are disputed issues of material fact regarding Press's status and responsibilities

for the project, and thus disputes about which parties were negligent, Press' motion seeking

summary judgment against Centrifugal on the indemnification claims is denied.

D. Plaintiffs Cross-Motion for Summary Judgment on the Labor Law§ 241(6)

claim

Plaintiff Sosa cross-moves for summary judgment on his claims against 310 Group,

Metro, and Press brought pursuant to Labor Law§ 241(6), which provides:

"All contractors and owners and their agents, ... when constructing or

demolishing buildings or doing any excavating in connection therewith, shall

comply with the following requirements: ...

6. All areas in which construction, excavation or demolition work is being

performed shall be . . . operated and conducted as to provide reasonable and

adequate protection and safety to the persons employed therein or lawfully

frequenting such places."

Sosa argues the site failed to provide "reasonable and adequate protection and safety" because it

violated the Industrial Code of the State of New York§ 23-l.7(e), which states:

"(e) Tripping and other hazards.

(1) Passageways. All passageways shall be kept free from accumulations of dirt

and debris and from any other obstructions or conditions which could cause

tripping."

Press argues first that plaintiff Sosa has never asserted a Labor Law § 241 (6) claim

against Press, but the Second Amended Verified Complaint does allege "defendants violated"

that statute. While Press is not named specifically, there is a colorable argument that the claim

was asserted against all named defendants. Press then argues that if the claim survives Press's

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 16 of23

Motion No. 006, 007

[* 16] 16 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

motion for summary judgment, plaintiffs motion for summary judgment must fail because there

is no evidence Mr. Hall left the electrical cord on the floor in the hallway for any particular

amount of time, and there is an issue of act as to whether the cord was an "integral part of the

work being performed" (McDonagh v Victoria's Secret, Inc., 9 AD3d 395, 396-97 [2d Dept

2004]). Here, there are issues of disputed material fact as to whether the dangerous condition

was avoidable or "inherent to the task at hand" (Bazdaric v Almah Partners LLC, 41 NY 3d 310,

320 [2024]). Accordingly, the plaintiffs cross-motion for summary judgment is denied.

IV. Motion Sequence 007

In Motion Sequence 007, 310 Group, Metro, and Centrifugal move together for summary

judgment dismissing plaintiffs Labor Law § 200 common law negligence claim and plaintiffs

labor law§ 240(1) claim, granting the movants summary judgment on their indemnification

counterclaims against Press, dismissing Press' s common law indemnification crossclaim and

counterclaim against movants, and dismissing Press' s claims against Centrifugal for contractual

indemnification, breach of contract, and common law indemnification and contribution.

A. Sosa's Labor Law§ 200/ Common Law Negligence Claim

Movants contend that for this claim to succeed against a property owner or general

contractor, a plaintiff must show the property owner or general contractor either created the

dangerous condition or had actual or constructive notice of the condition (Garcia v DPA Wallace

Ave. I, LLC, 101 AD3d 415,417 [1st Dept 2012]). However, Garcia provides for liability to

accrue to the person "with authority to control the activity bringing about the injury" (id.). Here,

it is undisputed the extension cord belonged to Centrifugal and was left on the floor by a

Centrifugal employee (Memo, NYSCEF Doc. No. 159, at para 33, Exhibits "U" at 25:20-25,

31:10-14 and "J" at 40:10-15; Noy Affidavit, i)8). However, the roles of the movants on site are

157148/2017 SOSA, GE1"ARO vs. 310 GROUP LLC

Motion No. 006, 007

Page 17 of23

[* 17] 17 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

disputed and issues of fact remain, as discussed above. Therefore, this portion of the motion is

granted and the plaintiff's claim pursuant to Labor Law § 200/common law negligence will

survive.

B. Sosa's Labor Law§ 240(1) Claim

As discussed above, Labor Law § 240(1 ), the Scaffold Law, does not apply to this case,

as there was no hazard of the type contemplated by that law and no failure to use the

corresponding scaffolding, harness, or other gear. This portion of the motion is granted, and this

claim dismissed as against movants.

C. Contractual Indemnification Claims between Metro/310 and Press

Movants seek summary judgment on their claim against Press for contractual

indemnification pursuant to the Construction Management Agreement between Metro, as

General Contractor, and Press, as Construction Manager, dated December 15, 2016 (CMA,

attached as Exh Y to the Affirmation of Megan Yllanes, NYSCEF Doc. No. 159). Movants rely

on Article 9 of the CMA, which provides:

"PRESS agrees to indemnify, defend and hold harmless METRO, 310 Group,

LLC, Helm Management, Inc. and their respective members, officers, directors,

employees, representatives, and agents (collectively, the "Indemnified Parties"),

against any and all claims, losses, damages, liabilities costs or expenses

(including, without limitation, attorney's fees and costs of litigation and or

settlement, whether incurred as a result of a claim by a third party or an

indemnitee hereunder) arising out of the Services performed pursuant to this

Agreement or occurring in connection with the Project or the construction of the

Project, except to the extent arising out of the gross negligence or willful

misconduct of the Indemnified Party that is seeking to be indemnified."

