Opinion

Nguyen v. Hartford Underwriters Insurance Company

Court
District Court, M.D. Louisiana
Filed
Jan 21, 2021
Cited by
0 cases
Authority
More cited than 22.5%

“Article III standing requires a plaintiff to show: (1) an injury in fact (2) that is fairly traceable to the actions of the defendant and (3) that likely will be redressed by a favorable decision.” (quotation marks omitted)

How later courts described this case

  • “Article III standing requires a plaintiff to show: (1) an injury in fact (2) that is fairly traceable to the actions of the defendant and (3) that likely will be redressed by a favorable decision.” (quotation marks omitted)
  • explaining “that statutes that are in pari materia may be construed together, so that inconsistencies in one statute may be resolved by looking at another statute on the same subject.”
  • “The NFIP specifically allows a policyholder to sue a WYO insurer for breach of contract[.]” (citing 42 U.S.C. §§ 4053, 4072)

Written by the judges who cited it.

The opinion

UNITED STATES DISTRICT COURT

MIDDLE DISTRICT OF LOUISIANA

KATHLEEN NGUYEN CIVIL ACTION

VERSUS

HARTFORD UNDERWRITERS NO. 17-01351-BAJ-SDJ

INSURANCE COMPANY, ET AL.

RULING AND ORDER

Before the Court is Plaintiff’s Motion for Partial Summary Judgment

(Doc. 20). Defendant opposes the Motion (Doc. 27), and Plaintiff has submitted a

reply to Defendant’s opposition, (Doc. 29). On January 13, 2021, the parties presented

oral argument, after which the Court took the matter under advisement.

For the reasons stated herein, Plaintiff’s Motion is GRANTED.

I. RELEVANT BACKGROUND

A. Overview

This is a flood insurance dispute, one of many in this District flowing from the

historic Baton Rouge flood of August 2016. Defendant is an authorized insurer

participating in the National Flood Insurance Program’s (NFIP) Write-Your-Own

(WYO) Program. Plaintiff is the insured, having purchased a Standard Flood

Insurance Policy (SFIP) from Defendant in March 2017. At issue is whether

Defendant must pay to replace Plaintiff’s exterior wall sheathing after it contacted

floodwater.

Exterior sheathing is building material that is nailed or screwed to the exterior

frame of a house—essentially, the home’s external shell. It comes in different forms—

some more resistant to water damage than others—and rarely attracts attention

because typically it is covered from view with siding or some other exterior wall finish.

Here, however, sheathing takes centerstage due to a disagreement regarding

what proof of loss is required before a flood insurer must pay to replace it. Plaintiff

insists that the SFIP and applicable Federal Emergency Management Agency

(FEMA) guidelines establish that certain types of sheathing—including hers—are

irretrievably damaged upon proof of “mere contact with floodwater.” Defendant

responds that regardless of type, an insurer must only replace sheathing after the

insured proves “evidence of physical change,” which, in Defendant’s view, means

obvious and apparent damage attributable to floodwater. The question ultimately

boils down to contract interpretation, and whether the Court may reference the NFIP

Claims Manual—a FEMA publication expressly intended “to improve clarity of claims

guidance to WYOs … so that policyholders experience consistent and reliable service,”

(Doc. 20-4 at 9)—when determining the scope of coverage under the SFIP.

B. Summary Judgment Evidence

The facts are undisputed. Defendant issued Plaintiff a SFIP (No.

87042037882016) protecting Plaintiff’s home, with policy limits of $250,000 for

building coverage, subject to a $1,250 deductible. On August 16, 2016, during the

policy period, Plaintiff reported a loss to her home due to the historic floods that

devastated large swaths of East Baton Rouge Parish and surrounding parishes.

Defendant acknowledged Plaintiff’s claim and assigned it to an independent adjuster.

On August 20, 2016, the adjuster inspected and photographed Plaintiff’s

property, documenting that Plaintiff’s home was inundated with more than two feet

of floodwater for multiple days. At the time of the inspection, Plaintiff had already

begun removing interior baseboards, drywall, and insulation, including from the

perimeter walls, allowing the adjuster to observe and photograph Plaintiff’s exterior

sheathing. Notably, Plaintiff’s sheathing is “Class 1” fiberboard,1 which, according to

FEMA’s guidance, puts it among building materials that can only be “used in spaces

with conditions of complete dryness.” (Doc. 20-15 at 6, 9). According to FEMA, Class

1 fiberboard is “[n]ot resistant” to water or moisture of any kind, and expressly

“cannot survive the wetting and drying associated with floods.” (Id.).2 Nonetheless,

the adjustor’s report does not indicate any delamination, swelling, crumbling, or other

evidence of obvious and apparent physical damage to Plaintiff’s fiberboard sheathing.

Based on her inspection, the adjuster estimated the replacement cost value

(RCV) of damages to Plaintiff’s home at $113,289.63. On November 17, 2016,

Defendant reviewed and verified the adjuster’s report and approved payment in the

amount of $113,289.63. This initial payment did not include reimbursement for

sheathing.

On July 21, 2017, Plaintiff submitted a supplemental Proof of Loss seeking

payment of the $250,000 policy limit, supported by a 45-page, line-by-line estimate

showing a RCV of $289,016.02. Among Plaintiff’s line-items are six entries

1 The NFIP Claims Manual and FEMA Technical Bulletin 2 (“TB2”)—each of which will be

discussed more fully below—clarify that fiberboard comes in two classes: Class 1 and Class

2. (See Doc. 20-4 at 12; Doc. 20-15 at 6, 9).

