Opinion

United States of America v. Kinder Morgan CO2 Company LP

Court
District Court, N.D. Texas
Filed
Sep 30, 2020
Cited by
0 cases
Authority
More cited than 29.9%

“A formal motion is not always required, so long as the requesting party has set forth with particularity the grounds for ORDER – PAGE 32 the amendment and the relief sought.”

How later courts described this case

  • “A formal motion is not always required, so long as the requesting party has set forth with particularity the grounds for ORDER – PAGE 32 the amendment and the relief sought.”
  • holding that the district court properly exercised its discretion in denying leave to amend because plaintiffs “did not suggest in their responsive pleading any additional facts not initially pled that could, if necessary, cure the pleading defects”
  • affirming denial of motion for leave to amend where plaintiffs stated only that “Should this Court find that the Complaint is insufficient in any way, however, plaintiffs respectfully request leave to amend.”

Written by the judges who cited it.

The opinion

IN THE UNITED STATES DISTRICT COURT

NORTHERN DISTRICT OF TEXAS

DALLAS DIVISION

UNITED STATES OF AMERICA ex rel. §

GRYNBERG PRODUCTION §

CORPORATION, §

§

Plaintiff-Relator, §

§

v. § Civil Action No. 3:18-CV-1775-K

§

KINDER MORGAN CO §

2

COMPANY, L.P., §

§

Defendant. §

MEMORANDUM OPINION AND ORDER

Before the Court is Defendant Kinder Morgan CO Company, L.P.’s Motion to

2

Dismiss Plaintiff-Relator’s Original Complaint Under Fed. R. Civ. P. 12(b)(6) and 9(b)

(Doc. No. 21). The Court has carefully considered the motion, the response, the reply,

the sur-reply, the supporting appendices, any relevant portions of the record, and the

applicable law. Moreover, the Court has taken notice of the United States’ Statement

of Interest (Doc. No. 45), the respective responses of Plaintiff-Relator Grynberg

Production Corporation (Doc. No. 48) and Defendant Kinder Morgan CO Company,

2

L.P. (Doc. No. 51), as well as the reply filed by the United States (Doc. No. 57). For

the following reasons, the Court GRANTS Defendant Kinder Morgan CO Company,

2

ORDER – PAGE 1

L.P.’s Motion to Dismiss. The Court DENIES Plaintiff-Relator Grynberg Production

Corporation’s request for leave to amend its Original Complaint.

I. Factual and Procedural Background

On July 10, 2018, Plaintiff-Relator Grynberg Production Corporation

(“Relator”) initiated this qui tam action on behalf of the United States of America (the

“Government”) against Defendant Kinder Morgan CO Company, L.P. (“Defendant”).

2

Realtor brings this action under the False Claims Act, 31 U.S.C. § 3729, et seq. In its

Original Complaint (“Complaint”), Relator alleges Defendant has been and currently

does produce carbon dioxide (“CO ”) pursuant to its leases with the federal government

2

for the fields at the McElmo Dome Leadville Unit (“McElmo Dome”) and the Doe

Canyon in Montezuma and Dolores Counties, Colorado, respectively. Pursuant to

federal statutes and regulations, the Government “reserves the ownership of and the

right to extract helium from all gas produced” under leases of federal lands and further

provide that a private party may extract and sell helium under a separation agreement

negotiated with the Government. 30 U.S.C. § 181; 50 U.S.C. § 167a; 43 C.F.R. §§

16.1 & 3100.1.

Although Defendant’s leases permit the production of CO , Relator alleges that

2

Defendant has been and currently does produce helium “concurrently” with its CO

2

production from the McElmo Dome and Doe Canyon fields. Relator further alleges

ORDER – PAGE 2

that Defendant never entered into a separation agreement with the Government for

either field which would permit Defendant to extract and sell helium. (Relator does

allege a third-party entered into a separation agreement with the Government in 2013

for the helium Defendant produced at Doe Canyon, and this agreement became

“operational” in 2015 and continues to-date.)

Even though Defendant was producing a CO gas stream with a helium

2

component (“commingled helium”), Relator alleges that Defendant “never disclosed

the fact that Helium was a percentage component of CO production; that Helium was

2

being produced in violation of “The Helium Act”; and never disclosed the volume and

value of that Helium production.” As a result, Relator alleges Defendant “knowingly

and intentionally misrepresented” that it was producing only CO in violation of “The

2

Helium Act” and failed to compensate the Government for the commingled helium.

Upon filing this case, the Complaint was sealed and served on the Government.

Ultimately, the Government declined to intervene in the case, and the Complaint was

unsealed and served on Defendant. Subsequently, Defendant filed the instant motion

to dismiss which is ripe for determination. Although the Government declined to

intervene, it filed a Statement of Interest (“SOI”) after the motion to dismiss was fully

briefed. Both Relator and Defendant filed their respective responses to the SOI, and

the Government filed a reply.

ORDER – PAGE 3

II. Legal Standards

A. Motion to Dismiss

In considering a Rule 12(b)(6) motion, a court must determine whether the

plaintiff has sufficiently stated a claim upon which relief may be granted. FED. R. CIV.

P. 12(b)(6). A well-pleaded complaint must allege facts upon which the claims are

based and not be a conclusory recitation of the elements of a cause of action. Bell Atl.

Corp. v. Twombly, 550 U.S. 544, 555 (2007). A court “accept[s] all well-pleaded facts

as true and view[s] those facts in the light most favorable to the plaintiff.” Stokes v.

Gann, 498 F.3d 483, 484 (5th Cir. 2007) (per curiam). However, a court “do[es] not

accept as true conclusory allegations, unwarranted factual inferences, or legal

conclusions.” Ferrer v. Chevron Corp., 484 F.3d 776, 780 (5th Cir. 2007) (quoting

Plotkin v. IP Axess Inc., 407 F.3d 690, 696 (5th Cir. 2005)). A complaint must state

sufficient facts such that the “claim has facial plausibility” and is not merely “possible.”

