“[P]reambles describing the use of an invention generally do not limit the claims because the patentability of apparatus or composition claims depends on the claimed structure, not on the use or purpose of that structure.”
How later courts described this case
- “[P]reambles describing the use of an invention generally do not limit the claims because the patentability of apparatus or composition claims depends on the claimed structure, not on the use or purpose of that structure.”
- “‘[O]ptimiz[ing] . . . QoS’ is a ‘term of degree’ that . . . is ‘purely subjective’ . . . .”
- preamble phrase “[a] personal recreational vehicle” not limiting because it described conventional, rather than inventive, aspects of the claimed invention
- “In the absence of any evidence to the contrary, we must presume that the use of these different terms in the claims connotes different meanings.”
Written by the judges who cited it.
The opinion
IN THE UNITED STATES DISTRICT COURT
FOR THE NORTHERN DISTRICT OF TEXAS
DALLAS DIVISION
NABORS DRILLING TECHNOLOGIES §
USA, INC., §
§
Plaintiff, §
§ Civil Action No. 3:20-cv-03126-M
v. §
§
HELMERICH & PAYNE INTERNATIONAL §
DRILLING CO., et al., §
§
Defendants. §
CLAIM CONSTRUCTION MEMORANDUM OPINION AND ORDER
This Order addresses the claim construction disputes presented by Plaintiff and Counter-
Defendant Nabors Drilling Technologies USA, Inc. (“Nabors”) and Defendants and Counter-
Claimants Helmerich & Payne International Drilling Co., Helmerich & Payne Technologies
LLC, and Motive Drilling Technologies, Inc. (collectively, “H&P”) in Nabors Drilling
Technologies USA, Inc. v. Helmerich & Payne International. Drilling Co., et al., Case No. 3:20-
cv-03126. Having considered the arguments and evidence presented by the parties at the claim
construction hearing, the Court issues this Order addressing claim construction disputes as to the
patents asserted by Nabors. The Court will shortly issue a separate order addressing the claim
construction disputes covering the patents asserted by H&P.
I. BACKGROUND
This is a patent infringement lawsuit between two providers of drilling services in the oil
and gas industry. Nabors and H&P each assert patents generally relating to systems and methods
for computerized drilling control and rotary steerable systems.
Nabors asserts that H&P infringes certain claims of seven asserted patents: U.S. Patent
No. 7,802,634 (“the ’634 Patent”), U.S. Patent No. 7,823,655 (“the ’655 Patent”), U.S. Patent
No. 7,860,593 (“the ’593 Patent”), U.S. Patent No. 8,360,171 (“the ’171 Patent”), U.S. Patent
No. 8,510,081 (“the ’081 Patent”), U.S. Patent No. 8,528,663 (“the ’663 Patent”), and U.S.
Patent No. 10,672,154 (“the ’154 Patent”) (collectively, the “Nabors asserted patents”). Am.
Compl. (ECF No. 37) ¶ 30. For purposes of this Order, the parties seek agreed constructions for
terms in the ’634, ’655, and ’081 patents, and dispute the meaning of certain claim terms in the
’593, ’171, ’663, and ’154 patents, which are discussed in more detail below.
After Nabors filed suit, H&P filed petitions to institute inter partes review (“IPR”)
challenging all asserted claims in the Nabors asserted patents. ECF No. 87. The Patent Trial and
Appeal Board (“PTAB”) has instituted review of the ’593 patent, and declined to institute review
of the remaining Nabors asserted patents, namely the ’663, ’655, ’081, ’171, ’634, and ’154
patents.1 See ECF Nos. 103, 104, 112.
II. LEGAL STANDARD
A. General Principles of Claim Construction
The construction of disputed claims is a question of law for the court. Markman v.
Westview Instruments, Inc., 52 F.3d 967, 971–72 (Fed. Cir. 1995), aff’d, 517 U.S. 370 (1996).
“Ultimately, the interpretation to be given a term can only be determined and confirmed with a
full understanding of what the inventors actually invented and intended to envelop with the
1 Helmerich & Payne Int’l Drilling Co. v. Nabors Drilling Techs. USA, Inc., IPR2021-01044, Paper No. 11 (PTAB
Jan. 4, 2022) (’663 patent); Helmerich & Payne Int’l Drilling Co. v. Nabors Drilling Techs. USA, Inc., IPR2021-
01043, Paper No. 12 (PTAB Dec. 10, 2021) (’154 patent); Helmerich & Payne Int’l Drilling Co. v. Nabors Drilling
Techs. USA, Inc., IPR2021-01018, Paper No. 11 (PTAB Dec. 9, 2021) (’634 patent); Helmerich & Payne Int’l Drilling
Co. v. Nabors Drilling Techs. USA, Inc., IPR2021-00897, Paper No. 12 (PTAB Nov. 10, 2021) (’171 patent);
Helmerich & Payne Int’l Drilling Co. v. Nabors Drilling Techs. USA, Inc., IPR2021-00671, Paper No. 12 (PTAB Oct.
1, 2021) (’081 patent); Helmerich & Payne Int’l Drilling Co. v. Nabors Drilling Techs. USA, Inc., IPR2021-00621,
Paper No. 12 (PTAB Sept. 21, 2021) (’655 patent).
claim.” Phillips v. AWH Corp., 415 F.3d 1303, 1316 (Fed. Cir. 2005) (en banc) (citation
omitted). Accordingly, a proper construction “stays true to the claim language and most
naturally aligns with the patent’s description of the invention.” Id. (citation omitted).
“It is a ‘bedrock principle’ of patent law that ‘the claims of a patent define the invention
to which the patentee is entitled the right to exclude.’” Phillips, 415 F.3d at 1312 (quoting
Innova/Pure Water, Inc. v. Safari Water Filtration Sys., Inc., 381 F.3d 1111, 1115 (Fed. Cir.
2004)). Courts first “look to the words of the claims themselves . . . to define the scope of the
patented invention.” Vitronics Corp. v. Conceptronic, Inc., 90 F.3d 1576, 1582 (Fed. Cir. 1996)
(citation omitted). The claim terms are “generally given their ordinary and customary meaning,”
but “a patentee may choose to be his own lexicographer and use terms in a manner other than
their ordinary meaning, as long as the special definition of the term is clearly stated in the patent
specification or file history.” Id. (citation omitted). The “ordinary and customary meaning” of
the terms in a claim is “the meaning that the term[s] would have to a person of ordinary skill in
the art in question at the time of the invention.” Phillips, 415 F.3d at 1313.
When the meaning of a term to a person of ordinary skill in the art is not apparent, a court
is required to consult other sources, including “the words of the claims themselves, the remainder
of the specification, the prosecution history, extrinsic evidence concerning relevant scientific
principles, the meaning of technical terms, and the state of the art.” Id. (citation omitted). A
court must consider the context in which the term is used in an asserted claim or related claims in
the patent, being mindful that “the person of ordinary skill in the art is deemed to read the claim
term not only in the context of the particular claim in which the disputed term appears, but in the
context of the entire patent, including the specification.” Id. The specification is “always highly
relevant to the claim construction analysis” and is “the single best guide to the meaning of a
disputed term.” Id. at 1315 (quoting Vitronics, 90 F.3d at 1582). For example, should the
specification reveal that a claim term has been given a special definition by the patentee that is
different from the ordinary meaning of the term, the inventor’s lexicography is controlling. Id. at
1316. Furthermore, if the specification reveals an intentional disclaimer or disavowal of claim
scope by the patentee, the claim scope dictated by the specification is controlling. Id.