2 In contrast, Class 2 fiberboard is slightly more versatile than Class 1 fiberboard due to its

external coating, and may be “used in predominately dry spaces that may be subject to

occasional water vapor and/or slight seepage.” (Doc. 20-15 at 6, 9). Still, however, Class 2

fiberboard also “cannot survive the wetting and drying associated with floods.” (Id.).

corresponding to removal and replacement of exterior sheathing, at a total cost of

$4,823.10. (See Doc. 27-13 at pp. 2, 39, 41). Plaintiff’s July 21 Proof of Loss did not

provide any additional evidence of physical damage to the exterior sheathing.

On September 3, 2017, Defendant denied Plaintiff’s claim for additional

payment, citing “no documentation to support any further payment.” (Doc. 20-13 at

p. 1). Defendant concedes that, to this day, it has never reimbursed Plaintiff for

sheathing, and Plaintiff has not made any repairs to the sheathing at issue. (Doc. 28

at ¶¶ 9-10).

C. Procedural History

On October 24, 2017, Plaintiff filed this action, alleging breach of contract

based on Defendant’s denial of her claim for payment of the policy limit. (Doc. 1).

On March 6, 2018, Defendant filed its Answer. Notably, among its Affirmative

Defenses, Defendant cites the NFIP Claims Manual and applicable FEMA guidance

bulletins multiple times. Defendant’s Answer states in no uncertain terms that the

Claims Manual “governs claim adjustment aspects of Plaintiff’s SFIP,” and that

Defendant “shall abide by” FEMA Bulletins:

FEMA BULLETINS: Per the Arrangement (Arts. I(5) and (6), II(A)(2)

and (G)), Foremost shall abide by written guidance published by FEMA.

See, https://nfip-iservice.com/nfip_docs.html.

…

FEMA ADJUSTER CLAIMS MANUAL: Foremost asserts that the

FEMA Adjuster Claims Manual, promulgated by FEMA under authority

of the U.S. Congress, governs claim adjustment aspects of Plaintiff’s

SFIP. See, https://www.fema.gov/media-library/assets/documents/2675.

(Doc. 11 at 17).

Additionally, Defendant’s Answer expressly concedes that these materials

must be read in pari materia with the SFIP:

The question of whether the Insured is entitled to additional sums under

the SFIP, and if so, how much, is strictly governed by the policy’s

Declarations Page, and all of the policy’s terms and conditions as

contained in the SFIP at 44 C.F.R. Pt. 61, App. A(1), in pari materia

with all applicable provisions of the Code of Federal Regulations, the

NFIA itself and FEMA’s regulations, Bulletins, and Claims Manual.

(Doc. 11 at 8).

On September 18, 2020, Plaintiff filed the instant Motion for Partial Summary

Judgment. (Doc. 20). Plaintiff’s Motion focuses solely on exterior sheathing and seeks

judgment on two issues: first, that she is entitled to reimbursement of the cost of

replacing her sheathing based exclusively upon proof that floodwater contacted the

sheathing; and second, that Defendant improperly denied her claim to additional

reimbursement based on her failure to submit proof of how she spent her initial

payment. As to each issue, Plaintiff argues that the SFIP is ambiguous, and that the

NFIP Claims Manual clears up the confusion, establishing that fiberboard sheathing

is compensable upon proof of “mere contact with floodwater,” (Doc. 20-2 at p. 15), and

that an insured “who has not completed repairs and is requesting additional payment

is not required to prove how they spent funds previously paid on the same claim.” (Id.

at p. 18).

Defendant objects, and disagrees with Plaintiff’s interpretation of the SFIP.

Initially, Defendant raises two procedural objections: first, that Plaintiff seeks an

impermissible “advisory opinion”; or, alternatively, that Plaintiff lacks standing to

compel Defendant to comply with the terms set forth in the Claims Manual. (Doc. 27

at pp. 4-9). Next, Defendant insists that even if the Court reaches the merits,

Plaintiff’s arguments fail because the SFIP unambiguously requires “evidence of

physical change” to Plaintiff’s sheathing before it is compensable—i.e., obvious and

apparent “physical damage.” (Id. at 23). Defendant asserts that Plaintiff has failed to

provide any such evidence, and therefore must lose. (Id. at 31).

The Court addresses the parties’ arguments below, beginning with

Defendant’s procedural objections.

II. LAW AND ANALYSIS

A. Procedural Objections

1. Plaintiff does not seek an advisory opinion

Off the top, Defendant insists that Plaintiff’s Motion should be denied as an

inappropriate demand for an advisory opinion. (Doc. 27 at pp. 4-6). In support,

Defendant cites cases where courts declined to resolve insurance disputes predicated

on assumptions or hypothetical future events.3 (Id.). Plaintiff responds that

Defendant’s authorities are easily distinguishable because the dispute here is not

hypothetical: “[Plaintiff’s] sheathing is damaged according to FEMA guidance, and

3 Specifically, Defendant cites two cases: Tribute Real Estate, LLC v. United Artist Theatre

Circuit, Inc., No. 10-cv-106-JJB, 2012 WL 1590042, at *1 (M.D. La. May 4, 2012), and