Aschcroft v. Iqbal, 556 U.S. 662, 678 (2009). The alleged facts must nudge the plaintiff’s

claims “across the line from conceivable to plausible.” Twombly, 550 U.S. at 570. A

plaintiff pleads a claim with facial plausibility when the “factual content . . . allows the

court to draw the reasonable inference that the defendant is liable.” Iqbal, 556 U.S. at

678. The complaint must allege sufficient facts to “give the defendant fair notice” of

plaintiff’s claims against the defendant. Twombly, 550 U.S. at 555 (quoting Conley v.

ORDER – PAGE 4

Gibson, 355 U.S. 41, 47 (1957)). “[A] complaint should not be dismissed under [Rule

12(b)(6)] for failure to state a claim unless it appears beyond doubt that the plaintiff

can prove no set of facts in support of his claim which would entitle him to relief.”

Ramming v. U.S., 281 F.3d 158, 161 (5th Cir. 2001)(per curiam).

The Court must generally determine a motion to dismiss for failure to state a

claim based solely on the pleadings, including any attachments thereto. Collins v.

Morgan Stanley Dean Witter, 224 F.3d 496, 498 (5th Cir. 2000). The Fifth Circuit has

held that district courts may consider documents attached to the motion to dismiss

when those documents “are referred to in the plaintiff’s complaint and are central to

[the plaintiff’s] claim.” Id. at 498–99 (quoting Venture Assocs. Corp. v. Zenith Data Sys.

Corp., 987 F.2d 429, 431 (7th Cir. 1993)).

B. False Claims Act

The False Claims Act (the “FCA”) imposes liability on a person who, in relevant

part to this case:

(D) has possession, custody, or control of property or money

used, or to be used, by the Government and knowingly delivers,

or causes to be delivered, less than all of that money or property;

[or] (G) knowingly makes, uses, or causes to be made or used, a

false record or statement material to an obligation to pay or

transmit money or property to the Government, or knowingly

conceals or knowingly and improperly avoids or decreases an

obligation to pay or transmit money or property to the

Government.

ORDER – PAGE 5

31 U.S.C. § 3729(a)(1). Although the Government may initiate an action for an FCA

violation, a private party may also enforce an action under the FCA. § 3730(a)-(b).

Such an action is referred to as a qui tam action, and the private party is referred to as

the “relator”. U.S. ex rel. Eisenstein v. City of New York, 556 U.S. 928, 932 (2009). If a

relator initiates a qui tam action, the U.S. has 60 days to review the claim and determine

whether to elect to intervene or decline. § 3730(b)(2). Even if the U.S. declines to

intervene as a party, it remains the party in interest in the qui tam action. Eisenstein,

556 U.S. at 930.

III. Legal Analysis

In its Motion to Dismiss, Defendant contends Relator’s Complaint must be

dismissed as a matter of law because Relator fails to plausibly allege that Defendant

violated any federal statutory, regulatory, or contractual obligation or duty to the

Government as it pertains to helium. Specifically, Defendant argues that: (1) its

production of CO with commingled helium does not violate 30 U.S.C. § 181 (which

2

Relator refers to as “The Helium Act”); (2) none of Defendant’s alleged actions violate

any other statute or regulation cited by Relator regarding helium production or

separation; (3) likewise, none of Defendant’s alleged actions violate the federal leases;

and (4) Defendant had no duty to report the presence of or pay royalties on the helium

contained in its CO production pursuant to the other regulations Relator cites.

2

ORDER – PAGE 6

Defendant also asserts that Relator’s Complaint must be dismissed because Relator

fails to plausibly allege a cognizable violation of the False Claims Act (“FCA”), and

certainly does not do so with the required particularity.

Relator responds that it has stated a claim for which relief can be granted

because: (1) “The Helium Act” and related regulations do not permit Defendant to

extract helium under its federal leases; (2) no other statute or regulation permits

Defendant to take helium because the Government owns it; (3) the federal leases do

not allow Defendant to extract helium; and (4) Defendant is violating federal reporting

requirements in failing to report the helium commingled in the CO Defendant

2

produced. Relator also responds that it has plausibly pleaded its FCA with the required

particularity.

The Court agrees with Defendant that Relator’s Complaint must be dismissed

as a matter of law because Relator failed to plausibly allege that Defendant violated

any federal statutory, regulatory, or contractual duty or obligation owed to the

Government relating to helium. Specifically, the Court finds that: (1) Relator failed to

plausibly allege Defendant violated any statute, regulation, or lease in producing a CO

2

stream with commingled helium where the helium was never extracted; (2) Relator

failed to plausibly allege Defendant was obligated under any statute, regulation, or lease

to compensate the Government for the commingled helium simply because the

ORDER – PAGE 7

Government owns it; (3) Relator failed to plausibly allege any of Defendant’s actions

with respect to helium violated any statute, regulation, or lease; and (4) Relator failed

to plausibly allege Defendant was obligated under any statute, regulation, or lease to

report the volume of that commingled helium and to pay the Government royalties

accordingly. Because there are no plausible allegations that Defendant owed the

Government any statutory, regulatory, or contractual duty or obligation or that

Defendant violated any statute, regulation, or lease with respect to the helium,

particularly as any obligation or violation relates to the payment of royalties on the

helium and the Government’s ownership of the helium, Relator has failed to state a

claim under the FCA on which relief can be granted. See 31 U.S.C. § 3729(a)(1)(D) &

(G). Because the Court finds that the Complaint must be dismissed, the Court need

not address Defendant’s alternative argument that Relator did not plausibly plead a

violation of the FCA.

A. Relator’s Allegations

Relator alleges that “[d]iscovery that the Government has been paid royalties

during all the relevant times on the basis of CO pricing alone, rather than pricing

2

inclusive of the value of its Helium component, or, alternatively, that the Government

has not been paid full value for the Helium produced in violation of the Helium Act,

forms the basis of this Qui Tam Action.” Relator alleges that Defendant violated the

ORDER – PAGE 8

cited statutory and regulatory provisions because Defendant “produced the Helium

concurrently with the CO taken from [the McElmo Dome and Doe Canyon fields],”

2

Defendant did not have a separation agreement with the Government to extract helium

from either the McElmo Dome or Doe Canyon fields, Defendant falsely reported the

total production volume as only CO and paid the Government royalties on the CO

2 2

only rather than royalties on the helium component, and Defendant sold (and

continues to sell) the helium in the CO stream even though the Government owns the

2

helium. Relator further alleges that Defendant “fail[ed] to disclose the production and

sale of Helium in contravention of the Helium Act; by represent[ing] the total

production volume as CO ; and by understating the value of the CO inclusive of the

2 2

value of its Helium component” which caused “the Government [to not be] paid

appropriate royalties and/or direct compensation due and owing for the production of

Helium from McElmo Dome and Doe Canyon.” Relator also alleges Defendant

violated its federal leases because the leases “exclude the right to extract Helium.”

