holding that plaintiffs could not establish a protected property interest “unless and until it is proven that they are entitled to the zoning variance which they sought”
How later courts described this case
- holding that plaintiffs could not establish a protected property interest “unless and until it is proven that they are entitled to the zoning variance which they sought”
- denying procedural due process claim when the plaintiff “is currently pursuing its appeal of the . . . Zoning Hearing Board’s decision through Pennsylvania’s court system”
- the procedural due process guarantee protects against “arbitrary takings”
- “In land-use cases, only executive action that ‘shocks the conscience’ constitutes a substantive due process violation.” (citations omitted)
Written by the judges who cited it.
The opinion
THE UNITED STATES DISTRICT COURT
FOR THE MIDDLE DISTRICT OF PENNSYLVANIA
ANTHONY HALCHAK, et al., :
:
Plaintiffs, :
v. : 3:18-CV-1285
: (JUDGE MARIANI)
DORRANCE TOWNSHIP BOARD OF :
SUPERVISORS, et al., :
:
Defendants. :
MEMORANDUM OPINION
I. INTRODUCTION
Presently before the Court are three cross-motions for summary judgment.
Defendants Dorrance Township Board of Supervisors (the “Dorrance Board”) and Alan
Snelson (Doc. 64) (together, “Dorrance Defendants”), and Code Inspections, Inc. (“CII”) and
Ken Fenstermacher (Doc. 71) (together, “CII Defendants”), move for summary judgment on
all claims against them. Plaintiffs Anthony and Kelly Halchak move for summary judgment on
their procedural due process claims against the Dorrance Board, CII, and Fenstermacher
(Doc. 66).
Plaintiffs filed their original Complaint on November 18, 2015, (Doc. 1-1), but the
operative complaint is the Amended Complaint, an action in mandamus filed in the Court of
Common Pleas of Luzerne County on December 7, 2017. (Doc. 2-1). Dorrance Defendants
removed the action to this Court on June 26, 2018, with CII’s and Fenstermacher’s consent.
(Doc. 1 ¶ 9.) Although the Amended Complaint contains five counts, the Court of Common
Pleas denied Plaintiffs’ Petition for Leave to File an Amended Complaint as to Counts II and
III. (Doc. 2 ¶ 3 & n.1.) Counts I, IV, and V remain. Count I does not identify a specific cause
of action, but alleges that Defendants acted “in violation of the Plaintiffs [sic] procedural due
process rights and civil rights under federal and state law” and demands judgment directing
that Defendants “issue an Occupancy Permit” and awarding damages, costs and attorney’s
fees. (Doc. 2-1 at ¶ 52–54, 56.) The federal due process claims provide the basis for federal
jurisdiction under 28 U.S.C. § 1331, and supplemental jurisdiction over the mandamus relief
is proper under 28 U.S.C. § 1367. Counts IV and V are claims for “damages” against
Defendants.
For the reasons set forth herein, Defendants’ Motions are granted in their entirety, and
Plaintiffs’ Motion is denied in its entirety.
II. STATEMENT OF FACTS
This case reflects Plaintiffs’ efforts to obtain two permits, a zoning permit and an
occupancy permit,1 both needed to commence the lawful operation of a used car lot on their
property. The briefs reflect strong disagreement between the parties as to whether and how
each of the permits need to be obtained, due to underlying disputes regarding the past use
1 The parties refer to the second permit as both an “occupancy permit” and a “certificate of
occupancy.” The Court understands the terms to be interchangeable, and will refer to the permit as an
“occupancy permit.”
of the property and the parties’ interpretations of the relevant zoning and building code
provisions. However, the Record itself demonstrates no dispute as to the material facts.
The following facts are undisputed, unless otherwise noted.
A. History of Property
On November 13, 2009, Plaintiffs purchased two adjoining parcels of land in Dorrance
Township, Luzerne County, Pennsylvania from John and Maria Colon. (Plaintiffs’ Concise
Statement of Material Facts, Doc. 67 at ¶ 1; see generally 686 South Mountain Blvd. Deed,
Doc. 65-1). Plaintiffs intended to operate a used car lot on the property. (Doc. 67 at ¶ 2.)
The Amended Complaint and “documents associated with the transfer of the property”
identify the property’s address as 686 South Mountain Boulevard. (Dorrance Defendants’
Statement of Material Facts, Doc. 65 at ¶¶ 9–10; see, e.g., 686 South Mountain Blvd. Deed,
Doc. 65-1 at 8.) Plaintiffs aver that the mailing address of the whole property was 686 South
Mountain Boulevard when they purchased it, but that the two parcels acquired separate
mailing addresses—686 and 688 South Mountain Boulevard—“[s]ometime in 2010.”
(Plaintiffs’ Counterstatement of Material Facts in Response to Statement by CII Defendants,
Doc. 83 at ¶ 5.)
The property with a current mailing address of 686 South Mountain Boulevard has a
single-family house and pool. (Doc. 65 at ¶ 12; A. Halchak 6/23/2020 Dep. Tr., Doc. 65-5, Ex.
E at 98:3–98:6).2 The adjoining parcel is the subject of this litigation (the “Property”) and
currently has a mailing address of 688 South Mountain Boulevard. (Doc. 65 at ¶¶ 11, 13;
Aerial Photograph, Doc. 65-7, Ex. G at 2).3 The Property has a “one-door garage and an
attached room with a separate entrance,” both of which existed when Plaintiffs purchased the
Property. (Doc. 65 at ¶ 14, Doc. 65-5, Ex. E at 97:18–98:2).
The Property is located in a zoning district designated as a “B-2 Highway Business
District” under the Zoning Ordinance for Dorrance Township enacted January 8, 2007. (Doc.
67 at ¶ 3; Doc. 67-1, Ex. 2.)
The parties agree on the following history of the ownership of the Property, though the
extent to which these details were known to the parties when the relevant events occurred is
2 Plaintiffs deny this statement, alleging that “[a]t all times relevant to this matter the property
known as 686 South Mountain Boulevard consisted of a garage and office.” (Doc. 79-1 at ¶ 12). However,
Mr. Halchak’s testimony directly contradicts Plaintiffs’ denial:
Q. And when I say the property, let’s be specific. 688 South Mountain Boulevard?
A. That’s correct.
MS. DOUGHERTY: Objection.
BY MR. CROTTY:
Q. Well, that’s – when I’m talking about property right now, that’s what we’re talking
about. Right?
A. Yes, 688, yes, where the garage and the office is at.
Q. Okay. So do you recognize that – it’s your position that 686 is a separate and distinct
parcel of ground?
A. Yes. It’s a house.
(A. Halchak 6/23/2020 Dep. Tr. at 97:18–98:6).
3 Plaintiffs deny this statement. However, their denial relates solely to the description of the 686
South Mountain Boulevard property as “residential,” (Doc. 79-3 at ¶ 11), as they argue that “at all times
during the dealings between the Halchaks and Snelson, the mailing address [of the Property] was 686
South Mountain Boulevard.” (Id. at 13–14.)
not clear. Anna and Joseph Kamionka bought the Property on December 12, 1978, and sold
it to Fairway Consumer Discount Company on March 29, 1999. (Doc. 65-1, Ex. A at 38,
Kamionka Deed; id. at 34, Fairway Deed.)4 Fairway Consumer Discount Company sold the
Property to Andrey and Yelena Makarenko on November 1, 1999. (Id. at 32, Makarenko
Deed.) The Makarenkos sold the Property to John and Marie Colon on May 1, 2009. (Id. at
30, Colon Deed.)
From 1999 until 2009, the Record reflects no evidence of the operation of an
automotive sales business on the Property, but Plaintiffs allege (without evidence) that the
Colons “had placed cars on the property for sale.”5 (Doc. 65 at ¶ 17; Doc. 79-3 at ¶ 17.)
Nonetheless, Plaintiffs acknowledge that the Property was vacant, and did not contain an
4 The Kamionkas held two vehicle salesperson licenses that expired in 1974 and 1976. (Doc. 65 at
¶ 25; Anna Kamionka License, Doc. 65-11, Ex. K at 2; Joseph Kamionka License, Doc. 65-12, Ex. L at 2.)
5 Defendants aver that the Property was vacant from 1999 through 2009 and was “not used for an
auto sales use business” during that time. (Doc. 65 at ¶ 17). Plaintiffs dispute this because they
understood that the Colons had “placed cars on the property for sale.” (Plaintiffs’ Counterstatement of
Facts, Doc. 79-3 at ¶ 17.) Defendants aver that “Plaintiffs have no evidence of the Colons’ use of the
property, other than understanding that it was vacant.” (Doc. 65 at ¶ 16; Doc. 65-4, Ex. D at 187; Doc. 65-5,
Ex. E at 102–03.) Plaintiffs respond that they “understood the property had been previously used for the
operation of a used car sales business, had no other use, and at the time the Colons owned it, they had
placed vehicles on the property for sale.” (Doc. 79-3 at ¶ 16.) In his deposition, Mr. Halchak stated, “I don’t
know if it was formal, but [Mr. Colon] did have a few cars there that he would sell now and then,” but
clarified that he did not purchase a business from the Colons. (A. Halchak 3/13/2020 Dep. Tr., Doc. 79-5,
Ex. 2 at 15:16–25.) Mrs. Halchak explained that they “were told there was an existing used car lot there in
the past” but acknowledged that no business of the sort was existing at the time that Plaintiffs purchased
the property from the Colons. (K. Halchak 8/19/2020 Dep. Tr., Doc. 79-6, Ex. 3 at 104:19–105:4.)
Because Plaintiffs present no evidence of the Colons’ use of the Property, and because their
testimony makes clear that there was no existing business on the Property when Plaintiffs purchased it,
and that they did not purchase a business from the Colons, the Court finds it undisputed that no automotive
sales business operated on the Property from 1999 through 2009.
automotive sales business, when they purchased it. (A. Halchak 3/13/20 Dep. Tr. at 98:13–
16.)
Plaintiffs had no dealings with the Makarenkos, Fairway Consumer Discount
Company, or the Kamionkas, and obtained from them no records of the use to which these
previous owners put the Property. (Doc. 65 at ¶¶ 21–23.) Although Mr. Colon allegedly told
Mr. Halchak that “there was a car lot” on the Property, Mr. Colon “didn’t specify whether it was
a licensed car dealership.” (Doc. 79-5, Ex. 2 at 30:4–13.)
B. Governing Zoning Provisions
The Dorrance Township Zoning Ordinance provides that “[n]o building, structure or
sign shall be erected, constructed, moved, added to or structurally altered, nor shall any land,
structure or building be put to any use without first obtaining a zoning permit from the Zoning
Officer.” Dorrance, Pa., Zoning Ordinance § 1302.1 (Jan. 8, 2007). A certificate of zoning
compliance is also required “prior to the occupation for the use or change of use of any
building, structure or land.” Id. § 1303. “Change of use” is defined as “[a]ny use which differs
from the previous use of a building, structure, or land.” Id. § 201.
Furthermore, the Dorrance Township Subdivision and Land Development Ordinance
enacted on September 28, 2006 [SALDO], requires that
[n]o subdivision or land development of any lot, tract, or parcel of land shall be
made, and no street, sanitary sewer, water main, gas, oil, or electric
transmission line, or other facilities in connection therewith shall be laid out,
constructed, opened, or dedicated for public use or travel or for the common
use of occupants of buildings abutting thereon, except in accordance with the
provisions of this Ordinance.
SALDO § 103.1. Further,
[n]o lot in a proposed subdivision or land development may be sold, and no
zoning and/or building permit to erect any building, structure or other
improvements upon land in a subdivision or land development may be issued
unless and until . . . [t]he plans and application have been granted final
approval by the Township Board of Supervisors.
Id. § 103.2. SALDO defines “Land Development” as, inter alia, “[t]he improvement of
one lot or two (2) or more contiguous lots, tracts or parcels of land for any purpose involving
. . . a single nonresidential building on a lot or lots regardless of the number of occupants or
tenure.” Id. at § 202.
