“A condition precedent is a fact or event that must exist or occur before there is a right to immediate performance, before there is a breach of contract duty.” (citing Cox v. Funk, 255 S.E.2d 600, 601 (N.C. Ct. App. 1979)
How later courts described this case
- “A condition precedent is a fact or event that must exist or occur before there is a right to immediate performance, before there is a breach of contract duty.” (citing Cox v. Funk, 255 S.E.2d 600, 601 (N.C. Ct. App. 1979)
- “A condition precedent is an event which must occur before a contractual right arises . . . .”
- “Parties can differ as to the interpretation of language without its being ambiguous[.]”
- “Agreements containing an unmet condition precedent are also unenforceable.” (citing Parker)
Written by the judges who cited it.
The opinion
UNITED STATES DISTRICT COURT
WESTERN DISTRICT OF NORTH CAROLINA
CHARLOTTE DIVISION
DOCKET NO. 3:19-cv-00157-GCM-DCK
RED APPLE DEVELOPMENT, LLC, )
)
Plaintiff, )
)
vs. )
) ORDER
RUFUS ROAD PARTNERS, LLC, )
)
Defendant. )
)
)
THIS MATTER is before the Court on Defendant’s Motion for Judgment as a Matter of
Law pursuant to Rule 50(b) of the Federal Rules of Civil Procedure. (Doc. No. 68). This motion
has been fully briefed by the parties and is ripe for disposition by the Court. For the reasons that
follow, the Court DENIES the motion.
I. Background
Plaintiff filed the instant suit alleging Defendant breached the terms in the parties’
Agreement for Purchase and Sale (“Agreement”), which was a land purchase contract between the
parties. This case was tried before a jury, who returned a verdict in favor of Plaintiff finding
Defendant breached the Agreement by failing to close on the transaction and therefore owed
Plaintiff $200,000 in damages. Defendant now seeks judgment as a matter of law and argues the
jury lacked a legally sufficient evidentiary basis to find a breach because Plaintiff failed to comply
with the condition precedent required by the Agreement.
During trial, the parties stipulated to several facts. On September 10, 2018, the parties
entered into the Agreement, wherein Defendant agreed to sell to Plaintiff a parcel of real property
1
located in Lincoln County, North Carolina, for a purchase price of $1,133,000. September 10,
2018, also served as the Agreement’s “Effective Date” and start of the 90-day “Due Diligence
Period,” as those terms are defined in the Agreement. In terms of setting forth the parties’
obligations, the Agreement provides in relevant part:
2. Time for Acceptance and Effective Date. The "Effective Date" of this
Agreement shall be the date on which the last of the Seller and Buyer has executed
this Agreement and each executing party on the day of execution sends the other
party an electronic copy of the executed and witnessed signature page. The
"Closing Date" (as defined by Paragraph 8 of this Agreement), shall be the time at
which all terms of this Agreement are considered fully performed or waived, if
applicable, as they pertain to the Property, subject to any of the terms which are
intended to survive the Closing hereof. The use of the terms "Closing" and "Closing
Date" when used in this Agreement can be used interchangeably, and each use of
those terms shall be construed to address the Closing and/or the Closing Date, as
appropriate.
. . . .
4. Purchase Price and Terms of Payment.
(i) The purchase price of the Property (the "Purchase Price")is One Million
One Hundred Thirty-Three Thousand and 00/100 Dollars ($1,133,000.00).
(ii) Within five (5) days of the Effective Date, Buyer shall deposit the sum
of Fifty Thousand and 00/1 00 Dollars ($50,000.00) (hereinafter "Initial
Deposit")with Tripp Scott, P.A._("Escrow Agent").The Initial Deposit shall be
remitted to the Escrow Agent by cashier's check (subject to clearance) or wire
transfer of immediately available federal funds. The Initial Deposit shall be held by
the Escrow Agent in an interest-bearing escrow account. Should Buyer deliver
timely notice of its intention to terminate the Agreement, Seller agrees Initial
Deposit shall be immediately returned to Buyer and the Agreement shall be
terminated. The Additional Deposit shall immediately be nonrefundable, except in
the event of a Seller default. The Initial Deposit and Additional Deposit (if paid)
shall be applied to the Purchase Price at closing.