Finally, in construing claims, a court may consult extrinsic evidence, including “expert
and inventor testimony, dictionaries, and learned treatises.” Phillips, 415 F.3d at 1317 (citing
Markman, 52 F.3d at 980). Technical dictionaries may assist a court in “‘better understand[ing]
the underlying technology’ and the way in which one of skill in the art might use the claim
terms.” Id. at 1318 (quoting Vitronics, 90 F.3d at 1584 n.6). Expert testimony may also be
helpful to “provide background on the technology at issue, to explain how an invention works, to
ensure that the court’s understanding of the technical aspects of the patent is consistent with that
of a person of skill in the art, or to establish that a particular term in the patent or the prior art has
a particular meaning in the pertinent field.” Id. (citation omitted).
Although extrinsic evidence may “shed useful light on the relevant art,” it is considered
“less significant than the intrinsic record.” Id. at 1317 (quoting C.R. Bard, Inc. v. U.S. Surgical
Corp., 388 F.3d 858, 862 (Fed. Cir. 2004)). More simply, “extrinsic evidence may be useful to
the court, but it is unlikely to result in a reliable interpretation of patent claim scope unless
considered in the context of the intrinsic evidence.” Id. at 1319. Accordingly, “a court should
discount any expert testimony ‘that is clearly at odds with the claim construction mandated by
the claims themselves, the written description, and the prosecution history, in other words, with
the written record of the patent.’” Id. at 1318 (quoting Key Pharms. v. Hercon Labs. Corp., 161
F.3d 709, 716 (Fed. Cir. 1998)).
B. Indefiniteness
Title 35, § 112(b) of the United States Code requires that a patent specification shall
“conclude with one or more claims particularly pointing out and distinctly claiming the subject
matter which the inventor or a joint inventor regards as the invention.” The Supreme Court has
held this definiteness provision “to require that a patent’s claims, viewed in light of the
specification and prosecution history, inform those skilled in the art about the scope of the
invention with reasonable certainty.” Nautilus, Inc. v. Biosig Instruments, Inc., 572 U.S. 898,
910 (2014). “The claims, when read in light of the specification and the prosecution history,
must provide objective boundaries for those of skill in the art.” Interval Licensing LLC v. AOL,
Inc., 766 F.3d 1364, 1371 (Fed. Cir. 2014). If a claim does not satisfy these requirements, it is
invalid as indefinite under § 112. Nautilus, 572 U.S. at 901. “[I]ndefiniteness is a question of
law and in effect part of claim construction.” ePlus, Inc. v. Lawson Software, Inc., 700 F.3d 509,
517 (Fed. Cir. 2012).
III. AGREED CONSTRUCTIONS
The parties have agreed to the following constructions to apply to the Nabors asserted
patents, as set forth in the Joint Claim Construction Chart. ECF No. 97.
Disputed Term Agreed Construction
“the electronic data” “data including quill position data, magnetic-based
• ’634 patent, claims 1, 7 toolface orientation data and gravity-based toolface
orientation data”
“at least one of gravity-based toolface “at least one gravity-based toolface orientation data and
orientation data and magnetic-based at least one magnetic-based toolface orientation data”
toolface orientation data”
• ’634 patent, claim 1
“user-viewable display” “display viewable to the directional driller”
• ’634 patent, claim 1
“a plurality of drilling operation “two or more parameters of a drilling operation other
parameters” than actual toolface orientation”
• ’655 patent, claim 1
“a drilling operation parameter” “a parameter of a drilling operation other than actual
• ’655 patent, claim 17 toolface orientation”
order of claim steps The method steps must occur in the order that they are
• ’593 patent, claim 19 written.
“a toolface advisory” “recommended toolface orientation”
• ’081 patent, claim 1
“configured to” “actually configured to and not merely capable to”
• ’154 patent, claims 1, 4, 6
IV. CONSTRUCTION OF DISPUTED TERMS
Of the Nabors asserted patents, the parties dispute the meaning of certain terms in the
’593, ’663, ’171, and ’154 patents. For each, the Court will first introduce the relevant patent
before discussing the disputed terms.
A. The ’593 patent: “Well prog execution facilitation system and method”
The ’593 patent discloses a system for “prog analysis and execution.” ’593 patent, at
2:9–10. The ’593 patent explains that “[a] well prognosis (prog) is generally understood in the
drilling industry to be a detailed and lengthy document containing specifications, goals, plans,
etc. for drilling and completing a well.” Id. at 1:6–9. The ’593 patent discloses a “project plan
execution system,” in which a computer system may be “operably coupled” with an interface
engine, an action item development engine, and a sensor engine, in which the computer system
receives and stores a project execution prog and communicates with these engines to analyze the
prog and control well drilling operations in according with the prog’s specifications. Id. at 2:1–
8. In doing so, the ’593 patent purports to improve prior art by providing an automated system
for compiling, analyzing, and executing well progs. Id. at 1:45–62.
The parties seek construction of one term in the ’593 patent, “receiving a well prog,”
which appears in asserted independent claim 19:
A method for controlling a well drilling operation, comprising:
receiving a well prog;
converting the well prog into a computer readable format;
assessing the converted well prog to identify action items;
associating a response with each identified action item; and
controlling a well drilling operation in accordance with the responses associated
with each identified action item from the well prog.
’593 patent, at 11:37–45 (emphasis added).
On October 18, 2021, the PTAB instituted review of claims 19–27 of the ’593 patent.
Helmerich & Payne Int’l Drilling Co. v. Nabors Drilling Techs. USA, Inc., IPR2021-00672,
Paper No. 11 (PTAB Oct. 18, 2021) (“’593 patent Inst. Dec.”). In doing so, the PTAB construed
“well prog” to have “its ordinary and customary meaning of a document containing information
for planning and chronicling the steps of drilling a well, and that the well prog may be in the
form of a non-computer readable document.” Id. at 14.
1. “receiving a well prog”
Disputed Term Nabors’s H&P’s Proposed The Court’s
Proposed Construction Construction
Construction
“receiving a well prog” Plain and ordinary receiving a Receiving a
• ’593 patent, claim 19 meaning, i.e., the document in a document, which
system receives a non-computer may be in a non-
well program readable format computer readable
/prognosis that contains format, that
information (a.k.a. specifications, contains
the well plan) goals, and plans information
for drilling and planning and
completing a well chronicling the
steps of drilling a
well
a. The Parties’ Positions
Nabors maintains that no construction of “receiving a well prog” is necessary in light of
the specification, which describes a well prog as being “generally understood” in the drilling
industry as “containing specifications, goals, plans, etc. for drilling and completing a well,” for
which there is no “universal standardization” for the format, structure, and content of a prog. See
ECF No. 88, at 11–12 (quoting ’593 patent, at 1:6–44, 4:9–15).