Finally, Relator alleges that Defendant failed to report the helium “as part of the CO

2

volume and price assessment for royalties payable to the Government,” and this

“concealed violation(s) of the Helium Act.”

ORDER – PAGE 9

B. Federal Statutes and Regulations

Relator alleges that Defendant violated the relevant statutory and regulatory

provisions in “selling the Government’s Helium, which it does not own, at a price

significantly less than its market value.” Relator alleges the relevant statutes “provide[ ]

for the exclusive ownership by the Government [of helium] and excludes Helium from

gases subject to lease” and the federal regulations “require Defendant to obtain fair

market value for all gases taken from leased federal lands.”

Relator alleges “that Helium was being produced in violation of 30 U.S.C. § 181

and 43 C.F.R. § 3100.1 by Defendant’s production of a CO stream with commingled

2

helium. Section 181 provides, in relevant part:

The United States reserves the ownership of and the right to

extract helium from all gas produced from lands leased or

otherwise granted under the provisions of this chapter, under

such rules and regulations as shall be prescribed by the Secretary

of the Interior: Provided further, That in the extraction of helium

from gas produced from such lands it shall be so extracted as to

cause no substantial delay in the delivery of gas produced from

the well to the purchaser thereof, and that extraction of helium

from gas produced from such lands shall maintain the lease as if

the extracted helium were oil and gas.

30 U.S.C. § 181. The related federal regulation states that “the ownership of and the

right to extract helium from all gas produced from lands leased or otherwise disposed

of under the Act have been reserved to the United States.” 43 C.F.R. § 3100.1. The

Court notes that Relator refers to § 181 and § 3100.1 as “The Helium Act” in its

ORDER – PAGE 10

Complaint. It appears from the Court’s research that Relator is mistaken in this

reference. See Phillips Petroleum Co. v. Texaco, Inc., 415 U.S. 15, 126-27 (1974)

(Supreme Court citing the Helium Act Amendments, 50 U.S.C. § 167 et seq. as “the

Helium Act”); N. Helex Co v. U.S., 524 F.2d 707 (Ct. Cl. 1975) (same internal citation);

Panhandle E. Pipeline Co. v. Fed. Power Comm’n, 359 F.2d 675, 676 (8th Cir. 1966) (same

internal citation). Therefore, for clarity, the Court will identify each statutory and

regulatory section specifically.

Sections 181 and 3100.1 indeed reserve the ownership of helium to the

Government. These provisions also unequivocally address the Government’s right to

extract helium from the gas produced from federal lands. Defendant argues that the clear

language of § 181 and § 3100.1 do not prohibit Defendant from producing CO that

2

contains commingled helium. Defendant contends that § 181 actually presumes

helium will be present in “all gas produced from federal lands” as it grants the

Government “the right to extract helium from all gas produced” from federally leased

lands. Furthermore, no other statute or regulation prohibits Defendant’s conduct with

respect to the commingled helium, specifically as to production or separation. Relator

responds that under § 181 the Governments owns the helium, and neither § 181 or

any other statute or regulation allows “an operator such as [Defendant] to remove the

helium if the government does not elect to do so.”

ORDER – PAGE 11

1. Government’s Right to Extract Helium

The fatal flaw of Relator’s argument as well as its allegations is that Relator very

obviously conflates the terms “extract” and “produce” in both its Complaint and

responsive briefing. The clear language of both § 181 and § 3100.1 reflects these two

terms are not synonymous as they are each used in a separate context within the same

sentence within the same statutory and regulatory provisions. Section 181 addresses

“the right to extract helium from all gas produced from” leased federal lands, and

Section 3100.1 contains identical language. “Courts properly assume, absent sufficient

indication to the contrary, that Congress intends the words in its enactments to carry

“their ordinary, contemporary, common meaning.” Pioneer Inv. Servs. Co. v. Brunswick

Assocs. Ltd. P’ship, 507 U.S. 380, 388 (1993). The word “extract” is defined as “to draw

out or forth; to pull out from a fixed position.” BLACK’S LAW DICTIONARY 704 (10th

ed. 2014). The word “produce” is defined as “to bring (oil, etc.) to the surface of the

earth.” Id. at 1401. Furthermore, “[t]he definition[s] of words in isolation however,

[are] not necessarily controlling in statutory construction. . . . Interpretation of a word

or phrase depends upon reading the whole statutory text, considering the purpose and

context of the statute, and consulting any precedents or authorities that inform the

analysis.” Cascabel Cattle Co., L.L.C. v. United States, 955 F.3d 445, 451 (5th Cir. 2020)

(quoting Dolan v. U.S. Postal Serv., 546 U.S. 481, 486 (2006)). “Beginning with

ORDER – PAGE 12

context, ‘different words within the same statute should, if possible, be given different

meanings.’” Cascabel Cattle, 955 F.3d at 451 (quoting BNSF Ry. Co. v. United States,

775 F.3d 743, 755 n.86 (5th Cir. 2015)).

In its Complaint, Relator’s factual allegations repeatedly, and almost exclusively,

speak to Defendant’s “production” of helium:

[N]o separation agreement(s) existed with respect to the Helium

produced by Kinder Morgan.

Nonetheless, Kinder produced the Helium concurrently with the

CO taken from these units.

2

Kinder Morgan is clearly producing Helium and falsely reporting

it as CO .

2

Mr. Grynberg has knowledge of the Helium unlawfully produced

from federal lands . . . .

Direct compensation is, therefore, owed by Kinder Morgan to the

U.S. government for the value of the Helium unlawfully produced

and sold from Doe Canyon and McElmo Dome during the

relevant time periods.

Kinder Morgan, however, never disclosed the fact that Helium

was a percentage component of CO production; that Helium was

2

being produced in violation of The Helium Act; and never

disclosed the volume and value of that Helium production.