(iii) In the event Buyer does not terminate this Agreement during the Due
Diligence Period, as hereinafter defined, Buyer shall, no later than three (3) days
after the expiration of the Due Diligence Period, deliver wired funds to the Escrow
Agent in the amount of Two Hundred Thousand and 00/100 Dollars ($200,000)
(the "Additional Deposit"), which, when deposited, shall be referred, collectively
2
with the Initial Deposit, as the "Deposit"). The timely delivery of the Additional
Deposit is a condition precedent to Seller's obligations under this Agreement. If
Buyer fails to timely deliver the Additional Deposit as provided herein, Seller may
terminate this Agreement by giving Buyer notice of termination at any time prior
to payment of the Additional Deposit and the Escrow Agent shall immediately
deliver the Initial Deposit to Buyer and thereafter neither party will have any further
rights or obligations under this Agreement except as set forth to the contrary in this
Agreement.
(iv) At the Closing, Buyer shall pay the balance of the Purchase Price in
excess of the Deposit to the Seller for the Property, subject to prorations and
adjustments stated elsewhere in this Agreement, by wire transfer of immediately
available federal funds made available to Seller at or prior to closing.
. . . .
10. Place of Closing. Closing shall be by mail or overnight delivery of Closing
Documents to the Escrow Agent with a wire transfer of the Purchase Price, subject
to adjustment as set forth in Section 4.
11. Closing Date. The consummation of this transaction ("Closing") the earlier
of 1) ten (10) days after Buyer provides Seller written notice of its intent to close,
or 2) thirty (30) days after the expiration of the Due Diligence Period.
. . . .
20. Default.
(i) In the event of a failure by Buyer or Seller to perform any obligation or
covenant which either of them is obligated to perform under this Agreement, except
for the failure to close in accordance with the terms of this Agreement, which failure
shall constitute an immediate default hereunder, no default shall occur until notice
thereof is given to the defaulting party by the other party hereto asserting an event
of default has occurred, describing the nature of the default, and giving a period of
five (5) days to cure the default, if readily curable by the payment of money, or a
period of twenty (20) days to cure the default, if not readily curable by the payment
of money. If after notice and the cure period provided in the preceding sentence,
Buyer is in default, then the Deposit shall be paid to and retained by and for the
account of Seller, with any interest accrued, as agreed and liquidated damages and
in full settlement of any claims whatsoever, and this Agreement shall terminate and
be of no further force or effect. If Seller fails to perform any of its covenants set
forth in this Agreement or fails to properly convey the Property when obligated to
do so in accordance with the terms hereof, Buyer shall be entitled to (i) seek specific
performance of this Agreement which the parties acknowledge is an appropriate
3
remedy and may be granted by a Court of competent jurisdiction, or, at Buyer's
option, to receive the return of the Deposit, with any interest accrued.
(ii) In the event that litigation ensues as to the parties' rights and obligations
under this Agreement or in the enforcement of this Agreement, the prevailing party
shall be entitled to recover from the non-prevailing party all reasonable costs and
attorney's fees at the trial level and all levels of appeal.