Under the Pennsylvania scheme for zoning matters, the zoning hearing board has
jurisdiction to hear and render final adjudications in matters which include a zoning officer's
“failure to act” on an application for any permit. 53 P.S. § 10909.1(a)(3).
C. 2009 Zoning Permit Application
In November 2009, Plaintiffs contacted the Dorrance Board seeking a permit for a
used car dealership. (Doc. 65 at ¶ 27.) The Dorrance Board directed Plaintiffs to Zoning
Officer Alan Snelson. (Id.) In their initial dealings with the Dorrance Board and Snelson,
Plaintiffs referred to the Property for which they sought a zoning permit as 686 South Mountain
Boulevard. (Id. at ¶ 28.) On November 17, 2009, Snelson emailed Ms. Halchak regarding
Plaintiffs’ request:
Kelly attached is an application for a Land Development and a zoning permit at
686 S Mountain Blvd. as well as the fee structure.
The location is a B-2 zoning district. The intent is the development of a used
car lot.
To my knowledge there is not an existing structure on the property.
Also, to my knowledge there is not an existing septic system or well on the
property.
Therefore you’ll need to obtain approval for the project at the Planning
commission prior to applying for a Zoning PErmit [sic]
Should you have any questions regarding this matter feel free to contact me
[sic]
(Doc. 65-13, Ex. M at 2). Ms. Halchak replied:
We received your letter and zoning application, thank you, just want to clarify
one point, your letter mentioned there was no structure, there is an existing
structure on the property. There was a previous business there at some
point,there [sic] is a garage and attached room with a separate entrance.
Thanks again for the forms,If [sic] I have any further questions I will call or email
you.
(Doc. 65 at ¶ 32; Doc. 65-9, Ex. I at 2).
On November 24, Snelson replied to Ms. Halchak: “Thanks for the info on the building.
That may change things for you as it relates to the Land Development Application, since the
building and property may have had this activity approved in the past.” (Doc. 65 at ¶ 34; Doc.
65-15, Ex. O at 4). He added, “I will visit the site as well as search the files and let you know
what my findings are.” (Id.) Snelson testified that he subsequently visited the Property6 and
6 Defendants point out that Plaintiffs referred to the Property as “686 S. Mountain Blvd.” in their
initial dealings with Dorrance Defendants. (Doc. 65 at ¶ 33.) However, they have not suggested that
Snelson visited the wrong property.
searched through his files, which are kept alphabetically in a filing cabinet in the Dorrance
Township office. (A. Snelson 3/12/2020 Dep. Tr., Doc. 65-16, Ex. P at 22:16–24; 27:12–19;
50:1–24.)7 His search did not recover any records approving either 686 or 688 South
Mountain Boulevard for this “activity” in the past. (Id. at 57:2–18.)
Plaintiffs had informed Snelson that the Colons and the Makarenkos were previous
owners of the property,8 but they did not provide him with any records or other information
regarding prior land development approvals associated with 686 or 688 South Mountain
Boulevard. (Id. at 57:11–58:6; A. Halchak 3/13/2020 Dep. Tr., Doc. 65-10, Ex. J at 80:8–
81:22.)9
7 Plaintiffs “admit that Snelson testified he searched the records,” but they “questioned whether
Snelson ever made any search of the municipal records for the zoning permits.” (Doc. 79-3 at ¶ 35).
Because Snelson testified he searched the records and Plaintiffs have produced no evidence to dispute as
much, the Court deems this statement admitted.
8 The Record does not clearly demonstrate whether Plaintiffs also informed Snelson of the
Kamionkas. Ms. Halchak first testified that she “[did not] remember if we mentioned [Kamionka’s] name at
that time . . . In the early meetings we had with Mr. Snelson before we were issued the zoning permits, I
don’t remember if we gave him the name of the used car lot.” (Doc. 79-5, Ex. 3, K. Halchak 8/19/20 Dep.
Tr. at 105:18–106:4.) In the same deposition she testified that she “believe[s]” that Mr. Halchak “had given
[Mr. Snelson] the name of the former owners of the property and that’s when the name Kamionka was first
mentioned.” (Id. at 106:11–17.) Snelson testified only that Plaintiffs told him about the Colons and the
Makarenkos in 2009. (A. Snelson 3/12/2020 Dep. Tr. at 57:2–58:6.)
While Plaintiffs do not argue in their briefs that Snelson was or should have been aware of the
name “Kamionka” prior to 2014, the Court finds there is a dispute as to whether Plaintiffs told Snelson
about the prior owners with that surname during their interactions in 2009 and 2010.
9 Plaintiffs deny Dorrance Defendants’ statement that “Plaintiffs were afforded the opportunity to
submit additional documentation as to prior uses and did not.” (Doc. 65 at ¶ 40; Doc. 79-3 at ¶ 40).
Plaintiffs argue that they “provided only the information known and available to them. Prior zoning records
were the property of the Defendant, Dorrance, and maintained by Dorrance and not subject to public
inspection.” (Doc. 79-3 at ¶ 40). This explanation, however, does not deny that Plaintiffs had the chance to
submit additional information, but did not do so. Accordingly, the Court deems Plaintiffs’ denial
nonresponsive to Dorrance Defendants’ statement and, therefore, deems this statement admitted.
Plaintiffs submitted a Zoning Permit Application on December 20, 2009. (2009 Zoning
Permit Application, Doc. 65-18, Ex. R at 2–4.) Plaintiffs indicated on the form that the
application was for “[r]oof, siding, replace 3 windows 2 doors,” and they identified the
proposed use as “used car sales.” (Id. at 3). On December 21, Snelson emailed Plaintiffs:
I’ve tried to reach you regarding the zoning permit application you submitted
for the proposed car lot.
The improvements to the building are not structural nor do they increase the
size of the building. As such, no permit for that is needed; however, you do
need a zoning permit for the use of the property as a used car lot. Before I can
issue a zoning permit for use of the property, I need to see the Approved Land
Development Plan for the site.
I’ve looked through all the files here in Dorrance Township and find no record
of it. I believe if there is one, it would have been issued to either John Colon
or the previous owner or owners named Mackarenko [sic]. If you have any
records that support the fact that Land Development approval has been granted
for this property, please get the information to me.
Otherwise, before any further action can be taken on the “Land Development”
of this property as a used car lot you will need to submit an application for Plan
approval. That application was sent to you via email on 11/17/09 via email. I’m
sending it with this message once again.
(12/21/2001 Email, Doc. 65-17, Ex. Q at 2.) Plaintiffs provided no records or information in
response. (A. Halchak 3/13/20 Dep. Tr. at 80:8–81:22.)
At some point in November or December, Snelson told Plaintiffs they would need to
install a bathroom on the Property in order to obtain an occupancy permit. (A. Halchak 3/13/20
Dep. Tr. at 93:16–94:13.)
Snelson and Plaintiffs attended a Township Planning Commission meeting on
December 28, at which Mr. Halchak expressed that he planned to open a used car dealership
on the Property with roughly twenty cars for sale. (12/28/2009 Twp. Planning Comm’n
Meeting Minutes, Doc. 65-19, Ex. S at 2.) Snelson explained that because “he could find
nothing in the files of the township of anything proposed in the past,” Plaintiffs’ proposed use
“is starting at square 1” and Plaintiffs “would have to comply with all sorts of plan approvals.”
(Id.) The “sewage issue” was also discussed again. (Id. at 94:21–95:9; Doc. 65-19, Ex. S at
2.)
The day after the meeting, Snelson sent an email to Plaintiffs summarizing their
discussion, outlining the steps Plaintiffs must take to secure the necessary permits and
approvals, and providing relevant contact information. (A. Snelson 12/29/2009 Email, Doc.
65-20, Ex. T at 2.) In particular, Snelson explained, “[s]ince the facility is a commercial
establishment, you will be required to comply with the building code requirements of Dorrance
Township. For specifics contact Code Enforcement [sic] Inc. @ 868.8482.” (Id.) Plaintiffs did
not contact CII at that point.10 (K. Halchak 8/19/2020 Dep. Tr. at 91:3–24.)
10 Plaintiffs “admit[] and den[y]” that they “did not contact CII as directed in Snelson’s December 29,
2009 email.” (Doc. 65 at ¶ 58; Doc. 79-3 at ¶ 58.) Plaintiffs explain, “The Halchaks did not contact CII
because they did not accept that there were any requirements to undertake a construction permit as they
intended to use the existing building without change.” (Doc. 79-3 at ¶ 58.) Because Dorrance Defendants’
state only that Plaintiffs did not contact CII and do not provide a reason for Plaintiffs’ inaction, Plaintiffs’
denial is nonresponsive to Dorrance Defendants’ statement. Accordingly, the Court deems this statement
admitted.
On January 19, 2010, Plaintiffs met with Snelson again. (K. Halchak 1/19/2010
Meeting Notes, Doc. 65-21, Ex. U at 2.) Snelson reiterated the need to submit a Land
Development Application. Ms. Halchak’s notes from the meeting state, “Land Development
Application (change of use) required every time there is a change of use of business because
change of use changes business related things such as parking etc.” (Id.) Snelson also
showed Plaintiffs the Dorrance Township Zoning Ordinance section pertaining to “Change of
Use.” (Id.) Ms. Halchak wrote, “Although there is no state requirement for us to have a
bathroom as a used automobile sales lot, Dorrance [Township] is requiring it due to the fact
. . . we are changing the use, which now means we have to comply with all the new codes.”
(Id.)
That same day, Snelson returned the fee Plaintiffs had submitted with their Zoning
Permit Application. (A. Snelson 3/12/20 Dep. Tr. at 52:20–53:17.) Snelson testified he did this
because Mr. Halchak had “applied for a permit to put roof, siding, and replace the windows
for a used car lot,” and these actions did not require a permit. (See id.)
The parties agree that Plaintiffs did not submit any additional applications or materials
to Snelson or the Dorrance Board with regard to the Property between December 20, 2009,
and January 2014. (Doc. 65 at ¶ 64; Doc. 79-3 at ¶ 64.) Dorrance Board had a duly constituted
Zoning Hearing Board in 2009, but Plaintiffs did not appeal Snelson’s actions—or lack
thereof—with respect to their application. (Doc. 65 at ¶¶ 65, 67; Doc. 79-3 at ¶¶ 65, 67.)
D. 2014 Zoning Permit Application
In January 2014, Snelson saw Mr. Halchak at a meeting and realized that “this had
been sitting for a while.” (A. Snelson 3/12/20 Dep. Tr. at 75:23–25.) He raised the issue to his
colleagues, and Dorrance Township Secretary/Treasurer Patricia Davis told him that she
recalled someone by the name of Kamionka operating a car lot on the Property decades
earlier. (Id. at 75:23–76:16.) Davis, who was hired after Plaintiffs contacted Snelson in 2009,
subsequently located documents related to the Kamionkas’ use of the Property in a filing
cabinet in a storage room within the Dorrance Township office.11 (Id. at 76:17–19; P. Davis
3/12/20 Dep. Tr. at 35:18–36:1.)
The Kamionka permits that Davis located do not demonstrate that the Kamionkas
operated a used car lot on the Property; while one of the permits is for “reopening garage
business,” none of them reference used car sales. Joseph Kamionka applied for two permits
(Nos. 90 and 91) in 1978, for the construction of a “double wide modular and accessory
garage” at RD #9, Box 188, Mt. Township.” (Doc. 65 at ¶ 71; Doc. 65-14, Ex. N at 4.) Plaintiffs
aver that this was the address assigned to the Property at the time. (Doc. 79-3 at ¶ 75.) In
1985, Kamionka applied for two more permits (Nos. 326 and 327) under the name
“Kamionka’s Garage,” at the same address. (Doc. 65 at ¶ 73; Doc. 65-14, Ex. N at 5–15.)
Permit No. 326 was for “reopening garage business.” (Doc. 65-14, Ex. N at 6.) Permit No.
11 The parties dispute whether this filing cabinet was maintained separately from other zoning
matters. (Doc. 65 at ¶ 79; Doc. 79-3 at ¶ 79.)