By reporting the entirety of the production volume as CO ,

2

Kinder Morgan knowingly and intentionally misrepresented the

volume and value of CO and Helium produced.

2

ORDER – PAGE 13

[A]nd the failure of Kinder Morgan to disclose, differentiate and

value the component of Helium being produced and reported as

CO .

2

Defendant has failed to report and pay for the value of Helium

produced from Government leases . . . .

By failing to disclose the production and sale of Helium in

contravention to the Helium Act . . . .

[T]he Government has not been paid appropriate royalties and/or

direct compensation due and owing for the production of Helium

from the McElmo Dome and Doe Canyon . . . .

[T]hat the Government recover from Defendant actual damages

in the amount equal to the amount of direct revenues the

Government should have received from the unauthorized

production of Helium, and royalties on the CO properly valued

2

to include its Helium component.

Only once does Relator use the term “extract” in its factual allegations—“By paying

royalties on the reported sales of CO and not separately reporting and paying royalties

2

on the sale of Helium as part of the CO volumes, or alternatively, by failing to pay the

2

Government full value for the Helium unlawfully extracted . . . .” Other than this single

allegation, Relator does not ever allege that Defendant extracted any helium.

Relator’s response does not fare any better. Even though Relator uses “extract”

as opposed to “produce” in its argument, Relator continues to conflate the two terms

and still fails to submit factual support for Defendant extracting any helium from the

CO stream after it was produced. See 30 U.S.C. §181; 43 C.F.R. §3100.1. For

2

ORDER – PAGE 14

example, Relator submits that “[Defendant] admits [in its motion] that it has been

extracting helium from Doe Canyon and McElmo Dome.” But Relator is wrong

because Defendant in no way concedes that it “extracted” helium from either lease;

rather, Defendant admits that it produced CO gas in which commingled helium was

2

present.

The parties do not appear to dispute that, under § 181 and § 3100.1, the right

to extract helium from gas produced from leased federal lands is reserved to the

Government. But, despite Relator’s argument to the contrary, neither § 181 nor

§ 3100.1 prohibit a lessee from producing a gas stream with commingled helium that

is not extracted. In fact, the clear language of both provisions contemplates that gas

produced by lessees on federal lands will contain helium because both provisions

reserve the Government’s “right to extract helium from all gas produced”. 30 U.S.C.

§ 181; 43 C.F.R. §3100.1.

Relator wholly fails to allege Defendant extracted helium from any CO stream

2

it produced at either McElmo Dome or Doe Canyon during the relevant time period.

In fact, Relator’s allegations actually belie any suggestion that Defendant extracted the

helium, including:

Mr. Grynberg has knowledge of the Helium unlawfully produced

from federal lands . . . [and] about sale of Helium as a component

of CO .

2

ORDER – PAGE 15

[T]he normal practice of simply selling the Helium within the

CO stream constitutes a loss of a significant volume of Helium

2

for which the Government has not been compensated.

The sequestered [helium] is principally owned by the CO

2

producers and/or their affiliates.

The Government, therefore, is twice deprived of the full value of

the Helium—once upon sale of the CO [by Defendant]; and

2

again from the 25% preserved for private purchase(s).

That Defendant produced CO gas streams containing commingled helium

2

which was sold with the CO stream, not as a separate product that was extracted, does

2

not constitute a violation of § 181 or § 3100.1 as Realtor alleges, and Relator cites no

other statute or regulation prohibiting the production of a gas stream containing

commingled helium. Sections 181 and 3100.1 speak to the right to extract helium from

the gas stream after the gas stream is produced under the leases, not to produce helium

directly from the federal lands as part of the larger CO gas stream. Relator itself

2

confirms this in its response, arguing that “the proper interpretation” of § 181 is

“evinced by the plain language” that “any extraction of that helium by an operator

without permission” of the Government is the violation. However, Relator’s own

factual allegations in its Complaint simply do not permit this Court to reasonably infer

that Defendant violated § 181 and § 3100.1 because Relator does not allege Defendant

extracted any helium.

ORDER – PAGE 16

2. Government’s Ownership of Helium

As the Court has previously noted, § 181 and § 3100.1 unequivocally reserve

the ownership of helium to the Government. Relator appears to allege that the

Government’s ownership right pursuant to § 181 and § 3100.1 is a separate right in

and of itself that creates an obligation Defendant owes the Government under those

provisions. Under this theory, Relator alleges that Defendant is obligated to

compensate the Government for the commingled helium even though it is not extracted

from the CO gas stream. The Court agrees with Defendant that no such obligation

2

exists. Neither § 181 or § 3100.1 creates any such obligation, and Relator cites no other

statute or regulation that does create such an obligation. This is a purely legal

conclusion Relator alleges that has no support.

In its response, Relator argues that Defendant may not “take the helium” that

belongs to the Government if it does not elect to extract the helium. Relator contends

that the absence of a separation agreement does not “allow[ ] [Defendant] carte

blanche to waste or dispose of the helium as it sees fit.” In its Complaint, Relator cites

50 U.S.C. § 167a and 43 C.F.R. § 16.1 as giving the Secretary of the Department of

the Interior (the “Secretary”) the authority to enter into “agreements with private

parties for the recovery and disposal of helium” from federal lands. 43 C.F.R. § 16.1

provides that,

ORDER – PAGE 17

the Secretary may enter into agreements with qualified applicants

to dispose of the helium of the United States upon such terms as

conditions as he deems fair, reasonable, and necessary to conserve

such helium, whenever helium can be conserved that would

otherwise be wasted or lost to Federal ownership or use in the

production of oil or gas from Government lands embraced in an

oil and gas lease or whenever federally owned deposits of helium-

bearing gas are being drained.