(Doc. No. 2, pp. 1, 2, 5, 11; Plaintiff’s Trial Ex. 1).1
The parties do not dispute that Plaintiff delivered the Initial Deposit to the Escrow Agent
within five days of the Effective Date. In November 2018, prior to the expiration of the Due
Diligence Period and prior to the Additional Deposit being due under the Agreement, Defendant
inquired as to whether the Escrow Agent was holding both the Initial Deposit and the Additional
Deposit. The Escrow Agent responded it held only the $50,000 Initial Deposit. On December 6,
2018, the Escrow Agent sent a letter to Defendant stating that Plaintiff intended to close on the
transaction on December 16, 2018, which was a Sunday. In the interim, the Due Diligence Period
ended on December 10, 2018. The parties stipulated Plaintiff did not terminate the Agreement
during the Due Diligence Period. No evidence at trial indicated Plaintiff provided the Escrow
Agent with the Additional Deposit within three days after the Due Diligence Period ended. The
parties stipulated, however, that Plaintiff was ready, willing, and able to close the transaction on
December 16, 2018, and on the next business day, December 17, 2018. The parties did not close
the transaction on either of those two dates.
On January 16, 2019, Defendant sent a letter to Plaintiff indicating Defendant was
terminating the Agreement because Defendant “had not received confirmation that the Additional
1 Plaintiff provided a copy of the Agreement as an Exhibit to the Complaint and admitted it as evidence at trial. The
Court hereinafter refers to specific provisions in the Agreement by paragraph and/or section number for ease of
reference.
4
Deposit was timely made.” (Plaintiff’s Trial Ex. 11, p. 1). The parties stipulated that on that same
day—January 16, 2019—Defendant “did not know with certainty” whether Plaintiff had delivered
the Additional Deposit to the Escrow Agent. On January 18, 2019, Plaintiff wired the Additional
Deposit to the Escrow Agent, informed Defendant of doing so, and indicated to Defendant that it
contested Defendant’s termination of the Agreement. The parties stipulated that on January 28,
2019, Plaintiff was ready, willing, and able to close the transaction. The parties did not close the
transaction, and this suit followed.
During trial, Plaintiff presented evidence and argued Defendant breached the Agreement
by failing to close on the transaction in December 2018 and again in January 2019, after Plaintiff
received notice of and cured its failure to make the Additional Deposit. Defendant also presented
evidence and argued it was not required to close in December 2018 because the Additional Deposit
had not been made within three days of the expiration of the Due Diligence Period and it was not
required to close in January 2019 because the Agreement’s terms allowed Defendant to terminate
the Agreement prior to Plaintiff making the Additional Deposit. The jury sided with Plaintiff,
finding that Defendant breached the Agreement by failing to close and awarding Plaintiff damages
in the amount of $200,000. (Doc. No. 65). Defendant contends it is entitled to judgment as a
matter of law on Plaintiff’s sole claim for breach of contract.
II. Standard of Review
Judgment as a matter of law is appropriate where “there is no legally sufficient
evidentiary basis for a reasonable jury to find for that party on the issue.” Fed. R. Civ. P. 50(a).
Pursuant to Rule 50(a) of the Federal Rules of Civil Procedure, a party may move for judgment as
a matter of law before the case is submitted to the jury. If the court denies the motion made under
5
Rule 50(a), Rule 50(b) allows the party to renew its motion for judgment as a matter of law after
a jury verdict has been returned. Belk, Inc. v. Meyer Corp., 679 F.3d 146, 156 (4th Cir. 2012).
“When a jury verdict has been returned, judgment as a matter of law may be granted only if,
viewing the evidence in a light most favorable to the non-moving party (and in support of the jury's
verdict) and drawing every legitimate inference in that party's favor, the only conclusion a
reasonable jury could have reached is one in favor of the moving party.” Drummond Coal Sales,
Inc. v. Norfolk S. Ry. Co., 3 F.4th 605, 610 (4th Cir. 2021) (quoting Int’l Ground Transp. v. Mayor
& City Council of Ocean City, MD, 475 F.3d 214, 218–19 (4th Cir. 2007)). A renewed motion
for judgment as a matter of law is properly granted “if the nonmoving party failed to make a
showing on an essential element of his case with respect to which he had the burden of proof.”