327 was for the installation of a mobile home/garage, and the permit states “occupancy after
sewage system is installed.” (Id. at 10.)12
Snelson instructed Plaintiffs to submit another Zoning Permit Application (without a
Land Development application) following this discovery. (Doc. 65 at ¶ 80.) Plaintiffs submitted
a Zoning Permit Application seeking a permit to operate a used car dealership on January
27, 2014. (Doc. 65 at ¶ 81; 2014 Zoning Permit Application, Doc. 65-24, Ex. X.)
On January 29, Snelson issued Plaintiffs (1) “a Certificate of Non-conformity certifying
that the lot and existing building on the [Property] were lawfully nonconforming with respect
to lot size and building setback”; (2) “a Certificate of Zoning Compliance certifying that
automotive sales were permitted on the [Property]”; and (3) a Zoning Permit for the operation
of an “Automotive Sales business (non residential use of an existing structure) in accordance
with Section 506.1 B of the Dorrance Township Ordinance of 2007.” (Doc. 65 at ¶¶ 82–84;
Zoning Certificate, Doc. 65-25, Ex. Y at 2–4.)
Plaintiffs subsequently inquired about obtaining an occupancy permit, and Snelson
told Plaintiffs that he did not issue occupancy permits. (Doc. 65 at ¶¶ 85–86; A. Halchak
3/13/20 Dep. Tr. at 141:5–17.) He directed Plaintiffs again to CII, the third-party agency
appointed by the Dorrance Board to administer and enforce its Uniform Construction Code,
12 Dorrance Defendants and Plaintiffs agree that Permit No. 327 and its reference to a sewage
system “related to the Kamionka’s residential parcel adjoining the [Property]” and not to the Property itself.
(Doc. 65 at ¶ 78; Doc. 79-3 at ¶ 76–78.) CII Defendants, however, do not admit that Permit No. 327 is
unrelated to the Property. (See Doc. 72 at ¶¶ 30, 31.)
and specifically to a CII employee named Ken Fenstermacher. (A. Halchak 3/13/20 Dep. Tr.
at 141:5–25; Doc. 65-26, Ex. Z at 2; Record of Dorrance Township Board of Commissioners
meeting minutes for August 2, 2004, Doc. 65-1, Ex. 12.) The parties agree that Plaintiffs
sought nothing further from Snelson after this point. (Doc. 65 at ¶ 87; Doc. 79-3 at ¶¶ 80–87.)
E. Regulations Governing Occupancy Permits
Pursuant to the Pennsylvania Construction Code Act (“PCCA”), the Pennsylvania
Department of Labor and Industry has promulgated construction standards and regulations
known as the Uniform Construction Code (“UCC”). See 35 P.S. § 7210.102(a). The UCC
governs the “construction, alteration, repair and occupancy of all buildings.” Id. § 7210.104(a).
The Dorrance Board adopted the PCCA by Ordinance passed on June 7, 2004. Dorrance,
Pa., Ordinance 6-7-04-1 (June 7, 2004). In July 2004, the Dorrance Board appointed CII to
administer and enforce the UCC on its behalf. (Doc. 65-31, Ex. EE at 7.) CII remained the
sole UCC administrator and enforcement officer for Dorrance Township until June 2018. (Doc.
65-30, Ex. DD.)
Under the UCC, “[a] building, structure or facility may not be used or occupied without
a certificate of occupancy issued by a building code official.” 34 Pa. Code § 403.46(a). In
Plaintiffs’ case, an occupancy permit is required if the Property was an “uncertified building,”
defined as “an existing building which was not approved for use and occupancy by the
Department or a municipality which was enforcing a building code before April 9, 2004.” 34
Pa. Code § 401.1. The UCC provides further that an uncertified building must “meet[] the
requirements of the latest version of the ‘International Existing Building Code . . .’ or Chapter
34 of the ‘International Building Code . . . ,’” whichever “best applies, in the official’s
professional judgment.” 34 Pa. Code § 403.28(c)(1).
Together, the International Existing Building Code of 2009 (“IEBC”) and the
International Building Code of 2009 (“IBC”) impose construction standards and requirements
on buildings “not previously occupied or used for its intended purpose in accordance with the
laws in existence at the time of its completion.” IEBC § 101.4.13 An occupancy permit “shall
13 In their briefs, the parties cite the 2009 versions of the IBC and IEBC without explanation, but the
Court’s research suggests the 2009 codes were the “latest versions” adopted in Pennsylvania at the time of
the events at issue.
The IBEC “appl[ies] to the repair, alteration, change of occupancy, addition and relocation of all
existing buildings, regardless of occupancy,” IEBC § 101.4, and provides that
A building or portion of a building that has not been previously occupied or used for its
intended purpose in accordance with the laws in existence at the time of its completion shall
comply with the provisions of the International Building Code . . . for new construction or with
any current permit for such occupancy.
IEBC § 101.4.1. In contrast, with respect to “buildings previously occupied”:
The legal occupancy of any building existing on the date of adoption of this code shall be
permitted to continue without change, except as is specifically covered in this code, . . . or
as is deemed necessary by the code official for the general safety and welfare of the
occupants and the public.
IEBC § 101.4.2. The IBC requires that
[a]lterations, repairs, additions and changes of occupancy to existing structures . . . comply
with the provisions for alterations, repairs, additions and changes of occupancy in the . . .
International Plumbing Code [and various other codes].
IBC § 3401.3. Furthermore,
[n]o change shall be made in the use or occupancy of any building that would place the
building in a different division of the same group of occupancies or in a different group of
be issued” only once the requirements for the new occupancy classification, determined by
the intended purpose of the building, are met. See IBC § 3408.2.
Under the IBC, the “use of a building or structure, or a portion thereof, for office,
professional or service-type transactions, including storage of records and accounts,” is
categorized as a “Business Group B” occupancy. IBC § 304.1. “Business Group B” covers,
among other types of businesses, “motor vehicle showrooms.” Id. To meet the requirements
for the issuance of an occupancy permit under the IBC, Business Group B structures must
have a bathroom with a toilet and a sink. IBC §§ 2901.1, 2902.1; see infra note 37.
Before undertaking the construction that may be required to comply with the
aforementioned code provisions, the UCC provides that
one who seeks to construct or enlarge a commercial building “shall first apply
to the building code official and obtain the required permit under § 403.42a.”
The application must be presented in the approved format, which, inter alia,
requires construction documents prepared by a licensed architect or licensed
professional engineer, showing the location, nature and extent of the work
proposed and how the project conforms to the Uniform Construction Code[.] 34
Pa. Code § 403.42a(a), (b),(c) and (e).
Flanders v. Ford City Borough Council, 986 A.2d 964, 970 (Pa. Commw. Ct. 2009) (emphasis
added) (internal citation omitted). 34 Pa. Code § 403.42 provides, in pertinent part,
(a) A building code official shall grant or deny a permit application, in whole or
in part, within 30 business days of the filing date. Reasons for the denial must
occupancies, unless such building is made to comply with the requirements of this code for
such division or group of occupancies,
IBC § 3408.1, and an occupancy permit shall be issued only once “it has been determined that the
requirements for the new occupancy classification has been met.” IBC § 3408.2.
be in writing, identifying the elements of the application which are not in
compliance with the relevant provisions of the Uniform Construction Code and
ordinance as appropriate and providing a citation to the relevant provisions of
the Uniform Construction Code and ordinance as appropriate, and sent to the
applicant. . . .
(b) A building code official shall examine the construction documents and shall
determine whether the construction indicated and described is in accordance
with the Uniform Construction Code and other pertinent laws or ordinances as
part of the application process.
34 Pa. Code § 403.43. In addition,
[a] municipality which has adopted an ordinance for the administration and
enforcement of the Uniform Construction Code or is a party to an agreement
for the joint administration and enforcement of the Uniform Construction Code
shall establish and appoint members to serve on a board of appeals under
section 501(c) of the act (35 P. S. § 7210.501(c)).
34 Pa. Code § 403.121(a) (emphasis added). Section 403.122(a) provides that “[a]n owner
or owner's agent may seek a variance or extension of time or appeal a building code official’s
decision by filing a petition with the building code official or other person designated by the
board of appeals on a form provided by the municipality.”
F. 2014: Occupancy Permit Application
Sometime in February 2014, Plaintiffs contacted Fenstermacher and asked him for
“an application for an occupancy permit.” (A. Halchak 3/13/20 Dep. Tr. at 142:4–14.)
Fenstermacher provided Plaintiffs with a “Construction Permit Application.” (Doc. 72 at ¶¶ 21–
22; Doc. 65-27, Ex. AA at 2–3.) Plaintiffs contend this was “not the correct form for submission
to reopen a business in an existing building without change or modification,” though they did
not communicate this to Fenstermacher at the time. (Plaintiffs’ Counterstatement of Material
Facts in Response to CII and Fenstermacher Defendants’ Facts, Doc. 83-2 at ¶ 21; A.
Halchak 3/13/20 Dep. Tr. at 171:4–23.)
Plaintiffs submitted a Construction Permit Application to CII on February 18, 2014.
(Doc. 67 at ¶ 19; Doc. 72 at ¶ 21.) They did not attach any construction documents to their
application. (See Doc. 72 at ¶ 40.) On the application form, Plaintiffs selected “Other” for the
“Type of Work or Improvement” and described the proposed work as “Occupancy Permit.”
(Ex. AA at 2.) Ms. Halchak’s name does not appear on the form. (See id.)
On March 18, 2014, Fenstermacher advised Plaintiffs that in order to obtain an
occupancy permit, they would have to install accessible bathroom facilities, (Doc. 65 at ¶ 91;
A. Halchak 3/13/20 Dep. Tr. at 159:2–11; K. Fenstermacher 3/10/20 Dep. Tr. at 72:8–24,
133:11–16), and their application would have to include professional design drawings for
those facilities.14 (A. Halchak 3/13/20 Dep. Tr. at 160:1–9.)
On March 25, Fenstermacher met with Ms. Halchak about the application. (K.
Fenstermacher 3/10/20 Dep. Tr. at 134:7–11.) He reiterated the need for bathroom facilities.
(Id. at 134:13–15.) Ms. Halchak showed Fenstermacher Kamionka Permit No. 327, approved
under the name “Kamionka’s Garage,” and argued that it proved their proposed use had had
been approved in the past and therefore Plaintiffs should not have to install bathrooms. (Id.
14 The Court notes that this was not the first time Plaintiffs were told they needed professional
design drawings. (See K. Halchak 1/19/2010 Meeting Notes, Doc. 65-21, Ex. U at 2 (“According to Mr.
Frank Tirico, Code Enforcement Officer, we need to hire a licensed architect to draw up the plans required
for a building permit pertaining to accessibility.”).)
at 134:9–15.) Fenstermacher “pointed out that one of the requirements for this was plainly
stated on [Permit No. 327] that well and septic were required.”15 (Id. at 134:13–15.)
Thereafter, Plaintiffs consulted an architect about drafting the required construction
documents for the bathroom, and the architect estimated it would cost $9,200 to produce
them. (A. Halchak 3/13/20 Dep. Tr. at 161:19–162:16.) Mr. Halchak then asked
Fenstermacher if Plaintiffs could produce the drawings themselves. (Id. at 165:10–12.) When
Fenstermacher said no, Mr. Halchak told him, “I’m done with this, I had enough[] . . . I’ll get a
lawyer involved.” (Id. at 166:6–8.) Mr. Halchak testified that Fenstermacher “flew off the
handle” during this exchange, “slammed his hands on his desk,” and “came at [him.]” (Id. at
166:1–8.) Plaintiffs had no further contact with Fenstermacher after this, and never
substantially interacted with anyone else at CII. (Doc. 65 at ¶¶ 97–98; A. Halchak 3/13/20
Dep. Tr. at 179:3–13.)
Plaintiffs understood at this time that CII required them to submit drawings prepared
by a licensed professional and to install bathroom facilities in order to obtain an occupancy
permit.16 (A. Halchak 3/13/20 Dep. Tr. at 181:13–182:19.)