Paragon Asset Co. Ltd v. Gulf Copper & Mfg. Corp., No. 17-cv-00203, 2020 WL 1892953, at

*1 (S.D. Tex. Feb. 11, 2020). Tribute Real Estate rejected the plaintiff’s request for a judgment

interpreting an insurance policy based on a hypothetical future loss. 2012 WL 1590042, at *1

(declining to issue declaration that “in the event of a covered loss,” Defendant would be

obligated to make a claim under the insurance policy and to contribute the insurance

proceeds towards the cost of repairs). Paragon Asset Company rejected a limitation plaintiff’s

attempt to cap its liability based on an assumption that the damages at issue related to “scrap

assets” incapable of being repaired. 2020 WL 1892953, at *1. In each case, the court

determined that the plaintiff’s proposed relief amounted to an impermissible advisory

opinion.

whether … the NFIP Claims Manual applies to [her] claim for damaged sheathing is

ripe for consideration.” (Doc. 29 at p. 6).

To be sure, the Court lacks authority to “render an advisory opinion on

hypothetical or abstract facts.” Hodgson v. H. Morgan Daniel Seafoods, Inc., 433 F.2d

918, 920 (5th Cir. 1970). This rule “ensure[s] that federal courts determine specific

disputes between parties, rather than hypothetical legal questions, and in doing so,

conserve judicial resources.” Texas v. Travis Cty., 272 F. Supp. 3d 973, 980 (W.D. Tex.

2017) (citing Flast v. Cohen, 392 U.S. 83, 96-97 (1968)), aff'd, 910 F.3d 809 (5th Cir.

2018). Here, however, Plaintiff’s claim is plainly not hypothetical. The uncontroverted

facts establish that she is insured against flood damage according to the terms of the

SFIP issued by Defendant; her home was flooded in August 2016, during the policy

period; floodwater contacted Plaintiff’s exterior fiberboard sheathing but did not

cause observable damage; Defendant’s original November 17, 2016 payment did not

include reimbursement for sheathing; Plaintiff’s July 21, 2017 supplemental Proof of

Loss specifically requested reimbursement for sheathing (to the tune of $4,823.10);

and Defendant has subsequently denied Plaintiff’s request for additional payment

based on Plaintiff’s failure to show how she spent her prior payment.

The issue at hand is whether, based on these concrete facts, the SFIP allows

Plaintiff to recover the cost of her sheathing. Resolving this issue requires weighing

competing interpretations of the SFIP only, not consideration of any hypotheticals or

assumptions. On this record, the Court may not avoid its duty to decide the issue at

hand. See Comer v. Murphy Oil USA, 607 F.3d 1049, 1060–61 (5th Cir. 2010) (Dennis,

J., dissenting) (“Just as courts have an ‘absolute duty ... to hear and decide cases

within their jurisdiction,’ litigants have a corresponding due process right to have

their cases decided when they are properly before the federal courts.” (quoting United

States v. Will, 449 U.S. 200, 215 (1980)).4

2. Plaintiff has standing and does not seek to enforce FEMA’s

rights under the Arrangement

Next, Defendant asserts that Plaintiff lacks “standing” to pursue her summary

judgment motion, or, alternatively, lacks authority “to stand in FEMA’s shoes to

enforce provisions of the NFIP Claims Manual.” (Doc. 27 at p. 8). Defendant reasons

(1) its obligations as a WYO Program carrier—including its obligations to follow the

Claims Manual—are governed by its authorizing contract with FEMA (the

“Arrangement”); (2) Defendant and FEMA are the only parties to the Arrangement,

and the only parties capable of enforcing its obligations; and, therefore, (3) Plaintiff

cannot complain that Defendant has failed to reimburse the cost of her sheathing

according to the Claims Manual’s guidance. (Doc. 27 at 12-14). Plaintiff counters that

she is not attempting to enforce Defendant’s obligations under the Arrangement—

but merely seeks to recover losses attributable to Defendant’s alleged breach of the

SFIP—and that she references the Claims Manual and FEMA Bulletins because

4 Strangely, Defendant also contends that Plaintiff’s Motion amounts to “piecemeal

litigation.” (See Doc. 27 at p. 11). There is no plausible basis for this contention, and nothing

objectionable about Plaintiff’s request for judgment is featured here. Rule 56 expressly

permits Plaintiff to seek summary judgment on any “part” of her claim; Plaintiff’s Motion is

her first (and only) motion for summary judgment; and a judgment on the merits will

materially advance the litigation. See Louisiana CNI, L.L.C. v. Landmark Ins. Co., No. CV

06-112-JJB, 2007 WL 9706513, at *5 (M.D. La. July 31, 2007) (“Courts routinely enter partial

summary judgments.”).

these materials are intended to be read in conjunction with the SFIP when

determining compensable loss. (Doc. 29 at 7-8).

Here, again, Defendant’s objections miss the mark. First, Article III standing

is obviously satisfied when, as here, Plaintiff complains that she is owed additional

money under the SFIP, which Defendant has failed to pay due to an alleged breach,

and a favorable decision will redress Plaintiff’s alleged loss. See Cibolo Waste, Inc. v.

City of San Antonio, 718 F.3d 469, 473 (5th Cir. 2013) (“Article III standing requires

a plaintiff to show: (1) an injury in fact (2) that is fairly traceable to the actions of the

defendant and (3) that likely will be redressed by a favorable decision.” (quotation

marks omitted)).