Wheatley v. Wicomico Cnty., Md., 390 F.3d 328, 332 (4th Cir. 2004) (citing Singer v. Dungan,
45 F.3d 823, 827 (4th Cir. 1995)).
Turning to the law applicable to the breach of contract claim at issue here, North Carolina
law undisputedly governs. See Republic Indus., Inc. v. Atl. Veneer Corp., 166 F.3d 1210 (4th Cir.
1999) (“In North Carolina, as in most other states, parties to a contract may agree in advance as to
the choice of law that will govern any disputes that arise between them.” (collecting cases)). In
North Carolina, “[t]he elements of a claim for breach of contract are (1) existence of a valid
contract and (2) breach of the terms of that contract.” Poor v. Hill, 530 S.E.2d 838, 843 (N.C. Ct.
App. 2000); see also Wells Fargo Ins. Servs. USA, Inc. v. Link, 827 S.E.2d 458, 472 (N.C. 2019)
(per curiam). If either party to a bilateral contract commits a material breach of the contract, “the
non-breaching party is excused from the obligation to perform further.” McClure Lumber Co. v.
Helmsman Const., Inc., 585 S.E.2d 234, 239 (N.C. Ct. App. 2003). A material breach is one
6
“going to the very heart of the instrument[.]” Wilson v. Wilson, 134 S.E.2d 240, 242 (N.C. 1964).
“Whether a breach is material or immaterial is ordinarily a question of fact.” McClure Lumber
Co., 585 S.E.2d at 239.
Additionally, under North Carolina law, it is well settled that a party to any agreement “is
required to act in good faith and to make reasonable efforts to perform his obligations under the
agreement.” Maglione v. Aegis Family Health Centers, 607 S.E.2d 286, 291 (N.C. Ct. App. 2005)
(citation and internal quotation marks omitted). “This obligation means ‘neither party will do
anything to injure or destroy the right of the other party to receive the benefits of the agreement.
Violation of the duty of good faith and fair dealing constitutes a breach of contract.’” Drummond
Coal Sales, Inc., 3 F.4th at 611 (quoting 23 WILLISTON ON CONTRACTS § 63:22 (4th ed.
2021) (footnotes omitted)).
Bearing these principles in mind, the Court turns to Defendant’s arguments in support of
its motion. To prevail, Defendant must show that there could be no breach of the Agreement under
any reasonable theory. Drummond Coal Sales, Inc., 3 F.4th at 610–11 (citing Atlas Food Sys. &
Servs., Inc. v. Crane Nat'l Vendors, Inc., 99 F.3d 587, 599 (4th Cir. 1996) (“An appeals court is
abjured to determine whether a jury verdict can be sustained, on any reasonable theory.” (internal
quotation marks omitted)).
III. Analysis
The crux of this case concerns whether Defendant breached a material term of the
Agreement by failing to close in December 2018 and/or in January 2019. Defendant contends it
is entitled to judgment as a matter of law because Plaintiff did not: 1) fulfill the Additional Deposit
condition precedent, thereby relieving Defendant of any obligation under the Agreement, including
7
the obligation to close the transaction; or 2) pay the Additional Deposit before Defendant provided
notice of termination of the Agreement, which also relieved Defendant of the obligation to close
in January 2019. The parties seem to agree in part on the first argument: Plaintiff failed to pay the
Additional Deposit prior to December 13, 2018; however, the parties dispute whether this was a
“condition precedent” as that term is used in North Carolina contract law and the impact of
Plaintiff’s failure to satisfy that “condition precedent” as it relates to Defendant’s failure to close.
As to the second argument, the parties dispute whether Plaintiff’s failure to pay the Additional
Deposit before Defendant provided notice of termination of the Agreement in January 2019 was
subject to the notice and cure provision, which—if inapplicable—would relieve Defendant of any
obligation to close in January 2019. The Court addresses each in turn.