H&P contends that Nabors’s proposal improperly broadens the claim to include not just
receiving a well prog, but “some amorphous type of well prog ‘information.’” ECF No. 92 at 10.
Accordingly, H&P proposes a construction that clarifies that the well prog contains
“specifications, goals, and plans for drilling and completing a well.” In addition, H&P proposes
that, because claim 19 includes the step of “converting the well prog into a computer readable
format” after the well prog is received,2 the well prog must necessarily be received in a non-
computer readable format, else the “converting” step is superfluous.
b. The Court’s Construction
Here, the parties present two disputes regarding meaning of “receiving a well prog” in
claim 19 of the ’593 patent: first, what information is received; and second, whether the well
prog must be received in a computer-readable format.
As to the first issue, the Court finds that H&P’s proposed construction improperly
requires a well prog to consist of “specifications, goals, and plans for drilling and completing a
well,” contrary to the specification’s repeated teaching that there is no fixed standard or
requirement for what a well prog contains. E.g., ’593 patent, at 1:6–8 (a well prog is “generally
understood” to contain “specifications, goals, plans, etc.” (emphasis added)); id. at 1:29–31
(“[T]ypically . . . a drilling operation prog may include a general description of the well to be
drilled . . . .” (emphasis added)); id. at 1:32–44 (“[O]ther activities generally detailed in a prog
may include operational instructions based on well depth, spud depth, . . . filing of governmental
forms, . . . when to order more pipe or cement, . . . etc.”); id. at 4:9–19 (“A well prognosis, or a
2 As stated above, the parties agree that the claimed steps of this method claim must be performed in the order recited
in claim 19. See ECF No. 97.
well program, . . . is generally known to be a detailed document containing the information
various experts contribute to plan for and chronicle the steps of drilling a well, which in general
includes all aspects surrounding the creation of an operational well, including planning, drilling,
and completing.” (emphasis added)); id. at 7:17–19 (“An exemplary prog excerpt 400 is shown
in FIG. 4, which illustrates the plurality of details and specifications that may be contained in a
prog.” (emphasis added)).
In light of the specification’s repeated characterization of a well prog in broad, general,
and unrestrictive terms, H&P’s proposed construction not only impermissibly narrows the
meaning of “well prog” to one isolated description, but also rigidly requires that the well prog
contain specifications, goals, and plans, as opposed to some other combination of information
that may appear in a prog, as contemplated by the specification. In addition, the Court finds that
H&P’s concerns about “some amorphous type of well prog ‘information,’” in Nabors’s proposed
construction are disingenuous, given that H&P advocates construing well prog with equally
amorphous and undefined terms such as “goals” and “plans.”
H&P points to the following disclosure in the specification as grounds for its
construction, arguing that Nabors’s proposal disregards the fact that each prog contains “critical
information,” which H&P contends it collectively describes as “specification, goals, and plans
for drilling and completing a well”:
[D]espite the distinctive structure and format of progs, there are certain types of
information, generally referred to herein as critical information, that are generally
included in every prog. Critical information may be distinguishable or identified by
particular elements in the prog, such as words, characters, symbols, or phrases that
are generally associated with the particular critical information. These identifying
elements generally indicate to one skilled in the drilling art that a particular event,
activity, routine, occurrence, or other happening, within the drilling operation is
being addressed in the prog.
’593 patent, at 1:12–23.
However, the Court concludes that this description of “critical information” does not
support H&P’s proposal. First, this passage contemplates that a well prog may address a
particular event within the drilling operation, and thus implicitly suggests that a well prog need
not be always directed toward drilling and completing a well, as opposed to some other discrete
event or happening within a drilling operation. Cf. id. at 7:3–5 (“[T]ypical activities . . .
described in a project execution prog include any activity understood to one skilled in the art to
relate to execution of the project (drilling the well).” (emphasis added)). Second, this passage
indicates although each well prog may contain critical information, it does not suggest that what
qualifies as critical information is consistent across all progs, or even that “specifications, goals,
and plans” qualify as critical information as described in the ’593 patent.
Regarding the second issue, H&P is correct that the language of claim 19 recites
“receiving a well prog” and then “converting the well prog into a computer readable format,”
which could suggest that because the prog received is converted into a format that is computer
readable, it is received in a non-computer readable format. See ’593 patent, cl. 19. However,
that logic does not extend to unasserted claim 15, which contains the disputed term “receiving a
well prog” but does not describe converting it into a computer readable format. Id. at cl. 15.3
H&P contends that claim 15 and claim 19 cover different embodiments of the invention
disclosed in the ’593 patent, namely that claim 15 covers an embodiment involving copying a
text data file into a computer system, which Nabors contends would necessarily involve
receiving the well prog in a computer readable format. See ECF No. 92 at 11-12. In doing so,
3 Claim 15 of the ’593 patent recites: “A non-transitory computer program embodied on a computer readable medium,
wherein the computer program is configured to control a method for analyzing a well prog, comprising: receiving a
well prog; analyzing the well prog, determining and marking potential events, and determining action items
corresponding to identified potential events in the well prog; and controlling a well drilling operation in accordance
with the determined action items from the well prog.”
H&P seemingly argues that “receiving a well prog” in claim 15 means something different than
in claim 19. However, there is a presumption that “the same terms appearing in different
portions of the claims should be given the same meaning unless it is clear from the specification
and prosecution history that the terms have different meanings at different portions of the
claims.” PODS, Inc. v. Porta Stor, Inc., 484 F.3d 1359, 1366 (Fed. Cir. 2007); see also Phillips,
415 F.3d at 1314 (“Because claim terms are normally used consistently throughout the patent,
the usage of a term in one claim can often illuminate the meaning of the same term in other
claims.”). H&P has identified nothing in the specification or the prosecution history suggesting
that “receiving a well prog” means anything different in claim 19 than claim 15.
Nor does the specification support construing “receiving a well prog” as being limited to
a non-computer readable format. As discussed, the specification explains that “each company’s
format and structure [for progs] is generally distinct,” and there is no express requirement that a
prog be in a non-computer readable format, such as being a paper copy, as opposed to some
digital or electronic version. See ’593 patent, at 1:11–12. Nor does H&P point to extrinsic
evidence, such as expert testimony, indicating that a POSITA would understand a well prog to
refer exclusively to a non-computer readable or paper document. As acknowledged by H&P, the
specification describes an embodiment involving “copying a text data file into the computer
system” as a means of entering a prog into a computer system, which indicate that the prog could
be a data file. Id. at 6:58–61. At most, the specification is clear that the definition of a well prog
includes non-computer readable progs, such as a hard copy document, but there is no support
that a well prog is exclusively limited to non-computer readable formats.4
4 The Court notes that the PTAB reached a similar conclusion, interpreting claim 19 in the ’593 patent as providing
that “the well prog may be in the form of a non-computer readable document,” but was not required to be in a non-
computer readable format. See ’593 patent Inst. Dec. at 13–14.