15 Plaintiffs now argue that Permit No. 327 has “no application to the [Property].” (Doc. 83-2 at ¶
31.) Because CII Defendants dispute the application of Permits 326 and 327 to each of the two parcels
(686 and 688 South Mountain Boulevard), the Court finds the assignment of each permit to each parcel is
disputed.
16 Mr. Halchak’s testimony is unclear as to whether he understood at the time that because
Plaintiffs had not met these requirements, Fenstermacher would not be issuing an occupancy permit. Mr.
Halchak testified as follows:
On December 11, 2014, Fenstermacher wrote in his files associated with Plaintiffs’
application: “Nothing to issue at this point. No further advance on getting approved sewer
permits to install a restroom in building.” (3/10/20 K. Fenstermacher Dep. Tr. at 136:1–3.)
Almost a year later, on November 12, 2015, Fenstermacher made another note: “Close out
as nothing further has taken place.” (Id. at 136:6–10.)
As of the filing of the present Motions, Plaintiffs have not filed a new application with
the required drawings, (A. Halchak 6/23/20 Dep. Tr. at 46:1–7), and the Property does not
have sewage or bathroom facilities. (K. Halchak 8/18/20 Dep. Tr. at 90:13–15.) Plaintiffs never
received an occupancy permit, (Doc. 65 at ¶ 107), nor any written grant or denial of their
application. (Doc. 78 at 10; Doc. 79 at 8.)
On March 3, 2017, Dorrance Township established a UCC Board of Appeals. (See
Doc. 65-29, Ex. CC.)
Q. I understand. So your understanding was Mr. Fenstermacher was telling you you had to
have a drawing by a licensed architect and then plans to install a bathroom, sink and a toilet,
and actually install the sink and toilet in order to obtain an occupancy permit, is that right?
. . .
A. At that point—yeah. That’s what my understanding with [sic] was, yes.
(A. Halchak 3/13/20 Dep. Tr. at 182:11–19.)
Q. I’m just trying to confirm you knew you were not going to get an occupancy permit from
Mr. Fenstermacher or Dorrance Township at the time?
A. I don’t know what their thoughts were. I didn’t know. If I went home and one was there,
that would be great for me. I didn’t know what their plans were after that.
(Id. at 183:16–22.)
On June 11, 2018, Dorrance Township ended its contract with CII. (See Doc. 65-30,
Ex. DD.)
III. STANDARD OF REVIEW
A. Summary Judgment
Summary judgment is appropriate “only where there is no genuine issue of material
fact and the moving party is entitled to judgment as a matter of law.” Gonzalez v. AMR, 549
F.3d 219, 223 (3d Cir. 2008). “An issue is genuine only if there is a sufficient evidentiary basis
on which a reasonable jury could find for the non-moving party, and a factual dispute is
material only if it might affect the outcome of the suit under governing law.” Kaucher v. Cnty
of Bucks, 455 F.3d 418, 423 (3d Cir. 2006) (citing Anderson v. Liberty Lobby, Inc., 477 U.S.
242, 248 (1986)). Thus, through summary adjudication, the court may dispose of those claims
that do not present a “genuine dispute as to any material fact.” Fed. R. Civ. P. 56(a).
The party moving for summary judgment bears the burden of showing the absence of
a genuine issue as to any material fact. Celotex Corp. v. Catrett, 477 U.S. 317, 323, 106 S.
Ct. 2548, 91 L. Ed.2d 265 (1986). Once such a showing has been made, the non-moving
party must offer specific facts contradicting those averred by the movant to establish a
genuine issue of material fact. Lujan v. Nat’l Wildlife Fed’n, 497 U.S. 871, 888, 110 S. Ct.
3177, 111 L. Ed.2d 695 (1990). Therefore, the non-moving party may not oppose summary
judgment simply on the basis of the pleadings, or on conclusory statements that a factual
issue exists. Anderson, 477 U.S. at 248. “A party asserting that a fact cannot be or is
genuinely disputed must support the assertion by citing to particular parts of materials in the
record . . . or showing that the materials cited to not establish the absence or presence of a
genuine dispute, or than an adverse party cannot product admissible evidence to support the
fact.” Fed. R. Civ. P. 56(c)(1)(A)-(B). In evaluating whether summary judgment should be
granted, “[t]he court need consider only the cited materials, but it may consider other materials
in the record.” Fed. R. Civ. P. 56(c)(3). “Inferences should be drawn in the light most favorable
to the non-moving party, and where the non-moving party’s evidence contradicts the
movant’s, then the non-movant’s must be taken as true.” Big Apple BMW, Inc. v. BMW of N.
Am., Inc., 974 F.2d 1358, 1363 (3d Cir. 1992), cert denied 507 U.S. 912, 113 S. Ct. 1262,
122 L. Ed.2d 659 (1993).
However, “facts must be viewed in the light most favorable to the nonmoving party
only if there is a ‘genuine’ dispute as to those facts.” Scott v. Harris, 550 U.S. 372, 380 (2007).
If a party has carried its burden under the summary judgment rule,
its opponent must do more than simply show that that there is some
metaphysical doubt as to the material facts. Where the record taken as a whole
could not lead a rational trier of fact to find for the nonmoving party, there is no
genuine issue for trial. The mere existence of some alleged factual dispute
between the parties will not defeat an otherwise properly supported motion for
summary judgment; the requirement is that there be no genuine issue of
material fact. When opposing parties tell two different stories, one of which is
blatantly contradicted by the record, so that no reasonable juror could believe
it, a court should not adopt that version of the facts for purposes of ruling on a
motion for summary judgment.
Id. (internal quotations, citations, and alterations omitted).
“In considering a motion for summary judgment, a district court may not make
credibility determinations or engage in any weighing of evidence.” Anderson, 477 U.S. at 255.
Therefore, when evidentiary facts are in dispute, when the credibility of witnesses may be in
issue, or when conflicting evidence must be weighed, a full trial is usually necessary.
A district court “should consider cross-motions for summary judgment separately and
apply the burden of production to each motion.”17 Beenick v. LeFebvre, 684 F. App’x 200,
205 (3d Cir. 2017) (not precedential) (citing Lawrence, 527 F.3d at 310). “If upon review of
cross motions for summary judgment [the court] find[s] no genuine dispute over material facts,
then [the court] will order judgment to be entered in favor of the party deserving judgment in
light of the law and undisputed facts.” Iberia Foods Corp. v. Romeo, 150 F.3d 298, 302 (3d
Cir. 1998) (citing Ciarlante v. Brown & Williamson Tobacco Corp., 143 F.3d 139, 145–46 (3d
Cir. 1998)).
17 Beenick further explains,
[the plaintiff] argues that the District Court failed to apply the correct standard on cross-
motions for summary judgment because it did not fully consider his motion for partial
summary judgment. Beenick is correct that a District Court should consider cross-motions
for summary judgment separately and apply the appropriate burden of production to each
motion. See Lawrence v. City of Philadelphia, 527 F.3d 299, 310 (3d Cir. 2008). The District
Court did not violate this rule because it did not consider the cross-motions simultaneously.
Rather, it addressed Defendants’ motion for summary judgment first. By proceeding with
Defendants’ motion first, the District Court viewed the evidence in the light most favorable
to Beenick and concluded that Defendants were entitled to summary judgment on all of his
claims. That conclusion ended the case and mooted any need to consider Beenick's cross-
motion for partial summary judgment.
Beenick v. LeFebvre, 684 F. App’x 200, 205–06 (3d Cir. 2017).
IV. ANALYSIS
A. Protected Property Interest in Zoning and Occupancy Permits
First, the Court addresses a threshold issue, critical to Plaintiffs’ constitutional claims
against both Dorrance and CII Defendants: whether Plaintiffs have a protected property
interest. Though not styled as such, Plaintiffs bring their due process claims under 42 U.S.C.
§ 1983.18 “Section 1983 does not create substantive rights, but rather provides a remedy for
the violation of rights created by federal law.” Spradlin v. Borough of Danville, No. 4:CV 02
2237, 2005 WL 3320788, at *2 (M.D. Pa. Dec. 7, 2005) (citing Groman v. Twp. of Manalapan,
47 F.3d 628, 633 (3d Cir. 1995)). Section 1983 states in pertinent part:
Every person who, under color of any statute, ordinance, regulation, custom,
or usage, of any State or Territory or the District of Columbia, subjects, or
causes to be subjected, any citizen of the United States or other person within
the jurisdiction thereof to the deprivation of any rights, privileges, or immunities
secured by the Constitution and laws, shall be liable to the party injured in an
action at law, suit in equity, or other proper proceeding for redress[.]
42 U.S.C. § 1983. To state a claim under § 1983, a plaintiff must allege that “(1) . . . the
conduct complained of was committed by a person acting under color of state law and (2) . . .
18 At the outset, it difficult to discern whether Plaintiffs assert these claims against Snelson, CII, and
Fenstermacher in their individual or official capacities. To the extent they are sued in their official
capacities, those claims are dismissed as duplicative of Plaintiffs’ claims against the local government
entity—the Dorrance Township Board of Supervisors—itself. See Palmer v. City of Scranton, No. CV 3:17-
2369, 2018 WL 3207323, at *2 (M.D. Pa. June 29, 2018). Despite the absence of a clear indication that
Plaintiffs intended to sue them as individuals, the Court will construe the suit as seeking relief against these
officers in their individual capacities as well. See Banks v. Gallagher, No. 3:08-CV-1110, 2011 WL 718632,
at *7 (M.D. Pa. Feb. 22, 2011) (first citing Fed. R. Civ. P. 8(e); then citing Hindes v. FDIC, 137 F.3d 148,
157 (3d Cir. 1998); and then citing Biggs v. Meadows, 66 F.3d 56, 60–61 (4th Cir. 1995)) (looking to the
“nature of the plaintiff’s claims, the relief sought, and the course of proceedings” and construing claims as
against officers in their individual capacities despite “confusion” as to the capacity in which they were sued).
[that] the conduct deprived the complainant of rights secured under the Constitution or federal
law.” Sameric Corp. v. City of Philadelphia, 142 F.3d 582, 590 (3d Cir. 1988). None of the
Defendants has argued it is not “a person acting under color of state law,” so the second
element is the sole focus of this Court’s analysis.
The Supreme Court has explained the distinction between substantive and procedural
due process as follows:
We have emphasized time and again that “[t]he touchstone of due process is
protection of the individual against arbitrary action of government,” Wolff v.
McDonnell, 418 U.S. 539, 558, 94 S. Ct. 2963, 2976, 41 L. Ed. 2d 935 (1974),
whether the fault lies in a denial of fundamental procedural fairness, see, e.g.,
Fuentes v. Shevin, 407 U.S. 67, 82, 92 S. Ct. 1983, 1995, 32 L. Ed. 2d 556
(1972) (the procedural due process guarantee protects against “arbitrary
takings”), or in the exercise of power without any reasonable justification in the
service of a legitimate governmental objective, see, e.g., Daniels v. Williams,
474 U.S. [327,] 331, 106 S. Ct. [662,] 664[, 88 L. Ed. 2d 662 (1986)] (the
substantive due process guarantee protects against government power
arbitrarily and oppressively exercised).
Cnty. of Sacramento v. Lewis, 523 U.S. 845-46, 118 S. Ct. 1708, 1717, 140 L. Ed. 2d 1043
(1998).
A plaintiff cannot prevail on a substantive or procedural due process claim without
showing he has been deprived of a property interest that the Constitution protects. See Taylor
Inv., Ltd. v. Upper Darby Twp., 983 F.2d 1285, 1290 (3d Cir. 1993). “[T]he property interests
protected by substantive due process are narrower than the interests protected by procedural
due process”—“[o]nly those . . . interests that are ‘fundamental’ under the . . . Constitution are
worthy of substantive due process protection.” Fortune Dev., L.P. v. Bern Twp., No. CIV.A.