50 U.S.C. § 167a similarly provides that the Secretary “may enter into agreements with

private parties for the recovery and disposal of helium on Federal lands upon such terms

and conditions as the Secretary deems fair, reasonable, and necessary.” As the language

of § 16.1 demonstrates, Congress clearly contemplated that helium may “otherwise be

wasted or lost to Federal ownership or use in the production of oil or gas” from leased

federal lands. To remedy this, the Secretary is authorized to enter into agreements

when “necessary to conserve such helium” and when it can be conserved. The Court

agrees that Defendant is not permitted “carte blanche” privileges with respect to the

commingled helium simply because the Government does not elect to extract it. But

neither does that situation create an obligation for Defendant to somehow “preserve”

the commingled helium for the Government, and Relator points to no statute or

regulation that does create such an obligation. This is particularly so in light of the

Government’s itself recognizing that helium may “otherwise be wasted or lost to

Federal ownership” if not conserved through a separation agreement. See 43 C.F.R. §

16.1.

ORDER – PAGE 18

3. Conclusion

Relator bears the burden of pleading facts to show that Defendant’s liability is

at least plausible. See Iqbal, 556 U.S. at 678. “[C]onclusory allegations will not suffice

to prevent a motion to dismiss and neither will unwarranted deductions of fact.” U.S.

ex rel. Willard v. Humana Health Plan of Tex., Inc., 336 F.3d 375, 379 (5th Cir. 2003).

Relator did not plausibly allege that Defendant violated any federal statute or

regulation in producing a CO gas stream with commingled helium that was never

2

extracted or in failing to compensate the Government for that commingled helium

because the ownership right of helium is reserved to the Government. Moreover, none

of Defendant’s conduct as alleged by Relator violates any other identified statute or

regulation with respect to the helium. Relator wholly failed to meet its burden as there

are simply no allegations that would permit the Court “to draw the reasonable inference

that the defendant is liable” for violations of these statutes and regulations. See Iqbal,

556 U.S. at 678. Because Relator failed to plausibly allege that Defendant violated

any statutory or regulatory obligation owed to the Government in this instance, Relator

has failed to state a claim under the FCA on which relief can be granted on these

grounds.

ORDER – PAGE 19

C. Federal Leases

As an initial matter, the Court addresses the exemplars of the nine unique federal

leases submitted by Defendant in support of its motion. Relator objects to these

documents and urges the Court to determine the motion to dismiss without considering

this “improperly-attached evidence”. While the Court must generally determine a

motion to dismiss for failure to state a claim based solely on the pleadings, the Fifth

Circuit allows district courts to consider documents attached to the motion to dismiss

when those documents “are referred to in the plaintiff’s complaint and are central to

[the plaintiff’s] claim.” Collins, 224 F.3d at 498–99. Review of this limited extrinsic

evidence is permitted because, “[i]n so attaching, the defendant merely assists the

plaintiff in establishing the basis of the suit, and the court in making the elementary

determination of whether a claim has been stated.” Id. at 499. In its motion,

Defendant contends that the “leases are an essential part of the Complaint” because it

“repeatedly refers to the federal leases” prohibiting the production and sale of any CO

2

stream containing commingled helium without paying the Government for the value

of the helium. In its response, Relator concedes that the Complaint “references” the

leases and that “the language of those leases plays a role in the determination of this

lawsuit.” These leases are, therefore, central to Relator’s claim. See id. Relator’s

objection to this extrinsic evidence is that the limited exception does not apply here

ORDER – PAGE 20

because “it is clear that [Defendant] did not attach all of the applicable leases.” Relator

states that “[Defendant] may be correct that there are ‘nine unique lease forms at issue,’

or it may not.” Relator takes issues with Defendant, “the only party that actually has

the leases in its possession”, identifying these “exemplars” as the “nine unique lease

forms at issue.” Relator complains that no discovery has taken place and asks the Court

to allow the parties to conduct discovery on the leases, including deposing witnesses

on the leases.

As to Relator’s request for discovery on the lease, the Court denies this request.

Skidmore Energy, Inc. v. KPMG LLP, 3:03-CV-2138-B, 2004 WL 3019097, at *12 n.6

(N.D. Tex. Dec. 28, 2004)(Boyle, J.) (“The Court will not allow the Plaintiffs to

conduct a ‘fishing expedition’ in an effort to manufacture their claims.”). Turning to

Relator’s objection, Relator states that “it is clear that [Defendant] did not attach all

of the applicable leases”; however, Relator provides no basis for this statement. For

example, Relator does not argue that other applicable lease forms actually do exist and

contain language other than that contained in the exemplars provided (which all

contain nearly, if not completely, identical language regarding helium). The Court

recognizes that Relator represents it sought the leases through the Freedom of

Information Act (“FOIA”) requests prior to filing this suit; however, there is no further

explanation of what occurred in relation to those FOIA requests or why this suit was

ORDER – PAGE 21

filed before Relator had those leases considering the FCA claim is based, in part, on

alleged violations of the lease provisions. Moreover, in its responsive arguments

regarding Defendant’s conduct violating the leases, Relator cites to specific language in

at least one of these exemplars and states that it is “similar to the statutes and

regulations” cited by Relator in its Complaint. Therefore, the Court finds these nine

exemplars of the leases to be appropriate for consideration because they are referred to

in Relator’s Complaint and are central to this claim. See Collins, 224 F.3d at 498–99.

Even without considering the exemplars, Relator fails to plausibly allege

Defendant violated any of the leases. In its Complaint, Relator alleges that Defendant

violated the federal leases in producing and selling CO streams with commingled

2

helium and not compensating the Government for that helium. Nowhere does Relator

actually identify the lease provision(s) or language allegedly being violated by

Defendant’s production of CO with commingled helium and/or for which Defendant

2

failed to compensate the Government. In its Complaint, Relator alleges that “leases

[of federally-owned properties] exclude the right to extract Helium.” Other than

reference to royalties owed generally under federal leases pursuant to federal

regulations, there are no other factual allegations regarding the leases and certainly no

specific factual allegations. For this reason alone, Defendant argues that Relator has

failed to sufficiently allege a claim regarding the federal leases. The Court agrees. “To

ORDER – PAGE 22

survive a motion to dismiss, a complaint must contain sufficient factual matter,

accepted as true, to ‘state a claim to relief that is plausible on its face.’” Iqbal, 556 U.S.

at 678. It is Relator’s burden as the party bringing this action to allege sufficient factual

content to plausibly allege a legally cognizable claim. With nothing more than a few

conclusory statements and legal conclusion, there is no well-pleaded facts supporting

Relator’s claim that Defendant violated the leases it entered into with the Government

on McElmo Dome and Doe Canyon fields. Even without consideration of the exemplar

leases, Relator’s claim based on the leases fails. See id.