H&P’s proposed construction is effectively an effort to import what is essentially the
infringement inquiry into claim construction; to the extent claim 19 recites a “converting” step,
the relevant inquiry is whether the patentee can establish that that step is performed by the
accused infringer as part of the claimed method, and not whether “well prog” must be construed
as being received in a certain format prior to conversion. The Court declines to add an additional
limitation to the meaning of “well prog” by implication.
To that end, the Court finds that the remainder of Nabors’s proposed construction—“i.e.,
the system receives a well program/prognosis information (a.k.a. the well plan)”—provides
minimal, if any, additional clarification beyond what is already apparent from the plain language
of the term and the ample descriptions of well progs in the specification. Accordingly, the Court
declines to adopt Nabors’s proposal in full, and instead construes “receiving a well prog” as the
PTAB did, as having its ordinary and customary meaning of receiving a document, which may
be in a non-computer readable format, that contains information planning and chronicling the
steps of drilling a well.
B. The ’663 patent: “Apparatus and methods for guiding toolface orientation”
The ’663 patent discloses an apparatus and methods for guiding a directional and/or
horizontal drilling operation. The ’663 patent describes a number of factors that will cause a
well to be drilled on or off course, and purports to address a long-felt need in the prior art to
more accurately guide and help a driller keep the wellbore toolface in the correct orientation and
to keep the well on target. ’663 patent, at 2:45–57. The specification describes a drilling
apparatus, a receiving apparatus, and a display apparatus, and discloses various embodiments to
assist a human operator in obtaining, monitoring, and adjusting the drilling direction. Id. at
2:61–4:3.
The parties identify two claim construction disputes relating to the ’663 patent: first,
whether the preamble in claim 12—“a method of directing a drilling operation in a wellbore”—is
limiting, and second, the meaning of “the recommended toolface orientation” in claims 12, 14,
15, 17, and 20. Claim 12 is an independent claim, from which claims 14, 15, 17, and 20 all
depend. Claim 12 recites:
A method of directing a drilling operation in a wellbore comprising:
[a] operating a drilling apparatus;
[b] receiving and displaying electronic data, wherein the electronic data
includes [1] quill position data, [2] actual toolface orientation data, and
[3] recommended toolface orientation data; and
[c] adjusting the drilling apparatus to move the toolface toward the
recommended toolface orientation.
Id. at cl. 12 (emphasis added).
1. “a method of directing a drilling operation in a wellbore”
Disputed Term Nabors’s H&P’s Proposed The Court’s
Proposed Construction Construction
Construction
“a method of directing a The preamble is The preamble is The preamble is
drilling operation in a not limiting limiting not limiting
wellbore”
• ’663 patent, claim 12
a. The Parties’ Positions
Nabors contends that claim 12’s preamble is not limiting, pointing to the presumption
that claim preambles are not normally limiting. See ECF No. 88, at 23 (citing Georgetown Rail
Equip. Co. v. Holland L.P., 867 F.3d 1229, 1236 (Fed. Cir. 2017)). H&P responds that the “in a
wellbore” language in the preamble is limiting because it gives meaning to the body of the claim
and defines the invention.
b. The Court’s Construction
“Whether a preamble stating the purpose and context of the invention constitutes a
limitation of the claimed process is determined on the facts of each case in light of the overall
form of the claim, and the invention as described in the specification and illuminated in the
prosecution history.” Applied Materials, Inc. v. Advanced Semiconductor Materials Am., Inc.,
98 F.3d 1563, 1572–73 (Fed. Cir. 1996). “A preamble is not a claim limitation if the claim body
‘defines a structurally complete invention . . . and uses the preamble only to state a purpose or
intended use for the invention.’” Georgetown Rail, 867 F.3d at 1236; see also Marrin v. Griffin,
599 F.3d 1290, 1294 (Fed. Cir. 2010) (“[U]se descriptions . . . are rarely treated as claim
limitations.”); Catalina Mktg. Int'l, Inc. v. Coolsavings.com, Inc., 289 F.3d 801, 809 (Fed. Cir.
2002) (“[P]reambles describing the use of an invention generally do not limit the claims because
the patentability of apparatus or composition claims depends on the claimed structure, not on the
use or purpose of that structure.”).
Here, the preamble’s recitation of “a method of directing a drilling operation in a
wellbore” is a statement of intended use of the claimed method, and identifies no additional steps
or structure for the claimed method. Put differently, the preamble is not limiting because
“deletion of the preamble phrase does not affect the structure or steps of the claimed invention.”
Catalina, 289 F.3d at 809. Moreover, “a drilling operation in a wellbore” is not an inventive or
patentably distinct aspect of the claimed invention, as the specification recognizes that drilling
operations, including directional or horizontal drilling, are conventional. E.g., ’663 patent, at
2:43–46; see also Arctic Cat Inc. v. GEP Power Prod., Inc., 919 F.3d 1320, 1329–30 (Fed. Cir.
2019) (preamble phrase “[a] personal recreational vehicle” not limiting because it described
conventional, rather than inventive, aspects of the claimed invention).
2. “the recommended toolface orientation”
Disputed Term Nabors’s H&P’s Proposed The Court’s
Proposed Construction Construction
Construction
“the recommended toolface Plain and ordinary “displayed Plain and ordinary
orientation” meaning, e.g., the recommended meaning, e.g., the
• ’663 patent, claims 12, recommended or toolface recommended or
14–15, 17, 20 desired toolface orientation that desired toolface
orientation, a.k.a. depends on the orientation, also
toolface advisory. recommended known as
(See ‘081 Patent, toolface “toolface
Claim 1) orientation data” advisory”
a. The Parties’ Positions
H&P maintains that the antecedent for “the recommended toolface orientation” in claim
12, element [c] is “recommended toolface orientation data” in element [b3], and accordingly
requests a construction clarifying that “the recommended toolface orientation” in the adjusting
step [c] is and depends on the same data being received and displayed in [b3]. According to
H&P, the claim term otherwise lacks a clear antecedent and would be indefinite. Nabors
responds that claim 12 of the ’663 Patent involves three steps: “operating” a drilling apparatus,
“receiving” and displaying electronic data, including recommended toolface orientation data, and
“adjusting the drilling apparatus” toward the recommended toolface orientation, but nothing
requires that the orientation the drilling apparatus is adjusted toward is limited to or depends on
the same orientation data that is received and displayed. Accordingly, Nabors advocates that this
term should have its plain and ordinary meaning.
b. The Court’s Construction
The dispute as to this term distills down to whether “the recommended toolface
orientation” in element [c] of claim 12 refers to or depends on the “recommended toolface
orientation data” in the preceding claim element [b3]. Specifically, H&P seeks a construction
requiring that the recommended toolface orientation is both (1) displayed and (2) depends on the
recommended toolface orientation data displayed. The Court concludes that although the
“recommended toolface orientation” in [c] is related to the data in [b3], it does not consist of or
depend on the data that is displayed in element [b], as H&P proposes. Accordingly, the Court
construes “the recommended toolface orientation” to have its plain and ordinary meaning, e.g.,
the recommended or desired toolface orientation, a.k.a. toolface advisory.