12-2327, 2013 WL 990454, at *6 (E.D. Pa. Mar. 13, 2013) (first citing DeBlasio v. Zoning Bd.
of Adjustment for Twp. of W. Amwell, 53 F.3d 592, 601 (3d Cir. 1995), abrogated on other
grounds by United Artists Theatre Cir., Inc. v. Twp. of Warrington, PA, 316 F.3d 392 (3d Cir.
2003); and then citing Gikas v. Washington Sch. Dist., 328 F.3d 731, 736 (3d Cir. 2003)).
Plaintiffs correctly state that “possessory interests in property invoke procedural due
process protections.” Long v. Bristol Twp., No. CIV.A. 10-1069, 2012 WL 2864410, at *5 (E.D.
Pa. July 11, 2012) (quoting Abbott v. Latshaw, 164 F.3d 141, 146 (3d Cir. 1998)). But whether
a yet-to-be-issued permit is a protected property interest, under either procedural or
substantive due process law, is less clear.
With respect to procedural due process, the Third Circuit has explained,
Core to the existence of an individual property interest is the requirement that
the plaintiff have “a legitimate claim of entitlement to” the interest at issue that
stems from “an independent source such as state law” or “rules or
understandings that secure certain benefits.” Bd. of Regents of State Colls. v.
Roth, 408 U.S. 564, 577, 92 S. Ct. 2701, 33 L.Ed.2d 548 (1972). Thus, it is not
sufficient that a plaintiff has an “abstract need or desire” or a “unilateral
expectation” of a particular benefit. Id.
McKinney v. Univ. of Pittsburgh, 915 F.3d 956, 960 (3d Cir. 2019). Some cases indicate that
plaintiffs must establish “entitlement” to zoning and occupancy permits themselves, not
merely to the use of their land, before they can properly invoke constitutional protections on
these grounds. See, e.g., WVCH Commc'ns, Inc. v. Kalil, No. CIV. A. 93-CV-2225, 1993 WL
268903, at *2 (E.D. Pa. July 15, 1993), aff'd sub nom. WVCH Commc'ns, Inc. v. Upper
Providence Twp., 27 F.3d 561 (3d Cir. 1994) (holding that plaintiffs could not establish a
protected property interest “unless and until it is proven that they are entitled to the zoning
variance which they sought”).
But with respect to substantive due process, the Third Circuit has held that “ownership
[of land] is a property interest worthy of substantive due process protection,” and has foregone
analysis of a potential interest in the permit itself. See DeBlasio, 53 F.3d at 600–01. The Third
Circuit explained,
[I]in the context of land use regulation, that is, in situations where the
governmental decision in question impinges upon a landowner’s use and
enjoyment of property, a landowning plaintiff states a substantive due process
claim where he or she alleges that the decision limiting the intended land use
was arbitrarily or irrationally reached.
Id. This suggests the “use and enjoyment of property” itself is a sufficient property interest on
which to base a due process challenge to a permit approval process, and that a plaintiff need
not show entitlement to the actual permit.
In Flanders v. Dzugan, the Western District of Pennsylvania recognized both of these
concepts. The court held that while the plaintiff had a protected property interest in the
“ownership of real property” and “in the premises wherein he conducted his business,” he did
not have a property interest in obtaining a building permit. 156 F. Supp. 3d 648, 665 (W.D.
Pa. 2016). Because he had not been issued a building permit, “the permit itself cannot serve
as the ‘property interest’ of which [the plaintiff] was deprived.” Id. (citing Flanders v. Ford City
Borough, 986 A.2d 964, 966 (Pa. Commw. Ct. 2009)). Still, the Court did not dispose of his
claim on these grounds, apparently holding that his interest in the land itself was sufficient to
maintain a substantive due process claim based on the failure to issue a building permit. See
id. at 666.
For purposes of deciding the present Motions, this Court reaches the same conclusion
as the court in Flanders.19 Plaintiffs have not demonstrated a “legitimate claim of entitlement”
to an occupancy permit,20 but the Court will assume that Plaintiffs’ interest in the land itself is
sufficient to maintain both substantive and procedural due process claims.
B. Dorrance Defendants’ Motion for Summary Judgment
Dorrance Defendants move for summary judgment on all claims against them. (Doc.
66 at ¶ 1.) Plaintiffs did not clearly delineate causes of action in their Amended Complaint,
but Plaintiffs clarify in their Brief in Opposition that they are not pursuing a procedural due
process claim against Snelson. (Doc. 79 at 11.) Accordingly, the claims at issue are (1)
substantive due process claims against both Dorrance Defendants, (2) a procedural due
process claim against the Dorrance Board, and (3) mandamus claims against both Dorrance
Defendants.21
19 Defendants have not challenged whether Plaintiffs have protected property interests, but as
necessary elements of Plaintiffs’ claims, this Court’s sua sponte analysis is appropriate.
20 The Court will not question Plaintiffs’ “legitimate claim of entitlement” to their zoning permit, as it
has already been issued. But they are not “entitle[d]” to an occupancy permit because none has been
issued and Plaintiffs have not demonstrated satisfaction of the requirements for permit issuance under the
UCC (e.g., Plaintiffs have not submitted construction documents as required by 34 Pa. Code § 403.42a).
21 The Court notes that although Dorrance Defendants asserted an affirmative defense of qualified
immunity in their Answer, (Doc. 44 at 10), none of the Defendants has raised or briefed said defense at the
motion for summary judgment stage. Because of this, and because the Court holds that Plaintiffs have
failed to establish any constitutional deprivations as a matter of law, the Court does not reach the question
of qualified immunity.
1. Substantive Due Process
Plaintiffs broadly contend that all Defendants violated their substantive due process
rights.22 A claim for a violation of one’s substantive due process rights may lie when a
government official engages in “an abuse of executive power so clearly unjustified by any
legitimate objective of law enforcement as to be barred by the Fourteenth Amendment.”
Lewis, 523 U.S. at 840. “[A] plaintiff must prove the particular interest at issue is protected by
the substantive due process clause and the government’s deprivation of that protected
interest shocks the conscience.” Chaney v. Street, 523 F.3d 200, 219 (3d Cir. 2008); see also
Blain v. Twp. of Radnor, 167 F. App’x 330, 333 (3d Cir. 2006) (“In land-use cases, only
executive action that ‘shocks the conscience’ constitutes a substantive due process violation.”
(citations omitted)). “The ‘shocks the conscience’ standard encompasses ‘only the most
22 Plaintiffs allege in their Amended Complaint,
Defendants have continued to engage in a continuing course an [sic] unlawful, intentional,
willful, vexatious and discriminatory course of conduct designed to prevent the Plaintiffs from
opening their automotive sales and service business by failing to acknowledge and
recognize the existence of the structure present on the property previously used for
automotive sales and service with a lawful Zoning Certificate issued as early as 1978,
wrongfully mandating a Subdivision and Land Use Application, and failing to acknowledge
existing zoning certificates, charging unnecessary fees prior to accepting an application for
an Occupancy Permit, using a third party agency construction code official without a contract
who assigned an individual who was not certified to issue a permit for plaintiff’s property and
then surreptitiously compelling plaintiffs to complete a construction permit application,
instead of the correct Occupancy Permit Application so that it would be used to compel
compliance with all building codes.
(Doc. 2-1 at ¶ 44.)
egregious official conduct.’” United Artists Theatre Circuit, Inc., 316 F.3d at 400 (quoting
Lewis, 523 U.S. at 846).
Plaintiffs’ claim against Dorrance Defendants falls short when judged against the
“shocks the conscience” standard. Zoning and other land-use decisions are typically “matters
of local concern” that “should not be transformed into substantive due process claims based
only on allegations that government officials acted with ‘improper’ motives.” United Artists
Theatre Circuit, 316 F.3d at 402. In these cases, the “shocks the conscience” standard
prevents federal courts “from being cast in the role of a ‘zoning board of appeals.’” Id. (quoting
Creative Env’ts Inc. v. Estabrook, 680 F.2d 822, 833 (1st Cir. 1982)). “The exact degree of
wrongfulness necessary to reach the ‘conscience-shocking’ level depends upon the
circumstances of a particular case.” Miller v. City of Phila., 174 F.3d 368, 375 (3d Cir. 1999).
Nonetheless, in general terms, the Supreme Court has “repeatedly emphasized that only the
most egregious conduct can be said to be ‘arbitrary in the constitutional sense’” and therefore
qualify as conscience-shocking. Lewis, 523 U.S. at 846 (quoting Colling v. Harker Heights,
503 U.S. 115, 129 (1992)).
In an earlier case involving Snelson himself, the Third Circuit explained, “In the land-
use context, we look for evidence of corruption, self-dealing, intentional interference with
constitutionally protected activity, virtual ‘takings,’ or bias against an ethnic group on the part
of local officials.” Button v. Snelson, 679 F. App'x 150, 154 (3d Cir. 2017) (quoting Eichenlaub
v. Twp. of Indiana, 385 F.3d 274, 286 (3d Cir. 2004)).
Upon review of the Record,23 we find no evidence upon which a reasonable jury could
find that Dorrance Defendants’ conduct qualifies as the “most egregious.” Rather, this case
presents the hallmarks of an admittedly contentious zoning dispute that should be resolved
at the local, not federal level.
As an initial matter, Plaintiffs have failed to produce evidence of any actions taken by
the Dorrance Board in relation to their permit applications. In fact, Plaintiffs fail to discuss the
Dorrance Board in the section of their Brief in Opposition dedicated to substantive due
process, and they do not refute Dorrance Defendants’ claim that Plaintiffs failed to establish
any evidence of the Board’s “involvement, disapproval, communications or otherwise with
respect to Plaintiffs’ proposed used auto sales business.” (See Doc. 74 at 17; Doc. 79 at 10–
11). Accordingly, the Court will grant Dorrance Defendants’ Motion for Summary Judgment
as to Plaintiffs’ substantive due process claim against the Dorrance Board.
Plaintiffs also assert a substantive due process claim against Snelson, but fail to
demonstrate that his conduct “shocks the conscience.”
Dorrance Defendants contend that Snelson’s “actions with respect to Plaintiffs’ efforts
to obtain zoning approval were fair and reasonable.” (Doc. 74 at 13.) They argue,
The record establishes that, in late 2009 and early 2010, he fielded Plaintiffs’
requests; advised them of his interpretation; directed them to the process under
the Zoning Ordinance he believed warranted; advised them of other approvals
23 The Court notes that none of the parties has submitted full deposition transcripts, so the Record
does not include all testimony that has been given.
needed; and allowed them an opportunity to provide him with information or
documentation to modify his interpretation.”
(Id. at 11.)
In response, Plaintiffs argue that “Snelson has an established history of disregard for
the rights of the business owners in Dorrance and Dorrance was on notice of his conduct”
and contend that Snelson’s conduct was “deliberate” and “establishes a course of action that
has no reasonable relation to legitimate government objectives.” (Doc. 79 at 10–11.)
According to Plaintiffs,
Snelson’s activities as Zoning Officer in denying the obvious existence of the
structure on the property, continuing insistence upon compliance with SALDO,
even after agreeing that an existing structure did not require such compliance,
imposing a burden on the Halchaks to produce documentation unavailable to
them, otherwise readily available to him, and his complete and intentional
disregard for his obligation to search records under his control constitute
evidence of a violation of the Halchaks[’] substantive due process.
(Id.) Notably, Plaintiffs cite nothing in the record to support these claims. (See id.)
Even if supported, Plaintiffs’ conclusory assertions are devoid of any allegations of
“corruption, self-dealing, intentional interference with constitutionally protected activity, virtual
‘takings,’ or bias against an ethnic group.” Button, 679 F. App’x at 154 (quoting Eichenlaub,
385 F.3d at 286). Accordingly, as in Button v. Snelson, Snelson’s conduct reflects, at worst,
“merely negligent . . . performance of official duties” and “does not shock the conscience.”24
24 In fact, the Third Circuit described Snelson’s conduct as “merely negligent or sometimes
contentious performance of official duties.” Button, 679 F. App’x at 154. Nothing here supports a
“contentious” characterization.