When the Court does consider the exemplars submitted by Defendant, it is ever

more clear that Relator did not sufficiently allege a violation of the leases, because none

of them prohibit Defendant from producing a CO stream with commingled helium nor

2

do they require Defendant to compensate the Government for helium within the CO

2

stream even if it is never extracted. As the exemplars establish, these leases

acknowledge the Government’s ownership of and right to extract helium from gas

streams produced from federal lands. As previously stated, Relator acknowledges the

language in the leases “is similar” to § 181 and § 3100.1. But, citing one of the

exemplars, Relator contends that the lease permits Defendant “to ‘drill for, mine,

extract, remove, and dispose of all the oil and gas deposits, except helium gas. . .’ In other

words, [Defendant] is not permitted to extract helium from McElmo Dome and Doe

ORDER – PAGE 23

Canyon.” Relator argues that “the leases are clear” that if the Government does not

choose to extract the helium, “[Defendant] is not allowed to extract the helium, but

must preserve it.”

First, Relator does not allege in its Complaint that Defendant was obligated

under the leases to “preserve” the commingled helium if the Government did not elect

to extract it. Relator may not amend its Complaint through its response to Defendant’s

motion to dismiss. See Phalanx Grp. Int’l v. Critical Sols. Int’l, 3:18-CV-244-B, 2019 WL

954727, at *6 (N.D. Tex. Feb. 26, 2019)(Boyle, J) (claim for breach of contract

dismissed where plaintiff attempted to “shift[ ] grounds” alleging, for first time in its

response, that an amendment to the parties’ agreement, rather than agreement itself,

was basis of its breach of contract claim). “[I]t is wholly inappropriate to use a response

to a motion to dismiss to essentially raise a new claim for the first time.” Diamond

Beach Owners Assoc. v. Stuart Dean Co., Inc., Civ. Action No. 3:18-CV-0173, 2018 WL

7291722, at *4 (S.D. Tex. Dec. 21, 2018). The Court will not consider this as it is

asserted for the first time in the response.

Relator fails to cite any language in the leases that requires Defendant: (1) to

pay the Government for any commingled helium that is never extracted; (2) take any

specific action with respect to the commingled helium if the Government does not elect

to extract it; or that prohibits Defendant (3) from producing any CO stream with

2

ORDER – PAGE 24

commingled helium. Furthermore, as previously discussed at length with respect to §

181 and § 3100.1, Relator again misunderstands the term “extract” in this instance.

The language of the exemplar lease that Relator cites in support of its argument states,

“The [Government] . . . reserves the ownership of helium and the right to extract or have

it extracted from all gas produced under this lease. . . .” (This language is found in all of the

exemplar leases Defendant submitted.) Just as the language of § 181 and § 3100.1

provide, this language in the leases refers to extracting helium from the gas produced

from the federal land, not extracting or “producing” helium directly from the federal

land. It is that process of extracting, or separating, the commingled helium from the

larger CO stream after Defendant produced it from McElmo Dome and Doe Canyon

2

which is reserved for the Government. Relator cites to no other lease provision or

language to support its argument that it plausibly alleged a contractual obligation

Defendant owed the Government pursuant to the leases or that Defendant violated the

federal leases. The Court concludes Relator did not plead factual allegations which

would allow the Court to reasonably infer that Defendant is liable for violating the

federal leases for McElmo Dome and Doe Canyon. See Iqbal, 556 U.S. at 758.

Accordingly, Relator failed to state a claim under FCA on which relief can be granted

on these grounds.

ORDER – PAGE 25

D. Disclosure and Identification of Helium Component and

Corresponding Royalty

Relator also alleges Defendant violated relevant federal regulations in failing “to

properly identify, disclose, and price the Helium component of CO produced from”

2

the McElmo Dome and Doe Canyon leases. In its Complaint, Relator cites several

federal regulations as support for its allegation that Defendant was required to report

“the correct value of natural gas produced from federally owned property”, which

included helium, and to pay royalties on that commingled helium.

None of these regulations which Relator cites, however, actually support its

allegation that Defendant was required to report helium volumes and compensate the

Government accordingly. Those regulations specifically excluded helium from

reporting or address helium that is marketed as a separate product, not commingled

helium as Relator has alleged. Relator concedes in its response that, “[Defendant]

contends that there are no other regulations that require it to report helium volumes

to the [Government]. As regards royalty payments, this is true enough . . .” In an

effort to salvage its allegation that Defendant violated a reporting obligation, Relator

states “[b]ut this is far from the end of the inquiry.” Changing course, Relator identifies

for the first time in its response two federal forms it contends impose a duty on

Defendant to accurately report the commingled helium and the volume in the CO gas

2

it produces at McElmo Dome and Doe Canyon—the Office of Natural Resources

ORDER – PAGE 26

Revenue Form 2014s (“ONRR”) and the Oil and Gas Operations Reports (“OGOR”).

Relator does not cite let alone rely on either form in its Complaint as the basis for its

allegation that Defendant was obligated to “report and pay for the value of Helium

produced from Government leases” and that Defendant’s failure to do so allegedly

“concealed violation(s)” of § 181 and/or § 3100.1. As previously noted, Relator may

not amend its Complaint through its response to Defendant’s motion to dismiss. See

Phalanx Grp., 2019 WL 954727, at *6 (claim for breach of contract dismissed where

plaintiff attempted to “shift[ ] grounds” alleging, for first time in its response, that an

amendment to the parties’ agreement, rather than agreement itself, was basis of its

breach of contract claim). “[I]t is wholly inappropriate to use a response to a motion

to dismiss to essentially raise a new claim for the first time.” Diamond Beach, 2018 WL

7291722, at *4. The Court will not consider these forms as the basis for Relator’s

allegation that Defendant violated federal regulatory reporting obligations as they are

asserted for the first time in its response. Because Relator concedes in its response that

the regulations it cites in the Complaint do not support its allegations that Defendant

was obligated to report and pay royalties on the commingled helium and that

Defendant violated these regulations, the Court concludes Relator did not sufficiently

plead this claim. Because Relator failed to plausibly allege Defendant violated a

regulatory obligation to report the helium separately from the CO gas produced and

2

ORDER – PAGE 27

to pay royalties to the Government on the commingled helium separately from those

paid for the CO gas, Relator failed to state a claim under the FCA on which relief can

2

be granted on these grounds.