There is a presumption that the same terms appearing in different portions of the claims
have the same meaning, and thus, “recommended toolface orientation” presumptively means the
same thing across claim 12. See PODS, Inc., 484 F.3d at 1366. However, this phrase is used in
two different ways in claim 12, first as an adjectival phrase modifying the noun “data”
(“recommended toolface orientation data”), and secondly as a standalone noun, i.e., the toolface
orientation that is recommended. Moreover, the terms appear in different steps of the claimed
method and are used in different ways; in element [b3], the electronic data received and
displayed includes recommended toolface orientation data, but in element [c], the drilling
apparatus is adjusted toward recommended toolface orientation, without reference to the data in
the preceding step. Put differently, although they appear to be related, the exact relationship
between recommended orientation data which is received and displayed and the recommended
orientation itself is not immediately apparent from the claim language, but at minimum, there is
no explicit requirement that the recommended orientation itself is the same as or depends on—
such as, for example, being calculated or derived from—the orientation data displayed.
The specification defines “recommended toolface orientation” as being synonymous with
“toolface advisory.” ’663 patent, at 4:43–46 (“[D]isplaying the relationship between the
toolface, the quill position, and the recommended toolface orientation, i.e., the toolface advisory,
can be surprisingly useful in increasing accuracy of drilling.” (emphasis added)); see also id. at
14:22—25 (“The recommended toolface orientation, 1.e., toolface advisory, may be used either
with or without the scoring discussed in the present disclosure.”). The ’663 patent also refers to
a toolface advisory as a “TFD.” E.g., id. at 9:65—67 (“A desired or toolface advisory TFD 210
may be determined to steer the well to a target or along a well plan.”).
The specification does not expressly define “recommended toolface orientation data.” At
most, it describes one embodiment where the recommended toolface orientation data includes
specific types of data, such as gravity-based, magnetic-based, azimuth, or inclination toolface
orientation data, or combinations thereof. /d. at 4:65—5:3.
The specification seemingly contemplates various embodiments where information
relating to the recommended toolface orientation—variously described as the recommended
toolface orientation, toolface advisory, or TFD—is displayed. However, none of these supports
H&P’s proposed construction that definitively equates the recommended orientation with the
recommended orientation data being displayed, or even that the recommended orientation, as
opposed to some data merely related to the recommended orientation, is displayed. Figure | is
described as “‘an example of a toolface advisory sector... showing an example toolface advisory
of 250 degrees.” Id. at 7:25—27 (emphasis added).
1s 105 ise
i {IO
/ 7 A . ~ \ Wy
T ASRS IY
SL
140 > NON | 4 145
130008 ~~ 125955
1830 ft + 1630 ft
140
FIG.1
Id. fig.1.
17
However, other examples indicate that the recommended orientation itself need not
necessarily be displayed, so long as the relationship between the actual toolface position, quill
position, and recommended orientation is depicted. Cf. id. at 4:43–46 (“[D]isplaying the
relationship between the toolface, the quill position, and the recommended toolface orientation
. . . can be surprisingly useful in increasing accuracy of drilling.” (emphasis added)). For
instance, the specification describes an embodiment where a percent difference between a
measured toolface angle and a toolface advisory is displayed. See id. at 10:33–34 (“[T]he
percent difference between TFD and TFM may be displayed.”). A further embodiment is
described in which “any toolface reading acquired as being inside or outside the toolface
advisory sector” could be scored—for example, awarding 10 points for being on target, 5 points
for being 5 degrees off target—and displayed. Id. at 10:35–67. Thus, while the specification
describes the display of various metrics, i.e. data, informing on the actual toolface position vis-à-
vis the recommended toolface orientation, the specification does not support H&P’s proposed
construction that “the recommended toolface orientation” necessarily always means the
“displayed recommended toolface orientation data.” For example, if the recommended
orientation data displayed is the driller’s toolface reading score of 10 for being 10% off target, as
described in a preferred embodiment, it would be nonsensical to construe the recommended
toolface orientation as being that score of 10. Moreover, the specification suggests that, in
certain embodiments, the recommended toolface orientation data is only optionally displayed.
E.g., id. at 3:18–20 (“In yet another embodiment, the display apparatus is further adapted to
display the recommended [toolface] orientation data.”). Thus, to interpret “recommended
toolface orientation” consistently across all claims, the Court’s construction must include within
its scope an orientation not necessarily displayed.
In addition, there is no support for H&P’s proposal that the recommended toolface
orientation “depends on the recommended toolface orientation data.” Put differently, there does
not appear to be any discussion of the recommended orientation being altered or changed
because of data that is displayed. For example, if the percentage difference between the
measured toolface angle and toolface advisory is displayed, there is nothing indicating that the
recommended orientation is altered as a result.
Instead, the specification supports a reading that the “recommended toolface orientation”
is a fixed, optimal target, and the recommended toolface orientation data displayed is either a
visual depiction of that orientation or derived from that target orientation, for example, by
measuring the difference between the recommended orientation and the actual toolface position,
scoring the toolface readings relative to the recommended orientation, or some derivative of the
recommended orientation, be it gravity-based, magnetic-based, azimuth, or inclination toolface
orientation data, a combination thereof, etc. See, e.g., id. at 12:59–13:13. As such, the
specification indicates that the recommended toolface orientation data depends on the
recommended toolface orientation, and not the other way around.
Accordingly, the Court concludes that H&P’s proposed construction is not mandated by
the claim language and impermissibly narrows the claim scope contrary to the specification.
“The recommended toolface orientation” is construed to have its plain and ordinary meaning,
e.g., the recommended or desired toolface orientation, also known as “toolface advisory.”
C. ’171 patent: “Directional drilling control apparatus and methods”
The ’171 patent discloses a method for controlling directional drilling using a quill to
steer a hydraulic motor when elongating a wellbore in a direction having a horizontal
component, wherein the quill and the hydraulic motor are coupled to opposing ends of a drill
string. ’171 patent, at Abstract. Conventionally, directional drilling requires determining the
current toolface orientation, and if the drilling direction needs adjustment, an operator rotating
the drill string changes the toolface orientation. Id. at 1:30–37. The ’171 patent describes how
reorienting the toolface in a drilling operation can be complex, labor intensive, and often
inaccurate, because it requires the operator to manipulate various things to position the toolface
properly, and each adjustment has different effects and must be considered in combination with
other drilling requirements. Id. at 1:46–54. The invention disclosed in the ’171 patent describes
using downhole sensors to evaluate various operating parameters, and monitoring a drilling
operation parameter indicative of a difference between the actual toolface orientation and a
desired toolface orientation, and then adjusting the position of the quill by an amount that is
dependent upon the monitored parameter. Id. at 2:63–67, 17:1–31.