Plaintiffs contend first that Snelson’s “[denial of] the obvious existence of the structure
on the property” violated their substantive due process rights. (Doc. 79 at 10–11). This is not
so. The Record demonstrates that Snelson’s “den[ial]” was actually a mistake that was quickly
corrected, (3/12/2020 A. Snelson Dep. Tr. at 47:20–22; 49:22–50:19), and the contention that
such a mistake “shocks the conscience” demonstrates a misunderstanding of the substantive
due process standard.
Plaintiffs also argue that Snelson violated their rights by “continuing [to insist] upon
compliance with SALDO, even after agreeing that an existing structure did not require such
compliance.” (Doc. 79 at 11.) But the Record shows that once Snelson located the
Kamionkas’ permits and learned of the Kamionkas’ use of the Property, he no longer required
the submission of a Land Development Application.25 (See Doc. 67 at 9–10.) This conduct
does not shock the conscience.
Further, despite having limited and sometimes inconsistent information, Snelson still
acted diligently to locate the necessary records. The Record reflects that Plaintiffs gave
Snelson different addresses for the Property without explanation and provided no documents
or records regarding the Property’s previous uses. And contrary to Plaintiffs’ assertion that
Snelson “complete[ly] and intentional[ly] disregarded . . . his obligation to search records
25 The Record also indicates that Snelson did not “agree[]” as much. Rather, Snelson
acknowledged in his deposition that “[i]f there was no change in use for an existing structure, [that would]
eliminate the need for a land development application.” (3/12/2020 A. Snelson Dep. Tr. at 48:15–19
(emphasis added).)
under his control,” the evidence indicates Snelson searched his files and determined neither
the Colons nor the Makarenkos had been approved for car sales in the past. (3/12/2020 A.
Snelson Dep. Tr. at 57:2–18.)26 When Snelson repeatedly asked Plaintiffs to provide him with
any relevant records, Plaintiffs produced nothing. Id.27
In sum, while the Court expresses no view as to whether Snelson correctly applied
SALDO or the Zoning Ordinance,28 the Court determines that there is no dispute of material
fact that Snelson’s application and enforcement of those laws with respect to Plaintiffs did not
“shock the conscience.” The Record reflects no evidence creating a genuine issue of material
fact as to the absence of corruption or self-dealing. Rather, Snelson’s conduct falls under the
category of “examples of the kind of disagreement that is frequent in [zoning and] planning
disputes.” Eichenlaub, 385 F.3d at 286. The undisputed facts reflect conduct that does not
give rise to a constitutional violation as a matter of law, and the Court will grant the Dorrance
26 Plaintiffs “admit that Snelson testified he searched the records,” but they “questioned whether
Snelson ever made any search of the municipal records for the zoning permits.” (Doc. 79-3 at ¶ 35).
Because Snelson testified that he searched the records and Plaintiffs have produced no evidence to
dispute this, the Court deems this fact undisputed.
27 The Court notes that whether the Kamionka permits were “readily available” to Snelson is
disputed but immaterial regardless. The Record does not clearly demonstrate whether Plaintiffs mentioned
the name “Kamionka” in early conversations with Snelson about prior owners of the Property. See supra
note 8. But the parties agree that the zoning records were organized alphabetically by owner. (A. Snelson
3/12/2020 Dep. Tr., at 27:12–19.). Drawing inferences in the light most favorable to Plaintiffs, the Court
finds that at worst, Snelson had a conversation with Mr. Halchak about prior owners in 2009, during which
Mr. Halchak “mentioned” the Kamionkas, and therefore Snelson acted negligently in failing to locate the
Kamionka permits before 2014. (See 8/19/20 K. Halchak Dep. Tr. at 106:11–17.) However, because
“mere[] negligen[ce]” does not “shock the conscience,” this disputed fact is not material to the disposition of
the claim.
28 That would be a question for the Zoning Hearing Board on appeal. See 53 P.S. § 10909.1(a)(3).
Defendants’ Motion with respect to the substantive due process claim against Snelson, and
enter judgment in Snelson’s favor.
2. Procedural Due Process
Plaintiffs also allege that the Dorrance Board violated their procedural due process
rights by failing to establish a board of appeals to which Plaintiffs could appeal CII’s decisions,
as required by the UCC. See 35 P.S. § 7210.501(c). Procedural due process requires that
individuals receive “the opportunity to be heard at a meaningful time and in a meaningful
manner” when they are impacted by government action. Mathews v. Eldridge, 424 U.S. 319,
333, 96 S. Ct. 893, 47 L.Ed.2d 18 (1976).
In order to make out a claim for a violation of procedural due process, a plaintiff
must allege three elements: (1) that the defendant was acting under color of
state law; (2) that the defendant deprived him of a property interest; and (3) the
state procedures for challenging the deprivation did not satisfy the
requirements of procedural due process. Midnight Sessions, Ltd. v. City of
Phila., 945 F.2d 667, 680 (3d Cir. 1991) (overruled on other grounds by United
Artists Theatre Circuit v. Twp. of Warrington, 316 F.3d 392 (2003); see also,
Parratt v. Taylor, 451 U.S. 527, 536-37 (1981). When a state “affords a full
judicial mechanism with which to challenge the administrative decision” at
issue, it provides adequate procedural due process, irrespective of whether the
plaintiffs avail themselves of that process. DeBlasio v. Zoning Bd. of
Adjustment, 53 F.3d 592, 597 (3d Cir. 1995) (overruled on other grounds by
United Artists, 316 F.3d 392; see also, Midnight Sessions, 945 F.2d at 681
(“The availability of a full judicial mechanism to challenge the administrative
decision to deny an application, even an application that was wrongly decided,
preclude[s] a determination that the decision was made pursuant to a
constitutionally defective procedure.”).
Sutton v. Chanceford Twp., No. 1:14-CV-1584, 2016 WL 7231702, at *10 (M.D. Pa. Dec. 14,
2016), aff’d, 763 F. App’x 1186 (3d Cir 2019).
With respect to the third element, federal courts have frequently determined that in the
context of municipal land use decisions, Pennsylvania law provides administrative and legal
remedies that satisfy procedural due process. See Sixth Angel Shepherd Rescue Inc. v. West,
790 F. Supp. 2d 339, 358 (E.D. Pa. 2011), aff’d, 477 F. App’x 903 (3d Cir. 2012) (citing Perano
v. Twp. of Tilden, 423 F. App’x 234, 237 (3d Cir. 2011)) (“Pennsylvania’s scheme for judicial
review of administrative land use decisions has . . . passed constitutional muster.”) Therefore,
courts have held that “[b]ecause Pennsylvania’s state procedure for challenging an
administrative zoning decision satisfies procedural due process, plaintiff fails to state a claim
founded on a violation of procedural due process.” Nicolette v. Caruso, 315 F. Supp. 2d 710,
721 (W.D. Pa. 2003).
Further, when state law provides a remedy,
a plaintiff must have taken advantage of the processes that are available to him
or her, unless those processes are unavailable or patently inadequate. “[A]
state cannot be held to have violated due process requirements when it has
made procedural protection available and the plaintiff has simply refused to
avail himself of them.” Dusanek v. Hannon, 677 F.2d 538, 543 (7th Cir. 1982);
see also, Bohn v. County of Dakota, 772 F.2d 1433, 1441 (8th Cir. 1985). A
due process violation “is not complete when the deprivation occurs; it is not
complete unless and until the State fails to provide due process.” Zinermon v.
Burch, 494 U.S. 113, 126, 110 S. Ct. 975, 108 L. Ed. 2d 100 (1990). If there is
a process on the books that appears to provide due process, the plaintiff cannot
skip that process and use the federal courts as a means to get back what he
wants. See McDaniels v. Flick, 59 F.3d 446, 460 (3d Cir. 1995); Dwyer v.
Regan, 777 F.2d 825, 834–35 (2d Cir. 1985), modified on other grounds, 793
F.2d 457 (2d Cir. 1986); Riggins v. Board of Regents, 790 F.2d 707, 711–12
(8th Cir. 1986).
Alvin v. Suzuki, 227 F.3d 107, 116 (3d Cir. 2000).
Accordingly, federal courts frequently reject procedural due process claims made by
plaintiffs who have not fully availed themselves of potential remedies under state law. See,
e.g., Giuliani v. Springfield Twp., 238 F. Supp. 3d 670, 692 (E.D. Pa. 2017), aff’d, 726 F. App’x
118 (3d Cir. 2018); Sixth Angel Shepherd Rescue Inc., 790 F. Supp. 2d at 358. And when the
record shows that judicial remedies were available to the plaintiffs under state law, and the
plaintiffs actually availed themselves of those remedies by pursuing state court litigation, a
federal procedural due process claim typically fails as a matter of law. See, e.g., Sixth Angel
Shepherd Rescue Inc., 790 F. Supp. 2d at 358 (denying procedural due process claim when
the plaintiff “is currently pursuing its appeal of the . . . Zoning Hearing Board’s decision through
Pennsylvania’s court system”).
Plaintiffs argue that the Dorrance Board violated their procedural due process rights
by failing to establish a board to which they could appeal a code administrator’s decision
under the UCC. (Doc. 79 at 13); see 34 Pa. Code § 403.121. The Court does not reach this
question because it finds that Plaintiffs did not submit a building permit application in
accordance with the requirements of the UCC, and accordingly did not receive an appealable
decision on their application.29 Without a decision from CII to appeal, whether Plaintiffs could
have or should have “taken advantage of the processes that [were] available” to them if they
had submitted a complete application and had received a decision to appeal, and whether
29 See discussion infra at 45.
any procedures were in fact available or adequate, see Alvin, 227 F.3d at 115, are
hypothetical questions not appropriate for this Court’s consideration. Put differently, Plaintiffs
do not have standing to allege a constitutional deprivation on this basis because they have
“yet to suffer any harm” with respect to the alleged lack of a board of appeals, and “allegations
of ‘possible future injury’ are not sufficient to satisfy Article III.” Glen Riddle Station, L.P. v.
Middletown Twp., No. CV 21-286, 2021 WL 1141964, at *4 (E.D. Pa. Mar. 25, 2021).
Accordingly, Plaintiffs have not established a valid procedural due process claim against the
Dorrance Board.30
The Court will grant Dorrance Defendants’ Motion with respect to Plaintiffs’ procedural
due process claim against the Dorrance Board and deny Plaintiffs’ Motion with respect to the
Dorrance Board, and enter judgment in Dorrance Defendants’ favor.
3. Mandamus Relief
30 The Court notes further that Plaintiffs have not established municipal liability. Dorrance Township
cannot be held liable for the acts of its employees under respondeat superior or vicarious liability. See
Monell v. Dep't of Soc. Servs. of New York, 436 U.S. 658, 98 S. Ct. 2018, 56 L.Ed.2d 611 (1978). To
determine any possible municipal liability, the Court looks to whether Plaintiffs have “demonstrate[d] that
the violation of rights was caused by the municipality’s policy or custom.” Johnson v. City of Philadelphia,
975 F.3d 394, 403 (3d Cir. 2020) (quoting Thomas v. Cumberland Cty., 749 F.3d 217, 222 (3d Cir. 2014)).
Plaintiffs can show as much by demonstrating that a supervisor “participated in violating the plaintiff's rights,
directed others to violate them, or, as the person in charge, had knowledge of and acquiesced in his
subordinates' violations.” Santiago v. Warminster Twp., 629 F.3d 121, 129 (3d Cir. 2010) (quoting A.M. ex
rel. J.M.K. v. Luzerne Cnty. Juvenile Det. Ctr., 372 F.3d 572, 586 (3d Cir. 2004)). On the Record, the Court
finds that the Dorrance Board’s conduct here shows no constitutional deprivation by way of an established
policy, custom, or practice, nor have Plaintiffs shown the Board has participated in, directed, or had
“knowledge of [or] acquiesced in” any due process violations caused by its subordinates. Therefore,
Plaintiffs cannot establish municipal liability.