E. Government’s Statement of Interest

Although the Government declined to intervene in this case, it remains the party

in interest in this qui tam action. Eisenstein, 556 U.S. at 930. After briefing related to

Defendant’s motion to dismiss was completed, the Government moved to file a

Statement of Interest (“SOI”) (Doc. No. 45), which the Court granted. The Court also

granted leave to Relator and Defendant to file their respective responses to the

Government’s SOI.

The Court is not bound by the Government’s SOI but has considered it as

providing “the valuable perspective of the [Department of Justice]” on the statutes and

regulations at issue. See Alvey v. Gualtieri, Case No. 8:15-CV-1861-T-33AEP, 2016 WL

6071746, at *2 (M.D. Fl. Oct. 17, 2016) Moreover, the Government filed its SOI only

to address,

Relator’s incorrect assertions that (1) [Defendant] is prohibited

from producing helium from federal, leased lands, along with a

CO gas stream and (2) [Defendant] is obligated to compensate

2

the [Government] for helium produced from federal, leased lands,

as part of a CO stream, regardless of whether the helium is

2

ultimately extracted from the gas stream or sold as a separate

product.

ORDER – PAGE 28

See Doc. No. 45 at 1. (The Government also addressed “Defendant’s assertion that a

regulatory violation is not material under the FCA, as a matter of law, where the

[G]overnment knows of the violation and takes no action.” The Court does not address

this argument made by Defendant as the Court finds Relator’s Complaint must be

dismissed as a matter of law because Relator failed to sufficiently allege any underlying

violation by Defendant to support Relator’s FCA claim.)

The Government’s SOI only confirms what the Court had already concluded in

its absence. Relator confuses the terms “extract” and “produce” which is critical in

establishing liability under the relevant federal statutes, regulations, and leases. As the

Government points out, “Relator confuses the production of helium from a formation

as part of a larger gas stream with the extraction of helium from the gas stream after it

has been produced from a formation.” Furthermore, “the law does not require a party

to compensate the government for comingled helium that is produced as part of a gas

stream from federal lands, but that is never extracted from the gas stream or sold as a

separate product.” The Government confirms that “[Defendant] is allowed to produce

gas that contains CO and commingled helium from the areas at issue, and [Defendant]

2

is not obligated to compensate the government for the helium unless the helium is

extracted from the CO gas stream.”

2

ORDER – PAGE 29

The Court reviewed and considered Relator’s response; however, the Court is

not persuaded any more by these arguments than it was by Relator’s response and sur-

reply to the motion to dismiss. The Court finds it humorous, if not ironic, that Relator

accuses the Government of “never actually identif[ying] ‘the law’ to which it is

referring” in stating that no statute or regulation proscribes Defendant’s actions when

Relator itself does the same—never identifies “the law” which specifically prohibits

Defendant from producing a gas stream contained commingled helium that is never

extracted and which specifically requires Defendant to pay the Government for that

commingled helium even if it is not extracted. Relator contends that “[Defendant’s]

liability under the FCA flows from its failure to report to the [Government] that it was

producing helium out of the formations, instead reporting helium volumes as it [sic]

they were CO .” The Government clearly stated in its SOI that Defendant is allowed

2

to produce helium from a formation as part of a larger gas stream; it is only the

extraction of helium from that gas stream after it has been produced from the formation

that triggers an obligation to compensate the Government.

The Government filed a Reply in Support of its Statement of Interest in which

the Government restated that “the obligation to compensate the Government for

helium from federal lands arises when the helium is extracted from the gas stream—

not when helium is commingled in a produced gas stream.”

ORDER – PAGE 30

Again, the Government’s SOI is not binding on this Court, but, as the

Government is the real party in interest in this case, the Court finds it, and its Reply,

valuable and informative in confirming what the Court had concluded.

F. Conclusion

As alleged in the Complaint, Relator’s FCA claim is premised on allegations that

federal statutes, regulations, and leases prohibit Defendant from producing (and

selling) a CO gas stream with commingled helium, obligate Defendant to report the

2

commingled helium separate from the CO gas produced, and require Defendant to

2

compensate the Government for the commingled helium even if it is not extracted.

Taking all of Relator’s well-pleaded allegations as true and viewing those in the light

most favorable to Relator, as the Court is required to do, Relator’s allegations are not

facially plausible because the Court cannot draw a reasonable inference that Defendant

is liable for any violation of a statute, regulation, or lease. Relator fails to plausibly

allege any obligation Defendant owed the Government under any statute, regulation,

or lease. The Court cannot infer even the “mere possibility of misconduct” by

Defendant based on the well-pleaded facts, therefore Relator has not shown that it is

entitled to relief. Iqbal, 556 U.S. at 678. “[A] complaint should not be dismissed

under [Rule 12(b)(6)] for failure to state a claim unless it appears beyond doubt that

the plaintiff can prove no set of facts in support of his claim which would entitle him

ORDER – PAGE 31

to relief.” Ramming, 281 F.3d at 161. For all the foregoing reasons set forth in the

Court’s analysis, it is more than apparent that Relator can prove no set of facts in

support of its FCA claim which would entitle it to relief. The Court must grant

Defendant’s motion to dismiss as Relator does not plead a claim with facial plausibility

and fails to state a claim on which relief can be granted.

IV. Relator’s Request to Amend the Complaint

When a party cannot amend a pleading as a matter of course, the party may

amend a pleading only “with the opposing party’s written consent or the court’s leave.”

FED. R. CIV. P. 15(a)(2). “The court should freely give leave when justice so requires.”

Id. However, “leave to amend under Rule 15 is by no means automatic.” Goldstein v.