A. Impact of the “Condition Precedent”
Under North Carolina law, “A condition precedent is an event which must occur before a
contractual right arises . . . [B]reach or non-occurrence of a condition prevents the promisee from
acquiring a right . . . but subjects him to no liability.” Carson v. Grassmann, 642 S.E.2d 537, 539
(N.C. Ct. App. 2007) (emphasis added); see also Powell v. City of Newton, 703 S.E.2d 723, 727
(N.C. 2010) (“A condition precedent is an event which must occur before a contractual right arises
. . . .”); Farmers Bank, Pilot Mountain v. Michael T. Brown Distribs., Inc., 298 S.E.2d 357, 362
(N.C. 1983). “A condition precedent foreshadows contractual rights. Terms of a condition
precedent often contain words such as ‘when, after, as soon as and the like [which] give clear
indication that a promise is not to be performed except upon the happening of the stated event.’ In
other words, a contract does not become enforceable until such condition is satisfied.” In re
Kirkbride, 409 B.R. 354, 357 (Bankr. E.D.N.C. 2009) (quoting Williams v. P.S. Investment Co.,
8
Inc., 401 S.E.2d 79 (1991)). “If negotiating parties impose a condition precedent on the
effectiveness of their agreement, no contract is formed until the condition is met.” Parker v.
Glosson, 641 S.E.2d 735, 737 (N.C. Ct. App. 2007) (emphasis added); see also TSC Rsch., LLC
v. Bayer Chemicals Corp., 552 F. Supp. 2d 534, 539 (M.D.N.C. 2008) (“Agreements containing
an unmet condition precedent are also unenforceable.” (citing Parker)); Mosely v. WAM, Inc., 606
S.E.2d 140, 144 (N.C. Ct. App. 2004) (“A condition precedent is a fact or event that must exist or
occur before there is a right to immediate performance, before there is a breach of contract duty.”
(citing Cox v. Funk, 255 S.E.2d 600, 601 (N.C. Ct. App. 1979)). North Carolina law also provides,
“Conditions precedent are not favored by the law. Thus, the provisions of a contract will not be
construed as conditions precedent in the absence of language clearly requiring such construction.”
Mosely, 606 S.E.2d at 144 (citing Craftique, Inc. v. Stevens & Co., Inc., 364 S.E.2d 129, 131 (N.C.
1988); In re Foreclosure of Goforth Props., Inc., 432 S.E.2d 855, 859 (N.C. 1993)).
Here, the Agreement includes the magic “condition precedent” language, but when
considered with the entirety of Section 4(iii), the use of this term is not dispositive. The second
sentence of Section 4(iii) explicitly states: “The timely delivery of the Additional Deposit is a
condition precedent to [Defendant’s] obligations under this Agreement.” (Emphasis added).
Under the terms of the Agreement, “timely delivery” required Plaintiff to make the Additional
Deposit three days after expiration of the Due Diligence Date, which the parties stipulated to be
December 10, 2018.2 The evidence showed Plaintiff did not provide the Additional Deposit on
December 13, 2018, instead depositing it with the Escrow Agent January 18, 2019, two days after
receiving a letter from Defendant providing notice of Defendant’s termination of the Agreement.
2 At trial, Plaintiff moved to withdraw this stipulation, and the Court denied that motion.
9
Defendant contends the Agreement’s “condition precedent” language “unequivocally” means that
Defendant “had no obligation to close the Agreement’s contemplated transaction” and “no further
obligations under the Agreement – including no obligation to give notice to cure.” (Doc. No. 81,
pp. 1, 2, 17). Importantly, however, the same paragraph provides, “If [Plaintiff] fails to timely
deliver the Additional Deposit as provided herein, [Defendant] may terminate the Agreement by
giving [Plaintiff] notice of termination at any time prior to payment of the Additional Deposit and
the Escrow Agent shall immediately deliver the Initial Deposit to Buyer and thereafter neither
party will have any further rights or obligations under this Agreement except as set forth the
contrary in this Agreement.” (Emphasis added).