The parties dispute the meaning of one term in claim 13 of the ’171 patent, “comparable
operating parameter.” Claim 13 recites:
A method of elongating a wellbore in a direction having a horizontal component
comprising:
detecting a current toolface orientation with respect to vertical;
comparing the current toolface orientation to a desired toolface orientation
based on operating parameters;
employing at least one controller to analyze whether one or more comparable
operating parameter has been previously recorded;
generating drilling control signals to oscillate a quill based on any of the
previously recorded drilling operation parameter to redirect the toolface to a
corrected drilling path; and
rotating a tubular along the corrected drilling path.
’171 patent, at cl. 13 (emphasis added).
1. “comparable operating parameter”
Disputed Nabors’s Proposed H&P’s The Court’s Construction
Term Construction Proposed
Construction
“comparable Plain and ordinary Indefinite Plain and ordinary meaning,
operating meaning, e.g., the operating i.e. operating parameters
parameter” parameter(s), e.g., WOB, such as WOB, torque, RPM,
• ’171 torque, RPM, pressure, ΔP, pressure, ΔP, data received
patent, data received from a from a toolface orientation
claim toolface orientation sensor, sensor, depth, and ROP, that
13 depth, ROP, that was was compared to the current
compared to the current toolface orientation in the
toolface orientation in the previous step of the claimed
previous step method
a. The Parties’ Positions
Nabors argues that “comparable operating parameter” should be construed according to
its plain and ordinary meaning, because a POSITA would know, based on the language of claim
13 and the specification, that this term means an operating parameter of the same type, e.g.,
WOB, torque, RPM, pressure, ΔP,5 data received from a toolface orientation sensor, depth, and
ROP, that was compared to the current toolface orientation in the previous step of the claimed
method.
H&P contends that “comparable operating parameter” as it appears in claim 13 is
indefinite, because the claim and specification do not inform a POSITA about the scope of the
claimed invention. Specifically, H&P contends that “comparable” is a term of degree indicating
similarity, and the specification provides no additional context or range from which a POSITA
could know whether operating parameters are sufficiently similar, or “comparable,” so as to fall
within the claim’s scope. Nabors responds that nothing in the language of claim 13 nor the
5 The specification of the ’171 patent refers to a mud motor ΔP in the context of “a pressure differential value or range
across the mud motor of the BHA,” which “may be alternatively or additionally calculated, detected, or otherwise
determined at the surface, such as by calculating the difference between the surface standpipe pressure just off-bottom
and pressure once the bit touches bottom and starts drilling and experiencing torque.” ’171 patent, at 7:1–12.
specification requires an assessment of similarity, but rather, the word “comparable” refers to a
requirement that a parameter of the same type be evaluated.
b. The Court’s Construction
The issue presented is whether, based on the specification and prosecution history, claim
13 of the ’171 patent is indefinite because the use of the term “comparable operating parameter”
in that claim fails to inform a POSITA about the scope of the claimed invention with reasonable
certainty. The Court concludes that the term “comparable operating parameter” is not indefinite.
Claim 13 describes a method consisting of detecting current toolface orientation with
respect to vertical, comparing that current orientation to a desired orientation “based on operating
parameters,” and then employing controller(s) to analyze “whether one or more comparable
operating parameters has been previously recorded.” Id. at cl. 13. The method then describes
redirecting the toolface to a corrected drilling path based on any of the previously recorded
drilling operation parameters, and rotating a tubular along that corrected path. Id.
As discussed, the ’171 patent describes configuring various instruments to evaluate
physical parameters and variously adjusting drilling operations in light of those parameters. The
specification describes such parameters broadly, including such physical properties as pressure,
temperature, torque, weight-on-bit (WOB), vibration, inclination, azimuth, toolface orientation in
three-dimensional space, and “other downhole parameters.” Id. at 2:63–67. Operational
parameters may also include actual bit torque and actual mud motor ΔP. Id. at 11:46–50.
The Court concludes, based on the plain claim language read in the context of the
specification, which describes operating parameters broadly and potentially consisting of
numerous different types of physical properties being measured and evaluated, the word
“comparable” as used in claim 13 is not a term of degree. Instead, it simply means that the
type(s) of parameters being analyzed are the same as those that have been previously recorded.
For example, in the “comparing” step, if the current toolface orientation is compared to a desired
toolface orientation based on temperature and vibration, then in the next step, at least one
controller is employed to analyze whether temperature and vibration had been previously
recorded, and making adjustments accordingly following the remainder of the claimed method.
Accordingly, the Court construes “comparable operating parameter” to have its plain and
ordinary meaning, namely operating parameters, such as WOB, torque, RPM, pressure, ΔP, data
received from a toolface orientation sensor, depth, and ROP, that was compared to the current
toolface orientation in the previous step of the claimed method.
D. The ’154 patent: “3D toolface wellbore steering visualization”
The ’154 patent discloses systems, devices, and methods for visualizing a downhole
environment, namely a three-dimensional visualization of a drill plan and toolface for steering
purposes. ’154 patent, at 1:6–11. The ’154 patent specification describes how reorienting a
toolface in a bore is a complex, labor-intensive process, and the invention disclosed in the ’154
patent describes a more efficient, reliable, and intuitive method for steering a bottom hole
assembly (“BHA”). Id. at 2:10–17. The three-dimensional visualization of the downhole
environment described by the ’154 patent includes depictions of the location and orientation of
the BHA and a drill plan, and may also include a toolface dial superimposed on the depiction of
the BHA, replicating parameters set by the surface control system and including real time
toolface angle data. Id. at 3:1–11.
The parties contest the meaning of one term in the ’154 patent, “optimized path,” which
appears in independent claim 20. Claim 20 recites:
A method of directing the operation of a drilling system, comprising;
inputting a drill plan into a controller in communication with the drilling
system;
driving a bottom hole assembly comprising a drill bit disposed at an end of a
drill string;
receiving sensor data from one or more sensors adjacent to or carried on the
bottom hole assembly;
calculating, with the controller, a position of the drill bit based on the received
sensor data;
determining, with the controller, a range of acceptable deviation from the drill
plan;
calculating, with the controller, a positional difference between the drill plan
and the calculated position of the drill bit;
determining, with the controller, if the positional difference between the drill
plan and the calculated position of the drill bit falls within the range of
acceptable deviation from the drill plan;
displaying a three-dimensional visualization based on the drill plan, the sensor
data, and the calculated position of the drill bit, wherein the three-dimensional
visualization comprises a visual representation of an underground environment
from a perspective looking down the drill string, the visualization depicting the
positional difference between the drill plan and the calculated position of the
drill bit and whether the positional difference between the drill plan and the
calculated position of the drill falls within the range of acceptable deviation
from the drill plan, the visualization further including an indicator extending
from the calculated position of the drill bit and indicating an optimized path
toward the drill plan; and
using the display as a reference in directing a change of position of the drill bit.
Id. at cl. 20 (emphasis added).
The original version of claim 20 did not include the “optimized path” language at issue.
During prosecution, the examiner rejected a prior version of claim 20 that recited “indicating a
direction toward the drill plan” under 35 U.S.C. § 103, in part on the grounds that a prior art
reference, Schuh, teaches “path/indicator ‘C’ which . . . describes a direction from the drill bit
location to the drill plan ‘A.’” ECF No. 88-13, at NABORS_004428. Nabors then submitted
amendments, including “indicating an optimized path direction toward the drill plan,” and the
rejections were withdrawn. Id. at NABORS_004440, _004445, _004451.