MCI WorldCom, 340 F.3d 238, 254 (5th Cir. 2003). Although Rule 15(a) favors

granting leave to amend, the decision whether to grant or deny leave to amend a

pleading is a matter within the district court’s discretion. See Thomas v. Chevron U.S.A.,

Inc., 832 F.3d 586, 590–91 (5th Cir. 2016). It is well established that a party seeking

to amend a pleading under Rule 15(a) need not always file a formal motion; but the

party must “give the court some notice of the nature of his or her proposed

amendments” and support the request for leave to amend with “some specificity” which

is required. Id. at 590; see Willard, 336 F.3d at 387 (“A formal motion is not always

required, so long as the requesting party has set forth with particularity the grounds for

ORDER – PAGE 32

the amendment and the relief sought.”). A plaintiff that simply “tack[s] on a general

curative amendment request” in response to a motion to dismiss does not provide a

sufficient basis for why the court should grant leave. Goldstein, 340 F.3d at 254. “[A]

bare request in an opposition to a motion to dismiss—without any indication of the

particular grounds on which the amendment is sought, cf. FED. R. CIV. P. 7(b)—does

not constitute a motion within the contemplation of Rule 15(a).” Willard, 336 F.3d

at 387(internal quotation omitted).

In a single paragraph of its response, Relator requests that, “if the Court believes

that the Complaint is deficient, Grynberg requests that the Court grant leave to amend

its Complaint.” Relator then quotes a Southern District of Texas case stating that a

plaintiff should generally be allowed to amend once before the action is dismissed.

Relator’s one paragraph entitled “Alternative Motion for Leave to Amend” is the

epitome of “a general curative amendment request.” See Goldstein, 340 F.3d at 254.

Realtor provides no explanation for how it might cure any of the deficiencies raised by

Defendant, such as whether there are additional, specific facts that might remedy the

pleading defects. See id. at 255 (holding that the district court properly exercised its

discretion in denying leave to amend because plaintiffs “did not suggest in their

responsive pleading any additional facts not initially pled that could, if necessary, cure

the pleading defects”). A party may amend its pleading once as a matter of course “any

ORDER – PAGE 33

time before a responsive pleading is served.” FED. R. CIV. P. 15(a). A motion to dismiss

under Rule 12(b)(6) is not a responsive pleading, therefore “the filing of such a motion

does not extinguish a party’s right to amend as a matter of course.” McKinney v. Irving

Indep. Sch. Dist., 309 F.3d 308, 315 (5th Cir. 2002). Relator did not amend its

Complaint as a matter of course even after Defendant filed the instant motion to

dismiss asserting numerous pleading deficiencies.

The Fifth Circuit has “not provided strict guidelines as to what constitutes a

sufficient request for leave to amend,” but that court has stated that “it is clear that

some specificity is required.” Thomas, 832 F.3d at 590. The Fifth Circuit has previously

held a district court did not abuse its discretion in denying the plaintiffs leave to amend

where, as here, the plaintiffs: (1) did not amend their complaint as a matter of right,

(2) submitted a general curative request to amend their complaint in their response to

the motion to dismiss, (3) did not submit a proposed amended complaint to the court,

and (4) failed to provide “some specificity” to the court and defendant of the substance

of their proposed amendment. McKinney, 309 F.3d at 315. For those same reasons,

the Court denies Relator’s request to amend its Complaint. See id.; see also Goldstein,

340 F.3d at 254-55 (affirming denial of motion for leave to amend where plaintiffs

stated only that “Should this Court find that the Complaint is insufficient in any way,

however, plaintiffs respectfully request leave to amend.”).

ORDER – PAGE 34

In the alternative, the Court would nevertheless deny Relator’s motion for leave

to amend because it would be futile. Even if a party provides sufficient specificity and

notice of the proposed amendments, the Court may still deny leave to amend for

“‘undue delay, bad faith or dilatory motive on the part of the movant, repeated failure

to cure deficiencies by amendments previously allowed, undue prejudice to the

opposing party by virtue of allowance of the amendment, futility of amendment, etc.’”

Thomas, 832 F.3d at 591 (quoting Foman v. Davis, 371 U.S. 178, 182 (1962)). If futility

is the basis for denying leave to amend, “‘the court is usually denying leave because the

theory presented in the amendment lacks legal foundation or because the theory has

been adequately presented in a prior version of the complaint.’” Thomas, 832 F.3d at

591 (quoting Jamieson By and Through Jamieson v. Shaw, 772 F.2d 1205, 1208 (5th Cir.

1985)).

As explained in depth in the Court’s analysis, Relator has not asserted any basis

for Defendant’s liability under the statues, regulations, and/or leases Relator cites, and

most importantly, the Court concludes those defects cannot be cured. In its response

and sur-reply to the motion to dismiss and its response to the Government’s SOI,

Relator failed to identify specific supporting facts that would in any way allow the

Court to reasonably infer that Defendant is liable for any of the alleged misconduct.

Also in its response and sur-reply, Relator requests the Court allow discovery as to the

ORDER – PAGE 35

federal leases, Defendant’s reporting regarding helium, and “other relevant factual

discovery” before the Court dismisses the case—essentially, “discovery to develop the

necessary facts to properly plead its claim.” Skidmore Energy, 2004 WL 3019097, at

*12 n.6 (“The Court will not allow the Plaintiffs to conduct a ‘fishing expedition’ in an

effort to manufacture their claims.”). The Court concludes any amendment to the

Complaint would be futile. See id. at *12.

Accordingly, for the all foregoing reasons, the Court denies Relator’s alternative

motion for leave to amend its Complaint.

V. Conclusion

The Court grants Defendant’s motion to dismiss. Taking the well-pleaded facts

as true, Relator did not plead sufficient facts to allow the Court to reasonably infer that

Defendant owed any obligation or duty to the Government pursuant to federal

statutes, regulations, and/or leases, nor that Defendant is liable for violating those

federal statutes, regulations, and/or leases. Because Relator’s FCA claim is premised on

these alleged underlying statutory, regulatory, and contractual obligations and

violations, Relator has not shown that it is entitled to relief on its FCA claim. See Iqbal,

556 U.S. at 679.

ORDER – PAGE 36

Furthermore, the Court denies Relator’s request to amend its Complaint.

Therefore, the Court hereby dismisses Relator’s FCA claim. All other relief not

expressly addressed is hereby denied.

SO ORDERED.

Signed September 30", 2020.

ED KINKEADE

UNITED STATES DISTRICT JUDGE

ORDER — PAGE 37

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.