This third sentence in Section 4(iii) construed alongside the “condition precedent” sentence
immediately preceding it makes the plain language of the Agreement, when read as a whole,
ambiguous. On one hand, the use of the “condition precedent” term tends to show the parties
intended the timely Additional Deposit to be required prior to Defendant having any obligations
under the Agreement. As Defendant contends, “No obligation means ‘no obligation.’” (Doc. No.
69, p. 17). In other words, without the occurrence of the event—timely delivery of the Additional
Deposit—Defendant argues it had no obligation whatsoever under the Agreement. The ambiguity,
however, comes with the sentence that follows, which explains Plaintiff’s and Defendant’s
obligations if the event—timely delivery of the Additional Deposit—does not occur. This sentence
suggests that untimely delivery did not per se render Defendant to be obligation-free. Indeed, a
plain reading of this sentence contemplates that Plaintiff could make an untimely delivery of the
Additional Deposit and Defendant would have all obligations under the Agreement. This stands
10
in stark contrast to Defendant’s interpretation above that Plaintiff’s failure to “timely deliver” the
Additional Deposit means Defendant has no obligation whatsoever.
Given the inconsistencies within this section of the Agreement, there is evidence in the trial
record to support both parties’ constructions of this ambiguous provision. Where an agreement is
ambiguous, interpretation of the contract is a matter for the jury. Dockery v. Quality Plastic Custom
Molding, Inc., 547 S.E.2d 850, 852 (N.C. Ct. App. 2001) (citing Dept. of Transportation v. Idol,
440 S.E.2d 863, 864 (N.C. Ct. App. 1994)); see also Simmons v. Waddell, 775 S.E.2d 661, 671
(N.C. Ct. App. 2015). In Dockery, the North Carolina Court of Appeals explained:
Ambiguity exists where the contract’s language is reasonably susceptible to either
of the interpretations asserted by the parties. Glover v. First Union National Bank,
428 S.E.2d 206, 209 (N.C. Ct. App. 1993). “The fact that a dispute has arisen as to
the parties’ interpretation of the contract is some indication that the language of the
contract is, at best, ambiguous.” St. Paul Fire & Marine Ins. Co. v. Freeman–White
Assoc., Inc., 366 S.E.2d 480, 484 (N.C. 1988).
547 S.E.2d at 852. Ambiguity exists in a contract’s terms “when either the meaning of words or
the effect of provisions is uncertain or capable of several reasonable interpretations.” Variety
Wholesalers, Inc. v. Salem Logistics Traffic Servs., LLC, 723 S.E.2d 744, 748 (N.C. 2012).
“Stated differently, a contract is ambiguous when the writing leaves it uncertain as to what the
agreement was.” Salvaggio v. New Breed Transfer Corp., 564 S.E.2d 641, 643 (N.C. Ct. App.
2002) (internal citation and quotation marks omitted). It is well-settled North Carolina law that “a
contract term or phrase is ambiguous if it is susceptible to two different interpretations. In other
words, for a term to be ambiguous, it must be ‘in the opinion of the court . . . fairly and reasonably
susceptible to either of the constructions for which the parties contend.’” Foodbuy, LLC v.
Gregory Packaging, Inc., 987 F.3d 102, 119 (4th Cir. 2021) (citing Woods v. Nationwide Mut. Ins.
Co., 246 S.E.2d 773, 777 (N.C. 1978); quoting Wachovia Bank & Tr. Co. v. Westchester Fire Ins.
11
Co., 172 S.E.2d 518, 522 (N.C. 1970); cf. Walton v. City of Raleigh, 467 S.E.2d 410, 412 (N.C.
1996) (“Parties can differ as to the interpretation of language without its being ambiguous[.]”)).