Likewise, the Court is unpersuaded that Plaintiff is seeking to enforce FEMA’s

rights under the Arrangement simply because she references the Claims Manual in

support of her interpretation of the SFIP.5 Plaintiff’s complaint asserts just one claim:

5 Again, Defendant relies on inapposite authorities to support its argument that “Plaintiff is

asking the Court to create a ‘right of action’ to stand in FEMA’s shoes to enforce provisions

of the NFIP Claims Manual.” (Doc. 27 at 13). Defendant quotes extensively from Eodice v.

Selective Ins. Co. of Am., No. 08-cv-151, 2010 WL 11693193 (D.N.J. Feb. 8, 2010), where the

U.S. District Court for the District of New Jersey rejected the plaintiff’s attempt to pursue

an extra-contractual claim of “bad faith” based exclusively on the insurer’s conduct outside

the scope of its obligations under the SFIP. Id. at *6. Observing that the plaintiff failed to

provide any authority “for the proposition that an insured may bring an action for damages

premised solely on a WYO insurer's failure to adhere to the requirements of the Arrangement

that governs the relationship between FEMA and WYO insurers,” the Court refused “to infer

a private right of action for them to enforce the terms of the Arrangement against a WYO

insurer.” Id. (Notably, in Eodice, the plaintiff’s breach of contract claim failed at summary

judgment because Plaintiff did not satisfy the SFIP’s mandatory preconditions for filing suit.

No such impediment exists here).

Eodice, and Defendant’s additional authorities, stand for the basic proposition that

SFIP policy-holders generally may not pursue extra-contractual claims arising from a WYO

insurer’s handling of a flood claim under a SFIP. See id.; see also Psychiatric Sols., Inc. v. Fid.

Nat'l Prop. & Cas. Ins. Co., 652 F. App'x 122, 125 (3d Cir. 2016); Gunter v. Farmers Ins. Co.,

736 F.3d 768, 773 (8th Cir. 2013); Wright v. Allstate Ins. Co., 500 F.3d 390, 394 (5th Cir.

breach of the SFIP based on Defendant’s failure to pay “damages directly caused to

the Property by or from the Flood.” (Doc. 1 at ¶ 33). Plaintiff’s summary judgment

motion focuses on one part of that claim: Defendant’s failure to reimburse for

sheathing. Unquestionably, Plaintiff may pursue her breach of contract claim against

Defendant. Gunter v. Farmers Ins. Co., 736 F.3d 768, 773 (8th Cir. 2013) (“The NFIP

specifically allows a policyholder to sue a WYO insurer for breach of contract[.]”

(citing 42 U.S.C. §§ 4053, 4072)).

Further, it is entirely appropriate (indeed, mandatory) for Plaintiff to support

her interpretation of the SFIP with reference to the Claims Manual. FEMA’s

regulations dictate the terms and conditions of the SFIP, and the same regulations

incorporate the Claims Manual by reference. White Hall on MS River, LLC v.

Hartford Ins. Co. of the Midwest, No. 13-cv-218, 2015 WL 1540436, at *2 (S.D. Miss.

Apr. 7, 2015) (“The FEMA Claims Manual … is incorporated by reference into the

FEMA regulations.” (quoting Suopys v. Omaha Prop. & Cas., 404 F.3d 805, 811 (3d

Cir. 2005)). Thus, not surprisingly, Courts read the SFIP in pari materia with the

Claims Manual to resolve coverage disputes. E.g., Westmoreland v. Fid. Nat. Indem.

Ins. Co., No. 13-cv-564, 2015 WL 3456634, at *3 (M.D. La. May 29, 2015) (deGravelles,

J.) (reading the Claims Manual in pari materia with the SFIP to resolve scope of

2007); Scritchfield v. Mut. of Omaha Ins. Co., 341 F. Supp. 2d 675, 678 (E.D. Tex. 2004); Lopez

v. State Farm Gen. Ins. Co., No. 13-cv-6029, 2014 WL 3894647, at *5 (E.D. La. Aug. 8, 2014);

Fisher v. Beers, No. 13-cv-6632, 2014 WL 3497572, at *2 (E.D. La. July 14, 2014); Howell-

Douglas v. Fid. Nat. Indem. Ins. Co., 24 F. Supp. 3d 579, 580 (E.D. La. 2014); Dickerson v.

State Farm Fire & Cas. Co., No. 06-cv-5181, 2007 WL 1537631, at *2 (E.D. La. May 23, 2007).

A different situation altogether is presented here, where Plaintiff is pursuing a standard

breach of contract claim based on the obligations set forth in the SFIP.

coverage dispute); Davis v. Nationwide Mut. Fire Ins. Co., 811 F. Supp. 2d 1240, 1248

n.8 (E.D. Va. 2011) (referencing the Claims Manual to clarify the SFIP’s definition of

“Post–FIRM Building”).