1. “optimized path”
Disputed Term Nabors’s Proposed H&P’s Proposed The Court’s
Construction Construction Construction
“optimized path” Plain and ordinary Indefinite Indefinite
• ’154 patent, meaning, e.g.,
claim 20 the best, e.g., efficient,
fastest, shortest, path
a. The Parties’ Positions
Nabors contends that “optimized path” should have its plain and ordinary meaning, “e.g.,
the best, e.g., efficient, fastest, shortest, path.” Nabors points to various disclosures in the
specification which it argues make clear that the optimized path is the “best route” by which an
off-course drill bit can be returned to the drilling plan. E.g., ECF No. 88, at 29–30 (citing ’154
patent, at 3:12–29, 10:41–49, figs. 5, 6). Nabors also relies on the testimony of its expert, Dr.
Rodgers, to argue that the indicator described in claim 20 points in the direction of the drill path,
“which would be the solution determined by the automatic drilling system’s controller optimized
to provide the path to get back on track with the drill plan.” Id. at 34 (citing ECF No. 88-7
(“Rodgers Dec.”) ¶¶ 20).
H&P responds that “optimized path” is indefinite, because neither the specification nor
the prosecution history provides objective criteria for determining whether a path toward the drill
plan indicated by the indicator, as recited in claim 20, is an “optimized” path. H&P points to
both claim 1, which recites “a direction” towards a drill plan, as opposed to an “optimized path,”
and the amendment made during prosecution history from “a direction” to “an optimized path,”
to argue that claim 20’s optimized path is not just any path towards the drilling plan, but one that
must be optimized according to some unspecified priorities. H&P also relies on the declaration
of its expert, Mr. Schaaf, who provides examples of various ways in which a path could be
deemed “optimized” according to different priorities, resulting in different paths. ECF No. 92 at
24 (citing ECF No. 93, at App. 1–11 (“Schaaf Dec.”)). Without guidance from the claim
language or specification as to which specific objective factors to consider and prioritize, H&P
argues that a POSITA is unable to determine with reasonable certainty the scope of an indicator
indicating an optimized path toward the drill plan, or analyze whether an indicated path is an
optimized one, and thus claim 20 is indefinite.
b. The Court’s Construction
The issue presented is whether, based on the specification and prosecution history, claim
20 of the ’154 patent is indefinite because the term “optimized path” as used in that claim fails to
inform a POSITA about the scope of the claimed invention with reasonable certainty. The Court
concludes that the term “optimized path” is indefinite.
The ’154 patent specification describes how typically, prior to commencing drilling, a
target location is identified and “an optimal wellbore profile or drill plan is established,” where
such plans are “generally based upon the most efficient or effective path to the target location or
locations.” ’154 patent, at 3:12–17. Claim 20 references the drill plan in conjunction with the
position of the drill bit, namely calculating “a positional difference between the drill plan and the
calculated position of the drill bit”—i.e., comparing the current position of the bit and where it
should be according to the drill plan—and determining whether that difference is within the
range of acceptable deviation from the plan. Id. at cl. 20. The claimed method then describes
displaying a three-dimensional visualization based on the drill plan, comprising a representation
of the underground environment depicting the positional difference between the drill plan and
the calculated position of the drill bit, and further “including an indicator extending from the
calculated position of the drill bit and indicating an optimized path toward the drill plan.” Id.
The specification likewise describes how the disclosed invention “may allow an operator to
visualize the location of the BHA and the drill plan, and in some cases, steer the BHA back to
the drilling path along an optimized route.” Id. at 3:12–22.
Thus, the “optimized path” term at issue refers to an optimized path for returning the drill
bit from its current position back to the planned route according to the drill plan. The plain
language of claim 20 describes an indicator that indicates not just any path, but specifically an
“optimized” path. Omitting the word “optimized” from claim 20 would give the claim a broader
meaning, and accordingly, the “optimized path” language is a narrowing limitation. See Bicon,
Inc. v. Straumann Co., 441 F.3d 945, 950 (Fed. Cir. 2006) (“[C]laims are interpreted with an eye
toward giving effect to all terms in the claim.”). This interpretation is supported by comparing
claim 20 with claim 1; claim 1 describes a drilling apparatus that displays a visualization
showing the positional difference between the location of the drill bit and the drill plan, with an
indicator extending from the drill bit’s location “indicating a direction toward the . . . depiction
of the drill plan.” Id. at cl. 1 (emphasis added). Thus, there is a difference between indicating “a
direction” toward a drill plan, and indicating an “optimized path” toward a drill plan. See CAE
Screenplates, Inc. v. Heinrich Fiedler GmbH & Co. KG, 224 F.3d 1308, 1317 (Fed. Cir. 2000)
(“In the absence of any evidence to the contrary, we must presume that the use of these different
terms in the claims connotes different meanings.”). The prosecution history compels the same
conclusion; during prosecution, to overcome a prior art rejection, Nabors amended the relevant
portion of claim 20 from “indicating a direction toward the drill plan” to “indicating an
optimized path toward the drill plan.” ECF No. 88-12, at NABORS_004451. Accordingly,
given that Nabors added the “optimized path” language to overcome a rejection, the Court
cannot now disregard it. See Ajinomoto Co. v. Int’l Trade Comm’n, 932 F.3d 1342, 1351 (Fed.
Cir. 2019) (“[W]hen a word is changed during prosecution, the change tends to suggest that the
new word differs in meaning in some way from the original word.”).
Thus, the Court concludes that “optimized path” must mean something beyond simply a
path by which the drill bit can return to the drilling plan. However, neither the intrinsic nor the
extrinsic evidence provides objective guidance to know when this limitation is met. The
specification is bereft of any guidance on criteria that may be relevant to assessing whether a
path for returning a drill bit to the drill plan is optimized; for example, there is no discussion
indicating that the fastest, shortest, or most direct route is the optimal approach, or that
considerations like speed, distance, or time should be weighed in determining whether a route is
optimal. Nabors’s expert Dr. Rodgers seemingly concedes that the ’154 patent provides no
guidance on what factors determine whether a path is optimized; he opines that “optimization
parameters used in determining an optimized path have no bearing,” and “[a] POSITA would
understand that the path was optimized with some set of parameters or factors and the
visualization indicates the direction towards that optimized path.” Rodgers Dec. ¶ 17 (emphasis
added).6
In addition, the Court notes that the term “optimized” is a subjective term of degree,
dependent on the characteristic sought to be optimized for any given drill plan. See, e.g., Intell.