Lastly, Plaintiffs demand “judgment against Defendants directing that they issue an
Occupancy Permit.” (Doc. 2-1 at 14.) Dorrance Defendants have demonstrated they are
entitled to summary judgment with respect to Plaintiffs’ mandamus action. Under
Pennsylvania law,
Mandamus is an extraordinary remedy designed to compel the performance of
a ministerial act or a mandatory duty. Evans v. Pennsylvania [Bd. of Prob.] and
Parole, 820 A.2d 904 (Pa. [Commw. Ct.] 2003), appeal quashed, 580 Pa. 550,
862 A.2d 583 (2004); Bell Atlantic Mobile [Syss.], Inc. [v. Borough of Clifton
Heights, 661 A.2d 909, 911 (Pa. [Commw. Ct.] 1995), appeal denied, 544 Pa.
652, 676 A.2d 1194 (1996)]. Mandamus may only be granted where there is a
clear legal right in the plaintiff, a corresponding duty in the defendant, and a
lack of any other appropriate and adequate remedy. Bell Atlantic Mobile [Syss.],
Inc.[, 661 A.2d at 911]; M & W [Corp.] v. Upper Chichester [Twp.], 651 A.2d
630[, 632] (Pa. [Commw. Ct.] 1994). The purpose of mandamus is not to
establish legal rights but only to enforce those legal rights that have already
been established.
Orange Stones Co. v. City of Reading, Zoning Hearing Bd., 32 A.3d 287, 290 (Pa. Commw.
Ct. 2011).
This cause of action fails for a host of reasons. First, it is not clear this Court even has
“the authority to grant the relief [Plaintiffs] seek[].” Glen Riddle Station, L.P., 2021 WL
1141964, at *7. Federal courts have declined, on Erie doctrine grounds, to “issue a state law
mandamus prescribing how a state or local agency must interpret and enforce its own
regulations.” Id. at *5–7.31 Second, even if this Court had such authority, mandamus is proper
31 As the Eastern District of Pennsylvania explained, because a “state court issues [a] mandamus
order as a procedural remedy pursuant to common law,” mandamus relief is not properly granted by federal
courts. Glen Riddle Station, L.P., 2021 WL 1141964, at *6; see also 52 Am. Jur. 2d Mandamus § 7
(explaining that mandamus will not issue “from a federal court to a state . . . or its officers”).
only “[w]hen the legal right to the issuance of a building permit is clear.” Kirk v. Smay, 367
A.2d 760, 762 (Pa. Commw. Ct. 1976). “The right to a building permit is not clear, however,
where the applicant has not met all of the necessary requirements of a[n] . . . ordinance.” Id.
Plaintiffs have not demonstrated satisfaction of the requirements for permit issuance under
the UCC; to name one deficiency, they have not submitted construction documents as
required by 34 Pa. Code § 403.42a. The Dorrance Board’s issuance of a permit under such
circumstances would be neither a “ministerial act” nor a “mandatory duty.”
Therefore, the Court will grant Dorrance Defendants’ Motion with respect to
mandamus relief, and will accordingly grant the Motion in its entirety.
B. CII Defendants’ Motion for Summary Judgment32
CII Defendants also move for summary judgment on all claims against them. The Court
will incorporate the law and analysis stated supra by reference as relevant.
1. Substantive Due Process
In their Brief in Opposition to CII Defendants’ Motion, Plaintiffs make various
conclusory statements, unsupported by even a single citation to the Record, alleging that
Fenstermacher violated their substantive due process rights:
The Halchaks contend that Fenstermacher acted intentionally to forestall the
Halchaks from securing their occupancy permit. Fenstermacher, acting in
concert with the Defendants, Dorrance and Snelson, continued in a course of
32 As an initial matter, CII Defendants’ argument that they are immune under the Pennsylvania
Political Subdivision Tort Claims Act is without merit, as the Act does not provide government officers with
immunity from liability on federal claims. See Phillips v. Heydt, 197 F. Supp. 2d 207, 222 (E.D. Pa. 2002)
(citing 42 P.S. §§ 8541, et seq.). Because Plaintiffs assert federal due process claims against CII
Defendants, they are not immune from liability under this statute.
conduct that is arguably evidence of corruption and self-dealing. He shared an
office space with Snelson and was well aware of the ongoing adverse treatment
received by the Halchaks from Snelson. He disregarded each and every
responsibility to carry out his duties as the third-party agency for Dorrance for
the administration and enforcement of the PACC. Although acknowledging his
legal responsibilities to undertake an inspection, he intentionally misapplied
prior permit records. He never issued a grant of denial, even throughout the
time this matter has been in litigation and he remained code enforcement
official for Dorrance Township through sometime in 2018.
(Doc. 83 at 16–17.) Having already established that substantive due process rights protect
against only the “most egregious official conduct,” see supra at 30–31, the Court easily
concludes that Plaintiffs’ allegations are all either facially devoid of conduct that shocks the
conscience (e.g., the claim that Fenstermacher “never issued a grant or denial”), or
unsupported by the Record (e.g., the claim that he “continued in a course of conduct that is
arguably evidence of corruption and self-dealing”). The Record reflects that Fenstermacher
advised Plaintiffs in accordance with his interpretation of the UCC and presents no evidence
showing a triable dispute of material fact as to “corruption, self-dealing, intentional
interference with constitutionally protected activity, virtual ‘takings,’ or bias against an ethnic
group.” Button, 679 F. Appx at 154 (quoting Eichenlaub, 385 F.3d at 286). As with Plaintiffs’
substantive due process claim against Snelson, their dispute with Fenstermacher reflects
“matters of local concern” that “should not be transformed into substantive due process claims
based only on allegations that government officials acted with ‘improper’ motives.” United
Artists Theatre Circuit, 316 F.3d at 402.
The Court will grant CII Defendants’ Motion with respect to Plaintiffs’ substantive due
process claim.
2. Procedural Due Process
Plaintiffs also contend that CII Defendants violated their procedural due process rights
by “fail[ing] to act on the Halchaks application” for an occupancy permit. (Doc. 77 at 14.)
Plaintiffs argue,
Although the federal courts have generally recognized that the scheme of
appeals in Pennsylvania is constitutional, all of the decisions rest upon the
existence of a decision by the administrative agency. In the Halchaks case,
there has never been a decision to trigger an appeal. The absence of the
decision effectively blocks the Halchaks from protecting their procedural due
process rights. The non existence [sic] of a decision distinguishes the Halchaks
[sic] case from the opinions which recognize that Pennsylvania has a
constitutional scheme in place for review. In essence, there was nothing for the
Halchaks to appeal and no basis upon which any review could be considered.
The Halchaks have never been afforded a basis to pursue an appeal.
Further, the failure to act on the Halchaks [sic] application is in direct violation
of the procedural protections established within the PACC.
(Id.) Indeed, this Court previously denied Dorrance and CII Defendants’ Motions to Dismiss,
rejecting a Report and Recommendation, (Doc. 35, “R&R”), and holding that Plaintiffs had
alleged a proper procedural due process claim in part because the pleadings demonstrated
that they had not received an appealable decision on their permit application. See Halchak v.
Dorrance Twp. Bd. of Supervisors, No. 3:18-CV-1285, 2019 WL 4795650, at *5 (M.D. Pa.
Sept. 30, 2019). This Court found it was “undisputed that Plaintiffs’ application for an
occupancy permit was never granted or denied.” Id. That fact distinguished this case from
those relied upon in the R&R because “in cases involving land-use decisions, a property
owner does not have a ripe, constitutional claim until the zoning authorities have had ‘an
opportunity to arrive at a final, definitive position regarding how they will apply the regulations
at issue to the particular land in question.’” Id. (quoting Sameric, 142 F.3d at 597).
While the parties agree that Plaintiffs’ permit application was never granted or denied,
(Doc. 78 at 10; Doc. 79 at 8), CII Defendants present several arguments in defense. 33 First,
CII Defendants contend that Plaintiffs “cannot establish a procedural due process violation
where judicial relief was available.” (CII Defendants’ Brief in Support, Doc. 78, at 20.) This
argument has merit. Courts have held that a petition for a writ of mandamus is “a vehicle to
challenge inaction on the part of municipal authorities,” including inaction in the form of “delay
from evaluation to the issuance of a permit,” and in cases where such relief is available,
procedural due process claims fail. LXR RS V, LLC v. Municipality of Norristown, No. 2:19-
CV-01397-JDW, 2019 WL 4930157, at *5 (E.D. Pa. Oct. 7, 2019); accord Mader v. Union
Twp., No. 2:20-CV-01138-CCW, 2022 WL 395052, at *7 (W.D. Pa. Feb. 9, 2022). As such,
33 The Court acknowledges CII Defendants’ argument that Ms. Halchak’s name is not listed on the
Construction Permit Application form, only Mr. Halchak’s, and therefore Ms. Halchak cannot state a claim
with respect to this application. However, the Court finds this detail insignificant as Ms. Halchak’s name
appears on previous applications related to the Property. Moreover, Fenstermacher had conversations with
both Plaintiffs with respect to this application and does not appear to suggest that Ms. Halchak is
unassociated with the Property or the proposed business. This argument is therefore rejected.
the availability (and actual pursuit) of mandamus relief in state court defeats Plaintiffs’
procedural due process claim.34
Even if mandamus relief did not preclude a procedural due process claim, CII
Defendants contend that Plaintiffs “did not complete the permit application according to the
UCC requirements and [are] not entitled to relief from [their] incomplete application.” (Id. at
9.)35 In other words, they argue Plaintiffs were not owed a grant or denial of their application,
nor any subsequent remedial procedures, because they never submitted a complete
application in the first place. Because it is clear that a permit application was required to be
submitted with professionally-drawn construction documents and could not properly be
considered without those documents, the Court agrees.
As the court in Flanders v. Ford City Borough Council explained, a building permit
“application must be presented in the approved format, which, inter alia, requires construction
documents prepared by a licensed architect or licensed professional engineer, showing the
location, nature and extent of the work proposed and how the project conforms to the Uniform
Construction Code[.]” 986 A.2d 964, 970 (Pa. Commw. Ct. 2009) (citing 34 Pa. Code §
403.42a(a), (b),(c) and (e)).
34 That Plaintiffs have not demonstrated a “clear legal right” to an occupancy permit in the present
litigation, see supra at 41, is immaterial. What matters is that Plaintiffs had a state judicial remedy available
to them.
35 CII Defendants also contend they did act on Plaintiffs’ permit application “when they informed Mr.
Halchak his application required construction documents prepared by a licensed professional,” and that
action was appealable. (Doc. 78 at 10.) The Court does not reach this argument because it finds that
Plaintiffs’ incomplete application does not entitle them to a decision or any other appealable action.
Plaintiffs were repeatedly informed that their “application required construction
documents prepared by a licensed professional,” but they declined to submit said documents.
Plaintiffs argue 34 Pa. Code § 403.42a does not apply to their permit application, and
therefore their permit application does not require construction documents, because these
provisions only govern applications to “construct, . . . alter, . . . or change the occupancy of a
commercial building, structure and facility,” none of which Plaintiffs intend to do. (Plaintiffs’
Reply to CII Defendants’ Brief in Opposition to their Motion, Doc. 89 at 8.) Plaintiffs contend
they “simply want to open a used car sales business in an existing structure without any
change or modification.” (Id.) Plaintiffs explain, “The subject property and structure were
approved for used car sales by Dorrance since at least 1978. There is no evidence of any
other use of the property. The Halchaks contend this represents a continuous approved use.”
(Id. at 10.) In other words, Plaintiffs apparently suggest that the Property has been
“continuous[ly]” used as a used car dealership, so opening a car dealership would not
constitute a “change of use,” and therefore CII and Fenstermacher were wrong to require
them to comply with the applicable building codes (i.e., to install a bathroom), and as such,
they properly submitted their occupancy permit application without professional construction
documents.
But Plaintiffs provide no evidence to substantiate this series of conclusions, and the
law is clear with respect to (1) the need for an occupancy permit, and (2) the requirements
that must be met before an occupancy permit can be issued, including the submission of
professional construction documents. Notwithstanding Plaintiffs’ adamant assertions to the
contrary, the record evidence is undisputed that Plaintiffs’ proposed use would involve a
change of occupancy.