Additionally, it is beyond strange to ignore the Claims Manual and relevant

FEMA Bulletins when, as here, the Defendant specifically invokes these materials as

affirmative defenses to Plaintiff’s claim to additional payment, stating that the Claims

Manual “governs claim adjustment aspects of Plaintiff’s SFIP,” that Defendant “shall

abide by” FEMA Bulletins, and that coverage under the SFIP is determined “by the

policy’s Declarations Page, and all of the policy’s terms and conditions as contained

in the SFIP … , in pari materia with all applicable provisions of the Code of Federal

Regulations, the NFIA itself and FEMA’s regulations, Bulletins, and Claims

Manual.” (Doc. 11 at 8, 17).6

B. Merits

To recall, Plaintiff seeks summary judgment on two issues: first, that she is

entitled to reimbursement of the cost of replacing her sheathing based exclusively

upon proof that floodwater contacted the sheathing; and second, that Defendant

6 At oral argument, the Court questioned Defendant regarding its obvious change of position

since filing its Answer. Counsel responded that Defendant’s positions were not contradictory

because Defendant did not anticipate this particular dispute when it filed its Answer. This

explanation is hardly convincing. Rather, it appears Defendant invokes the Claims Manual

and FEMA Bulletins when beneficial or convenient, but objects when Plaintiff does the same.

Defendant is reminded that in the law, as in life, “what is sauce for the goose is normally

sauce for the gander.” Heffernan v. City of Paterson, N.J., 136 S. Ct. 1412, 1418 (2016). Here,

the Court determines that the normal goose/gander rule applies, and that these materials

inform its analysis of Plaintiff’s claim to additional compensation, just as they would inform

the Court’s analysis of Defendant’s defenses against such a claim.

improperly denied her claim to additional reimbursement based on her failure to

submit proof of how she spent her initial payment.. Each issue requires an

interpretation of the SFIP.

1. Summary Judgment Standard

The Court may grant summary judgment only “if the movant shows that there

is no genuine dispute as to any material fact and the movant is entitled to judgment

as a matter of law.” Fed. R. Civ. P. 56(a). If the movant bears its burden of showing

that there is no genuine issue of fact, the nonmoving party “must do more than simply

show that there is some metaphysical doubt as to the material facts.” Matsushita

Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574, 586 (1986). In other words, the

nonmovant must identify “specific facts showing that there is a genuine issue for

trial,” id. (emphasis in original), and cannot meet its burden with “conclusory

allegations,” “unsubstantiated assertions,” or “by only a ‘scintilla’ of evidence.” Little

v. Liquid Air Corp., 37 F.3d 1069, 1075 (5th Cir. 1994). “Where the record taken as a

whole could not lead a rational trier of fact to find for the non-moving party, there is

no ‘genuine issue for trial.’” Matsushita Elec. Indus. Co., 475 U.S. at 587.

When ruling on motions for summary judgment, the Court views all inferences

drawn from the factual record in the light most favorable to the nonmoving party. Id.

2. Construction and Interpretation of the SFIP

The flood insurance policy at issue is a SFIP, administered pursuant to the

NFIP. The SFIP and all disputes arising from claims under it are governed by FEMA

flood insurance regulations and federal common law. 44 C.F.R. Pt. 61, App. A(1), Art.

IX. “The FEMA Claims Manual … is incorporated by reference into the FEMA

regulations.” White Hall on MS River, LLC, 2015 WL 1540436, at *2. When

addressing coverage disputes, the SFIP is read in pari materia with the FEMA

Claims Manual. Westmoreland, 2015 WL 3456634, at *3.

Additionally, the scope of coverage under the SFIP is subject to interpretation

by the Federal Insurance Administrator. 44 C.F.R. 61.4. And “FEMA's interpretation

of its own regulations is given ‘controlling weight unless it is plainly erroneous or

inconsistent with the regulation.’” Worthen v. Fid. Nat'l Prop. & Cas. Ins. Co., 463

Fed. Appx. 422, 426 (5th Cir. 2012) (quoting Stinson v. United States, 508 U.S. 36, 45

(1993) (internal citation and quotation omitted)). …

While federal common law governs, the Fifth Circuit has applied “general

principles of state insurance law” to aid the interpretation of the SFIP. These

principles include:

(1) if the language of a policy is clear and unambiguous, it is accorded

its natural meaning; (2) if the meaning of a policy provision is

susceptible to different constructions, the one most favorable to the

insured prevails; (3) insurance contracts are to be reasonably construed

in accordance with the objective and intent of the parties; (4) in

determining the most reasonable construction of contested provisions,

the court may draw from the provisions, the policy as a whole, and the

apparent objectives of the parties in entering the contract; and (5) in the

end, if the meaning of the policy terms remains unclear, the policy is

generally construed in the insured's favor to promote the policy's

objective of providing coverage.

Worthen, 463 Fed. Appx. at 425–26 (citing Hanover Bldg. Materials, Inc. v. Guiffrida,

748 F.2d 1011, 1013 (5th Cir. 1984)).

Finally, the Court is guided by “the requirement that a policy of insurance

issued pursuant to a federal program must be strictly construed and enforced.”

Monistere v. State Farm Fire & Cas. Co., 559 F.3d 390, 394 (5th Cir. 2009) (quotation

marks and alterations omitted).

Because insurance companies act as “fiscal agents” of the government

under the National Flood Insurance Program, all policy awards deplete

federally allocated funds. In re Estate of Lee, 812 F.2d 253, 256 (5th Cir.

1987). Therefore, “‘not even the temptations of a hard case’ will provide

a basis for ordering recovery contrary to the terms of a regulation, for to

do so would disregard ‘the duty of all courts to observe the conditions

defined by Congress for charging the public treasury.’” Forman v. Fed.

Emergency Mgmt. Agency, 138 F.3d 543, 545 (quoting Office of Pers.