Movants contend plaintiff's injury occurred in connection with the Project, so movants should be

indemnified by Press, regardless of whether any party's negligence can be established.

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 18 of 23

Motion No. 006, 007

18 of 23

[* 18]

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

Press argues movants misinterpret the clause and points out that the indemnification

requirements are mutual. That section later states that

"METRO agrees to indemnify, defend and hold harmless PRESS and their

respective officers, directors, employees, representatives, and agents against any

and all claims, losses, damages, liabilities, costs or expenses (including, without

limitation, attorney's fees and costs of litigation and or settlement) arising out of

the actions of METRO pursuant to this Agreement, except to the extent arising

out of the gross negligence at willful misconduct of PRESS."

"The fundamental rule of contract interpretation is that agreements are construed in

accord with the parties' intent. . . and '[t]he best evidence of what parties to a written

agreement intend is what they say in their writing' .... Thus, a written agreement that is clear

and unambiguous on its face must be enforced according to the plain terms, and extrinsic

evidence of the parties' intent may be considered only if the agreement is ambiguous [internal

citations omitted]" (Riverside South Planning Corp. v CRP/Extell Riverside LP, 60 AD3d 61, 66

[1 st Dept 2008], affd 13 NY3d 398 [2009]). Whether a contract is ambiguous presents a question

of law for resolution by the courts (id. at 67).

In accordance with these principles, a court should interpret a contract "so as to give full

meaning and effect to the material provisions" (Beal Savings Bank v Sommer, 8 NY 3d 318, 324

[2007], quoting Excess Ins. Co. Ltd. v Factory Mut. Ins. Co., 3 NY3d 577, 582 [2004]). "A

reading of a contract should not render any portion meaningless . . . . Further, a contract should

be read as a whole, and every part will be interpreted with reference to the whole; and if possible

it will be so interpreted as to give effect to its general purpose" (id. at 324-325, quoting Matter of

Westmoreland Coal Co. v Entech, Inc., 100 NY2d 352, 358 [2003]).

The sentence at issue, "claims ... arising out of the Services performed pursuant to this

Agreement or occurring in connection with the Project" has a grammatical ambiguity, whether

157148/2017 SOSA, GENARO vs. 310 GROUP LLC

Page 19 of23

Motion No. 006, 007

19 of 23

[* 19]

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

"occurring in connection with the Project" modifies "claims" or "Services." Movants effectively

argue it modifies "claims." Using movants' interpretation, Press would indemnify Metro for any

claims "occurring in connection with the Project," which would render the prior phrase

meaningless, as the requirement for Press to indemnify Metro for claims "arising out of the

Services performed pursuant to this Agreement" would be totally subsumed. Movant's

interpretation would also conflict with the remainder of that section of the CMA, in which Metro

agrees to indemnify Press for claims "arising out of the actions of METRO pursuant to this

Agreement." The interpretation which gives the terms of the indemnification section full force

and effect without making any portion meaningless is to interpret "occurring in connection with

the Project" to modify "Services," so Press provides indemnification for claims arising from its

services under the CMA or other services Press provides related to the Project. Therefore, this

portion of movants' motion for summary judgment is denied.

D. Common Law Indemnification

Movants seek summary judgment dismissing Press's cross and counterclaims against

defendants for common law indemnification. "[I]n the case of common-law indemnification, the

one seeking indemnity must prove not only that it was not guilty of any negligence beyond the

statutory liability but must also prove that the proposed indemnitor was guilty of some

negligence that contributed to the causation of the accident for which the indemnitee was held

liable to the injured party by virtue of some obligation imposed by law, such as the nondelegable

duty imposed by Labor Law§ 240 (l)" (Correia v Professional Data Mgt., Inc., 259 AD2d 60,

65 [1st Dept 1999]). As discussed above, issues of fact exist as to whether movants were

negligent, therefore their motion for summary judgment dismissing these claims is denied.