In order to resolve the ambiguity as to what effect the parties intended the timely payment
of the Additional Deposit to have on the parties’ obligations, the jury had to reconcile the
Agreement’s sentence that provides “timely delivery . . . is a condition precedent” with the
contrasting language in the next sentence explaining obligations for untimely delivery. The jury
could give full meaning to the “condition precedent” sentence in the Agreement’s Section 4(iii)
and conclude Defendant had no obligations under the Agreement unless the Additional Deposit
was made during the three-day time period. Alternatively, the jury could resolve the ambiguity to
contradict what Defendant contends was the intent of the parties and instead conclude failure to
make timely payment of the Additional Deposit meant the parties still had obligations under the
Agreement.
Based on the terms of the Agreement and evidence at trial, the jury could reasonably
resolve the ambiguity in Plaintiff’s favor. If the parties intended for delivery of the Additional
Deposit—either timely or untimely—to be a condition precedent, they could have omitted the
“timely” language in the sentence setting forth the condition. Alternatively, the parties could have
kept “timely” and deleted the entire sentence that followed it. These two sentences make
ambiguous what is typically unambiguous under North Carolina law, and the jury—in evaluating
the parties’ intent—could have reasonably concluded the parties’ intended the “condition
precedent” of “timely delivery” to not be required to trigger Defendant’s obligations under the
Agreement.
12
Furthermore, evidence at trial showed the parties continued to engage in discussions
regarding the property and the Agreement even after the deadline for “timely” making the
Additional Deposit. During this time period, Defendant did not inquire as to whether the
Additional Deposit had been made, despite the fact Defendant had asked this question to the
Escrow Agent prior to the deadline for doing so. Defendant conceded that at the time it provided
notice of termination, it “did not know with certainty” whether the Additional Deposit had been
made. This conduct also supports the reasonable conclusion that the parties did not intend “timely
delivery” of the Additional Deposit to void all of Defendant’s obligations in the Agreement.
Having concluded the jury could reasonably conclude the parties had obligations under the
Agreement notwithstanding Plaintiff’s failure to timely make the Additional Deposit, the issue
turns to whether the evidence supported a finding by the jury that Defendant breached the
Agreement by failing to close. The parties stipulated that Plaintiff provided written notice of intent
to close on December 16, 2018, and that Plaintiff was ready, willing, and able to close on that
date—a Sunday—and on the next business day. Defendant did not provide notice of termination
of the Agreement pursuant to Plaintiff’s failure to make a timely—or untimely—Additional
Deposit prior to the December closing date. Defendant did not close the transaction in December.
Accordingly, because evidence supports a conclusion that the parties did not intend the condition
precedent to be satisfied for any party to enforce the Agreement, and it is stipulated that no closing
occurred in December despite Plaintiff providing notice and being ready, willing, and able, the
jury could have reasonably concluded a breach of contract occurred by Defendant’s failure to close
in 2018. The Agreement expressly provides that “failure to close . . . shall constitute an immediate
default . . . .” Accordingly, the jury’s verdict must be upheld.
13
B. Impact of the “Default” Provision and Opportunity to Cure
Plaintiff contends that as an alternative basis to find Defendant breached the Agreement by
failing to close, the jury could have also found the parties intended for the Agreement’s Default
section in paragraph 20(i)—and specifically the “notice and cure” provision contained within that
paragraph—to apply to Plaintiff’s failure to deliver the Additional Deposit after the due date for
timely delivery occurred. The Default section provides, in relevant part, “In the event of a failure
by [Plaintiff] or [Defendant] to perform any obligation or covenant which either of them is
obligated to perform under this Agreement . . . no default shall occur until notice thereof is given
to the defaulting party . . . and giving a period of five (5) days to cure the default, if readily curable
by money.” Here, it is undisputed that Defendant provided notice of termination on January 16,
2019, because it had “not received confirmation that the Additional Deposit was timely made.”