Mgmt. v. Richmond, 496 U.S. 414, 420 (1990)).

Id.

3. Under the SFIP, Plaintiff’s sheathing was damaged upon

contact with floodwaters

The first issue is whether the SFIP allows Plaintiff to recover the cost of

replacing her sheathing based exclusively upon proof of mere contact with floodwater.

Answering this question requires an analysis of the SFIP’s scope of coverage

provisions, which may be found at Articles I (Agreement) and III (Property Covered),

and the SFIP’s definition of “direct physical loss by or from flood,” which may be found

at Article II (Definitions).

a. Disputed SFIP Provisions7

In relevant part, the disputed provisions read as follows:

SFIP Article I (Agreement):

We will pay you for direct physical loss by or from flood to your insured

property if you:

1. Have paid the correct premium;

2. Comply with all terms and conditions of this policy; and

7 The SFIP appears at Appendix A(1) to Title 44, Part 61 of the Code of Federal Regulations.

44 C.F.R. Pt. 61, App. A(1).

3. Have furnished accurate information and statements.

We have the right to review the information you give us at any time and

to revise your policy based on our review.

SFIP Article III (Property Covered):

We insure against direct physical loss by or from flood to:

1. The dwelling at the described location[.]

SFIP Article II (Definitions):

12. Direct Physical Loss By or From Flood. Loss or damage to insured

property, directly caused by a flood. There must be evidence of physical

changes to the property.

b. Arguments and analysis

The only dispute is what proof of loss is required before Defendant must

compensate Plaintiff for sheathing.8 Not surprisingly, the SFIP itself does not address

sheathing directly: it is written in general terms, and applicable to various forms of

real and personal property. By contrast, the Claims Manual addresses sheathing

expressly, providing specific guidance regarding whether and when an insurer must

pay for sheathing.

The first issue, then, is whether the Court may reference the Claims Manual,

and benefit from its guidance. Plaintiff argues that the Claims Manual is fair game

because the SFIP is ambiguous regarding what proof of loss is required for sheathing.

Defendant argues that the Claims Manual is off limits because the SFIP

unambiguously requires proof of obvious and apparent damage before an insurer is

8 The Parties agree that sheathing is a component of Plaintiff’s “dwelling,” and, as such, is

compensable, provided that Plaintiff has satisfied the SFIP’s prerequisite conditions for

payment. Further, Defendant concedes that Plaintiff has otherwise satisfied all prerequisite

conditions for payment.

required to pay for sheathing.

As an initial matter, the Court is not convinced it must find ambiguity in the

SFIP before referencing the Claims Manual. SFIP Article IX (What Law Governs)

provides, in relevant part, that claim-related disputes are governed by FEMA flood

insurance regulations. The Claims Manual is incorporated by reference into the

FEMA regulations, White Hall on MS River, LLC, 2015 WL 1540436, at *2, and,

therefore, carries the full force and effect of law, Batterton v. Francis, 432 U.S. 416,

425 n.9 (1977). On this basis, courts read the SFIP “in pari materia”9 with the Claims

Manual. E.g., Westmoreland, 2015 WL 3456634, at *3; Davis, 811 F. Supp. 2d at 1248

n.8. Strictly speaking, this analysis may occur absent an initial determination of

ambiguity in the SFIP. E.g., Westmoreland, 2015 WL 3456634, at *3 (construing the

SFIP in pari materia with the Claims manual without first determining that the SFIP

is ambiguous).

In any event, the SFIP’s definition of “Direct Physical Loss By or From Flood”

is ambiguous for purposes of this dispute. Critically, “Direct Physical Loss By or From

Flood Plaintiff” requires “evidence of physical changes to the property.” Yet, the SFIP

does not define, or otherwise elaborate on, the embedded term “physical changes.” In

Defendant’s view, “physical changes” means obvious and apparent damage—or

“proved damage”—to any given building component, including sheathing. (Doc. 27 at

9 The U.S. Supreme Court instructs that “all acts in pari materia are to be taken together, as

if they were one law.” United States v. Stewart, 311 U.S. 60, 64 (1940) (quoting United States

v. Freeman, 44 U.S. 556, 564 (1845)); see also BLACK'S LAW DICTIONARY (11th ed. 2019)

(explaining “that statutes that are in pari materia may be construed together, so that

inconsistencies in one statute may be resolved by looking at another statute on the same

subject.”).

31).10 But “physical changes” is not synonymous with obvious and apparent damage.

Indeed, plain English dictates that physical change occurs when something that was

once dry becomes wet. This interpretation, however, would create compensable

claims for all building materials that contact floodwater, even materials that

withstand inundation. To avoid this absurd (and costly) result, the Court looks to the

Claims Manual for clarification regarding whether and when sheathing is

compensable.

As noted by Plaintiff, the NFIP Claims Manual speaks directly to the point. In

relevant part, Claims Manual Section 30.2 provides guidance for “Determining

Coverage of Damage to Perimeter Wall Sheathing,” and states:

FEMA published Technical Bulletin 2- Flood Damage-Resistant

Materials Requirements for Buildings Located in Special Flood Hazard

10 Defendant argues throughout its opposition that Plaintiff’s proposed interpretation of the

SFIP, which would require only proof of contact with floodwater to recover for damaged

sheathing, is inconsistent with federal statutes authorizing the NFIP, specifically 42 U.S.C.