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 20 of23

Motion No. 006, 007

[* 20] 20 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

E. Dismissing Contractual Indemnification Claims Against Centrifugal

Press claims to be entitled to indemnification from Centrifugal pursuant to the

subcontract between ZDG LLC and Centrifugal. Movants seek summary judgment on this claim

on the ground that Press is neither a named beneficiary nor an intended third-party beneficiary of

Centrifugal's subcontract. Press argues the Centrifugal/ZOO agreement, (attached as Ex. BB to

Opposition, NYSCEF Doc. No. 264), required Centrifugal to indemnify or cover as additional

insureds a list of parties, including the "CM" or construction manager (Id. 'ii 109). Press explains

that ZDG was the construction manager at that time, and the counterparty to that agreement, but

that Press took over that position and so was entitled to that indemnification. Press also relies on

a Certificate of Liability Insurance naming Centrifugal as the named insured and Press as an

additional insured (Ex. FF to Opposition, NYSCEF Doc. No. 268), and the deposition testimony

of Raymond Hanratty in which Hanratty confirms Press is listed on an insurance certificate as an

additional insured (attached as Ex R to Opposition, NYSCEF Doc. No. 254, pp 35-9).

Defendants contend Metro took over the subcontract with Centrifugal and was the new

Construction Manager and that Metro acquired ZDG's rights, not Press. As discussed above,

there are disputed issues of fact regarding Press' role in the project. Therefore, material issues of

fact exist and the motion for summary judgment on this claim is denied.

F. Common Law Indemnification/Contribution Claims against Centrifugal

Movants seek summary judgment dismissing Press's common law indemnification and

contribution claims against Centrifugal for the portion of plaintiffs damages that were caused by

Centrifugal. They point out that plaintiff filed for Workers' Compensation benefits, so was

barred from suing his employer pursuant to New York Workers' Compensation Law and argue

that Centrifugal only has liability to third parties, such as Press, when the plaintiff was gravely

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 21 of 23

Motion No. 006, 007

[* 21] 21 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

injured or the employer and the third party had a written contract for indemnification or

contribution (New York Workers' Compensation Law § 11 ). Movants argue that plaintiff's

injuries do not qualify as grave, entitling Centrifugal to the protection of the Workers'

Compensation Law. Press points to the subcontractor agreement between ZDG and Centrifugal,

which provides for indemnification but not contribution, to which Press claims to be a successor

for ZDG.

The language in the Workers' Compensation Law§ 11 gives an employer an exemption

from liability for contribution or indemnity, except those terms

"shall not include a claim or cause of action for contribution or indemnification

based upon a provision in a written contract entered into prior to the accident or

occurrence by which the employer had expressly agreed to contribution to or

indemnification of the claimant or person asserting the cause of action for the type

of loss suffered"

(Workers' Compensation Law§ 11 ). This clause exempts Centrifugal, the plaintiffs employer,

from common law, but not contractual, claims for indemnification and contribution. Therefore,

this portion of the motion for summary judgment is granted and the claim for common law

indemnification and contribution is dismissed.

V. CONCLUSION

For the reasons discussed above it is hereby

ORDERED that Press Builders, Inc.'s Motion for Summary Judgment (006) is hereby

granted in part and denied in part in that, in the plaintiffs claim brought pursuant to Labor Law

§ 200 is dismissed, his claim brought pursuant to Labor Law § 240(1) is dismissed, and his claim

brought pursuant to Labor Law§ 241(6) survives as far as it is brought pursuant to ICR § 23-1/7

(e) (l)and (2) and otherwise dismissed. Further, the cross-claims brought against Press by 3 IO,

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 22 of23

Motion No. 006, 007

[* 22] 22 of 23

INDEX NO. 157148/2017

NYSCEF DOC. NO. 309 RECEIVED NYSCEF: 07/15/2024

Metro, and Centrifugal survive, except for the claim brought by Centrifugal for contractual

indemnification, which is dismissed. And it is further

ORDERED that the cross-motion made by plaintiff (006) for summary judgment on the

claim brought pursuant to Labor Law§ 241(6) is hereby denied and the claim will survive. And

it is further

ORDERED that the motion made by 310, Metro, and Centrifugal (007) is granted in part

and denied in part in that the portion of the motion seeking summary judgment dismissing the

plaintiffs Labor Law §240(1) claim and the portion of the motion seeking summary judgment

dismissing Press' s common law indemnification and contribution claims against Centrifugal are

granted and those claims are dismissed and the motion is otherwise denied.

This constitutes the decision and order of the Court.

7/12/2024

DATE ALEXANDER M. TISCH, J.S.C.

~

CHECK ONE: CASE DISPOSED NON-FINAL DISPOSITION

GRANTED □ DENIED GRANTED IN PART □ OTHER

APPLICATION: SETTLE ORDER SUBMIT ORDER

CHECK IF APPROPRIATE: INCLUDES TRANSFER/REASSIGN FIDUCIARY APPOINTMENT □ REFERENCE

157148/2017 SOSA, GENARO vs. 310 GROUP LLC Page 23 of23

Motion No. 006, 007 ·

[* 23] 23 of 23