6 In its reply, Nabors argues that the ’154 patent specification explains that the “indicator representing the optimized
path is the ‘advisory toolface direction,” which may be calculated by taking the average of three other indicators to
determine the best “direction path” back to the drill plan, and is thus not indefinite. ECF No. 94, at 15 (“The Patent
goes on to explain that this advisory toolface direction may be calculated by taking the average of the other three
indicators 316 (inclination of the wellbore), 318 (azimuth of the wellbore), and 320 (hole depth) to determine the best
direction path back to the drill plan.” (citing ’154 patent, at 10:20–50)). However, reviewing the portion of
specification relied on by Nabors reveals that Nabors is improperly equating indicator 310, which corresponds to the
advisory toolface direction, with a different indicator, contrary to the specification. Specifically, “[i]ndicator 310
gives an advisory toolface direction, corresponding to line 322. The advisory toolface direction represents an optimal
direction towards the drill plan.” ’154 patent, at 10:39–43. In contrast, “[i]ndicator 308, shown in Fig. 3 as an arrow
on the outermost edge of the dial 302, is an indicator of the overall resultant direction of travel of the toolface. This
indicator 308 may present an orientation that averages the values of other indicators 316, 318, 320.” Id. at 10:43–47.
Ventures I LLC v. T-Mobile USA, Inc., 902 F.3d 1372, 1381 (Fed. Cir. 2018) (“‘[O]ptimiz[ing]
. . . QoS’ is a ‘term of degree’ that . . . is ‘purely subjective’ . . . .”). Indeed, the specification
indicates that there may be multiple optimized paths by which a drill bit is returned to the drill
path, thus raising the question of in what capacity the path is being optimized. ’154 patent, at
3:19–22 (“[A]n operator [may] . . . in some cases, steer the BHA back to the drilling path along
an optimized route.” (emphasis added)). As explained by H&P’s expert Mr. Schaaf, a path could
be optimized according to various different, and possibly competing, priorities; for example, a
path could be optimized to be the fastest or the cheapest path back to the planned trajectory, or it
could be optimized to be the smoothest, so as to minimize the number of turns. Schaaf Dec.
¶ 33. Although the subjectivity here is not expressly dependent on “the unpredictable vagaries of
any one person’s opinion,” such as an end user, e.g., Intell. Ventures, 902 F.2d at 1381, the ’154
patent implies that, at least in conventional drilling systems, the drilling operator would be
involved in evaluating the situation and making judgments about the operation. E.g., ’154
patent, at 1:63–65 (“When deviation from the planned drilling path occurs, drillers must consider
the information available to them and then direct the drill back to the original path.”); id. at 2:11–
15 (“An operator must consider the implications of this textual information, formulate a visual
mental impression of the overall orientation of the drilling BHA, and try to formulate a steering
plan based on this mental impression, before steering the system.”).
For these reasons, the Court finds Nabors’s proposed construction—plain and ordinary
meaning, “e.g., the best, e.g., efficient, fastest, shortest, path”—unpersuasive. Construing
“optimized” to mean “best” does not provide any additional guidance on the term’s meaning.
Integral questions regarding the scope of this term remain—the path is optimized as to what?
The path is the “best” in what regard and according to whom? And as discussed, there is no
support in the specification establishing any particular criteria—such as efficiency, speed, or
length—as optimization parameters, and as Mr. Schaaf opined in his declaration, a path may
differ depending on the specific attribute being optimized. Moreover, Nabors’s cited cases are
distinguishable because in those cases, the characteristic to be optimized was defined or known,
or the specification provided guidance on relevant criteria to evaluate. See InfoGation Corp. v.
ZTE Corp., 16-CV-01901-H-JLB, 2017 WL 1821402, at *12–13 (S.D. Cal. May 5, 2017)
(construing “optimal routes/optimal route” as “recommended route(s) based on one or more
criteria,” described in the specification, such as traveling conditions or user preferences that have
been provided); iTimeline, Inc. v. Proclarity Corp., C05-1013JLR, 2006 WL 6143242, at *13
(W.D. Wash. June 29, 2006) (construing “optimization” to mean “providing performance with
respect to a given characteristic (e.g. speed or flexibility of output) that is superior to the
performance of some other possible configuration with respect to that characteristic”).
Nabors is effectively arguing that so long as the path is optimized to something, the
limitation in claim 20 is satisfied. But under 35 U.S.C. § 112, a patent claim must “particularly
point[ ] out and distinctly claim[ ] the subject matter” regarded as the invention. Claim 20
imposes a bare requirement that the path be optimized as to some criteria or priority, and the
specification provides no guidance on how to distinguish between a path for the BHA to return
to the drill path, as opposed to a claimed optimized path. Put simply, the specification does not
provide sufficient guidance on the meaning of “optimized path” to give notice to the public of
the boundaries between infringing and innocent activity.
Accordingly, the Court concludes that the specification of the ’154 patent does not inform
a POSITA about the scope of “optimized path” with reasonable certainty. H&P has proven that
claim 20 of the ’154 patent is indefinite under § 112.
V. CONCLUSION
The Court adopts the constructions set forth above, as summarized in the following table.
The Court further finds that claim 20 of the ’154 patent is indefinite under § 112 because of the
inclusion of the term “optimized path,” and thus Nabors may not pursue its infringement
contentions against H&P as to that claim.
The parties are ORDERED not to refer, directly or indirectly, to each other’s claim
construction positions in the presence of the jury. Likewise, the parties are ORDERED to
refrain from mentioning any portion of this opinion, other than the actual definitions adopted by
the Court, in the presence of the jury. Any reference to claim construction proceedings is limited
to informing the jury of the definitions adopted by the Court.
Term Construction
“the electronic data” “data including quill position data, magnetic-
• ’634 patent, claims 1, 7 based toolface orientation data and gravity-
based toolface orientation data”
“at least one of gravity-based toolface “at least one gravity-based toolface
orientation data and magnetic-based toolface orientation data and at least one magnetic-
orientation data” based toolface orientation data”
• ’634 patent, claim 1
“user-viewable display” “display viewable to the directional driller”
• ’634 patent, claim 1
“a plurality of drilling operation parameters” “two or more parameters of a drilling
• ’655 patent, claim 1 operation other than actual toolface
orientation”
“a drilling operation parameter” “a parameter of a drilling operation other than
• ’655 patent, claim 17 actual toolface orientation”
order of claim steps The method steps must occur in the order that
• ’593 patent, claim 19 they are written.
“a toolface advisory” “recommended toolface orientation”
• ’081 patent, claim 1
“configured to” “actually configured to and not merely
• ’154 patent, claims 1, 4, 6 capable to”
“receiving a well prog” “receiving a document, which may be in a
• ’593 patent, claim 19 non-computer readable format, that contains
information planning and chronicling the
steps of drilling a well”
“a method of directing a drilling operation in | The preamble is not limiting
□□
e °663 patent, claim 12
“the recommended toolface orientation” Plain and ordinary meaning, e.g., the
also known as “toolface advisory”
“comparable operating parameter” Plain and ordinary meaning, i.e. operating
pressure, AP, data received from a toolface
orientation sensor, depth, and ROP, that was
compared to the current toolface orientation
in the previous step of the claimed method
SO ORDERED.
May 26, 2022.
i □□
Pata Mik] Lp
BagBARA M.G.LYNN CO
CHIEF JUDGE
32