§§ 4019 and 4072. The Court pauses briefly to address this point.

In relevant part, Section 4019 states:

The Administrator is authorized to prescribe regulations establishing the

general method or methods by which proved and approved claims for losses

may be adjusted and paid for any damage to or loss of property which is covered

by flood insurance made available under the provisions of this chapter.

42 U.S.C. § 4019(a). In turn, Section 4072 states: “the Administrator shall be authorized to

adjust and make payment of any claims for proved and approved losses covered by flood

insurance.” 42 U.S.C. § 4072.

Based on these sections, Defendant insists that loss under the SFIP must necessarily

require proof of physical change, thus categorically prohibiting an insured from proving loss

based solely on proof of mere contact with floodwater. (See Doc. 27 at 18, 27, 30).

The Court cannot accept Defendant’s argument because there is simply no way to read

these Sections as Defendant proposes. Rather than creating a categorical rule requiring a

certain kind of proof to establish loss, these Sections specifically and permissively authorize

FEMA to implement regulations by which claims will be adjusted and paid for damaged

property. The Claims Manual is included among those regulations, White Hall on MS River,

2015 WL 1540436, at *2, and provides specific guidance for adjusting sheathing-related

claims.

Areas in Accordance with the New National Flood Insurance Program

(TB2) to provide communities enforcing their local floodplain

management requirements with guidance on which building materials

FEMA considers flood damage-resistant. Using TB2, FEMA has

developed the following guidance on the adjustment of claims

for perimeter wall sheathing.

A. Class 1 or 2 Sheathing

When Class 1 or 2 sheathing material is damaged directly by

contact with floodwaters, the material is not salvageable. It is not

necessary for a qualified professional, such as an engineer, to document

the flooded sheathing material’s condition. However, such professional

services may be appropriate to investigate possible exclusions or to

recommend methods of repair.

(Doc. 20-4 at 12 (emphasis added)).

In turn, FEMA’s Technical Bulletin 2 (TB2) explains that Class 1 and Class 2

fiberboard sheathing each “cannot survive the wetting and drying associated

with floods.” (Doc. 20-15 at 6 (emphasis added)).

Plaintiff’s sheathing is Class 1 fiberboard. Reading the SFIP in pari materia

with the NFIP Claims Manual, the Court concludes that compensable loss to Class 1

sheathing is established upon proof of “mere contact” with floodwater. Indeed, this is

the only logical interpretation.

First, this interpretation is consistent with the SFIP’s requirement that the

insured show “evidence of physical changes to the property” in order to establish flood

damage. Unavoidably, a change from dry to wet is a physical change.

Second, per the Claims Manual, compensable loss upon proof of “mere contact”

with floodwater is specifically limited to Class 1 and Class 2 building materials, thus

avoiding the absurd result that would follow from allowing recovery for any property

contacted by floodwater, regardless of its resistance to inundation.

Finally, Defendant’s contrary interpretation—that compensable loss to Class

1 sheathing requires proof of obvious and apparent damage—is completely at odds

with FEMA’s guidance. After all, if Class 1 building materials are “[n]ot resistant” to

water of any kind and “cannot survive the wetting and drying associated with floods,”

as stated in TB2,11 then, necessarily, Class 1 fiberboard sheathing “is damaged

directly by contact with floodwaters” and “is not salvageable,” as stated in the Claims

Manual. Again, the Claims Manual is incorporated among FEMA’s regulations, and

cannot be discarded simply because Defendant now finds its guidance inconvenient,

and beneficial to Plaintiff.

In sum, reading the SFIP in pari materia with the Claims Manual and TB2

establishes that Class 1 fiberboard sheathing is compensable upon proof that it came

into contact with floodwater. Here, the summary judgment evidence establishes that

Plaintiff’s home was inundated with more than two feet of floodwater for multiple

days, removing any doubt that floodwater contacted her sheathing. Thus, under the

SFIP, Plaintiff is entitled to reimbursement for her fiberboard sheathing, provided

she has otherwise satisfied the SFIP’s requirements for additional payment

(discussed below).

11 In another reversal, Defendant contends that the Court should disregard TB2 because the

Claims Manual does not state “that it is incorporating and/or adopting anything specifically

at all from TB2.” (Doc. 27 at 34). This argument is borderline specious, even putting aside

Defendant’s about-face. The Claims Manual expressly states that its “guidance on the

adjustment of claims for perimeter wall sheathing” was developed “[u]sing TB2.” (Doc. 20-4

at 12). Further, it is impossible to read the Claims Manual without reference to TB2 because

the Claim’s Manual’s guidance reflects that sheathing comes in five distinct classes, but does

not explain how these classes are determined. TB2 fills the gap. Clearly, FEMA intended the

Claims Manual to incorporate TB2.