The IBC defines “change of occupancy” as a “change in the purpose or level of activity
within a building that involves a change in application of the requirements of this code.” IBC
§ 202. While Plaintiffs have represented otherwise in their Briefs,36 Mr. Halchak testified
unequivocally that “there wasn’t a business operating on the property” when Plaintiffs
purchased it in November 2009, and that Plaintiffs planned to “operate a business on the
property.” (3/13/20 A. Halchak Dep. Tr. at 128:10–25.) It follows that Plaintiffs were proposing
to change “purpose or level of activity” within the structure on the Property from vacant, or at
least not operating a business, to operating a business.
Plaintiffs argue that the Property should be treated as a “building previously occupied”
under the IEBC, and their proposed use should not trigger any construction requirements,
because of the Kamionkas’ past use. See IEBC § 101.4.2 (”The legal occupancy of any
building existing on the date of adoption of this code shall be permitted to continue without
change, except as is specifically covered in this code, . . . or as is deemed necessary by the
36 For example, Plaintiffs contend without support, “[T]he evidence in this case establishes the
structure was fully certified and in use for used car sales since at least 1978 with all approvals required to
conduct business in the subject property,” (Doc. 89 at 8); and, “There is no evidence of any other use of the
property. The Halchaks contend this represents a continuous approved use,” (id. at 10); and, “The record
clearly establishes the prior use of the structure since at least 1978 as an office and garage for the sale of
used cars.” (Doc. 83 at 9.)
code official for the general safety and welfare of the occupants and the public.”) The Court
disagrees. First, this provision provides for “legal occupancy . . . to continue without change.”
Id. (emphasis added). If the current use of the Property were permitted to continue in this
case, it would continue to be vacant.
Even if the past use did not have to be continuous—put differently, if the fact that the
Property was long ago used for a similar purpose was sufficient, and it did not matter that the
past two owners of the Property have not operated any vehicle-related business on the
Property—Plaintiffs have failed to produce an occupancy permit indicating the Property was
ever approved to be a used car dealership. The most Plaintiffs have produced is a 1985
“Building/Development Permit Application” in which the Kamionkas sought to “reopen[] a]
garage business.” (See Doc. 65-14, Ex. N, at 6.) Plaintiffs do not point to an approved
occupancy permit demonstrating that said application, or any other application, resulted in a
determination that the “legal occupancy” of the Property permitted used car sales.
Finally, the IEBC expressly provides that a given use may continue except as “deemed
necessary by the code official for the general safety and welfare of the occupants and the
public code official.” IEBC § 101.4.2. Fenstermacher was therefore authorized to prohibit
Plaintiffs’ use, whatever it was, from continuing. Plaintiffs’ assertion that the Property should
be treated as a “building previously occupied” under the IEBC is without merit.
A change of use triggers the requirement that the building be “made to comply with
the requirements of this code for such division or group of occupancies,” IBC § 3408.1, before
an occupancy permit can be issued.37 IBC § 3408.2. IBC compliance required the installation
of a bathroom. IBC §§ 2901.1, 2902.1. Thus, while Plaintiffs complain that “no work or
improvements were planned or requested,” (Doc. 89 at 10), “work or improvements” were
required before Plaintiffs could obtain an occupancy permit, and professionally-drawn
construction documents were required to be submitted with their building permit application.
Plaintiffs’ unsubstantiated beliefs that these improvements were unnecessary do not
strengthen their legal position, and do not create any triable dispute of material fact.
Having established that there is no dispute of material fact that CII Defendants properly
required Plaintiffs to submit construction documents with their permit application, it is also
undisputed that Plaintiffs did not do so, despite having been notified of the requirement
several times.38 Indeed, Plaintiffs do not argue that they were not informed of the requirement.
After several discussions with Fenstermacher, they obtained an estimate for the cost to
37 Plaintiffs also challenge CII Defendants’ classification of their proposed business as a “motor
vehicle showroom.” (See Doc. 89 at 9.) However, Business Group B occupancies include any “use of a
building or structure, or a portion thereof, for office, professional or service-type transactions, including
storage of records and accounts.” IBC § 304.1. The very nature of the business Plaintiffs intended to open
would require the structure on the Property to serve as an office where “service-type transactions” to
effectuate the sale of a car are carried out. As such, their proposed business is properly classified as a
Business Group B occupancy.
38 Snelson told Plaintiffs they would need to install a bathroom on the property in order to obtain a
Certificate of Occupancy as early as December 2009. (3/13/20 A. Halchak Dep. Tr. at 93:16–94:13.) Ms.
Halchak’s notes from a meeting in January 2010 indicate they had been told by a code enforcement officer
that they “need to hire a licensed architect to draw up the plans required for a building permit pertaining to
accessibility.” (See K. Halchak 1/19/2010 Meeting Notes, Doc. 65-21, Ex. U at 2.)
Fenstermacher advised Plaintiffs on March 18, 2014, that in order to obtain a Certificate of
Occupancy, they would have to provide accessible bathroom facilities, (Doc. 65 at ¶ 91; 3/13/20 A. Halchak
Dep. Tr. at 159:2–11; 3/10/20 K. Fenstermacher Dep. Tr. at 72:8–24, 133:11–16), as well as professional
design drawings for those facilities. (3/13/20 A. Halchak Dep. Tr. at 160:1–9.) He reiterated the need for
bathroom facilities to Ms. Halchak on March 25, 2014. (3/10/20 K. Fenstermacher Dep. Tr. at 134:7–19.)
prepare the necessary drawings from an architect, yet declined to engage the services of the
architect. (3/13/20 A. Halchak Dep. Tr. at 161:19–162:16.)
With this background, the Court agrees with CII Defendants that Plaintiffs’ application
is properly characterized as “incomplete,” and therefore Plaintiffs were not entitled to a grant
or denial of their application. Section 403.42a of the UCC states,
(a) Applications for a permit required under § 403.42 (relating to permit
requirements and exemptions) shall be submitted to the building code official
in accordance with this section.
(b) A permit applicant shall submit an application to the building code official
and attach construction documents, including plans and specifications, and
information concerning special inspection and structural observation programs,
. . . and other data required by the building code official with the permit
application. The applicant shall submit three sets of documents when the
Department conducts the review.
(c) A licensed architect or licensed professional engineer shall prepare the
construction documents under the Architects Licensure Law (63 P. S. §§ 34.1-
-34.22), or the Engineer, Land Surveyor and Geologist Registration Law (63 P.
S. §§ 148--158.2). An unlicensed person may prepare design documents for
the remodeling or alteration of a building if there is no compensation and the
remodeling or alteration does not relate to additions to the building or changes
to the building's structure or means of egress.
. . .
(e) The permit applicant shall submit construction documents in a format
approved by the building code official. Construction documents shall be clear,
indicate the location, nature and extent of the work proposed, and show in detail
that the work will conform to the Uniform Construction Code.
34 Pa. Code § 403.42a. Once the application is submitted, the building code official is required
to “examine the construction documents and . . . determine whether the construction indicated
and described is in accordance with the [UCC] and other pertinent laws or ordinances,” and
to “stamp or place a notation on each page of the set of reviewed construction documents” to
indicate approval, and “clearly mark any required nondesign changes on the construction
documents.” Id. § 403.43(b), (c).
As these provisions illustrate, the code official’s consideration of the permit application
and his review of the required construction documents are one and the same—without
construction documents, the application is effectively unreviewable. At least one
Pennsylvania court has stated that absent a “written application that conform[s] to the
requirements of 34 Pa. Code § 403.42a, it can be urged that [plaintiff] did not have any appeal
rights.” Flanders v. Ford City Borough Council, 986 A.2d 964, 971 (Pa. Commw. Ct. 2009)
(emphasis added).39 Because Plaintiffs’ application did not comply with the requirements of
34 Pa. Code § 403.42a, the Court finds no dispute of material fact that it was incomplete and
did not trigger the requirement of a decision under § 403.43. Therefore, Fenstermacher’s
failure to grant or deny the application did not violate their procedural due process rights.
39 In Flanders, the Commonwealth Court of Pennsylvania considered the case of another plaintiff
who contested the construction document requirement due to its cost, and in which the Code Administrator
advised the plaintiff that his “permit application would not be considered complete until supported by
professionally prepared blueprints.” 986 A.2d at 971. The court noted that “[t]he appeal procedures in [the
UCC] presume that a permit application has actually been submitted to the building code official.” Id. The
plaintiff had submitted an “at best, an oral application” and had not submitted the required construction
documents. Id. The court suggested that the plaintiff may not have any appeal rights, but ultimately found
he was not denied due process because the code administrator’s written directive that he submit blueprints
with his permit application was an appealable action under 34 Pa. Code § 403.43(i). See id.
Plaintiffs had a procedural path forward: to submit an application with the attachments
required under the UCC, after which they would be owed a decision, and subsequently an
appeal. But absent a proper application in the first place, Plaintiffs can point to no deprivation
of their rights. The Court will grant CII Defendants’ Motion with respect to the procedural due
process claim. Plaintiffs’ motion with respect to CII Defendants is accordingly denied.
3. Mandamus Relief
Lastly, CII Defendants have demonstrated they are entitled to judgment as a matter of
law with respect to mandamus relief. The Court incorporates here its analysis of Dorrance
Defendants’ Motion with respect to mandamus. See supra at 39–41. Furthermore, CII has
established that it is undisputed that CII is no longer the third-party agency authorized to
administer and enforce the UCC on behalf of Dorrance Township. Without statutory and
contractual duties to act on Dorrance Township’s behalf, CII lacks legal authority to administer
occupancy permits and has no “corresponding duty” to do as much. See Orange Stones Co.,
32 A.3d at 290 (“Mandamus may only be granted where there is a clear legal right in the
plaintiff, a corresponding duty in the defendant, and a lack of any other appropriate and
adequate remedy.” (emphasis added)). Fenstermacher has the same defense.
Accordingly, the Court will grant CII Defendants’ Motion with respect to mandamus
relief, and will grant their Motion in its entirety.
C. Plaintiffs’ Motion for Partial Summary Judgment
As established supra, the Court will grant the Motions of Dorrance Defendants and CII
Defendants with respect to Plaintiffs’ procedural due process claims against them because
there are no disputes of material fact and Defendants are thus entitled to summary judgment
as a matter of law. This same absence of any dispute of material fact requires that Plaintiffs’
Motion for Partial Summary Judgment be denied. Accordingly, the Court denies Plaintiffs’
Motion in its entirety.
V. CONCLUSION
The Court will grant each defendant’s Motion for Summary Judgment in its entirety,
(Docs. 64, 71), and will deny Plaintiffs’ Partial Motion for Summary Judgment in its entirety.
(Doc. 66.)40 A separate order follows.
40 To the extent Plaintiffs sought to assert a separate claim for damages under 42 P.S. § 2503(7),
(see Doc. 2-1 Counts IV and V), that claim fails as a matter of law and will be dismissed. Section 2503(7)
provides that “attorneys’ fees may be awarded by the court where the commencement of an action is
‘arbitrary, vexatious or in bad faith,’ or where a party's conduct during an action is ‘dilatory, obdurate or
vexatious.’” Tax Matrix Techs., LLC v. Wegmans Food Markets, Inc., 154 F. Supp. 3d 157, 187 n.8 (E.D.
Pa. 2016) (quoting 42 P.S. § 2503). It is well-settled that “pre-litigation conduct is not covered by the
statute.” Id. (citing Cher–Rob, Inc. v. Art Monument Co., 406 Pa. Super. 330, 594 A.2d 362, 364 (1991)).
Because Plaintiffs have not alleged any bad faith or vexatious conduct on the part of Defendants pertaining
to the current litigation, this claim fails.
Plaintiffs’ claim under 42 P.S. § 8303 also fails. Section 8303 provides that “[a] person who is
adjudged in an action in the nature of mandamus to have failed or refused without lawful justification to
perform a duty required by law shall be liable in damages to the person aggrieved by such failure or
refusal.” As Plaintiffs’ mandamus claims fail, so too do their corresponding damages claims.