(Emphasis added). This suggests Defendant’s basis for termination relied solely on Plaintiff’s
failure to make the Additional Deposit by December 13, 2018. It is also undisputed that two days
later, on January 18, 2019, Plaintiff provided the Additional Deposit and informed Defendant of
the delivery. The parties stipulate that ten days later, on January 28, 2019, Plaintiff was ready,
willing, and able to close the transaction, and the parties did not close the transaction on that date.
Defendant contends no ambiguity exists because the Agreement clearly indicates the notice
and cure provision does not apply to any failure to make the Additional Deposit. Section 4(iii)’s
language allows Defendant to provide notice of termination “at any time” before payment of the
Additional Deposit. Defendant also points to the language requiring the Escrow Agent to
“immediately deliver the Initial Deposit” to Plaintiff and argues this indicates the instantaneous
impact of providing notice of termination for failure to make the Additional Deposit. The plain
14
language of this section, according to Defendant, conclusively establishes the parties intended for
Defendant to be able to terminate the Agreement “at any time” without being subject to an
opportunity to cure.
The ambiguity, however, arises when this sentence in Section 4(iii) is considered alongside
the Default provision in Section 20(i), which provides for an opportunity to cure “[i]n the event of
a failure by [Plaintiff] or [Defendant] to perform any obligation or covenant . . . except for the
failure to close . . . .” (Emphasis added.) The parties’ intent as to the applicability of this section
to the Additional Deposit requirement is unclear. The parties did not specific exclude the failure
to make the Additional Deposit in this provision, yet they specifically included “the failure to
close.” Moreover, Plaintiff presented testimony at trial tending to show the parties intended for
the opportunity to cure provision to apply to all obligations, including Plaintiff’s obligation to
make the Additional Deposit.
Defendant contends the delivery of the Additional Deposit is not an “obligation or
covenant” because it was, instead, a “condition precedent.” The Court has already explained that
the jury could have reasonably interpreted the Agreement to find the timely delivery of the
Additional Deposit was not intended to be a condition precedent as that term is used in North
Carolina law. The Agreement does not require only the “timely delivery” of the Additional Deposit
but also contemplates the untimely delivery as an alternative obligation that Plaintiff, as the buyer,
had under the Agreement. Accordingly, the Agreement is ambiguous as to the applicability of the
cure provision in Section 20(i) to Plaintiff’s default related to its “obligation” in making an
untimely delivery of the Additional Deposit.
15
Here, the jury could have resolved the ambiguity in Plaintiffs favor. The jury could
reasonably conclude the parties intended for the cure provision to apply, and the delivery of the
Additional Deposit within the five-day cure period after receiving Defendant’s notice to have cured
any default by Plaintiff under the Agreement. See LCA Dev., LLC v. WMS Mgmt. Grp., LLC,
789 S.E.2d 569, 2016 WL 3406519, at *2 (N.C. Ct. App. June 21, 2016) (unpublished table
decision) (“[T]he default could not be a material breach until after [the defendant] was given notice
and an opportunity to cure-were it otherwise, the cure provision in the contract would be
meaningless.”); see_also Moses H. Cone Mem’! Hosp. Operating Corp. v. Conifer Physician
Servs., Inc., No. 1:13CV651, 2017 WL 1378144, at *4 (M.D.N.C. Apr. 11, 2017) (‘North Carolina
law generally enforces valid notice and cure clauses in a contract.” (collecting cases)). Defendant’s
subsequent failure to close after Plaintiff made the Additional Deposit would support the jury’s
verdict that Defendant breached the Agreement. Thus, the jury’s verdict that Defendant breached
the Agreement by failing to close must be upheld.
IV. Conclusion
For these reasons, the jury had a legally sufficient basis to reach its verdict that Defendant
breached the Agreement by failing to close.
IT IS THEREFORE ORDERED that Defendant’s Motion for Judgment as a Matter of Law
(Doc. No. 68) is DENIED.
IT IS SO ORDERED.
Signed: February 24, 2022
Labo Lala
Graham C. Mullen ee
United States District Judge mt