4. Under the SFIP, Defendant improperly denied Plaintiff’s

request for additional reimbursement based on Plaintiff’s

failure to provide proof of how she spent the initial payment

The next issue is whether Defendant improperly denied Plaintiff’s claim to

additional reimbursement based on Plaintiff’s failure to submit proof of how she spent

her initial payment. Answering this question requires an analysis of the SFIP’s

Replacement Cost Loss Settlement Clause, which may be found at Article VII(V)(2).

a. Disputed SFIP Provision

The SFIP’s Replacement Cost Loss Settlement Clause states:

2. Replacement Cost Loss Settlement

The following loss settlement conditions apply to a single-family

dwelling described in V.1.a. above:

a. We will pay to repair or replace the damaged dwelling after

application of the deductible and without deduction for depreciation, but

not more than the least of the following amounts:

(1) The building limit of liability shown on your Declarations Page;

(2) The replacement cost of that part of the dwelling damaged, with

materials of like kind and quality and for like use; or

(3) The necessary amount actually spent to repair or replace the

damaged part of the dwelling for like use.

b. Arguments and analysis

Plaintiff asserts that the SFIP’s Replacement Cost Loss Settlement Clause is

ambiguous regarding whether an insured must prove how she spent her initial

payment before recovering a supplemental reimbursement for unrepaired items. And,

again, Plaintiff contends that the Claims Manual provides express guidance, stating

that an insured “who has not completed repairs and is requesting additional payment

is not required to prove how they spent funds previously paid on the same claim.”

(Doc. 20-4 at 15).

Defendant’s response is perfunctory, and difficult to discern. First, Defendant

asserts that “[t]he Court need not address this argument based on the numerous

genuine issues precluding summary judgment explained above.” (Doc. 27 at 37).

Obviously, this argument fails in light of the preceding analysis.

Next, Defendant contends that Plaintiff has not shown that her claim for

supplemental compensation was denied “because of a lack of incurred costs.” (Doc. 27

at 38). In the same breath, however, Defendant concedes that its September 3, 2017

denial letter demanded “copies of paid invoices, receipts, cancelled checks, credit card

receipts for actual incurred costs for repairs.” (Id. at 37-38). Defendant makes no

attempt to reconcile these contradictory statements.

Finally, and in any event, Defendant asserts that the Replacement Cost Loss

Settlement Clause is not ambiguous and allows Defendant to request proof of

incurred costs before paying additional reimbursements, reflecting the “general

insurance principle … that the policyholder is entitled to indemnity and cannot profit

from a loss.” (Doc. 27 at 39).

Here, again, the SFIP is ambiguous in the context of this dispute, though not

for the reasons stated in Plaintiff’s Motion. Quite simply, the SFIP’s Replacement

Cost Loss Settlement clause does not address this situation, where the insured has

received an initial payment, repaired her home with the proceeds, and seeks an

additional reimbursement for damaged items that have not been repaired.

And, again, reading the SFIP in pari materia with the Claims Manual clears

up the confusion. Section 43 of the Claims Manual is devoted entirely to “Requests

for Additional Payment.” (Doc. 20-4 at 15). Subsection 43.1 specifically addresses

“Handling of Requests for Additional Payment Prior to Repairs,” and states:

A policyholder who has not completed repairs and is requesting

additional payment is not required to prove how they spent

funds previously paid on the same claim. If a policyholder has

not completed the repair or replacement of items damaged by a

covered loss, NFIP insurers may not deny requests for

additional payment solely because the policyholder did not

provide evidence that all amounts previously paid on the claim,

plus the value of the deductible(s) and any applicable physical

depreciation, were spent to repair or replace covered flood

damage. NFIP insurers must evaluate such requests for additional

payments using the same methods, procedures, and requirements used

to evaluate the initial requests for payment.

(Id. (emphasis added)).

The Claims Manual removes any ambiguity regarding whether an insurer may

require proof of how a prior reimbursement was spent before providing an additional

payment to reimburse an unrepaired item: the insured “is not required to prove how

they spent funds previously paid on the same claim,” and the insurer “may not deny

requests for additional payment solely because the policyholder did not provide

evidence that all amounts previously paid on the claim … were spent to repair or

replace covered flood damage.”

All that remains is to apply this interpretation to the facts of the case. Here,

the summary judgment evidence establishes that Plaintiff’s fiberboard sheathing was

damaged by contact with floodwater, yet was not included among the items

reimbursed in Defendant’s initial November 2016 payment. Thereafter, in July 2017,

Plaintiff submitted a supplemental Proof of Loss, supported by a finely detailed, 45-

page line-item estimate that included costs corresponding to removal and

replacement of exterior sheathing. (See Doc. 27-13 at pp. 2, 39, 41). In September

2017, Defendant denied payment citing “no documentation to support any further

payment” (Doc. 20-13 at p. 1), and now admits that the basis of its denial was

Plaintiff’s failure to provide evidence of “actual incurred costs for repairs.” (Doc. 27 at

37-38). To this day, Defendant has not reimbursed Plaintiff for sheathing, and

Plaintiff has not made any repairs to her sheathing.

On this record, the Court concludes that Defendant improperly denied

Plaintiff’s claim for reimbursement of sheathing, in contradiction of its obligations

set forth in the SFIP and the Claims Manual. Here, again, Plaintiff is entitled to

judgment in her favor.

III. CONCLUSION

Having shown that there is no genuine dispute as to any material fact and that

Plaintiff is entitled to judgment as a matter of law,

IT IS ORDERED that Plaintiff’s Motion for Partial Summary Judgment (Doc.

20) is GRANTED, and that Plaintiff is entitled to recover from Defendant the

replacement cost value of her exterior sheathing.

Baton Rouge, Louisiana, this 21st day of January, 2021

_______________________________________

JUDGE BRIAN A. JACKSON

UNITED STATES DISTRICT COURT

MIDDLE DISTRICT OF LOUISIANA

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.